JPH01192996A - Pipe propelling construction - Google Patents

Pipe propelling construction

Info

Publication number
JPH01192996A
JPH01192996A JP1652588A JP1652588A JPH01192996A JP H01192996 A JPH01192996 A JP H01192996A JP 1652588 A JP1652588 A JP 1652588A JP 1652588 A JP1652588 A JP 1652588A JP H01192996 A JPH01192996 A JP H01192996A
Authority
JP
Japan
Prior art keywords
pipe
leading pipe
excavating
ground
leading
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP1652588A
Other languages
Japanese (ja)
Other versions
JP2576561B2 (en
Inventor
Yoshiki Takeya
竹谷 由樹
Shinsuke Kogame
小亀 信介
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
KAGATAGUMI KK
Original Assignee
KAGATAGUMI KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by KAGATAGUMI KK filed Critical KAGATAGUMI KK
Priority to JP63016525A priority Critical patent/JP2576561B2/en
Publication of JPH01192996A publication Critical patent/JPH01192996A/en
Application granted granted Critical
Publication of JP2576561B2 publication Critical patent/JP2576561B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

PURPOSE:To enable the natural ground of both hard and soft qualities to be excavated, by providing a rotatable leading pipe pushed forward with a pushing device, with an excavating bit, and by permitting the pipe to be engaged with or separated from an excavating device, to rotate the only the excavating device for excavation. CONSTITUTION:Inside an internal casing 2 set in a pushed pipe 1, the auger screw 3 of an excavating device is set. On the internal wall surface of a leading pipe 10 set rotatably at the tip of a leading pipe bearing unit 9 via a rugged fitted-on section 11, a tapered surface 12 having an engaging groove 13 is formed. Besides, on the front surface of an excavating head 15, an excavating bit 16 is set, and a tapered surface 17 with an engaging projection 18 is set confronted with the tapered surface 12, respectively. Then, by a pushing device 5, the screw 3 is advanced to excavate natural ground 22, to be separated from the engaging projection 18 and the engaging groove 13. Besides, the leading pipe 10 is pushed forward by a jack 8, and the pushed pipe 1 is pushed forward by the pushing device 5, respectively, and the pipes are propelled in order. As a result, gravels 23 butted to the tip of the leading pipe 10 can be avoided in good order.

Description

【発明の詳細な説明】 [産業上の利用分野] 本発明は硬質および軟質の地盤からなる地山を良好に掘
削して管の推進を行うようにした管推進工法に関する。
DETAILED DESCRIPTION OF THE INVENTION [Industrial Application Field] The present invention relates to a pipe propulsion method for properly excavating a ground consisting of hard and soft ground to propel a pipe.

[従来の技術] 従来より上水道管、下水道管あるいは電気。[Conventional technology] Traditionally water pipes, sewer pipes or electricity.

ガス等の布設管を市街地に布設する場合には、−数的に
路面下に施工するものであり、交通遮断および施工箇所
付近住民の迷惑等を考慮して路面からの開削工法を排除
し、地下推進布設手段が採られている。これは地表に立
坑を掘削し、この立坑内から内側ケーシング内に配設し
たオーガースクリュー等の掘削装置により地山を掘削し
ながら先導管および押込管を押進して埋設するようにし
た管推進工法である。
When laying gas and other pipes in urban areas, it is numerically necessary to construct them under the road surface, so cut-and-cut construction methods from the road surface are excluded in consideration of blocking traffic and inconveniencing residents near the construction site. Underground propulsion installation methods are being adopted. This is a pipe propulsion method in which a shaft is excavated on the surface of the earth, and from within the shaft, the lead pipe and push pipe are pushed and buried while excavating the ground using a drilling device such as an auger screw installed inside the inner casing. It is a construction method.

[発明が解決しようとする問題点] 上記従来技術においては、オーガースクリューの掘削ヘ
ッドが先導管内に収容可能に設けられており、オーガー
スクリューの前進により掘削ヘッドを先導管より前方に
突出することにより先行して掘削し、その後掘削ヘツド
によって掘削された孔に、前記先導管内に前記掘削ヘッ
ドを収容するようにして先導管を押進させながら管理設
を行っている。このため掘削ヘッドによって掘削された
孔の径は先導管の径より小さくなり、地山が硬質地盤か
らなる場合においては掘削ヘッドによって掘削された孔
にこれよりも大径な先導管を押進することが困難であっ
た。また先導管の先端部分に礫が突き当って掘削ヘッド
による掘削に支障を来たし易いという問題があった。
[Problems to be Solved by the Invention] In the above-mentioned conventional technology, the digging head of the auger screw is provided so as to be housed in the leading pipe, and the drilling head is projected forward from the leading pipe by advancing the auger screw. The drilling head is first excavated and then the drilling head is housed in the leading pipe, and the drilling head is pushed through the hole to perform management construction. For this reason, the diameter of the hole excavated by the drilling head is smaller than the diameter of the leading pipe, and if the ground is made of hard ground, a leading pipe with a larger diameter is pushed into the hole drilled by the drilling head. It was difficult. There is also the problem that gravel hits the tip of the leading pipe, which tends to interfere with excavation by the excavation head.

そこで本発明は硬質および軟質の地盤からなる地山を良
好に掘削できるとともに、先導管の先端に突き当った礫
を良好に排除できる管推進工法を提供することを目的と
する。
SUMMARY OF THE INVENTION Therefore, an object of the present invention is to provide a pipe propulsion method that can satisfactorily excavate the ground consisting of hard and soft ground, and can also satisfactorily remove gravel that hits the tip of a leading pipe.

[問題点を解決するための手段] 本発明は掘削装置により地山を掘削しながら押込装置に
より先導管及び押込管を押進する管推進工法において、
前記先導管に掘削ビットを設けるとともにこの先導管を
回転可能に設け、かつ前記先導管に前記掘削装置に対し
係脱可能な係合部を設け、前記係合部を係合し、この状
態で前記先導管を掘削装置と一体的に回転して掘削し、
前記係合部を離脱し、この状態で掘削装置のみを回転し
て掘削するようにしたものである。
[Means for Solving the Problems] The present invention provides a pipe propulsion method in which a leading pipe and a pushing pipe are pushed forward by a pushing device while excavating the ground with an excavating device.
A drilling bit is provided on the leading pipe, the leading pipe is rotatably provided, and an engaging part is provided on the leading pipe that can be engaged with and detached from the drilling equipment, and the engaging part is engaged, and in this state, the leading pipe is rotatably provided. The lead pipe is rotated integrally with the drilling equipment to excavate.
The engaging portion is disengaged, and in this state only the excavating device is rotated to excavate.

[作 用] 上記工法によって、地山が軟質地盤の場合、掘削装置の
みの掘削により管の押進を行い、地山が硬質地盤の場合
、掘削装置と先導管を一体的に回転して先導管の掘削ビ
ットおよび掘削装置の掘削により管の押進を行うことが
できる。また先導管の先端に突き当った礫を先導管の回
転によって排除することができる。
[Function] With the above construction method, if the ground is soft ground, the pipe is pushed forward by excavating only with the excavation equipment, and if the ground is hard ground, the excavation equipment and the leading pipe are rotated together to advance the pipe. Pushing of the pipe can be accomplished by drilling with a conduit drilling bit and drilling rig. Furthermore, gravel that hits the tip of the leading pipe can be removed by rotating the leading pipe.

[実施例] 以下、本発明の一実施例を添付図面を参照して説明する
[Example] Hereinafter, an example of the present invention will be described with reference to the accompanying drawings.

第1図乃至第4図において、1は押込管であり、この押
込管1内に内側ケーシング2が配設されている。3はそ
の内側ケーシング2内に設けられた掘削装置たるオーガ
ースクリューである。4は発進立坑であり、この発進立
坑4内には前記内側ゲージング2、オーガースクリュー
3および押込管1のジヤツキから成る押込装置5と、前
記オーガースクリュー3の駆動装置6が設けられている
。7は前記押込管lの先端内壁面と内側ゲージング2の
外壁面との間に設けられた支圧壁であり、この支圧壁7
の前方には複数のジヤツキ8を介し先導管受体9が前記
内側ゲージング2の外周に被装するようにして設けられ
ている。
In FIGS. 1 to 4, reference numeral 1 denotes a push-in tube, and inside this push-in tube 1 an inner casing 2 is disposed. Reference numeral 3 designates an auger screw, which is a drilling device, provided within the inner casing 2. Reference numeral 4 denotes a starting shaft, and within this starting shaft 4, a pushing device 5 consisting of the inner gauging 2, an auger screw 3, and a jack for the pushing pipe 1, and a driving device 6 for the auger screw 3 are provided. Reference numeral 7 denotes a bearing pressure wall provided between the inner wall surface of the tip end of the push-in tube 1 and the outer wall surface of the inner gauging 2;
A leading tube receiver 9 is provided in front of the inner gauging 2 via a plurality of jacks 8 so as to cover the outer periphery of the inner gauging 2.

10は前記先導管受体9の先端に凹凸嵌合部11を介し
回転可能に装着された先導管であり、この先導管10の
内壁面にはテーパ面12が形成され、このテーパ面12
には同一円周上に係合部たる2個の山形の係合溝13が
等間隔に形成されている。14は第4図のように先導管
10の先端外周面に多数等間隔に形成された掘削ビット
である。15は前記オーガースクリュー3の先端に設け
られた掘削ヘッドであり、この掘削ヘッド15の前面に
は掘削ビット16が設けられているとともに、側周面に
は前記テーパ面12に対応するテーパ面17が設けられ
、このテーパ面17には前記係合溝13に対応して係合
部たる山形の係合突起18が形成されている。
A guide tube 10 is rotatably attached to the tip of the guide tube receiver 9 via a concave-convex fitting part 11, and a tapered surface 12 is formed on the inner wall surface of the guide tube 10.
Two chevron-shaped engagement grooves 13 serving as engagement portions are formed at equal intervals on the same circumference. Reference numeral 14 denotes a large number of drilling bits formed at equal intervals on the outer peripheral surface of the tip of the leading pipe 10, as shown in FIG. Reference numeral 15 denotes a drilling head provided at the tip of the auger screw 3. A drilling bit 16 is provided on the front surface of the drilling head 15, and a tapered surface 17 corresponding to the tapered surface 12 is provided on the side peripheral surface. A chevron-shaped engagement protrusion 18 serving as an engagement portion is formed on the tapered surface 17 in correspondence with the engagement groove 13 .

19は前記掘削ヘッド15の基部に設けられたパツキン
から成る止水部であり、この止水部19が前記内側ケー
シング2の先端開口部20に嵌合することにより地下水
の内側ゲー゛シング2内への流入を阻止するようにして
いる。21は土砂排出口、22は地山である。
Reference numeral 19 denotes a water stop part made of a gasket provided at the base of the excavation head 15, and when this water stop part 19 fits into the tip opening 20 of the inner casing 2, underground water is removed from inside the inner casing 2. We are trying to prevent the inflow to. 21 is an earth and sand outlet, and 22 is a ground.

そして、地山22が軟質地盤からなるものにおいては、
第2図のように押込装置5によりオーガースクリュー3
を前進させて係合部たる係合突起18と係合溝13とを
離脱し、この状態でオーガースクリュー3を回転駆動し
ながら前進させて先行して地山22を掘削し、かつジヤ
ツキ8により先導管10を押進するとともに、押込装置
5によって押込管1を押進して順次管推進を行う。一方
、地山22が硬質地盤からなるものにおいては、第2図
のように押送装置5によりオーガースクリュー3を後退
して前記係合部たる係合突起18と係合溝13とを浅く
係合させ、この状態でオーガースクリュー3を回転駆動
することによりオーガースクリュー3と一体的に先導管
10を回転させ、先導管10の掘削ビット14および掘
削ヘッド15の掘削ビット16により地山22を掘削し
、かつ押込装置5によって先導管10および押込管1を
押進して順次管推進を行う。また、このようにしてオー
ガースクリュー3と一体的に先導管10が回転すること
によって、第3図のように先導管10の先端に突き当っ
た礫23を先導管10の回転を介し良好に排除すること
ができる。
In the case where the ground 22 is made of soft ground,
As shown in Fig. 2, the auger screw 3 is
is advanced to disengage the engagement protrusion 18 and the engagement groove 13, and in this state, the auger screw 3 is advanced while being rotationally driven to excavate the ground 22 in advance, and the jack 8 While pushing forward the leading tube 10, the pushing device 5 pushes the pushing tube 1 forward to sequentially propel the tube. On the other hand, when the ground 22 is made of hard ground, the auger screw 3 is moved back by the pushing device 5 as shown in FIG. By rotating the auger screw 3 in this state, the leading pipe 10 is rotated integrally with the auger screw 3, and the ground 22 is excavated by the drilling bit 14 of the leading pipe 10 and the drilling bit 16 of the drilling head 15. , and the pushing device 5 pushes the leading tube 10 and the pushing tube 1 to sequentially propel the tubes. In addition, by rotating the leading pipe 10 integrally with the auger screw 3 in this manner, the gravel 23 that has hit the tip of the leading pipe 10 as shown in FIG. 3 can be effectively removed through the rotation of the leading pipe 10. can do.

以上のように本実施例においては地山22が軟質地盤の
場合には係合突起18と係合溝13との離脱によって通
常通りオーガースクリュー3による掘削と管推進を行い
、地山22が硬質地盤の場合には係合突起18と係合溝
13との係合によってオーガースクリュー3と一体的に
先導管10を回転駆動し、この状態で先導管10および
オーガースクリュー3の掘削ビット14゜16により硬
質地盤からなる地山22を掘削できるとともに先導管1
0の先端に突き当った礫23の排除を可能とし、さらに
地山22が滞水砂層の場合には、止水部19により内側
ケーシング2の先端開口部20を塞ぐことにより、地下
水の発進立坑4への流入を防止することができる。而し
て、係合部の係脱という簡単な操作によって地山22の
状態に適応した管推進が可能である。
As described above, in this embodiment, when the ground 22 is soft ground, the engagement protrusion 18 and the engagement groove 13 are disengaged, and the auger screw 3 performs excavation and pipe propulsion as usual, and the ground 22 is hard ground. In the case of ground, the leading pipe 10 is rotated integrally with the auger screw 3 by the engagement between the engaging protrusion 18 and the engaging groove 13, and in this state, the leading pipe 10 and the drilling bit 14° 16 of the auger screw 3 are rotated. It is possible to excavate the ground 22 made of hard ground, and the lead pipe 1 can be excavated.
In addition, when the ground 22 is a water-retaining sand layer, by blocking the tip opening 20 of the inner casing 2 with the water stop part 19, it is possible to remove the gravel 23 that has hit the tip of the ground shaft. 4 can be prevented. Thus, the pipe can be propelled in accordance with the condition of the ground 22 by a simple operation of engaging and disengaging the engaging portion.

なお、本発明は上記実施例に限定されるものではなく本
発明の要旨の範囲内において種々の変形実施が可能であ
る0例えば係合部および掘削ビットの数、形状、構造は
適宜選定すればよく、例えば係合突起を先導管に設け、
係合溝を掘削装置に設けてもよい、また先導管と掘削装
置に係合突起を設けてもよい、また先導管用のジヤツキ
8は必要に応じ設ければよく、各種の管推進工法に適用
可能である。
Note that the present invention is not limited to the above-mentioned embodiments, and various modifications can be made within the scope of the gist of the present invention.For example, the number, shape, and structure of the engaging portion and the digging bit may be appropriately selected Often, for example, an engaging protrusion is provided on the leading tube,
An engagement groove may be provided on the excavation equipment, an engagement protrusion may be provided on the leading pipe and the excavation equipment, and the jack 8 for the leading pipe may be provided as necessary, and is applicable to various pipe propulsion methods. It is possible.

[発明の効果] 本発明は掘削装置により地山を掘削しながら押込装置に
より先導管及び押込管を押進する管推進工法において、
前記先導管に掘削ビットを設けるとともにこの先導管を
回転可能に設け、かつ前記先導管に前記掘削装置に対し
係脱可能な係合部を設け、前記係合部を係合し、この状
態で前記先導管を掘削装置と一体的に回転して掘削し、
前記係合部を離脱し、この状態で掘削装置のみを回転し
て掘削するようにしたことにより、硬質および軟質の地
盤からなる地山を良好に掘削できるとともに、先導管の
先端に突き当った礫を良好に排除できる管推進工法を提
供できる。
[Effects of the Invention] The present invention provides a pipe propulsion method in which a leading pipe and a pushing pipe are pushed forward by a pushing device while excavating the ground with an excavating device.
A drilling bit is provided on the leading pipe, the leading pipe is rotatably provided, and an engaging part is provided on the leading pipe that can be engaged with and detached from the drilling equipment, and the engaging part is engaged, and in this state, the leading pipe is rotatably provided. The lead pipe is rotated integrally with the drilling equipment to excavate.
By disengaging the engaging portion and rotating only the excavation device to excavate in this state, it is possible to excavate the ground consisting of hard and soft ground, and it is possible to excavate the ground consisting of hard and soft ground without hitting the tip of the leading pipe. A pipe propulsion method that can effectively remove gravel can be provided.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図乃至第4図は本発明の一実施例を示し、第1図は
管推進状態を示す概略説明図、第2図は軟質地盤からな
る。他山に対する管推進状態を示す要部の拡大断面図、
第3図は硬質地盤からなる地山に対する管推進状態を示
す要部の断面図、第4図は第3図のA−A線断面図であ
る。 1・・・押込管 3・・・オーガースクリュー(掘削装置)4・・・発進
立坑(立坑) 5・・・押込装置 10・・・先導管 13・・・係合清く係合部) 14・・・掘削ビット 18・・・係合突起(係合部) 22・・・地山
1 to 4 show an embodiment of the present invention, in which FIG. 1 is a schematic explanatory diagram showing a tube propulsion state, and FIG. 2 shows a soft ground. An enlarged sectional view of the main parts showing the state of the pipe being propelled against other mountains,
FIG. 3 is a cross-sectional view of a main part showing the state of the pipe being pushed against a rock made of hard ground, and FIG. 4 is a cross-sectional view taken along the line A--A in FIG. 3. 1... Pushing pipe 3... Auger screw (excavation equipment) 4... Starting shaft (vertical shaft) 5... Pushing device 10... Leading pipe 13... Engagement clear engagement part) 14. ...Drilling bit 18...Engagement protrusion (engagement part) 22...Ground

Claims (1)

【特許請求の範囲】 掘削装置により地山を掘削しながら押込装 置により先導管及び押込管を押進する管推進工法におい
て、前記先導管に掘削ビットを設けるとともにこの先導
管を回転可能に設け、かつ前記先導管に前記掘削装置に
対し係脱可能な係合部を設け、前記係合部を係合し、こ
の状態で前記先導管を掘削装置と一体的に回転して掘削
し、前記係合部を離脱し、この状態で掘削装置のみを回
転して掘削するようにしたことを特徴とする管推進工法
[Scope of Claims] A pipe propulsion method in which a leading pipe and a pushing pipe are pushed forward by a pushing device while excavating the ground with an excavating device, wherein the leading pipe is provided with an excavation bit and the leading pipe is rotatably provided, and The leading pipe is provided with an engaging part that can be engaged with and detached from the excavating equipment, the engaging part is engaged, and in this state, the leading pipe is rotated integrally with the excavating equipment to excavate, and the engaging part is engaged with the leading pipe. This pipe propulsion construction method is characterized in that the section is detached, and in this state only the excavation equipment is rotated to excavate.
JP63016525A 1988-01-27 1988-01-27 Pipe propulsion method Expired - Lifetime JP2576561B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP63016525A JP2576561B2 (en) 1988-01-27 1988-01-27 Pipe propulsion method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP63016525A JP2576561B2 (en) 1988-01-27 1988-01-27 Pipe propulsion method

Publications (2)

Publication Number Publication Date
JPH01192996A true JPH01192996A (en) 1989-08-03
JP2576561B2 JP2576561B2 (en) 1997-01-29

Family

ID=11918692

Family Applications (1)

Application Number Title Priority Date Filing Date
JP63016525A Expired - Lifetime JP2576561B2 (en) 1988-01-27 1988-01-27 Pipe propulsion method

Country Status (1)

Country Link
JP (1) JP2576561B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0642290A (en) * 1992-07-20 1994-02-15 Kido Gijutsu Kenkyusho:Kk Advancing method for embedded pipe
KR100718942B1 (en) * 2006-11-13 2007-05-16 이창원 The method construction digging and tunnel excavator for steel pipe pumping-up to soft ground

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6145098A (en) * 1984-08-08 1986-03-04 株式会社小松製作所 Leading apparatus of pipe propelling and embedding apparatus

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6145098A (en) * 1984-08-08 1986-03-04 株式会社小松製作所 Leading apparatus of pipe propelling and embedding apparatus

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0642290A (en) * 1992-07-20 1994-02-15 Kido Gijutsu Kenkyusho:Kk Advancing method for embedded pipe
KR100718942B1 (en) * 2006-11-13 2007-05-16 이창원 The method construction digging and tunnel excavator for steel pipe pumping-up to soft ground

Also Published As

Publication number Publication date
JP2576561B2 (en) 1997-01-29

Similar Documents

Publication Publication Date Title
JPH01192996A (en) Pipe propelling construction
KR101410853B1 (en) Tunneling Apparatus for Pipeline Excavation
JPH01275983A (en) Method for pipe setting to existing pipe
JP2012107464A (en) Excavator
JP2507827B2 (en) Underground method of pipe
JPH037797B2 (en)
JP2005330667A (en) Two-stage pipe-jacking construction method and connector
JP3539872B2 (en) Wellhead Water Stopper and Propulsion Method Using It
JP3542108B2 (en) Underground pipe laying method
JP2001295584A (en) Cutter head device for underground excavation
JP3024065B2 (en) Shaft excavation method
JPS6397794A (en) Method of corrected boring construction
JP3427360B2 (en) Shield machine
JP3110927B2 (en) Backfill injection method in propulsion method
JPH07127384A (en) Small-sized pipe jacking and layout device
JPS6213480B2 (en)
JPS6175198A (en) Propelling of small caliber machine
JPH0932093A (en) Method of installing fitting pipe to existing pipe or the like
JPH10110591A (en) Underground pipe jacking method
JP2516042Y2 (en) Auger for pipe installation in the ground
JP2003129790A (en) Method and device for constructing pit mouth
JPH01142194A (en) Method of rock excavation simultaneous pipe push-in construction
JPS6332938B2 (en)
JPS6160957B2 (en)
JP2001123791A (en) Excavator and excavating method

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081107

Year of fee payment: 12

EXPY Cancellation because of completion of term
FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081107

Year of fee payment: 12