Application number
JP9089388A
Other languages
Japanese (ja)
Other versions
JP2746335B2 (en
Inventor
Yasunori Shigemoto
重本 保則
Itoshi Izumi
和泉 意登志
Toshio Saito
俊夫 斉藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Takenaka Komuten Co Ltd
Original Assignee
Takenaka Komuten Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Takenaka Komuten Co Ltd filed Critical Takenaka Komuten Co Ltd
Priority to JP2089388A priority Critical patent/JP2746335B2/en
Publication of JPH03287980A publication Critical patent/JPH03287980A/en
Application granted granted Critical
Publication of JP2746335B2 publication Critical patent/JP2746335B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/02Conveying or working-up concrete or similar masses able to be heaped or cast
    • E04G21/04Devices for both conveying and distributing
    • E04G21/0418Devices for both conveying and distributing with distribution hose
    • E04G21/0472Details of connection of the hose to the formwork, e.g. inlets

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

PURPOSE:To facilitate loading and unloading of a press-in pipe by providing an insertion regulating flag on the way of the direction of the axis of the press-in pipe and, at the same time, providing either end fastening sections of a clamping band wound around a steel pipe in a state to hold an expansion bag. CONSTITUTION:An insertion regulating flange 6 for an insertion opening of the lower part of a steel pipe 4 is provided on the way of the axis of a press-in pipe connected to the front end of a supply pipe 2 through a joint clamp 1. In addition, either end fastening sections of a clamping band 9 wound around a steel pipe 4 in a state to hold an expansion bag 8 expanded and contracted by a compressor 7 placed to the opposite side of the steel pipe 4. Narrow shaped hook stopping holes 10 are provided to both sides of the flange 6, and stopping hooks 11 are provided to both ends of the clamping band 9 to draw the press-in pipe 3 toward an opening of the steel pipe 4. According to the constitution, loading and unloading of the press-in pipe 3 can be made by one touch.

Description

【発明の詳細な説明】 「産業上の利用分野」 この発明は、鋼管柱に下部よりコンクリートを圧入する
コンクリート打設工法における圧入管に関し、詳しくは
圧入コンクリートの逆流を阻止する逆止め弁を鋼管内に
圧入管とは独立させて構成し、圧入管はコンクリート圧
入完了をまって取り外し可能な方式における圧入管の改
善に関する。
Detailed Description of the Invention "Field of Industrial Application" This invention relates to a press-in pipe used in a concrete pouring method in which concrete is press-fitted from the bottom into a steel pipe column, and more specifically, a check valve for preventing backflow of press-in concrete is installed in a steel pipe. This invention relates to an improvement of a press-fit pipe in which the press-fit pipe is constructed independently of the press-fit pipe, and the press-fit pipe is removable after completion of concrete press-fitting.

「従来の技術」 鋼管柱にコンクリートを投入する打設方法にあっては、
スラブ高さからコンクリートを投入するため、コンクリ
ートの自由落下高さが大きくなり、また落下途中で鉄筋
等の障害物に衝突し、コンクリートの骨材分離を生起し
易く、特に階高が高い場合や、鉄筋が輻輳して配設され
ている場合等にこのような影響が出易い。またコンクリ
ート落下時の巻込み空気によって打上リコンクリートに
ジャンカ、大きな気泡の発生を生起する。さらには上述
の弊害を回避すべく打設部位まで供給管路を延出させる
としたところのトレミー管は鉄筋の配置状態によっては
使用不可能となる。畝上の諸問題はいずれもコンクリー
トを上方より打設しようとすることに起因している。
"Conventional technology" Regarding the pouring method of pouring concrete into steel pipe columns,
Since concrete is poured from the slab height, the free fall height of the concrete increases, and it also collides with obstacles such as reinforcing bars during the fall, which tends to cause concrete aggregate separation, especially when the floor height is high. This kind of effect is likely to occur when reinforcing bars are arranged in a congested manner. In addition, the air entrained when concrete falls causes junk and large air bubbles to form in the poured concrete. Furthermore, in order to avoid the above-mentioned disadvantages, the tremie pipe in which the supply pipe line is extended to the pouring site becomes unusable depending on the arrangement of the reinforcing bars. All of the problems on the ridges are caused by trying to pour concrete from above.

そこで、コンクリートを上方より投入するのではなくし
て、下部より圧入するとした工法が、特開昭56−93
974号公報、特開昭64−62555号公報等に提案
されている。
Therefore, instead of pouring concrete from above, a construction method was developed in which concrete was pressed in from below.
This method has been proposed in Japanese Patent Publication No. 974, Japanese Patent Application Laid-Open No. 64-62555, etc.

このように下部よりコンクリートを圧入することにより
空気を巻込む事なく連続して打設する事−が出来、圧入
範囲のコンクリートはコンクリート圧送装置による加圧
力と、自重とによって加圧された状態で打設されるので
、コンクリート内部に含まれようとする空気も上部に押
し出されるのでコンクリートの中間に空洞部が残ること
なく密実で強度があり、耐久性のあるコンクリートが打
設され、且つコンクリートが骨材分離のない平均した混
合状態のまま上昇するので、鉄筋等が障害となることが
なく、比重差によるコンクリート内部の質変差もなく平
均した強度を持ったコンクリート充填柱を形成すること
ができる。
By press-fitting concrete from the bottom in this way, it is possible to pour the concrete continuously without entraining air, and the concrete in the press-in area is pressurized by the pressure of the concrete pumping device and its own weight. Since the concrete is poured, the air that would otherwise be contained inside the concrete is pushed out to the top, so there is no cavity left in the middle of the concrete, and dense, strong, and durable concrete is poured. Since the concrete rises in an average mixed state with no aggregate separation, there are no obstacles such as reinforcing bars, and there is no change in quality inside the concrete due to differences in specific gravity, forming a concrete filled column with an average strength. I can do it.

畝上の下部より圧入するコンクリート打設工法において
は、コンクリート圧送装置から持ち出しの供給配管の先
端に何んらかの対鋼管取合用の治具を介在させてとり行
なわれると共に当該治具等に圧入コンクリートの逆流を
阻止する逆止め弁機構を確保するとしなければならない
In the concrete pouring method that presses in from the lower part of the ridge, a jig for joining the steel pipe is interposed at the tip of the supply pipe taken out from the concrete pumping device, and the jig etc. A check valve mechanism must be provided to prevent backflow of press-in concrete.

例えば、前記公報に提案のものにあっては、開閉弁を備
えた圧入口金物を鋼管下部に穿孔の接続孔外側に取り付
け、これにコンクリートの供給配管の先端を接続してな
されている。
For example, in the method proposed in the above-mentioned publication, an injection inlet hardware equipped with an on-off valve is attached to the outside of a connecting hole drilled at the bottom of a steel pipe, and the tip of a concrete supply pipe is connected to this.

この圧入口金物は、充填したコンクリートの固化後に、
鋼管柱から溶断等の手段により切り離され、切り離され
た圧入口金物はその中に固化したコンクリートが充填さ
れ、それを取り除くには多大の労力を要し、使い捨てに
するほかない。ところが、この圧入口金物は、開閉弁等
の逆流防止具が複雑な構成になっていて、高価なもので
あるので、非常に不経済なものである。そこで、本出願
人は特願昭63−212845にて、鋼管柱に開口を設
け、該開口のある鋼管柱の部分に閉空間に連通ずる圧入
口を備えた圧入管を固定し、該圧入管の前記閉空間の端
部分に、コンクリートの圧入により変形する筒状の逆止
筒を連結し、圧入管の前記閉空間外の端部に供給配管を
着脱自在に連結し、該供給配管をコンクリートの供給源
に連通させ、供給配管、圧入管等を通じて前記閉空間内
に所定量のコンクリートを圧入した後に、供給配管、圧
入管等の内部のコンクリートを逆流させ、逆止筒の周り
に作用するコンクリートの圧力により逆止筒を変形させ
、変形した逆止筒により圧入管の前記端部分の圧入口を
閉塞させてから、圧入管から供給配管を溶断にて外すと
したものを提案している。このものによれば、圧入管の
閉空間内に位置する部位に可撓性ある高分子材料からな
る逆止筒を取付けると云う簡単な構成により、コンクリ
ートの逆流を防止できるから、逆流防止手段を安価に提
供することができる。逆流止めの操作は、供給配管、圧
入管等の内部のコンクリートを単に逆流させるだけで良
いから、非常に簡単である。
This injection port hardware is used after the filled concrete hardens.
The injection port hardware is separated from the steel pipe column by means such as cutting, and is filled with hardened concrete, which requires a great deal of effort to remove, so it has no choice but to be thrown away. However, this press inlet hardware is very uneconomical because the backflow prevention devices such as on-off valves have a complicated structure and are expensive. Therefore, in Japanese Patent Application No. 63-212845, the present applicant provided an opening in a steel pipe column, fixed a press-fit pipe equipped with a press-in port communicating with a closed space to the part of the steel pipe column where the opening was located, and A cylindrical check tube that is deformed by press-fitting concrete is connected to the end of the closed space, a supply pipe is removably connected to the end of the press-fit pipe outside the closed space, and the supply pipe is connected to the concrete. After press-fitting a predetermined amount of concrete into the closed space through the supply piping, press-fitting pipe, etc., the concrete inside the supply piping, press-fitting pipe, etc. flows backward, and acts around the check cylinder. It is proposed that the check cylinder is deformed by the pressure of the concrete, the press inlet at the end of the press-in pipe is blocked by the deformed check cylinder, and then the supply pipe is removed from the press-in pipe by fusing. . According to this method, the backflow of concrete can be prevented with a simple configuration of attaching a check tube made of flexible polymer material to the part of the press-in pipe located in the closed space, so backflow prevention means can be used. It can be provided at low cost. The operation of backflow prevention is very simple because it is sufficient to simply cause the concrete inside the supply piping, press-in pipe, etc. to flow back.

しかし、このものにあっては、相変らずコンクリート圧
入機鋼管の表面に突起物として残留する圧入管は溶断で
撤去しなければならず、この点数の多い作業は極めて煩
わしいという既述のものと同様の難点は解決されず、当
然のことなから治具の転用は不可能であるという無駄、
さらには、撤去がコンクリート固化まで制約されると云
う不便もある。そこで、本出願人は特願平1−2811
46号にて、鋼管下部を貫通の開口にタップ切りを施こ
すと共に、供給配管の先端にスイベルジヨイントを介し
て取付けの圧入管に前記タップ切りに螺合のネジ付形を
施こして該供給配管を鋼管に対して螺着し、一方、該開
口の鋼管内側には逆止め弁機構を該圧入管とは別構成に
て配設し、鋼管の閉空間内に所定量のコンクリートを圧
入した後に、圧入停止で該逆止め弁を閉作動させ、しか
る後、圧入管をコンクリート固化をまつことなく螺脱さ
せるとした圧入管の着脱、再利用について簡易、可能と
した方式のものを提案した。
However, in this case, the press-fit pipe that remains as a protrusion on the surface of the concrete press-in machine steel pipe still has to be removed by fusing, and this work involving many points is extremely troublesome as mentioned above. The same difficulties have not been resolved, and it is a waste that the jig cannot be repurposed as a matter of course.
Furthermore, there is the inconvenience that removal is restricted until the concrete hardens. Therefore, the applicant filed the patent application No. 1-2811.
In No. 46, a tap is cut into the opening that passes through the lower part of the steel pipe, and a threaded shape is threaded into the tap cut to fit into the press-fit pipe attached via a swivel joint to the tip of the supply piping. The supply piping is screwed onto the steel pipe, and a check valve mechanism is installed inside the steel pipe at the opening, which is separate from the press-in pipe, and a predetermined amount of concrete is press-fitted into the closed space of the steel pipe. After that, the check valve is closed when the press-fit is stopped, and then the press-fit pipe is unscrewed without allowing the concrete to solidify.We propose a method that makes it possible to easily attach and detach the press-fit pipe and reuse it. did.

「発明が解決しようとする課題」 しかるに、畝上の提案にあっては、圧入管の着脱は螺動
に由るとするものであるため、ワンタッチとならず、か
つ混然とした現場では螺溝に砂礫等が噛んで着脱を困難
となることが考えられる。
``Problem to be solved by the invention'' However, in the proposal of Ugegami, the attachment and detachment of the press-fit pipe is based on a screw movement, so it is not possible to do it with one touch, and in a crowded field It is possible that sand and gravel get stuck in the grooves, making attachment and detachment difficult.

本発明は、着脱がワンタッチで期し得る圧入コンクリー
トの逆流を阻止する逆止め弁を鋼管内に圧入管とは独立
させて構成し、圧入管はコンクリート圧入完了をまって
取り外し可能とした方式における圧入管を提供すること
を目的とする。
The present invention is a press-fitting method in which a check valve that prevents the backflow of press-fit concrete that can be attached and detached with a single touch is configured in a steel pipe independently of the press-fit pipe, and the press-fit pipe can be removed after the concrete press-fit is completed. The purpose is to provide pipes.

「課題を解決するための手段」 上記目的を達成するために、本発明の圧入管においては
、管軸方向中途に、鋼管下部に穿孔の挿通用開口に対す
る挿入規制用のフランジを設けると共に鋼管反対側に配
置の膨脹袋を抱き込む形で鋼管に巻き付く締付バンドの
両端止着部を設け、ジヨイントクランプ等を介して供給
配管先端に接続されるとしたものである。締付バンドの
止着は、7ランジにフック係止孔を付設すると共に締付
バンド両端に係止用フックを付設することでなしてもよ
い。あるいは、締付バンドの止着を、管壁の7ランジの
後方位置にフック係止用金具を設けると共に締付バンド
両端に係止用フックを付設することでなしてもよい。
"Means for Solving the Problems" In order to achieve the above object, in the press-fit pipe of the present invention, a flange is provided at the lower part of the steel pipe in the middle of the pipe axis direction to restrict insertion into the opening for insertion of the perforation, and A tightening band is provided at both ends to wrap around the steel pipe so as to enclose an inflatable bag placed on the side, and is connected to the tip of the supply pipe via a joint clamp or the like. The tightening band may be fastened by providing a hook locking hole in the 7-lunge and by providing locking hooks at both ends of the tightening band. Alternatively, the tightening band may be fastened by providing hook locking metal fittings at the rear position of the seven flange of the tube wall and by attaching locking hooks to both ends of the tightening band.

「作用」 挿通用開口に挿着された圧入管は、膨脹袋の彫版によっ
て鋼管に密に巻き付く締付バンドを介して該開口に打設
コンクリートの圧に抗して圧接する。この圧接は、膨脹
袋の収縮によって解放され、圧入管を引き抜くことが出
来る。
"Operation" The press-fit pipe inserted into the insertion opening is pressed into contact with the opening against the pressure of the poured concrete via the tightening band tightly wrapped around the steel pipe by the engraving of the expansion bag. This pressure contact is released by deflation of the inflatable bag, and the press-fit tube can be pulled out.

畝上の着、脱は遊嵌孔に対する挿通管の出し入れであり
、ワンタッチ操作となる。
Attaching and detaching the ridge is done by inserting and removing the insertion tube from the loose fitting hole, which is a one-touch operation.

「実施例」 実施例について図面を参照して説明すると、第1図〜第
3図において、ジヨイントクランプ1等を介して供給配
管2の先端に接続される圧入管3には、その管軸中途に
鋼管4下部に穿孔の挿通用開口5に対する挿入規制用の
フランジ6が設けられている。さらに、圧入管3の所定
部位には第2゜3図に示す如く鋼管4の反対側に配置の
コンプレッサー7等によって彫版、収縮する膨脹袋8を
抱き込む形で鋼管4に巻き付けられた締付バンド9の両
端正着部が設けられる。すなわち、第2図にあっては7
ランジ6両側に細長状のフック係止孔10、10を付設
し、これに対応してバンド9両端に巾広の係止用フック
11.11を付設している。
“Example” To explain the example with reference to the drawings, in FIGS. 1 to 3, the press-fit pipe 3 connected to the tip of the supply pipe 2 via the joint clamp 1 etc. has its pipe axis. A flange 6 for restricting insertion into the insertion opening 5 of the perforation is provided at the lower part of the steel pipe 4 midway. Further, at a predetermined portion of the press-fit pipe 3, a compressor is wrapped around the steel pipe 4 to enclose an inflatable bag 8 that is engraved and contracted by a compressor 7 or the like disposed on the opposite side of the steel pipe 4, as shown in FIGS. Correct attachment portions are provided at both ends of the attached band 9. In other words, in Figure 2, 7
Elongated hook locking holes 10, 10 are provided on both sides of the lunge 6, and correspondingly wide locking hooks 11, 11 are provided at both ends of the band 9.

よって、圧入管3はフランジ6を介して開口5に引き寄
せられることとなる。
Therefore, the press-fit tube 3 is drawn toward the opening 5 via the flange 6.

一方、第3図にあっては、フランジ6の後方位置にフッ
ク係止用金具12.12を溶接し、これに対応してバン
ド9両端に係止用フック13.13を付設している。
On the other hand, in FIG. 3, a hook locking metal fitting 12.12 is welded to the rear position of the flange 6, and correspondingly locking hooks 13.13 are attached to both ends of the band 9.

よって、圧入管3はフランジ6後方を引き付は支点とし
て開口5に引き寄せられる。
Therefore, the press-fit tube 3 is drawn toward the opening 5 using the rear of the flange 6 as a fulcrum.

圧入管3の取り外しは膨脹袋8を収縮させ、バンド9の
止着を解除してなされる。
The press-fit tube 3 is removed by deflating the expansion bag 8 and releasing the band 9.

以下、各種の鋼管内の逆止め弁構成のもとでの実施態様
を説明する。
Hereinafter, embodiments of check valve configurations in various steel pipes will be described.

第4図a、  bでは、開口5の閉空間14側に先端口
に可撓性若しくは扉動式の逆止め弁15 (図示例は扉
動式)を付設の立ち上り供給管16を溶接している。
In FIGS. 4a and 4b, a rising supply pipe 16 is welded to the closed space 14 side of the opening 5, and a flexible or door-operated check valve 15 (the illustrated example is a door-operated type) is attached to the end opening. There is.

しかして、圧入コンクリート17は弁15を押し拡げつ
つ閉空間14の鉛直方向に方向付けされながら打設され
、圧入停止で弁15は閉塞する。
Thus, the press-fit concrete 17 is poured while being oriented in the vertical direction of the closed space 14 while expanding the valve 15, and when the press-fit stops, the valve 15 is closed.

弁15の閉塞作用で打設コンク!J−)17の漏れ出し
のおそれはないので、圧入管3を抜き取ると鋼管4外面
に何んらの突起物を残溜させないでもってコンクリート
打設がなし得る。
Concreting is done by the closing action of valve 15! Since there is no risk of leakage of J-) 17, when the press-fit pipe 3 is removed, concrete can be placed without any protrusions remaining on the outer surface of the steel pipe 4.

尚、立ち上り供給管16の空隙部には硬質モルタルの充
填処理を後工程として行なえばよい。
Incidentally, the cavity of the rising supply pipe 16 may be filled with hard mortar as a post-process.

第5図a、  bでは、上記の立ち上り供給管16を省
略し、弁15を開口5に直接付設するとしたものである
。この場合には立ち上り供給管16に由る打設コンク!
J −) 17の鉛直方向についての方向付けは享受し
得ないが、硬質モルタル充填処理の後加工は不要である
。第6図a、bは第51!la、bに対応した実施態様
を示し、弁15が可撓性の場合を示したものである。尚
、この場合の弁材質としては、薄板鉄板(0,5’″八
以下)、塩化ビニル、軟質プラスチック等が採用される
。第7図a、bに示す発明は、第6図(あるいは第5図
でもよい)の場合において、開口5部に該立ち上り供給
管16に代る方向転換板1Bを付設するとしたものであ
る。この場合は、立ち上り供給管16を同様の鉛直方向
付けの作用を享受するも、立ち上り供給管16に要され
る硬質モルタル充填処理の加工は不要である。
In FIGS. 5a and 5b, the above-mentioned rising supply pipe 16 is omitted, and the valve 15 is attached directly to the opening 5. In this case, the concrete is poured via the rising supply pipe 16!
J-) Although the vertical orientation of 17 cannot be enjoyed, post-processing of the hard mortar filling process is not required. Figure 6 a and b are the 51st! This figure shows an embodiment corresponding to la and b, in which the valve 15 is flexible. In this case, the valve material used is a thin iron plate (0.5'''8 or less), vinyl chloride, soft plastic, etc. The invention shown in FIGS. 5), a direction change plate 1B is attached to the opening 5 in place of the rising supply pipe 16. In this case, the rising supply pipe 16 is provided with a similar vertical orientation effect. However, the hard mortar filling process required for the rising supply pipe 16 is not required.

第8図a = dは、圧入管3を鋼管4の閉空間14へ
の所定化の侵入を確保したものにして第6図若しくは第
7図の場合に適用したことを示すものである。
Figures 8a and 8d show that the press-fit tube 3 is used to ensure that the steel tube 4 enters the closed space 14 in a specified manner and is applied to the case of Figure 6 or 7.

畝上所定化の侵入で弁15はコンクリート圧によること
なくして押し拡げられるので、コンクリート17の圧入
エネルギーは軽減する。コンクリートの圧入を停止した
状態で圧入管3は引き抜きされるが、この際圧入管3に
よって閉塞動を阻止されていた弁15は閉塞する。
Since the valve 15 is expanded by the predetermined intrusion into the ridge without being affected by concrete pressure, the energy required to press in the concrete 17 is reduced. The press-in pipe 3 is pulled out while the press-in of concrete is stopped, but at this time, the valve 15, which has been prevented from closing by the press-in pipe 3, is closed.

「発明の効果」 本発明は、以上説明したように構成されているので、以
下に記載されるような効果を奏する。
"Effects of the Invention" Since the present invention is configured as described above, it produces the effects described below.

(1)圧入管の着脱がワンタッチとなり簡易、迅速であ
る。
(1) The press-fit tube can be attached and detached with just one touch, making it simple and quick.

(2)治具の全てが捨てられることなく盛替え転用し得
るので有利である。
(2) It is advantageous because all the jigs can be reused and repurposed without being thrown away.

【図面の簡単な説明】 第1図は本発明の圧入管の鋼管に対する接続要領説明図
、第2図、第3図は本発明における締付バンドの止着側
説明図、第4図a、  bは本発明の詳細な説明縦断図
、a図中回線す部詳示図、第5図a、  bは本発明の
詳細な説明縦断図、a図中回線す部詳示図、第6図a、
  b、第6図a、  bは本発明の詳細な説明縦断図
、第8 F!lJa −dは本発明の実施要領工程手順
説明図である。 1・・・ジヨイントクランプ、 2・・・供給配管、 
3・・・圧入管、 4・・・鋼管、 5・・・挿通用開
口、 6・・・7ランジ、  7・・・コンプレッサー
、  8・・・膨脹袋、 9−・・締付バンド、 10
・・・フック係止孔、11・・・係止用フック、 12
・・・フック係止用金具、13・・・係止用フック、 
14・・・閉空間、 15・・・逆止め弁、 16・・
・供給管、 17・・・打設コンクリート、18・・一
方向転換板。 フψνzq ド−じデインドアランフ1  2−−−げ4金1乙麿 
 3−−−、=入着4−@看  5−−一坤jLffi
閣口6−−−フランζ   7−−−コンマ・L”y丁
−8−−一鱈シ睡東  9−−−4年41j;シト  
 10−−−フック棒上)し11−一一佛を用フ−71
2−−−フ・ン7侍止弔會阜    13−一−イ牟を
用フ・、714−1v1W閏  15−i上h’f1 
16−1e対檜17−−−jTjiコ>7II−ト  
       1s−−−tIa(*i’r’)j&a
。 q。 b。 b。 ブψ体7θ 0゜ b。 q。 b。 手 続 補 正 書 (方式) 事件の表示 平成0 2年特許願第8 88号 2゜ 発明の名称 圧入管 3゜ 補正をする者 事件との関係
[BRIEF DESCRIPTION OF THE DRAWINGS] Fig. 1 is an explanatory diagram of the method of connecting the press-fit pipe to the steel pipe of the present invention, Figs. 2 and 3 are explanatory diagrams of the fastening side of the tightening band of the present invention, Fig. 4a, b is a detailed longitudinal sectional view of the present invention; a is a detailed illustration of the line portion in figure a; Figs. 5a and b are detailed longitudinal sectional views of the present invention; a,
b, Figures 6a and b are detailed longitudinal sectional views of the present invention, and Figure 8F! 1Ja-d is an explanatory diagram of the procedure of the implementation procedure of the present invention. 1... Joint clamp, 2... Supply piping,
3... Press-fit pipe, 4... Steel pipe, 5... Opening for insertion, 6... 7 lunge, 7... Compressor, 8... Expansion bag, 9-... Tightening band, 10
...Hook locking hole, 11...Hook for locking, 12
...Hook locking metal fitting, 13...Hook for locking,
14...Closed space, 15...Check valve, 16...
- Supply pipe, 17... Placed concrete, 18... One-way change plate. Fu ψνzq Dodge Day Door Lump 1 2---Ge 4 Gold 1 Otomaro
3---, = arrival 4-@care 5--ichikonjLffi
Kakuguchi 6 --- Franc ζ 7 --- Comma L"y ding - 8 --- One cod shi sleep east 9 --- 4th year 41j; Shito
10--Hook on the rod) and 11-11 Use the Buddha on the hook-71
2---F714-1v1W Leap 15-i h'f1
16-1e vs. Hinoki 17---jTjiko>7II-to
1s---tIa(*i'r')j&a
. q. b. b. Bu ψ body 7θ 0°b. q. b. Procedural amendment (formality) Display of the case 2000 Patent Application No. 8 88 2゜Name of the invention Press-fit pipe 3゜Relationship with the case

Claims (3)

【特許請求の範囲】[Claims] (1)管軸方向中途に、鋼管下部に穿孔の挿通用開口に
対する挿入規制用のフランジを設けると共に鋼管反対側
に配置の膨脹袋を抱き込む形で鋼管に巻き付く締付バン
ドの両端止着部を設け、ジョイントクランプ等を介して
供給配管先端に接続される圧入管。
(1) A flange is provided midway in the axial direction of the steel pipe to restrict insertion into the hole for insertion into the lower part of the steel pipe, and a tightening band that wraps around the steel pipe in a manner that embraces an expansion bag placed on the opposite side of the steel pipe is fastened at both ends. A press-fit pipe that is connected to the tip of the supply pipe via a joint clamp, etc.
(2)締付バンドの止着を、フランジにフック係止孔を
付設すると共に締付バンド両端に係止用フックを付設す
ることでなした請求項1記載の圧入管。
(2) The press-fit pipe according to claim 1, wherein the tightening band is fastened by providing hook locking holes in the flange and locking hooks at both ends of the tightening band.
(3)締付バンドの止着を、管壁のフランジの後方位置
にフック係止用金具を設けると共に締付バンド両端に係
止用フックを付設することでなした請求項1記載の圧入
管。
(3) The press-fit pipe according to claim 1, wherein the tightening band is fixed by providing a hook locking fitting at a position behind the flange of the pipe wall and by attaching locking hooks to both ends of the tightening band. .
JP2089388A 1990-04-04 1990-04-04 Press-fit pipe Expired - Fee Related JP2746335B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2089388A JP2746335B2 (en) 1990-04-04 1990-04-04 Press-fit pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2089388A JP2746335B2 (en) 1990-04-04 1990-04-04 Press-fit pipe

Publications (2)

Publication Number Publication Date
JPH03287980A true JPH03287980A (en) 1991-12-18
JP2746335B2 JP2746335B2 (en) 1998-05-06

Family

ID=13969279

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2089388A Expired - Fee Related JP2746335B2 (en) 1990-04-04 1990-04-04 Press-fit pipe

Country Status (1)

Country Link
JP (1) JP2746335B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH053492U (en) * 1991-07-01 1993-01-19 株式会社大林組 Concrete press fitting bracket

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103469894B (en) * 2013-09-29 2016-02-17 天津二十冶建设有限公司 A kind of servicing unit for steel frame columns jacking grouting and using method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH053492U (en) * 1991-07-01 1993-01-19 株式会社大林組 Concrete press fitting bracket

Also Published As

Publication number Publication date
JP2746335B2 (en) 1998-05-06

Similar Documents

Publication Publication Date Title
US6345472B1 (en) Apparatus and method for anchoring and erecting concrete or similar materials
US20110024993A1 (en) Gasket and mandrel assembly for pipe joints
TW382051B (en) Liner material of branch pipes and manufacturing method for pipe liner
JPH03287980A (en) Press-in pipe
JP3688546B2 (en) Cast-in-place concrete pile construction method and cast-in-place concrete pile bottom ground preloading device
JP2978398B2 (en) Concrete products, their production methods and inserts
JP4252823B2 (en) Check valve for slurry filling
JPH0261260A (en) Press-in placement of concrete
KR20070107212A (en) Construction method of water tank and structure of water tank and sepatie for construction
WO2000068544A1 (en) Device and method in connection with a rock wall
KR100666027B1 (en) Pipe for leakage check of concrete
JP3697525B2 (en) Pipeline repair and rehabilitation method
JP2863440B2 (en) Lining sheet for concrete corrosion protection
JP2705988B2 (en) Concrete casting method
JP2001032308A (en) Bottom block of small-sized manhole and method for execution of small-sized manhole using the same
JP6689591B2 (en) Pile cement extraction method and extraction tool
JPH09132930A (en) Repairing method for existing water channel and repairing unit using therefor
JP3602091B2 (en) Formwork for producing hollow precast concrete member for construction and method for producing hollow precast concrete member for construction using the formwork
JPH02125015A (en) Reinforcing device for ground ahead of pile tip
JP3576864B2 (en) Method for producing concrete product and concrete product
KR20090006433U (en) Connecting cap for rubber hose of cocreat pump car
JPH0464666A (en) Molding form unit for hollow concrete member and molding method
JPH0261261A (en) Press-in placement of concrete
JP4036310B2 (en) Check valve for slurry filling
JPH09132998A (en) Repairing unit for existing channel and repairing construction method

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees