JPH0320340Y2 - - Google Patents
Info
- Publication number
- JPH0320340Y2 JPH0320340Y2 JP1983179083U JP17908383U JPH0320340Y2 JP H0320340 Y2 JPH0320340 Y2 JP H0320340Y2 JP 1983179083 U JP1983179083 U JP 1983179083U JP 17908383 U JP17908383 U JP 17908383U JP H0320340 Y2 JPH0320340 Y2 JP H0320340Y2
- Authority
- JP
- Japan
- Prior art keywords
- pile
- holder
- holds
- axis
- welding
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
- 238000003466 welding Methods 0.000 claims description 13
- 230000008878 coupling Effects 0.000 description 3
- 238000010168 coupling process Methods 0.000 description 3
- 238000005859 coupling reaction Methods 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
Landscapes
- Piles And Underground Anchors (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Description
【考案の詳細な説明】
[産業上の利用分野]
本考案は、掘削地中孔に垂下させた下部側PC
杭の上部面材に上部側PC杭の下部面材を溶接結
合させる際に用いるPC杭結合用治具に関するも
のである。[Detailed explanation of the invention] [Industrial field of application] This invention is based on the lower PC suspended in an excavated underground hole.
This invention relates to a PC pile joining jig that is used when welding the lower face material of the upper PC pile to the upper face material of the pile.
[従来の技術]
従来、PC杭の結合は、掘削地中孔に垂下させ
た下部側PC杭の上部面材に、杭打ち機で吊下げ
支持して垂下させた上部側PC杭の下部面材を当
接させ、この状態で両杭の面材同士を溶接するこ
とによつて行われていたが、面材の杭軸芯に対す
る僅かな傾斜(プレストレスを導入する際に生じ
る上、下部面材の傾斜)や他物の当接による面材
角部の突起状変形等がある場合、上下のPC杭を
同芯状に結合させることが困難であつた。[Conventional technology] Conventionally, PC piles are connected by attaching the lower surface of the upper PC pile that is suspended and supported by a pile driver to the upper surface material of the lower PC pile that is suspended in an excavated underground hole. This was done by welding the face plates of both piles in contact with each other in this state. When there is a protruding deformation of the corner of the facing material due to the slope of the facing material) or contact with other objects, it is difficult to connect the upper and lower PC piles concentrically.
このような不都合は、例えば、実開昭58−
61387号公報によつて、提案されているように、
上下のPC杭の溶接継手部を被覆する円筒状で且
つ開閉可能な位置決め片で、上下のPC杭の突き
合わせ端部を抱持させ、当該位置決め片に形成し
た窓から溶接するように構成することによつて解
消することが可能である。 This kind of inconvenience, for example,
As proposed by Publication No. 61387,
A cylindrical positioning piece that covers the welded joints of the upper and lower PC piles and can be opened and closed, and is configured to hold the butted ends of the upper and lower PC piles and weld through the window formed in the positioning piece. This can be resolved by
しかしながら、これによる場合は、位置決め片
に形成した窓の大きさ以上に溶接できないので、
周方向の一部を仮溶接し、前記位置決め片を取り
外した後、全周溶接を行わなければならず、2段
階の溶接作業となり、しかも、かなりの重量物で
ある前記位置決め片を人力によつて、所定位置に
持ち上げて、上下のPC杭の突き合わせ端部に着
脱しなければならず、作業能率が低く、安全面で
も問題があつた。 However, in this case, it is not possible to weld larger than the window formed in the positioning piece.
After temporarily welding a part of the circumferential direction and removing the positioning piece, the entire circumference must be welded, resulting in a two-step welding process.Moreover, the positioning piece, which is quite heavy, must be manually welded. Then, it had to be lifted into position and attached to and detached from the butt ends of the upper and lower PC piles, resulting in low work efficiency and safety issues.
また、特公昭57−5934号公報のように、掘削地
中孔の開口縁に、やぐらを設置し、やぐらの上部
に、杭体の上端部を保持する上部保持装置をセン
ターホールジヤツキを介して昇降自在に設け、や
ぐらの下部には同様な下部保持装置を位置固定状
態に設け、上部保持装置で第1杭体の上端部を保
持した状態で、当該第1杭体を上部保持装置とと
もに下降させ、当該第1杭体を下部保持装置で保
持させたら、上部保持装置を上昇させて、他の第
2杭体の上端部を保持し、この状態で、当該第2
杭体および上部保持装置を下降させ、第2杭体の
下端を第1杭体の上端に突き合わせて溶接するよ
うにした装置も知られている。 In addition, as in Japanese Patent Publication No. 57-5934, a tower is installed at the edge of the opening of an excavated underground hole, and an upper holding device for holding the upper end of the pile is attached to the top of the tower via a center hole jack. A similar lower holding device is provided at the lower part of the tower in a fixed position, and with the upper end of the first pile body held by the upper holding device, the first pile body is moved together with the upper holding device. When the first pile body is lowered and held by the lower holding device, the upper holding device is raised to hold the upper end of the other second pile body, and in this state, the second pile body is held by the lower holding device.
A device is also known in which the pile body and the upper holding device are lowered, and the lower end of the second pile body is butted against the upper end of the first pile body and welded.
しかし乍ら、これによる場合は、上部保持装置
に杭体の長さと略等しい昇降ストロークが必要で
あるため、一般的なPC杭のように、長尺な杭体
を対象とする場合、やぐらとして著しく高いもの
が必要である。しかも、その高いやぐらの上部保
持装置にPC杭のような長尺の杭体を保持させる
ためには、やぐらから、さらに長尺杭体の長さ以
上に高い位置まで杭体を吊り上げなければならな
い。このため、装置が非常に大掛かりとなり、杭
打ち機でこのような作業を行う場合、やぐらの2
倍以上の昇降ストロークを有する杭打ち機が必要
となるといつた問題がある。 However, in this case, the upper holding device requires a lifting stroke that is approximately equal to the length of the pile body, so when dealing with a long pile body such as a general PC pile, it is difficult to use it as a tower. Something significantly higher is required. Moreover, in order to hold a long pile such as a PC pile in the upper holding device of a tall tower, the pile must be lifted from the tower to a position higher than the length of the long pile. . For this reason, the equipment is very large-scale, and when performing this kind of work with a pile driver, two of the towers are required.
There is a problem that a pile driver with a lifting stroke more than double that is required.
[考案が解決しようとする課題]
本考案の目的は、上記従来例の問題点を解消で
きるPC杭結合用治具を提供することにある。[Problems to be Solved by the Invention] The purpose of the invention is to provide a PC pile joining jig that can solve the problems of the conventional example described above.
[課題を解決するための手段]
上記の目的を達成するために、本考案が講じた
技術的手段は、次の通りである。即ち、本考案に
よるPC杭結合用治具は、掘削地中孔に垂下させ
た下部側PC杭の上部面材に上部側PC杭の下部面
材を溶接結合させる際に用いるPC杭結合用治具
であつて、杭打ち機のリーダーに設けたレールに
沿つて昇降自在のベースに、上部側PC杭の下端
近傍部を抱持する杭軸芯と平行な軸周りで開閉可
能な第一杭保持器と、下部側PC杭の上端近傍部
を抱持する杭軸芯と平行な軸周りで開閉可能な第
二杭保持器とを、上下方向に溶接作業用の間隙を
隔てて同芯状に取り付けて成ることを特徴として
いる。[Means for Solving the Problems] In order to achieve the above object, the technical means taken by the present invention are as follows. That is, the PC pile joining jig according to the present invention is a PC pile joining jig used when welding the lower face material of the upper PC pile to the upper face material of the lower PC pile suspended in an excavated underground hole. A first pile that can be opened and closed around an axis parallel to the pile axis that holds the vicinity of the lower end of the upper PC pile on a base that can be raised and lowered along a rail installed on the leader of the pile driver. The retainer and the second pile retainer, which can be opened and closed around an axis parallel to the pile axis that holds the vicinity of the upper end of the lower PC pile, are arranged in a concentric manner with a gap for welding work in the vertical direction. It is characterized by being attached to.
[作用]
上記の構成によれば、第一杭保持器と第二杭保
持器で、上下のPC杭を抱持することにより、面
材の傾斜等にかかわらず、上下のPC杭が同芯状
に保持される。[Function] According to the above configuration, by holding the upper and lower PC piles with the first pile holder and the second pile holder, the upper and lower PC piles are concentric regardless of the slope of the facing material, etc. It is kept in the same condition.
第一杭保持器と第二杭保持器は、上下方向に溶
接作業用の間隙を隔てて設けられているので、第
一杭保持器で上部側PC杭の下端近傍部を抱持し、
第二杭保持器で下部側PC杭の上端近傍部を抱持
した状態のまま、上下のPC杭の面材の全周溶接
を行うことができる。 The first pile holder and the second pile holder are provided with a gap for welding in the vertical direction, so the first pile holder holds the vicinity of the lower end of the upper PC pile,
While the second pile retainer holds the upper end portion of the lower PC pile, the face materials of the upper and lower PC piles can be welded all around.
[実施例]
以下、本考案の実施例を図面に基づいて説明す
る。[Example] Hereinafter, an example of the present invention will be described based on the drawings.
図において、1は杭打ち機であり、その前部に
PC杭結合用治具2が装備されている。PC杭結合
用治具2は、予め形成された掘削地中孔3に挿入
され、ロープ4を介して架台5で吊下げ支持され
た垂下状態にある下部側PC杭6と、前記杭打ち
機1によつて吊下げ支持された垂下状態にある上
部側PC杭7とを、全体として略円筒状を呈する
杭保持器8によつて同芯状に抱持し、この状態
で、上下のPC杭6,7の面材10,11どうし
を溶接結合するために用いられるものである。1
5は杭打ち機1の前部に立設されたリーダー、1
6はリーダー15に付設された一対のレール、1
7はレール16に沿つて昇降自在なベースであ
る。 In the figure, 1 is a pile driver, and the front part of it is
A jig 2 for connecting PC piles is equipped. The PC pile coupling jig 2 is inserted into a pre-formed excavated underground hole 3, and is connected to a lower PC pile 6 in a hanging state that is suspended and supported by a frame 5 via a rope 4, and the pile driver. The upper PC pile 7, which is suspended and supported by the PC pile 1, is held concentrically by the pile retainer 8, which has an approximately cylindrical shape as a whole. It is used to weld and connect the face members 10 and 11 of the piles 6 and 7. 1
5 is a leader installed at the front of pile driver 1, 1
6 is a pair of rails attached to the leader 15;
A base 7 is movable up and down along the rail 16.
PC杭結合用治具2は、第2図、第3図に示す
ように、前記ベース17に、上部側PC杭7の下
端近傍部を抱持する杭軸芯と平行な軸26周りで
開閉可能な半円筒状部材8a,8a′より成る第一
杭保持器8Aと、下部側PC杭6の上端近傍部を
抱持する杭軸芯と平行な軸26周りで開閉可能な
半円筒状部材8b,8b′より成る第二杭保持器8
Bとを、上下方向に溶接作業用の間隙9を隔てて
同芯状に取り付けて構成したものである。19…
は第一杭保持器8Aおよび第二杭保持器8Bを閉
じ状態に固定する固定機構である。 As shown in FIGS. 2 and 3, the PC pile coupling jig 2 is attached to the base 17 and opens and closes around a shaft 26 parallel to the pile axis that holds the vicinity of the lower end of the upper PC pile 7. A first pile holder 8A consisting of possible semi-cylindrical members 8a and 8a', and a semi-cylindrical member that can be opened and closed around an axis 26 parallel to the pile axis that holds the vicinity of the upper end of the lower PC pile 6. Second pile retainer 8 consisting of 8b, 8b'
B are attached concentrically in the vertical direction with a gap 9 for welding work in between. 19...
is a fixing mechanism that fixes the first pile holder 8A and the second pile holder 8B in a closed state.
尚、リーダー15のレール16に沿つて昇降自
在なベース17に、開閉自在な第一杭保持器8A
および第二杭保持器8Bが取り付けられているの
で、リーダー15としては、1本のPC杭7の長
さよりも若干長いものであれば足りる。 In addition, a first pile holder 8A that can be opened and closed is mounted on a base 17 that can be raised and lowered along the rail 16 of the leader 15.
Since the second pile holder 8B is attached, it is sufficient for the leader 15 to be slightly longer than the length of one PC pile 7.
[考案の効果]
本考案は、上記した構成によりなるから、次の
効果を奏し得るのである。[Effects of the invention] Since the present invention has the above-described configuration, it can achieve the following effects.
第一杭保持器と第二杭保持器が、上下方向に
溶接作業用の間隙を隔てて設けられているの
で、第一杭保持器で上部側PC杭の下端近傍部
を抱持し、第二杭保持器で下部側PC杭の上端
近傍部を抱持した状態のまま、仮溶接なしに、
上下のPC杭の面材の全周溶接を行うことがで
き、しかも、第一杭保持器および第二杭保持器
はべースの昇降によつて上下に移動できるの
で、人力による昇降が不要であり、作業能率を
向上することができ、安全面でも有利である。 Since the first pile holder and the second pile holder are vertically separated by a gap for welding work, the first pile holder holds the vicinity of the lower end of the upper PC pile, and the second pile holder holds the lower end of the upper PC pile. While holding the upper end of the lower PC pile with the two-pile retainer, without temporary welding,
The face materials of the upper and lower PC piles can be welded all around, and the first and second pile retainers can be moved up and down by raising and lowering the base, so manual lifting is not required. This can improve work efficiency and is also advantageous in terms of safety.
第一杭保持器と第二杭保持器が開閉自在であ
り且つ昇降自在なベースに取り付けられている
ので杭打ち機としては、昇降ストロークの比較
的短いもので足り、杭長以上の長いやぐらも不
要である。 Since the first pile holder and the second pile holder can be opened and closed and are attached to a base that can be raised and lowered, a relatively short lifting stroke is sufficient as a pile driver, and it can also be used for towers that are longer than the pile length. Not necessary.
図面は本考案の一実施例を示し、第1図は杭打
ち機の側面図、第2図はPC杭結合用治具の側面
図、第3図は要部の概略平面図である。
3……掘削地中孔、6……下部側PC杭、7…
…上部側PC杭、8A……第一杭保持器、8B…
…第二杭保持具、9……溶接作業用の間隙、1
0,11……面材、15……リーダー、16……
レール、17……ベース。
The drawings show an embodiment of the present invention, in which Fig. 1 is a side view of a pile driver, Fig. 2 is a side view of a PC pile coupling jig, and Fig. 3 is a schematic plan view of the main parts. 3...Drilled underground hole, 6...Lower side PC pile, 7...
...Upper PC pile, 8A...First pile retainer, 8B...
...Second pile holder, 9...Gap for welding work, 1
0,11...Face material, 15...Leader, 16...
Rail, 17...Base.
Claims (1)
面材に上部側PC杭7の下部面材を溶接結合させ
る際に用いるPC杭結合用治具であつて、杭打ち
機のリーダー15に設けたレール16に沿つて昇
降自在のベース17に、上部側PC杭7の下端近
傍部を抱持する杭軸芯と平行な軸周りで開閉可能
な第一杭保持器8Aと、下部側PC杭6の上端近
傍部を抱持する杭軸芯と平行な軸周りで開閉可能
な第二杭保持器8Bとを、上下方向に溶接作業用
の間隙を隔てて同芯状に取り付けて成ることを特
徴とするPC杭結合用治具8。 This is a PC pile joining jig used for welding and joining the lower side material of the upper PC pile 7 to the upper side material of the lower side PC pile 6 suspended in an excavated underground hole, and is a leader 15 of a pile driver. A first pile holder 8A that can be opened and closed around an axis parallel to the pile axis that holds the vicinity of the lower end of the upper PC pile 7 is mounted on a base 17 that can be freely raised and lowered along a rail 16 provided on the lower side. A second pile retainer 8B that can be opened and closed around an axis parallel to the pile axis that holds the vicinity of the upper end of the PC pile 6 is attached concentrically with a gap for welding work in the vertical direction. PC pile joining jig 8 characterized by the following.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP17908383U JPS6087237U (en) | 1983-11-18 | 1983-11-18 | Jig for connecting PC piles |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP17908383U JPS6087237U (en) | 1983-11-18 | 1983-11-18 | Jig for connecting PC piles |
Publications (2)
Publication Number | Publication Date |
---|---|
JPS6087237U JPS6087237U (en) | 1985-06-15 |
JPH0320340Y2 true JPH0320340Y2 (en) | 1991-05-01 |
Family
ID=30388638
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP17908383U Granted JPS6087237U (en) | 1983-11-18 | 1983-11-18 | Jig for connecting PC piles |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPS6087237U (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP7048362B2 (en) * | 2018-03-13 | 2022-04-05 | 日本車輌製造株式会社 | Pile driver |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS575934A (en) * | 1980-06-04 | 1982-01-12 | Teijin Ltd | Latent nap yarn |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5861387U (en) * | 1981-10-19 | 1983-04-25 | 清水建設株式会社 | Positioning tool for welded joints of ready-made piles |
-
1983
- 1983-11-18 JP JP17908383U patent/JPS6087237U/en active Granted
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS575934A (en) * | 1980-06-04 | 1982-01-12 | Teijin Ltd | Latent nap yarn |
Also Published As
Publication number | Publication date |
---|---|
JPS6087237U (en) | 1985-06-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP3075723B1 (en) | Equipment for welding metal flanges to metal pipe ends | |
CN206844322U (en) | A kind of rigid joint of steel pipe column and H profile steel beam | |
JPH0320340Y2 (en) | ||
JPH0128136Y2 (en) | ||
CN213894915U (en) | X-shaped lifting appliance for large-scale component | |
CN211570052U (en) | Power cable trench cover plate opening trolley | |
CN214780271U (en) | Steel plate turning tool | |
CN110805149B (en) | Support column self-locking splicing structure | |
CN216809523U (en) | Manhole cover plate of box girder | |
JP2891618B2 (en) | Jig for positioning steel columns | |
JP3200001B2 (en) | Holder for lifting one end of heavy objects | |
CN220246694U (en) | Bridge girder steel auxiliary connection device | |
JP3648794B2 (en) | How to install repair equipment on the inner wall of the pressure vessel lower mirror | |
CN214161923U (en) | Tire crane saddle beam jacking support flange plate installation tool | |
CN213329549U (en) | Prefabricated reinforced concrete shear wall | |
CN210678686U (en) | Hydraulic movable type cold exchange equipment pipe box clamping vehicle | |
CN220150314U (en) | Steel pipe pile guiding device for water operation | |
CN212799293U (en) | Simple and easy downspout lifting device | |
CN214818119U (en) | Sewage-passing pipe connection has tractive location frock | |
CN213889903U (en) | Turnover structure and wine jar turnover fixture | |
JPH0144517Y2 (en) | ||
JP2926105B2 (en) | Steel column joint structure | |
JPH02153168A (en) | Field welding of steel structural beam | |
JPH089679Y2 (en) | Furnace shell lifting device | |
JP3442485B2 (en) | Segment fastening device |