JPH01239268A - Erection of steel work - Google Patents
Erection of steel workInfo
- Publication number
- JPH01239268A JPH01239268A JP6444088A JP6444088A JPH01239268A JP H01239268 A JPH01239268 A JP H01239268A JP 6444088 A JP6444088 A JP 6444088A JP 6444088 A JP6444088 A JP 6444088A JP H01239268 A JPH01239268 A JP H01239268A
- Authority
- JP
- Japan
- Prior art keywords
- erection
- steel
- column
- jack
- raising
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 26
- 239000010959 steel Substances 0.000 title claims abstract description 26
- 230000008602 contraction Effects 0.000 claims abstract 2
- 241000282818 Giraffidae Species 0.000 claims 2
- 238000010276 construction Methods 0.000 claims 1
- 230000013011 mating Effects 0.000 abstract 1
- 241000282819 Giraffa Species 0.000 description 3
- 230000000694 effects Effects 0.000 description 2
- 241000208421 Ericaceae Species 0.000 description 1
- OAICVXFJPJFONN-UHFFFAOYSA-N Phosphorus Chemical compound [P] OAICVXFJPJFONN-UHFFFAOYSA-N 0.000 description 1
- 239000011324 bead Substances 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 229910052698 phosphorus Inorganic materials 0.000 description 1
- 239000011574 phosphorus Substances 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
Description
【発明の詳細な説明】 「産業上の利用分野」 本発明は、鉄骨建方に関するものである。[Detailed description of the invention] "Industrial application field" The present invention relates to steel frame erection.
「従来の技術」
従来、鉄骨建方時における鉄骨柱の建起しく歪1ぎ正)
は、柱頭と足元との適所に、それぞれエレクションピー
スを配して、両エレクシッンピース間に斜めにワイヤー
及びレバーブロックを11)け渡し、レバーブロックを
操作してワイヤーを緊張させることにより行い、基準値
以内の精度となるよう調整している。``Conventional technology'' Conventionally, when steel frames are erected, the steel columns are erected and distorted.
This is done by placing an erection piece at the appropriate location at the capital and foot of the column, passing a wire and a lever block diagonally between the two pieces (11), and tensioning the wire by operating the lever block. The accuracy is adjusted to within the standard value.
「発明が解決しようとする課題」
しかし、長大スパンの鉄骨建方時等では、鉄骨柱が内側
へ傾き、トラス等の関連部材を取り付けるのに苦労する
ことがある。``Problems to be Solved by the Invention'' However, when constructing a steel frame with a long span, the steel columns tilt inward, making it difficult to attach related members such as trusses.
本発明は、斯る従来の問題点を解決しようとするもので
ある。The present invention attempts to solve these conventional problems.
「課題を解決するための手段」
本発明は、鉄骨柱の適所と足元の適所とにそれぞれエレ
クションピースを配して、両エレクションピース間にて
斜めにきりんを介在連係させ、該きりんの伸縮調整によ
り鉄骨柱の建起しを行うことにある。"Means for Solving the Problem" The present invention arranges erection pieces at appropriate locations on a steel column and at appropriate locations at the foot of the column, interposes a giraffe diagonally between both erection pieces, and connects the giraffe to expand and contract the giraffe. The purpose is to erect steel columns.
「作用」
如上の構成であり、きりんは、鉄骨の建入れと同時に組
み込み、伸縮させることにより建起しを行う。``Function'' With the above structure, Kirin is installed at the same time as the steel frame is erected, and is erected by expanding and contracting.
また、きりんは、圧縮材及び引張り材として働き、鉄骨
柱が傾くのを阻止する。Kirin also acts as a compressive and tensile material to prevent steel columns from tipping.
「実施例」 図面は、本発明の実施例を示している。"Example" The drawings illustrate embodiments of the invention.
第1図は、鉄骨柱lの中途部に、また、第2図は、鉄骨
柱1の柱・梁コーナ一部に、それぞれニレクシワンピー
ス3を設けた例を示している。Fig. 1 shows an example in which a Nireshi dress 3 is provided in the middle of a steel frame column l, and Fig. 2 shows an example in which a Nireshi dress 3 is provided in a part of the column/beam corner of the steel frame column 1.
而して、いずれの場合も、コンクリート床面2又は鉄骨
梁の適所に、上記エレクションピース3に^1応させて
、他のエレクションピース4を設け、両ニレクツぢン′
ヒ゛−ス3.4間にて、きりん5を介在連係させている
。In either case, another erection piece 4 is provided at a suitable location on the concrete floor 2 or steel beam in correspondence with the above-mentioned erection piece 3,
Kirin 5 is interposed and connected between the heaths 3 and 4.
なお、各エレクションピースは、溶接等によりあらかし
め固定しておく。In addition, each erection piece is fixed by welding or the like.
きりん5は、蝮筒51と蝶棒52とを螺合させ、該螺棒
の端部に設けたピン車53の回転により耀欅を蝮出入さ
せるようf1成し、両端にブラケット54゜55を段け
て、該ブラケットを以て上記両エレクンヨンビース3.
4に取り外し可能に枢16.7するようにしている。The Kirin 5 has a screw tube 51 and an insert pin 52 screwed together, and a pin wheel 53 provided at the end of the screw rod is rotated to move the pinwheel in and out. 3. Stack the two above-mentioned electronic beads with the bracket.
4, the pivot 16.7 can be removed.
なお、枢着には、ボルト ナツトを用いてもよい。Note that bolts and nuts may be used for the pivot connection.
きりん5は、鉄骨建入れと同時にエレクションピース3
.4へ連係させる。Kirin 5 was built at the same time as erection piece 3.
.. Link to 4.
続いて、きりん5のピン車53を回転させて、伸縮l9
し、歪修正を行う。Next, rotate the pin wheel 53 of Kirin 5 and expand/contract l9.
and perform distortion correction.
所定の鉄骨組立終了後、きりん5は取り外し、再度の使
用に供する。After completing the predetermined steel frame assembly, Kirin 5 is removed and used again.
「発明の効果」
本発明によれば、鉄骨柱の傾きを確実に防止でき、長大
スパンであってもトラス等の関連部材のをり付けに苦労
するようなことがない。"Effects of the Invention" According to the present invention, it is possible to reliably prevent a steel column from tilting, and there is no need to worry about attaching related members such as trusses even if the column has a long span.
また、鉄骨柱の建起しは、コンクリート床面等できりん
を操作して容易にかつ安定に行ことができる。Furthermore, the erection of steel columns can be easily and stably carried out by manipulating phosphorus on concrete floors, etc.
しかも、鉄骨柱の転倒防止効果を増大できる。Furthermore, the effect of preventing the steel frame column from falling can be increased.
更に、建起し作業が建入れと共に行うことができ、鉄骨
建方能率を向上させることができ、コストダウンを図る
ことができる。Furthermore, the erection work can be carried out at the same time as the erection, improving the steel frame erection efficiency and reducing costs.
図面は、本発明の実施例で、第1図、第2図は、各場合
における側面図である。
1・・・鉄骨柱 2・・・コンクリート床面3.
4・・エレクションピース
5・・きりん
51・・蝮筒 52・・・蝮捧53・・・ピン
車 54.55・・ブラケット出願人 株式会社
竹 中 工 務 店第1図The drawings show embodiments of the present invention, and FIGS. 1 and 2 are side views in each case. 1... Steel column 2... Concrete floor surface 3.
4..Erection piece 5..Girin 51..Budder tube 52..Block 53..Pin wheel 54.55..Bracket applicant Takenaka Construction Co., Ltd. Figure 1
Claims (1)
ョンピースを配して、両エレクションピース間にて斜め
にきりんを介在連係させ、該きりんの伸縮調整により鉄
骨柱の建起しを行うことを特徴とする鉄骨建方。(1) Erection pieces are placed at appropriate locations on the steel column and at appropriate locations at the foot of the column, and giraffes are diagonally interposed and linked between the two erection pieces, and the steel column is erected by adjusting the expansion and contraction of the giraffes. Steel frame construction featuring
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP6444088A JPH01239268A (en) | 1988-03-17 | 1988-03-17 | Erection of steel work |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP6444088A JPH01239268A (en) | 1988-03-17 | 1988-03-17 | Erection of steel work |
Publications (1)
Publication Number | Publication Date |
---|---|
JPH01239268A true JPH01239268A (en) | 1989-09-25 |
Family
ID=13258342
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP6444088A Pending JPH01239268A (en) | 1988-03-17 | 1988-03-17 | Erection of steel work |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPH01239268A (en) |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5652366U (en) * | 1979-09-28 | 1981-05-08 | ||
JPS6213659A (en) * | 1985-07-12 | 1987-01-22 | 株式会社竹中工務店 | Steel bar construction method of building |
-
1988
- 1988-03-17 JP JP6444088A patent/JPH01239268A/en active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5652366U (en) * | 1979-09-28 | 1981-05-08 | ||
JPS6213659A (en) * | 1985-07-12 | 1987-01-22 | 株式会社竹中工務店 | Steel bar construction method of building |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP2822012B2 (en) | Steel column construction adjustment jig | |
JPH01239268A (en) | Erection of steel work | |
JP3646575B2 (en) | Temporary support method and temporary support device | |
JP3247749B2 (en) | Construction method of long span truss beams | |
JPH09189132A (en) | Fixing method of column base for steel frame column | |
JPH0510107Y2 (en) | ||
JPH11324307A (en) | Mobile scaffold | |
JP2524735Y2 (en) | Steel column base | |
KR20020096773A (en) | Steel frame for steel frame | |
JPH08120771A (en) | Method for constructing steel trussed construction | |
JP2613552B2 (en) | Precast concrete frame and its construction method | |
JPS6055144A (en) | Iron skeletal column and beam connecting apparatus | |
JPS5817778Y2 (en) | Shoring | |
JPH0249314Y2 (en) | ||
JP2516357B2 (en) | Form support for arch concrete construction | |
JP2597691Y2 (en) | Tall column built-in mount | |
JPH0321739A (en) | Deflection control method for construction work with huge span | |
JPH09328816A (en) | Y-form column and anchor plate in hexagonal building structure | |
JPH06101349A (en) | Correcting method for steel member placing | |
JP2668616B2 (en) | Steel frame construction method | |
JPH06136945A (en) | Form timbering beam | |
JPH11217939A (en) | Steel framework column erection method and jig | |
JP3136095B2 (en) | Tension generator and tension generating method | |
JP3261526B2 (en) | Anchor frame for steel pier and footing using the same | |
JPS6278357A (en) | Moving type arch shaped mold frame apparatus |