JPH03119225A - Auxiliary tool - Google Patents
Auxiliary toolInfo
- Publication number
- JPH03119225A JPH03119225A JP25643689A JP25643689A JPH03119225A JP H03119225 A JPH03119225 A JP H03119225A JP 25643689 A JP25643689 A JP 25643689A JP 25643689 A JP25643689 A JP 25643689A JP H03119225 A JPH03119225 A JP H03119225A
- Authority
- JP
- Japan
- Prior art keywords
- foundation
- anchor bolt
- auxiliary tool
- formwork
- anchor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000009415 formwork Methods 0.000 claims description 25
- 229910000831 Steel Inorganic materials 0.000 abstract description 2
- 238000009434 installation Methods 0.000 abstract description 2
- 239000010959 steel Substances 0.000 abstract description 2
- 230000000694 effects Effects 0.000 description 2
- 230000003014 reinforcing effect Effects 0.000 description 2
- 238000010276 construction Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
- Foundations (AREA)
Abstract
Description
【発明の詳細な説明】
〔産業上の利用分野〕
この発明は、建物の基礎構築時にアンカーボルトを仮支
持、する治具を支える補助具に関するものである。DETAILED DESCRIPTION OF THE INVENTION [Industrial Application Field] The present invention relates to an auxiliary tool for supporting a jig that temporarily supports anchor bolts during building foundation construction.
従来、基礎の天端には、土台取付用のアンカーボルトが
立設されている。基礎構築時には、基礎型枠内にアンカ
ーボルトを立設しておき、基礎型枠内にコンクリートを
打設して基礎を構築していス
〔発明が解決しようとする課題〕
基礎構築時には、基礎型枠間に架設した支持部材等にア
ンカーボルトを仮固定して支持していた。Conventionally, anchor bolts for mounting the foundation have been installed at the top of the foundation. When constructing a foundation, anchor bolts are placed upright within the foundation formwork, and concrete is poured into the foundation formwork to construct the foundation. [Problem to be solved by the invention] When constructing the foundation, the foundation mold Anchor bolts were temporarily fixed to support members installed between the frames for support.
しかし、基礎の交差部にあっては、基礎型枠が存在しな
いため、アンカーボルトを仮支持する支持部材を架設で
きなかうた。However, since there is no foundation formwork at the intersection of the foundations, it was not possible to erect support members to temporarily support the anchor bolts.
したがって、この発明の目的は、基礎の交差部でのアン
カーボルトの仮支持が行えるようになる補助具を提供す
ることである。SUMMARY OF THE INVENTION Accordingly, it is an object of the present invention to provide an auxiliary tool that allows temporary support of anchor bolts at intersections of foundations.
この発明の補助具は、中央にアンカーボルト吊持部を有
し両端に基礎型枠掛載部を有するアンカーボルト支持治
具を、基礎の交差部に設置するものであって、基礎型枠
の対向部間に掛け渡す水平部と基礎型枠の内壁面に沿う
垂直部とを備えたものである。The auxiliary tool of the present invention is an anchor bolt support jig that has an anchor bolt hanging part in the center and foundation formwork hanging parts at both ends, and is installed at the intersection of the foundation. It has a horizontal part that spans between the opposing parts and a vertical part that runs along the inner wall surface of the foundation formwork.
この発明の補助具によると、基礎の交差部において基礎
型枠の対向部間に掛け渡したので、この補助具にアンカ
ーボルト支持治具の基礎型枠掛載部を搭載でき、基礎の
交差部であってもアンカーボルトの仮支持ができるよう
になる。According to the auxiliary tool of this invention, since it is spanned between the opposing parts of the foundation formwork at the intersection of the foundation, the foundation formwork hanging part of the anchor bolt support jig can be mounted on this auxiliary tool, and the However, temporary support for anchor bolts can be provided.
この発明の一実施例を第1図ないし第4図に基づいて説
明する。An embodiment of the present invention will be described based on FIGS. 1 to 4.
この実施例は、第2図に示すように、基礎のT字型交差
部におけるものであって、10.10’11は基礎型枠
である。基礎型枠10.10’の対向部間には補助具4
0が掛け渡しである。補助具40は、第3図に示すよう
に、水平部41と垂直部42とからなるL形鋼製の部材
であり、垂直部42を基礎型枠10.10’の内壁面に
沿わせて水平部41の両端を基礎型枠10.10′に載
置しである。This example is for a T-shaped intersection of the foundation, as shown in FIG. 2, and 10.10'11 is the foundation formwork. Auxiliary tools 4 are installed between the opposing parts of the foundation formwork 10 and 10'.
0 is crossing. As shown in FIG. 3, the auxiliary tool 40 is a member made of L-shaped steel consisting of a horizontal part 41 and a vertical part 42, and the vertical part 42 is placed along the inner wall surface of the foundation formwork 10.10'. Both ends of the horizontal section 41 are placed on the base formwork 10.10'.
次に、第1図および第4図に示すように、基礎型枠10
. 10’ 、 11内にアンカーボルト支持治具A
を設置する。アンカーボルト支持治具Aは、中央にアン
カーボルト吊持部27を有し、両端に基礎型枠掛載部1
2.13を有するものである。Next, as shown in FIGS. 1 and 4, the foundation formwork 10
.. Anchor bolt support jig A inside 10' and 11
Set up. Anchor bolt support jig A has an anchor bolt hanging part 27 at the center, and foundation formwork hanging parts 1 at both ends.
2.13.
アンカーボルト吊持部27−は、水平片29と両端の垂
直片30.31とからなり、垂直片30.31に設けた
縦長のスリット32.33にワッシャ23を介して蝶ボ
ルト22を挿通し、アンカーボルト吊持部27の高さ調
整を行って基礎型枠掛載部12゜13の縦片14,15
にナツトにて固定する。また、基礎型枠掛載部12.1
3は、その横片18゜19に螺合した蝶ボルト21を補
助具40ならびに基礎型枠11の上面にR置すると共に
、縦片14゜15に螺合した蝶ボルト25の先端の押し
板26を補助具40ならびに基礎型枠11の内壁面に当
接する。そして、アンカーボルト吊持部27の水平片2
9に、基礎補強用の補強プレート36を介してアンカー
ボルト37を挿通し、上下からナツト38にて固定する
。このようにして、基礎型枠10.10’、11内にア
ンカーボルト37を吊持しておいて、コンクリートを打
設して基礎を構築する。The anchor bolt hanging part 27- consists of a horizontal piece 29 and vertical pieces 30.31 at both ends, and the butterfly bolt 22 is inserted through the washer 23 into a vertical slit 32.33 provided in the vertical piece 30.31. , by adjusting the height of the anchor bolt hanging portion 27, the vertical pieces 14, 15 of the foundation formwork hanging portion 12°13 are adjusted.
Fix it with a nut. In addition, the foundation formwork hanging part 12.1
3 is a push plate at the tip of the butterfly bolt 25 screwed into the vertical piece 14° 15, and a wing bolt 21 screwed into the horizontal piece 18° 19 is placed R on the upper surface of the auxiliary tool 40 and the basic formwork 11. 26 is brought into contact with the auxiliary tool 40 and the inner wall surface of the foundation formwork 11. Then, the horizontal piece 2 of the anchor bolt hanging part 27
9, an anchor bolt 37 is inserted through a reinforcing plate 36 for reinforcing the foundation, and fixed with nuts 38 from above and below. In this way, the anchor bolts 37 are suspended within the foundation forms 10, 10', 11, and concrete is poured to construct the foundation.
このように構成された補助具40によると、基礎の交差
部において、基礎型枠10.10’の対向部間に補助具
40を掛け渡したので、この補助具40にアンカーボル
ト支持治具Aを搭載でき、基礎の交差部であってもアン
カーボルト37の仮支持ができるようになる。According to the auxiliary tool 40 configured in this way, since the auxiliary tool 40 is spanned between the opposing parts of the foundation forms 10 and 10' at the intersection of the foundations, the anchor bolt support jig A is attached to the auxiliary tool 40. can be mounted, and the anchor bolt 37 can be temporarily supported even at the intersection of the foundation.
なお、第5図に示すように、補助具40を基礎のコーナ
部において基礎型枠43.44間に掛け渡したり、第6
図に示すように、十字型交差部において基礎型枠45.
46.47.48間に掛け渡してもよい。In addition, as shown in FIG.
As shown in the figure, at the cross-shaped intersection, the foundation formwork 45.
46, 47, and 48.
この発明の補助具によると、基礎の交差部において基礎
型枠の対向部間に掛け渡したので、この補助具にアンカ
ーボルト支持治具の基礎型枠掛載部を搭載でき、基礎の
交差部であってもアンカーボルトの仮支持ができるよう
になるという効果が得られる。According to the auxiliary tool of this invention, since it is spanned between the opposing parts of the foundation formwork at the intersection of the foundation, the foundation formwork hanging part of the anchor bolt support jig can be mounted on this auxiliary tool, and the However, the effect of temporarily supporting the anchor bolt can be obtained.
第1図はこの発明の一実施例の斜視図、第2図はその補
助具の設置状態の斜視図、第3図はその補助具の斜視図
、第4図はその断面図、第5図および第6図は補助具の
他の設置状態を示す斜視図である。
A・・・アンカーボルト支持治具、to、10’11・
・・基礎型枠、12.13・・・基礎型枠掛載部、27
・・・アンカーボルト吊持部、40・・・補助具、41
・・・水平部、42・・・垂直部
第
2
図
第
図
7FIG. 1 is a perspective view of an embodiment of the present invention, FIG. 2 is a perspective view of the auxiliary tool installed, FIG. 3 is a perspective view of the auxiliary tool, FIG. 4 is a sectional view thereof, and FIG. 5 and FIG. 6 is a perspective view showing another installation state of the auxiliary tool. A... Anchor bolt support jig, to, 10'11.
...Foundation formwork, 12.13...Foundation formwork hanging part, 27
...Anchor bolt hanging part, 40...Auxiliary tool, 41
...Horizontal part, 42...Vertical part 2 Figure 7
Claims (1)
部を有するアンカーボルト支持治具を、基礎の交差部に
設置する補助具であって、基礎型枠の対向部間に掛け渡
す水平部と基礎型枠の内壁面に沿う垂直部とを備えた補
助具。An auxiliary tool for installing an anchor bolt support jig, which has an anchor bolt hanging part in the center and foundation formwork hanging parts at both ends, at the intersection of the foundation, and is hung between opposing parts of the foundation formwork. An auxiliary device with a horizontal part and a vertical part that runs along the inner wall surface of the foundation formwork.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP25643689A JPH03119225A (en) | 1989-09-29 | 1989-09-29 | Auxiliary tool |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP25643689A JPH03119225A (en) | 1989-09-29 | 1989-09-29 | Auxiliary tool |
Publications (1)
Publication Number | Publication Date |
---|---|
JPH03119225A true JPH03119225A (en) | 1991-05-21 |
Family
ID=17292637
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP25643689A Pending JPH03119225A (en) | 1989-09-29 | 1989-09-29 | Auxiliary tool |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPH03119225A (en) |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5029013B2 (en) * | 1972-07-10 | 1975-09-19 | ||
JPS511123U (en) * | 1974-06-21 | 1976-01-07 |
-
1989
- 1989-09-29 JP JP25643689A patent/JPH03119225A/en active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5029013B2 (en) * | 1972-07-10 | 1975-09-19 | ||
JPS511123U (en) * | 1974-06-21 | 1976-01-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN218952796U (en) | Adjustable kitchen and bathroom hanging die positioning and fixing device | |
JPH03119225A (en) | Auxiliary tool | |
JPH07116826B2 (en) | Anchor bolt support jig | |
JPS5828029Y2 (en) | Base metal fittings | |
JPS63236824A (en) | Structure for installing columnar body | |
JPH08209810A (en) | Anchor bolt installation method for large steel frame | |
JPS5920489Y2 (en) | Anchor bolt mounting structure | |
JP3029125U (en) | Girder support device for building form panel | |
JP2745238B2 (en) | Temporary support for slab half PCa board erection | |
JPH071466Y2 (en) | Temporary columns for formwork support | |
JPH0415800Y2 (en) | ||
JPH0732755Y2 (en) | Foundation bolt installation frame that also serves as a concrete formwork | |
JP2542432Y2 (en) | Lower frame of unit bus | |
JP2724891B2 (en) | Construction method of pillar half PCa formwork | |
JP2583489Y2 (en) | Anchor frame | |
JP2558094Y2 (en) | Embedded pillar PCa member for construction of reinforced concrete buildings | |
JPH10140641A (en) | Variable side ditch and laying method thereof | |
JPH09221855A (en) | Pc outer wall plate fitting structure for pc structure building | |
JP2761455B2 (en) | ALC external wall panel mounting method on the floor taken out | |
JPH1024407A (en) | Apparatus and method for producing semi-pca balcony | |
JPH11190130A (en) | Footing top end leveler jig | |
JPH045617Y2 (en) | ||
JPH0624528Y2 (en) | Standing structure of fence support | |
JPH10184005A (en) | Construction method of diagonal building frame | |
JPH063079Y2 (en) | Lower frame leveling device |