JPH02305720A - Mesh body mount/dismount device - Google Patents

Mesh body mount/dismount device

Info

Publication number
JPH02305720A
JPH02305720A JP12631389A JP12631389A JPH02305720A JP H02305720 A JPH02305720 A JP H02305720A JP 12631389 A JP12631389 A JP 12631389A JP 12631389 A JP12631389 A JP 12631389A JP H02305720 A JPH02305720 A JP H02305720A
Authority
JP
Japan
Prior art keywords
net
mesh body
frame
conveyor
cement board
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP12631389A
Other languages
Japanese (ja)
Other versions
JPH07100536B2 (en
Inventor
Takashi Okumura
隆 奥村
Toyohiko Okihara
沖原 豊彦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sekisui Chemical Co Ltd
Original Assignee
Sekisui Chemical Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sekisui Chemical Co Ltd filed Critical Sekisui Chemical Co Ltd
Priority to JP12631389A priority Critical patent/JPH07100536B2/en
Publication of JPH02305720A publication Critical patent/JPH02305720A/en
Publication of JPH07100536B2 publication Critical patent/JPH07100536B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Stacking Of Articles And Auxiliary Devices (AREA)
  • De-Stacking Of Articles (AREA)
  • Specific Conveyance Elements (AREA)
  • Devices For Post-Treatments, Processing, Supply, Discharge, And Other Processes (AREA)

Abstract

PURPOSE:To reduce the burden of a mesh body and attempt to prolong life by providing a mesh body holding chuck freely ascendable and rotatable to a movable table that is movable along a track provided above a travelling route in the title device of a mesh body for removal of redundant water in the manufacture process of hard wood chip cement board. CONSTITUTION:A mesh body mount/dismount device 50 is formed so that a movable table 53 moves on a portal high structure 51 built astride conveyors of a cement plate travelling route. A frame 55 goes up/down by an actuator 54 is provided to this movable table 53, and the longitudinal direction of the frame 55 is made coincidental with the travelling direction of the cement plate travelling route. And, swinging arms 58 are hung down swingable by actuators 57 at the part in the longitudinal direction of the frame 55, top ends are connected by a connecting member 59, and chucks 69 are mounted to the both ends of the connecting members 58 freely rotatable. With this constitution, life of the mesh body can be prolonged when the mesh body is lifted in the attitude gently curved.

Description

【発明の詳細な説明】 〔産業上の利用分野] この発明は、例えば硬質木片セメント板、インンユレー
7ヨンホード等の製造過程において原料中の余剰水等の
除去のために使用される網体を着脱する装置に関するも
のである。
[Detailed Description of the Invention] [Industrial Application Field] The present invention provides a method for attaching and detaching nets used for removing surplus water from raw materials in the manufacturing process of, for example, hard wood cement boards, inlay boards, etc. This relates to a device for

[従来の技術] 木片フレークとセメントと水等を混合し板状に成形して
得られる硬質木片セメント板は、建築物の外壁用材料と
しで多く採用されている。
[Prior Art] A hard wood cement board, which is obtained by mixing wood flakes, cement, water, etc. and forming the mixture into a board shape, is widely used as a material for the exterior walls of buildings.

この硬質木片セメント板はJ例えば特開昭56−140
058号公報に開示されているように、無端ベルト上に
木片フレークとセメントと水等との混合物からなる原料
を供給し、これを加熱加圧することにより硬化させて得
られる。この硬化処理時に発生する余剰の水分を除去し
ないと、硬質木片セメント板に空洞が発生したり、層割
れが起こる。
This hard wood cement board is J.
As disclosed in Japanese Patent No. 058, it is obtained by supplying a raw material consisting of a mixture of wood flakes, cement, water, etc. onto an endless belt, and hardening it by heating and pressurizing it. If the excess moisture generated during this hardening process is not removed, cavities or layer cracks will occur in the hard wood cement board.

この余剰水分の除去方法としては、前記原料の上面に金
網等の網体を載せ、プレス機で加圧する際、この網体の
空隙から水分を除去することが行われている。
As a method for removing this excess water, a mesh such as a wire mesh is placed on the upper surface of the raw material, and when pressurized with a press, water is removed from the voids of the mesh.

この原料の上面に網体を載置する作業は、網体にしわを
よらせないようにしたり、コーナーを合わせるなど比較
的に熟練を要するともに、手間がかかった。又、余剰水
の除去後に原料上の網体を除去する作業も、製品に傷を
付けないように静かに行わなければならず比較的熟練を
要し、手間もかかった。
The work of placing the net on top of this raw material required relatively skill and effort, such as ensuring that the net did not wrinkle and aligning the corners. Furthermore, the work of removing the mesh on the raw material after removing excess water had to be done quietly so as not to damage the product, which required relatively skill and time.

そこで、これらの作業を自動化する装置が開発されてい
る。例えば、網体の自動回収装置には特開昭60−56
725号公報に開示されたものがあり、網体の自動供給
装置には特開昭60−56727号公報に開示されたも
のがある。
Therefore, devices have been developed to automate these tasks. For example, in the automatic collection device for nets, Japanese Patent Laid-Open No. 60-56
There is one disclosed in Japanese Patent Laid-open No. 725, and an automatic net feeding device is disclosed in Japanese Patent Application Laid-Open No. 60-56727.

[発明か解決しようとする課題] しかしながら、上記特開昭60−56725号公報に開
示された網体の自動回収装置の場合には網体をセメント
板から取り外す時に網体を無理に鋭角的に屈曲させてお
り、特開昭60−56727号公報に開示された網体の
供給装置の場合にも、上記自動回収装置はどではないに
しても網体を相当の角度屈曲させている。
[Problems to be Solved by the Invention] However, in the case of the automatic net collection device disclosed in the above-mentioned Japanese Patent Application Laid-open No. 60-56725, when removing the net from the cement board, the net is forced at an acute angle. Even in the case of the net feeding device disclosed in Japanese Patent Application Laid-open No. 60-56727, the automatic collecting device bends the net at a considerable angle, although not all parts of the net are bent.

このような網体に対する無理な屈曲は網体を傷めて、そ
の寿命を縮めるという欠点があった。又、その結果、ラ
ンニングコストが高くつくという不利点もあった。
Such forcible bending of the net has the drawback of damaging the net and shortening its lifespan. Moreover, as a result, there was also a disadvantage that running costs were high.

この発明は」二連従来の技術の問題点に鑑みてなされた
ものであり、その目的とするところは、網体に負担がか
からないように移動させて、網体の寿命を延ばすことが
できる網体着脱装置を提供しようとするところにある。
This invention was made in view of the problems of the conventional technology, and its purpose is to provide a net that can be moved without putting a burden on the net and extend the life of the net. The aim is to provide a body attachment and detachment device.

[課題を解決するための手段] この発明は」二足目的を達成するためになされたちので
、その要旨は、板体を製造する際に板体)j:i料の上
に原料中の余剰水等を除去するための網体を載置し、余
剰水等を除去した後に上記網体を板体から取り外す網体
着脱装置において、板体の搬送路の上方に設置された軌
道に沿って移動可能な可動台と、この可動台に昇降可能
に支持されたフレームと、このフレームに回動可能に支
持され吊り下げられた複数のアームと、上記網体の両端
部に設けられた把手部を把持するために上記アームの先
端に回動可能に支持されその回動中心を」1記アームの
回動中心に対してモ行に位置させたチャックとを具備す
ることを特徴とする網体着脱装置にある。
[Means for Solving the Problems] This invention has been made in order to achieve two objectives, so the gist is that when manufacturing a plate, the surplus material in the raw material is In the net attachment/detachment device, which places a net for removing water, etc., and removes the net from the plate after removing excess water, etc., A movable movable base, a frame supported on the movable base so as to be movable up and down, a plurality of arms rotatably supported and suspended from the frame, and handles provided at both ends of the net body. a chuck that is rotatably supported at the tip of the arm and whose center of rotation is aligned with the center of rotation of the arm 1. It is in the attachment/detachment device.

[作用] チャックで網体の把手部を把持してフレームを上昇させ
網体を吊り上げると、両端を持って吊り上げられた網体
はその自重によりたわみ、下方に湾曲する。この網体の
自然な湾曲姿勢に対応してチャック及びアームが回動す
る。したがって、網体は無理な姿勢を強いられずに移動
可能となる。
[Operation] When the handle of the net is gripped by the chuck and the frame is raised to lift the net, the net, which is lifted by holding both ends, bends due to its own weight and curves downward. The chuck and arm rotate in response to the natural curved posture of the net. Therefore, the net body can be moved without being forced into an unreasonable posture.

網体を板体原料の上に載置する場吾には、別の場所で網
体を上記状態に吊り上げた後、可動台を搬送路上に移動
させ、フレームを下降させテ網体を静かに搬送路上の板
体原料の上に載置する。その載置する過程において、網
体が湾曲姿勢から平板状の姿勢に徐々に変わり、網体の
姿勢変化に対応してチャック及びアームが回動する。し
たがって、その間も網体は無理な姿勢となることかない
When placing the net on top of the plate material, the net is lifted to the above state at another location, and then the movable platform is moved onto the conveyance path, the frame is lowered, and the net is gently placed. Place it on the plate material on the conveyance path. In the process of placing the net, the net body gradually changes from a curved posture to a flat plate-like posture, and the chuck and arm rotate in response to the change in the posture of the net body. Therefore, during this time, the net body will not be in an unreasonable posture.

又、板体原料中の余剰水等を除去した後に網体を取り外
す場合には、上述手順と逆の手順により網体を静かに吊
り上げ移動する。この時にも、網体が無理な姿勢となる
ことはない。
In addition, when removing the net after excess water and the like in the plate raw material is removed, the net is gently lifted and moved by the reverse procedure to the above-mentioned procedure. Even at this time, the net body does not take an unreasonable posture.

[実施例] 以下、この発明の一実施例を第1図から第9図までの図
面に基ついて説明する。尚、この実施例における網体は
硬質木片セメント板の製造に使用されるものである。
[Embodiment] An embodiment of the present invention will be described below with reference to the drawings from FIG. 1 to FIG. 9. The mesh body in this example is used for manufacturing hard wood cement boards.

網体lOOは、第9図に示すように長方形の柔軟な金網
lO1の長手方向両端に金属板からなるハンガーlO2
が設けられて構成されている。ハンガー102の各端部
には把手部103が突出している。
As shown in FIG. 9, the net 100 includes hangers 102 made of metal plates at both longitudinal ends of a rectangular flexible wire net 101.
is set up and configured. A handle portion 103 protrudes from each end of the hanger 102.

第1図はこの発明の要旨である網体着脱装置實を三箇所
に配置した硬質木片セメント板(板体)製造プラントの
平面配置図であり、第2図はその側面図である。
FIG. 1 is a plan layout view of a hard wood cement board (board) manufacturing plant in which net attaching/detaching devices, which are the gist of the present invention, are arranged at three locations, and FIG. 2 is a side view thereof.

初めに、この硬質木片セメントtl造プラントの概要を
説明する。硬質木片セメント阪製造プラントは、セメン
!・仮原料をプレス成型するホットプレス装置lと、ホ
ットプレス装置lにセメント板原料を搬送するとともに
成型後のセメント板を送り出すセメント板搬送路(板体
搬送路)10と、セメント板搬送路10と並行に配置さ
れその搬送方向がセメント仮搬送路10の搬送方向と逆
方向になっている網体搬送装置20と、網体搬送装置2
0の途中に設けられた網体洗浄装置30と、セメント板
搬送路10においてホットプレス装置lよりも上流側(
第1図、第2図において右側)にありセメント板搬送路
10と網体搬送装置20の−Lに架は渡された網体着脱
装置50と、セメント仮搬送路10においてホットプレ
ス装置【よりちド流側(第1図、第2図において左側)
にありセメント仮搬送路10と網体搬送装置20の上に
架は渡された網体着脱装置90とから構成されている。
First, an overview of this hard wood chip cement construction plant will be explained. Hard wood chip cement Saka manufacturing plant is CEMENE! - A hot press device 1 for press-molding temporary raw materials, a cement board conveyance path (plate conveyance path) 10 that conveys the cement board raw material to the hot press device 1 and sends out the cement board after molding, and a cement board conveyance path 10 a net conveying device 20 which is arranged in parallel with the cement temporary conveying path 10 and whose conveying direction is opposite to the conveying direction of the temporary cement conveying path 10;
0, and the upstream side of the hot press device l in the cement board transport path 10 (
On the right side in Figs. 1 and 2), there is a net attachment/detachment device 50 which is placed on the -L side of the cement board conveyance path 10 and the net conveyance device 20, and a hot press device (in the temporary cement conveyance path 10). Current side (left side in Figures 1 and 2)
It consists of a temporary cement conveyance path 10 and a net attachment/detachment device 90 which is placed over a net conveyance device 20.

上記セメント板搬送路10は、ホットプレス装j!1よ
りも上流側が第1コンベア11と第2コンヘア12から
なり、ホットプレス装置1よりも下流側か第3コンベア
13と第4コンベア14とからなっている。
The cement board conveyance path 10 is equipped with a hot press! The upstream side of the hot press device 1 consists of a first conveyor 11 and the second conveyor 12, and the downstream side of the hot press device 1 consists of a third conveyor 13 and a fourth conveyor 14.

又、上記網体搬送装置20は、セメント仮搬送路10の
下流側から上流側へ向かって順に並ぶ第1コンベア1、
第2コンヘア22、i3コンヘア23、第4コンベア2
4から構成されており、第4コンベア24は前後に各一
対のクランプ装置24a、24bを具flifI L−
ている。クランプ装置24a、24bは網体100の両
ハンガー102をクランプして引−)張り、金網101
の皺延ばしをするとともに、後述する網体着脱装置50
による網体100の吊り上げ作業を容易にするためのも
のである。
The net conveying device 20 also includes first conveyors 1 arranged in order from the downstream side to the upstream side of the temporary cement conveying path 10;
2nd conveyor 22, i3 conveyor 23, 4th conveyor 2
4, and the fourth conveyor 24 includes a pair of clamp devices 24a and 24b at the front and rear.
ing. The clamp devices 24a and 24b clamp and pull both hangers 102 of the mesh body 100, and tighten the wire mesh 101.
In addition to smoothing out wrinkles, the net attachment/detachment device 50 described below
This is to facilitate the work of lifting the net body 100.

上記洗浄装置30は第2コンベア22の途中に配置され
ており、高圧ポンプユニット31と散水ユニット32か
ら構成されている。散水ユニット32は密閉室となって
おり、ここを第2コンベア22が貫いている。そして、
第2コンベア22によって搬送される網体100が上記
散水ユニット32の中を通過する際に、高圧ポンプユニ
ット31より送られた高圧水が散水ユニット32の上方
から噴射され、網体100を洗浄するようになっている
The cleaning device 30 is disposed midway along the second conveyor 22 and includes a high-pressure pump unit 31 and a water sprinkling unit 32. The watering unit 32 is a closed chamber through which the second conveyor 22 passes. and,
When the net 100 conveyed by the second conveyor 22 passes through the watering unit 32, high-pressure water sent from the high-pressure pump unit 31 is sprayed from above the watering unit 32 to wash the net 100. It looks like this.

次に、この発明の要旨である網体着脱装置について詳述
する。
Next, the net attachment/detaching device, which is the gist of the present invention, will be described in detail.

セメント板搬送路10の上流側に配置されている網体着
脱装置50は、上記セメント板搬送路IOの第1コンベ
ア11と網体搬送装置20の第4コンベア24に架は渡
されている。第3図は網体着脱装置50をセメント仮搬
送路lOの下流側から見た正面図であり、第4図は網体
着脱装置50の要部側面図である。網体着脱装置50は
、正面から見て門形をなす堅牢な高架構造体51を有し
ており、高架構造体51の上部にはセメント仮搬送路1
0の搬送方向に対して交差するように延びる一対のレー
ル(軌道)52が設けられている。このレール52を可
動台53が図示しないモーターにより駆動され走行する
ようになっている。
The net attachment/detachment device 50 disposed on the upstream side of the cement board conveyance path 10 is connected to the first conveyor 11 of the cement board conveyance path IO and the fourth conveyor 24 of the net conveyance device 20. FIG. 3 is a front view of the net attaching/detaching device 50 as seen from the downstream side of the temporary cement conveyance path IO, and FIG. 4 is a side view of the main parts of the net attaching/detaching device 50. The net attaching/detaching device 50 has a sturdy elevated structure 51 that is gate-shaped when viewed from the front, and a cement temporary conveyance path 1 is provided at the top of the elevated structure 51.
A pair of rails (tracks) 52 are provided that extend so as to intersect with the conveyance direction of zero. A movable base 53 is driven by a motor (not shown) and runs on this rail 52.

可動台53にはアクチュエータ54が設置されており、
このアクチュエータ54によって平面視矩形に組まれた
フレーム55がガイドロッド60に案内されて昇降可能
に吊り下げられている。フレーム55の長手方向はセメ
ント板搬送路10の’11111 送方向と一致してい
る。このフレーム55の長手方向各端部にはそれぞれシ
ャフト56が、その軸心を可動台53の移動方向と平行
に位置させて支持されている。各/ヤフト56はフレー
ム55に固定されたアクチュエータ57により駆動され
回動するようになっている。各シャフト56の両端部に
は下方に延びる揺動アーム58.58が固定されており
、6対をなす揺動アーム58.58の先端は連結部材5
9によって連結されている。
An actuator 54 is installed on the movable base 53,
A frame 55 assembled into a rectangular shape in plan view by the actuator 54 is guided by a guide rod 60 and suspended so as to be movable up and down. The longitudinal direction of the frame 55 coincides with the '11111 feeding direction of the cement board conveying path 10. A shaft 56 is supported at each end of the frame 55 in the longitudinal direction, with its axis positioned parallel to the moving direction of the movable base 53. Each shaft 56 is driven and rotated by an actuator 57 fixed to the frame 55. Swinging arms 58.58 extending downward are fixed to both ends of each shaft 56, and the tips of the six pairs of swinging arms 58.58 are connected to the connecting member 58.
connected by 9.

連結部材59の各端部には、第5図及び第6図に示すよ
うに、チャック取付台61が支持ロッド62及びガイド
ロッドロ3を介して昇降可能に吊リドげられている。チ
ャック取付台61の支持ブロック部61aには平面視コ
字形をなす支持アーム64が可動台53の移動方向と同
方向に水平移動可能に支持されている。即ち、支持ブロ
ック部61aには、軸心を水平にして上下平行に配置さ
れた二本の支持口yトロ5,65が水平移動可能に賞通
しており、副支持ロッド65.65の両端か上記支持ア
ーム64の開放側両端部に固定されている。又、支持ブ
ロック部61aの両側には支持アーム64との間にスプ
リング66が介装されており、このスプリング66によ
って支持ブロック部61aか支持アーム64の中央に位
置するように付勢されている。この機構により、網体1
00の把手部103.103の離間寸法に若干の製作誤
差があっても、網体lOOを吊り上げる際の問題となる
ことはない。
As shown in FIGS. 5 and 6, a chuck mount 61 is suspended from each end of the connecting member 59 via a support rod 62 and a guide rod 3 so as to be movable up and down. A support arm 64 having a U-shape in plan view is supported by the support block portion 61a of the chuck mounting base 61 so as to be horizontally movable in the same direction as the moving direction of the movable base 53. That is, the support block part 61a has two support ports 5 and 65 arranged vertically and parallelly with their axes horizontal, which are horizontally movable. It is fixed to both ends of the support arm 64 on the open side. Further, springs 66 are interposed between the support block part 61a and the support arm 64 on both sides, and the springs 66 bias the support block part 61a to be located at the center of the support arm 64. . With this mechanism, the mesh body 1
Even if there is a slight manufacturing error in the distance between the handle portions 103 and 103 of 00, it will not cause a problem when lifting the net body lOO.

上記支持アーム64の内側にはアクチュエータ68が固
定されている。このアクチュエータ68は、下方に位置
する一対のチャック支持ブロック67.67を第5図矢
印の如く接近離反させるためのものである。尚、チャッ
ク支持ブロック67゜67の移動方向は可動台53の移
動方向と同方向になっている。上記各チャック支持ブロ
ック67には、回転軸69aを可動台53の移動方向と
平行に位置させたチャック69が回動可能に支持されて
いる。即ち、チャック69の回動中心は揺動アーム58
の回動中心に対して平行な位置関係にある。アクチュエ
ータ68に支持された一対のチャック69.69の各爪
部69bは互いに対向するように位置している。上記一
対のチャック支持ブロック67.67を接近させること
によって、第7図に示すように、網体100の把手部1
03を各チャック69の爪部69bで挟持することがで
きるようになっている。
An actuator 68 is fixed inside the support arm 64. This actuator 68 is for moving a pair of chuck support blocks 67, 67 located below toward and away from each other as shown by the arrows in FIG. Note that the moving direction of the chuck support block 67°67 is the same as the moving direction of the movable table 53. Each of the chuck support blocks 67 rotatably supports a chuck 69 with a rotating shaft 69a positioned parallel to the moving direction of the movable table 53. That is, the center of rotation of the chuck 69 is the swing arm 58.
The position is parallel to the center of rotation. The claws 69b of the pair of chucks 69, 69 supported by the actuator 68 are positioned to face each other. By bringing the pair of chuck support blocks 67, 67 closer together, the grip portion 1 of the net body 100
03 can be held by the claws 69b of each chuck 69.

又、上記支持アーム64の外側にはバンカー上押え70
が昇降可能に支持されており、スプリング71によって
下方に付勢されている。このハンガー上押え70は、前
記網体搬送装置20の第4コンベア24に設けられた図
示しないバンカー上押えと協働して網体100のハンガ
ー102を挟持するものである。
Further, a bunker upper presser 70 is provided on the outside of the support arm 64.
is supported so as to be movable up and down, and is biased downward by a spring 71. This hanger upper presser 70 cooperates with a bunker upper presser (not shown) provided on the fourth conveyor 24 of the net body conveying device 20 to clamp the hanger 102 of the net body 100.

尚、網体搬送装置20の第4コンベア24はこの高翠構
造体51の下部はぼ中央に位置しており、第4コンベア
24を間にしてセメント板搬送路10と反対側には運転
開始時に網体100を積載しておくための台車80が用
意されている。
The fourth conveyor 24 of the net conveyor 20 is located at the center of the lower part of this high green structure 51, and the fourth conveyor 24 of the net conveyor 20 is located at the center of the lower part of the high green structure 51, and the fourth conveyor 24 is located on the opposite side of the cement board conveying path 10 with the fourth conveyor 24 in between. A cart 80 is prepared for loading the net 100 at times.

一方、セメント板搬送路lOの下流側に配置されている
網体着脱装置90は、上記台車80を収容するスペース
かない分、高架構造体の長さが短い以外は、構造上およ
び機能上共に上記上流側の網体着脱装置50と基本的に
は何ら変わるところはない。よって、その説明は省略し
、以下の説明において網体着脱装置90の各構成部分の
符号は刷体行脱装置50における構成部分の符号を援用
するものとする。
On the other hand, the net attachment/detachment device 90 disposed on the downstream side of the cement board conveyance path 1O has the same structure and function as described above, except that the length of the elevated structure is short due to the lack of space for accommodating the above-mentioned trolley 80. There is basically no difference from the net attachment/detachment device 50 on the upstream side. Therefore, the explanation thereof will be omitted, and in the following explanation, the reference numerals of the respective constituent parts of the net attaching/detaching device 90 will be referred to as those of the constituent parts of the printing body moving/detaching device 50.

次に、上記二つの網体着脱装置50.90の動作を硬質
木片セメント板製造プラント全体の動作を交えつつ説明
する。
Next, the operations of the two mesh attachment/detachment devices 50 and 90 will be explained together with the operation of the entire hard wood cement board manufacturing plant.

初めに、所定数の網体100を積載した台車80を網体
着脱装置50の下方所定位置にセットし、その上方に可
動台53を移動させる。この時、網体100の長手方向
をセメント板搬送路10の搬送方向に対して平行にする
First, the trolley 80 loaded with a predetermined number of nets 100 is set at a predetermined position below the net attaching/detaching device 50, and the movable base 53 is moved above it. At this time, the longitudinal direction of the net body 100 is made parallel to the conveyance direction of the cement board conveyance path 10.

次に、各揺動アーム58を真下に向かせ、且つ、各チャ
ック69を水平な姿勢に保って、フレーム55を降下さ
せる。各チャック69が網体100の把手部103を挟
持できる高さに達するとフレーム55は停止する。そし
て、各アクチュエータ68によって各チャ、り69が閉
じられ、網体100の四つの把手部103を挟持する。
Next, the frame 55 is lowered with each swing arm 58 facing directly downward and each chuck 69 kept in a horizontal position. When each chuck 69 reaches a height at which it can grip the handle portion 103 of the net body 100, the frame 55 stops. Then, each actuator 68 closes each lever 69 to grip the four handles 103 of the net 100.

各チャック69で各把手部103を挟持した後、フレー
ム55が上昇し網体100を吊り上げる。
After each grip portion 103 is clamped by each chuck 69, the frame 55 rises and lifts the net body 100.

その際、網体100の金網101はその自重によりたわ
み、湾曲していく。一方、フレーム55のL昇開始と同
時に、第4図において想像線で示すように各t5i動ア
ーム58が各アクチュエータ57に駆動されて先端を徐
々に内側に向けるように所定角度まで回転するとともに
、各チャック69か第8図に示すようにチャック支持ブ
ロック67に対して自由回転する。上記揺動アーム58
の回転速1文は金網101の自重による網体■00の自
然な湾曲姿勢に無理なく対応するように設定されており
、その結果、網体100は非常に無理のない姿勢で緩や
かな湾曲状態で吊り上げられることとなる。特に、各チ
ャック69も回転するようにな−)でいるので、網体1
00が金網101とハンガー102との連結部で折れ曲
がることもない。
At this time, the wire mesh 101 of the mesh body 100 bends and curves due to its own weight. On the other hand, at the same time as the frame 55 starts to rise L, each t5i movable arm 58 is driven by each actuator 57 and rotates to a predetermined angle so that its tip gradually turns inward, as shown by the imaginary line in FIG. Each chuck 69 freely rotates relative to the chuck support block 67 as shown in FIG. The swing arm 58
The rotational speed 1 is set to reasonably correspond to the natural curved posture of the mesh body 00 due to the weight of the wire mesh 101, and as a result, the mesh body 100 is in a gentle curved state in a very natural posture. It will be lifted up. In particular, since each chuck 69 also rotates, the mesh body 1
00 will not be bent at the joint between the wire mesh 101 and the hanger 102.

次に、網体100を吊り上げた状態で可動台53がセメ
ント仮搬送路10の真上に平行移動する。
Next, the movable table 53 is moved in parallel to the position directly above the cement temporary conveyance path 10 while the net body 100 is lifted up.

そして、フレーム53が徐々に下降し、第1コンベアl
l上の所定位置に載置された型板上のセメント板原料へ
の上に網体100を静かに降ろす。
Then, the frame 53 gradually descends, and the first conveyor l
The mesh body 100 is gently lowered onto the cement board material on the template placed at a predetermined position on the screen.

この時、網体lOOはちょうど吊り上げた時と逆の形に
、即ち、湾曲姿勢から徐々に水平な平坦な姿勢へと変化
する。一方、金網101の中央部かセメント板原料Aに
接すると同時に、各揺動アーム58が各アクチュエータ
57に駆動されて先端を徐々に外側に向けるように回転
するとともに、各チャンク69がチャック支持ブロック
67に対して回転する。その結果、上記網体100の姿
勢変化は極めて無理なく行われることとなり、網体lO
Oに無理な負担がかかることがない。
At this time, the net body lOO takes on the opposite shape from when it was just lifted, that is, it gradually changes from a curved posture to a horizontal flat posture. On the other hand, at the same time that the central part of the wire mesh 101 comes into contact with the cement board raw material A, each swinging arm 58 is driven by each actuator 57 and rotates so that its tip is gradually directed outward, and each chunk 69 is moved to the chuck support block. Rotate relative to 67. As a result, the posture change of the mesh body 100 is carried out extremely effortlessly, and the mesh body lO
No unreasonable burden is placed on O.

そして、網体lOOがセメント板原料への上に載置され
て平坦な状態になったところで、揺動アーム58が鉛直
方向を向くとともに、各チャ・ツク69が水平姿勢にな
るようにされており、これと同時に揺動アーム58は回
転を停止する。この後、各チャック69が各アクチュエ
ータ68によって開かれ、上流側網体着脱装置50から
網体100か解放される。尚、網体100をセメント板
原料への上に載置する上述の作業は、第1コンベア11
か停止状態の下で行われる。
Then, when the mesh body lOO is placed on the cement board raw material and becomes flat, the swinging arm 58 is oriented vertically and each chuck 69 is brought into a horizontal position. At the same time, the swing arm 58 stops rotating. Thereafter, each chuck 69 is opened by each actuator 68, and the net 100 is released from the upstream net attachment/detachment device 50. Note that the above-mentioned operation of placing the mesh body 100 on the cement board raw material is carried out on the first conveyor 11.
or under stopped conditions.

そして、各チャック69から網体100を離脱させた後
、フレーム55は上昇し、可動台53は再び台車80の
上に7行移動する。そして、上述同様の手順によって順
次、網体lOOを第1コンベア11の上のセメント板原
料Aの上に載置シていく。台車80から所定数の網体1
00をセメント板搬送路10に運んだ後においては、上
記上流側の網体着脱装置50は網体搬送装置20の上で
停止するようになる。
After removing the net body 100 from each chuck 69, the frame 55 rises, and the movable base 53 moves seven rows above the cart 80 again. Then, the mesh body lOO is sequentially placed on the cement board raw material A on the first conveyor 11 according to the same procedure as described above. A predetermined number of mesh bodies 1 from the trolley 80
00 to the cement board conveyance path 10, the upstream net attachment/detachment device 50 comes to stop above the net conveyance device 20.

一方、セメント板原料Aの上に網体100が載置される
と、セメント仮搬送路10の第1コンベア11は運転を
開始し、セメント板原料Aは第2コンベア12を介して
ホットプレス装置1に送うれる。このホットプレス装置
lによって、セメント板原料Aは加熱加圧されて硬化せ
しめられる。
On the other hand, when the net body 100 is placed on the cement board raw material A, the first conveyor 11 of the cement temporary conveyance path 10 starts operating, and the cement board raw material A is transferred to the hot press device via the second conveyor 12. Sent to 1. The cement board raw material A is heated and pressurized by this hot press device 1 to harden it.

その際にセメント板原料Aに含まれていた余剰水が除去
される。
At this time, excess water contained in the cement board raw material A is removed.

加工されたセメント板A′は第3コンヘア13を介して
第4コンベア14に送られ、セメント板A′が下流側の
網体着脱装置90の真下に位置したところで第4コンベ
ア14が停止する。この時、網体着脱装置90の可動台
53はセメント仮搬送路10 、J:、に位置しており
、上流側の網体着脱装置50と同様に作動して、セメン
ト板A′の上に載置された網体100を吊り上げる。そ
して、上記網体滑脱装置90の可動台53が網体搬送装
置20の」−に平行移動して停止し、この網体100を
停+h シている第1コンベア21の上に降ろす。この
吊り上げ、吊り下ろしの時にも、網体100の姿勢変化
が極めて無理なく行われ、網体lOOに無理な負担がか
からない。
The processed cement board A' is sent to the fourth conveyor 14 via the third conveyor 13, and the fourth conveyor 14 stops when the cement board A' is located directly below the net attachment/detachment device 90 on the downstream side. At this time, the movable platform 53 of the net attaching/detaching device 90 is located on the temporary cement conveyance path 10, J:, and operates in the same manner as the net attaching/detaching device 50 on the upstream side to place it on the cement plate A'. The placed net body 100 is lifted up. Then, the movable table 53 of the net sliding device 90 moves parallel to the net conveying device 20 and stops, and the net 100 is lowered onto the first conveyor 21 which is stopped. Even during this lifting and lowering, the posture of the net 100 is extremely easily changed, and no undue burden is placed on the net 100.

網体100が載置されると第1コンベア21は運転を開
始し、網体100を第2コンヘア22に送り込む。網体
100は第2コンベア22によって搬送される間に、洗
浄装置30の散水ユニット32を通過する。散水ユニッ
ト32内において網体100に高圧水が噴射され、網体
100に付着したセメント滓が洗い流される。
When the net 100 is placed, the first conveyor 21 starts operating and sends the net 100 to the second conveyor 22. While being conveyed by the second conveyor 22, the net 100 passes through the watering unit 32 of the cleaning device 30. High-pressure water is sprayed onto the net 100 within the water sprinkling unit 32, and cement slag adhering to the net 100 is washed away.

洗浄された網体100は第2コンベア22から第3コン
ベア23を介して第4コンベア24に送られ、網体10
0が上流側の網体着脱装置50の真下に位置したところ
で第4コンベア24が停止する。ここで、網体100の
両ハンガー102がそれぞれクランプ装置24a、24
bによってクランプされるとともに長手方向に引っ張ら
れる。
The cleaned net body 100 is sent from the second conveyor 22 to the fourth conveyor 24 via the third conveyor 23, and the net body 100
The fourth conveyor 24 stops when No. 0 is located directly below the upstream net attachment/detachment device 50. Here, both hangers 102 of the net body 100 are clamped by the clamp devices 24a and 24, respectively.
It is clamped and pulled in the longitudinal direction by b.

次に、揺動アーム58を鉛直下方に向けた状態にした網
体着脱装置50のフレーム53が降下する。そして、各
ハンガー上押え70か網体100のハンガー102に接
触し、ノ1ンが一下押え(図示せず。)とv;Amして
スプリング71の弾性力によりハンガー102の把手部
103近傍を水平姿勢に押える。尚、個々の網体100
の反り返り状態が相違する等によってハンガー102の
高さ位置がばらついていても、チャック取付台61が連
結部材59に対して昇降可能に支持されているので」二
記ばらつきか吸収され、ハンガー102は常にスプリン
グ71の一定な弾性力で押えられることになる。
Next, the frame 53 of the net attaching/detaching device 50, with the swinging arm 58 directed vertically downward, is lowered. Then, each hanger upper presser 70 contacts the hanger 102 of the net body 100, and the upper presser 70 contacts the hanger 102 of the net body 100, and the elastic force of the spring 71 presses the vicinity of the handle portion 103 of the hanger 102. Hold in a horizontal position. In addition, each net body 100
Even if the height position of the hanger 102 varies due to differences in the warped state of the It is always held down by the constant elastic force of the spring 71.

この後は、前述動作と同様にして各チャック69が閉じ
、ハンガー102の把手部103がチャック69によっ
て挟持されたi&、網体100は湾曲姿勢にされて吊り
上げられ、セメント板搬送路10の第1コンベア11の
上のセメント板原料Aの上に載置される。勿論、この際
にも網体100の姿勢変化が極めて無理なく行われるこ
ととなる。
After this, each chuck 69 is closed in the same manner as in the above-mentioned operation, and the grip portion 103 of the hanger 102 is held by the chuck 69, and the mesh body 100 is lifted up in a curved position, and the 1 is placed on the cement board raw material A on the conveyor 11. Of course, at this time as well, the posture of the net body 100 can be changed quite easily.

以後、セメント板原料Aへの網体100の供給と、加工
後のセメント板A′からの網体100の取り外しと、網
体100の洗浄と、セメント板原料へへの網体lOOの
再供給という一連の網体100の流れが閉ループとなる
。したがって、無駄な作業がな(、生産性が非常に高い
Thereafter, the net 100 is supplied to the cement board raw material A, the net 100 is removed from the processed cement board A', the net 100 is cleaned, and the net 100 is resupplied to the cement board raw material. This series of flow of the net body 100 becomes a closed loop. Therefore, there is no wasted work (and productivity is very high).

上述したように、網体100は網体着脱装置50.90
によって吊り上げた際、金網101の自重による自然な
無理のない緩やかな湾曲姿勢を保つようにされ、その姿
勢を保持しつつ移動せしめられるようになっているので
、網体100に無理な負担かかかることがなく、網体1
00の寿命か従来よりも非常に延びる。
As mentioned above, the net 100 is connected to the net attachment/detachment device 50.90.
When it is lifted up, the wire mesh 101 maintains a natural and moderately curved posture due to its own weight, and can be moved while maintaining this posture, so that an unreasonable burden is not placed on the mesh body 100. Without a doubt, net body 1
00's lifespan is much longer than before.

この発明による網体滑脱装置は、上記セメント板の製造
に用いられるたけでなく、インシュレ−7ヨンホード等
のう2造にも用いることができることは勿論である [発明の効果] 以上説明したように、この発明によれば、網体を1市に
よる自然な無理のない緩やかな湾曲姿勢に吊り−Lげる
ことかでき、且つ、その姿勢を保持しつつ移動させるこ
とかできるので、網体の寿命を延ばすことかできるとい
う優れた効果か奏される。
It goes without saying that the mesh sliding device according to the present invention can be used not only for manufacturing the above-mentioned cement board, but also for the construction of insulation boards, etc. [Effects of the Invention] As explained above, According to the present invention, the net can be hung in a natural and moderately curved posture, and can be moved while maintaining that posture. It has an excellent effect of extending lifespan.

【図面の簡単な説明】[Brief explanation of drawings]

第1図から第9図までの図面はこの発明の一実施例を示
すものであり、第1図はこの発明の網体り脱装置を使用
した硬質木片セメント板製造ブラットの平面配置図、第
2図は同側面配置図、第3図はこの発明の要旨である網
体着脱装置の正面図、第4図は同側面図、第5図は非ク
ランプ状態のチャック部を示した拡大正面図、第6図は
同拡大0111而図、第7図はクランプ状態のチャック
正面図、第8図は網体を吊り上げた時にチャックが回動
した状態を示すチャック部の側面図、第9図は網体の平
面図である。 10・・・セメント板搬送路(板体搬送路)、50.9
0・・・網体着脱装置、 52・・・レール(軌道)、 53・・・可動台、55
・・フレーム、  58・・揺動アーム、69・・・チ
ャック、 100・・網体、  103・・把手部、A セメント
板原料(板体原料)、 A′・・セメント板(板体)。
The drawings from FIG. 1 to FIG. 9 show one embodiment of the present invention, and FIG. Fig. 2 is a side view of the arrangement, Fig. 3 is a front view of the net attaching/detaching device which is the gist of the invention, Fig. 4 is a side view of the same, and Fig. 5 is an enlarged front view showing the chuck part in an unclamped state. , Fig. 6 is an enlarged 0111 diagram of the same, Fig. 7 is a front view of the chuck in the clamped state, Fig. 8 is a side view of the chuck part showing the state in which the chuck is rotated when the net body is lifted, and Fig. 9 is a FIG. 3 is a plan view of the net. 10... Cement board conveyance path (plate conveyance path), 50.9
0...Network attaching/detaching device, 52...Rail (track), 53...Movable base, 55
...Frame, 58.. Swinging arm, 69.. Chuck, 100.. Net body, 103.. Handle part, A. Cement board raw material (board material), A'.. Cement board (board body).

Claims (1)

【特許請求の範囲】[Claims] (1)板体を製造する際に板体原料の上に原料中の余剰
水等を除去するための網体を載置し、余剰水等を除去し
た後に上記網体を板体から取り外す網体着脱装置におい
て、板体の搬送路の上方に設置された軌道に沿って移動
可能な可動台と、この可動台に昇降可能に支持されたフ
レームと、このフレームに回動可能に支持され吊り下げ
られた複数のアームと、上記網体の両端部に設けられた
把手部を把持するために上記アームの先端に回動可能に
支持されその回動中心を上記アームの回動中心に対して
平行に位置させたチャックとを具備することを特徴とす
る網体着脱装置。
(1) When manufacturing a plate, a net is placed on top of the plate raw material to remove excess water, etc. in the raw material, and the net is removed from the plate after excess water, etc. is removed. In the body attachment/detachment device, there is a movable platform that is movable along a track installed above the conveyance path of the plate, a frame that is supported by the movable platform so that it can be raised and lowered, and a frame that is rotatably supported by the frame and suspended. A plurality of lowered arms and a plurality of lowered arms are rotatably supported at the ends of the arms in order to grasp the handles provided at both ends of the net, and the center of rotation is relative to the center of rotation of the arms. A net body attaching/detaching device characterized by comprising a chuck positioned in parallel.
JP12631389A 1989-05-18 1989-05-18 Net attachment / detachment device Expired - Lifetime JPH07100536B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP12631389A JPH07100536B2 (en) 1989-05-18 1989-05-18 Net attachment / detachment device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP12631389A JPH07100536B2 (en) 1989-05-18 1989-05-18 Net attachment / detachment device

Publications (2)

Publication Number Publication Date
JPH02305720A true JPH02305720A (en) 1990-12-19
JPH07100536B2 JPH07100536B2 (en) 1995-11-01

Family

ID=14932093

Family Applications (1)

Application Number Title Priority Date Filing Date
JP12631389A Expired - Lifetime JPH07100536B2 (en) 1989-05-18 1989-05-18 Net attachment / detachment device

Country Status (1)

Country Link
JP (1) JPH07100536B2 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102874604A (en) * 2012-06-26 2013-01-16 上海人造板机器厂有限公司 Stacking equipment for post-processing working section of artificial wood plate production line
CN107352268A (en) * 2017-08-10 2017-11-17 江苏环球新型木结构有限公司 A kind of cross-bedding pressed wood vacuum disc suction machine tool hand feeding device
CN112452739A (en) * 2020-11-04 2021-03-09 唐坤 Concrete raw material screening device for building construction
CN112690135A (en) * 2020-12-25 2021-04-23 重庆赐康果蔬有限公司 Vegetable seedling raising mechanism

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102874604A (en) * 2012-06-26 2013-01-16 上海人造板机器厂有限公司 Stacking equipment for post-processing working section of artificial wood plate production line
CN107352268A (en) * 2017-08-10 2017-11-17 江苏环球新型木结构有限公司 A kind of cross-bedding pressed wood vacuum disc suction machine tool hand feeding device
CN112452739A (en) * 2020-11-04 2021-03-09 唐坤 Concrete raw material screening device for building construction
CN112690135A (en) * 2020-12-25 2021-04-23 重庆赐康果蔬有限公司 Vegetable seedling raising mechanism
CN112690135B (en) * 2020-12-25 2023-08-25 重庆赐康果蔬有限公司 Vegetable seedling raising mechanism

Also Published As

Publication number Publication date
JPH07100536B2 (en) 1995-11-01

Similar Documents

Publication Publication Date Title
CN109226036A (en) A kind of babe cocoon cage raising frame cleaning sterilizing device
JPH02305720A (en) Mesh body mount/dismount device
JPH02305719A (en) Supply-recovery device of mesh body
TWI690251B (en) Vertical hanger investment board machine
JP3526600B2 (en) Decorative board sticking device for ball and ball game machines
US5059276A (en) Veneer edge glue applicator
JPH0412809A (en) Transferring method of reinforcing bar cage to alignment table and apparatus therefor
JPS59128117A (en) Cargo erecting device
JPH07228991A (en) Automatic polishing method and device of base plate for copper electrolysis
JPS6082512A (en) Holding and conveying method and apparatus for lamellar work of automatic cleaning device
JPH0482663A (en) Cleaning device of plate for sticking wafer
JPH08510963A (en) Core joining device
JP2993051B2 (en) Product removal machine for injection molding machine
JPH03285758A (en) Apparatus for knocking out mold
JP3592214B2 (en) Hydraulic transfer method and hydraulic transfer apparatus for long objects
JPH0930772A (en) Transfer device for glazed work
JPH0419021A (en) Bolt fastening device
JP3247648B2 (en) Shaping device for raw material mat of inorganic plate
JPS6056727A (en) Supply device for net-like member
JP2822520B2 (en) Device for holding and transferring green body
JP3058826U (en) Unloading device for workpieces in endless transfer device
JPS6311599Y2 (en)
JPH0794286B2 (en) Sushi transfer device
JPH0330334Y2 (en)
JPH06151677A (en) Plated article supply device