JPH02425Y2 - - Google Patents

Info

Publication number
JPH02425Y2
JPH02425Y2 JP1984174577U JP17457784U JPH02425Y2 JP H02425 Y2 JPH02425 Y2 JP H02425Y2 JP 1984174577 U JP1984174577 U JP 1984174577U JP 17457784 U JP17457784 U JP 17457784U JP H02425 Y2 JPH02425 Y2 JP H02425Y2
Authority
JP
Japan
Prior art keywords
base
brick
riser pipe
pipe
joint
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP1984174577U
Other languages
Japanese (ja)
Other versions
JPS6190840U (en
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to JP1984174577U priority Critical patent/JPH02425Y2/ja
Publication of JPS6190840U publication Critical patent/JPS6190840U/ja
Application granted granted Critical
Publication of JPH02425Y2 publication Critical patent/JPH02425Y2/ja
Expired legal-status Critical Current

Links

Landscapes

  • Furnace Housings, Linings, Walls, And Ceilings (AREA)

Description

【考案の詳細な説明】 産業上の利用分野 本考案は、コークス炉炭化室から発生するコー
クス炉ガスをコレクチングメインパイプに導出す
るための上昇管の基部構造に関するものである。
[Detailed Description of the Invention] Industrial Application Field The present invention relates to a base structure of a riser pipe for leading coke oven gas generated from a coke oven carbonization chamber to a collecting main pipe.

従来の技術 コークス炉は煉瓦を精緻に積み上げた構造物で
あつて、多数の炭化室がそれぞれ燃焼室にサンド
イツチ状にはさまれて並設されており、炭化室に
順次装入された石炭は、該炭化室の両側に設けら
れた燃焼室からの熱を得て乾留されるようになつ
ている。そして、各炭化室にて発生した高温のコ
ークス炉ガスは、各炭化室内を上昇してその炉頂
に立垂している上昇管からコレクチングメインパ
イプに導かれると共に、その直前で散水により一
次冷却される。
Conventional technology A coke oven is a structure made of bricks piled up precisely, and a number of carbonization chambers are arranged side by side in a sandwich-like manner between combustion chambers, and the coal that is sequentially charged into the carbonization chambers is Carbonization is carried out by obtaining heat from combustion chambers provided on both sides of the carbonization chamber. The high-temperature coke oven gas generated in each carbonization chamber rises inside each carbonization chamber and is led to the collecting main pipe from the riser pipe that hangs down from the top of the furnace. cooled down.

上記上昇管は、円筒状の鉄皮の内面に耐火煉瓦
が貼られた構成を有するものであつて、鉄皮の下
端にはフランジが形成してある。この上昇管は炭
化室上端の基部煉瓦上に立垂されると共に、その
基部外周にはベーススリーブが包設され、上昇管
の重量は最上段基部煉瓦への上記フランジの当接
により支持されている。また、最上段基部煉瓦と
その上に立垂された上昇管下端の内貼り煉瓦との
間は、耐火モルタルで目地加工されている。
The riser pipe has a structure in which refractory bricks are pasted on the inner surface of a cylindrical steel shell, and a flange is formed at the lower end of the steel shell. This riser pipe is suspended over the base brick at the upper end of the carbonization chamber, and a base sleeve is wrapped around the base of the riser pipe, and the weight of the riser pipe is supported by the abutment of the flange against the topmost base brick. There is. In addition, the joint between the topmost base brick and the lining brick at the lower end of the riser pipe suspended above it is made of refractory mortar.

第3図は、このような従来の上昇管の基部構造
を示した拡大断面図である。
FIG. 3 is an enlarged sectional view showing the base structure of such a conventional riser pipe.

1は炭化室、2はその炭化室1上端に積み上げ
た基部煉瓦、2aはその基部煉瓦2中最上段の基
部煉瓦である。
1 is a carbonization chamber, 2 is a base brick stacked at the upper end of the carbonization chamber 1, and 2a is the topmost base brick among the base bricks 2.

3は上昇管であつて、4はその上昇管3の鉄
皮、4aは該鉄皮4の下端に形成したフランジ、
5はその鉄皮4の内面に貼られた耐火煉瓦であ
り、鉄皮4と内貼り煉瓦5との間は断熱性モルタ
ル6が介在している。
3 is a rising pipe; 4 is a steel skin of the rising pipe 3; 4a is a flange formed at the lower end of the steel skin 4;
5 is a refractory brick pasted on the inner surface of the iron skin 4, and a heat insulating mortar 6 is interposed between the iron skin 4 and the inner brick 5.

7は、最上段の基部煉瓦2aと上昇管3の内貼
り煉瓦5およびフランジ4aとの間を充填する目
地である。
Reference numeral 7 denotes a joint that fills the gap between the uppermost base brick 2a and the inner lining brick 5 and flange 4a of the riser pipe 3.

8は上昇管3の基部を包設するベーススリーブ
であり、上昇管3の横ずれを防ぐ役割を果たして
いる。
A base sleeve 8 encloses the base of the ascending pipe 3, and serves to prevent the rising pipe 3 from shifting laterally.

なお、9は炉頂部のクロスタイロツド溝の上蓋
を兼ねた炉頂煉瓦の一部、10は炉体を炉長方向
に締めつけるためのクロスタイロツドである。空
間Saには通常モルタルが充填され、空間Sbには
通常アスベストヤーンが充填され、さらにモルタ
ルでシールされる。Lは炉頂レベルである。
In addition, 9 is a part of the furnace top brick which also serves as the upper cover of the cross tie rod groove at the top of the furnace, and 10 is a cross tie rod for tightening the furnace body in the furnace length direction. The space Sa is usually filled with mortar, and the space Sb is usually filled with asbestos yarn and further sealed with mortar. L is the furnace top level.

考案が解決しようとする問題点 炭化室はその炉頂まで煉瓦積みされており、ま
た炭化室炉頂から立垂している上昇管内面も煉瓦
貼りされているため、高温のコークス炉ガスは耐
火煉瓦で囲まれた室または筒の内部を上昇してい
くわけであるが、上昇管が立垂している最上段基
部煉瓦が数年で熔損を生ずることを免かれなかつ
た。そのため、積み替え工事に要する経量の負担
が重く、また工事に伴ない生産性が低下するとい
う問題点があつた。
Problems that the invention aims to solve: The carbonization chamber is lined with bricks up to the top of the oven, and the inner surface of the riser pipe that hangs down from the top of the oven is also lined with bricks, so the high-temperature coke oven gas is The ascent was carried out inside a chamber or tube surrounded by bricks, but the bricks at the base of the top tier, from which the ascending pipes hung vertically, were bound to melt and fail within a few years. As a result, there were problems in that the cost of transshipment work was heavy and productivity decreased as a result of the work.

そこで本考案者は、熔損防止のために、基部煉
瓦の耐火度をたとえばSK−30からSK−37にする
などの積み替えを試みたが、やはり熔損の発生を
有効には防止できなかつた。
Therefore, the inventor of the present invention attempted to change the fire resistance of the base brick from SK-30 to SK-37 in order to prevent damage, but this did not effectively prevent the occurrence of damage. .

最上段基部煉瓦2aとその上に立垂させた上昇
管3の内貼り煉瓦5との間には耐火性モルタルに
よる目地7が充填されているが、上昇管3にはた
わみ力が作用するため、この目地7には亀裂や隙
間が生じやすい。
A joint 7 made of refractory mortar is filled between the uppermost base brick 2a and the lining brick 5 of the rising pipe 3 suspended above it, but since a bending force acts on the rising pipe 3. , cracks and gaps are likely to occur in this joint 7.

本考案者は、上述の最上段基部煉瓦の熔損の原
因につき検討を加えた結果、従来においては、第
3図に示したように、最上段基部煉瓦2aとその
上に立垂させた上昇管3の内貼り煉瓦5および鉄
皮4下端のフランジ4aとの間を充填する目地7
が一直線状の通し目地となつていたため、該目地
に生じた亀裂や隙間に火炎の通過が生じてフラン
ジ4aの熔損を招き、さらにはその熔損に起因す
る材質変化によつて最上段基部煉瓦2aの熔損を
招いていたことが判明した。
The inventor of the present invention has investigated the cause of the above-mentioned melting damage of the uppermost base brick, and found that in the past, as shown in FIG. A joint 7 that fills the space between the lining brick 5 of the pipe 3 and the flange 4a at the lower end of the steel skin 4
Since the joint was a straight line, flame passed through the cracks and gaps created in the joint, causing damage to the flange 4a, and furthermore, due to changes in the material caused by the damage, the base of the top tier was damaged. It turned out that this had caused brick 2a to melt.

本考案は、たとえ上記の目地7に亀裂や隙間が
生じても、金属部の熔損や基部煉瓦の熔損を生じ
がたいコークス炉上昇管の基部構造を提供するこ
とを目的になされたものである。
The purpose of this invention is to provide a base structure for a coke oven riser pipe that is unlikely to cause melting damage to the metal parts or melting damage to the base bricks even if cracks or gaps occur in the joints 7. It is.

問題点を解決するための手段 本考案のコークス炉上昇管の基部構造は、 コークス炉上昇管3を立垂させる炭化室1基
部煉瓦2の最上段基部煉瓦2aをその外周側が
内周側よりも高くなるように段構造に形成する
と共に、その下段となる内周側に、上昇管3の
鉄皮4および内貼り煉瓦5のうち内貼り煉瓦5
の方の下端を突き合せて、最上段基部煉瓦2a
と内貼り煉瓦5との間を充填する目地7を非通
し目地の状態に形成し、 上昇管3基部の外周はベーススリーブ8で包
設し、 さらに上昇管3の外皮を構成する鉄皮4を、
ベーススリーブ8と直接または短管11を介し
て当接させることにより、上昇管3の重量をベ
ーススリーブ8で支持するように構成したこ
と、 を特徴とするものである。
Means for Solving the Problems The base structure of the coke oven riser pipe of the present invention is such that the outer circumferential side of the uppermost base brick 2a of the carbonization chamber 1 base brick 2 from which the coke oven riser pipe 3 hangs is lower than the inner circumferential side. It is formed into a stepped structure so as to be higher, and the inner lining brick 5 of the iron skin 4 and the lining brick 5 of the riser pipe 3 is formed on the inner peripheral side which is the lower step.
Butt the bottom edges of the top base brick 2a together.
The joint 7 that fills the space between the and the inner brick 5 is formed into a non-through joint state, and the outer periphery of the base of the riser pipe 3 is surrounded by a base sleeve 8, and furthermore, the iron skin 4 that constitutes the outer skin of the riser pipe 3 is formed. of,
The present invention is characterized in that the weight of the riser pipe 3 is supported by the base sleeve 8 by contacting the base sleeve 8 directly or via the short pipe 11.

本考案においては、従来のコークス炉上昇管の
基部構造と比べた場合、上記およびの2つの
新しい工夫を加えている。
In the present invention, when compared with the base structure of a conventional coke oven riser tube, the above two new ideas are added.

上記においては、段構造に形成した最上段基
部煉瓦2aの下段となる内周側に内貼り煉瓦5の
方の下端を突き合せて[鉄皮4および内貼り煉瓦
5の双方の下端ではなく、内貼り煉瓦5の方の下
端を突き合せて]、最上段基部煉瓦2aと内貼り
煉瓦5との間を充填する目地7を非通し目地の状
態に形成する。
In the above, the lower end of the inner lining brick 5 is butted against the inner circumferential side of the lowermost base brick 2a formed in the step structure [not the lower ends of both the iron skin 4 and the inner lining brick 5] The lower ends of the lining bricks 5 are butted against each other, and a joint 7 filling the space between the uppermost base brick 2a and the lining brick 5 is formed into a non-through joint.

そして上記の工夫を施したことにより、ベー
ススリーブ8についても、従来にはない上記の
工夫を施す。
By applying the above-mentioned measures, the base sleeve 8 is also provided with the above-mentioned measures that have not been seen in the past.

本考案においては、上記の工夫を加えたため、
上昇管3下部の金属部の熔損および基部煉瓦の熔
損を長期間にわたり防止することに成功した。
In this invention, since we added the above-mentioned ideas,
We succeeded in preventing the metal parts at the bottom of the riser pipe 3 from melting and the base brick from melting over a long period of time.

作 用 最上段基部煉瓦2aは、その段構造により、目
地7部に生じた亀裂や隙間を通して火炎が金属部
分に至るのを確実にさえぎる作用を示す。またベ
ーススリーブ8は、上昇管3の横ずれを防ぐと共
に、その重量を支持する作用を果たす。
Function The uppermost base brick 2a exhibits the function of reliably blocking the flame from reaching the metal part through the cracks and gaps generated in the joint 7 due to its stepped structure. Furthermore, the base sleeve 8 serves to prevent the riser pipe 3 from shifting laterally and to support its weight.

実施例 次に実施例をあげて、本考案をさらに詳細に説
明する。
EXAMPLES Next, the present invention will be explained in more detail with reference to examples.

第1図は上昇管の構造を模式的に示した全体図
である。
FIG. 1 is an overall view schematically showing the structure of the riser.

1は炭化室、2は基部煉瓦、3は上昇管、4は
その上昇管3の鉄皮、5はその鉄皮4の内面に貼
られた耐火煉瓦製の内貼り煉瓦、12は上昇管ベ
ンド、13はコレクチングメインパイプである。
1 is the carbonization chamber, 2 is the base brick, 3 is the riser pipe, 4 is the iron skin of the riser pipe 3, 5 is the inner wall brick made of refractory brick pasted on the inner surface of the steel skin 4, 12 is the riser pipe bend , 13 is a collecting main pipe.

炭化室1から上昇してきた高温のコークス炉ガ
スは、上昇管3内をさらに上昇し、上昇管ベンド
12内で水がスプレーされて一次冷却され、冷却
水と共にコレクチングメインパイプ13に導かれ
る。
The high-temperature coke oven gas rising from the carbonization chamber 1 further rises in the riser pipe 3, is primarily cooled by being sprayed with water in the riser pipe bend 12, and is guided to the collecting main pipe 13 together with cooling water.

第2図は、第1図における上昇管の基部構造を
示した拡大断面図である。
FIG. 2 is an enlarged sectional view showing the base structure of the riser pipe in FIG. 1.

従来技術を示した第3図と同様に、1は炭化
室、2は基部煉瓦、3は上昇管、4は鉄皮、5は
耐火煉瓦である。6は断熱性モルタル、9は煉
瓦、10はクロスタイロツド、Saはモルタルを
充填した空間、Sbはアスベストヤーンを充填し
た後さらにモルタルでシールした空間、Lは炉頂
レベルである。なお14はリブである。
Similar to FIG. 3 showing the prior art, 1 is a carbonization chamber, 2 is a base brick, 3 is a riser pipe, 4 is an iron skin, and 5 is a refractory brick. 6 is an insulating mortar, 9 is a brick, 10 is a cross tie rod, Sa is a space filled with mortar, Sb is a space filled with asbestos yarn and further sealed with mortar, and L is the furnace top level. Note that 14 is a rib.

第2図中、2aは基部煉瓦2の最上段基部煉瓦
である。この最上段基部煉瓦2aは、その外周側
が内周側よりも高くなるように段構造に形成され
ると共に、その下段となる内周側に、上昇管3の
鉄皮4および内貼り煉瓦5のうち内貼り煉瓦5の
方の下端を突き合せて、最上段基部煉瓦2aと内
貼り煉瓦5との間を充填する目地7を非通し目地
の状態に形成してある。
In FIG. 2, 2a is the uppermost base brick of the base bricks 2. The uppermost base brick 2a is formed in a step structure so that its outer circumferential side is higher than its inner circumferential side, and the iron skin 4 of the riser pipe 3 and the inner lining brick 5 are arranged on the inner circumferential side which is the lower step. The lower ends of the lining bricks 5 are butted against each other, and a joint 7 that fills the gap between the uppermost base brick 2a and the lining brick 5 is formed as a non-through joint.

そのため、たとえ目地7に亀裂や隙間が生じて
も、火炎は最上段基部煉瓦2aの段部でさえぎら
れて、鉄皮4その他の金属部分にまではほとんど
到達しないので、金属部分の熔損が防がれ、さら
にその熔損に起因する煉瓦の低融物への材質変化
も防がれ、最上段基部煉瓦2aの熔損も免かれ
る。
Therefore, even if a crack or gap occurs in the joint 7, the flame will be blocked by the step of the uppermost base brick 2a and will hardly reach the steel skin 4 and other metal parts, so there will be no damage to the metal parts. Furthermore, the material change of the brick to a low-melting material due to the melting damage is also prevented, and the melting damage of the uppermost base brick 2a is also avoided.

最上段基部煉瓦2aの形状をこのように変更し
たため、ーススリーブ8の構成にも次のような変
更を加えてある。
Since the shape of the uppermost base brick 2a has been changed in this way, the structure of the ground sleeve 8 has also been changed as follows.

すなわち、上昇管3の鉄皮4のフランジ4aの
位置を上昇管3下端より若干高い位置に変更し、
ベーススリーブ8との間を短管11につないであ
る。この場合、短管11を省略し、鉄皮4のフラ
ンジ4aを直接ベーススリーブ8で支持するよう
にしてもよい。いずれの場合もベーススリーブ8
は、単に上昇管3の横ずれを防ぐだけでなく、上
昇管3の重量を支える役割も果たすことになる。
That is, the position of the flange 4a of the iron skin 4 of the riser pipe 3 is changed to a position slightly higher than the lower end of the riser pipe 3,
A short pipe 11 is connected to the base sleeve 8. In this case, the short pipe 11 may be omitted and the flange 4a of the steel shell 4 may be directly supported by the base sleeve 8. In either case, base sleeve 8
not only prevents the riser pipe 3 from shifting laterally, but also plays a role of supporting the weight of the riser pipe 3.

実施例 本考案は、以上のようになされているので、長
期間にわたり金属部の熔損、さらには基部煉瓦の
熔損が効果的に防止される結果、上昇管の寿命が
著しく長くなると共に、基部煉瓦の積み替え頻度
が大幅に減少し、積み替え時の空窯もそれに応じ
て減少する。
Embodiment Since the present invention is made as described above, the melting damage of the metal part and furthermore the melting damage of the base brick is effectively prevented over a long period of time, and as a result, the life of the riser pipe is significantly extended, and The frequency of reloading the base bricks will be significantly reduced, and the number of empty kilns during reloading will also be reduced accordingly.

従つて、積み替え工事に要する経費および該工
事に伴なう生産性の低下が大幅に減少するので、
本考案は工業上の意義が大きい。
Therefore, the costs required for transshipment work and the decrease in productivity associated with the work are significantly reduced.
This invention has great industrial significance.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は上昇管の構造を模式的に示した全体
図、第2図は本考案の上昇管の基部構造を示した
拡大断面図である。第3図は従来の上昇管の基部
構造を示した拡大断面図である。 1……炭化室、2……基部煉瓦、2a……最上
段基部煉瓦、3……上昇管、4……鉄皮、4a…
…フランジ、5……上昇管の内貼り耐火煉瓦、6
……断熱性モルタル、7……目地、8……ベース
スリーブ、9……炉頂煉瓦、10……クロスタイ
ロツド、11……短管、12……上昇管ベンド、
13……コレクチングメインパイプ、14……リ
ブ、Sa,Sb……空間、L……炉頂レベル。
FIG. 1 is an overall view schematically showing the structure of the riser pipe, and FIG. 2 is an enlarged sectional view showing the base structure of the riser pipe of the present invention. FIG. 3 is an enlarged sectional view showing the base structure of a conventional riser pipe. 1... Carbonization chamber, 2... Base brick, 2a... Uppermost base brick, 3... Rising pipe, 4... Steel skin, 4a...
...Flange, 5...Rising pipe lining refractory brick, 6
... Insulating mortar, 7 ... Joint, 8 ... Base sleeve, 9 ... Furnace top brick, 10 ... Cross tie rod, 11 ... Short pipe, 12 ... Riser pipe bend,
13...Collecting main pipe, 14...Rib, Sa, Sb...Space, L...Furnace top level.

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] コークス炉上昇管3を立垂させる炭化室1基部
煉瓦2の最上段基部煉瓦2aをその外周側が内周
側よりも高くなるように段構造に形成すると共
に、その下段となる内周側に、上昇管3の鉄皮4
および内貼り煉瓦5のうち内貼り煉瓦5の方の下
端を突き合せて、最上段基部煉瓦2aと内貼り煉
瓦5との間を充填する目地7を非通し目地の状態
に形成し、上昇管3基部の外周はベーススリーブ
8で包設し、さらに上昇管3の外皮を構成する鉄
皮4を、ベーススリーブ8と直接または短管11
を介して当接させることにより、上昇管3の重量
をベーススリーブ8で支持するように構成したこ
とを特徴とするコークス炉上昇管の基部構造。
The uppermost base brick 2a of the base brick 2 of the coking chamber 1 in which the coke oven riser pipe 3 is vertically formed is formed into a stepped structure such that the outer circumferential side thereof is higher than the inner circumferential side, and on the inner circumferential side which is the lower step, Rising pipe 3 iron skin 4
Then, the lower ends of the inner-lined bricks 5 of the inner-lined bricks 5 are butted together to form a joint 7 that fills the space between the uppermost base brick 2a and the inner-lined brick 5 in a non-through state, and the rising pipe The outer periphery of the base of 3 is wrapped in a base sleeve 8, and the iron skin 4 constituting the outer skin of the riser pipe 3 is wrapped directly with the base sleeve 8 or with the short pipe 11.
A base structure of a coke oven riser pipe, characterized in that the weight of the riser pipe 3 is supported by the base sleeve 8 by contacting the riser pipe 3 through the base sleeve 8.
JP1984174577U 1984-11-16 1984-11-16 Expired JPH02425Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1984174577U JPH02425Y2 (en) 1984-11-16 1984-11-16

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1984174577U JPH02425Y2 (en) 1984-11-16 1984-11-16

Publications (2)

Publication Number Publication Date
JPS6190840U JPS6190840U (en) 1986-06-12
JPH02425Y2 true JPH02425Y2 (en) 1990-01-08

Family

ID=30732196

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1984174577U Expired JPH02425Y2 (en) 1984-11-16 1984-11-16

Country Status (1)

Country Link
JP (1) JPH02425Y2 (en)

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5221721Y2 (en) * 1974-04-03 1977-05-18
JPS5337741U (en) * 1976-09-08 1978-04-03
US4286792A (en) * 1980-03-10 1981-09-01 United States Steel Corporation Self-replenishing seal for the gas offtake piping of a coke oven and sealing method
JPS5738347U (en) * 1980-08-14 1982-03-01
JPS5831243U (en) * 1981-08-25 1983-03-01 新日本製鐵株式会社 Support device for coke oven riser pipe

Also Published As

Publication number Publication date
JPS6190840U (en) 1986-06-12

Similar Documents

Publication Publication Date Title
US4340360A (en) Fire brick for a rotary kiln
JPH02425Y2 (en)
CN112264610A (en) Hot-metal bottle and preparation method thereof
US2154813A (en) Suspended furnace roof
CN209371771U (en) Aluminium melting furnace and the furnace roof for using ceramic fiber module assembly
JPH0245683B2 (en)
US2215887A (en) Method of operating mineral wool furnace
CN218033152U (en) Novel burn burning furnace brickwork structure
JPS594042Y2 (en) Brick structure above the tuyere
JPS6154510B2 (en)
CN218763428U (en) Two-side furnace wall structure of garbage incinerator
CN211451895U (en) Chimney with buffer joint for submerged arc furnace
JP2609285B2 (en) Circular ceilings for grids and / or combustion cylinders in regenerative heat exchangers
CN216385070U (en) Novel smelting pot lining structure
US1971915A (en) Means preventing passage of gas through refractory walls
CN219890138U (en) Roller kiln for calcining zirconia by flame-proof type combustion
CN214791215U (en) Novel heat-insulating type furnace smoke pipe lining
JPS5941483B2 (en) Lining method for hot blast furnace for blast furnace
CN223028468U (en) A masonry structure for refractory bricks at the end of a torpedo tank
CN217275501U (en) Composite anti-corrosion lining structure for rotary kiln
CN221296794U (en) A coke oven riser base installation structure
CN219640683U (en) Furnace top of fluidized bed furnace
CN111609417B (en) Hot cigarette pipeline sealing connection structure
JPS6311166Y2 (en)
SU1493854A1 (en) Hearth of ore-smelting furnace