JPH04137692U - Meter reading device - Google Patents

Meter reading device

Info

Publication number
JPH04137692U
JPH04137692U JP4578391U JP4578391U JPH04137692U JP H04137692 U JPH04137692 U JP H04137692U JP 4578391 U JP4578391 U JP 4578391U JP 4578391 U JP4578391 U JP 4578391U JP H04137692 U JPH04137692 U JP H04137692U
Authority
JP
Japan
Prior art keywords
meter reading
buffer memories
measuring instrument
measuring instruments
day
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP4578391U
Other languages
Japanese (ja)
Inventor
元 小野田
寛二 鈴木
Original Assignee
株式会社金門製作所
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社金門製作所 filed Critical 株式会社金門製作所
Priority to JP4578391U priority Critical patent/JPH04137692U/en
Publication of JPH04137692U publication Critical patent/JPH04137692U/en
Pending legal-status Critical Current

Links

Landscapes

  • Selective Calling Equipment (AREA)

Abstract

(57)【要約】 【目的】本考案は、各計量器あるいは特定の計量器に対
して時間帯別、曜日別の積算計量値を知ることができる
検針装置を提供する。 【構成】特定の計量器11aに対しては2個のバッファ
メモリ14a,14bを、残りの計量器11b,11c
に対しては1個のバッファメモリ14c,14dを対応
関係に設け、これらバッファメモリで対応する計量器の
積算計量値を保持させる。そして、積算期間帯設定装置
16を設け、バッファメモリ14a,14bに対して積
算時間帯をそれぞれ設定している。各バッファメモリの
内容は検針盤15によって読取られる。
(57) [Summary] [Purpose] The present invention provides a meter reading device that is capable of knowing the integrated measurement value for each measuring instrument or a specific measuring instrument by time of day and by day of the week. [Configuration] Two buffer memories 14a and 14b are provided for a specific measuring instrument 11a, and two buffer memories 14a and 14b are provided for the remaining measuring instruments 11b and 11c.
For each, one buffer memory 14c, 14d is provided in a corresponding relationship, and these buffer memories hold the integrated measurement value of the corresponding measuring device. An integration period setting device 16 is provided to set integration time periods for the buffer memories 14a and 14b, respectively. The contents of each buffer memory are read by the meter reading board 15.

Description

【考案の詳細な説明】[Detailed explanation of the idea]

【0001】0001

【産業上の利用分野】[Industrial application field]

本考案は、検針装置に係り、特に、安定したエネルギ政策を実行する上で必要 な情報収集やサービスの向上に寄与できる検針装置に関する。 This invention relates to meter reading devices, especially those necessary for implementing stable energy policies. related to meter reading devices that can contribute to collecting information and improving services.

【0002】0002

【従来の技術】[Conventional technology]

電気、ガス、水道、暖房用温水等の使用量を遠隔的に検針する検針装置は、通 常、図2に示すように構成されている。 Meter reading devices that remotely read the usage of electricity, gas, water, hot water for heating, etc. Usually, the configuration is as shown in FIG.

【0003】 すなわち、図中1a,1b,1c,…は、需要家毎に設けられて共通の計量対 象を計量する発信出力付計量器を示している。これら計量器1a,1b,1c… の出力端は、接続端子2a,2b,…を介して4個ずつ端末装置3a,3b,… に接続されている。0003 In other words, 1a, 1b, 1c, ... in the figure are common measurement pairs provided for each customer. This figure shows a measuring instrument with a transmitting output for weighing objects. These measuring instruments 1a, 1b, 1c... The output terminals are connected to four terminal devices 3a, 3b, . . . via connection terminals 2a, 2b, . It is connected to the.

【0004】 端末装置3a,3b,…内には、4つの計量器に1対1に対応する関係に4つ のバッファメモリ4a,4b,4c,4dが設けてある。これらバッファメモリ 4a,4b,4c,4dは、対応する計量器の計量値を保持する。0004 In the terminal devices 3a, 3b,..., there are four measuring instruments in one-to-one correspondence with the four measuring instruments. Buffer memories 4a, 4b, 4c, and 4d are provided. These buffer memories 4a, 4b, 4c, and 4d hold the measured values of the corresponding measuring instruments.

【0005】 一方、端末装置3a,3b,…から距離的に離れた場所には、1つの検針盤5 が設けられている。この検針盤5は、定期的あるいは不定期的に各端末装置3a ,3b,…をアクセスして各バファメモリ4a,4b,4c,4dの内容、つま り各計量器毎の積算計量値を読取るように構成されている。 このように構成された検針装置では、人手を必要とすることなく、各計量器毎 の積算計量値を読取ることができる。[0005] On the other hand, one meter reading board 5 is located at a distance from the terminal devices 3a, 3b,... is provided. This meter reading board 5 periodically or irregularly checks each terminal device 3a. , 3b, ... to access the contents of each buffer memory 4a, 4b, 4c, 4d, i.e. It is configured to read the integrated measurement value for each weighing device. With the meter reading device configured in this way, each meter can be The integrated weight value can be read.

【0006】[0006]

【考案が解決しようとする課題】[Problem that the idea aims to solve]

ところで、安定したエネルギ政策の面からみると、エネルギの時間帯別や曜日 別の使用量分布を正確に知る必要がある。そのためには、使用量分布曲線を描く のに必要な情報を収集する必要がある。また、最近では、エネルギの有効利用を 前提にしたサービスの面からみて、各需要家がエネルギ使用代を果たして公平に 負担しているか否かが問題となっている。たとえば、温水による集中暖房システ ムを備えたビルを例にとると、普通のテナントや事務所が暖房運転を行う時間帯 にはほとんど暖房を行わず、主として別の時間帯に暖房を行う事務所が存在した 場合、その事務所で、その時間帯に暖房に使用した温水の単位量当りの料金と他 の事務所で暖房に使用した温水の単位量当りの料金とが同一では不公平となる場 合がある。この不公平を解消するには、時間帯別の料金体系を作る必要がある。 そして、この料金体系を運用するには、各テナントや事務所の時間帯別のエネル ギ使用量を知る必要がある。 By the way, from the perspective of stable energy policy, energy consumption by time of day and day of the week is important. It is necessary to know the different usage distribution accurately. To do this, draw a usage distribution curve It is necessary to collect the necessary information. In addition, recently, efforts have been made to use energy effectively. From the perspective of the service based on the premise, each consumer pays their energy usage fees fairly. The question is whether or not they are paying for it. For example, central heating systems with hot water For example, if a building is equipped with a There were offices that had little heating and mainly heated at other times. If so, the fee per unit amount of hot water used for heating at that office during that time period and other charges shall be paid. It would be unfair if the charges per unit amount of hot water used for heating in an office were the same. There is a case. In order to eliminate this inequity, it is necessary to create a fee structure based on time of day. In order to operate this rate system, it is necessary to calculate the energy consumption of each tenant or office depending on the time of day. It is necessary to know the amount of energy used.

【0007】 このように、安定したエネルギ政策を実行したり、サービスの公平化を図るに は、エネルギの時間帯別や曜日別の使用量を知る必要がある。しかし、従来の検 針装置では、現在まで使用したエネルギの積算値しか調べることができず、上述 した試みの実行には寄与できない問題があった。 そこで本考案は、構成の複雑化を招くことなく、時間帯別や曜日別の積算計量 値をも調べることができる検針装置を提供することを目的としている。[0007] In this way, it is important to implement stable energy policies and ensure fair services. needs to know the amount of energy used by time of day and day of the week. However, traditional inspection With the needle device, you can only check the cumulative value of the energy used up until now, and the above-mentioned There was a problem in the implementation of this attempt that made it impossible to contribute. Therefore, the present invention has been developed to perform integrated measurement by time of day or day of the week without complicating the configuration. The purpose is to provide a meter reading device that can also check values.

【0008】[0008]

【課題を解決するための手段】[Means to solve the problem]

上記目的を達成するために、本考案に係る検針装置では、複数の計量器と、こ れら計量器のそれぞれに対して複数個ずつの対応関係または特定の計量器に対し ては複数個ずつ、残りの計量器に対しては1個ずつの対応関係に設けられ、対応 する計量器の積算計量値を保持する複数個のバッファメモリと、1つの計量器に 複数個ずつの対応関係に設けられた前記各バッファメモリに対して積算期間帯を それぞれ設定する積算期間帯設定装置と、計量器毎に前記各バッファメモリに保 持されている積算計量値を読取る検針盤とを備えている。 In order to achieve the above purpose, the meter reading device according to the present invention includes a plurality of measuring instruments and a meter reading device according to the present invention. multiple correspondences for each of these scales or for a specific scale. For the remaining scales, there are multiple scales, and for the remaining scales, there is one scale. multiple buffer memories that hold the integrated measurement values of the weighing instruments, and one weighing instrument. An accumulation period band is set for each of the buffer memories provided in correspondence with each other. The integration period band setting device to set each and the storage in each buffer memory for each measuring instrument. It is equipped with a meter reading board for reading the accumulated weight value held.

【0009】[0009]

【作用】[Effect]

1つの計量器に複数個ずつの対応関係に設けられたバッファメモリの数を、た とえば2とし、積算期間帯設定装置で一方のバッファメモリに昼間、たとえば朝 5時から夕方6時までの時間帯における積算計量値を保持させ、他方のバッファ メモリに残りの時間帯における積算計量値を保持させるように積算期間帯を設定 しておくと、各時間帯毎の積算計量値を正確に知ることが可能となる。 The number of buffer memories provided in correspondence with each other in one measuring instrument is calculated as follows: For example, set it to 2, and use the integration period setting device to store one buffer memory during the daytime, for example in the morning. The accumulated weight value for the time period from 5 o'clock to 6 o'clock in the evening is held, and the other buffer Set the integration period so that the memory retains the integrated weight values for the remaining time period. By doing so, it becomes possible to accurately know the integrated metric value for each time period.

【0010】0010

【実施例】【Example】

以下、図面を参照しながら実施例を説明する。 図1には本考案の一実施例に係る検針装置が示されている。 Examples will be described below with reference to the drawings. FIG. 1 shows a meter reading device according to an embodiment of the present invention.

【0011】 図中11a,11b,11c,…は、需要家毎に設けられて共通の計量対象を 計量する発信出力付計量器を示している。これら計量器11a,11b,11c …の出力端は、接続端子12a,12b,…を介して3個ずつ端末装置13a, 13b,…に接続されている。[0011] In the figure, 11a, 11b, 11c, etc. are provided for each customer and represent common measurement targets. A measuring instrument with a transmitting output for weighing is shown. These measuring instruments 11a, 11b, 11c The output ends of... are connected to three terminal devices 13a, 3 each via connection terminals 12a, 12b,... 13b,...

【0012】 端末装置13a,13b,…内には、4つのバッファメモリ14a,14b, 14c,14dが設けてある。端末装置13aを例にとると、バッファメモリ1 4a,14bが図示しないゲート回路および接続端子12aを介して計量器11 aの出力端に接続されており、バッファメモリ14cが接続端子12aを介して 計量器11bの出力端に接続されており、さらにバッファメモリ14dが接続端 子12aを介して計量器11cの出力端に接続されている。同様に、端末装置1 3b内のバッファメモリ14a,14b,14c,14dも図示関係に接続され ている。0012 The terminal devices 13a, 13b, . . . include four buffer memories 14a, 14b, . 14c and 14d are provided. Taking the terminal device 13a as an example, the buffer memory 1 4a and 14b are connected to the measuring instrument 11 via a gate circuit (not shown) and a connecting terminal 12a. a, and the buffer memory 14c is connected to the output terminal of the terminal 12a through the connection terminal 12a. It is connected to the output end of the measuring instrument 11b, and the buffer memory 14d is connected to the connection end. It is connected to the output end of the measuring instrument 11c via the terminal 12a. Similarly, terminal device 1 Buffer memories 14a, 14b, 14c, and 14d in 3b are also connected in the illustrated relationship. ing.

【0013】 一方、端末装置13a,13b,…から距離的に離れた場所には、1つの検針 盤15が設けられている。この検針盤15は、定期的あるいは不定期的に各端末 装置13a,3b,…をアクセスして各バファメモリ14a,14b,14c, 14dの内容を読取るように構成されている。[0013] On the other hand, there is one meter-reading device located at a distance from the terminal devices 13a, 13b,... A board 15 is provided. This meter reading board 15 periodically or irregularly checks each terminal. Each buffer memory 14a, 14b, 14c, etc. is accessed by accessing the devices 13a, 3b, . 14d.

【0014】 前記各端末装置13a,13b,…には、積算期間帯設定装置16が付設され ている。この積算期間帯設定装置16は、各バファメモリ14a,14b,14 c,14dのうち、1つの計量器に対して2個の対応関係に設けられたバッファ メモリのゲート回路を切換え制御するもので、時計回路17と、カレンダー回路 18と、設定回路19とで構成されている。今、端末装置13a,13bだけを 例にとると、検針盤15を操作することによって、端末装置13a内のバッファ メモリ14aおよび端末装置13b内のバッファメモリ14cの入力端に設けら れたゲート回路を、たとえば朝5時から夕方6時までの時間帯だけ開かせ、また 残りの時間帯には端末装置13a内のバッファメモリ14bおよび端末装置13 b内のバッファメモリ14dの入力端に設けられたゲート回路だけを開かせるこ とができる。勿論、曜日レベルでの設定も行えるようになっている。[0014] Each of the terminal devices 13a, 13b, . . . is provided with an accumulation period band setting device 16. ing. This integration period band setting device 16 is configured to each buffer memory 14a, 14b, 14. Of c and 14d, two buffers are provided in correspondence with one measuring instrument. It switches and controls the memory gate circuit, and includes the clock circuit 17 and the calendar circuit. 18 and a setting circuit 19. Now, only the terminal devices 13a and 13b are connected. For example, by operating the meter reading board 15, the buffer in the terminal device 13a is Provided at the input ends of the memory 14a and the buffer memory 14c in the terminal device 13b. For example, by opening the gate circuit only from 5 a.m. to 6 p.m. During the remaining time period, the buffer memory 14b in the terminal device 13a and the terminal device 13 Opening only the gate circuit provided at the input end of the buffer memory 14d in I can do that. Of course, settings can also be made at the day of the week level.

【0015】 このような構成であると、積算期間帯設定装置16を使って上述した積算時間 帯に予め設定したものとすると、端末装置13a内のバッファメモリ14aは、 朝5時から夕方6時までの時間帯において計量器11aの積算計量値を保持する 。同様に、端末装置13b内のバッファメモリ14cも、朝5時から夕方6時ま での時間帯において計量器11fの積算計量値を保持する。さらに、端末装置1 3a内のバッファメモリ14bは、残りの時間帯において計量器11aの積算計 量値を保持し、同様に、端末装置13b内のバッファメモリ14dも、残りの時 間帯において計量器11fの積算計量値を保持する。そして、他のバッファメモ リ、すなわち、端末装置13a内のバッファメモリ14c,14dおよび端末装 置13b内のバッファメモリ14a,14bは、時間帯とは無関係に対応する計 量器の積算計量値を保持する。[0015] With such a configuration, the above-mentioned cumulative time can be set using the cumulative period band setting device 16. If it is set in advance in the band, the buffer memory 14a in the terminal device 13a is The integrated measurement value of the measuring instrument 11a is held during the time period from 5 a.m. to 6 p.m. . Similarly, the buffer memory 14c in the terminal device 13b is also stored from 5 a.m. to 6 p.m. The integrated measurement value of the measuring instrument 11f is held during the time period. Furthermore, the terminal device 1 The buffer memory 14b in 3a is used to store the totalizer of the measuring instrument 11a during the remaining time period. Similarly, the buffer memory 14d in the terminal device 13b also stores the remaining time value. The integrated measurement value of the measuring device 11f is held in the interval. And other buffer notes In other words, the buffer memories 14c and 14d in the terminal device 13a and the terminal device The buffer memories 14a and 14b in the storage 13b store the corresponding clocks regardless of the time zone. Holds the integrated measurement value of the meter.

【0016】 したがって、検針盤15を動作させると、計量器11a,11fについては朝 5時から夕方6時までの時間帯における積算計量値と、残りの時間帯における積 算計量値とが別々に読み取られ、他の計量器については現時点までの積算計量値 が読取られることになる。このため、計量器11a,11fを用いている需要家 については、時間帯別の細かい計量データを収集することができる。[0016] Therefore, when the meter reading board 15 is operated, the measuring instruments 11a and 11f are The cumulative weight value for the time period from 5:00 to 6:00 p.m. and the cumulative value for the remaining time period. The calculated weight value is read separately, and for other weighing instruments, the accumulated weight value up to the current time is read out. will be read. For this reason, customers using the measuring instruments 11a and 11f It is possible to collect detailed metrological data by time of day.

【0017】 上述した実施例では、特定の計量器、つまり計量器11a,11fについての み積算時間帯を分けるようにしているが、他の計量器についても分けるようにし てもよい。また、時間帯の分け方も昼間と夜間のような分け方に限らず、24時 間を3つ以上に分けてもよいし、また曜日別に分けるようにしてもよい。[0017] In the embodiment described above, the specific measuring instruments, that is, the measuring instruments 11a and 11f We are trying to separate the integration time periods for the weighing scales, but we are also trying to separate the integration time periods for other measuring instruments. It's okay. In addition, the division of time zones is not limited to divisions such as daytime and nighttime, but also 24-hour division. The period may be divided into three or more, or may be divided by day of the week.

【0018】[0018]

【考案の効果】[Effect of the idea]

以上のように、本考案によれば、需要家の時間帯別あるいは曜日別の使用量情 報を正確に知ることができるので、安定したエネルギ政策を実行したり、サービ スの公平化を図る試みの実行に寄与できる。また、既存の計量器をそのまま使用 できるので、装置全体のコストが上昇するのを抑制できる。 As described above, according to the present invention, usage information of consumers by time of day or day of the week is provided. Since you can accurately know the information, you can implement stable energy policy and improve service. It can contribute to the implementation of attempts to level the playing field. Also, existing measuring instruments can be used as is. Therefore, it is possible to suppress an increase in the cost of the entire device.

【図面の簡単な説明】[Brief explanation of drawings]

【図1】本考案の一実施例に係る検針装置のブロック構
成図、
FIG. 1 is a block configuration diagram of a meter reading device according to an embodiment of the present invention;

【図2】従来の検針装置のブロック構成図。FIG. 2 is a block diagram of a conventional meter reading device.

【符号の説明】[Explanation of symbols]

11a,11b,11c,… …計量器、 2a,2b
… …接続端子、13a,13b,… …端末装置、
14a〜14d…バッファメモリ、15…検針盤、
16…積算期間帯設定装置。
11a, 11b, 11c,... Measuring instrument, 2a, 2b
... ... Connection terminal, 13a, 13b, ... ... Terminal device,
14a to 14d...buffer memory, 15...meter reading board,
16... Accumulation period band setting device.

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] 【請求項1】複数の計量器と、これら計量器のそれぞれ
に対して複数個ずつの対応関係または特定の計量器に対
しては複数個ずつ、残りの計量器に対しては1個ずつの
対応関係に設けられ、対応する計量器の積算計量値を保
持する複数個のバッファメモリと、1つの計量器に複数
個ずつの対応関係に設けられた前記各バッファメモリに
対して積算期間帯をそれぞれ設定する積算期間帯設定装
置と、計量器毎に前記各バッファメモリに保持されてい
る積算計量値を読取る検針盤とを具備してなることを特
徴とする検針装置。
Claim 1: A correspondence relationship between a plurality of measuring instruments and a plurality of units for each of these measuring instruments, or a correspondence relationship of a plurality of units for a specific measuring unit and one unit for the remaining measuring instruments. A plurality of buffer memories are provided in a corresponding relation and hold the integrated measurement values of the corresponding measuring instruments, and an integration period period is set for each of the plurality of buffer memories provided in a corresponding relation to one measuring instrument. 1. A meter reading device comprising: an integration period band setting device for setting each meter; and a meter reading board for reading integrated measurement values held in each of the buffer memories for each meter.
JP4578391U 1991-06-18 1991-06-18 Meter reading device Pending JPH04137692U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP4578391U JPH04137692U (en) 1991-06-18 1991-06-18 Meter reading device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP4578391U JPH04137692U (en) 1991-06-18 1991-06-18 Meter reading device

Publications (1)

Publication Number Publication Date
JPH04137692U true JPH04137692U (en) 1992-12-22

Family

ID=31925558

Family Applications (1)

Application Number Title Priority Date Filing Date
JP4578391U Pending JPH04137692U (en) 1991-06-18 1991-06-18 Meter reading device

Country Status (1)

Country Link
JP (1) JPH04137692U (en)

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH02170299A (en) * 1988-12-23 1990-07-02 Hitachi Ltd Method and device for processing transaction

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH02170299A (en) * 1988-12-23 1990-07-02 Hitachi Ltd Method and device for processing transaction

Similar Documents

Publication Publication Date Title
CA1143843A (en) Meters for measuring electrical energy consumption
CA1189907A (en) Multiple rate metering system
EP0244384A2 (en) An automatic utility meter reading and monitoring system
JPH0353680B2 (en)
Griffin et al. Urban residential demand for water in the United States: Comment
CN107202919A (en) Intelligent electric energy meter with communication interface
JP2001229261A (en) Charging device for energy rate, charging system, terminal equipment, energy consumption equipment, charging method of energy rate, and recording medium
EP0092436B1 (en) Improved apparatus for the collection of payments for commodities
GB2096370A (en) Electrical energy consumption meter
JPH04137692U (en) Meter reading device
GB2300721A (en) Improvements in or relating to utility meters
JP3220056B2 (en) Prepaid energy meter
JP2002142030A (en) Interphone system
CN112686689A (en) Intelligent charging system
EP0660121B1 (en) Arrangement of dependent utility meters
JP3313912B2 (en) Price display meter system
JP4102017B2 (en) Billing system
JPH06130085A (en) Energy use information control equipment
RU2399026C2 (en) System for controlling communal services
RU30037U1 (en) ELECTRIC POWER CONSUMPTION TERMINAL
SU858039A1 (en) Device for monitoring and registering electric power consumption
JP2752875B2 (en) Invoice issuing device
RU2231889C1 (en) Computer-based electricity metering device
JPH09172503A (en) Automatic metering system
JPH10260205A (en) Gage examination instrument