JPH0226611U - - Google Patents

Info

Publication number
JPH0226611U
JPH0226611U JP10460888U JP10460888U JPH0226611U JP H0226611 U JPH0226611 U JP H0226611U JP 10460888 U JP10460888 U JP 10460888U JP 10460888 U JP10460888 U JP 10460888U JP H0226611 U JPH0226611 U JP H0226611U
Authority
JP
Japan
Prior art keywords
steel
plate
bridge
concrete composite
prefabricated concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP10460888U
Other languages
Japanese (ja)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to JP10460888U priority Critical patent/JPH0226611U/ja
Publication of JPH0226611U publication Critical patent/JPH0226611U/ja
Pending legal-status Critical Current

Links

Description

【図面の簡単な説明】[Brief explanation of drawings]

第1図は鋼パネル板の正面図で、第2図はその
側面図である。第3図は木主桁の横断面図で、第
4図はその縦断面図である。第5図はプレハブコ
ンクリート合成鋼床版を木主桁の上に結合したこ
とを示す橋全体の横断面図であり、第6図はその
平面断面図である。 1:鋼板、2:鋼スタツドジベル、3:鉛直突
起鋼板、4:木主桁、5:木主桁の上フランジ部
における溝孔、6:メツシユ鉄筋、7:コンクリ
ート、8:左岸橋台、9:右岸橋台。
FIG. 1 is a front view of the steel panel plate, and FIG. 2 is a side view thereof. Figure 3 is a cross-sectional view of the wooden main girder, and Figure 4 is its longitudinal cross-section. Fig. 5 is a cross-sectional view of the entire bridge showing that the prefabricated concrete composite steel deck slabs are joined to the wooden main girder, and Fig. 6 is a plan sectional view thereof. 1: Steel plate, 2: Steel stud dowel, 3: Vertical projecting steel plate, 4: Wooden main girder, 5: Groove in the upper flange of the wooden main girder, 6: Mesh reinforcement, 7: Concrete, 8: Left bank abutment, 9: Right bank abutment.

Claims (1)

【実用新案登録請求の範囲】 鋼板1に鋼スタツドジベル2と鉛直突起鋼板3
とを溶接して作る鋼パネル板を工場で製作し、さ
らに工場で、この鋼パネル板にコンクリート7を
打設し硬化させ、プレハブコンクリート合成鋼床
版を製作する。そのときすでに、メツシユ鉄筋6
を理め込んでおく。 橋を現場に架設するとき、木主桁4にはあらか
じめ溝孔5をあけておき、そこに液状接着剤を流
し込み、そこにプレハブコンクリート合成鋼床版
の鉛直突起鋼板3を上からはめ込み、接着剤の硬
化とともに橋を完成させる組立式コンクリート合
成鋼床版木桁橋。
[Scope of claim for utility model registration] Steel plate 1, steel stud dowel 2 and vertical protrusion steel plate 3
A steel panel plate is produced by welding the steel panel plates and the steel panel plate, and concrete 7 is poured and hardened on the steel panel plate at the factory to produce a prefabricated concrete composite steel deck slab. At that time, mesh reinforcement 6
Let's understand this. When constructing a bridge on site, slots 5 are drilled in the main wooden girder 4 in advance, liquid adhesive is poured into them, and the vertical protruding steel plates 3 of the prefabricated concrete composite steel deck are fitted from above and bonded. A prefabricated concrete composite steel slab wooden girder bridge that completes the bridge as the agent hardens.
JP10460888U 1988-08-08 1988-08-08 Pending JPH0226611U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP10460888U JPH0226611U (en) 1988-08-08 1988-08-08

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP10460888U JPH0226611U (en) 1988-08-08 1988-08-08

Publications (1)

Publication Number Publication Date
JPH0226611U true JPH0226611U (en) 1990-02-21

Family

ID=31336481

Family Applications (1)

Application Number Title Priority Date Filing Date
JP10460888U Pending JPH0226611U (en) 1988-08-08 1988-08-08

Country Status (1)

Country Link
JP (1) JPH0226611U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003306905A (en) * 2002-04-15 2003-10-31 Pc Bridge Co Ltd Wood bridge using long-sized beam made of prestressed glue laminated wood as main girder
CN102943434A (en) * 2012-10-24 2013-02-27 南京林业大学 Semi-assembly bamboo-concrete composite bridge

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003306905A (en) * 2002-04-15 2003-10-31 Pc Bridge Co Ltd Wood bridge using long-sized beam made of prestressed glue laminated wood as main girder
CN102943434A (en) * 2012-10-24 2013-02-27 南京林业大学 Semi-assembly bamboo-concrete composite bridge
CN102943434B (en) * 2012-10-24 2014-11-19 南京林业大学 Semi-assembly bamboo-concrete composite bridge

Similar Documents

Publication Publication Date Title
JP2522714B2 (en) Construction method of building frame
JPH0226611U (en)
CN218989862U (en) Combined slot structure suitable for connecting combined beam bridge and plate
JPH02300439A (en) Prefabricating method
JPS6165116U (en)
JPH026097Y2 (en)
JP2556389B2 (en) Construction method of earthquake-resistant wall
JPS6235096U (en)
JPS62154007U (en)
JPS62178634A (en) Framework construction method of structure
JPS5925931Y2 (en) Composite girder using π-shaped steel
JPH0715183B2 (en) Connection structure of precast steel concrete columns
JPH0749681B2 (en) Steel frame / reinforced concrete composite construction method
JP2713139B2 (en) Floor method using steel assembly as beam form
JPS62120506U (en)
JPH02120451A (en) Precast concrete lintel and construction therewith
JPH05339986A (en) Structure of beam connection for pc column
JPS63136111U (en)
JPH039403U (en)
JPH0638973Y2 (en) Shear reinforcement structure of column head of flat slab
JPH0528815U (en) Precast steel reinforced concrete columns
JPS5858503B2 (en) Construction method of reinforced concrete composite wall
JPH0442418Y2 (en)
JP2574644Y2 (en) Frame structure combining steel beams with reinforced concrete girders
JPH07207800A (en) Floor construction method using precast reinforced concrete large beam and steel frame small beam