JPH0317204U - - Google Patents

Info

Publication number
JPH0317204U
JPH0317204U JP7852689U JP7852689U JPH0317204U JP H0317204 U JPH0317204 U JP H0317204U JP 7852689 U JP7852689 U JP 7852689U JP 7852689 U JP7852689 U JP 7852689U JP H0317204 U JPH0317204 U JP H0317204U
Authority
JP
Japan
Prior art keywords
turbine
power generation
section
setting section
generation plant
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP7852689U
Other languages
Japanese (ja)
Other versions
JP2561265Y2 (en
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to JP1989078526U priority Critical patent/JP2561265Y2/en
Publication of JPH0317204U publication Critical patent/JPH0317204U/ja
Application granted granted Critical
Publication of JP2561265Y2 publication Critical patent/JP2561265Y2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Description

【図面の簡単な説明】[Brief explanation of drawings]

第1図は本考案の一実施例を示す自家発プラン
ト運転支援装置のブロツク図であり、第2図は本
考案を重油ボイラ、抽気復水タービン、抽気背圧
タービン、背圧タービンからなる自家発電プラン
トに適用した場合の一実施例である。第3図は実
施例の説明に用いた重油ボイラの発生蒸気流量と
消費燃料流量の特性関数を示す。第4図は実施例
の説明に用いたタービンの段通過蒸気流量とター
ビン出力の特性関数を示す。 1…自家発電プラント運転支援装置、2…運用
モード設定部、3…タービンプロセス入力部、4
…ボイラ、タービン特性設定部、5…タービン制
約設定部、6…最適解探索部、7…運転支援表示
部、8…タービン出力設定部、9…入力部。
Fig. 1 is a block diagram of a private power plant operation support system showing one embodiment of the present invention, and Fig. 2 is a block diagram of a private power plant operation support system showing an embodiment of the present invention. This is an example in which the present invention is applied to a power generation plant. FIG. 3 shows a characteristic function of the generated steam flow rate and the consumed fuel flow rate of the heavy oil boiler used to explain the embodiment. FIG. 4 shows a characteristic function of the steam flow rate passing through the stages of the turbine and the turbine output used to explain the embodiment. 1... Private power generation plant operation support device, 2... Operation mode setting section, 3... Turbine process input section, 4
... Boiler, turbine characteristic setting section, 5... Turbine constraint setting section, 6... Optimum solution searching section, 7... Operation support display section, 8... Turbine output setting section, 9... Input section.

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] 複数台のボイラ、タービンからなる自家発電プ
ラントの各タービンのタービン下位制御装置の上
位に設けられ、自家発電プラント全体の高効率運
転を支援する装置であつて、本装置の運用モード
を設定する運用モード設定部と、同運用モード設
定部からの出力を受け、各タービンからの流量検
出器と電力検出器からの出力信号を受け工学値変
換するタービンプロセス入力部と、各ボイラの蒸
気流量と燃料流量の特性及び各タービンの蒸気流
量とタービン出力の特性を設定するボイラ、ター
ビン特性設定部と、各タービンの運転制約条件を
設定するタービン制約設定部と、同タービン制約
設定部、上記タービンプロセス入力部およびボイ
ラ、タービン特性設定部の出力を受けて時々刻々
変動する電力需要と蒸気需要を演算し、自家発電
プラント全体の効率が最大になる各タービンの操
作量を探索し自家発電プラントの高効率運転に寄
与しているタービン制約条件を指摘する最適解探
索部と、この最適解探索部および上記タービン制
約設定部の出力を受け、高効率運転を実現するガ
イダンスを表示する運転支援表示部と、上記最適
解探索部および運用モード設定部の出力を受けて
下位制御装置の設定を変更するタービン設定出力
部とを具備することを特徴とする自家発電プラン
ト運転支援装置。
This device is installed above the turbine lower control device of each turbine in a private power generation plant consisting of multiple boilers and turbines, and supports high-efficiency operation of the entire private power generation plant, and is used to set the operation mode of this device. A mode setting section, a turbine process input section that receives the output from the operation mode setting section, receives output signals from the flow rate detector and power detector from each turbine, and converts them into engineering values, and the steam flow rate and fuel of each boiler. A boiler and turbine characteristic setting section that sets the flow rate characteristics and the steam flow rate and turbine output characteristics of each turbine; a turbine constraint setting section that sets operational constraints for each turbine; the turbine constraint setting section; and the turbine process input. The high efficiency of the private power generation plant is calculated by calculating the power demand and steam demand that fluctuate from moment to moment based on the outputs of the power generation unit, boiler, and turbine characteristic setting unit, and searching for the operation amount of each turbine that maximizes the efficiency of the entire private power generation plant. an optimal solution search unit that points out turbine constraint conditions that contribute to operation; an operation support display unit that receives outputs from the optimal solution search unit and the turbine constraint setting unit and displays guidance for achieving high efficiency operation; A private power generation plant operation support device comprising: a turbine setting output section that receives outputs from the optimum solution search section and the operation mode setting section and changes settings of a lower-order control device.
JP1989078526U 1989-07-03 1989-07-03 In-house power plant operation support equipment Expired - Lifetime JP2561265Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1989078526U JP2561265Y2 (en) 1989-07-03 1989-07-03 In-house power plant operation support equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1989078526U JP2561265Y2 (en) 1989-07-03 1989-07-03 In-house power plant operation support equipment

Publications (2)

Publication Number Publication Date
JPH0317204U true JPH0317204U (en) 1991-02-20
JP2561265Y2 JP2561265Y2 (en) 1998-01-28

Family

ID=31621878

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1989078526U Expired - Lifetime JP2561265Y2 (en) 1989-07-03 1989-07-03 In-house power plant operation support equipment

Country Status (1)

Country Link
JP (1) JP2561265Y2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1996010219A1 (en) * 1994-09-26 1996-04-04 Kabushiki Kaisha Toshiba Method and system for optimizing plant utility
JP2000078750A (en) * 1998-08-31 2000-03-14 Mitsubishi Chemicals Corp Method and device for controlling optimum operation of power plant
JP2000078749A (en) * 1998-08-31 2000-03-14 Mitsubishi Chemicals Corp Method and device for controlling optimum operation of power plant

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS56132124A (en) * 1980-03-17 1981-10-16 Tokyo Shibaura Electric Co Method of operating non-utility generating facility

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS56132124A (en) * 1980-03-17 1981-10-16 Tokyo Shibaura Electric Co Method of operating non-utility generating facility

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1996010219A1 (en) * 1994-09-26 1996-04-04 Kabushiki Kaisha Toshiba Method and system for optimizing plant utility
US5886895A (en) * 1994-09-26 1999-03-23 Kabushiki Kaisha Toshiba Plant utility optimizing method and an optimizing system
JP2000078750A (en) * 1998-08-31 2000-03-14 Mitsubishi Chemicals Corp Method and device for controlling optimum operation of power plant
JP2000078749A (en) * 1998-08-31 2000-03-14 Mitsubishi Chemicals Corp Method and device for controlling optimum operation of power plant

Also Published As

Publication number Publication date
JP2561265Y2 (en) 1998-01-28

Similar Documents

Publication Publication Date Title
US4590384A (en) Method and means for peaking or peak power shaving
JPH0227122Y2 (en)
EP2423471A2 (en) Systems and methods involving combined cycle plants
JPH08320105A (en) Feed water regulating method of exhaust-heat steam generator
HU202958B (en) Method for combined electric power and heat producing at power plants operating with boilers of heat utilization
JPH0317204U (en)
JPH06185307A (en) Heat utilizing power generating facility
JPS5840506U (en) Combined cycle power plant
SU943476A1 (en) Device for automatic control of thermal load of a set of steam generators
JPS6014210U (en) combined cycle power plant
JPH0319402U (en)
KEYHANI Stochastic load modeling and optimal dynamic generation control in power systems[Ph. D. Thesis]
JP2002317609A (en) Exhaust heat recovery plant
Okura et al. Completion of High-efficiency Coal-fired Power Plant
SU1375903A2 (en) System for regulating power supply of steam generator of solar power supply plant with heat accumulator
SU1341357A1 (en) Method of operation of back-pressure turbine
JPS63131835A (en) Method for running control of gas turbine plant
RU2166643C2 (en) Pressure drop recovery device for steam-generating systems
JPS61144202U (en)
JPS61170802U (en)
JPH01125868U (en)
JPS6172808A (en) Output controlling equipment for combined cycle generating plant
JPH01136635U (en)
RU93031176A (en) METHOD OF WORK OF STEAM AND GAS INSTALLATION
JPH0491326A (en) Cogeneration system using gas turbine