JPH019843Y2 - - Google Patents

Info

Publication number
JPH019843Y2
JPH019843Y2 JP6654482U JP6654482U JPH019843Y2 JP H019843 Y2 JPH019843 Y2 JP H019843Y2 JP 6654482 U JP6654482 U JP 6654482U JP 6654482 U JP6654482 U JP 6654482U JP H019843 Y2 JPH019843 Y2 JP H019843Y2
Authority
JP
Japan
Prior art keywords
joint pipe
column
steel frame
joint
threaded rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP6654482U
Other languages
Japanese (ja)
Other versions
JPS58171405U (en
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to JP6654482U priority Critical patent/JPS58171405U/en
Publication of JPS58171405U publication Critical patent/JPS58171405U/en
Application granted granted Critical
Publication of JPH019843Y2 publication Critical patent/JPH019843Y2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Reinforcement Elements For Buildings (AREA)

Description

【考案の詳細な説明】 本考案は鉄筋、鉄骨鉄筋構造物における1スパ
ン梁と柱との接合構造に関するものである。
[Detailed Description of the Invention] The present invention relates to a joint structure between a single span beam and a column in a reinforced steel structure.

1スパン梁と柱鉄骨との接合は、まず柱間に梁
鉄骨を吊り込み、ガセツトプレートにより梁鉄骨
を柱鉄骨に接続し、ついで柱鉄骨にL字状のアン
カー筋を通して、その突出端を梁に予め配筋して
ある梁主筋に重ね継手または圧接により接合する
ものであつた。しかしながら、従来例の継手作業
は手間を要すると共に面倒であり、また建方後高
所にてアンカー筋を柱鉄骨に取り付けなければな
らないので、作業上危険が大きいなどの問題があ
つた。
To connect a 1-span beam and a column steel frame, first suspend the beam steel frame between the columns, connect the beam steel frame to the column steel frame using a gusset plate, then pass an L-shaped anchor bar through the column steel frame, and attach the protruding end of the beam to the column steel frame. It was connected to the main beam reinforcement that had been placed in advance on the beam by lap joints or pressure welding. However, the conventional jointing process is time-consuming and troublesome, and the anchor bars must be attached to the column steel frame at a high location after construction, which poses problems such as high operational risks.

本考案は上記の問題点に鑑みて為されたもの
で、継手作業を特殊な工具類、手間を要すること
なく簡単に行い得、かつ柱鉄骨に予めアンカー筋
を取り付けることにより高所での作業を改善した
1スパン梁と柱との接合構造を提供することを目
的とする。
This invention was created in view of the above problems, and allows for easy joint work without the need for special tools or effort, and by pre-attaching anchor bars to the column steel frame, it is possible to perform work at high places. The purpose of the present invention is to provide a joint structure between a single span beam and a column that improves this.

本考案の構成の特徴は、L形状のアンカー筋の
先端に軸心部にネジ孔を有する継手パイプを取付
けて、このアンカー筋を柱鉄骨に孔を介して予め
取付けておき、かつ梁の主筋の先端にも上記継手
パイプと同一構成の継手パイプを取付けておき、
柱側と梁側の継手パイプ間をネジ棒で連結し、ネ
ジ棒に取付けてある2個の固定用のナツトを利用
して連結を固定するところにある。
The structure of the present invention is characterized by attaching a joint pipe having a threaded hole in the axial center to the tip of the L-shaped anchor bar, attaching this anchor bar to the column steel frame through the hole in advance, and attaching it to the main bar of the beam. Attach a fitting pipe with the same configuration as the above fitting pipe to the tip of the
The joint pipes on the column and beam sides are connected using a threaded rod, and the connection is fixed using two fixing nuts attached to the threaded rod.

以下本考案の実施例を図面を参照して説明す
る。
Embodiments of the present invention will be described below with reference to the drawings.

第1,2図において、柱鉄骨(片側の柱鉄骨1
のみ図示)間には1スパン梁2が架設してある。
In Figures 1 and 2, the column steel frame (column steel frame 1 on one side)
(Only shown in the figure) A one-span beam 2 is installed between them.

ところで、柱鉄骨1のウエブ1aには後端部を
下方に屈成させた複数のL字状のアンカー筋3,
3…が取り付けてある。各アンカー筋の水平部3
a,3a…はウエブ1aに設けた孔1b,1b…
に軸方向に移動自在に挿通し、その先端部は梁2
に向けて突出している。各アンカー筋3,3…の
水平部3a,3a…の先端部は継手パイプ4,4
…がそれぞれ固着してある。一方、梁2は、この
例では鉄骨鉄筋梁であつて、H型鋼の梁鉄骨5の
端部は柱鉄骨1のガセツトプレート6にボルト1
0により接続してある。梁鉄骨の上下四角隅に梁
主筋7,7…を配筋し、この梁主筋にスターラツ
プ8,8…が掛回してある。各梁主筋7,7…の
各端部7a,7a…には、継手パイプ9,9…を
それぞれ固着してある。そして梁主筋7,7…と
アンカー筋3,3…とは、継手パイプ9,4を結
合するネジ棒11により接合している。
By the way, the web 1a of the column steel frame 1 has a plurality of L-shaped anchor bars 3 whose rear ends are bent downward.
3... is installed. Horizontal part 3 of each anchor bar
a, 3a... are holes 1b, 1b... provided in the web 1a.
It is inserted into the beam 2 so that it can move freely in the axial direction.
protruding towards. The tip of each horizontal part 3a, 3a... of each anchor bar 3, 3... is a joint pipe 4, 4
... are fixed to each other. On the other hand, the beam 2 is a steel reinforced beam in this example.
They are connected by 0. Beam main reinforcements 7, 7... are arranged at the upper and lower square corners of the beam steel frame, and stirrups 8, 8... are wound around these beam main reinforcements. Joint pipes 9, 9... are fixed to each end portion 7a, 7a... of each beam main reinforcement 7, 7..., respectively. The beam main reinforcements 7, 7... and the anchor reinforcements 3, 3... are connected by a threaded rod 11 that connects the joint pipes 9, 4.

第3図は上記した鉄筋継手を示すもので、各継
手パイプ4及び9は、それぞれその後方開口より
挿入したアンカー筋3の水平部3aの先端及び梁
主筋7の端部7a先端に被嵌圧着したもので、中
空部前部には雌ネジ4a及び9aをそれぞれ設け
てあり、この雌ネジ4a及び9aに一方向のネジ
棒11を挿入螺合し得るようになつている。この
ネジ棒11の一端部(右端部)は、継手パイプ4
の前方開口より予め螺入しており、またこのネジ
棒には2個のナツト12,13が螺合している。
この場合ネジ棒11の長さは、他方の継手パイプ
9の雌ネジ9aに螺合可能なものでなければなら
ない。
FIG. 3 shows the above-mentioned reinforcing bar joint, in which each of the joint pipes 4 and 9 is fitted and crimped to the tip of the horizontal part 3a of the anchor bar 3 and the tip of the end 7a of the beam main bar 7 inserted from the rear opening, respectively. Female threads 4a and 9a are provided at the front of the hollow portion, respectively, and a one-way threaded rod 11 can be inserted into and screwed into these female threads 4a and 9a. One end (right end) of this threaded rod 11 is connected to the joint pipe 4.
It is screwed in advance from the front opening of the screw rod, and two nuts 12 and 13 are screwed onto this threaded rod.
In this case, the length of the threaded rod 11 must be such that it can be screwed into the female thread 9a of the other joint pipe 9.

このネジ棒11による梁主筋7とアンカー筋3
との接合作業は次の通りである。すなわち第3図
Aの状態において、まずナツト13をナツト12
方に接合し強く接するまで回転させる。そこでこ
のナツト12,13の双方又は一方(殊に13)
を回転させると、ネジ棒11も連動回転し左方へ
延出する。この回転作業を継続していくと、第3
図B図示のように、ネジ棒11は継手パイプ9の
雌ネジ9aに螺合する。そこで後方のナツト13
のみを逆転させ、継手パイプ4の先端端面にまで
戻し、この端面に強く接合させる(第3図B鎖線
状態)。
Beam main reinforcement 7 and anchor reinforcement 3 by this threaded rod 11
The joining process is as follows. That is, in the state shown in FIG. 3A, first the nut 13 is replaced with the nut 12.
Rotate until they are firmly connected. Therefore, both or one of nuts 12 and 13 (especially 13)
When the threaded rod 11 is rotated, the threaded rod 11 also rotates and extends to the left. If you continue this rotation work, the third
As shown in FIG. B, the threaded rod 11 is screwed into the female thread 9a of the joint pipe 9. There, Natsu 13 in the back
The joint is reversed and returned to the tip end face of the joint pipe 4, and is strongly joined to this end face (as shown by the chain line in FIG. 3B).

このネジ棒14の両端部を継手パイプ4の雌ネ
ジ4bおよび継手パイプ9の雌ネジ9aに螺入
し、フランジ15を工具で挾んで回転させ、アン
カー筋3と梁主筋7とを接合するものである。
Both ends of this threaded rod 14 are screwed into the female threads 4b of the joint pipe 4 and the female threads 9a of the joint pipe 9, and the flange 15 is held and rotated with a tool to join the anchor reinforcement 3 and the beam main reinforcement 7. It is.

次に柱鉄骨1と梁2との接合作業について説明
する。柱鉄骨1のウエブ1aに予めアンカー筋
3,3…を取り付けておき、梁2についても梁主
筋7,7…およびスターラツプ8を先組みしてお
いてから、柱および梁の建方作業を行う(第1
図)。この際、アンカー筋3,3…は先端に継手
パイプ4が取り付けてあるので、ウエブの孔1b
…から外れることがなく、したがつて柱1を立設
した後にアンカー筋の配筋は不要となる。そして
継手パイプ4に取り付けてあるネジ棒11…をナ
ツト12,13で前進させて、継手パイプ9にネ
ジ結合させて接合作業を終了する。
Next, the joining work between the column steel frame 1 and the beam 2 will be explained. The anchor reinforcements 3, 3... are attached in advance to the web 1a of the column steel frame 1, and the beam main reinforcements 7, 7... and stirrups 8 are assembled in advance for the beam 2, and then the erection work of the columns and beams is carried out. (1st
figure). At this time, since the joint pipe 4 is attached to the tip of the anchor bars 3, 3..., the holes 1b of the web
..., and therefore there is no need to arrange anchor reinforcement after the column 1 is erected. Then, the threaded rods 11 attached to the joint pipe 4 are advanced by nuts 12, 13, and are threadedly connected to the joint pipe 9, thereby completing the joining work.

本考案は上記構成であるため、アンカー筋と梁
主筋との現場での接合作業はネジ棒を回転させる
だけであるので、継手作業が極めて簡単になり、
また工期も短縮される。そして本考案の接合構造
によれば、継手部分を柱の鉄骨のウエブに近接さ
せ柱の近くに位置させることができるので、従来
のように梁主筋とアンカー筋の継手部分から柱ま
でに梁のスターラツプとは異なるスターラツプを
巻回する作業が不要となり、しかも柱のスパイラ
ル筋の落し込みに支障は生じない。さらに、アン
カー筋は予め柱の鉄骨に取り付けておいても継手
パイプによつて抜け落ちが防止できるから、その
状態で柱の鉄骨を建てることが可能となり、この
ため作業員が高所でアンカー筋の柱の鉄骨に取り
付ける際の作業が不要となり、従つて高所での作
業を改善することができる。
Since the present invention has the above-mentioned configuration, the on-site joining work between the anchor reinforcement and the beam main reinforcement is simply by rotating the threaded rod, making the joining work extremely easy.
The construction period will also be shortened. According to the joint structure of the present invention, the joint part can be placed close to the web of the steel frame of the column and close to the column, so the joint part of the beam can be moved from the joint part of the main beam reinforcement and anchor reinforcement to the column, unlike conventional methods. There is no need to wind a stirrup that is different from the stirrup, and there is no problem in lowering the spiral strips of the columns. Furthermore, even if the anchor bars are attached to the steel frame of the column in advance, the joint pipe can prevent them from falling off, making it possible to erect the steel frame of the column in that state. No work is required when attaching to the steel frame of the column, and therefore work at high places can be improved.

【図面の簡単な説明】[Brief explanation of the drawing]

図面は本考案の実施例を示すもので、第1図は
1スパン梁と柱との接合前の状態を示す斜視図、
第2図は接合後の状態を示す一部破断側面図、第
3図Aは継手パイプとネジ棒との結合前の状態を
示す拡大断面図、第3図Bはその結合後の状態を
示す拡大断面図である。 1……柱鉄骨、1b……孔、2……梁、3……
アンカー筋、3a……アンカー筋の水平部、4,
9……継手パイプ、4a,4b,9a……雌ネ
ジ、5……梁鉄骨、7……梁主筋、7a……梁主
筋端部、8……スターラツプ、11……ネジ棒。
The drawings show an embodiment of the present invention, and Fig. 1 is a perspective view showing the state before joining a 1-span beam and a column;
Fig. 2 is a partially cutaway side view showing the state after joining, Fig. 3 A is an enlarged sectional view showing the state before the joint pipe and threaded rod are joined, and Fig. 3 B shows the state after joining. It is an enlarged sectional view. 1...Column steel frame, 1b...hole, 2...beam, 3...
Anchor bar, 3a...Horizontal part of anchor bar, 4,
9... Joint pipe, 4a, 4b, 9a... Female thread, 5... Beam steel frame, 7... Beam main reinforcement, 7a... Beam main reinforcement end, 8... Stirrup, 11... Threaded rod.

Claims (1)

【実用新案登録請求の範囲】 柱鉄骨に孔を介して挿通して取付けてあり、1
スパン梁側に突出している端部の先端に軸心部に
ネジ孔を有する継手パイプが被嵌圧着されてお
り、後端部側が下方に屈成しているL形状のアン
カー筋と、 端部の先端に上記継手パイプと同一構成の継手
パイプが柱鉄骨側の継手パイプと対向位置して被
嵌圧着されている1スパン梁の梁主筋と、 対向位置している柱側継手パイプと梁側継手パ
イプとを連結するネジ棒と、 ネジ棒に取付けてある固定用の2個のナツトと
を具備する1スパン梁と柱との接合構造。
[Scope of Claim for Utility Model Registration] It is installed by inserting it into the column steel frame through a hole, and 1
A joint pipe having a threaded hole in the shaft center is fitted and crimped to the tip of the end protruding toward the span beam side, and an L-shaped anchor bar whose rear end side is bent downward; A joint pipe with the same configuration as the above joint pipe is placed at the tip of the main beam reinforcement of a 1-span beam, which is positioned opposite the joint pipe on the column steel frame side and is crimped, and the joint pipe on the column side, which is located opposite, and the joint pipe on the beam side. A joint structure between a 1-span beam and a column, which includes a threaded rod that connects the joint pipe and two fixing nuts attached to the threaded rod.
JP6654482U 1982-05-10 1982-05-10 Connection structure between 1-span beam and column Granted JPS58171405U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP6654482U JPS58171405U (en) 1982-05-10 1982-05-10 Connection structure between 1-span beam and column

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP6654482U JPS58171405U (en) 1982-05-10 1982-05-10 Connection structure between 1-span beam and column

Publications (2)

Publication Number Publication Date
JPS58171405U JPS58171405U (en) 1983-11-16
JPH019843Y2 true JPH019843Y2 (en) 1989-03-20

Family

ID=30076410

Family Applications (1)

Application Number Title Priority Date Filing Date
JP6654482U Granted JPS58171405U (en) 1982-05-10 1982-05-10 Connection structure between 1-span beam and column

Country Status (1)

Country Link
JP (1) JPS58171405U (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6373665B2 (en) * 2014-07-09 2018-08-15 前田建設工業株式会社 Joining structure and joining method

Also Published As

Publication number Publication date
JPS58171405U (en) 1983-11-16

Similar Documents

Publication Publication Date Title
JPH019843Y2 (en)
JPH0581403U (en) Joint structure of reinforced concrete columns and steel beams
JPH11158997A (en) Joint device for column and beam made of precast concrete and wall reinforcement of concrete wall
JPH0657971B2 (en) Building frame
JP3158115B1 (en) Joint structure of steel pipe column and method of construction of the joint structure
JPS6321604Y2 (en)
JP2722209B2 (en) Precast concrete beams
JPS58204258A (en) Pc member
JP2606250B2 (en) Joint structure between reinforced concrete column and steel beam
JP2621758B2 (en) Connection structure of steel columns and steel beams
JPH019851Y2 (en)
JPS5840171Y2 (en) Frame structure consisting of steel reinforced concrete structural columns and reinforced concrete structural beams
JPH0376948A (en) Joining device of steel framed column consisting of enclosed sectional member and steel framed beam
JP2926148B2 (en) Joint structure of prestressed structure
JPH0692673B2 (en) Joint structure of closed-section column and beam main bar
JPH07113260A (en) Method for connecting column and beam
JPS6231135B2 (en)
JPS6144173B2 (en)
JPH031565Y2 (en)
JPH0443521Y2 (en)
JPS645141B2 (en)
JPH0533606Y2 (en)
JPH051865B2 (en)
JPS6347857B2 (en)
JPH0463943B2 (en)