JPH03126958U - - Google Patents

Info

Publication number
JPH03126958U
JPH03126958U JP5720790U JP5720790U JPH03126958U JP H03126958 U JPH03126958 U JP H03126958U JP 5720790 U JP5720790 U JP 5720790U JP 5720790 U JP5720790 U JP 5720790U JP H03126958 U JPH03126958 U JP H03126958U
Authority
JP
Japan
Prior art keywords
support frame
scaffold
frame panels
panels
view
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP5720790U
Other languages
Japanese (ja)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to JP5720790U priority Critical patent/JPH03126958U/ja
Publication of JPH03126958U publication Critical patent/JPH03126958U/ja
Pending legal-status Critical Current

Links

Landscapes

  • Ladders (AREA)

Description

【図面の簡単な説明】[Brief explanation of drawings]

第1図はこの考案の張出し足場の一例の使用状
態の側面図、第2図は第1図の矢視図、第3図
はこの考案における支持枠パネルの斜視図、第4
図は支持枠パネルの要部側面図、第5図はこの考
案における伸縮部の拡大側面図、第6図は伸縮部
の分解斜視図、第7図は使用状態の概略斜視図、
第8図は使用状態の概略平面図、第9図はこの考
案の張出し足場の別の形態を示す側面図、第10
図は更に別の形態を示す要部斜視図、第11図は
この考案の第二実施例の張出し足場の側面図、第
12図は第二実施例におけるブラケツトの取付部
の側面図、第13図は第12図の−断面
図、第14図は第12図の−断面図、第
15図は第二実施例における伸縮部の一部を断面
で示す側面図である。 符号説明、10……連結部材、20……支持枠
パネル、21……横桟、22……固定支柱、23
……足場板載置用ブラケツト、24……手摺取付
部、25……調整固定部、26……受板、27…
…伸縮杆、28……支持ピン、29……固定ナツ
ト、30……足場板、40……手摺部、60……
支持枠パネル、70……ブラケツト、75……固
定手段、80……伸縮部。
Figure 1 is a side view of an example of an overhanging scaffold of this invention in use, Figure 2 is a view taken in the direction of the arrow in Figure 1, Figure 3 is a perspective view of the support frame panel of this invention, and Figure 4 is a perspective view of the support frame panel of this invention.
The figure is a side view of the main part of the support frame panel, Figure 5 is an enlarged side view of the extendable part in this invention, Figure 6 is an exploded perspective view of the extendable part, and Figure 7 is a schematic perspective view of the use state.
Fig. 8 is a schematic plan view in use, Fig. 9 is a side view showing another form of the overhanging scaffold of this invention, and Fig. 10
11 is a side view of the overhanging scaffold of the second embodiment of this invention; FIG. 12 is a side view of the bracket mounting portion in the second embodiment; FIG. The drawings are a cross-sectional view taken from FIG. 12, FIG. 14 is a cross-sectional view taken from FIG. Description of symbols, 10... Connecting member, 20... Support frame panel, 21... Horizontal beam, 22... Fixed support, 23
... Bracket for placing scaffolding board, 24 ... Handrail attachment part, 25 ... Adjustment fixing part, 26 ... Reception plate, 27 ...
... Telescopic rod, 28 ... Support pin, 29 ... Fixing nut, 30 ... Scaffold board, 40 ... Handrail section, 60 ...
Support frame panel, 70...bracket, 75...fixing means, 80...extensible portion.

Claims (1)

【実用新案登録請求の範囲】 (1) 少なくとも2つが連結部材を介して連結さ
れる複数の支持枠パネルと、 上記支持枠パネル上に載置される足場板と、 上記支持枠パネルの側方上部に取付けられる手
摺部とから成り、 上記支持枠パネルは、横桟によつて連結される
一対の固定支柱の一方の上部に足場板載置用ブラ
ケツト及び手摺取付部を設け、かつ、各固定支柱
の上下端に、それぞれ先端に受板を有する伸縮部
を長さ調節可能に装着して成ることを特徴とする
建築工事用張出し足場。 (2) 少なくとも2つが連結部材を介して連結さ
れる複数の支持枠パネルと、 上記支持枠パネルの側方上部に突設され、その
上部に足場板を載置すると共に、その側方上部に
手摺部を突設するブラケツトとから成り、 上記支持枠パネルは、横桟によつて連結される
一対の固定支柱にて形成されると共に、固定支柱
の上下いずれか一端に、それぞれ先端に受板を有
する伸縮部を長さ調節可能に装着し、 上記ブラケツトは、上記支持枠パネルの一方の
固定支柱に着脱可能に係合する固定手段を具備し
て成ることを特徴とする建築工事用張出し足場。
[Claims for Utility Model Registration] (1) A plurality of support frame panels, at least two of which are connected via a connecting member, a scaffold board placed on the support frame panels, and a side surface of the support frame panels. The supporting frame panel has a scaffold board mounting bracket and a handrail mounting part on the top of one of a pair of fixed columns connected by a horizontal beam, and each An overhanging scaffold for construction work, characterized in that extendable parts each having a receiving plate at the tip are attached to the upper and lower ends of a support column so that the length can be adjusted. (2) a plurality of support frame panels, at least two of which are connected via connecting members; and a plurality of support frame panels protruding from the upper side of the support frame panels, on which a scaffold board is placed; The supporting frame panel is made up of a pair of fixed columns connected by a horizontal crosspiece, and a receiving plate is provided at either the upper or lower end of the fixed column. An overhanging scaffold for construction work, characterized in that the length of the scaffold is adjustable, and the bracket is provided with a fixing means that removably engages with one of the fixing columns of the support frame panel. .
JP5720790U 1990-03-19 1990-06-01 Pending JPH03126958U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP5720790U JPH03126958U (en) 1990-03-19 1990-06-01

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2728190 1990-03-19
JP5720790U JPH03126958U (en) 1990-03-19 1990-06-01

Publications (1)

Publication Number Publication Date
JPH03126958U true JPH03126958U (en) 1991-12-20

Family

ID=31889933

Family Applications (1)

Application Number Title Priority Date Filing Date
JP5720790U Pending JPH03126958U (en) 1990-03-19 1990-06-01

Country Status (1)

Country Link
JP (1) JPH03126958U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010133154A (en) * 2008-12-04 2010-06-17 Asahi Gakuen Group:Kk Construction scaffold
WO2016188660A1 (en) * 2015-05-27 2016-12-01 Peri Gmbh Scaffold with scaffold holder receptacle and use of an aperture in a scaffold pole

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010133154A (en) * 2008-12-04 2010-06-17 Asahi Gakuen Group:Kk Construction scaffold
WO2016188660A1 (en) * 2015-05-27 2016-12-01 Peri Gmbh Scaffold with scaffold holder receptacle and use of an aperture in a scaffold pole
JP2018519437A (en) * 2015-05-27 2018-07-19 ペリー ゲー・エム・ベー・ハーPeri GmbH How to use scaffolds using scaffold holder receiving parts and openings in scaffolding struts
US10190326B2 (en) 2015-05-27 2019-01-29 Peri Gmbh Scaffold with scaffold holder receptable and use of an aperture in a scaffold pole

Similar Documents

Publication Publication Date Title
US5865410A (en) Universal staging bracket
US3637045A (en) Knockdown sawhorse
JPH03126958U (en)
US20090095877A1 (en) Adjustable supporting device with movable telescopic leg units
JPH0274439U (en)
CN214302793U (en) A hoist and mount scaffold frame for frame post construction
JP4806754B2 (en) Optional mounting device
JPH051547Y2 (en)
CN207139776U (en) Tool rack for building
JPH0246599Y2 (en)
JPS62126439U (en)
JPH058620Y2 (en)
JP2002153519A (en) Balustrade unit for bed
JPH0328264U (en)
JPS6294245U (en)
JP3640045B2 (en) Support structure of support in display shelf
JPH0731711Y2 (en) Folding mechanism on the drafting table
JPH0448353U (en)
JPH03108040U (en)
JPS6140179Y2 (en)
JPS6388134U (en)
DE8528577U1 (en) Knee seat with work surface and storage space
KR0131613Y1 (en) Easel
JPH02137441U (en)
JPS62176207U (en)