JPH0386192U - - Google Patents
Info
- Publication number
- JPH0386192U JPH0386192U JP14622689U JP14622689U JPH0386192U JP H0386192 U JPH0386192 U JP H0386192U JP 14622689 U JP14622689 U JP 14622689U JP 14622689 U JP14622689 U JP 14622689U JP H0386192 U JPH0386192 U JP H0386192U
- Authority
- JP
- Japan
- Prior art keywords
- guide body
- support beam
- shaft
- tip
- pressure support
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000005192 partition Methods 0.000 claims description 7
- 239000004576 sand Substances 0.000 claims description 2
- 239000002689 soil Substances 0.000 claims 1
- 238000010276 construction Methods 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
Description
第1図は、本考案の実施例である先導体を示す
平面図。第2図は、施工状態を示す縦断面図。第
3図は、補助仕切板の設置状況を示す平面図。第
4図は、圧力支持梁およびライナープレートの組
み立て状態を示す平面図。第5図は、小判形先導
体の仕切板設置状態を示す平面図。第6図は、従
来技術による立坑構築状況を示す縦断面図。
なお、図中1……先導体、2……外筒、5……
ジヤツキ、6……圧力支持梁、7,8……仕切板
、9,10,11……補助仕切板、20……従来
技術の先導体、21……刃口、22……ジヤツキ
、23……土砂を示す。
FIG. 1 is a plan view showing a guide body which is an embodiment of the present invention. FIG. 2 is a longitudinal sectional view showing the construction state. FIG. 3 is a plan view showing the installation status of the auxiliary partition plate. FIG. 4 is a plan view showing the assembled state of the pressure support beam and liner plate. FIG. 5 is a plan view showing the installation state of the partition plate of the oval-shaped leading body. FIG. 6 is a vertical cross-sectional view showing the state of shaft construction according to the prior art. In addition, in the figure, 1... guide body, 2... outer cylinder, 5...
Jacket, 6... Pressure support beam, 7, 8... Partition plate, 9, 10, 11... Auxiliary partition plate, 20... Prior art leading body, 21... Blade mouth, 22... Jacket, 23... …Indicates earth and sand.
Claims (1)
向に沿つて圧力支持梁を設けるとともに、同支持
梁をその外周方向に向かつてアンカー手段で坑壁
の地盤に固定しておき、先端に備えた先導体を前
記圧力支持梁より反力を得て坑底に圧入し、圧入
された先導体内の土砂を掘削して立坑を掘り進め
るとともに、先導体内の上方側でライナープレー
トを順次継ぎ足しながら坑壁を築造していく立坑
の先導体装置において、先導体先端の外筒部に断
面平行またはテーパ状の仕切板を十字に装着し、
さらに土質条件に応じて前記仕切板内を断面平行
またはテーパ状の補助仕切板により格子状に結合
して、先導体先端の内部を任意の大きさに分割す
ることを特徴とする立坑構築の先導体装置。 A pressure support beam is provided along the axial direction of the shaft in a part of the circumferential direction of the liner plate, and the support beam is fixed to the ground of the shaft wall by anchor means toward the outer circumference, and a pressure support beam is provided at the tip. The guide body is press-fitted into the bottom of the mine by receiving a reaction force from the pressure support beam, and the earth and sand inside the press-fit guide body is excavated to advance the shaft, while liner plates are sequentially added above the guide body and the mine wall is In the guide body device for a shaft that is being constructed, a partition plate with a parallel or tapered cross section is installed in a cross shape on the outer cylinder at the tip of the guide body.
Further, depending on the soil conditions, the inside of the partition plates are connected in a lattice shape with parallel or tapered auxiliary partition plates to divide the inside of the tip of the guide body into arbitrary sizes. body equipment.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP14622689U JPH0638953Y2 (en) | 1989-12-19 | 1989-12-19 | Vertical conductor construction device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP14622689U JPH0638953Y2 (en) | 1989-12-19 | 1989-12-19 | Vertical conductor construction device |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH0386192U true JPH0386192U (en) | 1991-08-30 |
JPH0638953Y2 JPH0638953Y2 (en) | 1994-10-12 |
Family
ID=31692825
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP14622689U Expired - Lifetime JPH0638953Y2 (en) | 1989-12-19 | 1989-12-19 | Vertical conductor construction device |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPH0638953Y2 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP7158620B1 (en) * | 2022-07-13 | 2022-10-21 | 辻 ふうな | Retaining wall construction method |
-
1989
- 1989-12-19 JP JP14622689U patent/JPH0638953Y2/en not_active Expired - Lifetime
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP7158620B1 (en) * | 2022-07-13 | 2022-10-21 | 辻 ふうな | Retaining wall construction method |
Also Published As
Publication number | Publication date |
---|---|
JPH0638953Y2 (en) | 1994-10-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JPH0386192U (en) | ||
JPS624639Y2 (en) | ||
JPH11181767A (en) | End metal fitting of steel pipe pile | |
JP3591376B2 (en) | Lining structure and lining method for rectangular section tunnel | |
JPS63141294U (en) | ||
JPS5833145Y2 (en) | steel pipe pile | |
JPS6111324Y2 (en) | ||
JPS64434Y2 (en) | ||
JPS6158292U (en) | ||
JPS62125138U (en) | ||
JPH0332591Y2 (en) | ||
JPH11210390A (en) | Segment | |
JPS6117120Y2 (en) | ||
JPS6136573Y2 (en) | ||
JPS62125139U (en) | ||
JPH0465833U (en) | ||
JPH03111630U (en) | ||
JPH01104484U (en) | ||
JPS61198348U (en) | ||
JPH0412598U (en) | ||
JPS58103232U (en) | Joint structure of steel jacket structure and steel pipe pile | |
JPS61135947U (en) | ||
JPH0250430U (en) | ||
JPH0354321U (en) | ||
JPS6365746U (en) |