Fixing method of waterproof layer protection presser gravel

Info

Publication number
JPH02200950A
JPH02200950A JP1844989A JP1844989A JPH02200950A JP H02200950 A JPH02200950 A JP H02200950A JP 1844989 A JP1844989 A JP 1844989A JP 1844989 A JP1844989 A JP 1844989A JP H02200950 A JPH02200950 A JP H02200950A
Authority
JP
Japan
Prior art keywords
gravel
layer
asphalt
waterproof layer
sheet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP1844989A
Other languages
Japanese (ja)
Other versions
JPH0663324B2 (en
Inventor
Yuzo Mifune
裕造 三船
Yoshitaka Sasaki
佐々木 義堯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NIPPON BOSUI SOGYO KK
Nissin Kogyo Co Ltd
Original Assignee
NIPPON BOSUI SOGYO KK
Nissin Kogyo Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NIPPON BOSUI SOGYO KK, Nissin Kogyo Co Ltd filed Critical NIPPON BOSUI SOGYO KK
Priority to JP1844989A priority Critical patent/JPH0663324B2/en
Publication of JPH02200950A publication Critical patent/JPH02200950A/en
Publication of JPH0663324B2 publication Critical patent/JPH0663324B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Revetment (AREA)
  • Road Paving Structures (AREA)

Abstract

PURPOSE:To fasten together gravels in a gravel layer by forming the gravel layer on the upper surface of a waterproof layer, laying a sheet consisting of asphalt material on the gravel layer and heating and melting the sheet so as to force it permeate the gravels. CONSTITUTION:A waterproof layer 2 is formed by sticking a waterproof sheet made of asphalt material on the upper surface of a concrete plate 1. Then, on the upper surface of the waterproof layer 2, a gravel layer 4 is formed with gravels 3 and an asphalt sheet 6 is heated with a burner 7 on the gravel layer 4 and after asphalt material 5 is melted and forced to permeate the gravels 3, it is cooled down. Then, two or three protection presser gravel layers are provided on the upper surface of the waterproof layer 2. Consequently, there is no influence of rainfall during the time of construction and it is possible to apply construction work even when the temperature is below zero Centigrade.

Description

【発明の詳細な説明】 (産業上の利用分野) 本発明は建造物の屋上等に施された防水層を保護するた
めに防水層の上面に載置した保護押え砂利を固定する方
法に関する。
DETAILED DESCRIPTION OF THE INVENTION (Industrial Application Field) The present invention relates to a method for fixing protective gravel placed on the top surface of a waterproof layer to protect the waterproof layer applied to the roof of a building or the like.

(従来の技術) 従来、建造物の屋上等に施されたアスファルト、ゴム化
アスファルト等の防水材から成る防水層を直射日光、雨
水等による老化、外力による損傷等から保護する方法と
しては、該防水層の上面に径が大きな砂利をふた並べ以
上の厚さで層状に敷き詰める方法が知られている。
(Prior Art) Conventionally, as a method to protect a waterproof layer made of waterproof material such as asphalt or rubberized asphalt applied to the roof of a building from aging caused by direct sunlight, rainwater, etc., and damage caused by external forces, A method is known in which a layer of large-diameter gravel is spread over the top of the waterproof layer to a thickness equal to or thicker than that of the lid.

しかしながら、前記方法の場合は、防水層の上面に砂利
を単に敷き詰めているので台風等によって砂利が吹き飛
ぶ懸念があるので、敷き詰める砂利は径25m嘗以上の
大きなものが必要であり、しかも砂利を敷き詰める場所
が広い場合は面積約3メートル平方毎に仕切板を配設し
て砂利が片寄らないようにしなければならない等の問題
がある。
However, in the case of the above method, gravel is simply spread on the top surface of the waterproof layer, so there is a risk that the gravel will be blown away by typhoons, etc., so the gravel to be spread needs to be large, with a diameter of 25 m or more, and the gravel is spread all over. If the area is large, there are problems such as having to install partition plates every 3 meters square to prevent the gravel from being piled up.

そこで防水層の上面に径25 am以下の砂利を敷き詰
めて厚さ30m騰程度の砂利層を形成し、該砂利層にア
スファルトエマルジョン或いは合成樹脂エマルジョンを
散布し、該エマルジョンの水分を蒸発させ、固化せしめ
て砂利を相互に固着させる方法、や、前記方法において
遅効性凝固剤を添加したアスファルトエマルジョン或い
は合成樹脂エマルジョンを用いる方法、或いは、防水層
の上面に予め径25 m11以下の砂利とアスファルト
エマルジョン或いは合成樹脂エマAt ’)ヨンを均一
に混合した砂利材を厚さ30m−程度の層状にa置し、
その上から塩化カルシウム水溶液等の分解剤を散布して
該エマルジョンを急速に分解し凝固させる方法が行われ
ている。
Therefore, gravel with a diameter of 25 am or less is spread over the top of the waterproof layer to form a gravel layer about 30 m thick, and asphalt emulsion or synthetic resin emulsion is sprinkled on the gravel layer, and the water in the emulsion is evaporated and solidified. A method of at least fixing gravel to each other, a method of using an asphalt emulsion or a synthetic resin emulsion to which a slow-acting coagulant is added in the above method, or a method of pre-coating gravel with a diameter of 25 m or less and an asphalt emulsion on the upper surface of the waterproof layer. Gravel material uniformly mixed with synthetic resin Emma At') was placed in a layer about 30 m thick,
A method of rapidly decomposing and coagulating the emulsion by spraying a decomposing agent such as an aqueous calcium chloride solution thereon has been used.

(発明が解決しようとする課題) しかしながら、前記方法のうちアスファルトエマルジョ
ン或いは合成樹脂エマルジョンを散布する方法の場合は
、該エマルジョンの水分が蒸発し、固化するまでにかな
りの時間を要して作業性が悪いばかりではなく、水分が
蒸発・固化するまでの間に降雨があると散布したエマル
ジョンが流失しやすくなり、流失したときは砂利相互間
の固着力が弱められ、また砂利の上からエマルジョンを
散布するため散布量が同等とならずその結果砂利相互間
の固着力が不均一となり、しかも気温が0℃以下になっ
たとき該エマルジョンは凍結するので使用することが出
来ない等の問題がある。また、砂利層に散布するエマル
ジョンに遅効性凝固剤を添加したエマルジョンを用いる
方法の場合は、該エマルジョンは徐々に増粘するので、
エマルジョンを散布した際砂利間に浸透しにくくなって
、防水層と砂利層の界面まで均一に浸透させることが出
来ない等の問題がある。また、砂利とエマルジョンの混
合砂利材を載置する方法の場合は、防水層の上面に混合
砂利材を載置した後分解剤を散布するため、該エマルジ
ョンの分解は砂利材層の表面から始まり分解剤が砂利材
層の下層まで均等に浸透しにくいので均一な防水層への
保護層を形成することが出来ない等の問題がある。
(Problem to be Solved by the Invention) However, among the above methods, in the case of the method of spraying an asphalt emulsion or a synthetic resin emulsion, it takes a considerable amount of time for the water in the emulsion to evaporate and solidify, resulting in poor workability. Not only is this bad, but if it rains before the water evaporates and solidifies, the applied emulsion will be more likely to be washed away, and when it is washed away, the adhesion between the gravels will be weakened, and it will be difficult to pour the emulsion over the gravel. Since the emulsion is sprayed, the amount of spraying is not equal, resulting in uneven adhesion between the gravels.Furthermore, the emulsion freezes when the temperature drops below 0°C, making it unusable. . In addition, in the case of a method using an emulsion in which a slow-acting coagulant is added to the emulsion to be sprinkled on the gravel layer, the emulsion gradually thickens, so
When the emulsion is sprayed, it becomes difficult to penetrate between the gravel, making it impossible to penetrate evenly to the interface between the waterproof layer and the gravel layer. In addition, in the case of placing a mixed gravel material of gravel and emulsion, the decomposition agent is sprayed after the mixed gravel material is placed on the top surface of the waterproof layer, so the decomposition of the emulsion starts from the surface of the gravel material layer. Since it is difficult for the decomposing agent to penetrate evenly to the lower layer of the gravel material layer, there are problems such as the inability to form a uniform protective layer on the waterproof layer.

本発明は、かかる問題点を解消し、防水層の上面に形成
された保護層えの砂利層の砂利を容易にかつ確実に固着
する方法を提供することを目的とする。
SUMMARY OF THE INVENTION An object of the present invention is to solve such problems and provide a method for easily and reliably fixing gravel in a protective gravel layer formed on the upper surface of a waterproof layer.

(課題を解決するための手段) 本発明者らは、前記目的を達成する防水層保護層え砂利
の固定方法について鋭意検討の結果、砂利層にエマルジ
ョンを散布し、固化させる代わりに砂利層の上面にアス
ファルトシートを載置し、これを加熱、溶融させること
によって砂利を相互に固着させることが出来るというこ
とを知見した。
(Means for Solving the Problems) As a result of intensive study on a method of fixing gravel in a waterproof layer protective layer to achieve the above object, the present inventors discovered that instead of spraying an emulsion on the gravel layer and solidifying it, the gravel layer was fixed. It was discovered that by placing an asphalt sheet on the top surface and heating and melting it, the gravel could be made to adhere to each other.

本発明は、前記知見に基づいてなされたものであって、
本発明の防水層保護層え砂利の固定方法は、防水層の上
面に粒径5〜15mmの砂利で砂利層を形成し、該砂利
層上にアスファルト材から成るシートを載置した後、該
シートを加熱、溶出させてアスファルト材、を砂利層の
砂利間に浸透させ、砂利層の砂利を相互に固着させるこ
とを特徴とする。
The present invention has been made based on the above findings, and includes:
The method of fixing gravel in the waterproof layer protective layer of the present invention involves forming a gravel layer on the upper surface of the waterproof layer using gravel with a grain size of 5 to 15 mm, placing a sheet of asphalt material on the gravel layer, and then The sheet is heated and eluted to infiltrate the asphalt material between the gravel in the gravel layer, thereby making the gravel in the gravel layer stick to each other.

また、所定厚さの砂利層を得るためにアスファルト材で
砂利を固定された砂利層の上面に粒径5〜15m−の砂
利で新たな砂利層を形成し、該砂利層上にアスファルト
材から成るシートを載置した後、該シートを加熱、溶融
させてアスファルト材を新たに形成された砂利層の砂利
間に浸透させ、新たに形成された砂利層の砂利並びに両
砂利層を相互に固着させてもよい。
In addition, in order to obtain a gravel layer of a predetermined thickness, a new gravel layer is formed using gravel with a particle size of 5 to 15 m on the top surface of the gravel layer where gravel is fixed with asphalt material, and on top of the gravel layer, asphalt material is applied. After placing the sheet, the sheet is heated and melted to infiltrate the asphalt material between the gravels in the newly formed gravel layer, thereby fixing the gravel in the newly formed gravel layer and both gravel layers to each other. You may let them.

砂利層の厚さは砂利層上に載置したアスファルト材を砂
利層の砂利間に均一に浸透させること等を考慮すると1
回当り15mm前後とする。
The thickness of the gravel layer is 1, considering that the asphalt material placed on the gravel layer should evenly penetrate between the gravel in the gravel layer.
It should be around 15mm per turn.

本発明で用いる砂利としては、河川から採取された玉砂
利、安山岩等の原石を粗砕して得られた砕石砂利等が挙
げられる。また、砂利の径を5〜15 asとしたのは
、砂利径が5 amより小さいと砂利全体の総表面積が
増大するので使用するアスファルト材が多量となるばか
りではな(、アスファルト材を加熱、溶解させて砂利間
を浸透させて防水層と砂利層の界面まで到達させるのに
多量の熱エネルギーを必要とするため不経済であり、ま
た砂利径が151腸より大きいと砂利層の厚さを15■
鵬程度に形成するのに不適当である等の理由からである
Examples of the gravel used in the present invention include gravel collected from rivers, crushed stone gravel obtained by coarsely crushing raw stones such as andesite, and the like. In addition, the reason why the diameter of the gravel is set to 5 to 15 as is because if the diameter of the gravel is smaller than 5 am, the total surface area of the entire gravel increases, which not only requires a large amount of asphalt material to be used (but also by heating the asphalt material, It is uneconomical because it requires a large amount of thermal energy to melt and permeate between the gravels and reach the interface between the waterproof layer and the gravel layer.Also, if the gravel diameter is larger than 151 mm, the thickness of the gravel layer will be reduced. 15■
This is because it is unsuitable for forming at the same level as the peng.

砂利層に載置するアスファルト材としては、ストレート
アスファルト、混合アスファルト、ストレートアスファ
ルト或いは混合アスファルトに充填剤を添加したアスフ
ァルトコンパウンド、改質アスファルト、改質アスファ
ルトに充填剤を添加した改質アスファルトコンパウンド
等が挙げられる。
Asphalt materials placed on the gravel layer include straight asphalt, mixed asphalt, asphalt compound made by adding a filler to straight asphalt or mixed asphalt, modified asphalt, and modified asphalt compound made by adding filler to modified asphalt. Can be mentioned.

前記ストレートアスファルトとしては、一般には60〜
80.80〜100ストレートアスフアルト(月S K
 2207による)を用いる。
The straight asphalt is generally 60~
80.80~100 Straight Asphalt (Month SK
2207) is used.

また、混合アスファルトとしては、一般には60〜80
. 80〜100ストレ一トアスフアルト100mm部
に、10〜20.20〜30ブローンアスフアルト(月
S K 2207による)を5〜100重量部程度混合
したアスファルトを用いる。
In addition, mixed asphalt is generally 60 to 80
.. Asphalt is used in which about 5 to 100 parts by weight of 10 to 20.20 to 30 blown asphalt (according to SK 2207) is mixed with 100 mm parts of 80 to 100 straight asphalt.

また、改質アスファルトとしては、一般には100〜!
2[1、120〜150ストレートアスフアルト(JI
S K 2207による)に、該ストレートアスファル
トと相溶性のある液状ポリブタジェンゴム、液状クロロ
ブレンゴム等の低分子量の液状ゴム、スチレン・ブタジ
ェンΦスチレンゴム等の熱可塑性ゴム等の合成ゴム、該
ストレートアスファルトと相溶性のあるアタクチックポ
リプロピレン樹脂、エチレン・酢酸ビニル共重合体樹脂
、エチレン・エチルアクリレート共重合体樹脂等の合成
樹脂を単独、或いは2FIi類以上、該ストレートアス
ファルトioomm部に対して5〜2om m部程度添
加混合したアスファルトを用いる。
In addition, as modified asphalt, it is generally 100~!
2 [1, 120-150 straight asphalt (JI
S K 2207), liquid polybutadiene rubber that is compatible with the straight asphalt, low molecular weight liquid rubber such as liquid chloroprene rubber, synthetic rubber such as thermoplastic rubber such as styrene-butadiene Φ styrene rubber, etc. Synthetic resins such as atactic polypropylene resins, ethylene/vinyl acetate copolymer resins, ethylene/ethyl acrylate copolymer resins, etc., which are compatible with straight asphalt, are used alone, or 2FIi or higher, 5% for the ioomm portion of the straight asphalt. Use asphalt to which about 20 mm parts are added and mixed.

また、アスファルトコンパウンドとしては一般には前記
ストレートアスファルト、混合アスファルト、改質アス
ファルトに、タルク、珪砂、炭酸カルシウム等の無機質
充填剤を単独、或いは2種類以上、該アスファルト10
0 fflffk部に対して5〜30重量部重量部加混
合したアスファルトを用いる。
Further, as an asphalt compound, generally the above-mentioned straight asphalt, mixed asphalt, or modified asphalt is added with one or more inorganic fillers such as talc, silica sand, and calcium carbonate, and the asphalt 10
Asphalt is used in which 5 to 30 parts by weight are added to 0 fflffk parts.

まtこ、アスファルトシートは前;己アスファルト材を
常法に従ってシート状に成形すればよく、該シートの厚
さは砂利層を形成する砂利の大きさおよびm1アスフア
ルト材中のアスファルト含aQ等に応じ適宜選択すれば
よく一般には1.5〜2.5mm程度とする。また該ア
スファルト材シートはその両面に予め離型紙を積層して
おけば、該シートの保存中或いは運搬中にシートが互い
に付着することがなく、がっ現場施工の際は該M型紙を
剥がすだけで砂利層上に簡単に載置出来る。
As for the asphalt sheet, the asphalt material may be formed into a sheet according to the conventional method, and the thickness of the sheet depends on the size of the gravel forming the gravel layer and the asphalt content aQ in the m1 asphalt material. The thickness may be selected as appropriate, and is generally about 1.5 to 2.5 mm. In addition, if the asphalt material sheet is laminated with release paper on both sides in advance, the sheets will not stick to each other during storage or transportation, and when on-site construction, just peel off the M-pattern paper. It can be easily placed on a gravel layer.

前記アスファルト材の具体例は表1に示す通りである。Specific examples of the asphalt materials are shown in Table 1.

尚、表1に例示の各アスファルト材による砂利の同右状
態を調べるために、次のような実験を行った。
Incidentally, in order to investigate the same condition of gravel produced by each of the asphalt materials illustrated in Table 1, the following experiment was conducted.

大きさ100 X 100 X 15mmの鉄製型枠内
に砕石6号(粒度5〜13龍の砕石)の砂利をこてで圧
青しながら敷き詰めて厚さ15mmの砂利層を形成し、
次に砂利層の上面に表1に示す各アスファルト材から成
る大きさ100 X 100 m、m、厚さ2關のアス
ファルトシートを載置した後、夫々のアスファルトシ・
−トをプロパンガスバーナーで温度290℃に加熱して
アスファルト材を!a融させ、溶融したアスファルト材
を砂利間に浸透させ、自然冷却した。
A 15 mm thick gravel layer was formed by spreading gravel of No. 6 crushed stone (grain size 5 to 13 dragon crushed stone) while compacting it with a trowel in an iron formwork of size 100 x 100 x 15 mm.
Next, after placing an asphalt sheet of each asphalt material shown in Table 1 on the top of the gravel layer, the size of 100 x 100 m, and the thickness of 2 meters,
-Heat the asphalt material with a propane gas burner to a temperature of 290℃! The molten asphalt material was allowed to penetrate between the gravel and allowed to cool naturally.

このようにして得られたアスファルト材が^透した各砂
III層を夫々破壊して、砂利の固着状態を調べ、その
結果を表1に示した。
Each of the sand III layers through which the asphalt material thus obtained had penetrated was destroyed, and the adhesion state of the gravel was examined. The results are shown in Table 1.

表1 O・・・強固に固着 表1から明らかなように、各アスファルト材とも砂利を
砂利層の上側から下ωIノに亘って強固1こ固着するこ
とが警賓二召された。
Table 1 O: Firmly fixed As is clear from Table 1, each asphalt material was required to firmly fix gravel from the upper side of the gravel layer to the lower ωI.

(実施例) 次に本発明の具体的実施例について説明する。(Example) Next, specific examples of the present invention will be described.

図面は本発明方法の1実施例によって防水層の上面に保
護押え砂利層を設ける過程を示す説明図である。
The drawings are explanatory diagrams showing the process of providing a protective gravel layer on the upper surface of a waterproof layer according to an embodiment of the method of the present invention.

実施例1 大きさ1メートル平方のコンクリート板1の上面にゴム
化アスファルト材から成る厚さ4關の防水シートをアス
ファルトで貼着して防水層2を形成した。次に防水層2
の上面に砕石6号(粒度5〜13m5の砕石)の砂利3
をこてで圧着しながら敷き詰めて厚さ151I11の砂
利層4を形成した。続いて砂利層4の上面に60〜8o
ストレートアスフアルト(JIS K 2207)44
5から成る大きさ1メートル平方、厚さ2 mmのアス
ファルトシート6を載置した後、アスファルトシート6
をプロパンガスバーナー7で温度290 ’Cに加熱し
てアスファルト材5を溶融させ、溶融したアスファルト
材5を砂利3間に浸透させた後、自然冷却した。次いで
特に図示しないが砂利3が固着された砂利層4の上面に
、再度前記砕石6号の砂利を敷き詰めて厚さ15關の新
たな砂利層を形成し、該砂利層の上面に新たな前記アス
ファルトシートを載置した後、該アスファルトシートを
プロパンガスバーナーで加熱、溶融し、溶融アスファル
ト材を新たに形成された砂利層の砂利181に浸透させ
た後、自然冷却して防水層の上面に厚さ3f)+m (
厚さ15■■の砂利層が2層)の保護押え砂利層を設け
た。
Example 1 A waterproof layer 2 was formed by asphalting a waterproof sheet made of rubberized asphalt material and having a thickness of 4 mm on the upper surface of a concrete plate 1 having a size of 1 meter square. Next, waterproof layer 2
Gravel 3 of crushed stone No. 6 (crushed stone with particle size 5 to 13 m5) on the top surface
A gravel layer 4 having a thickness of 151I11 was formed by spreading the gravel while pressing it with a trowel. Next, 60~8o on the top surface of gravel layer 4.
Straight asphalt (JIS K 2207) 44
After placing the asphalt sheet 6 of 1 meter square and 2 mm thick consisting of the asphalt sheet 6
was heated to a temperature of 290'C with a propane gas burner 7 to melt the asphalt material 5, and the molten asphalt material 5 was infiltrated between the gravels 3, and then allowed to cool naturally. Next, although not particularly shown, on the top surface of the gravel layer 4 to which the gravel 3 was fixed, the crushed gravel No. 6 is again spread to form a new gravel layer with a thickness of 15 mm, and a new gravel layer 4 is placed on the top surface of the gravel layer. After the asphalt sheet is placed, the asphalt sheet is heated and melted with a propane gas burner, and the molten asphalt material is infiltrated into the gravel 181 of the newly formed gravel layer, and then naturally cooled and applied to the upper surface of the waterproof layer. Thickness 3f) + m (
A protective holding gravel layer (2 layers of gravel with a thickness of 15 mm) was provided.

実施例2 砂利層の上面に載置するアスファルトシート6を厚さ1
.5−園の60〜80ストレ一トアスフアルト50mf
f1部と10〜20ブローンアスフアルト(」ISK 
2207)5Offim部とから成る混合アスファルト
シートとし、砂利層の施工を3回とした以外は実施例1
と同様の方法で防水層の上面に厚さ45++++s(厚
さ15i+mの砂利層が3層)の保護押え砂利層を設け
た。
Example 2 The asphalt sheet 6 placed on the top surface of the gravel layer has a thickness of 1
.. 5- Garden's 60-80 Straight Asphalt 50mf
f1 part and 10-20 blown asphalt ("ISK
2207) Example 1 except that the mixed asphalt sheet consisted of 5Offim parts and the gravel layer was applied three times.
A protective gravel layer with a thickness of 45 + + + s (3 layers of gravel with a thickness of 15 i + m) was provided on the upper surface of the waterproof layer in the same manner as above.

実施例3 砂利層の上面に載置するアスファルトシート6を厚さ2
,5層層の80〜8oストレ一トアスフアルト7帽1部
にタルク30ffi ffi部を添加し混合したアスフ
ァルトシートとした以外は実施例1と同様の方法で防水
層の上面に厚さ3o龍(厚さ15mmの砂利層が2層)
の保護押え砂利層を設けた。
Example 3 The asphalt sheet 6 placed on the top surface of the gravel layer has a thickness of 2
An asphalt sheet with a thickness of 3° (3°) on the upper surface of the waterproof layer was prepared in the same manner as in Example 1, except that 30 parts of talc was added to 7 parts of 5-layer 80-8o straight asphalt and mixed. (2 layers of gravel 15mm thick)
A protective gravel layer was provided.

そして実施例1〜3の各保護押え砂利層を破墳して観察
したところ、いずれも砂利層の砂利はアスファルト材に
よってその上側がら下側に亘って相互に強固に固着され
ていた。
When each of the protective gravel layers of Examples 1 to 3 was demolished and observed, it was found that the gravel in each gravel layer was firmly fixed to each other by the asphalt material from the upper side to the lower side.

(9!明の効!A) このように本発明によるときは、防水層の上面に形成さ
れた粒径5〜15龍の砂利がら成る厚さ15關前後の砂
利層の上にアスファルト材から成るシートを載置し、該
シートを加熱、溶融し、アスファルト材を砂利層の砂利
間に浸透させてアスファルト材で砂利を固着するように
したので、防水層の上面に形成された保護押え砂利を容
易にかつ確実に固着することが出来るため、施工中の降
雨に影舌されることがなく、また気温が0℃以下という
悪条件下でも施工することが出来るから防水層の上面へ
の保護押え砂利層の施工作業性がよい等の効果がある。
(9! Bright effect! A) In this way, according to the present invention, asphalt material is applied on top of the gravel layer with a thickness of about 15 cm consisting of gravel with a grain size of 5 to 15 mm formed on the upper surface of the waterproof layer. The sheet was heated and melted, and the asphalt material was infiltrated between the gravels in the gravel layer to fix the gravel with the asphalt material, so that the protective gravel formed on the top surface of the waterproof layer Because it can be easily and reliably fixed, it will not be affected by rainfall during construction, and it can be installed even under adverse conditions with temperatures below 0°C, providing protection to the top surface of the waterproof layer. It has the effect of improving the workability of the pressing gravel layer.

【図面の簡単な説明】[Brief explanation of the drawing]

図面は本発明方法の1実施例によって防水層の上面に保
護用砂利層を設ける過程を示す説明図である。 1・・・コンクリート板 2・・・防水層 3・・・砂利 4・・・砂利層 5・・・アスファルト材(シートを溶融したもの)6・
・・シート
The drawings are explanatory diagrams showing the process of providing a protective gravel layer on the upper surface of a waterproof layer according to an embodiment of the method of the present invention. 1... Concrete plate 2... Waterproof layer 3... Gravel 4... Gravel layer 5... Asphalt material (melted sheet) 6.
・・Sheet

Claims (1)

【特許請求の範囲】 1、防水層の上面に粒径5〜15mmの砂利で砂利層を
形成し、該砂利層上にアスファルト材から成るシートを
載置した後、該シートを加熱、溶融させてアスファルト
材を砂利層の砂利間に浸透させ、砂利層の砂利を相互に
固着させることを特徴とする防水層保護押え砂利の固定
方法。 2、アスファルト材で砂利を固定された砂利層の上面に
、粒径5〜15mmの砂利で新たな砂利層を形成し、該
砂利層上にアスファルト材から成るシートを載置した後
、該シートを加熱、溶融させてアスファルト材を新たに
形成された砂利層の砂利間に浸透させ、新たに形成され
た砂利層の砂利並びに両砂利層を相互に固着させること
を特徴とする請求項1に記載の防水層保護押え砂利の固
定方法。 3、砂利層は厚さ15mm前後に形成することを特徴と
する請求項1または2に記載の防水層保護押え砂利の固
定方法。
[Claims] 1. A gravel layer is formed on the upper surface of the waterproof layer using gravel with a grain size of 5 to 15 mm, and a sheet made of asphalt material is placed on the gravel layer, and then the sheet is heated and melted. A method for fixing gravel for protecting a waterproof layer, which is characterized by infiltrating asphalt material between the gravels in a gravel layer and fixing the gravels in the gravel layer to each other. 2. Form a new gravel layer with gravel with a grain size of 5 to 15 mm on the top surface of the gravel layer where gravel is fixed with asphalt material, place a sheet made of asphalt material on the gravel layer, and then Claim 1, characterized in that the asphalt material is heated and melted to infiltrate between the gravels of the newly formed gravel layer, thereby fixing the gravel of the newly formed gravel layer and both gravel layers to each other. The method for fixing the waterproof layer protection gravel described. 3. The method of fixing gravel for protecting a waterproof layer according to claim 1 or 2, wherein the gravel layer is formed to have a thickness of about 15 mm.
JP1844989A 1989-01-27 1989-01-27 Waterproof layer protection foot Fixing method of gravel Expired - Fee Related JPH0663324B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1844989A JPH0663324B2 (en) 1989-01-27 1989-01-27 Waterproof layer protection foot Fixing method of gravel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1844989A JPH0663324B2 (en) 1989-01-27 1989-01-27 Waterproof layer protection foot Fixing method of gravel

Publications (2)

Publication Number Publication Date
JPH02200950A true JPH02200950A (en) 1990-08-09
JPH0663324B2 JPH0663324B2 (en) 1994-08-22

Family

ID=11971935

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1844989A Expired - Fee Related JPH0663324B2 (en) 1989-01-27 1989-01-27 Waterproof layer protection foot Fixing method of gravel

Country Status (1)

Country Link
JP (1) JPH0663324B2 (en)

Also Published As

Publication number Publication date
JPH0663324B2 (en) 1994-08-22

Similar Documents

Publication Publication Date Title
JP4790698B2 (en) 3D reverse tanking membrane
US4357377A (en) Thermal insulating and bituminous waterproofing board and application process thereof
CA2118183C (en) Waterproofing membrane
CN101481931B (en) Sticking modified asphalt waterproof coiled material and adhesive, as well as preparation method and application thereof
CN106183268A (en) A kind of pre-laying water-proof coiled material of self-adhesion macromolecule and preparation method thereof
US4518548A (en) Method of overlaying sulphur concrete on horizontal and vertical surfaces
US5453313A (en) Elastomeric polysulfide composites and method
JP2009293326A (en) Heat insulating granule, artificial turf, heat insulating granule manufacturing method and artificial turf manufacturing method
US20170167085A1 (en) Patch and method for repairing asphalt pavement
KR20170033591A (en) Paving method having reflective cracking resistance and water resistance
CN102182253A (en) Manufacturing method of rubber and chemical fiber synthetic waterproof sheet and product thereof
US5028487A (en) Primerless waterproofing laminates
KR100605003B1 (en) A road repairing composit and tape using it and manufacturing method thereof
EP0483995A1 (en) Waterproofing material
CA3081111A1 (en) Pre-applied membrane having granular polymer outer protective layer
KR101998820B1 (en) Complex waterproof structure for concrete slab and construction method thereof
CN107245248A (en) A kind of environment-friendly hot-melt type does not glue tire sticking layer oil and preparation method thereof
JPH02200950A (en) Fixing method of waterproof layer protection presser gravel
DK2873700T3 (en) Sealing tape and method for making such a sealing tape
CN217027534U (en) Novel pre-paved waterproof coiled material and waterproof heat-insulation integrated board
CN201620354U (en) Multilayer composite self-adhesive waterproof coiled material
CN114525084A (en) Double-base pre-paved enhanced waterproof roll and construction method thereof
KR20180020795A (en) Waterproof agent compound and method for forming the same
US5122009A (en) Highway structure sealing complex and process for its application
JP2005016268A (en) Recycled asphalt mixture preservable at room temperature and its manufacturing method

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees