JPH0249829A JP19937188A JP19937188A JPH0249829A JP H0249829 A JPH0249829 A JP H0249829A JP 19937188 A JP19937188 A JP 19937188A JP 19937188 A JP19937188 A JP 19937188A JP H0249829 A JPH0249829 A JP H0249829A
Authority
JP
Japan
Prior art keywords
bar
unit
reinforcement
bars
large beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP19937188A
Other languages
Japanese (ja)
Other versions
JPH0749679B2 (en
Inventor
Akira Sanechika
実近 暁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Construction Co Ltd
Shimizu Corp
Original Assignee
Shimizu Construction Co Ltd
Shimizu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Construction Co Ltd, Shimizu Corp filed Critical Shimizu Construction Co Ltd
Priority to JP19937188A priority Critical patent/JPH0749679B2/en
Publication of JPH0249829A publication Critical patent/JPH0249829A/en
Publication of JPH0749679B2 publication Critical patent/JPH0749679B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Reinforcement Elements For Buildings (AREA)
  • Rod-Shaped Construction Members (AREA)

Abstract

PURPOSE:To provide practically of executing steel bar installing works in parallel with form setting works by assembling large beam steel bars previously in other place. CONSTITUTION:Ground fabrication of a large beam steel bar unit 1 is first made in a specified place. This unit 1 is assembled by tying a plurality of parallel lower main bars 2 in such a length as extending near a column with a plurality of parallel upper main bars 3 in a length some shorter than the first named bars 2 at certain intervals of tying by the use of a stirrup 4, which surrounds three sides with the top excluded. In the central part of this unit, a sleeve 5 is in advance fitted by mounting the stirrup 4 together with a sleeve reinforcing bar 5. This large beam steel bar unit 1 with the top open is set in a form 7 for beam whose assembly is completed by a wrecker. Then a lower main-bar joint bar 9 on the column side is overlapped over the lower main bar 2 of the large beam steel bar unit 1 and connected, and an upper main-bar joint bar 12 on the column side is coupled with the upper main bar 3 by pressure welding.

Description

【発明の詳細な説明】 [産業上の利用分野] この発明は鉄筋コンクリート造の建物の大梁鉄筋を先組
して柱側とジヨイントする工法に関するものである。
[Detailed Description of the Invention] [Industrial Application Field] The present invention relates to a construction method in which girder reinforcing bars of a reinforced concrete building are pre-assembled and jointed with column sides.

[従来の技術] 従来のこの種の工法は、柱・梁仕口部を東西方向、柱四
方向共たこ足のように地上で組上げた大梁鉄筋ユニット
を梁型枠内に落し込んだのら、柱・東名々の中間点付近
で、隣接部材との接合を行なっている。
[Conventional technology] In this type of conventional construction method, girder reinforcing bar units are assembled on the ground in the east-west direction and in all four directions of the columns like a kite foot, and then dropped into the beam formwork. , the joints with adjacent members are made near the midpoint of the pillars and Tomei.

柱鉄筋ユニットと梁鉄筋ユニットとを別々に一方向に長
く筒状に地組みし、梁鉄筋ユニットを片側が柱鉄筋ユニ
ットに掛は渡るように梁型枠内に落し込み、梁中間部に
て梁鉄筋ユニットの主筋を相互に接続している。
The column reinforcing bar unit and the beam reinforcing bar unit are assembled separately into a long cylindrical shape in one direction, and the beam reinforcing bar unit is dropped into the beam formwork so that one side crosses the column reinforcing bar unit. The main bars of the beam reinforcement unit are connected to each other.

[発明が解決しようとする課題] 前者にあっては、地組が複雑となり、組立用足場を用意
する必要が生じる等の面倒がある他、下主筋の接合に当
っては、型枠が邪魔になるため、梁側型枠の一部を模施
工する必要が生じる。
[Problem to be solved by the invention] In the former case, the ground assembly becomes complicated, and there are troubles such as the need to prepare scaffolding for assembly, and when joining the lower main reinforcement, the formwork gets in the way. Therefore, it will be necessary to simulate a part of the beam side formwork.

また後者にあっては、片側を掛は渡すため、型枠内への
落し込みに当っては、梁下主筋を柱フープ筋の下を潜ら
せてセットする必要があり、組立てが非常に困難である
上、前者と同様に梁下主筋の接合に当っては、梁側型枠
を一部後施工にせざるを得ないという不便さがある。
In addition, in the latter case, since the hook is passed on one side, when dropping it into the formwork, it is necessary to set the main reinforcement under the beam under the column hoop reinforcement, which makes assembly very difficult. Moreover, like the former method, there is the inconvenience that part of the beam side formwork has to be constructed later when joining the main reinforcement at the bottom of the beam.

さらにまた上記従来工法のいずれにおいてもセット後に
スリーブ及びスリーブ補助筋を取付けているので手間を
要し、精度も不十分であるなどの問題を有する。
Furthermore, in any of the above conventional construction methods, the sleeve and sleeve auxiliary reinforcing bars are attached after setting, which requires time and effort and has problems such as insufficient accuracy.

この発明は、上記従来の問題点を解決するために考えら
れたものであって、その目的は、大梁鉄筋ユニットの接
合が容易で、スリーブ及びスリーブ補助筋を取付けにも
手間を要せず、精度も充分で、梁型枠の一部後施工をも
不要とする新たな鉄筋コンクリート造の大梁鉄筋先組工
法を提供することにある。
This invention was devised to solve the above-mentioned conventional problems, and its purpose is to facilitate the joining of girder reinforcing bar units, and to eliminate the need for effort in attaching sleeves and sleeve auxiliary bars. The object of the present invention is to provide a new girder reinforcing bar pre-assembly method for reinforced concrete construction that has sufficient accuracy and eliminates the need for partial post-construction of beam formwork.

[課題を解決するための手段] 上記目的によるこの発明は、下止筋が下止筋より若干短
く、上下主筋を結束しているスターラップにスリーブ及
びスリーブ補強筋等を取付けた大梁鉄筋ユニットを他の
場所にて先組し、その大梁鉄筋ユニットを柱間に組立て
られた梁型枠内にセットしたのち、柱側の下止筋ジヨイ
ント筋を大梁鉄筋の下止筋に重ねて接続し、柱側の下止
筋ジヨイント筋を大梁鉄筋の下止筋に圧接により接合す
ることによって上記問題を解決してなる。
[Means for Solving the Problems] This invention according to the above object uses a girder reinforcing bar unit in which the lower stop bar is slightly shorter than the lower stop bar, and sleeves, sleeve reinforcing bars, etc. are attached to stirrups that bind the upper and lower main bars. After pre-assembling at another location and setting the girder reinforcing bar unit in the beam formwork assembled between the columns, connect the bottom stop bars on the column side by overlapping the bottom stop bars of the girder reinforcing bars. The above-mentioned problem is solved by connecting the bottom stop bar joint bar on the column side to the bottom stop bar of the girder reinforcing bar by pressure welding.

[実施例1 第1図及び第2図 まず所定の場所で大梁鉄筋ユニット1の地組を行なう。[Example 1 Figures 1 and 2 First, the girder reinforcing bar unit 1 is assembled at a predetermined location.

この大梁鉄筋ユニット1は、柱近傍に達する長さの複数
本の並行な下止筋2と、下止筋2より若干短い良さの複
数本の並行な下止筋3とを、上方を除き三方を囲むスタ
ーラップ4により一定間隔毎に結束して組立て、またユ
ニット中央部にはスリーブ5をスリーブ補強筋6ととも
に、スターラップ4に取付けて先組みして置く。
This girder reinforcing bar unit 1 has a plurality of parallel bottom stop bars 2 whose length reaches the vicinity of the column, and a plurality of parallel bottom stop bars 3 whose length is slightly shorter than the bottom stop bars 2 on three sides except the upper part. The sleeves 5 and the sleeve reinforcing bars 6 are attached to the stirrups 4 and pre-assembled in the center of the unit.

第3図 次にこの上方が開放された大梁鉄筋ユニット1を、レッ
カーにより組立てが完了している梁型枠7の内にセット
する。
FIG. 3 Next, the girder reinforcing bar unit 1 with its top open is set inside the beam formwork 7, which has been assembled by a wrecker.

第4図 セット後に柱8側から下止筋シミインド筋9を必要な定
着長さSを確保して、上記下止筋2のジヨイント部に重
ね、結束により一体的に接続する。
FIG. 4 After setting, the lower stop bar shimmed muscle 9 is secured from the column 8 side to a required anchoring length S, overlapped with the joint part of the lower stop bar 2, and integrally connected by binding.

またユニット上部には、柱8とにわたる下止筋3のトッ
プ筋10と2段611とを取付け、さらに柱側から下止
筋3の端部に下止筋ジヨイント筋12を衝き合わせ、圧
接により一体に接合する。
In addition, the top bar 10 and second step 611 of the stop bar 3 that spans the column 8 are attached to the top of the unit, and the stop bar joint bar 12 is brought into contact with the end of the stop bar 3 from the column side, and is press-fitted. Join together.

接続の後、ジヨイント部分の開放されている上部を、第
5図に示すように、スターラップ13の取付けをもって
塞ぐ。
After the connection, the open upper part of the joint part is closed by attaching a stirrup 13, as shown in FIG.

C発明の効果] この発明は上述のように、大梁鉄筋を他の場所で先組み
するので、型枠作業と並行して鉄筋組立作業を行なうこ
とができ、梁・スラブ鉄筋組立時の労務の集中を低減す
ることができる。
C Effects of the Invention] As described above, this invention pre-assembles girder reinforcing bars at another location, so reinforcing bars can be assembled in parallel with formwork work, reducing labor when assembling beams and slab reinforcing bars. Concentration can be reduced.

また大梁鉄筋とともにスリーブ及びスリーブ補強筋も先
組みしてユニット化するため、スリーブ等の取付けが従
来よりも容易となり、取付は位置の精度が一段と向上す
る。
In addition, since the sleeve and sleeve reinforcing bars are pre-assembled into a unit along with the girder reinforcing bars, the installation of sleeves, etc. is easier than before, and the accuracy of the installation position is further improved.

さらにまた上下主筋のいずれもが、柱筋内に入り込まな
いので型枠内にセットし易く、柱との取合部も下止筋は
圧接、下止筋はジヨイント筋との接合としたので、接続
に際して型枠が邪魔となるようなこともなく、従来工法
のように梁型枠の一部を侵施工したり、組立足場を用意
することもなくなり、施工が容易となる結果、工期が短
縮化されるなどの多くの利点を有する。
Furthermore, neither of the upper and lower main reinforcements penetrate into the columnar reinforcement, so it is easy to set them in the formwork, and the bottom stopper reinforcement is in pressure contact with the column, and the bottom stopper reinforcement is connected to the joint reinforcement. The formwork does not get in the way when connecting, and unlike conventional construction methods, there is no need to encroach on a part of the beam formwork or prepare assembly scaffolding, making construction easier and shortening the construction period. It has many advantages such as being standardized.

【図面の簡単な説明】[Brief explanation of the drawing]

図面はこの発明に係る鉄筋コンクリート造の大梁鉄筋先
組工法の1実施例を示すもので、第1図は大梁鉄筋ユニ
ットの正面図、第2図はその断面図、第3図及び第4図
は接合工程図、第5図は取合部の断面図である。 1・・・・・・大梁鉄筋ユニット 3・・・・・・下止筋 5・・・・・・スリーブ 7・・・・・・梁型枠 9・・・・・・下止筋ジヨイント筋 10・・・・・・トップ筋 11・・・・・・2段筋 12・・・・・・下止筋ジヨイント筋 13・・・・・・上部スターラップ 2・・・・・・下止筋 4・・・・・・スターラップ 6・・・・・・スリーブ補強筋 8・・・・・・柱
The drawings show one embodiment of the girder reinforcing bar pre-assembly method for reinforced concrete construction according to the present invention, in which Fig. 1 is a front view of a girder reinforcing bar unit, Fig. 2 is a sectional view thereof, and Figs. 3 and 4 are cross-sectional views. The joining process diagram, FIG. 5, is a sectional view of the joining part. 1... Beam reinforcing bar unit 3... Bottom stop bar 5... Sleeve 7... Beam formwork 9... Bottom stop bar joint bar 10... Top muscle 11... 2nd stage muscle 12... Bottom stop muscle joint muscle 13... Upper stirrup 2... Bottom stop muscle Reinforcement 4... Stirrup 6... Sleeve reinforcing bar 8... Column

Claims (1)

【特許請求の範囲】[Claims] 上主筋が下主筋より若干短く、上下主筋を結束している
スターラップにスリーブ及びスリーブ補強筋等を取付け
た大梁鉄筋ユニットを他の場所にて先組し、その大梁鉄
筋ユニットを柱間に組立てられた梁型枠内にセットした
のち、柱間の下主筋ジョイント筋を大梁鉄筋の下主筋に
重ねて接続し、柱側の上主筋ジョイント筋を大梁鉄筋の
上主筋に圧接により接合してなることを特徴とする鉄筋
コンクリート造の大梁鉄筋先組工法。
The upper main reinforcement is slightly shorter than the lower main reinforcement, and a girder reinforcing bar unit with sleeves and sleeve reinforcing bars attached to the stirrup that binds the upper and lower main reinforcing bars is preassembled elsewhere, and the girder reinforcing bar unit is assembled between the columns. After setting in the beam formwork, the lower main joint reinforcement between the columns is overlapped and connected to the lower main reinforcement of the girder reinforcement, and the upper main joint reinforcement on the column side is connected to the upper main reinforcement of the girder reinforcement by pressure welding. This is a girder reinforcement construction method for reinforced concrete construction.
JP19937188A 1988-08-10 1988-08-10 Reinforced concrete construction beam girder reinforcement assembly method Expired - Lifetime JPH0749679B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP19937188A JPH0749679B2 (en) 1988-08-10 1988-08-10 Reinforced concrete construction beam girder reinforcement assembly method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP19937188A JPH0749679B2 (en) 1988-08-10 1988-08-10 Reinforced concrete construction beam girder reinforcement assembly method

Publications (2)

Publication Number Publication Date
JPH0249829A true JPH0249829A (en) 1990-02-20
JPH0749679B2 JPH0749679B2 (en) 1995-05-31

Family

ID=16406644

Family Applications (1)

Application Number Title Priority Date Filing Date
JP19937188A Expired - Lifetime JPH0749679B2 (en) 1988-08-10 1988-08-10 Reinforced concrete construction beam girder reinforcement assembly method

Country Status (1)

Country Link
JP (1) JPH0749679B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015055059A (en) * 2013-09-10 2015-03-23 株式会社竹中工務店 Beam connection structure and beam connection method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015055059A (en) * 2013-09-10 2015-03-23 株式会社竹中工務店 Beam connection structure and beam connection method

Also Published As

Publication number Publication date
JPH0749679B2 (en) 1995-05-31

Similar Documents

Publication Publication Date Title
JPH0249829A (en) Previously assembled construction method for large beam steel bar of ferro-concrete structure
JPH0396544A (en) Jointing method for precast steel frame reinforced concrete column having beam steel frame
KR102379888B1 (en) Method For Assembling Reinforced Concrete Columns Using Prefabricated Assembly
JP2635872B2 (en) How to build a composite structure
JP2656175B2 (en) Column-beam joint structure
JPH076338U (en) PC beam
JP2998450B2 (en) Connection method between PC beam and column
JPS5840171Y2 (en) Frame structure consisting of steel reinforced concrete structural columns and reinforced concrete structural beams
JP2643641B2 (en) Building method using PC members
JPH0366878A (en) Construction method for precast column and beam and precast anti-seismic wall
JPH01137032A (en) Method of lap joint construction of main reinforcement in post and beam joining section
JPH06316964A (en) Method for constructing joint of precast reinforced concrete column and beam
JPS5846970B2 (en) Connection method between RC columns, Pca girders in the column direction, and cast-in-place girders in the span direction
JPH0375704B2 (en)
JP2893406B2 (en) Precast concrete beam-column joining method
JPH0732642Y2 (en) Beam-column joint structure
JP2634002B2 (en) Connection structure of girders
JPH0443131B2 (en)
JPH02252832A (en) Joint construction method for column beam
JPH0572507B2 (en)
JPH0448136B2 (en)
JPH0460183B2 (en)
JP2560912B2 (en) Column-beam joint structure and construction method
JP2554535B2 (en) Steel beam / reinforced concrete column composite construction method
JPH0439954Y2 (en)