Tundish refining method

Info

Publication number
JPH0313255A
JPH0313255A JP14689689A JP14689689A JPH0313255A JP H0313255 A JPH0313255 A JP H0313255A JP 14689689 A JP14689689 A JP 14689689A JP 14689689 A JP14689689 A JP 14689689A JP H0313255 A JPH0313255 A JP H0313255A
Authority
JP
Japan
Prior art keywords
molten metal
tundish
mold
refining
poured
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP14689689A
Other languages
Japanese (ja)
Inventor
Masaaki Onishi
大西 公明
Motomichi Yoshino
能野 基道
Takahiko Sawara
佐原 崇彦
Hidefusa Haga
芳賀 英興
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Topy Industries Ltd
Original Assignee
Topy Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Topy Industries Ltd filed Critical Topy Industries Ltd
Priority to JP14689689A priority Critical patent/JPH0313255A/en
Publication of JPH0313255A publication Critical patent/JPH0313255A/en
Pending legal-status Critical Current

Links

Abstract

PURPOSE:To enhance the quality of a molten metal by maintaining a degassing state in a tundish and pouring the molten metal to a mold after subjecting the molten metal to a temp. controlling, stirring and component adjusting. CONSTITUTION:The molten metal 8 is poured into the tundish 2 and the tundish 2 is moved to a preheating position by moving means 4, 6. A refining cap device 10 is put on the tundish 2 and the inside of a container 16 is evacuated by a degassing device 30 and is evacuated by a degassing device 22. An inert gas, such as gaseous Ar, is fed to the molten metal 8 from an inert gas supplying device 18 in succession to the above to stir the molten metal 8. The oxygen and air in the molten metal 8 are removed and the molten metal 8 is heated by a tundish heater 20. Alloy iron is supplied from a hopper 26 and a wire is supplied by a wire feeder 24 at need to execute the component adjustment of the molten metal. The molten metal 8 is refined by the supplying effect thereof. The tundish 2 is moved to the position where the molten metal is poured into the mold after the refining. The tundish is then connected to the mold and the molten metal is poured into the mold. The molten metal 8 solidifies in the mold as time passes by. The casting is thus produced.

Description

【発明の詳細な説明】 [産業上の利用分野] 本発明は、タンディツシュにおいても精練を行イlうタ
ンディツシュ精錬法に関する、。
DETAILED DESCRIPTION OF THE INVENTION [Industrial Application Field] The present invention relates to a tanditsu refining method in which refining is also carried out in a tanditsu.

[従来の技術] 電気炉で溶融された溶湯は、レードルに注渇され、レー
トルをタンデイプ91位置にクレーンで運び、レードル
からタンディツシュに注湯され、タンディツシュからモ
ールドへ注入される。
[Prior Art] Molten metal melted in an electric furnace is poured into a ladle, the ladle is carried by a crane to a tundish 91 position, the molten metal is poured from the ladle into a tundish, and from the tundish it is poured into a mold.

従来のタンディツシュは1部か開放された容器から成り
、溶場温鳴が下がらないように温鴎コントロールする。
Conventional tanditshu consists of a partly open container and controls the temperature so that the melting field temperature does not drop.

しかし、タンj゛イッシ]内溶揚は直接外81賛[−ア
と接1/FJ! L (いたの(−゛、七−ルトl\の
注湯開始までの時間か艮い場合は、溶湯か酸化して溶場
の品質が低下する。
However, the tanj゛isshi] is directly outside the 81 [-a and contact 1/FJ! If the time until the start of pouring L (-゛, 7-rutl\) is not enough, the molten metal will oxidize and the quality of the melt will deteriorate.

[発明か解決しようとりる課題] 本発明は、ランデイツシュ自体にも*^錬機能をbたU
るようにしたタンディツシュネ1)線法を(♀供するこ
とを[]的とする。。
[Problem to be solved by the invention] The present invention also provides a training function to the laundry bag itself.
1) The aim is to provide the line method (♀).

[課題を解決覆るための手段1 上記[1的は、本発明にJ、れば、つぎのタンディツシ
ュ精錬法によって達成される。す41わら、レードルよ
りタンディツシュに注渇し、タンディツシュを予熱位買
に移動して精錬詰装置を施し、クンデイツシュ内情Qト
ti空間を少なくとも部分的に脱カスし、税ガスした状
態で合金Sス等成分調整剤投入、溶湯撹拌、溶湯湿1q
コントロールを行ない、タンディツシュをモールドへの
注入位置に移動後モールドへの注湯を開始する、タンデ
ィツシュ精錬法。
[Means for Solving the Problems 1] [1] According to the present invention, the above-mentioned [1] is achieved by the following tanditsu refining method. 41 Then, pour water into the tank from the ladle, move the tank to a preheating chamber, apply a refining device, remove at least part of the space in the tank, and add alloy S etc. Add component adjuster, stir molten metal, moisten 1q of molten metal
A tanditshu refining method in which the tanditshu is controlled, moved to the injection position into the mold, and then starts pouring into the mold.

[作  用] 本発明によれは、タンデイフシ1内は少なくと6部分的
に脱ガス状態とされ温喰コンi〜ロール、撹拌、成分調
整か行なわれるので、タンディツシュにおいても溶湯は
精錬され、モールドへの注湯に際し溶湯は高品質と八つ
ている。
[Function] According to the present invention, the inside of the tundish 1 is at least partially degassed and hot-rolling, stirring, and component adjustment are performed, so that the molten metal is refined even in the tundish and molded. The molten metal is said to be of high quality when poured.

[実施例] 第1図は本発明のタンディツシュ精錬法を実施するため
のタンディツシュLおよびそのまわりの設備の一実施例
を示している。
[Example] FIG. 1 shows an example of a tandish L and surrounding equipment for carrying out the tandish refining method of the present invention.

タンディツシュ、2は、移動手段(たとえば台in4と
レール6)によって、レードルからの注、湖位置、予熱
位置(精錬位置)、モールドへの注湯位置の3つの位置
間に移動可能とされている。第1図13L予熱位置にタ
ンディツシュ1がきたときの状態をホしている。タンデ
ィツシュ2内にはし一ドルから注入された溶湯8が既に
入っている。
The tanditshu 2 can be moved between three positions: pouring from the ladle, lake position, preheating position (refining position), and pouring position into the mold by means of moving means (for example, table in 4 and rail 6). . Figure 1 shows the state when the tundish 1 has come to the preheating position. The tundish 2 already contains the molten metal 8 that was poured from one dollar.

予熱位置には粘錬器装首10が設けられてJ3す、タン
ディッシ]−2が予熱位置に移送されてきて停止しIた
ときに、タンディツシュ2を+jiから覆って、タンデ
ィツシュ2内の溶湯8に方空間を密閉状態にでる3、精
、Il!盈装研装置10昇降部12(Jよって上下方向
に可動であり、タンディツシュ2が1白[・にぎIこと
きに降下されてタンディツシュ2に石座し、シール材3
4でシールする、精錬詰装置10tに4本体14と諸設
幅を覆う二]ンテプ16を石し、」ンデナ16は蓋本体
14の外部(二」ンラナ16内部のスペースを密閉空間
としり4空引きを可能にする1゜タンディツシュ2に(
JLその内部の溶N8に不活性ガス、たとえば△rガス
、を送り込んで溶湯8をlj2拌づるための不活性ガス
供給管18が接続される。また溶湯8を加熱するための
タンデイフシ1ヒータ20も接続される。
A kneading device neck 10 is provided at the preheating position to cover the tundish 2 from +ji and to cover the molten metal 8 in the tundish 2 when the tundish 2 is transferred to the preheating position and stopped. 3, Sei, Il, who leaves the space in a sealed state! The lifting part 12 of the esoken equipment 10 (J is movable in the vertical direction, and the tandish 2 is lowered and seated on the tandish 2, and the sealing material 3
4 to seal the refining and packing equipment 10t with a 2-metal seal 16 that covers the main body 14 and the width of the various facilities, and a 2-metal seal 16 to seal the outside of the lid body 14 (2) to make the space inside the lid body 14 an airtight space. 1゜tandish 2 that enables empty drawing (
An inert gas supply pipe 18 is connected to the molten N8 inside the JL for supplying an inert gas, such as Δr gas, to stir the molten metal 8. A heater 20 for heating the molten metal 8 is also connected.

粘辣詰)ム問10は、さ1うに、晶−本体14に接、続
される脱ガス装置べ22(不活f生ガスの送給前にタン
ディツシュ22内のエア、酸素41々さ、精錬中は不活
性ガスとともに溶湯中のガスを抜<84置)、蓋本体1
11にフレキシブル管を介して接続されるワイヤーフィ
ーダ24(成分調整用)、合金鉄、だの仙成分調製剤を
投入ηるためのホッパ26を含む。28は測)j品すン
プリング¥c首(湿1宴コント日−ルの1こめの湿1q
検出ヒン1))である。諸設備22.24.26.28
は、望ましくは、コンテナ16内に納められる。コンう
す16にはその内部/N−真空引きするための脱ガス駅
間30が接続される。この真空引き(よって溶m十7j
空間への酸素、コーアの洩入を抑える。32は谷本体1
4を冷却するために4本体14にはりめぐらした配管(
図示略)じ水やエアを送るための設備でおる。
Question 10 is that, as mentioned above, the degassing device 22 (air, oxygen 41, etc. in the tundish 22 before feeding the inert live gas) is During refining, remove the gas from the molten metal together with the inert gas (<84 positions), and remove the lid body 1.
11 via a flexible tube, and a hopper 26 for charging the ferroalloy and Danasen component preparation agent. 28 is measured) j product sample ring ¥c neck (humidity 1 banquet control day - 1 q of humidity)
Detection Hint 1)). Equipment 22.24.26.28
is preferably housed within container 16. The container 16 is connected to a degassing station 30 for evacuating its interior/N. This vacuum (therefore, the melting
Prevents oxygen and core from leaking into the space. 32 is the valley body 1
A pipe (
(not shown) equipment for sending water and air.

第2図は本発明のタンデイフシ12精錬法を実施覆るだ
めの設備のもう一つの実施例を示している。第1図の実
施例にンψじる部材には、第1図と同じ番号が付しであ
る。コンテナ16は下方に延びる管36を有し、この管
36は蓋本体14を挿通してタンディツシュ2内の溶湯
8内に延びている。コンテナ16と蓋本体14とは第2
図の実施例では上下方向に相対動可能であり、タンディ
ツシュ2に蓋本体14を施した後、]]ンl−フ1かシ
(1降部12t、−よつC降下され、管36を蓋本体1
4の穴Cご挿通(〕て溶溶湯内へと入れる1、X、、i
−、/’テフ16内(、′L鞭!j′ス装置2?【、二
J、。
FIG. 2 shows another embodiment of the equipment for carrying out the Tandifushi 12 refining method of the present invention. Components that are similar to the embodiment of FIG. 1 are numbered the same as in FIG. The container 16 has a downwardly extending tube 36 which extends through the lid body 14 and into the molten metal 8 in the tundish 2. The container 16 and the lid main body 14 are
In the illustrated embodiment, it is movable relative to each other in the vertical direction, and after applying the lid body 14 to the tundish 2, the lower part 12t and the lower part 12t are lowered, and the tube 36 is lowered. Lid body 1
Insert hole C in hole C () and put it into the molten metal.
-, /'Inside Tef16(,'L whip!j'S device 2?[,2J,.

って1空i)1さされ、溶x4 s c、を二1ンテブ
16内イ!1−(こよっで押し]げられる2、これによ
って)6f潟−1−h空間はコンテナ16内において山
空引きさ゛れる9、1本体14と溶湯面との間のスペー
スに1.1不活↑(1)島ノ供給)4置18からの不活
・I’lガノ1.たとえばArノ、j′ス、。
1 empty i) 1 inserted, melt x4 s c, 21 intab 16 ai! 1- (Pushed by) 2, As a result, the 6f-1-h space is drawn up in the container 169, 1.1 In the space between the main body 14 and the molten metal surface. Active ↑ (1) Island supply) Inactive from 4-18 I'l Gano 1. For example, Arノ, j′su.

が充満していで、そのfl−力は、管36と蓋本体Ll
との間の隙間に」、ろタンディツシュ2内と外部どの連
通じよって、(J、ば]気[1て゛ある。1合金鉄のi
トツパ26は調整弁38を介して」ン″jプ16に接続
されており、小ツバ26からの含企♀ス)3シJンデフ
16内の溶湯上に投入される。
is full, and the fl-force is applied to the tube 36 and the lid body Ll.
In the gap between the inside and outside of the filter tundish 2, there is a (J) air [1].
The topper 26 is connected to the pump 16 via a regulating valve 38, and the molten metal from the small cap 26 is poured onto the molten metal in the pump 16.

つぎに、第1図また(、−1第2図の駅間を用いて、実
施される本発明のノーi法G、:、ついて説明する。
Next, the no-i method G, : of the present invention, which is implemented using the stations in FIG.

まず、従来と同様にレードルからタンディツシュ2に溶
湯8を注)易す′る。
First, pour the molten metal 8 into the tundish 2 from the ladle as in the conventional method.

つき′に、タンディツシュ−2を移動手段4.61.:
よって予熱40置に移動し、精錬詰装置108タンディ
ッシュ2に施し、第1図または第2図の状態にする。第
1図の装置では、コンテナ16内を脱ガス装置30によ
り真空(真空に近い状態)にし、タンディツシュ2内を
脱ガス装置22によって真空にする。第2図の装置では
コンテナ16内を脱ガス装置22によって真空(真空t
こ近い状態)にする。続いて不活14力゛ス供給装同1
8がらArガス等の不活性ガスを溶湯8に送り、溶湯8
を撹拌するとと−しに溶湯8中の酸素、土アを(々き、
タンディツシュヒータ20によって溶湯8を加熱し、ホ
ッパ26より合金鉄を、また必曹に応じてワイヤフィー
ダ24より一ノイ17を供給して溶湯の成分調整を行な
い、これらの供給作用によって溶湯8を精錬づる。この
精錬を約10分間行なう。
4.61. :
Therefore, the mixture is moved to the preheating position 40, and the tundish 2 of the refining and filling apparatus 108 is brought into the state shown in FIG. 1 or 2. In the apparatus shown in FIG. 1, the inside of the container 16 is made vacuum (near vacuum state) by the degassing device 30, and the inside of the tundish 2 is made vacuum by the degassing device 22. In the apparatus shown in FIG. 2, the interior of the container 16 is vacuumed (vacuum t
(close to this). Next, the inactive 14 force supply system 1
8, send an inert gas such as Ar gas to the molten metal 8,
When the molten metal 8 is stirred, the oxygen and soil in the molten metal 8 are mixed.
The molten metal 8 is heated by the tanditshi heater 20, and the composition of the molten metal is adjusted by supplying ferroalloy from the hopper 26 and 17 from the wire feeder 24 according to the necessity, and the molten metal 8 is heated by these supply actions. Refining Tsuru. This refining is carried out for about 10 minutes.

精錬後、タンディツシュ2をモールドへの注湯位置(移
動手段4.6によって移動1〕、タンデイッシ′l−2
をモールドに接続して、モールド内に注湯−する1、t
−ルド内に注湯された溶湯8はモールド内〔こて、時間
の経過につれて1疑固し、鋳)を製品がでさ゛る。
After refining, the tundish 2 is moved to the mold pouring position (moved 1 by the moving means 4.6), the tundish 'l-2
Connect it to the mold and pour the metal into the mold.1.
- The molten metal 8 poured into the mold is solidified and cast as time passes, and the product comes out.

上記のようなタンディツシュ精錬法では、タンディツシ
ュの溶鋼分を1バツチとした小ロツト生産を行なって・
しよい。
In the tanditsu refining method described above, small lots are produced in which the molten steel of the tanditsu is made into one batch.
Shiyoi.

[発明の効宋] 本発明によるときは、タンディツシュ2で、溶湯の移送
、温度コントロールのみならず、精錬まで行なうように
したので、モールドへ注湯される溶湯の品質を高品質に
覆ることかできる。
[Effects of the invention] According to the present invention, the tundish 2 not only transfers and controls the temperature of the molten metal, but also performs refining, so the quality of the molten metal poured into the mold can be maintained at a high level. can.

また、タンディッシ]の溶鋼分を1バツ−1とした小【
」ット生産が可能となる。
In addition, the molten steel content of [Tandish] is 1 x -1
” production becomes possible.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は本発明のタンディツシュ精錬法の実施に用いる
装置の一例を承り、一部分を断面で示した、概略車面図
、 第2図は本発明の傘ンディッシ:L精線法の実施に用い
る装置のもう一つの例を示す、一部分を断面で示した、
概略if−面図、 である。 2・・・・・・タンディツシュ 8・・・・・・溶湯 10・・・・・・精錬詰装置 14・・・・・・諸本体 16・・・・・・」ンテt。 18・・・・・・不活性ガス供給装置 20・・・・・・タンデイフシ1ヒータ22・・・・・
・ロ9カス装胃 26・・・・・・ホッパ 26+、バ 第2図 特i+’l出願人 代    理    人 トピー工業株式会社
Fig. 1 is a schematic view, partially shown in cross section, of an example of the apparatus used in carrying out the tundish refining method of the present invention, and Fig. 2 is a schematic diagram showing an example of the apparatus used in carrying out the tundish refining method of the present invention. Another example of the device, partially shown in cross section,
This is a schematic if-plane view. 2... Tandish 8... Molten metal 10... Refining and packing equipment 14... Main bodies 16... 18...Inert gas supply device 20...Tandei Fushi 1 heater 22...
・Ro9 Casting stomach 26... Hopper 26+, Figure 2 Special i+'l Applicant's representative Person Topy Industries, Ltd.

Claims (1)

【特許請求の範囲】 1、レードルよりタンディッシュに注湯し;タンディッ
シユを予熱位置に移動して精錬蓋装置を施し;タンディ
ッシュ内溶湯上方空間を少なくとも部分的に脱ガスし、
脱ガスした状態で合金鉄等成分調整剤投入、溶湯撹拌、
溶湯温度コントロールを行ない; タンディッシュをモールドへの注湯位置に移動後、モー
ルドへの注湯を開始する; ことを特徴とするタンディッシュ精錬法。
[Claims] 1. Pouring the molten metal from the ladle into the tundish; moving the tundish to a preheating position and applying a refining lid device; at least partially degassing the space above the molten metal in the tundish;
In a degassed state, add composition adjusting agent such as ferroalloy, stir the molten metal,
A tundish refining method characterized by: controlling the temperature of the molten metal; moving the tundish to a position for pouring the molten metal into the mold; and then starting pouring the molten metal into the mold;
JP14689689A 1989-06-12 1989-06-12 Tundish refining method Pending JPH0313255A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP14689689A JPH0313255A (en) 1989-06-12 1989-06-12 Tundish refining method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP14689689A JPH0313255A (en) 1989-06-12 1989-06-12 Tundish refining method

Publications (1)

Publication Number Publication Date
JPH0313255A true JPH0313255A (en) 1991-01-22

Family

ID=15418026

Family Applications (1)

Application Number Title Priority Date Filing Date
JP14689689A Pending JPH0313255A (en) 1989-06-12 1989-06-12 Tundish refining method

Country Status (1)

Country Link
JP (1) JPH0313255A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0533945U (en) * 1991-10-16 1993-05-07 株式会社神戸製鋼所 Continuous casting facility
JPH06344094A (en) * 1993-06-07 1994-12-20 Sumitomo Metal Ind Ltd Method and apparatus for divided refining

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0533945U (en) * 1991-10-16 1993-05-07 株式会社神戸製鋼所 Continuous casting facility
JPH06344094A (en) * 1993-06-07 1994-12-20 Sumitomo Metal Ind Ltd Method and apparatus for divided refining

Similar Documents

Publication Publication Date Title
US3014255A (en) Method of operating vacuum induction furnace
JP4398643B2 (en) Steel ladle refining
US5121406A (en) Induction melting furnace
MX2007002351A (en) Method and device for casting molten metal.
ZA200701821B (en) Casting method and apparatus
JPH0313255A (en) Tundish refining method
US5178203A (en) Apparatus for the countergravity casting of metals
US4037644A (en) Process for casting steel ingots under a vacuum
DE4307867A1 (en) Process and appts. for purifying molten aluminium - with purification taking place in a melt transport vessel provided temp. with a special head section.
JPS6096738A (en) Method and apparatus for manufacturing high purity alloy
MXPA03000286A (en) Method and device for rising casting with a sliding closure that is mounted on the mould frame.
US4977946A (en) Differential pressure, countergravity casting of individual charges of melt from a casting basin
EP0562170A1 (en) Differential pressure, countergravity casting
JPS63268559A (en) Sliding gate
US3961779A (en) Apparatus and method for refining a metal melt
DE1508112A1 (en) Method and arrangement for treating molten metal
JP3188195B2 (en) Vacuum casting device
DE2147548B2 (en) Method and implementation arrangement for refining and casting steel
US1583248A (en) Process for bottom casting
JPH02169161A (en) Sliding nozzle and method for opening hole thereof
WO1995017528A1 (en) A method of processing ferrous materials
JPH08243725A (en) Method and equipment for manufacturing metal block
US3819842A (en) Method and furnace for maintaining the temperature level of metal melts
JPS5992151A (en) Production of free-cutting lead steel by continuous casting method
RU2026151C1 (en) Method of casting with directed solidification of metal