JPH04146885A - Constructing method for marine vessel - Google Patents
Constructing method for marine vesselInfo
- Publication number
- JPH04146885A JPH04146885A JP2271931A JP27193190A JPH04146885A JP H04146885 A JPH04146885 A JP H04146885A JP 2271931 A JP2271931 A JP 2271931A JP 27193190 A JP27193190 A JP 27193190A JP H04146885 A JPH04146885 A JP H04146885A
- Authority
- JP
- Japan
- Prior art keywords
- dock
- hull
- ship
- completed
- submerged
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 15
- 238000003032 molecular docking Methods 0.000 abstract 1
- 238000010276 construction Methods 0.000 description 5
- 239000013535 sea water Substances 0.000 description 5
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 4
- 238000007796 conventional method Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 239000003973 paint Substances 0.000 description 1
- 238000010422 painting Methods 0.000 description 1
- 238000004904 shortening Methods 0.000 description 1
- 230000007306 turnover Effects 0.000 description 1
Landscapes
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
Description
【発明の詳細な説明】 産業上の利用分野 この発明は、船舶の建造方法に関する。[Detailed description of the invention] Industrial applications The present invention relates to a method of building a ship.
従来の技術
従来、船舶は、通常、次の(a)および(b)のいずれ
かの方法によって建造されている。BACKGROUND OF THE INVENTION Conventionally, ships have been generally constructed using either of the following methods (a) and (b).
(a)1つのドックまたは船台で船殻部分を完成させ、
進水後、膳装工事および運転を含む残工事を施工して船
として完成させる。(a) completing the hull section in one dock or slipway;
After launching, the remaining work including fittings and operation will be completed to complete the ship.
(b)次の3つのいずれかの方法により、船を前後に分
割して建造する。(b) Build the ship by dividing it into front and rear parts using one of the following three methods:
船の船尾船体部分を完成させ、別の船台またはドックで
完成した船首船体部分とドック内で接合する。The completion of the stern hull section of a ship and its joining in the dock with the completed bow hull section on another slipway or dock.
船の船尾船体部分を完成させ、別の船台またはドックで
完成した船首船体部分と船尾船体建造ドック内で接合す
る。The completion of the stern hull section of a ship and its joining in the stern hull construction dock with the completed fore hull section on another slipway or dock.
船の船尾船体部分を完成させて、別のドックに移し、船
首部分を延長して、船として完成させる。The stern section of the ship will be completed, moved to another dock, and the bow section will be extended to complete the ship.
発明が解決しようとする課題
ところが、上記のような従来の方法には、次のような問
題がある。Problems to be Solved by the Invention However, the above conventional methods have the following problems.
上記(a)のように1つのドックまたは船台で船殻部分
を完成させる方法では、特定のドックまたは船台の占有
期間が長すぎるという問題がある。In the method of completing the hull portion at one dock or berth as in (a) above, there is a problem that the period of occupation of a particular dock or berth is too long.
上記(b)のように船を前後に分割して建造すると、前
後の分割箇所は海水に浸り、分割箇所のバイブには水が
入らないように養生しなければならない。また、船殻構
造で海水に浸った部分は、泥清掃しなければならない。If a ship is constructed by dividing into front and rear sections as in (b) above, the front and rear sections will be submerged in seawater, and the vibrator at the section will need to be cured to prevent water from entering. Additionally, parts of the hull structure that have been submerged in seawater must be cleaned of mud.
さらに、複数のドックまたは船台を使用するにもかかわ
らず、船底の盤木に当る部分は同じであり、盤木に当る
船底部分を塗装するには、船体が一体になったのちにも
う一度人渠させなければならない。Furthermore, even though multiple docks or berths are used, the part of the bottom of the ship that corresponds to the board is the same, and in order to paint the part of the bottom that corresponds to the board, it is necessary to redo the dock once the hull is integrated. I have to let it happen.
この発明の目的は、上記の問題をすべて解決した船舶の
建造方法を提供することにある。An object of the present invention is to provide a method of building a ship that solves all of the above problems.
課題を解決するための手段
この発明による船舶の建造方法は、第1のドックまたは
船台において、船尾部分に舵およびプロペラを搭載する
とともに、船体の少なくとも没水部を含む下方部分を完
成させ、この状態で船体を進水させて、第2のドックに
入渠させ、この第2のドックにおいて船体の残りの部分
を完成させることを特徴とするものである。Means for Solving the Problems A method of building a ship according to the present invention includes mounting a rudder and a propeller on the stern portion of the ship at a first dock or a slipway, and completing the lower portion of the ship including at least the submerged portion; The method is characterized in that the hull is launched in the same state and docked at a second dock, and the remaining portion of the hull is completed at the second dock.
作 用
第1のドックのように船体に舵およびプロペラなどを搭
載するためのドックにはこれに適した設備が装備されて
おり、このような特別な装備を持ったドックでの建造期
間はできるだけ短くしてドックの回転を上げるのが好ま
しい。船台についても同様である。この発明の方法では
、第1のドックまたは船台において、船尾部分に舵およ
びプロペラを搭載するとともに、船体の少なくとも没水
部を含む下方部分を完成させただけの状態で、船体を進
水させて第2のドックに入渠させるので、第1のドック
または船台の占有期間が短くなって、回転が上がる。Dock, like the first dock, is equipped with equipment suitable for mounting rudders, propellers, etc. on the ship's hull, and the construction period at a dock with such special equipment is as short as possible. It is preferable to shorten it and increase the rotation of the dock. The same applies to the boat platform. In the method of the present invention, the ship is launched at a first dock or a slipway with the rudder and propeller mounted on the stern part and with only the lower part of the ship, including at least the submerged part, completed. Since the ship is docked at the second dock, the period of occupancy of the first dock or berth is shortened, and the rotation rate is increased.
また、第1のドックまたは船台で建造した船体を進水さ
せるときには、船体の少なくとも没水部を含む下方部分
が完成しているので、従来のように分割箇所が海水に浸
るようなことがない。In addition, when launching a hull built at the first dock or slipway, at least the lower part of the hull, including the submerged part, is completed, so there is no need for the split points to be submerged in seawater as in the past. .
さらに第1のドックまたは船台において船体の下方部分
を完成してから第2のドックに移すので、第1のドック
または船台において盤木に接触していた船底部分を第2
のドックにおいては盤木に接触しないようにして、この
部分を容易に塗装することができる。Furthermore, since the lower part of the hull is completed at the first dock or slipway and then transferred to the second dock, the bottom part that was in contact with the board at the first dock or slipway is moved to the second dock.
In the dock, this part can be easily painted without touching the board.
実施例
第1図〜第3図は、この発明による船舶の建造方法の1
実施例を工程順に示している。Embodiment FIGS. 1 to 3 show a method of building a ship according to the present invention.
Examples are shown in the order of steps.
以下、これらの図面を参照して、船舶の建造工程を順に
説明する。Hereinafter, the ship construction process will be explained in order with reference to these drawings.
まず、第1のドック(1)において、盤木(2)の上で
、船体(3)を建造する(第1図参照)。First, at the first dock (1), the hull (3) is built on a board (2) (see Figure 1).
この第1のドック(1)では、船体(3)の船尾部分に
舵(4)およびプロペラ(5)を搭載するとともに、機
関室(6)内に主機関(図示路)を搭載する。また、第
1のドック(1)において建造する船体(3)は、船体
の少なくとも没水部を含む下方部分が完成している。す
なわち、この状態における吃水線(7)の上方まで完成
している。In this first dock (1), a rudder (4) and a propeller (5) are mounted on the stern portion of the hull (3), and a main engine (as shown) is mounted in the engine room (6). Further, the hull (3) to be constructed at the first dock (1) has at least the lower part including the submerged part of the hull completed. In other words, it has been completed above the water line (7) in this state.
次に、この船体(3)を進水して海面に浮上させ(第2
図参照)、これを第1のドック(1)がら出渠させる。Next, this hull (3) is launched and floated to the sea surface (second
(see figure) and discharged from the first dock (1).
第1のドック(1〉には、船体に舵およびプロペラを搭
載するのに適した設備が装備されており、主機関もドッ
ク(1)へ運搬してくるのに便利なようにできている。The first dock (1) is equipped with equipment suitable for mounting the rudder and propeller on the hull, and the main engine is also constructed to be conveniently transported to the dock (1). .
したがって、このような特別な装備を持ったドックでの
建造期間はできるだけ短くしてドックの回転を上げるの
が好ましい。この方法では、第1のドック(1)におい
て、船体(3)の船尾部分に舵(4) プロペラ(5
)および主機関を搭載するとともに、船体の少なくとも
没水部を含む下方部分を完成させただけの状態で、船体
(3)を進水させて出渠させるので、第1のドック(1
)の占有期間を短くして、回転を上げることができる。Therefore, it is preferable to shorten the construction period of a dock with such special equipment as much as possible to increase the turnover of the dock. In this method, a rudder (4) and a propeller (5) are attached to the stern part of the hull (3) at the first dock (1).
) and the main engine, and the hull (3) is launched and docked with only the lower part of the hull, including at least the submerged part, completed, so the first dock (1
) can be used to increase rotation by shortening the period of occupation.
とくに、舵(4)、プロペラ(5)および主機関の搭載
が完了したときに船体(3)の下方部分が完成している
ようにすれば、ドック(1)の占有期間を最短にして、
回転を最大に上げることができる。In particular, if the lower part of the hull (3) is completed when the rudder (4), propeller (5), and main engine are installed, the period of occupation of the dock (1) can be minimized.
You can increase the rotation to the maximum.
また、第1のドック(1)で建造した船体(3)を進水
させるときには、船体の少なくとも没水部を含む吃水線
(7)より下の下方部分が完成しているので、従来のよ
うに分割箇所が海水に浸るようなことがなく、シたがっ
て、分割箇所が汚れたり、分割箇所から浸水することも
ない。Furthermore, when launching the hull (3) built at the first dock (1), at least the lower part of the hull below the water line (7) including the submerged part is completed, so There is no possibility that the divided part will be submerged in seawater, and therefore the divided part will not get dirty or water will seep through the divided part.
次に、第1のドック(1)から出渠させた船体(3)を
第2のドック(8)に入渠させ、盤木(9)上で、残り
の部分を完成させて、船体(10)を建造する(第3図
参照)。このとき、第1のドック(1)において盤木(
2)に接触していた船底部分を盤木(9)に接触しない
ようにすることは容易であり、このようにすれば、第1
のドック(1)では盤木(2)に接触していて塗装がで
きなかった船底部分を容易に塗装することができる。Next, the hull (3) that was docked from the first dock (1) is docked at the second dock (8), the remaining parts are completed on the board (9), and the hull (10 ) (see Figure 3). At this time, the board (
It is easy to prevent the bottom part of the ship that was in contact with the board (9) from touching the board (9), and if you do this, the
The bottom of the ship, which could not be painted because it was in contact with the board (2) on the dock (1), can be easily painted.
このように、第2のドック(8)での船底部分の工事は
、第1のドック(1)では盤木(2)に接触していて塗
装ができなかった部分の塗装だけである。In this way, the work on the bottom of the ship at the second dock (8) is limited to painting the parts that could not be painted at the first dock (1) because they were in contact with the board (2).
発明の効果
この発明の船舶の建造方法によれば、上述のように、特
定のドックまたは船台の占有期間を短くすることができ
、また従来のように分割箇所が海水に浸って浸水するこ
とがなく、さらに船底の盤木に当る部分も容易に塗装す
ることができる。Effects of the Invention According to the ship construction method of the present invention, as described above, the period of occupation of a particular dock or berth can be shortened, and the dividing point can be prevented from being submerged in seawater as in the past. Moreover, the part of the bottom of the ship that corresponds to the board can be easily painted.
第1図、第2図および第3図は、この発明による船舶の
建造方法の1実施例を工程順に示す概略側面図である。
(1)・・・第1のドック、(3)・・・船体、(4)
・・・舵、(5)・・・プロペラ、(8)・・・第2の
ドック、(10)・・・船体。
以 上FIGS. 1, 2, and 3 are schematic side views showing one embodiment of the method for building a ship according to the present invention in the order of steps. (1)...first dock, (3)...hull, (4)
... Rudder, (5) ... Propeller, (8) ... Second dock, (10) ... Hull. that's all
Claims (1)
プロペラを搭載するとともに、船体の少なくとも没水部
を含む下方部分を完成させ、この状態で船体を進水させ
て、第2のドックに入渠させ、この第2のドックにおい
て船体の残りの部分を完成させることを特徴とする船舶
の建造方法。At the first dock or slipway, the rudder and propeller are mounted on the stern, and the lower part of the hull, including at least the submerged part, is completed, and in this state the hull is launched and docked at the second dock. , a method of building a ship, characterized in that the remaining part of the ship is completed at this second dock.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2271931A JPH04146885A (en) | 1990-10-09 | 1990-10-09 | Constructing method for marine vessel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2271931A JPH04146885A (en) | 1990-10-09 | 1990-10-09 | Constructing method for marine vessel |
Publications (1)
Publication Number | Publication Date |
---|---|
JPH04146885A true JPH04146885A (en) | 1992-05-20 |
Family
ID=17506844
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2271931A Pending JPH04146885A (en) | 1990-10-09 | 1990-10-09 | Constructing method for marine vessel |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPH04146885A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2018127125A (en) * | 2017-02-09 | 2018-08-16 | 株式会社三井E&Sホールディングス | Vessel |
-
1990
- 1990-10-09 JP JP2271931A patent/JPH04146885A/en active Pending
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2018127125A (en) * | 2017-02-09 | 2018-08-16 | 株式会社三井E&Sホールディングス | Vessel |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Busby | Manned submersibles | |
GB1218272A (en) | Method and apparatus for constructing a ship | |
US3750607A (en) | Shallow-draft boat | |
US3019755A (en) | Hydrofoil deck extension | |
US3398716A (en) | Submersible twin hulled tug | |
US3776167A (en) | Semi-submersible tender | |
JPH04146885A (en) | Constructing method for marine vessel | |
US3675606A (en) | Method of constructing marine float structures | |
GB2361458A (en) | Semi-submersible marine craft | |
Gore | SWATH ships | |
Martin | Horse and cargo handling on Medieval Mediterranean ships | |
Egorov et al. | Justification of main characteristics of river-sea dry-cargo vessels with extra-full hull forms | |
US3870005A (en) | Houseboat hull | |
JPS5563995A (en) | Hull outside plating anti-fouling method | |
Ballard | The great obelisk lighter of 1550 BC | |
Bond | Catamarans—Dream or Reality | |
GB2173453A (en) | A device relating to a semi-submersible craft | |
Holden | Hydrographic Survey Catamaran for the Port of Liverpool | |
COMPTON | The US Naval Academy's new yard patrol craft: From concept to delivery | |
JPS5992284A (en) | Layer block type building method of barge | |
JPH0134639Y2 (en) | ||
JP3104087U (en) | Ferry boat | |
Kennedy | A further note on the Thera ships | |
Hasegawa et al. | Hydraulic Transportation of Cargo-Tank Sludge | |
Guner et al. | SWATH fishing platform with higher propulsor efficiency |