JPH0213598A - Level luffing crane - Google Patents
Level luffing craneInfo
- Publication number
- JPH0213598A JPH0213598A JP15918188A JP15918188A JPH0213598A JP H0213598 A JPH0213598 A JP H0213598A JP 15918188 A JP15918188 A JP 15918188A JP 15918188 A JP15918188 A JP 15918188A JP H0213598 A JPH0213598 A JP H0213598A
- Authority
- JP
- Japan
- Prior art keywords
- sheave
- boom
- link
- sheaves
- mast
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 239000000725 suspension Substances 0.000 description 5
- 239000000463 material Substances 0.000 description 3
- 241000723353 Chrysanthemum Species 0.000 description 2
- 235000007516 Chrysanthemum Nutrition 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000001125 extrusion Methods 0.000 description 2
- 239000002184 metal Substances 0.000 description 2
- 230000000694 effects Effects 0.000 description 1
- 125000006850 spacer group Chemical group 0.000 description 1
Landscapes
- Jib Cranes (AREA)
Abstract
Description
【発明の詳細な説明】
〔産業上の利用分野〕
本発明は引込みクレーンにおいて、コンテナ荷役を行う
ための引込みクレーンに関するものである。DETAILED DESCRIPTION OF THE INVENTION [Field of Industrial Application] The present invention relates to a retraction crane for handling container cargo.
引込みクレーンは、基台上に設けられたマスト、このマ
スト下部に回動自在に取付けられたメインブーム、この
メインブーム先端に回動自在に装着され、かつ吊荷を支
持するトップブーム、このトップブームの他端側をマッ
ト側に引張るテンションブームと、トップブームの先端
に設けられたシーブに巻回された巻上ロープによって吊
持される吊具、巻上ロープを巻上げるドラム、メインブ
ームの押出し引込みを行なう引込装置などを具備してい
る。このような引込みクレーンは、例えば、特開昭54
−67955号、特開昭54−122551号、#囲昭
55−35765号などに明らかである。A retractable crane consists of a mast installed on a base, a main boom rotatably attached to the bottom of the mast, a top boom rotatably attached to the tip of this main boom and supporting the suspended load, and this top boom. A tension boom that pulls the other end of the boom toward the mat, a lifting device that is suspended by a hoisting rope wound around a sheave installed at the tip of the top boom, a drum that hoists the hoisting rope, and a main boom. It is equipped with a retraction device that performs extrusion and retraction. Such a retractable crane is, for example, disclosed in Japanese Unexamined Patent Publication No. 1983
-67955, JP-A No. 54-122551, and No. 55-35765.
このような引込みクレーンは一般にパケットやフックを
吊って荷役を行うように用いられる。Such retractable cranes are generally used to handle cargo by hanging packets or hooks.
従来、コンテナを吊る場合には、トップブームの下方に
平行に第1のリンクを設け、この第1のリンクとh−/
プブームの先端との間を第2のリンクで接続し、第1の
リンクと第2のリンクとの接続点に第2のシーブを設け
、トップブームの先端のシーブから直接に2本のロープ
を吊下げ、他の2本のロープを前記先端のシーブから前
記第2のシーブを経由して吊下げ、4点吊りを行うよう
にしている。Conventionally, when hoisting a container, a first link is provided below the top boom in parallel, and this first link and h-/
A second link connects the top boom to the top of the top boom, a second sheave is installed at the connection point between the first link and the second link, and two ropes are connected directly from the sheave at the top of the top boom. The other two ropes are suspended from the tip sheave via the second sheave to perform four-point suspension.
一方、パケットやフックを吊る場合には、W記第1のリ
ンク、第2のリンク、第2のシーブを除き、4本のロー
プを先端のシーブから直接吊下げるようにしている。On the other hand, when hanging a packet or a hook, four ropes are hung directly from the sheave at the tip, excluding the first link, second link, and second sheave.
メインブームの引込みに伴い荷物がほぼ水平に移動する
クレーンを水平引込みクレーンと云う。A crane whose cargo moves almost horizontally as the main boom is retracted is called a horizontal retraction crane.
荷物が水平に移動すると云うことは、荷物を等速で、引
込み、押出しするためのエネルギーを必要としない。The fact that the load moves horizontally means that no energy is required to pull in or push out the load at a constant speed.
しかし、完全な水平軌跡を得るには機構が複雑となり実
用的でない。However, in order to obtain a perfect horizontal trajectory, the mechanism becomes complicated and is not practical.
従来、近似的に水平となる機構を採用していたが、パケ
ット荷役およびフック荷役においては特に問題になるこ
とがなかった。Conventionally, an approximately horizontal mechanism has been adopted, but this has not caused any particular problems in packet cargo handling and hook cargo handling.
コンテナ荷役において4点吊を行う場合は、コンテナが
長尺であるためこの軌跡がMWな問題となってくる。When four-point lifting is performed during container cargo handling, this trajectory becomes a MW problem because the container is long.
完全な水平軌跡でないために、引込動作において、4点
吊の重点の位置が変化するため、コンテナが長手方向に
傾き、地切りおよび着床時に非常に危険であった。Since the trajectory was not completely horizontal, the position of the point of emphasis of the four-point suspension changed during the retraction operation, causing the container to tilt in the longitudinal direction, which was very dangerous when it took off and landed on the ground.
本発明の目的は、4点吊を行う場合に、実用上問題とな
らない程度に完全な水平軌跡に近づけることにある。An object of the present invention is to achieve a perfectly horizontal trajectory to the extent that it does not pose a problem in practice when four-point suspension is performed.
上記目的は、マストの任意の位置にシーブを設・ 3
・
け、メインブームの引込み、押出しによって、旋回半径
が変化しても、重点位置の変化を少なくすることにより
達成される。 ゛
〔作 用〕
マストに設置されたシーブの位置は、トップブームの先
端シーブ位置が、メインブームの引込み、押出しによっ
て、友4回半径が変化しても変化の少ない位置に決めて
いるため、スプレッダが旋回して、コンテナの長手方向
がブーム方向に一致した状態で地切りおよび着床しても
傾きが少ないため特に問題とならない。The above purpose is to install a sheave at any position on the mast.
- This is achieved by minimizing changes in the key position even if the turning radius changes due to pulling in or pushing out the main boom. [Function] The position of the sheave installed on the mast is determined so that the position of the sheave at the tip of the top boom will not change much even if the radius changes four times due to the retraction and extrusion of the main boom. Even if the spreader turns and the container takes off and lands in a state where the longitudinal direction of the container coincides with the boom direction, there is no particular problem because the inclination is small.
以下、本発明の詳細を図に示す一実施例により説明する
。Hereinafter, details of the present invention will be explained with reference to an embodiment shown in the drawings.
′M1図において、1は走行体2に載置した次回体、で
あり、水平面で旋回する。旋回体1には以下ノ=itが
載っ、ている。5はメインブームで、引込装置6によっ
て回動する。引込装置6はマスト7に取付けている。メ
インブーム5の先端にはトップブーム8が回動自在に取
付けられている。トラ、 4
プブーム8の後端とマスト7との間はテンションブーム
9で連結している。1oは釣合用の錘である。'M1 In the figure, 1 is the next body placed on the traveling body 2, which rotates on a horizontal plane. The following items are mounted on the revolving body 1. 5 is a main boom, which is rotated by a retraction device 6. The retraction device 6 is attached to the mast 7. A top boom 8 is rotatably attached to the tip of the main boom 5. The rear end of the boom 8 and the mast 7 are connected by a tension boom 9. 1o is a counterweight.
第1図〜第6図に示すように、マスト7の側面先端、ト
ップブーム8の後端および先端には4本のロープ15
a 、 15 b 、 15 c 、 15 dの通
るシーブ16゜17、 18.19がそれぞれ設けであ
る。シーブ16.17゜18.19はそれぞれ四つのシ
ーブからなる。外側のシーブ19a、19dを通るロー
プ15a、15dをドラム21に巻取るようにしている
。内側のシーブ19b。As shown in FIGS. 1 to 6, four ropes 15 are attached to the end of the side of the mast 7 and the rear end and tip of the top boom 8.
Sheaves 16, 17 and 18 and 19 are provided through which a, 15b, 15c and 15d pass, respectively. Sheaves 16, 17 and 18, 19 each consist of four sheaves. Ropes 15a and 15d passing through outer sheaves 19a and 19d are wound around a drum 21. Inner sheave 19b.
19 cを通るロープ15b、15cをドラムηに巻取
るようにしている。5はトップブーム8の先端からリン
ク加で吊下げたシーブであり、旋回体2に設置したドラ
ムnのロープ路で操作される。ロープ路はマスト7に設
置したシーブ69からメインブーム5に沿って張られ、
メインブーム5の先端のシーブ怨を通ってリンク加に連
結している。リンク加はシーブ5と同軸で連結している
。シーブ5゜囚、69はおのおの二つからなり、ロープ
15a、1sdの鉛直下に設置している。ドラム21.
22.27はおのおの単独で運転できる。ドラム21
と乙は同期して運転できる。The ropes 15b and 15c passing through 19c are wound around the drum η. Reference numeral 5 denotes a sheave suspended from the tip of the top boom 8 by a link, and is operated by a rope path of a drum n installed on the revolving structure 2. The rope path is stretched along the main boom 5 from the sheave 69 installed on the mast 7,
It is connected to the link through the sheave at the tip of the main boom 5. The linkage is coaxially connected to the sheave 5. Sheaves 5° and 69 each consist of two pieces, and are installed vertically below the ropes 15a and 1sd. Drum 21.
22.27 can each be operated independently. drum 21
and Party B can operate in synchronization.
トップブーム8の先端のシーブ5の周囲の構成について
、第7図、第11図により説明する。以後の説明はシー
ブ15 a側について説明するが、シーブ19 d側も
原則として同様の構成である。トップブーム8の先端の
シーブ19と同軸上にリンクかを回転自在に設置してい
る。リンクあの先端にはシーブ6、およびリンク部を回
動自在に設置している。シーブ5とリンク凹は同軸であ
る。リンク菊の先端にロープ列を接続している。The configuration around the sheave 5 at the tip of the top boom 8 will be explained with reference to FIGS. 7 and 11. Although the following description will be made regarding the sheave 15 a side, the sheave 19 d side also has the same configuration in principle. A link is rotatably installed coaxially with the sheave 19 at the tip of the top boom 8. A sheave 6 and a link section are rotatably installed at the tip of the link. The sheave 5 and the link recess are coaxial. A rope string is connected to the tip of the link chrysanthemum.
第11図(A)のように、リンクかはシーブ15 aを
中心としてその両側において軸31に取付けである。リ
ンク部の断面はH状である。As shown in FIG. 11(A), the links are attached to the shaft 31 on both sides of the sheave 15a. The cross section of the link portion is H-shaped.
第11図(D)のように、リンクかの中心にシーブ6が
位置し、リンク部の両側にリンク(資)が位置している
。板あを軸あの凹部に挿入してリンクかにボルト37で
固定し、軸Iの回転および移動を防止している。リンク
(資)は2枚の板からなるもので、左右2枚の板をスペ
ーサを介してボルト41で固定して一体にしている。As shown in FIG. 11(D), the sheave 6 is located at the center of the link, and the links are located on both sides of the link. A plate is inserted into the recess of the shaft and fixed to the link with a bolt 37 to prevent rotation and movement of the shaft I. The link consists of two plates, and the left and right plates are fixed together with bolts 41 via a spacer.
リンク部の上面側にはロープ15 aを支持可能なロー
ラ化を設けている。ローラaは定常時にはロープ15
aやシーブ別に接することはないが、近接して設置して
いる。第11図(0)、(D)のようにローラ化を支持
する軸材の長さLはリンク(9)の幅lよりも十分に長
い。またローラ化はリンク部の左右の板の内に入ること
ができる。A roller capable of supporting the rope 15a is provided on the upper surface side of the link portion. Roller a is on rope 15 during normal operation.
Although they do not touch each other, they are installed close to each other. As shown in FIGS. 11(0) and 11(D), the length L of the shaft material supporting the roller structure is sufficiently longer than the width l of the link (9). Also, the rollers can be placed inside the left and right plates of the link part.
ロープ15 B 、 15 b 、 15 c 、
15 dの重言への連結端には、例えばコツタとケラ
トとからなる連結金具を設けている。第2図、第3図の
15 fはスプレッダ(資)やパケット51の吊具のブ
ラケットにピンを介して連結した部分を示している。第
3図のパケット51の開閉用のシーブ52や第4図のフ
・ツク閏のシーブヌに対しては、おのおののロープ謁の
連結金具の間をロープ55で連結している。15gはこ
の連結部を示している。連結部15 gは両方のロープ
の金具にピンを通して連結したものである。Rope 15B, 15b, 15c,
At the connecting end of 15 d to the important word, a connecting metal fitting made of, for example, kotsuta and kerato is provided. Reference numeral 15f in FIGS. 2 and 3 indicates a portion connected to the spreader and the bracket of the hanger of the packet 51 via a pin. For the sheave 52 for opening and closing of the packet 51 shown in FIG. 3 and the sheave 52 of the hook-up box shown in FIG. 4, a rope 55 is used to connect the connecting fittings of each rope audience. 15g indicates this connection. The connecting portion 15g is connected by passing a pin through the metal fittings of both ropes.
かかる構成における荷役作業について説明する。Cargo handling work in this configuration will be explained.
先ず、ロープ15a、15dをシーブ19a、19dか
らシーブ25a、25bにかけて吊下げる。この場合、
・ 7
第11図CB)の如くリンク部の大胡から通し、ローラ
化を取付ける。リンク(9)にロープ部な連結する。ロ
ープ15b、15Cはシーブ19b、19Cから吊下げ
る。First, ropes 15a and 15d are suspended from sheaves 19a and 19d to sheaves 25a and 25b. in this case,
・7 As shown in Fig. 11 CB), pass through the link part through the ogo and attach the roller. Connect the rope part to the link (9). Ropes 15b and 15C are suspended from sheaves 19b and 19C.
コンテナ用のスプレッダ50を吊下げる場合には、ロー
プ部をドラムnでも巻上げると共にロープ15b、15
cをドラムnで巻上げてスプレッダが水平になる程度に
引張ってお喝。ドラムnはその状態で固定する。シーブ
5をロープ部で引張っているので、ロープ15a、15
dはロープ15b、15cに対してほぼ平行に吊下がる
ことになり、4点吊りのための墨点間隔を保持できるも
のである。When suspending the container spreader 50, the rope portion is also wound up on the drum n, and the ropes 15b, 15
Wind up c with drum n and pull it until the spreader is horizontal. Drum n is fixed in that state. Since the sheave 5 is pulled by the rope section, the ropes 15a, 15
d is suspended substantially parallel to the ropes 15b and 15c, and the distance between the black dots for four-point suspension can be maintained.
そして、ドラム21.Z2を同期して運転することによ
り、スプレッダ関の高さを調節できるものである。And drum 21. By operating Z2 in synchronization, the height of the spreader can be adjusted.
引込装置6の運転によってスプレッダ(資)はほぼ水平
に移動させられる。この場合、トップブーム8とメイン
ブーム5との連結点にシーブ四を設けていれば、スプレ
ッダ(資)は傾斜することはない。By operating the retraction device 6, the spreader is moved approximately horizontally. In this case, if the sheave 4 is provided at the connection point between the top boom 8 and the main boom 5, the spreader will not tilt.
しかし、トップブーム8の回動中心にシーブ囚を・ 8
設けることは困難であるので、第5図の如く、トップブ
ーム8の回動中心49とシーブ酋の取付は位置(トップ
ブーム8に設けている)場合は、ロープあの長さが一定
であるとスプレッダ関は傾斜する。However, it is difficult to install a sheave catcher at the center of rotation of the top boom 8, so as shown in Fig. ), the length of the rope is constant and the spreader slope is sloped.
構造的に取付は容易な位置にシーブ囚を取付けて、スプ
レッダ(資)の傾斜量が実害のない程度の位置にシーブ
69を設置する。The sheave 69 is installed at a position where it is structurally easy to install, and the sheave 69 is installed at a position where the amount of inclination of the spreader does not cause any actual damage.
次に、パケット51やフック関を吊る場合について説明
する。この場合は、第3図、第4図に示すようにドラム
γを用いてロープ部な十分に緩める。Next, the case of hanging the packet 51 and the hook will be explained. In this case, as shown in FIGS. 3 and 4, the rope portion is sufficiently loosened using a drum γ.
そして、シーブ52,54用のロープ団を結合すると共
に、吊具に連結する。ドラム21.22を適宜運転して
パケット51やフック閏が水平になるようにロープ15
の長さを調整する。吊具を吊上げるとロープ15a、1
5dの張力によってシーブδは第9図、第10図の如く
シーブ19よりも外側に移動し、ロープ15a、・15
dは垂直に吊下がる。Then, the rope groups for the sheaves 52 and 54 are combined and connected to a hanging tool. Operate the drums 21 and 22 appropriately and tighten the rope 15 so that the packet 51 and the hook are horizontal.
Adjust the length. When the hanging tool is lifted, the ropes 15a, 1
Due to the tension of 5d, the sheave δ moves to the outside of the sheave 19 as shown in FIGS. 9 and 10, and the ropes 15a, 15
d hangs vertically.
トップブーム8を最小半径にした場合は、第10図に示
す如く、シーブ5はシーブ18,19を接続する中心線
Pよりも外側に位置するので、ロープ部をシーブδの軸
あに直接取付けると、ロープ部がシーブ19a、19d
に接触したり、シーブ19a。When the top boom 8 is set to the minimum radius, as shown in Fig. 10, the sheave 5 is located outside the center line P connecting the sheaves 18 and 19, so the rope section is attached directly to the shaft of the sheave δ. And the rope part is sheave 19a, 19d
or in contact with the sheave 19a.
19 bとトップブーム8との間に入り込んだりし、ロ
ープ列が損傷する。19b and the top boom 8, damaging the rope row.
このため、リンク(資)を設けて、ロープ列がシーブ1
9よりも内側に位置するようにしたものである。For this reason, a link is provided so that the rope row can be connected to the sheave 1.
It is arranged to be located inside of 9.
但し、リンク(9)はロープ列によって引張られてリン
ク%に平行になろうとする。リンク(資)の重量はロー
プあよりも軽く、ドラムn−シーブ9間の方がシーブ四
−シーブ5間よりも長いためである。However, the link (9) is pulled by the rope row and tends to become parallel to the link %. This is because the weight of the link is lighter than that of the rope, and the distance between drum n and sheave 9 is longer than the distance between sheave 4 and sheave 5.
そこで、軸材の長さLをリンク(資)の幅lよりも長々
して、リンク頷が軸材に当ってリンク部にテ行にならな
いようにしている。これによってロープ列はシーブ19
よりも内側に常に位置するものである。Therefore, the length L of the shaft member is made longer than the width l of the link (material) to prevent the link nod from hitting the shaft member and causing the link portion to become taut. This allows the rope row to move to sheave 19.
It is always located inside.
トップブーム8を内側から外側へ(又はその逆)延して
停めると、シーブ5からロープ15a、15bが外れる
可能性があり、ローラ4でこれを防止している。二〇ロ
ーラ招の軸材を前記リンク(資)の位置決めのストッパ
として兼用しているので、部材を少鳴でき、軽量で安価
にできるものである。If the top boom 8 is extended from the inside to the outside (or vice versa) and stopped, the ropes 15a and 15b may come off the sheave 5, and the rollers 4 prevent this. Since the shaft material of the 20 rollers is also used as a stopper for positioning the link, the members can be made with less noise and can be made lightweight and inexpensive.
以上の如く、4点吊りするためのシーブ6をローフ28
によって操作するようにしているので、吊具の交換の場
合の墨点の変更を極めて容易にかつ安全に行うことがで
きるものである。As described above, the sheave 6 for hanging at four points is attached to the loaf 28.
Therefore, when changing the hanging tool, the ink dots can be changed extremely easily and safely.
また、シーブ3とロープ部との間にリンク凹を設け、か
つこのリンク部の角度調整用のストッパ(軸44)をリ
ンク部に設けているので、パケットやフックを吊った場
合にロープ列がシーブ19に接触するのを防止できるも
のである。なお、リンク(資)はシーブ5と同軸である
必要はない。またストッパとしては%第8図のようにブ
ーム8のロープZ側にローラ70を突出させて設け、ロ
ープ部がシーブ19に接触しないようにすることも考え
られる。In addition, a link recess is provided between the sheave 3 and the rope part, and a stopper (shaft 44) for adjusting the angle of this link part is provided in the link part, so that when a packet or hook is hung, the rope row is This can prevent contact with the sheave 19. Note that the link does not need to be coaxial with the sheave 5. It is also conceivable to provide the stopper with a roller 70 protruding from the rope Z side of the boom 8 as shown in FIG. 8 to prevent the rope portion from contacting the sheave 19.
もちろんリンク菊がリンクかに平行にならないようにす
るためのストッパは必要である。Of course, a stopper is necessary to prevent the link chrysanthemum from being parallel to the link.
また、前記ストッパをはずれ止め用のローラ朝の軸と兼
用しているので、安価にできるものである。Further, since the stopper is also used as the shaft of the roller for preventing slippage, the cost can be reduced.
、11 。, 11.
フック53等の2点吊りの場合にシーブ5をロープ列で
引張って、シーブ19,25から吊具(フック53)ま
でのロープを斜めに配置して使用することもできる。In the case of two-point hanging using a hook 53 or the like, the sheave 5 can be pulled by a row of ropes, and the ropes from the sheaves 19, 25 to the hanging tool (hook 53) can be arranged diagonally.
さて、シーブ四とドラムごとの間にシーブ69を設置し
ているので、メインブーム5の起伏角度がいかほどであ
ってもスプレッダ関の水平度をほぼ一定に保つことがで
きるものである。ドラムnをシーブ69の位置に設けて
も良いが、大きなドラムnをシーブ69の位置に設ける
ことは実際上不可能である。シーブ69はそれよりも小
さいので、最適な位置に容易に設置できるものである。Now, since the sheave 69 is installed between the sheave 4 and each drum, the horizontality of the spreader can be kept almost constant no matter what the up-and-down angle of the main boom 5 is. Although the drum n may be provided at the sheave 69, it is practically impossible to provide a large drum n at the sheave 69. Since the sheave 69 is smaller, it can be easily installed in an optimal position.
ダブルリンク式クレーンの各リンクの長さの決定や吊具
の軌跡は1周知のように トライ アンド エラー で
求めている。シーブ69の最適位置の算出もこれと同様
である。As is well known, the length of each link of a double-link crane and the trajectory of the lifting equipment are determined by trial and error. The calculation of the optimum position of the sheave 69 is also similar to this.
第2図、第3図、第4図に示す他の実施例について説明
する。シーブ69,69は軸方向に駆動装置(例えばシ
リンダ装置i70.70)で移動できるようになってい
る。スプレッダ50を着床させる際にス、12
プレブダ(資)が傾斜していれば、運転者は駆動装置7
0.70を駆動させ、シーブ6(1,69の位置を変え
ることにより、スプレッダ関の傾斜量を補正する。Other embodiments shown in FIGS. 2, 3, and 4 will be described. The sheaves 69, 69 can be moved in the axial direction by a drive device (for example, a cylinder device i70.70). When placing the spreader 50 on the floor, if the spreader 12 is tilted, the driver must
By driving 0.70 and changing the position of sheave 6 (1, 69), the amount of inclination of the spreader is corrected.
二つの駆動装置70.70は同時に同一量だけ動作し、
二つのシーブ69,69の間隔を縮めたり、離したりす
る。The two drives 70.70 operate simultaneously by the same amount;
The distance between the two sheaves 69, 69 is shortened or separated.
なお、シーブ69,69る半径方向に移動させても良い
。Note that the sheaves 69, 69 may be moved in the radial direction.
本発明によれば、4点吊りを行う場合に、実用上問題と
ならない程度に完全な水平軌跡に近づけることができ、
コンテナの長平方向の傾きが少な(なり、地切りおよび
着床時においても安全な作業ができる。According to the present invention, when performing four-point suspension, it is possible to approximate a perfectly horizontal trajectory to the extent that it does not cause any practical problems,
There is little inclination of the container in the longitudinal direction, allowing safe work even when cutting off the ground and landing on the ground.
第1図は引込みクレーンの全体正面図、第2図はスプレ
ッダを吊る場合のロープの配置を示す斜視図、第3図は
パケットを吊る場合のロープの配置を示す斜視図、第4
図はフックを吊る場合のロープの配置を示す斜視図、第
5図はトツブブームの周辺の正面図、第6図はトップブ
ームのシーブの配置を示す図、第7図はスプレッダを吊
った場合でトップブームを最大半径にした場合のトップ
ブームの先端の正面図、第8図はスプレッダを吊った場
合でトップブームを最小半径にした場合のトップブーム
の先端の正面図、第9図はフックを吊った場合でトップ
ブームを最大半径にした場合のトップブームの先端の正
面図、第10図はフックを吊った場合でトップブームを
最小半径にした場合のトップブームの先端の正面図、第
11図は第7図のA−B−0線に沿う断面図である。
2・・・・・旋回体、5・・・・・・メインブーム、6
・・・・・引込装置、7・・・・・・マスト、8・・・
・・・ トップブーム、9・・・・・・テンションブー
ム、15 、15 a 、 15 b 、 15 c
r15 d−−−−−・O−プ、16. 17.18
. 19.19a、 19b。Figure 1 is an overall front view of the retraction crane, Figure 2 is a perspective view showing the arrangement of ropes when hanging a spreader, Figure 3 is a perspective view showing the arrangement of ropes when hanging a packet, and Figure 4 is a perspective view showing the arrangement of ropes when hanging a packet.
The figure is a perspective view showing the arrangement of the rope when hanging a hook, Figure 5 is a front view of the area around the totsubu boom, Figure 6 is a diagram showing the arrangement of the top boom sheave, and Figure 7 is a diagram showing the arrangement when the spreader is hung. Figure 8 is a front view of the top boom tip with the top boom at its maximum radius, Figure 8 is a front view of the top boom tip with the spreader hanging and the top boom is at its minimum radius, and Figure 9 is a front view of the top boom tip with the hook set. Figure 10 is a front view of the tip of the top boom when the hook is suspended and the top boom is set to the maximum radius; Figure 11 is a front view of the tip of the top boom when the hook is suspended and the top boom is set to the minimum radius. The figure is a sectional view taken along line A-B-0 in FIG. 7. 2...Swivel body, 5...Main boom, 6
...Retraction device, 7...Mast, 8...
...Top boom, 9...Tension boom, 15, 15 a, 15 b, 15 c
r15 d----・O-p, 16. 17.18
.. 19.19a, 19b.
Claims (1)
ンブームと、メインブームの先端に回動自在に取付けた
トップブームと、トップブームの後端とマストの上部と
の間に回動自在に取付けたテンションブームと、トップ
ブームの先端部の左右に配置した二つの第1のシーブと
、第1のシーブよりも後端側の左右に配置した二つの第
2のシーブと、第1および第2のシーブから吊下げた吊
具用の4本のロープとからなる引込クレーンにおいて、
前記トップブームの先端から前記第2のシーブを上下方
向に回動自在に吊下げたリンクと、前記メインブームと
の連結点の近傍の前記リップブームに設置した二つの第
3のシーブと、前記マストに設置した二つの第4のシー
ブと、前記マストの下部に設置したドラムと、該ドラム
から繰出した2本のロープを前記第4のシーブ、前記第
3のシーブに順次掛けた後、前記リンクに連結した、こ
とを特徴とする引込みクレーン。1. A mast, a main boom rotatably attached to the bottom of the mast, a top boom rotatably attached to the tip of the main boom, and a rotatable structure between the rear end of the top boom and the top of the mast. a tension boom attached to the top boom, two first sheaves placed on the left and right of the tip of the top boom, two second sheaves placed on the left and right of the rear end of the first sheave, and two second sheaves placed on the left and right of the rear end of the top boom; In a retractable crane consisting of four ropes for lifting equipment suspended from a second sheave,
a link in which the second sheave is vertically rotatably suspended from the tip of the top boom; two third sheaves installed on the lip boom near a connection point with the main boom; After the two fourth sheaves installed on the mast, the drum installed at the bottom of the mast, and the two ropes fed out from the drum are sequentially applied to the fourth sheave and the third sheave, A retractable crane characterized by being connected to a link.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP63159181A JPH07108759B2 (en) | 1988-06-29 | 1988-06-29 | Retractable crane |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP63159181A JPH07108759B2 (en) | 1988-06-29 | 1988-06-29 | Retractable crane |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH0213598A true JPH0213598A (en) | 1990-01-17 |
JPH07108759B2 JPH07108759B2 (en) | 1995-11-22 |
Family
ID=15688077
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP63159181A Expired - Fee Related JPH07108759B2 (en) | 1988-06-29 | 1988-06-29 | Retractable crane |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPH07108759B2 (en) |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS59108693A (en) * | 1982-12-15 | 1984-06-23 | 株式会社日立製作所 | Device for stabilizing and supporting hung load of double link type leading-in crane |
-
1988
- 1988-06-29 JP JP63159181A patent/JPH07108759B2/en not_active Expired - Fee Related
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS59108693A (en) * | 1982-12-15 | 1984-06-23 | 株式会社日立製作所 | Device for stabilizing and supporting hung load of double link type leading-in crane |
Also Published As
Publication number | Publication date |
---|---|
JPH07108759B2 (en) | 1995-11-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP4454861B2 (en) | Cranes, especially mobile cranes | |
JPH02182696A (en) | Crane and attachment for increasing hoisting capacity thereof | |
CN113321139B (en) | Lifting hook assembly and lifting machinery | |
CN215666664U (en) | Prevent that side carries two roof beam hoisting equipment of suspension type | |
US4762240A (en) | Articulating crane | |
JPH07315766A (en) | Shuttle jib type climbing crane | |
JPH0213598A (en) | Level luffing crane | |
JP2001233586A (en) | Mounting method for counterweight and frame support means | |
JP3268260B2 (en) | Double link crane | |
JPH04266397A (en) | Crane with jib | |
JP2552019Y2 (en) | Lifting device | |
JPS6181390A (en) | Leading-in crane | |
JP2019077541A (en) | Crane and crane disassembling method | |
JPH1143290A (en) | Boom hoisting device for crane and boom hoisting method | |
JP2749157B2 (en) | Retractable crane | |
JPS6181389A (en) | Feed device for leading-in crane | |
JP6956627B2 (en) | Lifting device with horizontal jib | |
JPH0986875A (en) | Travelling crane | |
JPH0192198A (en) | Method and equipment for mounting and dismounting jib to crane | |
JP2001199685A (en) | Suspension lifting device | |
JPH0780673B2 (en) | Retractable crane | |
JPH027874B2 (en) | ||
JP2023104075A (en) | Jib mooring device and jib mooring method | |