JPH01105111U - - Google Patents

Info

Publication number
JPH01105111U
JPH01105111U JP81488U JP81488U JPH01105111U JP H01105111 U JPH01105111 U JP H01105111U JP 81488 U JP81488 U JP 81488U JP 81488 U JP81488 U JP 81488U JP H01105111 U JPH01105111 U JP H01105111U
Authority
JP
Japan
Prior art keywords
overhang
entire length
laterally outward
wiring
piping
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP81488U
Other languages
Japanese (ja)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to JP81488U priority Critical patent/JPH01105111U/ja
Publication of JPH01105111U publication Critical patent/JPH01105111U/ja
Pending legal-status Critical Current

Links

Landscapes

  • Floor Finish (AREA)
  • Installation Of Indoor Wiring (AREA)
  • Rod-Shaped Construction Members (AREA)

Description

【図面の簡単な説明】[Brief explanation of the drawing]

図面は本考案に係る建築物の配管・配線設備の
実施例を示し、第1図は縦断面図、第2図は横断
平面図であり、第3図、第4図は夫々、本考案の
別実施例を示す要部の縦縦断図である。 1……梁、2……柱、3……張出部、4……床
スラブ、5……溝。
The drawings show an example of the piping and wiring equipment for a building according to the present invention, and FIG. 1 is a longitudinal sectional view, FIG. 2 is a cross-sectional plan view, and FIGS. FIG. 7 is a longitudinal sectional view of main parts showing another embodiment. 1... Beam, 2... Column, 3... Overhang, 4... Floor slab, 5... Groove.

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] 梁1に、その梁1が接合する柱2よりも横外方
にまで突出し、かつ、その梁1の全長にわたる張
出部3を一体に連設し、その張出部3の先端に床
スラブ4を接合し、前記張出部3の上面のうち前
記柱2よりも横外方に位置する部分に張出部3の
全長にわたる配管・配線用の溝5を形成してある
建築物の配管・配線設備。
A beam 1 is integrally connected with an overhang 3 that protrudes laterally outward from the column 2 to which the beam 1 joins and spans the entire length of the beam 1, and a floor slab is attached to the tip of the overhang 3. 4 are joined together, and a groove 5 for piping and wiring is formed over the entire length of the overhang 3 in a portion of the upper surface of the overhang 3 located laterally outward than the pillar 2.・Wiring equipment.
JP81488U 1988-01-06 1988-01-06 Pending JPH01105111U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP81488U JPH01105111U (en) 1988-01-06 1988-01-06

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP81488U JPH01105111U (en) 1988-01-06 1988-01-06

Publications (1)

Publication Number Publication Date
JPH01105111U true JPH01105111U (en) 1989-07-14

Family

ID=31200157

Family Applications (1)

Application Number Title Priority Date Filing Date
JP81488U Pending JPH01105111U (en) 1988-01-06 1988-01-06

Country Status (1)

Country Link
JP (1) JPH01105111U (en)

Similar Documents

Publication Publication Date Title
JPH01105111U (en)
JPS6158210U (en)
JPH0236506U (en)
JPS6171734U (en)
JPS61175406U (en)
JPH0284832U (en)
JPH0256221U (en)
JPS61133601U (en)
JPH01131713U (en)
JPS6364806U (en)
JPS6191945U (en)
JPS6273013U (en)
JPS6037501U (en) Balcony drainage system
JPH0289128U (en)
JPH0232527U (en)
JPH021312U (en)
JPS6437819U (en)
JPS6457214U (en)
JPS6254150U (en)
JPS6289369U (en)
JPS647620U (en)
JPH0268908U (en)
JPH02141037U (en)
JPS61112002U (en)
JPH01100817U (en)