JP7842006B2 - 揚水発電を用いた電力需要調整サーバ及び電力需要調整システム - Google Patents
揚水発電を用いた電力需要調整サーバ及び電力需要調整システムInfo
- Publication number
- JP7842006B2 JP7842006B2 JP2022197461A JP2022197461A JP7842006B2 JP 7842006 B2 JP7842006 B2 JP 7842006B2 JP 2022197461 A JP2022197461 A JP 2022197461A JP 2022197461 A JP2022197461 A JP 2022197461A JP 7842006 B2 JP7842006 B2 JP 7842006B2
- Authority
- JP
- Japan
- Prior art keywords
- pumped
- power
- electricity
- storage
- unit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Description
図1に示すように、本発明の実施の形態に係る電力需要調整システム100は、需要家毎に備えられた、太陽光発電装置10、揚水発電装置12、及び制御装置16と、エネルギーセンター側に設けられたサーバ20とを備えている。需要家毎の制御装置16とサーバ20は、インターネットなどのネットワーク41を介して相互に接続されている。なお、サーバ20が、電力需要調整サーバの一例である。
(発電電力)=9.8QHηG
理論流量Q=消費電力×ポンプ効率ηP/(重力加速度×全揚程H)
であるため、全揚程H=10m、ポンプ効率ηP=0.6とすれば、理論流量Qは約36.7m3/min(=100(kW)×0.6×10/(9.8(m/s2)×10(m))なので、3時間で6612m3(=36.7×180)の水を上池50に揚水できる。一般的には100kW出力のIE3グレードの高効率モータの効率は96%程度であるが、ここではモータ効率は計算の便宜上100%と考える。
(電力需要の調整に応じた単位当たりの報酬[円]+揚水発電期待値[円])>当該時間帯の電気代[円]
である場合には、ポンプ56による揚水を実行して、電力需要を増加するように調整すると判定する。
ポンプ56の消費電力単位は(kW)であり、消費電力100(kW)で一時間ポンプ揚水すれば、100(kW)×1(h)=100(kWh)であり、100(kW)で3時間ポンプ揚水すれば、100(kW)×3(h)=300(kWh)となる。
従って、報酬は6000円(=300(kWh)×20(円/kWh))となる。
次に、本実施形態に係る電力需要調整システム100の動作について説明する。
12 揚水発電装置
16 制御装置
20 サーバ
22 通信部
24 演算部
30 取得部
32 算出部
34 判定部
36 出力部
50 上池
52 下池
54 発電電動機
56 ポンプ
100 電力需要調整システム
Claims (4)
- 水車が連結した発電電動機の下部に設置された下池から、上部に設置された上池にくみ上げた水を、前記上池から前記下池に流すことで発電する揚水発電装置を有する需要家の電力需要を調整するための、揚水発電を用いた電力需要調整サーバであって、
電力需要を増加するように調整する際に、電力需要の調整に応じた単位当たりの報酬と、現在の単位当たりの電気料金とを取得する取得部と、
揚水発電装置の特性と、発電時の単位当たりの電気料金とに基づいて、前記電力需要の調整において前記上池に水をくみ上げた場合の揚水発電期待値を算出する算出部と、
電力需要の調整に応じた単位当たりの報酬と、現在の単位当たりの電気料金と、前記揚水発電期待値とに基づいて、電力需要を増加するように調整するか否かを判定する判定部と、
前記判定部による判定結果に応じて前記揚水発電装置に対して運転指令を出力する出力部と、
を含む電力需要調整サーバ。 - 前記算出部は、前記揚水発電装置の特性に基づいて、所定時間だけ、前記下池から前記上池に水をくみ上げるように前記揚水発電装置を運転させた場合の揚水量に応じた発電量を算出し、前記算出した前記発電量と、発電時の単位当たりの電気料金とに基づいて、前記揚水発電期待値として、削減できる電気料金を算出する請求項1記載の電力需要調整サーバ。
- 前記需要家は、太陽光発電装置を更に有する請求項1記載の電力需要調整サーバ。
- 請求項1~請求項3の何れか1項記載の電力需要調整サーバと、
揚水発電装置と、
を含む電力需要調整システム。
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2022197461A JP7842006B2 (ja) | 2022-12-09 | 2022-12-09 | 揚水発電を用いた電力需要調整サーバ及び電力需要調整システム |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2022197461A JP7842006B2 (ja) | 2022-12-09 | 2022-12-09 | 揚水発電を用いた電力需要調整サーバ及び電力需要調整システム |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2024083119A JP2024083119A (ja) | 2024-06-20 |
| JP7842006B2 true JP7842006B2 (ja) | 2026-04-07 |
Family
ID=91539102
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2022197461A Active JP7842006B2 (ja) | 2022-12-09 | 2022-12-09 | 揚水発電を用いた電力需要調整サーバ及び電力需要調整システム |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP7842006B2 (ja) |
Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20180100480A1 (en) | 2016-10-07 | 2018-04-12 | Littoral Power Systems Inc. | Pumped storage hydropower system |
| JP2021108525A (ja) | 2019-12-27 | 2021-07-29 | 昭和電工株式会社 | 電力運用システム |
-
2022
- 2022-12-09 JP JP2022197461A patent/JP7842006B2/ja active Active
Patent Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20180100480A1 (en) | 2016-10-07 | 2018-04-12 | Littoral Power Systems Inc. | Pumped storage hydropower system |
| JP2021108525A (ja) | 2019-12-27 | 2021-07-29 | 昭和電工株式会社 | 電力運用システム |
Also Published As
| Publication number | Publication date |
|---|---|
| JP2024083119A (ja) | 2024-06-20 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| DK2733810T3 (en) | Method of controlling a power grid | |
| KR102920247B1 (ko) | 하이브리드 발전소 | |
| Papaefthimiou et al. | Operating policies for wind-pumped storage hybrid power stations in island grids | |
| US7315769B2 (en) | Multi-tier benefit optimization for operating the power systems including renewable and traditional generation, energy storage, and controllable loads | |
| WO2019241554A1 (en) | Distributed energy control | |
| US20020103745A1 (en) | System, method and computer program product for enhancing commercial value of electrical power produced from a renewable energy power production facility | |
| US20030126060A1 (en) | System, method and computer program product for enhancing commercial value of electrical power produced from a renewable energy power production facility | |
| JP2010233352A (ja) | 電力供給システムおよび分散型発電装置の制御装置 | |
| EP3229333A1 (en) | Electric power control system, electric power control method, and program | |
| EP2973932A1 (en) | System and method for energy distribution | |
| Aziz et al. | Issues and mitigations of wind energy penetrated network: Australian network case study | |
| CN110571868B (zh) | 微电网的优化配置方法 | |
| JP7842006B2 (ja) | 揚水発電を用いた電力需要調整サーバ及び電力需要調整システム | |
| El-Hendawi et al. | Enhanced MG with optimum operational cost of pumping water distribution systems | |
| CN119651776A (zh) | 一种电力系统的发电调度方法及相关装置 | |
| Asaduz-Zaman et al. | Techno-Economic Optimization of Autonomous PV/Wind/Battery Microgrid for Seawater Reverse Osmosis Desalination Plant | |
| Das et al. | Socio-economic advancement and grid-frequency control of a wind farm-PHS-solar connected EV hybrid electrical system considering imbalance prices | |
| JP7727365B1 (ja) | 水力発電の未活用エネルギーを利用した水素管理システム | |
| Kong et al. | Impact of reservoir evaporation on determining power purchasing agreement under solar-hydro hybridization | |
| CN114512985B (zh) | 一种基于调峰辅助服务分摊的新能源交易分析方法 | |
| CN113935778B (zh) | 一种电力的市场出清控制方法、装置及系统 | |
| Truong | Resource Adequacy and Capacity Payment Mechanism in Vietnam Electricity Market | |
| Chen et al. | Long-term optimization for the extension scheme of island microgrids | |
| Zahmoun et al. | Grid Integration of Renewable Energy Through Wind-Pumped Hydro Storage for Load Limiting | |
| Taoa et al. | Research on the Operation of 2 Reservoirs and 3 Stations with Hybrid Pumped Storage Power Station |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20250526 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20260306 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20260317 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20260326 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 7842006 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |