JPH028106B2 - - Google Patents

Info

Publication number
JPH028106B2
JPH028106B2 JP676985A JP676985A JPH028106B2 JP H028106 B2 JPH028106 B2 JP H028106B2 JP 676985 A JP676985 A JP 676985A JP 676985 A JP676985 A JP 676985A JP H028106 B2 JPH028106 B2 JP H028106B2
Authority
JP
Japan
Prior art keywords
crane
mast
foundation work
work
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP676985A
Other languages
Japanese (ja)
Other versions
JPS61165471A (en
Inventor
Shigeto Matsumoto
Shigeru Okano
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
IHI Corp
Original Assignee
IHI Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by IHI Corp filed Critical IHI Corp
Priority to JP676985A priority Critical patent/JPS61165471A/en
Publication of JPS61165471A publication Critical patent/JPS61165471A/en
Publication of JPH028106B2 publication Critical patent/JPH028106B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Jib Cranes (AREA)

Description

【発明の詳細な説明】 [産業上の利用分野] 本発明は山岳等に送電鉄塔等を建設する場合の
基礎工事から鉄塔組立工事を行う工法と該工法に
用いるクライミングクレーンに関するものであ
る。
DETAILED DESCRIPTION OF THE INVENTION [Field of Industrial Application] The present invention relates to a construction method for performing foundation work to tower assembly work when constructing power transmission towers, etc. in mountains, etc., and a climbing crane used in the construction method.

[従来の技術] 山岳に送電鉄塔、アンテナ用鉄塔等を背建設す
る場合は、鉄塔建設に必要な機材をヘリコプター
で運搬することが行われている。
[Prior Art] When constructing power transmission towers, antenna towers, etc. in mountains, the equipment necessary for constructing the towers is transported by helicopter.

鉄塔建設における基礎工事は、地面を掘削して
コンクリートを打設することにより鉄塔脚部を植
設するが、高さの高い鉄塔の場合は脚柱同士の固
定位置が広い間隔となるため、クレーンが使用さ
れている。
Foundation work for steel tower construction involves excavating the ground and pouring concrete to plant the tower legs. However, in the case of tall steel towers, the fixed positions of the pillars are widely spaced, so cranes are required to construct the tower. is used.

しかし、クレーンを用いて鉄塔建設工事を行う
場合、基礎工事中にヘリコプターで平地から多く
の機材を運んで荷卸しするが、基礎工事のときに
ヘリコプターの飛来に対する安全性の点から、ク
レーンの高さは6m位が限度とされており、極力
高さを低くしておくことが必要である。
However, when constructing a steel tower using a crane, a large amount of equipment is transported and unloaded from the ground by helicopter during the foundation work. The maximum height is around 6m, so it is necessary to keep the height as low as possible.

そのため、従来では基礎工事は第9図に示す如
き高さを低くした基礎工事用定置式クレーンを使
用し、鉄塔組立ては高さが高い鉄塔組立用クライ
ミングクレーンを使用するため、2種類のクレー
ンを用意し、基礎工事のときは定置式クレーンを
鉄塔建設場所に組み立てて設置し、基礎工事が終
ると、鉄塔組立用クライミングクレーンを基礎工
事用定置式クレーンに変えて組み立てて設置し、
クライミングさせながら鉄塔を組み立てて行くよ
うに2種類のクレーンを使い分けていた。第9図
中、aは基礎工事用架台、bは旋回フレーム、c
はガイサポート、dはジブであり、高さhが5m
位としてある。
For this reason, conventionally, foundation work uses a lower-height stationary crane for foundation work, as shown in Figure 9, and tower assembly uses a taller climbing crane for tower assembly, so two types of cranes are used. During foundation work, a stationary crane is assembled and installed at the tower construction site, and once the foundation work is completed, the climbing crane for assembling the tower is replaced with a stationary crane for foundation work, assembled and installed.
Two types of cranes were used to assemble the tower while climbing. In Figure 9, a is a base for foundation work, b is a rotating frame, and c
is the guy support, d is the jib, and the height h is 5m
There is a rank.

[発明が解決しようとする問題点] ところが、クレーン自体は大重量物であり、平
地から鉄塔建設個所である山岳までクレーンをヘ
リコプターで輸送する場合は、クレーンを分解し
て何回も往復飛行しなければならず、ヘリコプタ
ー運搬回数が増大すると共に、基礎工事用定置式
クレーンを撤去した後、クライミングクレーンを
設置しなければ、鉄塔の組立工事に移行できず、
クレーンの設置、撤去に多大な手間と時間を要し
ていた。
[Problems to be solved by the invention] However, the crane itself is a heavy object, and if the crane is to be transported by helicopter from the flat ground to the mountain where the steel tower will be constructed, the crane must be disassembled and made many round-trip flights. This meant that the number of helicopter transports would increase, and the construction work could not proceed to the tower assembly unless a climbing crane was installed after the fixed crane for foundation work was removed.
It took a lot of time and effort to install and remove the crane.

そこで、本発明は、基礎工事用のクレーンと鉄
塔組立用クレーンの2種類を1つのクレーンで共
用させ、基礎工事から鉄塔組立工事へスムースに
移行できるようにして前記従来の問題点を解消さ
せようとするものである。
Therefore, the present invention solves the above-mentioned conventional problems by allowing two types of cranes, one for foundation work and one for assembling steel towers, to be used in common by one crane, thereby allowing a smooth transition from foundation work to tower assembly work. That is.

[問題点を解決するための手段] 本発明は、基礎工事用の専用架台でクレーン本
体に着脱自在に支持させ、基礎工事中は上記専用
架台に取り付けて基礎工事用クレーンとして使用
し、基礎工事の完了後、上記専用架台を撤去する
と共にクライミング用のガイドマストを設置し、
該ガイドマストに沿いクレーンをクライミングさ
せ、鉄塔を上方へ組み立てて行くようにする。
[Means for Solving the Problems] The present invention provides a special mount for foundation work that is detachably supported by the crane body, and is used as a crane for foundation work by being attached to the dedicated mount during foundation work. After completion of the above, the dedicated trestle was removed and a guide mast for climbing was installed.
The crane is made to climb along the guide mast and the steel tower is assembled upward.

[作 用] 基礎工事を行うときは、専用架台を脚として使
用し、クレーンの高さを低くして基礎工事を行
う。鉄塔の脚が埋め立てられて基礎工事が終了す
ると、専用架台を撤去してガイドマストを立て、
クレーンをクライミングさせてマストを継ぎ足し
て行き、鉄塔の脚に鉄塔の骨材を組み付け、鉄塔
組立てを行う。
[Operation] When performing foundation work, use the dedicated trestle as legs and lower the height of the crane. Once the legs of the steel tower have been reclaimed and the foundation work is completed, the special pedestal is removed and the guide mast is erected.
A crane is used to climb the mast, the mast is added, and the steel tower aggregate is attached to the legs of the steel tower, and the tower is assembled.

[実施例] 以下、本発明の実施例を図面を参照して説明す
る。
[Example] Hereinafter, an example of the present invention will be described with reference to the drawings.

第1図乃至第8図は本発明の実施例を示すもの
で、クレーン本体1は、旋回フレーム2上に、前
部支柱3a及び後部支柱3bをA状にしてなるガ
イドサポート3を立設させると共に前端部にジブ
4を起伏自在に取り付け、且つ旋回フレーム2に
設置した起伏用ウインチ5に巻いた起伏用ロープ
6をガイドサポート3項部のジーブとジブ4先端
のジーブ間に掛け渡してジブ4が起伏できるよう
にし、又、旋回フレーム2上の巻上用ウインチ7
に巻いた巻上用ロープ8にてジブ先端のジーブを
介してフツク9を吊り、フツク9の巻上下が行わ
れるようにする。上記旋回フレーム2は旋回ベア
リング10を介して旋回座11上に載置し、上記
旋回フレーム2上に設置した旋回装置12により
旋回フレーム2が旋回できるようにしてある。
1 to 8 show an embodiment of the present invention, in which a crane main body 1 has a guide support 3 erected on a revolving frame 2, with a front strut 3a and a rear strut 3b formed in an A-shape. At the same time, a jib 4 is attached to the front end so that the jib 4 can be raised and lowered freely, and a hoisting rope 6 wound around a hoisting winch 5 installed on the revolving frame 2 is passed between the jib at the third section of the guide support and the jib at the tip of the jib 4 to create a jib. 4 can be raised and lowered, and a hoisting winch 7 on the revolving frame 2
A hook 9 is hung via a jib at the tip of the jib by a hoisting rope 8 wound around the hoist, so that the hook 9 can be hoisted up and down. The swing frame 2 is placed on a swing seat 11 via a swing bearing 10, and is configured to be able to swing by a swing device 12 installed on the swing frame 2.

上記クレーン本体1は、鉄塔建設の基礎工事に
使用するときは全高を低くし且つ安定性よく作業
できるようにするため、第1図乃至第4図に示す
如く四方に水平に張り出した脚部14をそれぞれ
分割可能にしてなる基礎工事専用架台13上に載
置させ、工事現場の地面の傾斜に応じて脚部14
先端のアウトリガー15の高さを調整して専用架
台13を水平に保持させる。16はクレーン本体
1を鉄塔組立工事に使用するときにクライミング
させるための昇降フレームであり、予め専用架台
13上に載せておく。17は鉄塔組立工事で使用
するクライミング用のガイドマスト18及び鉄塔
組立工事を行うクレーンのマスト19を載せるた
めの台であり、基礎の地面を整地させて水平に設
置させる。
When the crane main body 1 is used for foundation work for constructing a steel tower, in order to reduce the overall height and enable stable work, the crane body 1 has legs 14 that extend horizontally in all directions as shown in Figs. 1 to 4. The legs 14 are placed on a pedestal 13 dedicated to foundation work that can be separated, and the legs 14 are separated according to the slope of the ground at the construction site.
The height of the outrigger 15 at the tip is adjusted to hold the dedicated frame 13 horizontally. Reference numeral 16 denotes an elevating frame for climbing the crane main body 1 when used for steel tower assembly work, and is placed on a dedicated pedestal 13 in advance. Reference numeral 17 designates a platform on which a guide mast 18 for climbing used in the steel tower assembly work and a mast 19 of a crane used in the steel tower assembly work are mounted, and the ground of the foundation is leveled and installed horizontally.

基礎工事を行うときは、第1図の状態でジブ4
の起伏によりフツク9で吊られた機械の運搬、フ
ツク9の吊り上げ下げにより鉄塔基礎工事部への
機械の搬入を連続的に行い、搬入された機械の組
立て、コンクリート21の打設、等を行つて鉄塔
脚20の埋め立てを行う。
When performing foundation work, set jib 4 in the condition shown in Figure 1.
Due to the ups and downs of the building, the machines are transported suspended by hooks 9, and the machines are continuously carried into the tower foundation construction department by lifting and lowering hooks 9, and the machines carried in are assembled, concrete 21 is poured, etc. Then, the steel tower legs 20 are reclaimed.

一連の基礎工事が終ると、第2図及び第3図に
示す如く専用架台13の脚部14間にガイドマス
ト18を立てる。このガイドマスト18は台17
上に固定する。同時に上記ガイドマスト18に取
り付けたウインチ22に巻いたロープ23をガイ
ドマスト18頂部のジーブ24と昇降フレーム1
6との間に掛け回して昇降フレーム16を吊る。
昇降フレーム16は、外側にガイド車輪25(第
8図参照)を有してガイドマスト18の内面に設
けた又は内面に形成したガイドレールに沿い昇降
できるようにしてあると共に、中央部に継足しマ
スト19を貫通させる大きさのくり抜き孔26
(第8図参照)を有して該孔26の内縁適宜個所
にカンヌキを水平方向に出入自在に備えた構成と
してある。
When a series of foundation works are completed, the guide mast 18 is erected between the legs 14 of the dedicated frame 13, as shown in FIGS. 2 and 3. This guide mast 18 is the stand 17
Fix it on top. At the same time, the rope 23 wound around the winch 22 attached to the guide mast 18 is connected to the jive 24 at the top of the guide mast 18 and the lifting frame 1.
6 and hang the elevating frame 16.
The elevating frame 16 has guide wheels 25 (see FIG. 8) on the outside so that it can be moved up and down along a guide rail provided or formed on the inner surface of the guide mast 18. A hollow hole 26 large enough to pass through the mast 19
(See FIG. 8), and a cannula is provided at an appropriate location on the inner edge of the hole 26 so that it can be moved in and out in the horizontal direction.

上記昇降フレーム16がロープ23にて吊られ
た状態になると、基礎工事用の専用架台13の脚
部を分割部14aで分割して専用架台13を解体
して撤去し、ウインチ22を駆動して昇降フレー
ム16を上昇させクレーン本体1をそのまま持ち
上げる(第4図参照)。上記昇降フレーム16の
上昇距離は、継ぎ足すべき継足しマスト19の長
さ分とする。クレーン本体1が継足しマスト19
の長さ分持ち上げられると、継足しマスト19を
台17の中央部上に立てて、該継足しマスト19
の上端と旋回座11とを連結した後、昇降フレー
ム16を下降させ、カンヌキで継足しマスト19
の上端部に係合させて再び昇降フレーム16を次
に継ぎ足す継足しマスト19の長さ分だけ上昇さ
せる。この昇降フレーム16の昇降は、ガイドマ
スト18にガイド車輪25を介し案内されるので
振れることなく円滑に行われる。
When the elevating frame 16 is suspended by the rope 23, the legs of the dedicated pedestal 13 for foundation work are divided at the dividing part 14a, the dedicated pedestal 13 is dismantled and removed, and the winch 22 is driven. The lifting frame 16 is raised and the crane main body 1 is lifted as it is (see Fig. 4). The lifting distance of the elevating frame 16 is the length of the addition mast 19 to be added. The crane body 1 is added to the mast 19
When it is lifted by the length of
After connecting the upper end and the swivel seat 11, lower the elevating frame 16, connect it with a cannula, and install the mast 19.
The lifting frame 16 is again raised by the length of the addition mast 19 to be added next by engaging the upper end portion. The elevating and lowering frame 16 is guided by the guide mast 18 via the guide wheels 25, so that the elevating frame 16 is smoothly moved without shaking.

継足しマスト19とともにクレーン本体1が持
ち上げられると、2段目の継足しマスト19を台
17上に立てて1段目の継足しマスト19の下端
に連結して継ぎ足す。
When the crane main body 1 is lifted together with the replenishing mast 19, the second stage replenishing mast 19 is erected on the stand 17 and connected to the lower end of the first stage replenishing mast 19 to perform replenishment.

このようにして順次クレーン本体1の支持用マ
ストを継ぎ足してクレーン本体1をクライミング
させ、基礎工事の終つた鉄塔脚20へ鉄塔骨材を
組み付けて鉄塔を組み立てて行く。鉄塔組立工事
の進渉に伴ないクレーン本体1をクライミングさ
せて支持用マストを第6図から第8図のように順
次継ぎ足して行き、機械置場からの機械の吊り上
げ、組付けの作業を行い鉄塔組立工事を行わせ
る。
In this way, the supporting masts of the crane main body 1 are sequentially added to allow the crane main body 1 to climb, and the steel tower is assembled by assembling the steel tower aggregates to the steel tower legs 20 for which the foundation work has been completed. As the tower assembly work progresses, the crane body 1 is climbed and support masts are added sequentially as shown in Figures 6 to 8, and machines are hoisted from the machine storage area and assembled, and the tower is assembled. Have assembly work done.

鉄塔組立工事が終り、クレーンを撤去するとき
は、前記クライミング操作と逆の操作でクレーン
本体1を下降させる。すなわち、昇降フレーム1
6でマスト19及びクレーン本体1を支持させな
がら下段の継足しマストから順に外して行き、ク
レーン本体1がガイドマスト18の間を下降する
ときは、ジブ4を最小半径となるよう起立させた
状態とする。クレーン本体1が降ろされると、分
解し、ガイドマスト18も分解して撤去させる。
なお、本発明は上記実施例に限定されるものでは
なく、昇降フレーム16の昇降機構としては第8
図の左半分に示すウインチ22とロープ23によ
る場合を示したが、第8図右半分に示す如くシリ
ンダ装置27を採用してもよいこと、その他本発
明の要旨を逸脱しない範囲内で種々変更を加え得
ること等は勿論である。
When the tower assembly work is finished and the crane is to be removed, the crane body 1 is lowered by performing the operation opposite to the climbing operation described above. That is, the lifting frame 1
6, while supporting the mast 19 and the crane body 1, remove them from the lower additional mast in order. When the crane body 1 descends between the guide masts 18, the jib 4 is erected to the minimum radius. shall be. When the crane body 1 is lowered, it is disassembled and the guide mast 18 is also disassembled and removed.
Note that the present invention is not limited to the above-mentioned embodiment, and the elevating mechanism for the elevating frame 16 is the eighth embodiment.
Although the case using the winch 22 and rope 23 shown in the left half of the figure is shown, it is also possible to adopt a cylinder device 27 as shown in the right half of FIG. Of course, it is also possible to add

[発明の効果] 以上述べた如く本発明によれば、山岳での鉄塔
建設に必要な基礎工事用のクレーンと高所作業と
なる鉄塔組立工事用のクレーンとを、基礎工事の
ときに使用する専用架台を分解撤去可能にして採
用することだけで共用できるようにし、1台のク
レーンを基礎工事から鉄塔組立工事へ簡単に移行
できるようにしているので、2種類のクレーンを
使い分ける必要がなくて撤去、組立の労力を削減
できると共に、基礎工事用の専用架台を用意する
だけでクレーン本体を共用できることから経済性
を高めることができ、且つ設置、撤去の手間、時
間の大幅な削減を図ることができ、更に、機材の
ヘリコプター運搬回数を減少できる、等の優れた
効果を奏し得る。
[Effects of the Invention] As described above, according to the present invention, a crane for foundation work necessary for constructing a steel tower in the mountains and a crane for assembling a steel tower, which is work at heights, are used during foundation work. The dedicated mount can be disassembled and removed so that it can be used in common, and one crane can be easily transferred from foundation work to tower assembly work, eliminating the need to use two different types of cranes. In addition to being able to reduce labor for removal and assembly, the crane body can be shared by simply preparing a special frame for foundation work, increasing economic efficiency, and significantly reducing the effort and time required for installation and removal. Furthermore, it can bring about excellent effects such as reducing the number of times equipment is transported by helicopter.

【図面の簡単な説明】[Brief explanation of drawings]

第1図乃至第8図はいずれも本発明の実施例を
示すもので、第1図は基礎工事中のクレーンを示
す側面図、第2図は基礎工事が終了して鉄塔組立
工事に移るときの状態を示す側面図、第3図は第
2図の−矢視図、第4図、第5図、第6図及
び第7図は鉄塔組立用のクレーンとしてクライミ
ングさせる状態の順序を示す図、第8図はクライ
ミング機構の例を示す図、第9図は従来の基礎工
事用定置式クレーンの側面図である。 1はクレーン本体、2は旋回フレーム、4はジ
ブ、13は専用架台、16は昇降フレーム、18
はガイドマスト、19は継足しマストを示す。
Figures 1 to 8 all show examples of the present invention, with Figure 1 being a side view of the crane during foundation work, and Figure 2 showing the crane when the foundation work is completed and the tower assembly work begins. FIG. 3 is a side view showing the condition of FIG. 2, FIG. 4, FIG. 5, FIG. 6, and FIG. , FIG. 8 is a diagram showing an example of a climbing mechanism, and FIG. 9 is a side view of a conventional stationary crane for foundation work. 1 is the crane body, 2 is the revolving frame, 4 is the jib, 13 is the dedicated mount, 16 is the lifting frame, 18
19 indicates a guide mast, and 19 indicates an additional mast.

Claims (1)

【特許請求の範囲】 1 分解可能な専用架台にクレーン本体を支持し
て基礎工事を行い、基礎工事終了後、ガイドマス
トを立ててクレーン本体を支持し、次いで、上記
専用架台を分解撤去し、しかる後、クレーン本体
をクライミングさせながら鉄塔組立工事を行うこ
とを特徴とする鉄塔建設工法。 2 旋回フレーム上にジブを起伏自在に備えたク
レーン本体を、分解可能な基礎工事専用の架台上
に載置できるようにすると共に、上記クレーン本
体は載置でき且つ継足しマストは貫通できるよう
にした昇降フレームをガイドマストに昇降自在に
備え、且つ上記昇降フレームに継足しマストに係
合する係合装置を離脱自在に備えたことを特徴と
する鉄塔建設工法に用いるクライミングクレー
ン。
[Scope of Claims] 1. Foundation work is carried out by supporting the crane body on a dedicated pedestal that can be disassembled, and after the foundation work is completed, a guide mast is erected to support the crane body, and then the dedicated pedestal is disassembled and removed; After that, the steel tower construction method is characterized in that the tower assembly work is performed while climbing the crane body. 2. The crane body, which is equipped with a jib that can be raised and lowered on a revolving frame, can be placed on a disassembleable platform dedicated to foundation work, and the crane body can be placed on it, and the additional mast can be penetrated. A climbing crane for use in a steel tower construction method, characterized in that a guide mast is provided with an elevating frame that can be raised and lowered freely, and an engagement device that is attached to the elevating frame and that engages with the mast is removably provided.
JP676985A 1985-01-18 1985-01-18 Iron tower construction method and climbing crane used therein Granted JPS61165471A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP676985A JPS61165471A (en) 1985-01-18 1985-01-18 Iron tower construction method and climbing crane used therein

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP676985A JPS61165471A (en) 1985-01-18 1985-01-18 Iron tower construction method and climbing crane used therein

Publications (2)

Publication Number Publication Date
JPS61165471A JPS61165471A (en) 1986-07-26
JPH028106B2 true JPH028106B2 (en) 1990-02-22

Family

ID=11647380

Family Applications (1)

Application Number Title Priority Date Filing Date
JP676985A Granted JPS61165471A (en) 1985-01-18 1985-01-18 Iron tower construction method and climbing crane used therein

Country Status (1)

Country Link
JP (1) JPS61165471A (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA3061001A1 (en) * 2017-04-26 2018-11-01 Sucof B.V. Crane, method for assembling a crane and method for disassembling a crane
JP7197118B2 (en) * 2018-10-29 2022-12-27 ポルタパーク株式会社 Work barge equipped with a crane and its crane operation method
CN111173347B (en) * 2020-01-10 2021-06-29 江苏大盛铁塔制造有限公司 Construction method for power communication steel structure iron tower
JP7159387B1 (en) * 2021-04-16 2022-10-24 東光電気工事株式会社 Steel tower construction method using an external climbing crane

Also Published As

Publication number Publication date
JPS61165471A (en) 1986-07-26

Similar Documents

Publication Publication Date Title
JPH0245274Y2 (en)
US3127996A (en) Climbing cranes
CN108590170A (en) A kind of rectangle chimney twin-well frame displacement type template integral lifting apparatus and its construction method
CN218201897U (en) Sliding and hoisting construction device
JPH028106B2 (en)
CN208563968U (en) A kind of rectangle chimney twin-well frame displacement type template integral lifting apparatus
CN211171941U (en) Manual hole digging operation frame based on full-sleeve full-slewing drilling machine
US3998029A (en) Tower crane climbing
CN112412152B (en) Construction method of underslung derrick-free variable-section rectangular chimney support system
CN210767838U (en) Large-section inclined column template construction structure for constructional engineering
CN112324161A (en) Mounting structure of annular rail dismounting device and annular rail dismounting method
JPH028107B2 (en)
CN212024599U (en) Column cantilever crane convenient to transportation
JPH05286694A (en) Construction method and crane for assembling external type steel tower
JPS5846993B2 (en) Method of constructing a steel tower using a lifting crane
JP7174806B1 (en) Wind turbine dismantling method, wind turbine assembly method, and wind turbine construction stand
JP3532161B2 (en) Tower construction machine and tower construction method
CN212050249U (en) Earthwork transportation equipment suitable for sinking portal construction
CN218027231U (en) Simple device for lowering bottom basket of hanging basket
CN216403640U (en) Cable shaft power maintenance hoist device
CN219411758U (en) Lifting type multifunctional scaffold
CN211871227U (en) Light crane is installed and is hoisted on floor
CN211971560U (en) Column type cantilever crane
CN209924424U (en) Creeping formwork device with safety structure
CN212641226U (en) Detachable operation platform and be used for landing stage template subassembly of anticollision barrier construction

Legal Events

Date Code Title Description
EXPY Cancellation because of completion of term