JPH0413499B2 - - Google Patents

Info

Publication number
JPH0413499B2
JPH0413499B2 JP13949887A JP13949887A JPH0413499B2 JP H0413499 B2 JPH0413499 B2 JP H0413499B2 JP 13949887 A JP13949887 A JP 13949887A JP 13949887 A JP13949887 A JP 13949887A JP H0413499 B2 JPH0413499 B2 JP H0413499B2
Authority
JP
Japan
Prior art keywords
water
sheet
groove
trench
cartridge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP13949887A
Other languages
Japanese (ja)
Other versions
JPS63304831A (en
Inventor
Shozo Konno
Nobuyuki Matsui
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP13949887A priority Critical patent/JPS63304831A/en
Priority to US07/196,617 priority patent/US4909674A/en
Publication of JPS63304831A publication Critical patent/JPS63304831A/en
Priority to US07/460,044 priority patent/US5022792A/en
Publication of JPH0413499B2 publication Critical patent/JPH0413499B2/ja
Granted legal-status Critical Current

Links

Description

【発明の詳細な説明】 〔産業上の利用分野〕 この発明は地中連続遮水壁工法に関するもので
ある。
[Detailed Description of the Invention] [Industrial Application Field] This invention relates to an underground continuous impermeable wall construction method.

〔この発明が解決すべき問題点〕[Problems to be solved by this invention]

地下構造物を施行中の地下水の湧水を防ぎ、或
いはダム工事における地下水の止水等を目的とし
て地中連続壁を構築するが、シートパイルを打設
してジヨイント部に注入を行う等の工法が採用さ
れている。
Continuous underground walls are constructed to prevent groundwater from springing up during construction of underground structures, or to stop groundwater during dam construction. construction method has been adopted.

これら従来の工法を止水のみを目的として構築
する場合、以下のような問題がある。
When these conventional construction methods are used for construction purposes only to stop water, the following problems arise.

イ 地中連続壁は必要以上の壁厚を施工するのが
通常であり、施工が不必要に大がかりとなると
ともに余分なコンクリートを大量に使用して施
工費が高価である。
B. Underground continuous walls are usually built with a wall thickness greater than necessary, making the construction unnecessarily large-scale and using a large amount of excess concrete, resulting in high construction costs.

ロ シートパイルを打設してジヨイント部に注入
を行う工法も同じく施工が大がかりであり、材
料費が高価である。
The method of driving sheet piles and injecting into the joints also requires extensive construction and is expensive in material cost.

ハ 地中連続壁において施工費を安価にするため
に壁厚を薄く造ることも考えられるが、狭巾の
溝を掘削し得る機械もなく、例え狭巾の溝が掘
れたとしてもコンクリートの流動性が損われて
物質な地中壁は完成できない。
C. It is possible to make the wall thickness thinner in order to reduce construction costs for underground continuous walls, but there are no machines that can excavate narrow trenches, and even if a narrow trench can be dug, the flow of concrete A physical underground wall cannot be completed because its properties are damaged.

ニ また止水の確実性及び信頼性の点で見れば、
コンクリート壁は地震時のクラツクが止水性を
損わせ、プレキヤストコンクリートパネルやシ
ートパイルを使用した工法ではジヨイント部に
夾雑物、ベントナイト等を挟み込み充分な止水
性能を得ることができなかつた。
D. Also, from the point of view of water stoppage certainty and reliability,
Cracks during earthquakes impair the water-stopping properties of concrete walls, and construction methods using precast concrete panels or sheet piles were unable to obtain sufficient water-stopping performance due to contaminants, bentonite, etc. being trapped in the joints.

この発明は、施工が容易であつて施工費が安価
となり、且つ止水の確実性、信頼性の高い遮水壁
を構築可能な地中連続遮水工法を提供することを
目的とする。
An object of the present invention is to provide an underground continuous water-blocking construction method that is easy to construct, has low construction costs, and can construct a water-blocking wall that is highly reliable and reliable.

〔問題点を解決するための手段〕[Means for solving problems]

この発明にかかる地中連続遮水壁工法は、複数
枚の平行な仕切板によつて上下方向に連続する折
畳み溝部を形成したシートカートリツジを使用す
るものである。
The underground continuous impermeable wall construction method according to the present invention uses a sheet cartridge in which a vertically continuous folding groove is formed by a plurality of parallel partition plates.

遮水シートを折畳んで各折畳み溝部間に収納す
る。遮水シートの各折畳み溝部の溝底に位置する
折曲部分に脱着可能なスペースロツドを通して遮
水シートを固定する。
The water-blocking sheet is folded and stored between each folding groove. The water-shielding sheet is fixed by passing removable space rods through the folded portions located at the bottom of each folding groove of the water-shielding sheet.

地盤に溝を掘削する。この溝に前記遮水シーシ
トを固定したカートリツジを降下する。
Dig a trench in the ground. The cartridge with the water-shielding sheet fixed thereto is lowered into this groove.

スペースロツドを引抜きながらシートカートリ
ツジから遮水シートを引出す。溝を巾方向左右に
仕切るよう遮水シートを溝内に配設する。溝内に
硬化材を注入して固化するか或いは溝内にソイル
モルタルを充填して遮水壁を構築する。
Pull out the water-blocking sheet from the seat cartridge while pulling out the space rod. A water-blocking sheet is placed inside the groove to partition the groove into left and right sides in the width direction. A water-blocking wall is constructed by injecting a hardening material into the groove and solidifying it, or by filling the groove with soil mortar.

溝掘削、遮水シート配設、泥水固化という簡易
な施工によつて構築でき、施工費を安価にするこ
とができる。
It can be constructed by simple construction such as trench excavation, installation of water-shielding sheets, and solidification of muddy water, and construction costs can be reduced.

地震によつてクラツクが生ずる等があつても遮
水シートによつて止水性が損われることがない。
Even if cracks occur due to an earthquake, the water-stopping properties of the water-blocking sheet will not be impaired.

シートカートリツジに遮水シートを固定して溝
内に降下するため、遮水シートがもつれたりせず
作業が容易である。
Since the water-shielding sheet is fixed to the seat cartridge and lowered into the groove, the water-shielding sheet does not get tangled and the work is easy.

〔実施例〕〔Example〕

以下、図に示す一実施例に基づき、この発明を
詳細に説明する。
Hereinafter, the present invention will be explained in detail based on an embodiment shown in the drawings.

(1) 溝掘削 地盤に溝1を掘削する。溝1の掘削には第7
図に示すような掘削装置Aが使用可能である。
先ず地盤に適宜間隔離して複数の削孔2を形成
し、この削孔2内に掘削装置Aにガイドポスト
3を立設する。掘削装置Aの駆動部4はガイド
ポスト3のラツク5に沿つて上下動可能であ
る。駆動部4には一端が軸支されたソウ部6が
取付けられている。ソウ部6は外周にビツト7
が取付けられたチエーン8が回動可能となつて
いる泥水9を充填しながら駆動部4を降下さ
せ、チユーン8の回転によつて削孔2,2間に
狭巾の溝1を掘削する。
(1) Trench excavation Dig trench 1 in the ground. No. 7 is used for excavating trench 1.
A drilling rig A as shown in the figure can be used.
First, a plurality of drilled holes 2 are formed in the ground at appropriate intervals, and a guide post 3 is erected on the excavation device A within the drilled holes 2. The drive part 4 of the excavation device A is movable up and down along the rack 5 of the guide post 3. A saw part 6 whose one end is pivotally supported is attached to the drive part 4. The saw part 6 has a bit 7 on the outer periphery.
A chain 8 to which a chain 8 is attached is rotatably filled with muddy water 9 while lowering the driving part 4, and the rotation of the chain 8 excavates a narrow groove 1 between the drilled holes 2.

掘削土砂は泥水9とともにガイドポスト3下
端の吸込み口10から吸込み、ガイドポスト3
内を通した揚泥ホース11を通して溝1外へ排
出する。まこ溝壁が強固なときはオーガー等に
よつて泥水を注入しないで掘削することもでき
る。
The excavated earth and sand are sucked together with muddy water 9 from the suction port 10 at the lower end of the guide post 3, and
The mud is discharged to the outside of the groove 1 through a pumping hose 11 that passes through the inside. If the trench wall is strong, it is possible to excavate it using an auger or the like without injecting mud.

(2) シートカートリツジ 図において12はシートカートリツジであつ
て、断面半円状の基板13の内側に複数枚の平
行な仕切板14によつて上下方向に連続する折
畳み溝部15が形成されている。仕切板14の
先端には棒状のガイド材16が固定されてい
る。シートカートリツジ12の下端はエキスパ
ンドメタルによつて底部17が形成されてい
る。底部17上には基板13近傍に折畳み溝部
15を仕切る外れ止め18が固着されている。
(2) Sheet Cartridge In the figure, reference numeral 12 denotes a sheet cartridge, in which a vertically continuous folding groove portion 15 is formed by a plurality of parallel partition plates 14 on the inside of a substrate 13 having a semicircular cross section. There is. A rod-shaped guide member 16 is fixed to the tip of the partition plate 14. At the lower end of the seat cartridge 12, a bottom portion 17 is formed of expanded metal. A retainer 18 is fixed on the bottom 17 near the substrate 13 to partition the folding groove 15.

図において19は遮水シートであり、ポリエ
チレンシート等が採用できる。遮水シート19
は第11図に示すように左右いずれか一端に長
尺棒状のシートジヨイナー20、他端に断面C
字状のシートジヨイナー21が取付けられてい
る。遮水シート19のシートジヨイナー21寄
りにはポケツト状にカバー22が接着され、こ
の中に長尺袋状のパツカー23が挿入されてい
る。
In the figure, 19 is a water-blocking sheet, and a polyethylene sheet or the like can be used. Waterproof sheet 19
As shown in FIG.
A letter-shaped seat joiner 21 is attached. A pocket-shaped cover 22 is adhered to the water-shielding sheet 19 near the seat joiner 21, and a long bag-shaped packer 23 is inserted into the cover 22.

以上のような遮水シート19を折畳んで、前
記シートカートリツジ12の折畳み溝部15に
収納する。遮水シート19の折曲部は各折畳み
溝部15の溝底に位置するようにし、この折曲
部分にスペースロツド24を通して遮水シート
19を固定する。スペースロツド24の下端は
外れ止め18と基板13間に位置させて脱落を
防止する。
The water-blocking sheet 19 as described above is folded and stored in the folding groove 15 of the sheet cartridge 12. The folded portion of the water-shielding sheet 19 is positioned at the bottom of each folding groove portion 15, and the water-shielding sheet 19 is fixed through the space rod 24 through this bent portion. The lower end of the space rod 24 is positioned between the stopper 18 and the board 13 to prevent it from falling off.

(3) 遮水シート配設 遮水シート19を溝1内に降下する。遮水シ
ート19は前記したようにシートカートリツジ
12内に固定したままで溝1内に降下するもの
で、遮水シート19のシートジヨインナー21
内に長尺棒状の引込ジヨイナー25を嵌合す
る。(第15図)この引込ジヨイナー25には
複数本のワイヤ26が結びつけられ、このワイ
ヤ26は鋼管である引込ポスト27内のシーブ
28に掛けられて、上方に引上げられている。
(第14図) シートカートリツジ12を溝1内に降下する
場合、前記引込みポスト27も平行に溝1内に
降下する。(第2図)既に溝1内に配設した遮
水シート19がある場合、既設の遮水シート1
9のシートジヨイナー21に降下する遮水遮水
シート19のシートジヨイナー20を嵌合しな
がら降下する。両遮水シート19,19はシー
トジヨイナー20,21によつて連結される。
(3) Water-shielding sheet placement Lower the water-shielding sheet 19 into the groove 1. As described above, the water-shielding sheet 19 descends into the groove 1 while being fixed in the sheet cartridge 12, and the sheet joint inner 21 of the water-shielding sheet 19
A long rod-shaped retraction jointer 25 is fitted inside. (FIG. 15) A plurality of wires 26 are tied to this retraction joiner 25, and the wires 26 are hung on a sheave 28 in a retraction post 27, which is a steel pipe, and are pulled upward.
(FIG. 14) When the seat cartridge 12 is lowered into the groove 1, the retraction post 27 is also lowered into the groove 1 in parallel. (Figure 2) If there is already a water-shielding sheet 19 installed in the groove 1, the existing water-shielding sheet 1
The sheet joiner 20 of the water-shielding sheet 19 that is lowered is fitted into the seat joiner 21 of No. 9 while being lowered. Both water-shielding sheets 19, 19 are connected by sheet joiners 20, 21.

降下完了後、引込みポスト27を通したワイ
ヤ26を引き遮水シート19を引き寄せる。こ
のとき第10図,に示すようにスペースロ
ツド24を順次引抜いて遮水シート19を折畳
み溝部15から引出し可能にする。
After the descent is completed, the wire 26 passed through the retracting post 27 is pulled to draw the water shielding sheet 19 closer. At this time, the space rods 24 are sequentially pulled out as shown in FIG. 10, so that the water-blocking sheet 19 can be pulled out from the folding groove 15.

以上のようにして遮水シート19によつて溝
1を巾方向左右に仕切るように溝1内に遮水シ
ート19を配設する。(第4図) (4) 泥水固化 遮水シート19のパツカー23内に水または
空気を注入して膨らませ、溝1を仕切る。(第
5図、第16図)溝1内に硬化材を注入して泥
水を固化する。(第6図)硬化材としてはモル
タル、若しくはコンクリートが採用できる。
As described above, the water-shielding sheet 19 is disposed within the groove 1 so that the water-shielding sheet 19 partitions the groove 1 into left and right sides in the width direction. (Figure 4) (4) Solidification of muddy water Water or air is injected into the cover 23 of the water-shielding sheet 19 to inflate it and partition the groove 1. (Fig. 5, Fig. 16) A hardening material is injected into the groove 1 to solidify the muddy water. (Figure 6) Mortar or concrete can be used as the hardening material.

泥水固化後、溝1掘削、遮水シート19配設
を繰り返して遮水壁を連続して構築する。また
泥水を使用しないときは、溝内にソイルモルタ
ルを充填してもよい。
After the mud solidifies, the trench 1 is excavated and the water-blocking sheet 19 is placed repeatedly to construct the water-blocking wall continuously. Also, when muddy water is not used, soil mortar may be filled in the groove.

〔発明の効果〕〔Effect of the invention〕

この発明は以上のような構成を有し、以下のよ
うなう効果を得ることができる。
The present invention has the above configuration and can obtain the following effects.

イ 溝を掘削し、遮水シートを配設し、泥水を固
化、或いはソイルモルタルを充填するだけであ
るため、施工は容易となり、大がかりな施工は
不要で施工費は安価となる。
(b) Construction is easy, as it only involves digging a trench, installing a water-blocking sheet, solidifying muddy water, or filling it with soil mortar, and there is no need for large-scale construction, resulting in low construction costs.

ロ 完成した遮水壁は内側に遮水シートを挟み込
むため、地震時にクラツクが発生しても止水が
損なわれことがなく、確実性、信頼性が高くな
る。
(b) The completed water-shielding wall will have a water-shielding sheet sandwiched inside, so even if a crack occurs during an earthquake, the water stoppage will not be compromised, increasing certainty and reliability.

ハ 泥水を固化、或いはソイルモルタルを充填し
て構築するため、地中壁全体を均一な地中壁と
することができる。また例え強度の低下する部
分が生じても上記のように遮水シートによつて
止水性は確保される。
C) Because the wall is constructed by solidifying muddy water or filling it with soil mortar, the entire underground wall can be made into a uniform underground wall. Furthermore, even if there is a portion where the strength is reduced, water-stopping properties are ensured by the water-blocking sheet as described above.

ニ 遮水シートはシートカートリツジに固定して
溝内に降下し、随時引出して溝内に配設するた
め、シートがかならず、スムーズな配設作業が
行える。
D. The water-blocking sheet is fixed to the sheet cartridge and lowered into the groove, and is pulled out and placed in the groove at any time, so that the sheet is always installed and the installation work can be carried out smoothly.

【図面の簡単な説明】[Brief explanation of drawings]

第1図〜第6図はこの発明の施工順序を示す斜
視図、第7図は溝を掘削状態の斜視図、第8図は
シートカートリツジの上部斜視図、第9図はシー
トカートリツジの下部切り抜き斜視図、第10図
,はシートカートリツジから遮水シートを引
出す状態の斜視図、第11図は遮水シートの斜視
図、第12図はその平面図、第13図はパツカー
の斜視図、第14図は引込ポストの縦断面図、第
15図はシートジヨイナーに引込みジヨイナーを
嵌合状態の斜視図、第16図,はパツカーに
よる溝を仕切る状態の平面図である。 1……溝、2……削孔、3……ガイドポスト、
4……駆動部、5……ラツク、6……ソウ部、7
……ビツト、8……チエーン、9……泥水、10
……吸込み口、11……揚泥ホース、12……シ
ートカートリツジ、13……基板、14……仕切
板、15……折畳み溝部、16……ガイド材、1
7……底部、18……外れ止め、19……遮水シ
ート、20,21……シートジヨイナー、22…
…カバー、23……パツカー、24……スペース
ロツド、25……引込ジヨイナー、26……ワイ
ヤ、27……引込みポスト、28……シーブ、A
……掘削装置。
Figures 1 to 6 are perspective views showing the construction sequence of the present invention, Figure 7 is a perspective view of the groove being excavated, Figure 8 is a top perspective view of the sheet cartridge, and Figure 9 is a perspective view of the sheet cartridge. A cutaway perspective view of the lower part, FIG. 10 is a perspective view of the water-shielding sheet being pulled out from the seat cartridge, FIG. 11 is a perspective view of the water-shielding sheet, FIG. 12 is a plan view thereof, and FIG. 13 is a perspective view of the vehicle. 14 is a longitudinal sectional view of the retracting post, FIG. 15 is a perspective view of the retracting joiner fitted to the seat joiner, and FIG. 16 is a plan view of the groove being partitioned by the packer. 1...Groove, 2...Drilling, 3...Guide post,
4... Drive part, 5... Rack, 6... Saw part, 7
...bit, 8...chain, 9...muddy water, 10
... Suction port, 11 ... Mud pumping hose, 12 ... Sheet cartridge, 13 ... Board, 14 ... Partition plate, 15 ... Folding groove, 16 ... Guide material, 1
7...Bottom, 18...Removal prevention, 19...Waterproof sheet, 20, 21...Seat joiner, 22...
... Cover, 23 ... Police car, 24 ... Space rod, 25 ... Retraction jointer, 26 ... Wire, 27 ... Retraction post, 28 ... Sheave, A
...Drilling equipment.

Claims (1)

【特許請求の範囲】[Claims] 1 複数板の平行な仕切板によつて上下方向に連
続する折畳み溝部を形成したシートカートリツジ
に遮水シートを折畳んで各折畳み溝部間に収納
し、遮水シートの各折畳み溝部の溝底に位置する
折曲部分に脱着可能なスペースロツドを通して遮
水シートを固定し、このシートカートリツジを地
盤に掘削した溝内に降下して前記スペースロツド
を引抜きながら遮水シートを引出し、溝を巾方向
左右に仕切るよう溝内に配設し、泥水を固化、或
いは溝内にソイルモルタルを充填して遮水壁を構
築することを特徴とする地中連続遮水壁工法。
1. A water-blocking sheet is folded into a sheet cartridge in which vertically continuous folding grooves are formed by a plurality of parallel partition plates and stored between each folding groove, and the groove bottom of each folding groove of the water-blocking sheet is A water-shielding sheet is fixed through a removable space rod located at the bent part, and this sheet cartridge is lowered into a trench excavated in the ground, and while pulling out the space rod, the water-shielding sheet is pulled out, and the trench is moved from side to side in the width direction. An underground continuous impermeable wall construction method that is characterized by constructing an impermeable wall by placing it in a trench so as to partition the walls, solidifying muddy water, or filling the trench with soil mortar.
JP13949887A 1987-05-28 1987-06-03 Construction work of underground continuous cut-off wall Granted JPS63304831A (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
JP13949887A JPS63304831A (en) 1987-06-03 1987-06-03 Construction work of underground continuous cut-off wall
US07/196,617 US4909674A (en) 1987-05-28 1988-05-19 Underground continuous impervious wall and method for installing same
US07/460,044 US5022792A (en) 1987-05-28 1990-01-02 Undergrond continuous impervious wall and method for installing same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP13949887A JPS63304831A (en) 1987-06-03 1987-06-03 Construction work of underground continuous cut-off wall

Publications (2)

Publication Number Publication Date
JPS63304831A JPS63304831A (en) 1988-12-13
JPH0413499B2 true JPH0413499B2 (en) 1992-03-09

Family

ID=15246674

Family Applications (1)

Application Number Title Priority Date Filing Date
JP13949887A Granted JPS63304831A (en) 1987-05-28 1987-06-03 Construction work of underground continuous cut-off wall

Country Status (1)

Country Link
JP (1) JPS63304831A (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2371069B (en) * 2001-01-15 2004-09-08 Cementation Found Skanska Ltd Waterstop for foundation elements

Also Published As

Publication number Publication date
JPS63304831A (en) 1988-12-13

Similar Documents

Publication Publication Date Title
US4741644A (en) Environmental cut-off and drain
JPH0686729B2 (en) Drilling rig for continuous underground wall
JPS5985021A (en) Method and apparatus for construction of underground continuous wall
JP3979466B2 (en) Temporary closing method
JP2001115458A (en) Deep well construction method using earth retaining wall
JPH086348B2 (en) Drilling rig for continuous underground wall
JPH0413499B2 (en)
JPH09158174A (en) Water stopping mechanism and method between case bodies of underground continuous wall
CN111636440A (en) Structure for supporting and waterproof curtain to penetrate through old bottom plate obstacle and construction method thereof
JP3208085B2 (en) Structure of passage of tunnel excavator in middle shaft
JP3843175B2 (en) Pile formation method that penetrates existing underground structures
JPH01310011A (en) Underground continuous wall construction
EP1964981A1 (en) Reinforcement elements for in-situ cast walls and method to excavate in situ cast walls
JPS63297624A (en) Construction work of underground continuous cut-off wall and excavator therefor
JPS62117911A (en) Setting of pipe for well
JPS5985022A (en) Underground continuous wall constructing work
JPH0433326B2 (en)
JP3445923B2 (en) Continuous underground wall and its construction method
JP3424117B2 (en) Construction method of continuous underground wall
JPS6192235A (en) Fixing of embedded pipe
KR101711393B1 (en) A method of construction for retaining wall
JPH0314998B2 (en)
JP2797869B2 (en) Wall well
JPS59203191A (en) Opening, drilling and propelling construction method
JPH01163315A (en) Continuous underground wall construction

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees