JPH038559Y2 - - Google Patents
Info
- Publication number
- JPH038559Y2 JPH038559Y2 JP1984087936U JP8793684U JPH038559Y2 JP H038559 Y2 JPH038559 Y2 JP H038559Y2 JP 1984087936 U JP1984087936 U JP 1984087936U JP 8793684 U JP8793684 U JP 8793684U JP H038559 Y2 JPH038559 Y2 JP H038559Y2
- Authority
- JP
- Japan
- Prior art keywords
- hatch
- bulk cargo
- hatch cover
- hatches
- ship
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
- 230000000694 effects Effects 0.000 description 2
- 230000032258 transport Effects 0.000 description 2
- 238000004804 winding Methods 0.000 description 2
Landscapes
- Ship Loading And Unloading (AREA)
Description
【考案の詳細な説明】
産業上の利用分野
本考案は船舶のハツチカバーに関するものであ
る。[Detailed Description of the Invention] Industrial Application Field The present invention relates to a hatch cover for a ship.
従来例の構成とその問題点
陸上から貨物船の船倉内にばら積み貨物を積込
む場合には、能率化を考慮し、3500〜10000t/n
程度の大量の積荷役がおこなわれる。またハツチ
からハツチ積込用ローダを移動させるときに、そ
のローダを停止させる場合には陸側コンベアをも
全面停止させなくてはならないので、通常、ロー
ダを停止させることなく、移動させている。この
ため上甲板のハツチ間にばら積み貨物が堆積す
る。この堆積したばら積み貨物を取除くのに手間
がかかり、特に船体装備品の付近のばら積み貨物
を取除くのが大変である。Conventional configuration and its problems When loading bulk cargo from land into the hold of a cargo ship, efficiency is taken into account, and the loading capacity is 3,500 to 10,000 t/n.
A large amount of cargo work is carried out. Furthermore, when moving a hatch loading loader from a hatch, if the loader is stopped, the land conveyor must also be completely stopped, so the loader is usually moved without stopping. This causes bulk cargo to accumulate between the hatches on the upper deck. It takes time and effort to remove this accumulated bulk cargo, and it is particularly difficult to remove bulk cargo near the ship's equipment.
考案の目的
本考案は上記従来の欠点を解消する船舶のハツ
チカバーを提供することを目的とする。Purpose of the invention The object of the present invention is to provide a hatch cover for a ship that eliminates the above-mentioned conventional drawbacks.
考案の構成
上記目的を達成するため、本考案の船舶のハツ
チカバーは、船首尾方向に沿う間隔の方が船体横
断方向に沿う間隔よりも小さい長方形のハツチを
船首尾方向に沿つて適当間隔ごとに複数形成し、
各ハツチ間の間隔をハツチカバーの船首尾方向に
沿う間隔とほぼ同一に設定し、各ハツチカバーを
ハツチ上とハツチ間の位置との間で往復移動自在
に構成し、ハツチカバーの上面を、その上に投下
させられたばら積み貨物がハツチ内に案内させら
れる形状にしたものである。Structure of the Invention In order to achieve the above object, the hatch cover for a ship of the present invention has rectangular hatches arranged at appropriate intervals along the bow and stern direction, the spacing of which is smaller than the spacing along the transverse direction of the ship. Form multiple,
The interval between each hatch is set to be almost the same as the interval along the bow and stern direction of the hatch cover, and each hatch cover is configured to be movable back and forth between the position above the hatch and between the hatches, and the upper surface of the hatch cover is It is shaped so that the dropped bulk cargo is guided into the hatch.
かかる構成によれば、ハツチを開放して船倉内
に積込用ローダによつてばら積み貨物を投下し、
次にそのローダを隣のハツチへ移動させるとき
に、ローダから上甲板のハツチ間にばら積み貨物
が落下するが、その上甲板のハツチ間をハツチカ
バーで覆い、しかもそのハツチカバーの上面を、
その上に投下させられたばら積み貨物がハツチ内
に案内させられる形状にしてあることから、ロー
ダから上甲板のハツチ間に落下したばら積み貨物
はハツチカバーに当たつてハツチ内に案内させる
ものである。したがつて従来のように上甲板のハ
ツチ間にばら積み貨物が堆積することははない。 According to this configuration, the hatch is opened and the bulk cargo is dropped into the hold by the loading loader,
Next, when the loader is moved to the next hatch, bulk cargo falls from the loader between the hatches on the upper deck, but the space between the hatches on the upper deck is covered with a hatch cover, and the top surface of the hatch cover is
Since the loader is shaped so that the bulk cargo dropped onto it is guided into the hatch, the bulk cargo that falls from the loader between the hatches on the upper deck hits the hatch cover and is guided into the hatch. Therefore, bulk cargo does not accumulate between the hatches on the upper deck as in the past.
実施例と作用
以下、本考案の一実施例を第1図〜第6図に基
づいて説明する。1はばら積み貨物2を運搬する
貨物船であつて、複数の船倉3を有する。4は各
船倉3に複数(この実施例では2箇所または3箇
所)形成されたハツチであつて、船首尾方向に沿
う間隔L1の方が船体横断方向に沿う間隔L2より
も小さい長方形に形成され、船側近くまで開口さ
れている。また各ハツチ4間の間隔αをハツチカ
バー5の船首尾方向に沿う間隔βとほぼ同一に設
定してある。さらにハツチカバー5の上面を山形
傾斜面5Aに形成してある。6は各ハツチカバー
5どうしを連結する長さ調整機構7付き連結杆、
8はハツチカバー5の車輪9を支持するガイドレ
ール、10は上甲板11の船首および船尾におい
て両端に位置するハツチカバー5の隅部に対向し
て配設されたブラケツト12にそれぞれ回転自在
に支持された上下一対のプーリ、13は両端に位
置するハツチカバー5の隅部に両端が連結される
と共に各プーリ10に巻回された一対の索体、1
4は適当なプーリ10を正逆転させることにより
各索体13を介して各ハツチカバー5を矢印Aま
たはB方向へ移動させる駆動モータ、15は船倉
3のホツパ状底部8Aの各開口16の下に船首尾
方向に沿つて配設された8本の第1ベルトコンベ
ア、17は両端の第1ベルトコンベア15から落
下したばら積み貨物2を船体中央に向けて搬送す
る一対の第2ベルトコンベア、18は第2ベルト
コンベア17および中央の第1ベルトコンベア1
5から落下してきたばら積み貨物2を上甲板11
まで搬送するバケツトコンベア、20は該バケツ
トコンベア18の途中からばら積み貨物2が落下
しないようにそのバケツトコンベア18と一体的
に作動する第8ベルトコンベア、21は上甲板1
1上に配設された荷降し装置であつて、上甲板1
1上に矢印C,D方向旋回自在に配設された旋回
台22と、該旋回台22に支軸23を介して上下
動自在に連結されたブーム24と、旋回台22上
の支柱25の上部に配設されると共にその巻取ド
ラムからのばしたワイヤロープ26の一端をブー
ム24の先端に連結したブーム上下動用ウインチ
27と、ブーム24に配設されると共にバケツト
コンベア18の上端から落下してきたばら積み貨
物2をホツパ28を介して受取つて陸上の受取施
設に送り込む第4ベルトコンベア29とから構成
されている。Embodiment and operation Hereinafter, an embodiment of the present invention will be described based on FIGS. 1 to 6. 1 is a cargo ship that transports bulk cargo 2 and has a plurality of holds 3. Reference numeral 4 denotes a plurality of hatches (two or three in this embodiment) formed in each hold 3, each having a rectangular shape in which the interval L 1 along the bow and stern direction is smaller than the interval L 2 along the transverse direction of the ship. It is formed and opens close to the side of the ship. Further, the interval α between each hatch 4 is set to be approximately the same as the interval β of the hatch cover 5 along the bow and stern direction. Further, the upper surface of the hatch cover 5 is formed into a chevron-shaped inclined surface 5A. 6 is a connecting rod with a length adjustment mechanism 7 that connects each hatch cover 5;
8 is a guide rail that supports the wheels 9 of the hatch cover 5, and 10 is rotatably supported by brackets 12 that are disposed opposite the corners of the hatch cover 5 located at both ends of the bow and stern of the upper deck 11. A pair of upper and lower pulleys 13 are connected at both ends to the corners of the hatch cover 5 located at both ends, and a pair of cables 1 are wound around each pulley 10.
4 is a drive motor that moves each hatch cover 5 in the direction of arrow A or B via each rope body 13 by rotating an appropriate pulley 10 in the forward and reverse directions; Eight first belt conveyors arranged along the bow and stern direction, 17 a pair of second belt conveyors that transport the bulk cargo 2 that has fallen from the first belt conveyors 15 at both ends towards the center of the ship; 18 a pair of second belt conveyors; Second belt conveyor 17 and first belt conveyor 1 in the center
The bulk cargo 2 that fell from 5 was transferred to the upper deck 11.
20 is an eighth belt conveyor that operates integrally with the bucket conveyor 18 to prevent the bulk cargo 2 from falling from the middle of the bucket conveyor 18; 21 is the upper deck 1;
1, which is an unloading device disposed on the upper deck 1.
1, a swivel base 22 is disposed on the swivel base 22 so as to be rotatable in the directions of arrows C and D, a boom 24 is connected to the swivel base 22 via a support shaft 23 so as to be movable up and down, and a support column 25 on the swivel base 22 is provided. A winch 27 for vertically moving the boom connects one end of a wire rope 26 extending from the winding drum to the tip of the boom 24, and a winch 27 for vertically moving the boom connects one end of a wire rope 26 extending from the winding drum to the top end of the boom 24; It is comprised of a fourth belt conveyor 29 that receives the fallen bulk cargo 2 via a hopper 28 and sends it to a receiving facility on land.
以下、上記構成における作用について説明す
る。まず船倉3内にばら積み貨物2を積込む場合
には、上甲板11上の荷降し装置21を矢印Cま
たはB方向へ移動させて船外へ突出させ、次に各
ハツチコーミングのシリンダを作動させて車輪9
を持上げる。次にモータ14を作動させて索体1
3を一方向へ引張り、これによつて第1図、第2
図、第4図上側および第5図の状態の各ハツチカ
バー5を矢印A方向へ移動させ、第4図下側およ
び第6図に示すごとくハツチカバー5をハツチ4
間にもたらし、ハツチ4を開放する。次に陸上の
ローダの先端を適当なハツチ4の上方にもたら
し、該ローダを作動させてばら積み貨物2をハツ
チ4から船倉3内に投下し、同様にして次々とハ
ツチ4から船倉3内にばら積み貨物2を投下して
いけばよい。ここでローダがハツチ4からハツチ
4へ移るときに、そのローダからばら積み貨物2
が落下するのが、上甲板11のハツチ4間をハツ
チカバー5で覆つているので、その落下したばら
積み貨物2はハツチカバー5上に落下し、その山
形傾斜面5Aを滑つてハツチ4内に投入されるも
のである。したがつて上甲板11のハツチ4間に
ばら積み貨物2が堆積しないことはもちろんのこ
と、ハツチカバー5上にも堆積しないものであ
る。 Hereinafter, the effects of the above configuration will be explained. First, when loading bulk cargo 2 into the hold 3, the unloading device 21 on the upper deck 11 is moved in the direction of arrow C or B to project out of the ship, and then the cylinders of each hatch coaming are activated. Let me wheel 9
lift up. Next, the motor 14 is operated to
3 in one direction, thereby causing the
4, the hatch covers 5 in the upper side of FIG. 4, and the states of FIG.
Bring it in between and open hatch 4. Next, bring the tip of the loader on land above a suitable hatch 4, operate the loader, drop the bulk cargo 2 from the hatch 4 into the hold 3, and similarly load the bulk cargo 2 from the hatch 4 into the hold 3 one after another. All you have to do is drop Cargo 2. Here, when the loader moves from hatch 4 to hatch 4, the bulk cargo 2 is transferred from the loader to hatch 4.
Since the space between the hatches 4 on the upper deck 11 is covered by the hatch cover 5, the fallen bulk cargo 2 falls onto the hatch cover 5, slides on the chevron-shaped slope 5A, and is thrown into the hatch 4. It is something that Therefore, it goes without saying that the bulk cargo 2 does not accumulate between the hatches 4 of the upper deck 11, and also does not accumulate on the hatch cover 5.
積込みが終了したならば、モータ14を逆転さ
せて各ハツチカバー5を矢印B方向へ移動させて
ハツチ4を閉鎖し、車輪9直下のプレートを降下
させてハツチカバー5をハツチコーミング上に載
置すればよい。 When loading is completed, the motor 14 is reversed to move each hatch cover 5 in the direction of arrow B to close the hatch 4, and the plate directly below the wheel 9 is lowered to place the hatch cover 5 on the hatch coaming. good.
次に船倉3内のばら積み貨物2を陸揚げする場
合には、まず船倉底部3Aの開口16を開け、そ
の開口16から落下したばら積み貨物2を第1ベ
ルトコンベア15により船尾に向かつて搬送し、
両端の第1ベルトコンベア15から落下してばら
積み貨物2を第2ベルトコンベア17により船体
中央に集め、その各第2ベルトコンベア17およ
び中央の第1ベルトコンベア15から落下してき
たばら積み貨物2をバケツトコンベア18により
上甲板11の上方まで持上げ、第3ベルトコンベ
ア20によりバケツトコンベア18の途中からば
ら積み貨物2が落下しないようにし、バケツトコ
ンベア18の上端から落下したばら積み貨物2を
ホツパ28を介して第4ベルトコンベア29によ
り受取つて陸上の受取施設に受け渡せばよい。 Next, when the bulk cargo 2 in the cargo hold 3 is to be unloaded, the opening 16 in the cargo hold bottom 3A is first opened, and the bulk cargo 2 that has fallen from the opening 16 is transported toward the stern by the first belt conveyor 15.
The bulk cargo 2 falling from the first belt conveyors 15 at both ends is collected at the center of the ship by the second belt conveyor 17, and the bulk cargo 2 falling from each of the second belt conveyors 17 and the first belt conveyor 15 at the center is collected in a bucket. The third belt conveyor 20 prevents the bulk cargo 2 from falling from the middle of the bucket conveyor 18, and the bulk cargo 2 that has fallen from the upper end of the bucket conveyor 18 is lifted to the top of the upper deck 11 by the third belt conveyor 20. They may be received by the fourth belt conveyor 29 and delivered to a receiving facility on land.
上記実施例ではハツチカバー5の上面を山形傾
斜面5Aとしたが、これに限定されるわけではな
く、たとえば第7図に示すごとく、かまぼこ形の
円弧面5Bとしてもよい。要はばら積み貨物2が
ハツチ4内に案内させられるような形状であれば
よいのである。 In the above embodiment, the upper surface of the hatch cover 5 is formed into a chevron-shaped inclined surface 5A, but it is not limited to this. For example, as shown in FIG. 7, it may be formed into a semicylindrical arc surface 5B. In short, any shape is sufficient as long as the bulk cargo 2 is guided into the hatch 4.
考案の効果
以上述べたごとく本考案によれば、ハツチを開
放して船倉内に積込用ローダによつてばら積み貨
物を投下し、次にそのローダを隣のハツチへ移動
させるときに、ローダから上甲板のハツチ間にば
ら積み貨物が落下するが、その上甲板のハツチ間
をハツチカバーで覆い、しかもそのハツチカバー
の上面を、その上に投下させられたばら積み貨物
がハツチ内に案内させられる形状にしてあること
から、ローダから上甲板のハツチ間に落下したば
ら積み貨物はハツチカバーに当たつてハツチ内に
案内されるものである。したがつて従来のように
上甲板のハツチ間にばら積み貨物が堆積すること
はない。Effects of the invention As described above, according to the invention, when a hatch is opened and bulk cargo is dropped into the hold by a loading loader, then when the loader is moved to the next hatch, Bulk cargo falls between the hatches on the upper deck, but the space between the hatches on the upper deck is covered with a hatch cover, and the top surface of the hatch cover is shaped so that the bulk cargo dropped onto it is guided into the hatch. For this reason, bulk cargo that falls from the loader between the hatches on the upper deck hits the hatch cover and is guided into the hatch. Therefore, bulk cargo does not accumulate between hatches on the upper deck as in the past.
第1図〜第6図は本考案の一実施例を示し、第
1図は縦断面図、第2図は平面図、第3図は横断
面図、第4図上側はハツチ閉鎖状態の平面図、第
4図下側はハツチ開放状態の平面図、第5図は第
4図の−矢視図、第6図は第5図の−矢
視図である。第7図は本考案の他の実施例を示す
要部の縦断面図である。
1……貨物船、2……ばら積み貨物、3……船
倉、4……ハツチ、5………ハツチカバー、5A
……山形傾斜面、5B……円弧面、6……連結
杆、13……索体、14……駆動モータ。
Figures 1 to 6 show an embodiment of the present invention, in which Figure 1 is a longitudinal cross-sectional view, Figure 2 is a plan view, Figure 3 is a cross-sectional view, and Figure 4, the upper side, is a plan view of the hatch in the closed state. The lower side of FIG. 4 is a plan view of the hatch in the open state, FIG. 5 is a view taken along the - arrow in FIG. 4, and FIG. 6 is a view taken along the - arrow in FIG. FIG. 7 is a vertical cross-sectional view of the main parts showing another embodiment of the present invention. 1... Cargo ship, 2... Bulk cargo, 3... Hold, 4... Hatch, 5... Hatch cover, 5A
... Chevron-shaped inclined surface, 5B ... Arc surface, 6 ... Connection rod, 13 ... Cable body, 14 ... Drive motor.
Claims (1)
う間隔よりも小さい長方形のハツチを船首尾方向
に沿つて適当間隔ごとに複数形成し、各ハツチ間
の間隔をハツチカバーの船首尾方向に沿う間隔と
ほぼ同一に設定し、各ハツチカバーをハツチ上と
ハツチ間の位置との間で往復移動自在に構成し、
ハツチカバーの上面を、その上に投下させられた
ばら積み貨物がハツチ内に案内させられる形状に
したことを特徴とする船舶のハツチカバー。 A plurality of rectangular hatches are formed at appropriate intervals along the bow and stern direction, and the spacing along the bow and stern direction is smaller than the spacing along the hull transverse direction, and the spacing between each hatch is set to the interval along the bow and aft direction of the hatch cover. , each hatch cover is configured to be movable back and forth between the position above the hatch and the position between the hatches,
A hatch cover for a ship, characterized in that the upper surface of the hatch cover is shaped so that bulk cargo dropped thereon is guided into the hatch.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP8793684U JPS613194U (en) | 1984-06-13 | 1984-06-13 | ship hatch cover |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP8793684U JPS613194U (en) | 1984-06-13 | 1984-06-13 | ship hatch cover |
Publications (2)
Publication Number | Publication Date |
---|---|
JPS613194U JPS613194U (en) | 1986-01-10 |
JPH038559Y2 true JPH038559Y2 (en) | 1991-03-01 |
Family
ID=30640606
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP8793684U Granted JPS613194U (en) | 1984-06-13 | 1984-06-13 | ship hatch cover |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPS613194U (en) |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS57205289A (en) * | 1981-06-09 | 1982-12-16 | Mitsui Eng & Shipbuild Co Ltd | Cargo stowage for bulk freighter |
-
1984
- 1984-06-13 JP JP8793684U patent/JPS613194U/en active Granted
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS57205289A (en) * | 1981-06-09 | 1982-12-16 | Mitsui Eng & Shipbuild Co Ltd | Cargo stowage for bulk freighter |
Also Published As
Publication number | Publication date |
---|---|
JPS613194U (en) | 1986-01-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP0102191B1 (en) | Containerization system, apparatus and method | |
US4498584A (en) | Stackable container for use in a containerization system | |
JPS5823308B2 (en) | enchiyoku conveyor | |
US5613820A (en) | Continuous-operation cargo-transfer equipment | |
CA2281092C (en) | Transporter container-loading bridge | |
US5564878A (en) | Apparatus and method for continuous handling of bulk materials | |
US1565875A (en) | Unloading apparatus for vessels | |
CA1189476A (en) | Bulk-material unloading unit for ships or like carriers | |
JPH038559Y2 (en) | ||
US3002634A (en) | Bulk-cargo carrying ship | |
JPH037277Y2 (en) | ||
JP3210305B2 (en) | Ship deck loading / unloading equipment | |
US3861539A (en) | Barge cover handling system | |
US4755094A (en) | Self-unloading barge and unloading apparatus therefor | |
JPH03501114A (en) | Ship cargo handling equipment for transporting packed cargo, especially pallets loaded with such cargo | |
US2793766A (en) | Cargo handling device | |
JPS5825615B2 (en) | Organizing and leveling equipment for bulk materials in cargo or storage rooms | |
JPS5823787Y2 (en) | Soil lifting device | |
EP0020167A1 (en) | Bucket wheel unloaders especially for ships | |
SU1184773A1 (en) | Conveyer arrangement for reloading loose materials in ports | |
JP3088139U (en) | Dust proof structure of self-unloader ship | |
EP0109114B1 (en) | Self-unloading vessel | |
JPS58113039A (en) | Continuous unloader | |
JP6730064B2 (en) | Ship and cargo handling method | |
JPS584675B2 (en) | Ships transporting slag, etc. |