Prior art keywords
concrete foundation
plate
fixing
embedded box
foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP28608189A
Other languages
Japanese (ja)
Other versions
JPH02186032A (en
Inventor
Takeshi Yoshida
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sekisui House Ltd
Original Assignee
Sekisui House Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sekisui House Ltd filed Critical Sekisui House Ltd
Priority to JP28608189A priority Critical patent/JPH02186032A/en
Publication of JPH02186032A publication Critical patent/JPH02186032A/en
Publication of JPH034702B2 publication Critical patent/JPH034702B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)
  • Floor Finish (AREA)

Description

【発明の詳細な説明】 (産業上の利用分野) 本発明は、住宅の床を構成する大引端部のコン
クリート基礎に対する固定方法に関する。
DETAILED DESCRIPTION OF THE INVENTION (Industrial Application Field) The present invention relates to a method for fixing an end part of a house floor to a concrete foundation.

(従来の技術と問題点) 従来の大引端部の固定方法は、第6図に示すよ
うに、コンクリート基礎aの内側面の上端に設け
られた大引掛用の凹部bに大引cと端部が嵌入さ
れると共に、該端部近傍が束dにより下方から支
持され、根がらみe,fで固定されていたため
に、作業が大変煩雑で、しかも束dも束石gを初
めとして多くの部材を要するためコスト高となつ
ていた。また、凹部dの底面はコンクリート基礎
aの天端均とし同時にモルタルhによつて均され
るのであるが、凹部であるが故に完全に均するこ
とは困難で、このことが大引cのガタつき及び施
工精度の悪さの原因ともなつていた。
(Prior art and problems) As shown in Fig. 6, the conventional method for fixing the end of a large pull is to attach a large hook c to a recess b for a large hook provided at the upper end of the inner surface of a concrete foundation a. When the end is inserted, the vicinity of the end is supported from below by the bundle d and fixed by the roots e and f, which makes the work very complicated.Moreover, the bundle d also has many stones including the bundle g. The cost was high because several parts were required. In addition, the bottom surface of the recess d is leveled with the mortar h at the same time as the top of the concrete foundation a, but since it is a recess, it is difficult to completely level it, and this causes the backlash of the large pull c. This was also a cause of poor installation accuracy.

(問題を解決するための目的) 本発明は、受金具を用いてコンクリート基礎の
内側面に大引の端部を直角に取付ける方法であ
り、受金具をコンクリート基礎に固定する固定ボ
ルトの埋込固着方法にも特徴を有する。
(Purpose of Solving the Problem) The present invention is a method of attaching the end of a large wire at right angles to the inner surface of a concrete foundation using a receiving metal fitting, in which a fixing bolt is embedded to fix the receiving metal fitting to the concrete foundation. Another feature is the fixing method.

(実施例) 以下、本発明の構成を実施例について図面を参
照して説明する。
(Example) Hereinafter, the configuration of the present invention will be described with reference to the drawings.

第4図は本発明において用いられる受金具2を
示す。この受金具2は、一枚の金属板を折曲げて
形成したもので、大引1の端部を挟持する挟持板
7,7を受板6の両側縁に立上げて形成するとと
もに受板6の後端を垂下させて受金具2をコンク
リート基礎4に取付ける取付板5となしたもので
ある。取付板5には二個以上のボルト挿通孔8が
形成されている。また、挟持板7,7の内側面に
は斜め下方に向けた爪片9が突設されている。該
爪片9は挟持板7,7を部分的に切り起こして内
方に折曲げ形成するとよい。受金具2の形状は上
述したものに限られない。例えば第5図に示すよ
うに、受板6と取付板5との間に補強リブ板10
が設けられていてもよく、また、両挟持板7,7
間の後端部を背板30で閉じていてもよい。
FIG. 4 shows the receiving metal fitting 2 used in the present invention. This receiving metal fitting 2 is formed by bending a single metal plate, and is formed by raising up both side edges of the receiving plate 6, and holding plates 7, 7 for holding the ends of the Ohiki 1. The rear end of 6 is made to hang down to form a mounting plate 5 for attaching the receiving metal fitting 2 to the concrete foundation 4. Two or more bolt insertion holes 8 are formed in the mounting plate 5. Furthermore, claw pieces 9 are provided on the inner surfaces of the holding plates 7, 7 to project diagonally downward. The claw pieces 9 are preferably formed by partially cutting and raising the holding plates 7, 7 and bending them inward. The shape of the receiving metal fitting 2 is not limited to that described above. For example, as shown in FIG. 5, a reinforcing rib plate 10 is inserted between the receiving plate 6 and the mounting plate 5.
may be provided, and both clamping plates 7, 7 may be provided.
The rear end portion between them may be closed with a back plate 30.

次に、このように構成した受金具2をコンクリ
ート基礎4に取付ける手段について説明する。
Next, a description will be given of means for attaching the receiving metal fitting 2 configured in this way to the concrete foundation 4.

第3図に示すように、まず後端部がU字状に屈
曲された固定ボルト11,11をそれぞれスペー
サー13,13を介して皿状の埋込ボツクス14
の底板15の取付孔16,16に挿通し、底板1
5の内側からナツト12,12をそれぞれ固定ボ
ルト11,11のねじ部に螺着して固定ボルト1
1,11を埋込ボツクス14に取付ける。固定ボ
ルト11,11の後端部は底板15から外方へ突
出している。
As shown in FIG. 3, first fixing bolts 11, 11 whose rear ends are bent into a U-shape are inserted into a dish-shaped embedding box 14 through spacers 13, 13, respectively.
Insert into the mounting holes 16, 16 of the bottom plate 15 of the bottom plate 1.
Screw the nuts 12, 12 onto the threaded portions of the fixing bolts 11, 11 from the inside of the fixing bolt 1, respectively.
1 and 11 are attached to the embedded box 14. The rear end portions of the fixing bolts 11, 11 protrude outward from the bottom plate 15.

次に仮枠17を組み立てた後、固定ボルト1
1,11を取付け埋込ボツクス14を、埋込ボツ
クス14の上端に設けられている逆L字形の掛止
杆18,18を用いて仮枠17の上端に引つ掛け
て仮枠の内面に取付ける。その際、掛止杆18,
18に螺入されている位置調整ねじ19,19を
回して埋込ボツクス14が所定位置に、換言すれ
ば固定ボルト11,11が所定埋設位置にくるよ
う埋込ボツクス14の取付高さを調整する。次
に、コンクリートを打設し、埋込ボツクス14の
掛止杆18,18の立上り部に突設されているレ
ベル調整板20,20を利用して天端均しを行な
いコンクリート基礎4を構築する。コンクリート
硬化後、まず仮枠17を順次解体していき、最後
にナツト12,12を外して埋込ボツクス14を
コンクリート基礎4から取り外し作業を完了す
る。
Next, after assembling the temporary frame 17, fixing bolt 1
1 and 11, the embedded box 14 is hooked onto the upper end of the temporary frame 17 using the inverted L-shaped hanging rods 18, 18 provided at the upper end of the embedded box 14, and attached to the inner surface of the temporary frame. Install. At that time, the hanging rod 18,
Adjust the mounting height of the embedding box 14 by turning the position adjustment screws 19, 19 screwed into the embedding box 18 so that the embedding box 14 is in a predetermined position, in other words, the fixing bolts 11, 11 are in a predetermined embedding position. do. Next, concrete is poured and the top level is leveled using the level adjustment plates 20, 20 protruding from the rising parts of the locking rods 18, 18 of the embedded box 14, and the concrete foundation 4 is constructed. do. After the concrete has hardened, the temporary frame 17 is first dismantled one by one, and finally the nuts 12 are removed and the embedded box 14 is removed from the concrete foundation 4 to complete the work.

コンクリート基礎4に後端部を埋設した固定ボ
ルト11,11に受金具2を取付けるには、第1
図及び第2図に示すように、受金具2の取付板5
に設けられたボルト挿通孔8,8を固定ボルト1
1,11に嵌め、ワツシヤ21を介してナツト1
2,12を固定ボルト11,11のねじ部に螺着
する。このようにして受金具2をコンクリート基
礎4の内側面に固定する。ナツト12,12は固
定ボルト11,11の埋設時に使用したものであ
る。
To attach the bracket 2 to the fixing bolts 11, 11 whose rear ends are buried in the concrete foundation 4, first
As shown in the figure and FIG. 2, the mounting plate 5 of the bracket 2
Fix the bolts 1 through the bolt insertion holes 8, 8 provided in the
1, 11, and nut 1 through washer 21.
2 and 12 onto the threaded portions of the fixing bolts 11 and 11. In this way, the receiving metal fitting 2 is fixed to the inner surface of the concrete foundation 4. Nuts 12, 12 are used when fixing bolts 11, 11 are buried.

コンクリート基礎4の固定ボルト11に締着さ
れた受金具2に大引1の端部を固定するには、第
1図及び第2図に示すように、大引1の端部を受
金具2の上方から両挟持板7,7の間に木槌等を
使つて強制嵌入し、大引1の底面を受板6の上面
に当接させる。このとき、両挟持板7,7に突設
された爪片9が大引1の端部に両側面に食い込
み、大引1の端部を両挟持板7,7によつてしつ
かりと固定される。大引の端部はコンクリート基
礎4の内側面に直角に固定される。この固定は、
両挟持板9,9に釘孔を穿設しておいて、大引1
の端部を釘止めしてもよい。
In order to fix the end of the daihiki 1 to the receiving metal fitting 2 which is tightened to the fixing bolt 11 of the concrete foundation 4, as shown in Figs. It is forcibly inserted between the holding plates 7, 7 from above using a mallet or the like, and the bottom surface of the drawer 1 is brought into contact with the top surface of the receiving plate 6. At this time, the claw pieces 9 protruding from both clamping plates 7, 7 bite into the ends of the large pull 1 on both sides, and the ends of the large pull 1 are firmly fixed by the two clamping plates 7, 7. be done. The end of the large pull is fixed at right angles to the inner surface of the concrete foundation 4. This fixation is
Drill nail holes in both clamping plates 9, 9, and
The ends may be nailed.

(発明の効果) 本発明は、大引の端部を受板の上に載せ、大引
の端部の両側面を挟持する挟持板が設けられた受
金具がコンクリート基礎の内側面に取付けられ、
この受金具を介して大引の端部がコンクリート基
礎に直角に固定されるものである。したがつて、
大引の端部をコンクリート基礎にガタつきなく確
実に固定することができるので、作業性、経済性
が大巾に向上する。また、大引の端部は受金具に
嵌入するだけで固定できるため、作業能率がよ
い。
(Effects of the Invention) The present invention is characterized in that the end of the large pull is placed on a receiving plate, and a receiving metal fitting provided with a clamping plate that holds both sides of the end of the large pull is attached to the inner surface of a concrete foundation. ,
The end of the daihiki is fixed to the concrete foundation at right angles through this receiving metal fitting. Therefore,
Since the end of the puller can be securely fixed to the concrete foundation without wobbling, work efficiency and economic efficiency are greatly improved. In addition, the end of the drawer can be fixed by simply fitting it into the receiving metal fitting, which improves work efficiency.

さらに、大引の端部は受金具により支持、固定
され、かつ受金具はコンクリート基礎に埋込ボツ
クスを用いて水平状に固着された固定ボルトに締
着されている。したがつて大引の取付位置が正確
で施工精度が高くなる。さらにまた、受金具は1
枚の金属板が屈曲されて形成されるものであるか
ら、材料費の節減が図れ、このこともまた経済性
の向上に寄与するものである。
Furthermore, the end of the main drawer is supported and fixed by a receiving metal fitting, and the receiving metal fitting is fastened to a fixing bolt horizontally fixed to the concrete foundation using an embedded box. Therefore, the installation position of the large puller is accurate and the construction accuracy is high. Furthermore, the bracket is 1
Since it is formed by bending a sheet of metal, material costs can be reduced, which also contributes to improved economic efficiency.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は本発明方法による大引端部の固定構造
の一実施例を示す正面図、第2図は第1図におけ
るX−X線断面図、第3図は本発明に係る固定ボ
ルトの埋設方法を示す説明図、第4図は本発明に
おいて用いられる受金具の一実施例を示す斜視
図、第5図は受金具の他の実施例を示す斜視図、
第6図は従来の大引の端部の固定方法を示す斜視
図である。 1……大引、2……受金具、4……コンクリー
ト基礎、5……取付板、6……受板、7……挟持
板、8……ボルト挿通孔、11……固定ボルト。
FIG. 1 is a front view showing an embodiment of a fixing structure for a large draw end according to the method of the present invention, FIG. 2 is a sectional view taken along the line X-X in FIG. 1, and FIG. An explanatory diagram showing the embedding method, FIG. 4 is a perspective view showing one embodiment of the receiving metal fitting used in the present invention, and FIG. 5 is a perspective view showing another embodiment of the receiving metal fitting.
FIG. 6 is a perspective view showing a conventional method of fixing the end of a large pull. DESCRIPTION OF SYMBOLS 1... Main puller, 2... Receiving metal fitting, 4... Concrete foundation, 5... Mounting plate, 6... Receiving plate, 7... Clamping plate, 8... Bolt insertion hole, 11... Fixing bolt.

Claims (1)

【特許請求の範囲】 1 後端部をU字状に屈曲した二個以上の固定ボ
ルトをそれぞれスペーサーを介して皿状の埋込ボ
ツクスの底板に形成した取付孔に挿通させ、この
取付孔から埋込ボツクス内に突出したねじ部にナ
ツトをねじ入れることにより、固定ボルトを後端
部が底板から外方へ突出するように埋込ボツクス
に取付け、コンクリート基礎を構築する仮枠の側
面(コンクリート基礎の内側面を形成する面)の
適所に、固定ボルトの後端部が仮枠内に突入する
ように埋込ボツクスを伏せて取付け、このように
なした仮枠内にコンクリートを打設して基礎を構
築した後、仮枠を解体し、前記したナツトを外し
て埋込ボツクスをコンクリート基礎から除くこと
により固定ボルトをコンクリート基礎の内側面に
水平状に埋込み固着し、 一枚の金属板を折曲げて受板と取付板からなる
断面L字形の受金具を形成し、この受金具は両側
縁が立上げられて挟持板となされ、この両挟持板
の内側面には斜め下方に向けた爪片が形成され、
取付板には二個以上のボルト挿通孔が設けられた
ものであり、 前記した固定ボルトのコンクリート基礎から突
出したねじ部に前記取付板のボルト挿通孔を挿通
させ、取付板から突出したねじ部にナツトを締込
んで受金具をコンクリート基礎に固定し、 この受金具の両挟持板内に大引の端部を嵌入
し、大引をコンクリート基礎の内側面に直角に固
定することを特徴とするコンクリート基礎に対す
る大引端部の固定方法。
[Scope of Claims] 1. Two or more fixing bolts whose rear ends are bent into a U-shape are inserted into mounting holes formed in the bottom plate of a dish-shaped embedded box through spacers, and from these mounting holes. Attach the fixing bolt to the embedded box with the rear end protruding outward from the bottom plate by screwing a nut into the threaded part protruding inside the embedded box. Mount the embedded box face down at the appropriate location on the surface (forming the inner surface of the foundation) so that the rear end of the fixing bolt protrudes into the temporary frame, and pour concrete into the temporary frame thus created. After constructing the foundation, the temporary frame was dismantled, the nuts mentioned above were removed, the embedded box was removed from the concrete foundation, and the fixing bolts were embedded and fixed horizontally into the inner surface of the concrete foundation, and a single metal plate was installed. is bent to form a receiving bracket with an L-shaped cross section consisting of a receiving plate and a mounting plate, and both edges of this receiving bracket are raised up to form a clamping plate. A claw piece is formed,
The mounting plate is provided with two or more bolt insertion holes, and the bolt insertion holes of the mounting plate are inserted into the threaded portions of the fixing bolts protruding from the concrete foundation, and the threaded portions protruding from the mounting plate are inserted into the threaded portions of the fixing bolts that protrude from the concrete foundation. The holder is fixed to the concrete foundation by tightening a nut, and the ends of the holder are fitted into both clamping plates of the holder, thereby fixing the holder at right angles to the inner surface of the concrete foundation. How to fix the end of the main pull to the concrete foundation.
JP28608189A 1989-11-02 1989-11-02 How to fix the Ohiki end to the concrete foundation Granted JPH02186032A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP28608189A JPH02186032A (en) 1989-11-02 1989-11-02 How to fix the Ohiki end to the concrete foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP28608189A JPH02186032A (en) 1989-11-02 1989-11-02 How to fix the Ohiki end to the concrete foundation

Publications (2)

Publication Number Publication Date
JPH02186032A JPH02186032A (en) 1990-07-20
JPH034702B2 true JPH034702B2 (en) 1991-01-23

Family

ID=17699698

Family Applications (1)

Application Number Title Priority Date Filing Date
JP28608189A Granted JPH02186032A (en) 1989-11-02 1989-11-02 How to fix the Ohiki end to the concrete foundation

Country Status (1)

Country Link
JP (1) JPH02186032A (en)

Also Published As

Publication number Publication date
JPH02186032A (en) 1990-07-20

Similar Documents

Publication Publication Date Title
JPH1144025A (en) Concrete form panel, concrete form and construction method thereof
JPH034702B2 (en)
JPH0544268A (en) Anchor plate
JPH08260658A (en) Double-wall bearing material
JPS6231553Y2 (en)
JPH034701B2 (en)
JP2750338B2 (en) Anchor frame
JPH0545712Y2 (en)
JPS644964Y2 (en)
JPS6235768Y2 (en)
KR950008947Y1 (en) Hanger for ceiling panel
JPH02118028U (en)
JPH0347065Y2 (en)
JPH0413296Y2 (en)
JPS6224647Y2 (en)
KR200161889Y1 (en) Ceiling plate holder
JPH0552108U (en) Balcony formwork support device
JPS6012043Y2 (en) Joist support fittings
JPS6111400Y2 (en)
JPH0327154Y2 (en)
JPH0422659Y2 (en)
JP3280329B2 (en) Handrail support fixture
JPH02118029U (en)
JP3004639U (en) Wall material mounting base structure
JPS6127383Y2 (en)

Legal Events

Date Code Title Description
EXPY Cancellation because of completion of term