JPH02180133A - Apparatus for processing sheaf of paper - Google Patents

Apparatus for processing sheaf of paper

Info

Publication number
JPH02180133A
JPH02180133A JP63329953A JP32995388A JPH02180133A JP H02180133 A JPH02180133 A JP H02180133A JP 63329953 A JP63329953 A JP 63329953A JP 32995388 A JP32995388 A JP 32995388A JP H02180133 A JPH02180133 A JP H02180133A
Authority
JP
Japan
Prior art keywords
bundle
section
strap
sheaf
band
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP63329953A
Other languages
Japanese (ja)
Inventor
Hitoshi Takahashi
均 高橋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Original Assignee
Toshiba Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Corp filed Critical Toshiba Corp
Priority to JP63329953A priority Critical patent/JPH02180133A/en
Publication of JPH02180133A publication Critical patent/JPH02180133A/en
Pending legal-status Critical Current

Links

Abstract

PURPOSE:To always remove a wide strap completely from a sheaf of papers by carrying a optical number of sheaves of papers bound with straps by a conveying means, cutting off the strap around the sheaf by a cutting means and rolling in the cut pieces by the frictional forces of strap removal parts to be carried off from the conveying line. CONSTITUTION:When a sheaf of papers T moves in a cutting position, a wide strap K thereon is cut off by a cutter 66 and then picked up by a catcher 67 for removal therefrom. Even if the catcher 67 fails to remove the strap K wholly from the sheaf, the sheaf T with the remaining cut pieces K' is allowed to move on to a first strap removal part 121 in order for the cut pieces to be rolled therein by the frictional and rolling forces of rollers 126a and 126b, from which it is sent by the discharging action of the first strap removal part via the outer periphery of a third strap removal roller 133 into a wide strap holding set 69. In doing so, the sheaf T is deprived completely of the strap K and separated into the ten collections of papers to be rebound. If the first strap removal part 121 fails to roll in the remaining cut pieces K', the sheaf T is sent as such to a second strap removal part 122.

Description

【発明の詳細な説明】 [発明の目的] (産業上の利用分野) 本発明は、銀行券等の紙葉類を一枚ずつの状態にし、こ
れらを鑑査処理した後分類する紙葉類鑑査システムに用
いられる紙葉類束処理装置に関する。
[Detailed Description of the Invention] [Objective of the Invention] (Industrial Application Field) The present invention is a paper sheet inspection method in which paper sheets such as banknotes are separated into individual sheets, inspected, and then classified. The present invention relates to a paper sheet bundle processing device used in the system.

(従来の技術) この種の装置としては被検査物体例えば銀行券を順次1
枚ずつ取出して真偽、正損等につき検査するものが提供
されている。この装置は一般に銀行券をパラで受は付け
るものではなく施封帯によって結束されているものを受
は付けるようになっている。例えば、小帯k(施封帯)
によって100枚づつ施封されたちの(把)を10把ず
つ大帯K(施封帯)にて結束されたもの、すなわち束T
が受は付けられる。
(Prior art) In this type of device, an object to be inspected, for example, a banknote, is
There is a device that takes out each sheet and inspects it for authenticity, integrity, etc. This device generally does not accept banknotes in parallel, but rather accepts banknotes bound together with a band. For example, frenulum k (sealed band)
A bundle of 100 sheets each bound with a large obi K (sealing belt), that is, a bundle T
is accepted.

従って、装置内では上記大帯に、小帯kを切断して順次
銀行券が取り出されるようになっており、この後、種々
の処理が行われる。
Therefore, in the apparatus, the banknotes are sequentially taken out by cutting the large band and the small band k, and thereafter various processes are performed.

ところで、従来装置においては、大帯の切断及び除去す
る手段として、第11図(a)、(b>。
By the way, in the conventional apparatus, as a means for cutting and removing a large band, the method shown in FIGS.

(C)に示す手段が知られている。The means shown in (C) is known.

すなわち、この切断除去手段は、束Tの外周を施封する
大帯Kをカッタ200により切断すると共に、切断され
た大幅Kを、第11図(b)に示すようにヒンジ状で、
摩擦係数が大きい部材により形成したキャッチャ201
で把持し、このキャッチャ201を束Tの搬送領域外へ
運ぶようになつている。この結果、原則的には第11図
(C)に示すように束Tの外周から大帯Kを除去するこ
とができる。
That is, this cutting/removing means uses a cutter 200 to cut the large band K that seals the outer periphery of the bundle T, and also cuts the large band K that has been cut into a hinge shape as shown in FIG. 11(b).
Catcher 201 formed of a member with a large friction coefficient
The catcher 201 is grasped by the handler 201 and carried outside the bundle T transport area. As a result, in principle, the large belt K can be removed from the outer periphery of the bundle T, as shown in FIG. 11(C).

しかし、束Tに対する大帯にの施封状態は、第12図(
a>、(b)、(c)、(d)に示tにうに種々の形態
がおり、例えば第13図(a)に示すように二重巻の大
帯Kをカッタ200で切断した後、第13図(b)に示
すようにキャッチャ201により大帯Kを把持して除去
しても、第13図(C)に示すように大帯にの一部に′
が束Tの外周に残存し、この結果、この後に行われる吊
帯にの除去処理に支障か生じるという問題があった。
However, the state of sealing the large belt for the bundle T is as shown in Fig. 12 (
There are various forms as shown in a>, (b), (c), and (d).For example, as shown in FIG. Even if the large belt K is grasped and removed by the catcher 201 as shown in FIG. 13(b), a part of the large belt K is removed as shown in FIG.
remains on the outer periphery of the bundle T, and as a result, there is a problem in that it interferes with the subsequent removal process from the sling.

(発明が解決しようとする課題) 本発明は上記事情に鑑みてなされたものであり、常に大
帯を完全に除去できこの装置の円滑な稼動に寄与し得る
紙葉類束処理装量を提供することを目的とするものであ
る。
(Problems to be Solved by the Invention) The present invention has been made in view of the above circumstances, and provides a paper sheet bundle processing capacity that can always completely remove large sheets and contribute to the smooth operation of this device. The purpose is to

[発明の構成] (課題を解決するための手段) 本発明の紙葉類束処理装@は、外周が帯により施封され
た任意数の紙葉類を搬送する搬送手段と、前記紙葉類の
搬送領域に臨ませて配置され搬送手段により搬送される
紙葉類外周の帯を切断する切断手段と、この切断手段に
より切断された紙葉類外周の帯を摩擦力により巻込んで
排出処理する帯排出処理手段とを有するものでおる。
[Structure of the Invention] (Means for Solving the Problems) The paper sheet bundle processing device@ of the present invention includes a conveying means for conveying an arbitrary number of paper sheets whose outer periphery is sealed with a band, A cutting means is arranged facing the conveying area of the paper sheets and cuts the outer circumferential band of the paper sheets conveyed by the conveying means, and the outer circumferential band of the paper sheets cut by the cutting means is rolled up by frictional force and discharged. and band discharge processing means for processing.

く作 用) 以下に上記構成の装置の作用を説明する。(for Kusaku) The operation of the apparatus having the above configuration will be explained below.

搬送手段により帯で施封された任意数の紙葉類が搬送さ
れ、切断手段の位置に至ると、切断手段は紙葉類外周の
帯を切断する。切断された前記帯は、帯排出処理手段の
摩擦力により巻込まれて、紙葉類の搬送領域外へ排出さ
れる。
An arbitrary number of paper sheets wrapped in a band are transported by the transport means, and when they reach the position of the cutting means, the cutting means cuts the band around the outer periphery of the paper sheets. The cut band is wound up by the frictional force of the band discharge processing means and is discharged out of the sheet conveyance area.

(実施例) 以下、本発明の実施例を詳細に説明する。(Example) Examples of the present invention will be described in detail below.

第1図は装置の全体を示すもので、図中2は束処理機で
ある。この束処理機2には束搬送機としてのコンベア3
を介して鑑査処理手段を構成する鑑査機5及び本実施例
装置を構成する前処理償4が複数台接続されており、こ
れらの構成装置及び後)ホする排除#処理機6は制御手
段たる集中制御卓1により集中制御されるようになって
いる。
FIG. 1 shows the entire apparatus, and numeral 2 in the figure is a bundle processing machine. This bundle processing machine 2 includes a conveyor 3 as a bundle conveying machine.
A plurality of inspection machines 5 constituting the inspection processing means and a plurality of pre-processing units 4 constituting the device of this embodiment are connected via the It is designed to be centrally controlled by a central control console 1.

前記束処理關2は第2図及び第8図に示すように、未鑑
査束の投入台としての未鑑査束投入台8゜束取出部19
,10把計数部10a、10b、投入束排除部11.受
入束排除部12.押印集積部13、鑑査済束の収集部と
しての鑑査済束受入台14、券種確認部55A、55B
、操作表示パネル15等を有して構成されている。
As shown in FIGS. 2 and 8, the bundle processing unit 2 includes an uninspected bundle loading table 8 and a bundle take-out unit 19, as shown in FIGS. 2 and 8.
, 10 bundle counting units 10a, 10b, input bundle removal unit 11. Accepted bundle removal section 12. Seal accumulating section 13, inspected bundle receiving table 14 as a collecting section for inspected bundles, and bill type confirmation sections 55A and 55B.
, an operation display panel 15, and the like.

前記コンベア3は、第3図、第4図に示すように、束処
理渫2の束搬送コンベア32から搬出される束Tをバッ
ファコンベア49上で受取るようになっている。このバ
ッフ1コンベア49上の束Tは束停止壁50により停止
する。この束停止壁50により2個の束Tが貯められる
ようになっている。この場合、2束目の束Tは1束目の
束Tの後端に当接し停止することになる。尚、本実施例
では、貯める束数は2束でおるが、2束に限定されるも
のではなく任意束数とすることも勿論可能である。
As shown in FIGS. 3 and 4, the conveyor 3 receives the bundle T carried out from the bundle conveyor 32 of the bundle processing bank 2 on a buffer conveyor 49. The bundle T on this buffer 1 conveyor 49 is stopped by a bundle stopping wall 50. This bundle stopping wall 50 allows two bundles T to be stored. In this case, the second bundle T comes into contact with the rear end of the first bundle T and stops. In this embodiment, the number of bundles to be stored is two, but the number is not limited to two and it is of course possible to store any number of bundles.

次に、集中制御卓1からの制御信号により、投入束押込
板51が動作し、1束ずつ束下を投入束コンベア35上
に押し出す。この場合、2束目の束Tは前記1束目の押
込動作中は投入束押込仮51の側壁に規制され、投入束
押込板51が初期位置へ戻ることにより、2束目の束が
束停止壁50方向へ動き、当該束停止壁50によりこの
束Tが停止され、前記投入束押込板51は次の動作に備
える。束検出器41必るいは52の検出信号により、束
処理機2の東押出しアーム31を動作させて束Tを投入
する。投入束コンベア35には前処連敗4側から束プラ
ンジャ(後述する)が投入束コンベア35上に進入して
束Tを前処理別4内へ受入れる。
Next, the input bundle pushing plate 51 is operated by a control signal from the central control console 1, and the lower part of the bundle is pushed onto the input bundle conveyor 35 one bundle at a time. In this case, the second bundle T is regulated by the side wall of the input bundle pusher 51 during the pushing operation of the first bundle, and when the input bundle pusher plate 51 returns to the initial position, the second bundle T is pushed into the bundle. The bundle T moves toward the stop wall 50, and the bundle T is stopped by the bundle stop wall 50, and the input bundle pushing plate 51 prepares for the next operation. Based on the detection signal from the bundle detector 41 or 52, the east pushing arm 31 of the bundle processing machine 2 is operated to feed the bundle T. A bundle plunger (described later) enters the input bundle conveyor 35 from the side of the pretreatment consecutive failure 4 and receives the bundle T into the pretreatment separate 4.

ところで、本実施例では投入束コンベア35の末端手前
に検出器を設けている。この検出器の信号により、束プ
ランジャで投入コンベア35上の束子を取り損ねたと判
断した際には、当該束Tは投入コンベア35の末端に設
けられた収納部としての排除N(図示しない)に集積さ
れるようにしている。これにより、仮に末端の前処理機
4が束Tを取り損ねた場合にもこの前処理機4の受入れ
部分に束Tが滞留せず、この前処理は4の動作に支障が
生じることはない。
By the way, in this embodiment, a detector is provided before the end of the input bundle conveyor 35. Based on the signal from this detector, when it is determined that the bundle plunger has failed to remove a bundle on the input conveyor 35, the bundle T is placed in a storage section N (not shown) provided at the end of the input conveyor 35. I am trying to accumulate them. As a result, even if the terminal pre-processing machine 4 fails to take out the bundle T, the bundle T will not remain in the receiving part of this pre-processing machine 4, and this pre-processing will not interfere with the operation of 4. .

ここで、前処理機4を経て鑑査FA5から後段側の処理
について概略を説明すると、詳細を後述する鑑査機5か
ら排出された鑑査溝の束T′は受入束コンベア36上に
渡され搬送される。受入束コンベア36の搬送末端には
受入束押込板53が設けられ、搬送されてきた束T′を
受は取り検出器54の信号を基にして束処理機2の束搬
送コンベア42上に渡されるようにしている。
Here, to briefly explain the process from the inspection FA5 through the pre-processing machine 4, the inspection groove bundle T' discharged from the inspection machine 5, which will be described in detail later, is passed onto the receiving bundle conveyor 36 and conveyed. Ru. A receiving bundle pushing plate 53 is provided at the conveying end of the receiving bundle conveyor 36, which takes the transported bundle T' and passes it onto the bundle conveyor 42 of the bundle processing machine 2 based on the signal from the detector 54. I'm trying to make it happen.

前記コンベア3を構成する投入束コンベア35及び受入
れ束コンベア36は第4図に示すようになっている。す
なわち、筐体55内に設けられ、この筐体55の一側面
には束T、T’ を出入させる開閉カバー56.57が
設けられている。また、前記筐体51内には束処理別2
及び鑑査殿5の排熱を集める排気ダクト58が設けられ
ていると共に、束処理機2と鑑査v35とを接続する信
号ケーブル59.電源ケーブル60等が配設されている
The input bundle conveyor 35 and the receiving bundle conveyor 36 constituting the conveyor 3 are shown in FIG. That is, the opening/closing covers 56 and 57 are provided inside the housing 55, and on one side of the housing 55, the opening/closing covers 56 and 57 allow the bundles T and T' to enter and exit. Further, in the housing 51, there is a separate bundle processing unit 2.
An exhaust duct 58 is provided to collect waste heat from the inspection hall 5, and a signal cable 59 is provided to connect the bundle processing machine 2 and the inspection v35. A power cable 60 and the like are provided.

次に、前記前処理機4内における紙葉類の束の処理状態
を、第5図に示す概略図に基づいて説明する。
Next, the processing state of a bundle of paper sheets in the preprocessing machine 4 will be explained based on the schematic diagram shown in FIG.

前述した投入束コンベア35上を搬送された束Tが、前
処理機4の投入口近傍において確認されると、シャッタ
61が開き、このとき束Tは投入束コンベア35により
駆動され所定の取り込み位置(A>まで搬送される。こ
の取り込み位置で束搬送手段としての東プランジャ62
が駆動して束Tを装置内に取り込むと共に、束Tはこの
昇降可能なサイドストッパ(図示しない)に到達する位
置(B>まで移送され停止する。このとき、サイドスト
ッパまで移送された束Tを結束している大帯Kには、大
帯連番プリンタ63により紙葉類との関連を示す連番が
押印されるようになっている。
When the bundle T conveyed on the input bundle conveyor 35 mentioned above is confirmed near the input port of the preprocessing machine 4, the shutter 61 opens, and at this time, the bundle T is driven by the input bundle conveyor 35 to a predetermined take-in position. (A>. At this take-in position, the east plunger 62 as a bundle conveying means
is driven to take the bundle T into the device, and the bundle T is transported to a position (B> where it reaches this liftable side stopper (not shown) and stopped. At this time, the bundle T that has been transported to the side stopper The large obi K that binds the paper sheets is stamped with a serial number indicating the relationship with the paper sheets by a large obi serial number printer 63.

この状態で、上述したサイドストッパが下降して束Tの
当接状態が解放されると、前記束プランジャ62が再び
駆動し、束Tが切断位置(C)まで移送されるや、この
束Tに対して、切断位置(C)に配置された切断手段と
してのカッタ66による大帯にの切断処理及び帯排出処
理手段120による大帯の排出処理が行われるようにな
っている。
In this state, when the above-mentioned side stopper is lowered to release the abutting state of the bundle T, the bundle plunger 62 is driven again and the bundle T is transferred to the cutting position (C). On the other hand, the cutter 66 serving as a cutting means disposed at the cutting position (C) performs a cutting process into a large band, and the band discharging process means 120 performs a process of discharging the large band.

ここで、帯排出処理手段120について、第6図を参照
して詳)ホする。
Here, details regarding the band discharge processing means 120 will be explained with reference to FIG.

この帯排出処理手段120は、前記束Tの搬送路におけ
るカッタ66の位置よりもやや大帯連番プリンタ63側
に配置された従来例と同様なキャッチャ67と、前記末
子の搬送路に6けるキャッチャ66の位置よりも後段に
配置された第1.第2の帯巻込排出部121,122と
、この第1゜第2の帯巻込排出部121,122の下方
に設置された大帯保管カセット69と、前記束Tの上側
をガイドするローラ123、平板124を有するガイド
部125とを具備している。
This belt discharge processing means 120 includes a catcher 67 similar to the conventional example, which is arranged slightly closer to the large belt serial number printer 63 than the position of the cutter 66 in the conveyance path of the bundle T, and a catcher 67 arranged in the conveyance path of the youngest child. The first . A second belt winding discharge section 121, 122, a large belt storage cassette 69 installed below the first and second belt winding discharge sections 121, 122, and a roller that guides the upper side of the bundle T. 123 and a guide portion 125 having a flat plate 124.

第7の帯巻込排出部121は、束Tの搬送路に臨ませた
一対の摩涼係数の大きい部材で形成した巻込ローラ12
6a、126bと、この両巻込ローラ126a、126
bを第7図に示す矢印方向に駆動する合計3個の駆動ロ
ーラ127,128゜129と、これら各ローラ126
a、126b。
The seventh band winding and discharging section 121 includes a winding roller 12 formed of a pair of members having a large coefficient of friction and facing the conveyance path of the bundle T.
6a, 126b, and both winding rollers 126a, 126
A total of three driving rollers 127, 128° 129 that drive the roller b in the direction of the arrow shown in FIG. 7, and each of these rollers 126
a, 126b.

127乃至129に張設された第1の巻込用ベルト13
0とにより、第1の帯巻込部を41成している。
The first winding belt 13 stretched between 127 and 129
0 constitutes the first band winding part 41.

また、前記駆動ローラ12つと同心配置の第1の排出ロ
ーラ131.第2の排出ローラ132゜第3の排出ロー
ラ133.これら各排出ローラ131乃至133に張設
した第1の排出ベルト134により第1の帯排出部を構
成している。
In addition, a first discharge roller 131 is arranged concentrically with the 12 drive rollers. Second ejection roller 132° Third ejection roller 133. A first ejection belt 134 stretched around each of these ejection rollers 131 to 133 constitutes a first belt ejection section.

前記各ローラ’126a、126b、127乃至129
.131乃至133は、固定フレーム135によりそれ
ぞれ回転可能に支持されている。
Each of the rollers '126a, 126b, 127 to 129
.. 131 to 133 are rotatably supported by a fixed frame 135, respectively.

また、第1の帯巻込部、第1の帯排出部はそれぞれ図示
しない駆動モータにより第7図に示す矢印方向に駆動さ
れるようになっている。
Further, the first band winding section and the first band discharging section are each driven in the direction of the arrow shown in FIG. 7 by a drive motor (not shown).

前記第2の帯巻込排出部122は、前記固定フレーム1
35に隣接配置の垂直固定フレーム136と、この垂直
固定フレーム136の上端部に設けた支軸137により
回動可能に支持された回動フレーム138とを具備して
いる。
The second band winding discharge section 122 is connected to the fixed frame 1.
35, and a rotating frame 138 rotatably supported by a support shaft 137 provided at the upper end of the vertical fixed frame 136.

この回動フレーム138には、前記東下の上側に対応す
る位置に臨ませて配置した一対の摩擦係数の大きい部材
で形成した巻込ローラ139a。
The rotating frame 138 includes a pair of winding rollers 139a formed of a member having a large friction coefficient and arranged so as to face a position corresponding to the upper side of the east and lower sides.

139bと、回動フレーム138に配置したローラ14
0,141と、前記垂直固定フレーム136に配置した
ローラ142,143及び駆動ローラ144と、これら
各ローラ139a。
139b and the roller 14 arranged on the rotating frame 138.
0, 141, rollers 142, 143 and drive roller 144 disposed on the vertical fixed frame 136, and each of these rollers 139a.

139b、140,141,142,143゜144に
張設した第2の巻込用ベルト145とからなる第2の帯
巻込部が設けられている。また、前記ローラ141と同
心配置の第4の排出ローラ146と、前記第3の排出ロ
ーラ133の近傍に配置した第5の排出ローラ147と
、両排出ローラ146,147に張設した第2の排出ベ
ルト148とにより、第2の帯排出部を構成している。
139b, 140, 141, 142, 143° 144, and a second winding belt 145 is provided. Further, a fourth ejection roller 146 arranged concentrically with the roller 141, a fifth ejection roller 147 arranged near the third ejection roller 133, and a second ejection roller 147 stretched between both ejection rollers 146 and 147 are provided. The discharge belt 148 constitutes a second belt discharge section.

前記第2の帯巻込部及び第2の帯排出部は、図示しない
駆動モータによりそれぞれ第7図に示す矢印方向に駆動
されるようになっている。
The second band winding part and the second band discharge part are each driven in the direction of the arrow shown in FIG. 7 by a drive motor (not shown).

尚、第7図中、149,150a、150bはガイド部
材である。
In addition, in FIG. 7, 149, 150a, and 150b are guide members.

上述した帯排出処理手段120による大帯にの排出処理
については後に詳述する。
The large belt discharge process by the above-mentioned belt discharge processing means 120 will be described in detail later.

一方、大帯Kが分離除去された10個の施封把は、前に
搬送された束Tの10@の施封把の一把ずつの切出しが
完了するのを待って、その前に搬送された束Tの施封把
最後の切り出しが完了すると、細径動部70が第1の切
断位置(C)まで移動して停止し、次いで、前記東スト
ッパ65が上昇して、解封された10個の施封把の前記
束移動改64との挟持状態を解放し、さらに、この束移
動礪64と前記細径動部70とで再び解封された10個
の施封把を挾持して施封把切り出し位置(D>まで移送
する。
On the other hand, the 10 sealed bundles from which the large belt K has been separated and removed are transported after waiting for the completion of cutting out each batch of 10@ sealed bundles from the previously transported bundle T. When the final cutting of the sealed bundle T is completed, the narrow diameter moving part 70 moves to the first cutting position (C) and stops, and then the east stopper 65 rises to unseal the bundle T. The ten sealed grips are released from being held between the bundle moving part 64 and the bundle moving part 64 and the narrow-diameter moving part 70 again clamp the ten unsealed grips. and transport it to the sealing and cutting out position (D>).

前記細径動部70は、施封把切り出し位置(D)まで移
動すると、下降して施封把の下側を通って前記束径動機
65よりも第1の切断位置(C)側に戻ってから上昇し
、次に、再び施封把切り出し位置(D>側に移動して施
封把を押圧するようになっているものであり、また、前
記束移動敗64は、第1の切断位置(C)の処理を待つ
ように動作してなるものである。そして、施封把切り出
し位置(D)に移送された10個の施封把は、把ストッ
パ72で保持されながら切り出し部73により1把ずつ
切り出され、次いで、把送り込み部74により第2の切
断位置(E)まで1把ずつ移送されるもので、この第2
の切断位置(E)には、施封把に結束された小帯kを切
断処理する小帯カット部75が設けられている。
When the narrow diameter movable portion 70 moves to the bundle cutting position (D), it descends, passes under the binding clamp, and returns to the first cutting position (C) side relative to the bundle diameter mower 65. After that, the bundle moves up and then moves again to the sealing tab cutting position (D> side to press the sealing tab. The 10 sealed bundles transferred to the sealed bundle cutting position (D) are held by the clamp stopper 72 while being moved to the cutting section 73. is cut out one bundle at a time by
A frenulum cutting section 75 is provided at the cutting position (E) for cutting the frenulum k bound to the band.

小帯カット部75は、図示しない天井ベースの固定面に
施封把を上昇させて押圧挾持することにより位置決め保
持する把圧縮は構76と、この把圧縮機構76により保
持された施封把の小帯kを2つのカッタ77A、77B
により切断する第2の切断部77と、この第2の切断部
77により分離された紙葉類Tと小帯kを把圧縮機4a
76の下降状態で、後述する小帯にの扱き取り位置(F
)まで移送するブツシャ78と、このブツシャ78によ
り移送される紙葉類下の下面側に摩擦体79を介して当
接させた吊帯捲り部80と、この吊帯捲り部80で捲ら
れた小帯kを紙葉類から扱き取って紙葉類と小帯に分離
する第2の施封帯分離部114を構成するキャッチ81
と、このキャッチ81により扱き取られた小帯kを受け
とる施封帯搬送ベルト82とから構成されている。そし
て、この施封帯ベルト82で小帯kを吊帯保管カセット
の投入口に搬送し、かつ、この搬送された小帯に@施封
帯収納部83により、前記吊帯保管カセット84内に順
次収納するようになっている。
The frenulum cutting part 75 has a grip compression mechanism 76 that positions and holds the sealing grip by raising and pressing the grip onto a fixed surface of a ceiling base (not shown), and a grip compression mechanism 76 that holds the sealing grip held by the grip compression mechanism 76. Cut the frenulum k with two cutters 77A and 77B.
A second cutting section 77 that cuts the paper sheets T and a frenulum k separated by this second cutting section 77 is held and compressed by a compressor 4a.
76 in the lowered state, the frenulum handling position (F
), a sling winding part 80 which is brought into contact with the lower surface side of the paper sheet transferred by this busher 78 via a friction body 79, A catch 81 constituting the second band separating section 114 that handles the frenulum k from the paper sheets and separates the frenulum into the paper sheets and the frenulum.
and a band conveying belt 82 that receives the frenulum k handled by the catch 81. Then, the frenulum k is conveyed to the input port of the sling storage cassette by the band belt 82, and the transported frenulum is stored in the sling storage cassette 84 by the band storage section 83. It is designed to be stored sequentially.

方、前記小帯kが分離された100枚の券は、図示しな
い供給部により、取出しローラ85の下方に移送されて
、上側から1枚ずつ順に取り出されるようになっている
On the other hand, the 100 bills from which the frenulum k has been separated are transferred to the lower part of the take-out roller 85 by a supply section (not shown), and are taken out one by one from the upper side.

すなわち、上述した把送り込み部74により第2の切断
位置(E)まで1把ずつ移送された施封把の小帯kを切
断処理する小帯カット部75は第11図に示すように把
圧縮機構76の上昇により、施封把を装置本体の天井ベ
ースの固定面側に上昇させて押圧挾持することにより位
置決め保持し、これによって湾曲等の施封把を平らな状
態にして吊帯にの切断が無理なくできるようにしている
That is, the frenulum cutting section 75, which cuts the frenulum k of the sealed bundles transferred one by one to the second cutting position (E) by the above-mentioned bundle feeding section 74, compresses the frenulum k as shown in FIG. As the mechanism 76 rises, the sealing lug is raised to the fixed surface side of the ceiling base of the device main body, and is held in position by pressing and clamping it, thereby flattening the bent sealing lug and attaching it to the sling. This allows for easy cutting.

次に、前記鑑査処理手段について第12図に基づいて説
明する。
Next, the inspection processing means will be explained based on FIG. 12.

この鑑査処理手段は、鑑査部5と、この鑑査部5に束子
を送込む前処理機4とを具備している。
This inspection processing means includes an inspection section 5 and a preprocessing machine 4 that feeds the bundles into the inspection section 5.

鑑査部5は、取出部38A、搬送区分部38B。The inspection section 5 includes a take-out section 38A and a conveyance section 38B.

鑑査部38C1区分集積部38D1把施封部38E1束
施封部38F2束包装部38G2失効部38日、制御部
38丁、操作表示部38J@−具備している。
It is equipped with an inspection section 38C, a classification accumulation section 38D1, a clamping section 38E, a bundle sealing section 38F, a bundle wrapping section 38G2, an expiration section, a control section 38, and an operation display section 38J.

尚、操作表示部38Jは操作部の一例であり、取出部3
8A、 W1送区分部38B、鑑査部38C2区分集積
部38D1把施封部38E1束施封部38F、東口装部
38G、失効部38Hは機構部の一例でおる。そしてこ
の機構部から操作部への騒音を防止するために、例えば
操作表示部38Jの回りには装置を設置するスペースの
床から天井に至るまでの壁BOADが設けられていて、
操作部と機構部とはこの壁BOAR)により大略仕切ら
れるようになっている。この実施例において「把」とは
紙葉類(例えば紙幣等の有価証券、以下券ともいう)を
100枚重ねて帯封をしたものを言い、「束」とは把を
10個施封したものを言い、「正券」とは鑑査の結果正
規でかつ有効な券でおると認められ発行元から再び利用
に供すために返却される券のことを言い、「損券」とは
鑑査の結果正規でかつ有効な券でおると認められたが、
再利用に適さないため発行元において廃棄処分される券
のことを言い、「偽券」とは鑑査の結果、正規でも有効
でもないと認められた(判定の不可能なものは無効と認
める)券のことを言い、「鑑査不能券」とは例えば重ね
取り、スキュー(券の斜行)、ショートピッチ(Wi送
送路路中おいて前の券との間隔が短か過ぎて後段の処理
が困難となるもの)等の理由により鑑査が出来ない券の
ことをいう。このうち「偽券」と鑑査不能券は装置から
排除される券であるから「排除券」ともいう。
Note that the operation display section 38J is an example of an operation section, and the ejection section 3
8A, W1 feeding section 38B, inspection section 38C, 2 sorting and accumulating section 38D1, clamping section 38E, bundle sealing section 38F, east exit section 38G, and expiration section 38H are examples of mechanical sections. In order to prevent noise from the mechanism section to the operation section, for example, a wall BOAD is provided around the operation display section 38J from the floor to the ceiling of the space where the device is installed.
The operating section and the mechanism section are roughly separated by this wall (BOAR). In this example, a "bundle" refers to a stack of 100 paper sheets (for example, securities such as banknotes, hereinafter also referred to as tickets), and a "bundle" refers to a bundle of 10 bundles bound together. A "good note" refers to a note that is found to be a genuine and valid note after inspection and is returned by the issuer for use again, and a "damaged note" refers to a note that is found to be a genuine and valid note after inspection. Although it was recognized as a genuine and valid ticket,
A counterfeit ticket refers to a ticket that is discarded by the issuer because it is not suitable for reuse, and a "counterfeit ticket" is one that has been inspected and found to be neither genuine nor valid (those that cannot be determined are considered invalid). ``Tickets that cannot be inspected'' include, for example, stacking, skewing (skewing of the ticket), short pitch (width: the interval between the previous ticket and the previous ticket is too short during the transport route, and the subsequent processing is too short). This refers to tickets that cannot be inspected for reasons such as those in which inspection is difficult. Among these, ``counterfeit notes'' and unverifiable notes are also called ``excluded notes'' because they are excluded from the device.

前記区分集積部38Dは、排除券区分集積部39A、異
種券区分集積部39B、正券区分集積部39D、損券区
分集積部39Eとに分割されており、搬送区分部38B
も前記分υ1に基づいて搬送経路中に5個所(52A乃
至52 E ) 設けられている。そして各搬送区分部
38BにはゲートGTがそれぞれ設けられている。そし
て各区分集積部39A乃至39Eには公知の回収輪FW
1乃”1FWaがそれぞれ設けられており搬送されてく
る券を1枚ずつ取り出して集積箱BINに集積できるよ
うになっている。この集積部のうち、排除券区分集積部
39Aには上下に2個BINoz(偽券集積箱)、BI
NO2(鑑査不能券集積箱)とが設けられ、他の区分集
積部には各1個毎の集積箱BIN2乃至BIN4が配置
されており、前記細流封部38Eも、38E1.38E
2.38E3のように上記各集積箱BIN2乃至BIN
4の下方にそれぞれ分割配置されている。前記正券集積
部39Dの下方に設けられた細流封部38Eの下方には
末流封部38Fが設けられ、後方の束包装部38Gに券
を受渡すための窓が設けられている。
The sorting and accumulating section 38D is divided into a rejected note sorting and accumulating section 39A, a different type of note sorting and accumulating section 39B, a normal note sorting and accumulating section 39D, and an unfit note sorting and accumulating section 39E, and a transport sorting section 38B.
Also, five locations (52A to 52E) are provided in the conveyance path based on the above-mentioned portion υ1. Each transport section 38B is provided with a gate GT. A known collection wheel FW is installed in each of the sectional accumulation sections 39A to 39E.
1FWa are provided respectively, so that the tickets being conveyed can be taken out one by one and stacked in the stacking box BIN. Among these stacking sections, the rejected ticket sorting and stacking section 39A has two stacking sections above and below. Individual BINoz (counterfeit ticket collection box), BI
38E1.38E is also provided.
2.38E3, each of the above collection boxes BIN2 to BIN
They are divided and arranged below 4. A trailing sealing section 38F is provided below the trickling sealing section 38E provided below the genuine bill accumulating section 39D, and a window is provided for transferring the tickets to the bundle wrapping section 38G at the rear.

前記取出部38Aは、1枚ずつになった券を複数枚集積
した集積部38aと、券を1枚ずつ取り出す送出ローラ
38bと、取り出された券を搬送する搬送ローラ群38
Gと、搬送経路に設けられて券の特徴(重ね取り、スキ
ュー、ショートピッチ等の鑑査不能状態)を検査する検
査部38dとによって構成されている。尚、この検査部
38dと前記鑑査部38Cとは、所定項目に従って紙幣
を検査する検査装置の一例でおり、両省による検査の結
果は前記制御部381内の記憶部220に記憶されるよ
うになっている。この取出部38Aは、前の把の処理が
終了するまで次の把の1枚取出しを行なわないようにな
っている。また、操作表示部38Jは同図(C)に示す
ように、供給された把の入口部54Aと、その上方に設
けられたテンキー等を含む操作部54B、モニタ用CR
T54G1カセット取出口54Dとによって構成されて
いる。尚、束包装部38Gには取出口38G1が設けら
れている。前記各部を収納した部分はそれぞれモジュー
ル化されており、同図(a)に示すように、供給台86
が着脱自在に取り付けれた給送モジュールM1 、鑑査
モジュールM2゜集積モジュールM3 、 M4 、廃
棄モジュールMs 。
The take-out section 38A includes a stacking section 38a that collects a plurality of individual tickets, a delivery roller 38b that takes out tickets one by one, and a conveyance roller group 38 that transports the taken-out tickets.
G, and an inspection section 38d which is provided on the conveyance path and inspects the characteristics of the ticket (uninspectable states such as overlapping, skew, short pitch, etc.). The inspection section 38d and the inspection section 38C are an example of an inspection device that inspects banknotes according to predetermined items, and the results of inspection by both ministries are stored in the storage section 220 in the control section 381. ing. This take-out section 38A is configured not to take out one sheet of the next bundle until the processing of the previous bundle is completed. In addition, as shown in FIG. 3C, the operation display section 38J includes an entrance section 54A for the supplied bundle, an operation section 54B including a numeric keypad, etc. provided above the entrance section 54A, and a CR for monitoring.
T54G1 cassette outlet 54D. Note that the bundle wrapping section 38G is provided with an outlet 38G1. The parts housing the above-mentioned parts are each modularized, and as shown in FIG.
A feeding module M1, an inspection module M2, an accumulation module M3, M4, and a disposal module Ms, each of which is detachably attached thereto.

東回装部38Gがそれぞれ着脱可能に配置され、用途及
び機能に応じて任意に増減できるようになっている。そ
して、同図(b>に示すように給送モジュールM1には
上下に区分されて排除券区分集積部39Aと取出部38
とが収納され、その後方には制御部38Iが収納されて
いる。また、モジュールM2には鑑査部38Cと第1と
第2の搬送区分部52A、52Bが収納されており、モ
ジュールM3には異種券区分集積部39Bと細流封部3
8E及び第3.第4の搬送区分部52C252Dとが収
納されており、モジュールM4には正券区分集積部39
D及びその施封部38E2と、損券区分集積部39E及
びその細流封部38E3と、第5の搬送区分装置52E
と、第1.第2の失効部としてのシュレッダ−3881
,3882とが収納されており、モジュールMSには廃
棄箱38H3が収納されている。
The east mounting parts 38G are arranged in a removable manner so that they can be increased or decreased as desired depending on the purpose and function. As shown in FIG.
is housed, and a control unit 38I is housed behind it. Furthermore, the module M2 houses an inspection section 38C and first and second conveyance sorting sections 52A and 52B, and the module M3 houses a dissimilar ticket sorting and accumulation section 39B and a trickle sealing section 3.
8E and 3rd. A fourth conveyance sorting section 52C252D is housed in the module M4.
D and its sealing part 38E2, unfit bill sorting and accumulation part 39E and its trickle sealing part 38E3, and the fifth conveyance sorting device 52E
And the first. Shredder-3881 as second revocation section
, 3882, and a waste box 38H3 is stored in the module MS.

また、前記2個のB I No1. B I NO2の
近くには排除券カセット240tJ<Hけられている。
In addition, the two B I No. 1. There is an exclusion ticket cassette 240tJ<H near B I NO 2.

に示すように鑑査不能券集積部250(BINO2>次
に、この装置全体の制御系統について第8図を参照して
説明する。
As shown in FIG. 8, the non-inspectable bill accumulating section 250 (BINO2)> Next, the control system of the entire device will be explained with reference to FIG.

鑑査機5は、吊帯が除去された把から券を連続的に一枚
づつ取出す取出部38A、この取出部38Aから取出さ
れた券を搬送する搬送区分部38B、前記鑑査部38C
2前記区分集積部38D、前記細流封部38E、前記束
施封部38F2束包装部38G、前記執行部38H1曲
記制御部38I、前記操作表示部38J、前記失効部3
81−1の前記シュレッダ38Hで、 381−12に
連結したシュレッド屑気送管87.I10インターフェ
ース247を具備している。
The inspection machine 5 includes a take-out section 38A that continuously takes out tickets one by one from the bundle from which the sling has been removed, a conveying section 38B that conveys the tickets taken out from the take-out section 38A, and an inspection section 38C.
2 the sorting and accumulating section 38D, the trickle sealing section 38E, the bundle sealing section 38F2, the bundle wrapping section 38G, the execution section 38H1, the recording control section 38I, the operation display section 38J, the expiration section 3
In the shredder 38H of 81-1, a shred waste pneumatic pipe 87 connected to 381-12. It is equipped with an I10 interface 247.

前記排除券処理機6は、操作部912表示部94、プリ
ンタ93.券供給部962区分カード処理部93.検知
部97.計数部103.−時集積部101、−時保管部
102.損券シュレッダ104、I10インターフェー
ス242を具備している。
The rejected ticket processing machine 6 includes an operation section 912, a display section 94, a printer 93 . Ticket supply section 962 Classification card processing section 93. Detection unit 97. Counting section 103. - Time accumulation section 101, - Time storage section 102. It is equipped with an unfit note shredder 104 and an I10 interface 242.

前記集中制御卓1は、本装置全体の制御を司る主制御部
16と、キーボード等からなる操作部17と、本装置の
制御プログラム、パラメータ例えば券種切換えに伴う各
部の調整値データ等を記憶したプログラムメモリ21.
鑑査情報、その他のデータを記憶したデータメモリ22
からなる記憶部20と、収集あるいは記憶された鑑査情
報等を表示するCRT18と、前述した束処理機2゜鑑
査処理手段、排除券処理機6との間で既述した各種情報
の伝送を行うI10インターフェース23とを具備して
いる。
The central control console 1 stores a main control section 16 that controls the entire device, an operation section 17 consisting of a keyboard, etc., and a control program for the device, parameters such as adjustment value data for each section associated with switching ticket types, etc. Program memory 21.
Data memory 22 that stores inspection information and other data
The various types of information described above are transmitted between the storage unit 20 consisting of the CRT 18 that displays collected or stored inspection information, etc., and the aforementioned bundle processing machine 2° inspection processing means and rejected ticket processing machine 6. It is equipped with an I10 interface 23.

次に前記実施例装置の作用を前処理機4における大帯の
切断及び除去処理を主にし、かつ、第9図、第10図を
も参照して説明する。
Next, the operation of the apparatus of the embodiment will be explained, focusing mainly on cutting and removing large bands in the pre-processing machine 4, and also with reference to FIGS. 9 and 10.

束Tが既述した第5図に示す動作の基に切断位置(C)
に至ると、カッタ66により大帯Kが切断される。
The bundle T is cut at the cutting position (C) based on the operation shown in FIG.
When the cutter 66 reaches this point, the large belt K is cut.

この後、キャッチャ67が動作し、第9図(a)に示す
ように束T外周大帯Kを把持しつつ除去処理を行う。こ
のとき、キャッチャ67が大帯にの全てを除去できず、
第9図(a>に示すようにその残部に′が依然として残
存しているものとする。
Thereafter, the catcher 67 operates, and as shown in FIG. 9(a), removes the bundle T while gripping the outer circumferential band K. At this time, the catcher 67 could not remove all of the large belt,
It is assumed that ' still remains in the remainder as shown in FIG. 9 (a>).

残部に′を残存したままの束Tは第9図(b)に示すよ
うに前記第1の帯巻込排出部12]に至るが、このとき
巻込ローラ126a、126bの摩擦力1巻込力により
第9図(C)に示すように巻込まれ、さらに、この後、
第1の帯排出部の矢印方向への排出動作により第3の排
出ローラ133外周を経て大帯保管カセット69に送り
込まれる。
As shown in FIG. 9(b), the bundle T with ' remaining in the remainder reaches the first belt winding and discharging section 12], but at this time, the frictional force of the winding rollers 126a and 126b causes one winding. The force causes it to become entangled as shown in Figure 9 (C), and further, after this,
Due to the discharge operation of the first belt discharge section in the direction of the arrow, the belt is fed into the large belt storage cassette 69 via the outer periphery of the third discharge roller 133.

このようにして、束Tは大帯にの全てが除去され10g
の施封把となる。この後は、既述した吊帯にの切断処理
に供される。
In this way, the entire bundle T is removed in a large band and weighs 10 g.
It will be sealed. After this, it is subjected to the above-described cutting process into slings.

一方、上述した場合に、残部に′を第1の帯巻込排出部
121が巻込んでなかった場合には、第9図(a)と同
様な第10図(a)の状態から第10図(b)に示すよ
うに残部に′が残存したままの束Tは第2帯巻込排出部
122の位置まで移送される。このとき、巻込ローラ1
39a。
On the other hand, in the above case, if the first band entraining and discharging section 121 does not involve ' in the remaining part, the state shown in FIG. 10(a), which is similar to FIG. As shown in FIG. 3(b), the bundle T with ' remaining therein is transferred to the position of the second band winding and discharging section 122. At this time, take-up roller 1
39a.

139bの摩涼力2巻込力により第10図(C)に示す
ように残部に′が巻込まれ、この後、残部に′はガイド
149,150a、150bにより第6図に示す点線の
経路でガイドされ、大帯保管カセット69に送り込まれ
る。
139b's cooling force 2 winding force causes ' to be rolled up in the remaining part as shown in FIG. It is guided and fed into the large obi storage cassette 69.

この後の動作は上述した場合と同様である。The subsequent operations are similar to those described above.

このように本実施例装とによれば、2段構成で残部に′
の巻込排出処理を行うようにしたものであるから、束T
から大帯Kを完全に除去することが可能となる。
In this way, according to the present embodiment, the remaining part is
Since the bundle T
It becomes possible to completely remove the large belt K from.

本発明は上述した実施例に限定されず、その要旨の範囲
内で種々の変形が可能でおる。
The present invention is not limited to the embodiments described above, and various modifications can be made within the scope of the invention.

例えば、上述した第1.第2の帯巻込部に対し、さらに
、大帯の残部を巻込ローラの巻込位置まで誘導する誘導
ピン及びこの誘導ピン駆動機構部を設けるという応用も
可能でおる。
For example, the above-mentioned 1. It is also possible to provide the second band winding section with a guide pin for guiding the remaining part of the large belt to the winding position of the winding roller and a mechanism for driving this guide pin.

[発明の効果] 以上詳述した本発明によれば、上記構成としたことによ
り、束から常に大帯を完全に除去することが可能となっ
て、この装置の円滑な稼働に寄与し1qる紙葉類束処理
装置を提供できる。
[Effects of the Invention] According to the present invention described in detail above, with the above configuration, it is possible to always completely remove the large band from the bundle, which contributes to the smooth operation of this device. A paper sheet bundle processing device can be provided.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は本発明実施例装置を含む鑑査システムの外観斜
視図、第2図は束処理灘の概略説明図、第3図の束搬送
コンベアから投入束コンベアへの未鑑査末の搬送状態と
受入束コンベアから束搬送コンベアへの鑑査済み束の搬
送状態とを示す説明図、第4図はコンベアの概略断面図
、第5図は実施例装置でおる前処理機の概略の構成説明
図、第6図は同前処理機の帯巻込排出処理手段を示す概
略側面図、第7図(a)は鑑査処理手段の概略平面図、
第7図(b)は同上の概略断面図、第7図(C)は同上
の側面図、第8図は鑑査処理システム全体の構成ブロッ
ク図、第9図(a)、(b)。 (C)はそれぞれ第1の帯巻込排出部による大帯の巻込
排出処理動作を示す説明図、第10図(a)、(b)、
(C)はそれぞれ第2の帯巻込排出部による大帯の巻込
排出処理動作を示す説明図、第11図(a)、(b)、
(C)は従来の大帯除去過程を示す説明図、第12図(
a)。 (b)、(c)、(d)はそれぞれ束を構成する大帯の
巻付状態を示す説明図、第13図(a)。 (b)、(C)はそれぞれ従来手段による大帯除去過程
を示す説明図である。 T・・・束、     K・・・大帯、4・・・前処理
は、  66・・・カッタ、67・・・キャッチャ、1
20・・・帯排出処理手段。 第 図 第 図 第 図
FIG. 1 is an external perspective view of an inspection system including an apparatus according to an embodiment of the present invention, FIG. 2 is a schematic explanatory diagram of a bundle processing stage, and FIG. FIG. 4 is a schematic sectional view of the conveyor; FIG. 5 is an explanatory diagram showing the general configuration of a preprocessing machine as an example device; FIG. 6 is a schematic side view showing the band entrainment discharge processing means of the pre-processing machine, FIG. 7(a) is a schematic plan view of the inspection processing means,
FIG. 7(b) is a schematic cross-sectional view of the same as above, FIG. 7(C) is a side view of same as above, FIG. 8 is a block diagram of the overall structure of the inspection processing system, and FIGS. 9(a) and (b). (C) is an explanatory diagram showing the operation of entraining and discharging a large band by the first band entraining and discharging unit, and FIGS. 10(a) and 10(b),
11(C) is an explanatory diagram showing the operation of entraining and discharging a large band by the second band entraining and discharging unit, FIGS. 11(a) and 11(b),
(C) is an explanatory diagram showing the conventional large band removal process, and Fig. 12 (
a). (b), (c), and (d) are explanatory diagrams each showing the state of wrapping of the large belt constituting the bundle, and Fig. 13 (a). (b) and (C) are explanatory diagrams each showing a large band removal process by conventional means. T...Bundle, K...Large band, 4...Pre-processing, 66...Cutter, 67...Catcher, 1
20...Band discharge processing means. Figure Figure Figure

Claims (1)

【特許請求の範囲】[Claims] 外周が帯により施封された任意数の紙葉類を搬送する搬
送手段と、前記紙葉類の搬送領域に臨ませて配置され搬
送手段により搬送される紙葉類外周の帯を切断する切断
手段と、この切断手段により切断された紙葉類外周の帯
を摩擦力により巻込んで排出処理する帯排出処理手段と
を有することを特徴とする紙葉類束処理装置。
A conveyance means for conveying an arbitrary number of paper sheets whose outer periphery is sealed with a band; and a cutting means for cutting the band around the outer periphery of the paper sheets arranged facing the conveyance area of the paper sheets and conveyed by the conveyance means. 1. A paper sheet bundle processing device comprising: a means for discharging paper sheets cut by the cutting means; and a band discharge processing means for winding up and discharging the outer circumferential band of paper sheets cut by the cutting means using frictional force.
JP63329953A 1988-12-27 1988-12-27 Apparatus for processing sheaf of paper Pending JPH02180133A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP63329953A JPH02180133A (en) 1988-12-27 1988-12-27 Apparatus for processing sheaf of paper

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP63329953A JPH02180133A (en) 1988-12-27 1988-12-27 Apparatus for processing sheaf of paper

Publications (1)

Publication Number Publication Date
JPH02180133A true JPH02180133A (en) 1990-07-13

Family

ID=18227111

Family Applications (1)

Application Number Title Priority Date Filing Date
JP63329953A Pending JPH02180133A (en) 1988-12-27 1988-12-27 Apparatus for processing sheaf of paper

Country Status (1)

Country Link
JP (1) JPH02180133A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001031009A (en) * 1999-07-14 2001-02-06 Toshiba Corp Binding band sticking apparatus
JP2016170664A (en) * 2015-03-13 2016-09-23 株式会社東芝 Paper sheet pretreatment system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001031009A (en) * 1999-07-14 2001-02-06 Toshiba Corp Binding band sticking apparatus
JP2016170664A (en) * 2015-03-13 2016-09-23 株式会社東芝 Paper sheet pretreatment system
US10351288B2 (en) 2015-03-13 2019-07-16 Kabushiki Kaisha Toshiba Paper sheets pre-processing apparatus

Similar Documents

Publication Publication Date Title
JP2003216999A (en) Handling device for paper sheets
JP2746996B2 (en) Paper sheet bundle processing device
JPS5969882A (en) Sheet papers processor
JPH11268718A (en) Sealing strip removing device and device for disposing sheet paper or the like
JPS5969884A (en) Sheet papers processor
US5074739A (en) Paper sheet processing apparatus
JPH02180133A (en) Apparatus for processing sheaf of paper
JPH0334091A (en) Binding processor for sheet paper or the like
JPH0642612U (en) Paper sorting machine
JPS6087133A (en) Paper-sheet processing apparatus
JPS6087134A (en) Paper-sheet processing apparatus
JP3279858B2 (en) Paper sorting machine
JP2557900B2 (en) Paper processing equipment
JP2598027B2 (en) Paper processing equipment
JP2804070B2 (en) Paper strip strip remover
JP2577391B2 (en) Paper processing equipment
JP2637111B2 (en) Paper processing equipment
JPS59132084A (en) Sheet paper processor
JP2624697B2 (en) Paper processing equipment
JPS6335539B2 (en)
JP2716788B2 (en) Paper strip strip remover
JPH0790947B2 (en) Paper handling mechanism
JPS5974019A (en) Device for treating sheet of paper
JPS6184789A (en) Sheet paper processor
JPS59130581A (en) Paper teating apparatus