JP7489904B2 - Regional energy management system, regional energy management device, facility energy management device, demand forecasting method, and demand forecasting program - Google Patents

Regional energy management system, regional energy management device, facility energy management device, demand forecasting method, and demand forecasting program Download PDF

Info

Publication number
JP7489904B2
JP7489904B2 JP2020195396A JP2020195396A JP7489904B2 JP 7489904 B2 JP7489904 B2 JP 7489904B2 JP 2020195396 A JP2020195396 A JP 2020195396A JP 2020195396 A JP2020195396 A JP 2020195396A JP 7489904 B2 JP7489904 B2 JP 7489904B2
Authority
JP
Japan
Prior art keywords
demand
information
energy management
power
power demand
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2020195396A
Other languages
Japanese (ja)
Other versions
JP2022083834A (en
Inventor
浩史 小野
遼太 松浦
真人 高井
一浩 西都
卓志 前田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Corp
Original Assignee
Mitsubishi Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Corp filed Critical Mitsubishi Electric Corp
Priority to JP2020195396A priority Critical patent/JP7489904B2/en
Publication of JP2022083834A publication Critical patent/JP2022083834A/en
Application granted granted Critical
Publication of JP7489904B2 publication Critical patent/JP7489904B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/222Demand response systems, e.g. load shedding, peak shaving

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

本開示は、地域の電力の需給を管理する地域エネルギー管理システム、地域エネルギー管理装置、施設エネルギー管理装置、需要予測方法および需要予測プログラムに関する。 This disclosure relates to a local energy management system that manages the supply and demand of electricity in a region, a local energy management device, a facility energy management device, a demand forecasting method, and a demand forecasting program.

スマートコミュニティーのように、地域(コミュニティー)全体で電力の有効活用を図る技術の導入と検討が進んでいる。このような地域では、地域内で電力融通を行うことで、地域内の発電設備、蓄電設備の有効活用を図っている。 Technologies that aim to make efficient use of electricity throughout an entire region (community), such as smart communities, are being introduced and examined. In such regions, electricity is shared within the region to make effective use of the local power generation and storage facilities.

一般に、このような地域では、地域エネルギー管理装置が設けられ、地域エネルギー管理装置が、地域における電力の供給量および需要量を管理している。地域エネルギー管理装置は、例えば、電力の融通を行っても電力が不足する場合には、地域内の需要家に消費電力の抑制を要請したり、電力会社または電力市場から電力を購入したりといった対応を行うため、地域内の電力の需要量と供給量とを予測し、需給計画を策定する。地域内で有効に電力を融通するには、電力需要を精度よく予測することが望ましい。 Generally, in such areas, a local energy management device is installed, which manages the supply and demand of electricity in the area. The local energy management device predicts the demand and supply of electricity in the area and formulates a supply and demand plan in order to take measures such as requesting consumers in the area to reduce their power consumption or purchasing electricity from a power company or the electricity market if there is a power shortage even after power exchange. To exchange electricity effectively within the area, it is desirable to accurately predict electricity demand.

特許文献1には、電力需要の予測精度を向上させる技術が開示されている。特許文献1に記載の技術では、過去の実績値を用いて電力需要と人流量を予測する。次に、特許文献1に記載の技術では、毎時間得られる電力需要の計測値と電力需要の予測値との差を電力需要予測誤差として求めるとともに、毎時間得られる、モバイル機器の位置情報、人口統計値、交通量、各駅乗降者数などに基づいて、人流量を推定し、人流量の予測値と人流量の推定値との差である人流予測誤差を算出する。そして、特許文献1の技術では、電力需要予測誤差と人流予測誤差との相関があると判定された場合に、人流予測誤差を用いて電力需要の予測値を補正する。 Patent Document 1 discloses a technology for improving the accuracy of power demand prediction. The technology described in Patent Document 1 predicts power demand and pedestrian flow using past actual values. Next, the technology described in Patent Document 1 obtains the difference between the measured power demand value obtained every hour and the predicted power demand value as the power demand prediction error, and estimates the pedestrian flow based on the position information of mobile devices, demographic values, traffic volume, and the number of passengers boarding and alighting at each station, which are obtained every hour, and calculates the pedestrian flow prediction error, which is the difference between the predicted pedestrian flow value and the estimated pedestrian flow value. Then, in the technology of Patent Document 1, if it is determined that there is a correlation between the power demand prediction error and the pedestrian flow prediction error, the pedestrian flow prediction error is used to correct the power demand prediction value.

特開2017-208952号公報JP 2017-208952 A

近年、感染症対策によるテレワーク、営業自粛が行われており、このような社会的状況は今後も継続すると考えられる。テレワーク、営業自粛は、人流に影響を与え電力需要に影響する。上記特許文献1に記載の技術によれば、人流量の変動を考慮して電力需要を算出することができるが、人流量の推定値のもとになるモバイル機器の位置情報、人口統計値、交通量、各駅乗降者数などは、電力需要に直ちに影響するとは限らない。例えば、オフィスビル、工場などの最寄りの駅の乗降者数が多い時間帯は、当該オフィスビル、工場などの電力需要のピークとなる時間帯とは異なっている。このため、最寄りの駅の乗降者数に関しては、電力需要の予測対象時刻と、最寄りの駅の乗降者数が計数された時刻との時間差が電力需要の予測誤差に影響を与える可能性がある。一方、例えば、人口統計値は頻繁に更新されないため、電力需要の予測対象時刻と、人口統計値の算出された時刻との時間差はあまり問題にならない。特許文献1では、上記の時間差を考慮していないため、電力需要の予測精度が十分でない可能性がある。 In recent years, teleworking and business voluntary restraints have been implemented as a measure against infectious diseases, and such social conditions are expected to continue in the future. Teleworking and business voluntary restraints affect the flow of people, which in turn affects electricity demand. According to the technology described in the above-mentioned Patent Document 1, it is possible to calculate electricity demand by taking into account fluctuations in the flow of people, but the location information of mobile devices, demographic values, traffic volume, and the number of passengers boarding and alighting at each station, which are the basis for the estimated value of the flow of people, do not necessarily affect electricity demand immediately. For example, the time period when the number of passengers boarding and alighting at the nearest station to an office building or factory is high is different from the time period when the power demand of the office building or factory is at its peak. For this reason, with regard to the number of passengers boarding and alighting at the nearest station, the time difference between the time when the power demand is predicted and the time when the number of passengers boarding and alighting at the nearest station is counted may affect the prediction error of the power demand. On the other hand, for example, since the demographic values are not frequently updated, the time difference between the time when the power demand is predicted and the time when the demographic values are calculated is not a big problem. In Patent Document 1, since the above-mentioned time difference is not taken into account, the accuracy of the prediction of the power demand may be insufficient.

本開示は、上記に鑑みてなされたものであって、電力需要の予測精度を向上させることができる地域エネルギー管理システムを得ることを目的とする。 The present disclosure has been made in consideration of the above, and aims to provide a regional energy management system that can improve the accuracy of electricity demand forecasts.

上述した課題を解決し、目的を達成するために、本開示にかかる地域エネルギー管理システムは、電力融通を行う地域全体の電力の需給を管理する地域エネルギー管理装置と、地域においてそれぞれに定められた領域の電力を管理する複数の施設エネルギー管理装置と、を備える。複数の施設エネルギー管理装置は、それぞれの対応する領域の電力需要の予測値を求め、予測値を地域エネルギー管理装置へ送信し、地域エネルギー管理装置は、複数の施設エネルギー管理装置からの予測値を需要影響情報を用いて補正し、補正された予測値を用いて、地域全体の需給を管理し、需要影響情報は、駅の乗降者数を含み、地域エネルギー管理装置は、取得済の需要影響情報および電力需要を用いて、基準時刻と電力需要の時刻との時間差ごとの、需要影響情報と電力需要との相関値を算出し、算出した相関値を用いて、予測値の補正に用いる時間差を設定する In order to solve the above-mentioned problems and achieve the object, the local energy management system according to the present disclosure includes a local energy management device that manages the supply and demand of electricity in an entire area where electricity is exchanged, and a plurality of facility energy management devices that manage electricity in respective areas defined in the area. The facility energy management devices obtain forecast values of electricity demand in their respective corresponding areas and transmit the forecast values to the local energy management device, the local energy management device corrects the forecast values from the facility energy management devices using demand impact information and manages the supply and demand of the entire area using the corrected forecast values, the demand impact information including the number of passengers getting on and off at stations, the local energy management device calculates a correlation value between the demand impact information and the electricity demand for each time difference between a reference time and the time of the electricity demand using the acquired demand impact information and the electricity demand, and sets a time difference used for correcting the forecast value using the calculated correlation value .

本開示にかかる地域エネルギー管理システムは、電力需要の予測精度を向上させることができるという効果を奏する。 The regional energy management system disclosed herein has the effect of improving the accuracy of electricity demand forecasts.

実施の形態にかかる地域エネルギー管理システムの構成例を示す図FIG. 1 is a diagram showing a configuration example of a local energy management system according to an embodiment; 実施の形態のAEMSを実現するコンピュータシステムの構成例を示す図FIG. 1 is a diagram showing an example of the configuration of a computer system that realizes an AEMS according to an embodiment. オフィスにおける電力需要の変化を示す模式図Schematic diagram showing changes in electricity demand in offices 小売店における電力需要の変化を示す模式図Schematic diagram showing changes in electricity demand at retail stores ホテルにおける電力需要の変化を示す模式図Schematic diagram showing changes in electricity demand in a hotel 業態ごとの感染症対策による社会的状況の電力需要への影響度の一例を示す図A diagram showing an example of the impact of social conditions on electricity demand due to infection control measures for each business type 第1情報の一例である営業時間情報を示す図FIG. 13 is a diagram showing business hours information as an example of first information; 第1情報の一例である出勤状況を示す図FIG. 13 is a diagram showing an example of attendance status of the first information; 監視カメラの画像とビルのあるフロアにおける在館人数の予測との関係を示す図A diagram showing the relationship between surveillance camera images and predictions of the number of people present on a floor of a building. 図9に示した監視カメラの画像から認識された通行者数に基づく電力需要の補正の一例を示す図FIG. 10 is a diagram showing an example of correction of power demand based on the number of passersby recognized from the image of the surveillance camera shown in FIG. 第2情報の一例である駅の乗降者数と電力需要との関係の一例を示す図FIG. 13 is a diagram showing an example of a relationship between the number of passengers getting on and off at a station and power demand, which is an example of second information; 各情報の時間差ごとの相関値を示す模式図A schematic diagram showing correlation values for each time difference of information 第2情報の別の一例である気象情報の電力需要への影響を模式的に示す図FIG. 13 is a diagram showing an example of the second information, which is meteorological information, and its influence on power demand; 補正情報の生成処理手順の一例を示すフローチャート11 is a flowchart showing an example of a procedure for generating correction information. 実施の形態のAEMSにおける電力需要の補正処理手順の一例を示すフローチャートA flowchart showing an example of a procedure for correcting power demand in the AEMS according to the embodiment. ビルの位置と駅の位置の一例を示す模式図A schematic diagram showing an example of building and station locations

以下に、実施の形態にかかる地域エネルギー管理システム、地域エネルギー管理装置、施設エネルギー管理装置、需要予測方法および需要予測プログラムを図面に基づいて詳細に説明する。 The following provides a detailed explanation of the local energy management system, local energy management device, facility energy management device, demand forecasting method, and demand forecasting program according to the embodiments, with reference to the accompanying drawings.

図1は、実施の形態にかかる地域エネルギー管理システムの構成例を示す図である。本実施の形態の地域エネルギー管理システムは、地域エネルギー管理装置であるAEMS(Area Energy Management System)1と、ビルのエネルギーを管理する施設エネルギー管理装置であるBEMS(Building Energy Management System)2-1~2-3とを備える。AEMS1と、各BEMS2-1~2-3は通信ネットワークにより接続されている。 Figure 1 is a diagram showing an example of the configuration of a local energy management system according to an embodiment. The local energy management system of this embodiment includes an area energy management system (AEMS) 1, which is a local energy management device, and building energy management systems (BEMS) 2-1 to 2-3, which are facility energy management devices that manage the energy of buildings. The AEMS 1 and each of the BEMS 2-1 to 2-3 are connected via a communication network.

AEMS1は、地域内で電力を融通する地域において、当該地域全体の電力の需給を管理する。BEMS2-1~2-3は、それぞれに対応するビルの電力の需給を管理する。ビルは、地域においてそれぞれに定められた領域の一例である。図1に示した例では、地域内には、3つの領域である3つのビルが存在し、各ビルに対応するBEMS2-1~2-3の3つのBEMSが設けられているが、地域内に存在して電力を融通し合うビルの数は3に限定されない。また、以下では、地域内に複数の領域として複数のビルが存在する例を示しているが、これに限らず、地域内に、ビル施設の代わりに、複数の工場施設、大型商業施設などそれぞれに対応する施設エネルギー管理装置(xEMS:x Energy Management System)が設けられる領域が存在していてもよく、また、地域内にビルとこれらの施設などとが混在していてもよい。 The AEMS 1 manages the supply and demand of electricity for the entire region in which electricity is exchanged within the region. The BEMS 2-1 to 2-3 manage the supply and demand of electricity for the buildings corresponding to each of them. The buildings are examples of areas defined in the region. In the example shown in FIG. 1, there are three buildings in the region, which are three areas, and three BEMSs, BEMS 2-1 to 2-3, corresponding to each building are provided, but the number of buildings in the region that exchange electricity is not limited to three. In the following, an example is shown in which there are multiple buildings as multiple areas within the region, but this is not limiting. Instead of building facilities, there may be areas in the region where multiple factory facilities, large commercial facilities, etc. are provided with corresponding facility energy management devices (xEMS: x Energy Management System), and buildings and these facilities may be mixed within the region.

地域内で電力を融通する地域全体のエネルギーを管理する場合、特に、オフィスビル、工場、大型商業施設などにおいては、営業状況、従業員の出勤状況などにより電力の需要量が変動する。従来は、過去の実績値に基づいて、電力需要の予測が行われているが、特に、感染症対策によるテレワーク、営業自粛が行われたり、気象警報が発令されたりといった状況では、過去の実績値に基づく予測では十分な精度が得られない。本実施の形態では、各BEMS2-1~2-3は実績値に基づいて電力需要を予測し、AEMS1が、各BEMS2-1~2-3から受信した予測値を、様々な情報を用いて補正する。ここで、補正に用いる情報によっては、情報が示す値の影響が当該値に対応する時刻と同時刻の電力需要に現れるとは限らず、電力需要への影響が現れるまでに時間差が生じることがある。本実施の形態では、AEMS1が、この時間差も考慮して予測値の補正を行うことで、電力需要の予測の高精度化を図る。 When managing the energy of an entire region that exchanges power within the region, the demand for power fluctuates depending on the business situation, the attendance status of employees, and the like, particularly in office buildings, factories, large commercial facilities, and the like. Conventionally, power demand has been predicted based on past actual values, but predictions based on past actual values do not provide sufficient accuracy, particularly in situations where teleworking and business voluntary restraints are implemented as infection control measures, or weather warnings are issued. In this embodiment, each BEMS 2-1 to 2-3 predicts power demand based on actual values, and the AEMS 1 corrects the predicted values received from each BEMS 2-1 to 2-3 using various information. Here, depending on the information used for correction, the effect of the value indicated by the information does not necessarily appear on the power demand at the same time as the time corresponding to the value, and there may be a time lag before the effect on power demand appears. In this embodiment, the AEMS 1 corrects the predicted value taking this time lag into account, thereby improving the accuracy of the power demand prediction.

図1に示すように、BEMS2-1は、通信部21、需要予測部22および記憶部23を備える。通信部21は、他の装置との間で通信を行う。通信部21は、例えば、通信ネットワークを介してAEMS1と通信を行うとともに、ビルセキュリティ管理システム3および勤務管理システム4と通信を行うことが可能である。 As shown in FIG. 1, the BEMS 2-1 includes a communication unit 21, a demand forecasting unit 22, and a memory unit 23. The communication unit 21 communicates with other devices. The communication unit 21 can communicate with the AEMS 1, for example, via a communication network, as well as with the building security management system 3 and the work management system 4.

ビルセキュリティ管理システム3は、BEMS2-1の管理対象のビルにおけるセキュリティ管理を行うシステムであり、ビル内に設置された監視カメラの映像の取得、ビルのゲートの入場管理、ビル内の各居室の入退出管理、エレベーターの管理、その他各種センサによる人の動態の把握などを行う。勤務管理システム4は、BEMS2-1の管理対象のビルに入居するテナントの勤務管理システムであり、従業員の出勤状況を管理する。なお、勤務管理システム4については、基本的にはテナントごとに設けられるが、ビル内の全テナントが一括して管理されていてもよい。また、テナントによっては勤務管理システム4による管理が行われていないこともあるが、この場合には、BEMS2-1は、勤務管理システム4が設けられているテナントの出勤状況を取得すればよい。ビルセキュリティ管理システム3、勤務管理システム4は、第1情報を提供する装置の一例である。第1情報は、BEMS2-1の管理対象のビルにおける電力に影響を与える可能性のある情報であってBEMS2-1が取得可能な情報であり、ビルにおいて取得される情報である。すなわち、第1情報は、BEMS2-1がビルにおいて取得する情報である。したがって、第1情報を局所情報とも呼ぶ。第1情報は、例えば、監視カメラにより取得された画像、ビルに入居するテナントの従業員の勤務形態を示す情報、テナントの営業時間を示す情報、ビル内の各居室の入退出管理情報、ビルの扉の開閉回数、ビルの窓の開閉回数、エレベーターの昇降回数、ビルの入館者数、およびビルの各所における人の量・方向のうち少なくとも1つを含む。第1情報は、これらに限定されず、BEMS2-1の電力に影響を与える可能性のある情報であってBEMS2-1が取得可能な情報であればよい。 The building security management system 3 is a system that manages security in the building managed by the BEMS 2-1, and performs the following: acquiring images from surveillance cameras installed in the building, managing entrances to the building gates, managing entrances and exits to each room in the building, managing elevators, and grasping people's movements using various sensors. The work management system 4 is a work management system for tenants who reside in the building managed by the BEMS 2-1, and manages the attendance status of employees. The work management system 4 is basically provided for each tenant, but all tenants in the building may be managed collectively. In addition, some tenants may not be managed by the work management system 4, and in this case, the BEMS 2-1 may obtain the attendance status of the tenant in which the work management system 4 is provided. The building security management system 3 and the work management system 4 are examples of devices that provide first information. The first information is information that may affect the power in the building managed by the BEMS 2-1, and is information that can be obtained by the BEMS 2-1 and is obtained in the building. In other words, the first information is information that the BEMS 2-1 obtains in the building. Therefore, the first information is also called local information. The first information includes, for example, at least one of the following: images captured by a surveillance camera, information indicating the working patterns of employees of tenants in the building, information indicating business hours of tenants, entry and exit management information for each room in the building, the number of times the building's doors are opened and closed, the number of times the building's windows are opened and closed, the number of times the elevator goes up and down, the number of people entering the building, and the amount and direction of people in each part of the building. The first information is not limited to these, and may be any information that may affect the power of BEMS2-1 and that can be acquired by BEMS2-1.

通信部21は、ビルセキュリティ管理システム3および勤務管理システム4から取得した第1情報を記憶部23に一時的に格納する。また、通信部21は、例えば、定期的に、記憶部23に格納した第1情報を読み出してAEMS1へ送信する。なお、第1情報の取得元の装置は、ビルセキュリティ管理システム3および勤務管理システム4のうちの一方であってもよいし、ビルセキュリティ管理システム3および勤務管理システム4以外の他の装置であってもよい。 The communication unit 21 temporarily stores the first information acquired from the building security management system 3 and the work management system 4 in the memory unit 23. The communication unit 21 also reads out the first information stored in the memory unit 23 and transmits it to the AEMS 1, for example, periodically. The device from which the first information is acquired may be either the building security management system 3 or the work management system 4, or may be another device other than the building security management system 3 and the work management system 4.

また、通信部21は、電力需要の実績値を含む各種実績値を実績情報として記憶部23に格納する。具体的には、通信部21は、図示しない計測器などからビルにおける電力の使用量の計測値を取得し、日時を示す情報とともに需要量の実績値として記憶部23に保存する。なお、この計測値(実績値)は、テナントごとに格納されていることが望ましい。また、通信部21は、通信ネットワークを介して外部システム5の一例である気象情報提供システムから気温、湿度などの情報を取得し、取得した情報を、日時を示す情報とともに気象情報の実績値として記憶部23に保存する。このように、記憶部23に格納される実績値は、需要量の実績値と気象情報の実績値とを含む。また、実績値には、日付ごとの曜日、平日と休日の別などを示すカレンダー情報が含まれていてもよい。このように、実績情報は、需要量の実績値と気象情報の実績値とを含む。また、実績情報はカレンダー情報の実績値を含んでいてもよい。なお、気象情報、カレンダー情報は、BEMS2-1における電力予測に用いられる情報であり、実績情報に、これら以外に一般的に電力需要の予測に用いられる情報が含まれていてもよい。また、各実績値の取得方法は、通信部21が取得する方法に限らず、図示を省略したBEMS2-1の入力手段を用いてオペレータにより入力されてもよい。 The communication unit 21 also stores various actual values, including the actual value of the power demand, in the storage unit 23 as actual information. Specifically, the communication unit 21 acquires the measured value of the amount of power usage in the building from a measuring instrument (not shown) and stores it in the storage unit 23 as an actual value of the demand amount together with information indicating the date and time. It is preferable that this measured value (actual value) is stored for each tenant. The communication unit 21 also acquires information such as temperature and humidity from a weather information providing system, which is an example of the external system 5, via the communication network, and stores the acquired information in the storage unit 23 as an actual value of the weather information together with information indicating the date and time. In this way, the actual value stored in the storage unit 23 includes the actual value of the demand amount and the actual value of the weather information. The actual value may also include calendar information indicating the day of the week for each date, whether it is a weekday or a holiday, and the like. In this way, the actual information includes the actual value of the demand amount and the actual value of the weather information. The actual information may also include an actual value of the calendar information. The weather information and calendar information are information used for power prediction in the BEMS 2-1, and the actual information may also include information generally used for predicting power demand in addition to these. Furthermore, the method of acquiring each performance value is not limited to the method acquired by the communication unit 21, but may be input by an operator using an input means of the BEMS 2-1 (not shown).

また、通信部21は、記憶部23に格納されている実績情報をAEMS1へ送信する。この実績情報は、AEMS1における後述する分析に用いられる。 The communication unit 21 also transmits performance information stored in the memory unit 23 to the AEMS 1. This performance information is used for the analysis in the AEMS 1, which will be described later.

需要予測部22は、記憶部23に格納された実績情報を用いて、ビルにおける電力需要を予測する。すなわち、需要予測部22は、過去の電力需要の実績値を用いて対応するビルの電力需要の予測値を求める。ここでは、電力需要の予測の対象となる予測期間を1日とし、1日を30分単位の48枠に分割した単位で予測が行われるとする。予測期間および予測の単位はこれに限定されない。需要予測部22における電力需要の予測方法は、需要量の実績値に基づいて予測する方法であればどのような方法でもよい。例えば、需要予測部22は、通信部21を介して、気象情報提供システムから予測期間の気温、湿度などの予報値を取得し、記憶部23に格納されている電力需要の実績値のうち、予測期間と季節または月が同一でありかつ曜日が同一の日付で最高気温が予報値と最も近い日付の一日分の電力需要の実績値を、予測期間の予測値とする。需要予測部22は、電力需要の予測値を、通信部21を介してAEMS1へ送信する。 The demand forecasting unit 22 predicts the power demand in the building using the actual information stored in the memory unit 23. That is, the demand forecasting unit 22 obtains a predicted value of the power demand of the corresponding building using the actual value of the power demand in the past. Here, the prediction period for predicting the power demand is one day, and the prediction is performed in units of one day divided into 48 slots of 30 minutes. The prediction period and the unit of prediction are not limited to this. The method of predicting the power demand in the demand forecasting unit 22 may be any method as long as it is a method of predicting based on the actual value of the demand amount. For example, the demand forecasting unit 22 obtains forecast values of temperature, humidity, etc. for the prediction period from the weather information providing system via the communication unit 21, and among the actual values of the power demand stored in the memory unit 23, the actual value of the power demand for one day on a date that is the same season or month as the prediction period, has the same day of the week, and has the highest temperature closest to the forecast value is set as the predicted value for the prediction period. The demand forecasting unit 22 transmits the predicted value of the power demand to the AEMS1 via the communication unit 21.

なお、以下の説明では、需要予測部22は、感染症対策などの社会的状況の変化が生じておらずまた特別な気象警報の発令されていない日時の実績情報に基づいて電力需要を予測することとする。なお、気象警報については、発令されている日を除外するかわりに、気温、湿度などの差が少なく曜日も同一で同じ季節の多数の日の電力需要の平均値を求めておくことで、気象警報の影響を排除しておいてもよい。 In the following explanation, the demand forecasting unit 22 forecasts the power demand based on actual information for dates and times when there are no changes in social conditions, such as infectious disease countermeasures, and no special weather warnings have been issued. Instead of excluding days when weather warnings have been issued, the influence of weather warnings can be eliminated by calculating the average power demand for many days in the same season with little difference in temperature, humidity, etc., and on the same day of the week, instead of excluding days on which weather warnings have been issued.

BEMS2-2,2-3は、BEMS2-1と同様の構成であり、BEMS2-1と同様の動作を行う。BEMS2-2,2-3は、BEMS2-1と同様に、それぞれに対応するビルを管理するビルセキュリティ管理システム3、対応するビルに入力するテナントの勤務管理システム4などから第1情報を取得する。ただし、例えば、BEMS2-1の管理対象のビルに入場ゲートが設けられており、BEMS2-2の管理対象のビルには入場ゲートが設けられていないなどといったようにビルにより条件が異なる可能性がある。このため、例えば、BEMS2-1が収集する第1情報には、入場ゲートの通過人数が含まれ、BEMS2-2が収集する第1情報には入場ゲートの通過人数は含まれないといったように、BEMS2-1~2-3ごとに第1情報の内容が異なっていてもよい。 BEMS2-2, 2-3 have the same configuration as BEMS2-1 and perform the same operation as BEMS2-1. Like BEMS2-1, BEMS2-2, 2-3 acquire first information from the building security management system 3 that manages the corresponding building, the tenant work management system 4 that inputs the information to the corresponding building, and the like. However, conditions may differ depending on the building, for example, the building managed by BEMS2-1 may have an entrance gate, while the building managed by BEMS2-2 may not have an entrance gate. For this reason, the contents of the first information may differ for each of BEMS2-1 to 2-3, for example, the first information collected by BEMS2-1 includes the number of people passing through the entrance gate, while the first information collected by BEMS2-2 does not include the number of people passing through the entrance gate.

AEMS1は、需給管理部11、分析部12、補正部13、通信部14、記憶部15および表示部16を備える。通信部14は、他の装置と通信を行う。例えば、通信部14は、BEMS2-1~2-3から、それぞれに対応する電力需要の予測値、第1情報、実績情報を受信し、記憶部15に格納する。また、通信部14は、地域エネルギー管理システム外の外部システム5から取得した第2情報を記憶部15に格納する。第2情報は、例えば、外部システム5から取得される情報であり、BEMS2-1~2-3の管理するビルにおいて取得される情報以外の情報である。第2情報は、例えば、携帯電話の位置情報、駅の乗降者数、気象警報、交通機関の運行予定、行政からの営業自粛、外出自粛などの要請を示す情報(行政情報)、企業の広報などによる公開情報(企業情報)などである。外部システム5は、例えば、気象情報提供装置、携帯電話の位置情報を提供する装置、駅の乗降者数を提供する装置などである。第2情報は、地域内のビルに特化された情報ではなくより一般的な情報である。このため、第2情報を広域情報とも呼ぶ。 The AEMS 1 includes a supply and demand management unit 11, an analysis unit 12, a correction unit 13, a communication unit 14, a memory unit 15, and a display unit 16. The communication unit 14 communicates with other devices. For example, the communication unit 14 receives the forecast value, the first information, and the actual information of the power demand corresponding to each of the BEMS 2-1 to 2-3, and stores them in the memory unit 15. The communication unit 14 also stores the second information acquired from the external system 5 outside the regional energy management system in the memory unit 15. The second information is, for example, information acquired from the external system 5, and is information other than the information acquired in the buildings managed by the BEMS 2-1 to 2-3. The second information is, for example, mobile phone location information, the number of passengers boarding and alighting at stations, weather warnings, transportation schedules, information indicating requests from the government to refrain from business and to refrain from going out (government information), public information from corporate public relations (corporate information), etc. The external system 5 is, for example, a weather information providing device, a device providing mobile phone location information, a device providing the number of passengers boarding and alighting at stations, etc. The second information is more general information rather than specific to buildings in the area. For this reason, the second information is also called wide-area information.

分析部12は、記憶部15に格納されている第1情報、第2情報および実績情報を用いて、第1情報および第2情報と電力需要との関係を分析し、分析結果を用いて、第1情報および第2情報の少なくとも1つを用いて電力需要を補正するための補正情報を生成する。第1情報および第2情報は、いずれも電力の需要に影響を与える可能性のある情報であり、以下これらを区別せずに示すときには需要影響情報と呼ぶ。分析部12が生成する補正情報は、需要影響情報を用いて電力需要の補正値を算出する関係式を示すものであってもよいし、需要影響情報と電力需要の補正値とがテーブルとして示されたものであってもよい。また、分析部12は、需要影響情報および実績情報を用いて機械学習を行うことで、需要影響情報から電力需要の補正値を算出する学習済みモデルを生成し、この学習済みモデルを補正情報としてもよい。なお、ここではAEMS1が分析部12を備える例を示したが、AEMS1が分析部12を備えずに、補正を行うためのテーブルまたは計算式などが補正情報としてオペレータから入力されまたは外部の装置から送信されて記憶部15に記憶されてもよい。需要影響情報および電力需要の実績値を用いた機械学習により学習済みモデルが生成される場合、例えば、補正部13は、この学習済みモデルである補正モデルを用いて予測値の補正に用いる補正値を推論し、推論した補正値を用いて補正を行う。すなわち、補正された予測値は、需要影響情報および実績値を用いて機械学習により学習された補正モデルを用いた推論により生成される。なお、この場合も、補正モデルには、情報が示す値の影響が当該値に対応する時刻と同時刻の電力需要に現れるまでの時間差が考慮されるように需要影響情報および電力需要の実績値を時系列データとして入力した学習済みモデルを生成することで、補正において時間差が反映される。 The analysis unit 12 analyzes the relationship between the first information and the second information and the power demand using the first information, the second information, and the actual information stored in the memory unit 15, and generates correction information for correcting the power demand using at least one of the first information and the second information using the analysis result. The first information and the second information are both information that may affect the demand for power, and when they are not distinguished from each other, they are referred to as demand influence information. The correction information generated by the analysis unit 12 may indicate a relational expression for calculating a correction value of the power demand using the demand influence information, or may indicate the demand influence information and the correction value of the power demand as a table. In addition, the analysis unit 12 may generate a trained model for calculating a correction value of the power demand from the demand influence information by performing machine learning using the demand influence information and the actual information, and this trained model may be used as the correction information. Note that, although an example in which the AEMS 1 includes the analysis unit 12 has been shown here, the AEMS 1 may not include the analysis unit 12, and a table or a calculation formula for performing the correction may be input by an operator or transmitted from an external device as correction information and stored in the memory unit 15. When a trained model is generated by machine learning using the demand impact information and the actual value of the power demand, for example, the correction unit 13 infers a correction value to be used for correcting the predicted value using the trained model, that is, the correction model, and performs the correction using the inferred correction value. That is, the corrected predicted value is generated by inference using the correction model trained by machine learning using the demand impact information and the actual value. Note that in this case as well, a trained model is generated in which the demand impact information and the actual value of the power demand are input as time-series data so that the correction model takes into account the time difference between the time when the impact of the value indicated by the information appears in the power demand at the same time as the time corresponding to the value, thereby reflecting the time difference in the correction.

補正部13は、需要影響情報と補正情報とを用いて、BEMS2-1~2-3から送信されて記憶部15に格納されている予測値を補正する。補正部13は、記憶部15に格納されている予測値を補正後の値で更新する。なお、補正前の予測値が分析部12による補正情報の生成に用いられる場合は、補正前の予測値も過去の予測値として記憶部15に残される。補正部13は、すでに補正を行った日時の需要値に対応する需要影響情報を受信すると、受信した需要影響情報を用いて予測値を補正し、記憶部15に格納されている予測値を補正後の値で更新する。このように、新たな需要影響情報を受信すると再度補正が行われることで新たな需要影響情報を反映した補正を行うことができる。 The correction unit 13 uses the demand impact information and the correction information to correct the forecast values transmitted from the BEMS 2-1 to 2-3 and stored in the memory unit 15. The correction unit 13 updates the forecast values stored in the memory unit 15 with the corrected values. Note that when the forecast values before correction are used to generate correction information by the analysis unit 12, the forecast values before correction are also left in the memory unit 15 as past forecast values. When the correction unit 13 receives demand impact information corresponding to the demand value at the date and time when correction has already been performed, it corrects the forecast value using the received demand impact information and updates the forecast value stored in the memory unit 15 with the corrected value. In this way, when new demand impact information is received, correction is performed again, so that a correction that reflects the new demand impact information can be performed.

需給管理部11は、補正後のBEMS2-1~2-3の予測値を用いて、地域全体の需要量を算出し、算出した需要量を用いて地域の需給計画を作成する。すなわち、需給管理部11は、補正された予測値を用いて、地域全体の需給を管理する。表示部16は、需給計画、需要量の予測値などを表示する。需給管理部11は、例えば、翌日の一日分の需給計画を作成し、その後、最新の情報を用いて、作成済みの需給計画を順次更新する。例えば、各BEMS2-1~2-3が翌日の1日分の電力需要の予測値を生成してAEMS1へ送信し、AEMS1の補正部13がこれらの予測値を補正し、需給管理部11が、補正後の予測値と地域内の発電量などの予測値とに基づいて需給計画を作成する。その後、当該需給計画に対応する期間に関して最新の情報を用いて電力需要の補正が再度行われて予測値が更新されると、需給管理部11は、更新された電力需要を用いて需給計画を更新する。なお、需給管理部11は、1週間分の需給計画など、翌日分より長期的な需給計画を策定してもよい。なお、ここでは、AEMS1が需給計画、需要量の予測値を表示する例を示すが、これらが他の装置に送信され、他の装置で表示されてもよい。 The supply and demand management unit 11 calculates the demand for the entire region using the corrected predicted values of the BEMS 2-1 to 2-3, and creates a supply and demand plan for the region using the calculated demand. That is, the supply and demand management unit 11 manages the supply and demand for the entire region using the corrected predicted values. The display unit 16 displays the supply and demand plan, the predicted value of the demand, and the like. The supply and demand management unit 11 creates a supply and demand plan for the next day, for example, and then sequentially updates the created supply and demand plan using the latest information. For example, each BEMS 2-1 to 2-3 generates a predicted value of the power demand for the next day and transmits it to the AEMS 1, the correction unit 13 of the AEMS 1 corrects these predicted values, and the supply and demand management unit 11 creates a supply and demand plan based on the corrected predicted values and predicted values such as the amount of power generation in the region. After that, when the power demand is corrected again using the latest information for the period corresponding to the supply and demand plan and the predicted value is updated, the supply and demand management unit 11 updates the supply and demand plan using the updated power demand. The supply and demand management unit 11 may also formulate a supply and demand plan for a longer period than the next day, such as a one-week supply and demand plan. Here, an example is shown in which the AEMS 1 displays the supply and demand plan and the predicted value of the demand amount, but these may be transmitted to another device and displayed on the other device.

ここで、AEMS1のハードウェア構成例について説明する。図2は、本実施の形態のAEMS1を実現するコンピュータシステムの構成例を示す図である。 Here, we will explain an example of the hardware configuration of AEMS1. Figure 2 is a diagram showing an example of the configuration of a computer system that realizes AEMS1 of this embodiment.

図2に示すように、このコンピュータシステムは、制御部101と入力部102と記憶部103と表示部104と通信部105と出力部106とを備え、これらはシステムバス107を介して接続されている。図2において、制御部101は、例えば、CPU(Central Processing Unit)等であり、本実施の形態の各サーバにおける処理が記述されたプログラムを実行する。入力部102は、たとえばキーボード、マウスなどで構成され、コンピュータシステムのユーザが、各種情報の入力を行うために使用する。記憶部103は、RAM(Random Access Memory),ROM(Read Only Memory)などの各種メモリおよびハードディスクなどのストレージデバイスを含み、上記制御部101が実行すべきプログラム、処理の過程で得られた必要なデータ、などを記憶する。また、記憶部103は、プログラムの一時的な記憶領域としても使用される。表示部104は、LCD(液晶表示パネル)などで構成され、コンピュータシステムのユーザに対して各種画面を表示する。通信部105は、通信処理を実施する受信機および送信機である。出力部106は、プリンタなどである。 As shown in FIG. 2, this computer system includes a control unit 101, an input unit 102, a storage unit 103, a display unit 104, a communication unit 105, and an output unit 106, which are connected via a system bus 107. In FIG. 2, the control unit 101 is, for example, a CPU (Central Processing Unit) or the like, and executes a program in which the processing in each server of this embodiment is described. The input unit 102 is, for example, composed of a keyboard, a mouse, and the like, and is used by the user of the computer system to input various information. The storage unit 103 includes various memories such as a RAM (Random Access Memory) and a ROM (Read Only Memory) and a storage device such as a hard disk, and stores the program to be executed by the control unit 101, necessary data obtained in the process of processing, and the like. The storage unit 103 is also used as a temporary storage area for the program. The display unit 104 is composed of an LCD (Liquid Crystal Display Panel) or the like, and displays various screens to the user of the computer system. The communication unit 105 is a receiver and a transmitter that perform communication processing. The output unit 106 is a printer or the like.

ここで、本実施の形態のAEMS1を実現するプログラムが実行可能な状態になるまでのコンピュータシステムの動作例について説明する。上述した構成をとるコンピュータシステムには、たとえば、図示しないCD(Compact Disc)-ROMドライブまたはDVD(Digital Versatile Disc)-ROMドライブにセットされたCD-ROMまたはDVD-ROMから、プログラムが記憶部103にインストールされる。そして、プログラムの実行時に、記憶部103から読み出されたプログラムが記憶部103に格納される。この状態で、制御部101は、記憶部103に格納されたプログラムに従って、本実施の形態のAEMS1としての処理を実行する。 Here, an example of the operation of the computer system until the program that realizes the AEMS1 of this embodiment is in an executable state will be described. In the computer system having the above-mentioned configuration, for example, a program is installed in the storage unit 103 from a CD-ROM or DVD-ROM set in a CD (Compact Disc)-ROM drive or DVD (Digital Versatile Disc)-ROM drive (not shown). Then, when the program is executed, the program read from the storage unit 103 is stored in the storage unit 103. In this state, the control unit 101 executes processing as the AEMS1 of this embodiment according to the program stored in the storage unit 103.

なお、上記の説明においては、CD-ROMまたはDVD-ROMを記録媒体として、処理を記述したプログラムを提供しているが、これに限らず、コンピュータシステムの構成、提供するプログラムの容量などに応じて、たとえば、通信部105を経由してインターネットなどの伝送媒体により提供されたプログラムを用いることとしてもよい。 In the above explanation, the program describing the processing is provided on a CD-ROM or DVD-ROM as a recording medium. However, this is not limiting, and depending on the configuration of the computer system and the capacity of the program provided, for example, a program provided via a transmission medium such as the Internet via the communication unit 105 may be used.

図1に示した通信部14は、例えば、図2に示した通信部105により実現される。図1に示した需給管理部11、分析部12および補正部13は、制御部101がプログラムを実行することにより実現される。図1に示した記憶部15は図2に示した記憶部103により実現される。図1に示した表示部16は、図2に示した表示部104により実現される。なお、図2は、一例であり、コンピュータシステムの構成は図2に示した例に限定されない。例えば、コンピュータシステムに出力部106が設けられていなくてもよい。 The communication unit 14 shown in FIG. 1 is realized, for example, by the communication unit 105 shown in FIG. 2. The supply and demand management unit 11, analysis unit 12, and correction unit 13 shown in FIG. 1 are realized by the control unit 101 executing a program. The memory unit 15 shown in FIG. 1 is realized by the memory unit 103 shown in FIG. 2. The display unit 16 shown in FIG. 1 is realized by the display unit 104 shown in FIG. 2. Note that FIG. 2 is just an example, and the configuration of the computer system is not limited to the example shown in FIG. 2. For example, the computer system does not need to be provided with the output unit 106.

本実施の形態の需要予測プログラムは、過去の電力需要の実績値を用いて、電力融通を行う地域における定められた複数の領域のそれぞれの電力需要の予測値を求めるステップと、領域の電力需要に影響する可能性のある情報である需要影響情報に対応して設定された基準時刻と電力需要の時刻との時間差のうち、需要影響情報の領域の電力需要との相関より設定された時間差と、需要影響情報とを用いて予測値を補正し、補正された予測値を用いて、地域全体の需給を管理するステップと、をコンピュータに実行させる。 The demand forecasting program of this embodiment causes a computer to execute the steps of: determining a forecast value of power demand for each of a number of defined regions in a region where power is exchanged, using actual values of past power demand; correcting the forecast value using the demand impact information and a time difference between the reference time and the time of power demand, which is set according to the correlation between the power demand of the region in the demand impact information, and the time difference between the reference time and the time of power demand, which is set according to the demand impact information and the power demand of the region; and managing the supply and demand of the entire region using the corrected forecast value.

また、AEMS1は、1台のコンピュータシステムにより実現されてもよいし、複数台のコンピュータシステムにより実現されてもよい。例えば、AEMS1は、クラウドシステムにより実現されてもよい。 Furthermore, AEMS1 may be realized by one computer system or by multiple computer systems. For example, AEMS1 may be realized by a cloud system.

BEMS2-1~2-3も同様に、コンピュータシステムにより実現される。図1に示した通信部21は、例えば、図2に示した通信部105により実現される。図1に示した需要予測部22は、制御部101がプログラムを実行することにより実現される。図1に示した記憶部23は図2に示した記憶部103により実現される。また、BEMS2-1~2-3は、1台のコンピュータシステムにより実現されてもよいし、複数台のコンピュータシステムにより実現されてもよい。例えば、BEMS2-1~2-3は、クラウドシステムにより実現されてもよい。 BEMS 2-1 to 2-3 are also realized by computer systems. The communication unit 21 shown in FIG. 1 is realized by, for example, the communication unit 105 shown in FIG. 2. The demand forecasting unit 22 shown in FIG. 1 is realized by the control unit 101 executing a program. The memory unit 23 shown in FIG. 1 is realized by the memory unit 103 shown in FIG. 2. Furthermore, BEMS 2-1 to 2-3 may be realized by one computer system or multiple computer systems. For example, BEMS 2-1 to 2-3 may be realized by a cloud system.

次に、実施の形態の電力需要の補正方法について説明する。まず、業態による電力需要の日変化の違いについて説明する。 Next, we will explain the method for correcting electricity demand in the embodiment. First, we will explain the difference in daily changes in electricity demand depending on the business type.

図3は、オフィスにおける電力需要の変化を示す模式図である。図3では、定時の就業時間が定められているオフィスにおける夏季の電力需要の一日の変化を模式的に示している。図3に示すように、就業時間内では電力需要が高く、また気温の上昇にともない空調機器が使用されるため13時頃に需要電力のピークが生じている。 Figure 3 is a schematic diagram showing changes in electricity demand in an office. Figure 3 shows a schematic diagram of daily changes in electricity demand in the summer in an office with set working hours. As shown in Figure 3, electricity demand is high during working hours, and as air conditioning equipment is used as the temperature rises, electricity demand peaks around 1:00 p.m.

図4は、小売店における電力需要の変化を示す模式図である。図4では、小売店における夏季の電力需要の一日の変化を模式的に示している。図4に示すように、営業時間内では電力需要が高い。また、図3に示したオフィスの電力需要における就業時間後の電力需要に比べて、小売店の営業時間後の電力需要は急激に減少している。 Figure 4 is a schematic diagram showing the change in electricity demand at a retail store. Figure 4 shows a schematic diagram of the daily change in electricity demand at a retail store in the summer. As shown in Figure 4, electricity demand is high during business hours. Also, compared to the electricity demand after working hours in the office shown in Figure 3, the electricity demand at the retail store after business hours drops sharply.

図5は、ホテルにおける電力需要の変化を示す模式図である。図5では、ホテルにおける夏季の電力需要の一日の変化を模式的に示している。図5に示すように、ホテルでは一日の電力需要の変化が少ない。これは、オフィス、小売店では日中の滞在者が多いのに対し、ホテルでは朝、夕の方が日中より滞在者が多いため、日中の空調機器などの使用による増加がオフィス、小売店に比べて少なくなるからである。 Figure 5 is a schematic diagram showing the change in electricity demand in a hotel. Figure 5 shows a schematic diagram of the daily change in electricity demand in a hotel in the summer. As shown in Figure 5, the change in electricity demand in a hotel is small throughout the day. This is because, while offices and retail stores have more guests during the day, hotels have more guests in the mornings and evenings than during the day, so the increase in electricity demand due to the use of air conditioning equipment and the like during the day is smaller than in offices and retail stores.

このように、電力需要の日変化は業態によって異なる。さらに、テレワーク、営業自粛、外出自粛など感染症対策による社会的状況、気象警報などの影響も業態によって異なると考えられる。このため、本実施の形態では、業態ごとに補正方法を定める。 As such, daily changes in electricity demand differ depending on the type of business. Furthermore, the impact of social conditions due to infectious disease countermeasures such as teleworking, business voluntary restraints, and self-restraint on going out, as well as weather warnings, is also thought to differ depending on the type of business. For this reason, in this embodiment, a correction method is defined for each type of business.

図6は、業態ごとの感染症対策による社会的状況の電力需要への影響度の一例を示す図である。図6に示すように、業態ごとのテレワークの実施率と電力需要に対する変動要因である需要変動要因とが示されている。このテレワークの実施率は、公開されている統計情報などを用いてもよいし、地域内のビルに同種の業態のテナントが複数存在する場合には、これらのテナントから情報を集めてもよい。 Figure 6 is a diagram showing an example of the degree of impact of social conditions on electricity demand due to infection control measures for each business type. As shown in Figure 6, the implementation rate of telework for each business type and the demand fluctuation factors that are fluctuation factors for electricity demand are shown. This implementation rate of telework may be obtained by using publicly available statistical information, or, if there are multiple tenants of the same business type in a building in the area, information may be collected from these tenants.

需要変動要因は、業態ごとに需要の変動に影響を与える要因を示しており、オフィスでは就業人数(ビルに勤務する就業人数)が需要変動要因となり、ホテルでは宿泊者数が変動要因となり、小売店、食品スーパー、医療機関、飲食店では来客人数が需要変動要因となる。図6に示した影響度#1は、需要変動要因の変動の一例であるテレワークによる電力需要への影響度を示しており、影響度#2は外出自粛の影響度を示している。影響度#1に関しては、オフィスビルにおける就業人数が変動し、就業人数自体も多いことから就業人数の変動による電力需要への影響は大きい。ホテルでは、テレワークによりビジネス目的の宿泊者数が増減し、宿泊者数の増減による電力需要への影響が大きい。また、小売店、食品スーパー、医療機関、飲食店では、テレワークが増えると来客者数が増減するが、小売店、食品スーパー、医療機関については来客数による電力需要の変動はあるものの固定設備による電力消費の割合が飲食店に比べて多く、来客者数の影響が少ない。飲食店では、来客者数の増減による電力需要への影響が大きいため、テレワークの影響は中程度である。このように、業態によって、変動要因と変動要因による電力需要への影響度は異なるため、本実施の形態では、業態ごとに変動要因を推定しておく。 The demand fluctuation factors indicate factors that affect the fluctuation of demand for each business type. In offices, the number of employees (the number of employees working in the building) is a factor of demand fluctuation, in hotels, the number of guests is a factor of demand fluctuation, and in retail stores, food supermarkets, medical institutions, and restaurants, the number of visitors is a factor of demand fluctuation. Influence level #1 shown in Figure 6 indicates the degree of influence on electricity demand due to telework, which is an example of the fluctuation of demand fluctuation factors, and influence level #2 indicates the degree of influence of refraining from going out. Regarding influence level #1, the number of employees in office buildings fluctuates, and since the number of employees is large, the influence of the fluctuation in the number of employees on electricity demand is large. In hotels, the number of guests staying overnight for business purposes increases or decreases due to telework, and the influence of the increase or decrease in the number of guests on electricity demand is large. In addition, in retail stores, food supermarkets, medical institutions, and restaurants, the number of visitors increases or decreases as telework increases, but for retail stores, food supermarkets, and medical institutions, although the electricity demand fluctuates due to the number of visitors, the proportion of electricity consumption by fixed equipment is higher than that of restaurants, and the influence of the number of visitors is small. In restaurants, the impact of teleworking is moderate because the increase or decrease in the number of customers has a large impact on electricity demand. In this way, the fluctuation factors and the degree of impact of the fluctuation factors on electricity demand differ depending on the business type, so in this embodiment, the fluctuation factors are estimated for each business type.

また、図6の影響度#2に示したように、外出自粛の影響は、オフィス、ホテル、小売店、食品スーパー、医療機関、飲食店のいずれも大きくなる。一方、人出による影響を受けやすい業態と受けにくい業態とがあり、広域情報により外出自粛が予定される場合には、AEMS1は、業態別に補正を行う。例えば、業態#1、業態#2、業態#3に各テナントを分類しておく。業態#1は、外出自粛が行われても営業するオフィス、ホテルなどであり、業態#2は、外出自粛が行われても営業する小売店、食品スーパー、医療機関、飲食店などである。業態#3は、外出自粛にともなって休業するテナントである。なお、業態#1~業態#3を判別するためには営業時間、休業の有無などを把握する必要はあるが、この情報は後述するように営業時間情報から得ることができる。 As shown in impact level #2 in Figure 6, the impact of voluntary stay-at-home orders will be large for offices, hotels, retail stores, supermarkets, medical institutions, and restaurants. On the other hand, there are business types that are easily affected by crowds and business types that are not, and when voluntary stay-at-home orders are planned based on wide-area information, AEMS1 makes corrections by business type. For example, each tenant is classified into business type #1, business type #2, and business type #3. Business type #1 is offices, hotels, etc. that will remain open even if voluntary stay-at-home orders are implemented, and business type #2 is retail stores, supermarkets, medical institutions, restaurants, etc. that will remain open even if voluntary stay-at-home orders are implemented. Business type #3 is a tenant that will be closed due to voluntary stay-at-home orders. Note that in order to distinguish between business types #1 to #3, it is necessary to know the business hours and whether or not the business will be closed, but this information can be obtained from business hours information as described below.

例えば、業態#1については、自粛があっても通常時同様の業態で営業を続ける業態であり、AEMS1は、第2情報(広域情報)における駅の乗降者数などの人流量を示す情報に対応した補正を行う際の人流量に応じた補正量を業態#2より大きくする。業態#2については、通常時からの変化が大きい業態であり、AEMS1は、第2情報における人流量を示す情報に対応した補正を行う際の人流量に応じた補正量を業態#1より小さくする。業態#3については、休業する業態であり、営業時間を考慮してすなわち第1情報を用いて休業時の電力の補正を行えば人流による変動要素は少ないため、第2情報を考慮した補正を行わなくてもよい。 For example, business type #1 is a business type that continues to operate in the same manner as normal even if there is self-restraint, and AEMS1 sets a larger correction amount according to the foot traffic flow when making corrections in response to information indicating foot traffic flow, such as the number of passengers boarding and alighting at stations in the second information (wide area information), than for business type #2. Business type #2 is a business type that changes significantly from normal times, and AEMS1 sets a smaller correction amount according to the foot traffic flow when making corrections in response to information indicating foot traffic flow in the second information than for business type #1. Business type #3 is a business type that is closed, and since there are few fluctuations due to foot traffic if power corrections are made during closure taking into account business hours, i.e. using the first information, corrections that take into account the second information are not necessary.

本実施の形態では、AEMS1は、上記に例示した需要変動要因の値が、各BEMS2-1~2-3の需要予測部22の予測に用いた実績値に対応する日時から変化していると推定される場合、変化した量に基づいて電力需要の補正を行う。本実施の形態では、需要変動要因の値の変化を把握するための情報として、上述した第1情報および第2情報のうち少なくとも1つを用いる。 In this embodiment, when the AEMS1 estimates that the value of the demand fluctuation factor exemplified above has changed from the date and time corresponding to the actual value used in the prediction by the demand forecasting unit 22 of each BEMS 2-1 to 2-3, the AEMS1 corrects the power demand based on the amount of change. In this embodiment, at least one of the first information and second information described above is used as information for grasping the change in the value of the demand fluctuation factor.

ここで、本実施の形態の補正情報の算出に用いる第1情報について例を挙げて説明する。図7は、第1情報の一例である営業時間情報を示す図である。図7では図示を省略しているが、営業時間情報は日付と対応づけられている。図7に示した例では、営業時間を標準営業時間と実営業時間とに分けている。また、図7では、各テナントが上述した業態#1~業態#3のいずれに対応するかを右端に示している。実営業時間には、対応づけられている日付の最新の情報が格納される。例えば、需要の発生する前日に予定されていた営業時間が当日になって変更された場合には、当日に営業時間情報の実営業時間が更新される。BEMS2-1は、営業時間情報が更新されると、更新された営業時間情報をAEMS1へ送信する。BEMS2-1は、図7に示す営業時間情報を、例えば、ビルセキュリティ管理システム3から取得する。図7に示すように、営業時間情報は、BEMS2-1の管理対象のビルに入居するテナントごとの営業時間が示されている。なお、テナントがオフィスの場合には営業時間は例えば定時の就業時間が設定される。標準営業時間は、BEMS2-1の需要予測部22において推定に用いられた需要量の実績値に対応する営業時間の推定値として用いることができる。 Here, an example of the first information used to calculate the correction information in this embodiment will be described. FIG. 7 is a diagram showing business hours information, which is an example of the first information. Although not shown in FIG. 7, the business hours information is associated with a date. In the example shown in FIG. 7, business hours are divided into standard business hours and actual business hours. Also, in FIG. 7, which of the above-mentioned business types #1 to #3 each tenant corresponds to is shown on the right side. The actual business hours store the latest information of the associated date. For example, if the business hours scheduled on the day before the demand occurs are changed on the day, the actual business hours in the business hours information are updated on the day. When the business hours information is updated, BEMS2-1 transmits the updated business hours information to AEMS1. BEMS2-1 acquires the business hours information shown in FIG. 7 from, for example, the building security management system 3. As shown in FIG. 7, the business hours information shows the business hours of each tenant in the building managed by BEMS2-1. Note that, if the tenant is an office, the business hours are set to, for example, regular working hours. The standard business hours can be used as an estimate of the business hours corresponding to the actual demand value used for estimation in the demand forecasting unit 22 of BEMS2-1.

上述したように、ここでは、需要予測部22に需要予測に用いられる電力需要の実績値は感染症対策などの社会的変化が生じていない日時のものとして扱うため、これらの日時では標準営業時間で各テナントが影響していたと推定する。したがって、標準営業時間と実営業時間とが一致していれば、電力需要に関して営業時間の変更に起因する補正は行わなくてよい。営業時間を用いた補正が行われる場合、例えば、テナントごとに各時間帯の休業時の電力需要の実績値と通常時の電力需要の実績値との差をあらかじめ求めておき、この差をテナントおよび時間帯ごとに補正情報として記憶部15に格納することで、AEMS1は、休業時にはテナントごとにこの差の分を電力需要の予測値から減算するようにすればよい。なお、この時間帯の単位は、上述した予測値の算出単位である30分単位であってもよいし、1時間など複数単位の時間帯であってもよい。また、例えば、営業時間が変更になる場合には、テナントごとおよび時間帯ごとに、短縮されて営業しなくなった時間帯の予測値から予め定めた値を減算する。 As described above, the actual value of the power demand used in the demand forecasting unit 22 for the demand forecast is treated as the date and time when no social changes such as infectious disease countermeasures have occurred, so it is assumed that each tenant was affected by the standard business hours on these dates and times. Therefore, if the standard business hours and the actual business hours match, corrections due to changes in business hours do not need to be made to the power demand. When corrections are made using business hours, for example, the difference between the actual value of the power demand during closure and the actual value of the power demand during normal times for each tenant is calculated in advance, and this difference is stored in the storage unit 15 as correction information for each tenant and time period, so that the AEMS1 subtracts this difference from the predicted value of the power demand for each tenant when the tenant is closed. The unit of this time period may be 30 minutes, which is the calculation unit of the predicted value described above, or may be a multiple unit time period such as one hour. In addition, for example, when business hours change, a predetermined value is subtracted from the predicted value for the time period during which the business hours are shortened and no longer open, for each tenant and time period.

上記補正方法は、補正情報が直接定められる例であるが、AEMS1の分析部12が、第1情報である標準営業時間および実営業時間と電力需要の実績値とを用いて、回帰分析、機械学習などによりテナントごとに、実営業時間と電力需要の予測値から増減させる値とを算出してもよい。なお、上述したとおり、電力需要の予測値は標準営業時間で営業されている実績値から算出されているとしている。また、テナントごとではなく業態ごとに、回帰分析、機械学習などにより電力需要の予測値の算出に用いる補正係数を算出してもよい。 The above correction method is an example in which the correction information is directly determined, but the analysis unit 12 of the AEMS1 may use the first information, which is the standard business hours and actual business hours, and the actual power demand value, to calculate the actual business hours and the value to be increased or decreased from the predicted power demand value for each tenant by regression analysis, machine learning, etc. As described above, the predicted power demand value is calculated from the actual value of business during standard business hours. In addition, a correction coefficient used to calculate the predicted power demand value may be calculated by regression analysis, machine learning, etc., not for each tenant but for each business type.

図8は、第1情報の一例である出勤状況を示す図である。出勤状況は従業員の勤務形態を示す情報であり、図8では図示を省略しているが、日付と対応づけられている。BEMS2-1は、図8に示す出勤状況を、例えば、テナントの勤務管理システム4から取得する。図8に示した例では、従業員ごとに、通常出社、在宅勤務、時差出勤などの勤務形態が示されている。通常出社は、ビル内のオフィスなどの各テナントのエリアに出勤することを示す。出勤状況は、例えば、需要の発生する前日に勤務管理システム4からBEMS2-1へ提供される。出勤状況は当日に更新されてもよい。なお、図6に示したように、テナントがオフィスである場合には、在館人数が出勤状態に依存するが、テナントが食品スーパー、飲食店などである場合には従業員の出勤状態より来客者数の影響が大きい。このため、BEMS2-1は、オフィスなど出勤状態の電力需要への影響の大きい業態のテナントから出勤状況を取得し、出勤状態の電力需要への影響の小さい業態のテナントからは出勤状況を取得しないようにしてもよい。 Figure 8 is a diagram showing the attendance status, which is an example of the first information. The attendance status is information indicating the working style of an employee, and although not shown in Figure 8, it is associated with a date. The BEMS 2-1 acquires the attendance status shown in Figure 8 from, for example, the tenant's work management system 4. In the example shown in Figure 8, working styles such as normal attendance, telecommuting, and staggered attendance are shown for each employee. Normal attendance indicates that the employee comes to work in the area of each tenant, such as an office in a building. The attendance status is provided to the BEMS 2-1 from the work management system 4, for example, on the day before the demand occurs. The attendance status may be updated on the day. As shown in Figure 6, when the tenant is an office, the number of people present in the building depends on the attendance status, but when the tenant is a food supermarket, restaurant, etc., the number of visitors has a greater impact than the attendance status of employees. For this reason, the BEMS 2-1 may acquire the attendance status from tenants in business types that have a large impact on the power demand due to the attendance status, such as offices, and may not acquire the attendance status from tenants in business types that have a small impact on the power demand due to the attendance status.

出勤状況に基づくと、図6に示したオフィスの需要変動要因である就業人数を求めることができる。したがって、通常時すなわち感染症対策などの社会的状況の変化の前の就業人数と、算出された就業人数との比を用いて電力需要の予測値を補正することができる。例えば、電力需要の予測値に、(算出された就業人数/通常時の就業人数)を乗じることで補正を行うことができる。この場合、この計算を行う計算式またはテーブルを補正情報としてAEMS1の記憶部15に格納しておく。 Based on the attendance situation, the number of employees, which is a factor of fluctuation in office demand shown in Figure 6, can be calculated. Therefore, the predicted value of electricity demand can be corrected using the ratio of the number of employees in normal times, i.e., before changes in social conditions such as infection control measures, to the calculated number of employees. For example, correction can be made by multiplying the predicted value of electricity demand by (calculated number of employees / number of employees in normal times). In this case, the formula or table for this calculation is stored in the memory unit 15 of the AEMS1 as correction information.

また、AEMS1の分析部12が、テレワーク等の導入後の就業人数と対応する電力需要の実績値とを用いて、回帰分析、機械学習により、下記式(1)のa,bの係数を算出し、この係数を補正情報として記憶部15に格納してもよい。すなわち、下記計算式で算出した補正後の予測値と電力需要の実績値との差が最小となるようにa,bを学習する。なお、計算式は下記式(1)の形式に限定されず、算出された就業人数を用いて補正後の予測値を求める式であればよい。このa,bは24時間分同じ値を使用してもよいし、30分単位の時間帯ごとにa,bを定めておいてもよい。また、季節ごと、曜日ごとなどにa,bを定めておいてもよい。なお、この補正は、例えば、後述する時間差を考慮して行われる。例えば、出勤状況に基づく補正は定時の就業時間の始業時間に発生する事象を考え、始業時間からの時間差を考慮して補正が行われる。例えば、時間差が1時間であり、始業が9時であれば、下記補正は10時の予測値に関して行われる。
補正後の予測値
=補正前の予測値×a×就業人数+b ・・・(1)
In addition, the analysis unit 12 of the AEMS 1 may calculate the coefficients a and b in the following formula (1) by regression analysis and machine learning using the number of employees after the introduction of teleworking and the corresponding actual value of power demand, and store this coefficient as correction information in the storage unit 15. That is, a and b are learned so that the difference between the corrected predicted value calculated by the following calculation formula and the actual value of power demand is minimized. Note that the calculation formula is not limited to the form of the following formula (1), and may be any formula that uses the calculated number of employees to obtain a corrected predicted value. The same values of a and b may be used for 24 hours, or a and b may be determined for each time zone in 30-minute units. Also, a and b may be determined for each season, day of the week, etc. Note that this correction is performed, for example, taking into account the time difference described below. For example, the correction based on the attendance status considers an event that occurs at the start time of regular work hours, and the correction is performed taking into account the time difference from the start time. For example, if the time difference is one hour and the start time is 9:00, the following correction is performed on the predicted value for 10:00.
Corrected forecast value = Uncorrected forecast value × a × Number of employees + b ... (1)

第1情報は、監視カメラの画像または監視カメラの画像から得られる情報であってもよい。BEMS2-1は、監視カメラの画像を、例えば、ビルセキュリティ管理システム3から取得する。図9は、監視カメラの画像とビルのあるフロアにおける在館人数の予測との関係を示す図である。図9に示すように、BEMS2-1の管理対象のビルのあるフロアにおいて、出入口に監視カメラが設置されていたとする。BEMS2-1またはAEMS1は、監視カメラにより取得された画像を解析することで、1時間あたりの出入口の通行者数を算出する。なお、画像内の人の検出方法は画像処理により人を検出する一般的な手法を用いることができるため詳細な説明は省略する。第1情報として監視カメラの画像をBEMS2-1がAEMS1へ送信する場合は、AEMS1の分析部12が画像を用いて1時間あたりの出入口の通行者数を算出する。また、BEMS2-1が図示しない画像処理部を備え、画像処理部が画像を用いて1時間あたりの出入口を通過した人数を算出してもよい。または、ビルセキュリティ管理システム3が1時間あたりの出入口の通行者数を算出する機能を有している場合には、BEMS2-1が画像の代わりに、ビルセキュリティ管理システム3により算出された1時間あたりの出入口の通行者数を第1情報として取得してもよい。 The first information may be an image of a surveillance camera or information obtained from an image of a surveillance camera. BEMS2-1 acquires the image of the surveillance camera from, for example, the building security management system 3. FIG. 9 is a diagram showing the relationship between the image of the surveillance camera and the prediction of the number of people in a certain floor of a building. As shown in FIG. 9, a surveillance camera is installed at an entrance on a certain floor of a building managed by BEMS2-1. BEMS2-1 or AEMS1 calculates the number of people passing through the entrance per hour by analyzing the image acquired by the surveillance camera. Note that a general method for detecting people in an image can be used by image processing, so a detailed description is omitted. When BEMS2-1 transmits the image of the surveillance camera to AEMS1 as the first information, the analysis unit 12 of AEMS1 calculates the number of people passing through the entrance per hour using the image. In addition, BEMS2-1 may be provided with an image processing unit (not shown), and the image processing unit may calculate the number of people passing through the entrance per hour using the image. Alternatively, if the building security management system 3 has a function for calculating the number of people passing through an entrance/exit per hour, the BEMS 2-1 may acquire the number of people passing through an entrance/exit per hour calculated by the building security management system 3 instead of an image as the first information.

図9に示した監視カメラの画像から算出される、1時間あたりの出入口の通行者数(以下、単に通行者数とも呼ぶ)は、ビルの当該フロアに滞在している人(アクティブユーザ)の人数そのものを表しているわけではないが、ビルの当該フロアに滞在している人が増えれば通行者数も増加し、ビルの当該フロアに滞在している人が減少すれば通行者数も減少すると考えられる。このため、通常時のビルの当該フロアの電力需要と、通常時の通行者数と電力需要の予測対象日当日の通行者数との比とを用いて、電力需要を補正することができる。例えば、通常時に、アクティブユーザ数が50であり通行者数が100であった場合、予測対象日当日の通行者数が50であったとすると、アクティブユーザ数の推定値は、通常時の1/2の25となる。このため、例えば、電力需要も1/2になると推定される。 The number of people passing through the entrance and exit per hour (hereinafter also simply referred to as the number of people passing through) calculated from the surveillance camera image shown in FIG. 9 does not represent the actual number of people (active users) staying on the floor of the building, but it is considered that the number of people passing through increases as the number of people staying on the floor of the building increases, and the number of people passing through decreases as the number of people staying on the floor of the building decreases. Therefore, the power demand on the floor of the building in normal times and the ratio between the number of people passing through in normal times and the number of people passing through on the day of the power demand prediction can be used to correct the power demand. For example, if the number of active users is 50 and the number of people passing through is 100 in normal times, and if the number of people passing through on the day of the prediction is 50, the estimated number of active users will be 25, which is half of the normal number. Therefore, for example, the power demand is also estimated to be halved.

図10は、図9に示した監視カメラの画像から認識された通行者数に基づく電力需要の補正の一例を示す図である。図10では、図9に示した監視カメラの画像から認識された通行者数の平均値と、アクティブユーザ数と、電力需要とを、通常時、雨天時およびテレワーク時のそれぞれについて示している。図9に示したテナントA~テナントDのうち一部はオフィスであり、他は小売店であるとする。このため、図10に示すように、テレワーク時すなわちオフィスのテナントがテレワークを実施しているときには通行者数が減少し、雨天時(テレワーク非実施)には小売店の来客数が減少するため通行者数が減少する。 Figure 10 is a diagram showing an example of the correction of electricity demand based on the number of passersby recognized from the surveillance camera image shown in Figure 9. Figure 10 shows the average number of passersby recognized from the surveillance camera image shown in Figure 9, the number of active users, and electricity demand, respectively, during normal times, rainy weather, and telework. It is assumed that some of Tenants A to D shown in Figure 9 are offices, and the others are retail stores. For this reason, as shown in Figure 10, the number of passersby decreases during telework, i.e., when office tenants are teleworking, and the number of passersby decreases during rainy weather (when telework is not being performed), due to the decrease in the number of customers at retail stores.

図10は、補正するための計算式またはテーブルが補正情報として直接設定される場合の補正の例を示しており、電力需要が通行者数に正比例することを仮定している。図10に示すように、通常時に、アクティブユーザ数が50であり電力需要が10kWhであり通行者数が100の場合に、予測対象日が雨天であり、監視カメラの画像から認識された通行者数の平均値が50であったとすると、電力需要の予測値は50×(50/100)=50×(1/2)kWhに補正される。同様に、テレワーク時に、監視カメラの画像から認識された通行者数の平均値が10であったとすると、電力需要の予測値は50×(10/100)=50×(1/10)kWhに補正される。 Figure 10 shows an example of correction when a formula or table for correction is directly set as correction information, and assumes that power demand is directly proportional to the number of passersby. As shown in Figure 10, in normal times, when the number of active users is 50, the power demand is 10 kWh, and the number of passersby is 100, if the forecast target day is rainy and the average number of passersby recognized from the surveillance camera image is 50, the predicted value of power demand is corrected to 50 x (50/100) = 50 x (1/2) kWh. Similarly, in teleworking, if the average number of passersby recognized from the surveillance camera image is 10, the predicted value of power demand is corrected to 50 x (10/100) = 50 x (1/10) kWh.

なお、図10では、現象と対応づけるため、雨天とテレワーク時とを分けて記載したが、原因を区別せずに、通常時の通行者数と電力需要の予測対象日当日の通行者数との比とに基づいて電力需要を補正してもよい。すなわち、補正情報として、以下の式(2)の計算式または下記式(2)に相当するテーブルがAEMS1の記憶部15に格納される。なお、通常時の電力需要は、BEMS2-1~2-3から送信される電力需要の予測値である。基準通行者数はあらかじめ定めた定数であり、例えば上記の通常時の通行者数として定める。なお、この補正も、例えば、後述する時間差を考慮して行われる。
補正後の予測値
=補正前の予測値×(予測対象日の通行者数/基準通行者数) ・・・(2)
In FIG. 10, rainy weather and teleworking are described separately to correspond to the phenomenon, but the power demand may be corrected based on the ratio between the number of passersby in normal times and the number of passersby on the day for which the power demand is predicted, without distinguishing between the causes. That is, the calculation formula of the following formula (2) or a table corresponding to the following formula (2) is stored in the storage unit 15 of the AEMS 1 as correction information. The power demand in normal times is a predicted value of the power demand transmitted from the BEMS 2-1 to 2-3. The reference number of passersby is a predetermined constant, and is set as the number of passersby in normal times, for example. This correction is also performed, for example, taking into account the time difference described below.
Corrected forecast value = Uncorrected forecast value × (number of pedestrians on the forecast target day / reference number of pedestrians) ... (2)

なお、雨天、晴天など天候ごとに、通常時の通行者数と電力需要との実績値を求めておき、天候ごとに上記式(2)の基準通行者数を定めておいてもよい。 In addition, it is also possible to obtain actual values of the number of pedestrians and electricity demand under normal conditions for each weather condition, such as rainy or sunny, and determine the standard number of pedestrians in the above formula (2) for each weather condition.

上記の例では、補正情報が直接設定される例を示したが、AEMS1の分析部12が、第1情報である監視カメラの画像と電力需要の実績値とを用いて、回帰分析、機械学習などにより監視カメラから認識される通行者数と電力需要の予測値に乗ずる補正係数とを算出してもよい。例えば、分析部12がBEMS2-1から取得した監視カメラの画像を画像処理することで1時間あたりの通行者数を算出し、通行者数と当該画像に対応する日時の電力需要の予測値および実績値とを1組のデータセットとし、BEMS2-1から取得した多数のデータセットを用いて、回帰分析、機械学習などにより、下記式(3)における係数α,βを定めてもよい。この場合、係数α,βが補正情報として記憶部15に格納される。
補正後の予測値
=補正前の予測値×α×通行者数+β ・・・(3)
In the above example, the correction information is directly set, but the analysis unit 12 of the AEMS 1 may use the surveillance camera image and the actual value of the power demand, which are the first information, to calculate the number of passersby recognized from the surveillance camera and the correction coefficient to be multiplied by the predicted value of the power demand by regression analysis, machine learning, or the like. For example, the analysis unit 12 may calculate the number of passersby per hour by performing image processing on the surveillance camera image acquired from the BEMS 2-1, and the number of passersby and the predicted value and actual value of the power demand at the date and time corresponding to the image may be set as one data set, and the coefficients α and β in the following formula (3) may be determined by regression analysis, machine learning, or the like using a large number of data sets acquired from the BEMS 2-1. In this case, the coefficients α and β are stored in the storage unit 15 as correction information.
Corrected predicted value = Predicted value before correction × α × Number of pedestrians + β ... (3)

このα,βは24時間分同じ値を使用してもよいし、30分単位の時間帯ごとにα,βを定めておいてもよい。また、季節ごと、曜日ごとなどにα,βを定めておいてもよい。
また、上述したように、BEMS2-1またはビルセキュリティ管理システム3が監視カメラの画像から通行者数を算出する場合には、BEMS2-1が第1情報として通行者数をAEMS1へ送信することで、同様に、分析部12が補正情報を算出することができる。なお、計算式は上記式(3)の形式に限定されず、監視カメラから認識された通行者数を用いて補正後の予測値を求める式であればよい。
The values of α and β may be the same for 24 hours, or may be determined for each time period in 30-minute units.Also, α and β may be determined for each season, day of the week, etc.
Furthermore, as described above, when the BEMS 2-1 or the building security management system 3 calculates the number of passersby from the images from the surveillance camera, the BEMS 2-1 transmits the number of passersby as the first information to the AEMS 1, and the analysis unit 12 can similarly calculate the correction information. Note that the calculation formula is not limited to the form of the above formula (3), and any formula that can obtain a corrected predicted value using the number of passersby recognized by the surveillance camera may be used.

以上、第1情報の例を示したが、第1情報はこれらに限らず、各BEMS2-1~2-3が管理するビルに入居するテナントの業態、テナントから取得できる情報、ビルにおいて取得できる情報に応じて適宜設定することができる。また、第1情報として、ビル内の各居室の入退出管理情報、エレベーターの昇降回数、およびビルの入館者数(入場ゲートを通過した人数)などを用いる場合も同様の方法で、通常時との人数の差に応じて電力需要を補正することができる。また、ビルの扉の開閉回数、ビルの窓の開閉回数は、空調設備の効率に影響するため、ビルの扉の開閉回数、ビルの窓の開閉回数が多いときには予測値を増加させるなどといった補正を行うことで、予測精度を向上させることができる。 Although the above are examples of the first information, the first information is not limited to these, and can be set appropriately depending on the business type of the tenants residing in the buildings managed by each BEMS 2-1 to 2-3, information that can be obtained from the tenants, and information that can be obtained in the building. In addition, even if the first information uses entrance and exit management information for each room in the building, the number of times the elevator goes up and down, and the number of people entering the building (the number of people passing through the entrance gate), the power demand can be corrected in a similar manner depending on the difference in the number of people compared to normal times. In addition, since the number of times the building doors and windows are opened and closed affects the efficiency of the air conditioning equipment, the prediction accuracy can be improved by making corrections such as increasing the predicted value when the number of times the building doors and windows are opened and closed is high.

次に、第2情報について説明する。図11は、第2情報の一例である駅の乗降者数と電力需要との関係の一例を示す図である。第2情報は、上述したように外部システム5から得られる情報である。図11に示した棒グラフは、BEMS2-1が管理するビルの最寄り駅の各時間帯の乗降者数を示している。電力需要201は、BEMS2-1の管理するビルの夏季の電力需要を示している。ここでは、BEMS2-1の管理するビルに入居するテナントの多くがオフィスであると仮定しているため、オフィスの就業開始時間である9時の前に乗降者数のピーク値203が生じている。この時刻の乗降者数が多いと、電力需要201も増えることになる。したがって、上述した第1情報と同様に、駅の乗降者数についても、あらかじめ補正情報を定めておく、または回帰分析、機械学習などにより補正情報を定めておくことで、駅の乗降者数の影響を補正に反映することができる。 Next, the second information will be described. FIG. 11 is a diagram showing an example of the relationship between the number of passengers boarding and alighting at a station, which is an example of the second information, and the power demand. The second information is information obtained from the external system 5 as described above. The bar graph shown in FIG. 11 shows the number of passengers boarding and alighting at the nearest station to the building managed by the BEMS 2-1 in each time period. The power demand 201 shows the power demand in the summer of the building managed by the BEMS 2-1. Here, it is assumed that most of the tenants in the building managed by the BEMS 2-1 are offices, so that a peak value 203 of the number of passengers boarding and alighting occurs before 9:00, which is the start time of the office work. If the number of passengers boarding and alighting at this time is large, the power demand 201 will also increase. Therefore, as with the first information described above, the influence of the number of passengers boarding and alighting at the station can be reflected in the correction by determining correction information in advance for the number of passengers boarding and alighting at the station, or by determining correction information by regression analysis, machine learning, or the like.

一方で、9時の前に乗降者数のピーク値203が生じているのに対し、オフィスの電力需要のピーク値202は15時頃である。オフィスの電力需要のピーク値202はオフィスに出勤している就業人数に依存する。したがって、7~8時の乗降者数がオフィスの電力需要の15時頃のピーク値202に影響を与えることになる。 Meanwhile, while a peak value 203 in the number of passengers getting on and off occurs before 9:00, the peak value 202 of the office's electricity demand occurs around 15:00. The peak value 202 of the office's electricity demand depends on the number of employees who come to the office. Therefore, the number of passengers getting on and off between 7:00 and 8:00 will affect the peak value 202 of the office's electricity demand around 15:00.

また、図11に示した朝の時間帯の駅の乗降者数の増加率のピーク値204が、電力需要と相関があることも考えられる。このため、乗降者数のピーク値203と同様に、就業時間前の増加率のピーク値204を電力需要の補正に用いてもよい。乗降者数のピーク値203および乗降者数の増加率のピーク値204は、広い意味では駅の乗降者数を示す情報である。このように、電力需要の補正に用いられる第2情報は、各時間帯の駅の乗降者数であってもよいし、乗降者数のピーク値203であってもよいし、乗降者数の増加率のピーク値204であってもよい。 It is also possible that the peak value 204 of the rate of increase in the number of passengers boarding and alighting at the station in the morning hours shown in FIG. 11 is correlated with the electricity demand. For this reason, like the peak value 203 of the number of passengers, the peak value 204 of the rate of increase before working hours may be used to correct the electricity demand. The peak value 203 of the number of passengers boarding and alighting and the peak value 204 of the rate of increase in the number of passengers are, in a broad sense, information indicating the number of passengers boarding and alighting at the station. In this way, the second information used to correct the electricity demand may be the number of passengers boarding and alighting at the station in each time period, the peak value 203 of the number of passengers boarding and alighting, or the peak value 204 of the rate of increase in the number of passengers.

このように、情報によっては、当該情報の値に対応する時刻と当該値が電力需要へ顕著に影響が表れる時刻とに時間差が生じることがある。上述した駅の乗降者数は時間差が比較的大きいが、上述した営業情報などはほぼ時間差がなく値の影響が表れる。このため、本実施の形態では、分析部12が、第1情報および第2情報の情報ごとに、当該情報と電力需要との時間差ごとに相関を算出する。 As such, depending on the information, there may be a time difference between the time corresponding to the value of that information and the time when that value has a noticeable effect on electricity demand. The number of passengers boarding and alighting at the above-mentioned stations has a relatively large time difference, but the above-mentioned business information, etc., has an effect of the value with almost no time difference. For this reason, in this embodiment, the analysis unit 12 calculates the correlation for each time difference between the information and electricity demand for each piece of first information and second information.

図12は、各情報の時間差ごとの相関値を示す模式図である。図12の横軸は時間差を示す。相関値301~304はそれぞれ異なる種類の情報に関する情報と電力需要との相関値を示す。例えば、分析部12は、同じ季節、同じ曜日のビルの電力需要と駅の乗降者数とを複数収集しておき、駅の乗降者数のピークをxとし、駅の乗降者数がピークとなる時刻を算出し、算出した時刻からΔT後の時刻のビルの電力需要をyとする。そして、分析部12が、複数のx,yの組を用いてxとyの相関値を求める。これを時間差であるΔTを例えば0から10時間の時間差まで順次変化させて相関値を求めることを繰り返す。別の情報についても同様に相関値を求めることで図12に模式的に示した相関値301~304が得られる。情報ごとに、このようにして求めた時間差を与えた時間帯の補正に当該情報を用いる。例えば、駅の乗降者数に関して、乗降者数の朝の時間帯のピークと5時間後の電力需要の値との相関が最も大きい場合、当日の朝のピーク値を5時間後の電力需要に反映させる。具体的には、例えば、このようにして求めた時間差を反映して、上記の補正情報を求める機械学習を行う。例えば、機械学習を行う際に、時刻tの乗降者数と5時間後の電力需要の実績値と5時間後の電力需要の予測値とをデータセットとして用いて、補正を行うための係数を求めておく。そして、補正を行う際には、5時間後の電力需要以降にこの補正を反映させる。すなわち、本実施の形態の補正部13は、需要影響情報に対応して設定された基準時刻と電力需要の時刻との時間差のうち、需要影響情報のビルの電力需要への影響が大きくなる時間差と、需要影響情報とを用いて電力需要の予測値を補正する。なお、以上の例では分析部12が時間差ごとの相関(需要影響情報と電力需要との相関)を求め相関の高くなる時間差を算出したが、相関の高くなる時間差はオペレータなどにより入力されてもよい。 Figure 12 is a schematic diagram showing correlation values for each time difference of each piece of information. The horizontal axis of Figure 12 indicates the time difference. Correlation values 301 to 304 indicate correlation values between information on different types of information and power demand. For example, the analysis unit 12 collects multiple pieces of building power demand and station passenger numbers for the same season and the same day of the week, sets the peak number of passengers at the station to x, calculates the time when the number of passengers at the station peaks, and sets the building power demand at a time ΔT after the calculated time to y. The analysis unit 12 then uses multiple sets of x and y to find a correlation value between x and y. This is repeated to find correlation values by sequentially changing the time difference ΔT from, for example, 0 to 10 hours. Correlation values are similarly found for other pieces of information to obtain correlation values 301 to 304 as shown in Figure 12. For each piece of information, the information is used to correct the time period to which the time difference found in this way is given. For example, in the case where the correlation between the number of passengers boarding and alighting at a station in the morning and the value of the power demand five hours later is the highest, the morning peak value of the day is reflected in the power demand five hours later. Specifically, for example, machine learning is performed to obtain the above correction information by reflecting the time difference obtained in this manner. For example, when performing machine learning, a coefficient for correction is obtained by using the number of passengers boarding and alighting at time t, the actual value of the power demand five hours later, and the predicted value of the power demand five hours later as a data set. Then, when performing the correction, this correction is reflected after the power demand five hours later. That is, the correction unit 13 of this embodiment corrects the predicted value of the power demand using the time difference at which the impact of the demand impact information on the power demand of the building becomes large, and the demand impact information, among the time differences between the reference time set in response to the demand impact information and the time of the power demand. Note that in the above example, the analysis unit 12 obtains the correlation for each time difference (the correlation between the demand impact information and the power demand) and calculates the time difference at which the correlation is high, but the time difference at which the correlation is high may be input by an operator, etc.

なお、5時間後の電力需要を乗降者数のピーク値を用いて補正した場合には、5時間後の前後の定められた期間の電力需要を、5時間後と同じ比率で増減させてもよい。例えば、5時間後の前後1時間の期間の電力需要を5時間後と同じ比率で増減させてもよい。このように、時間差を考慮して補正する場合、その時点だけでなく前後の期間も補正を行ってもよい。この前後の期間も解析により予め定めておく。 When the power demand five hours from now is corrected using the peak number of passengers, the power demand for a specified period before and after five hours may be increased or decreased at the same rate as after five hours. For example, the power demand for a period of one hour before and after five hours may be increased or decreased at the same rate as after five hours. In this way, when making corrections taking into account a time difference, corrections may be made not only for that point in time but also for the periods before and after. These periods before and after are also determined in advance by analysis.

相関の高い時間差が大きい情報を用いると、当日の電力需要において、余裕をもって予測値に反映することができる。特に、一日の電力需要のピーク値を把握したい場合には、当該ピーク値となる時間帯よりかなり前に予測に反映することができ、電力の調達計画、電力の抑制計画に反映しやすくなる。なお、上述しように、出勤状態などの情報については時間差を求める際の当該情報の時刻は例えば始業時間としてもよいし、始業時間に一定値時間後の時刻または始業時間より一定時間の時刻であってもよい。また、監視カメラの画像から取得された通行者数のように計測値に基づく情報については、時間差を考慮する際の基準時刻は例えば、当該計測値が計測された時刻である。例えば、監視カメラの画像から取得された通行者数の場合には、監視カメラにより画像が取得された時刻である。1時間あたりの通行者数のように期間内の値については、基準とする時刻は当該期間の開始時刻であってもよいし中央の時刻であってもよいし終了時刻であってもよく当該期間内の時刻であればよい。 By using information with a high correlation and a large time difference, the power demand for that day can be reflected in the forecast value with plenty of time. In particular, when it is desired to grasp the peak value of the power demand for a day, it is possible to reflect it in the forecast well before the time period when the peak value occurs, which makes it easier to reflect it in the power procurement plan and the power suppression plan. As described above, the time of the information when calculating the time difference for information such as the attendance status may be, for example, the start time of the workday, or a time a certain number of hours after the start time of the workday, or a time a certain number of hours after the start time of the workday. In addition, for information based on a measurement value such as the number of passersby obtained from a surveillance camera image, the reference time when considering the time difference is, for example, the time when the measurement value was measured. For example, in the case of the number of passersby obtained from a surveillance camera image, it is the time when the image was obtained by the surveillance camera. For values within a period such as the number of passersby per hour, the reference time may be the start time, the center time, or the end time of the period, as long as it is a time within the period.

図13は、第2情報の別の一例である気象情報の電力需要への影響を模式的に示す図である。図13の棒グラフは大雨警報、暴風警報などの気象警報の発令があった日の駅の乗降者数を示す。図13の上の図の例では、6時頃から20時頃まで長い時間帯で警報が発令されており、図13の下の図の例では、朝の時間帯だけ警報が発令されている。電力需要は図11に示した通常時の電力需要201を示し、電力需要205は6時頃から20時頃まで長い時間帯で警報が発令されているときの電力需要を示し、電力需要208は朝の時間帯だけ警報が発令されているときの電力需要を示す。図13の上の図に示すように、6時頃から20時頃まで長い時間帯で警報が発令されているときには、乗降者数の増加率のピーク値207が図11の増加率のピーク値204に比べて減少しており、電力需要のピーク値206も図11の電力需要201のピーク値202に比べて減少している。一方、図13の下の図に示すように、朝の時間帯のみ気象警報が発令されている場合には、出勤時間がずれるものの電力需要208に示すようにピーク値209自体は通常時とあまり変わらない可能性がある。このように、朝の時間帯だけ気象警報が発令されている場合、駅の乗降者数の増加率のピークは図11に示した例より遅い時間に現れる。このため、朝の時間帯に気象警報が発令され、就業開始時刻付近で気象警報が解除された場合には、乗降者数と電力需要のピーク値との時間差が通常時と異なる可能性がある。 Figure 13 is a diagram showing the influence of weather information, which is another example of the second information, on the power demand. The bar graph in Figure 13 shows the number of passengers at stations on days when weather warnings such as heavy rain warnings and storm warnings were issued. In the example of the upper diagram in Figure 13, warnings are issued for a long time period from about 6:00 to about 20:00, and in the example of the lower diagram in Figure 13, warnings are issued only in the morning. The power demand shows the normal power demand 201 shown in Figure 11, power demand 205 shows the power demand when a warning is issued for a long time period from about 6:00 to about 20:00, and power demand 208 shows the power demand when a warning is issued only in the morning. As shown in the upper diagram in Figure 13, when a warning is issued for a long time period from about 6:00 to about 20:00, the peak value 207 of the increase rate of the number of passengers is reduced compared to the peak value 204 of the increase rate in Figure 11, and the peak value 206 of the power demand is also reduced compared to the peak value 202 of the power demand 201 in Figure 11. On the other hand, as shown in the lower diagram of FIG. 13, if a weather warning is issued only in the morning, the start time of work will be shifted, but the peak value 209 itself, as shown in power demand 208, may not change much from normal times. In this way, if a weather warning is issued only in the morning, the peak of the increase rate of the number of passengers boarding and alighting at the station will appear later than in the example shown in FIG. 11. For this reason, if a weather warning is issued in the morning and then lifted near the start of work, the time difference between the number of passengers boarding and alighting and the peak value of power demand may differ from normal times.

このように、気象警報が発令されている時間帯により、電力需要が変わる可能性があるため、分析部12は、電力需要の時系列データを警報が発令されている時間帯(例えば、6時から8時、6時から20時など)と対応づけて機械学習によって学習しておいてもよい。例えば、分析部12は、過去の気象警報の発令の時間帯と電力需要の予測値の時系列データと電力需要の実績値の一日の変化の時系列データとのデータセットを用いて機械学習を行うことで、気象警報の発令されている時間帯ごとに電力需要の予測値を補正するための学習済みモデルを補正情報として生成する。 As such, since the power demand may change depending on the time period during which a weather warning is issued, the analysis unit 12 may learn the time series data of the power demand by machine learning in association with the time period during which the warning is issued (e.g., 6:00 to 8:00, 6:00 to 20:00, etc.). For example, the analysis unit 12 performs machine learning using a data set of the time periods during which past weather warnings were issued, time series data of the predicted power demand, and time series data of the daily change in the actual power demand, to generate a learned model as correction information for correcting the predicted power demand for each time period during which a weather warning is issued.

なお、第2情報は、携帯電話の位置情報であってもよいし、企業の広報などによる営業情報などであってもよい。携帯電話の位置情報を用いる場合には、AEMS1は、監視カメラにより認識された通行者数と同様に、携帯電話の位置情報を用いてビル内の人数を推定し、推定した人数を用いて電力需要を補正する。 The second information may be mobile phone location information or business information from corporate public relations etc. When using mobile phone location information, the AEMS1 estimates the number of people in the building using the mobile phone location information, in the same way as the number of passersby recognized by the surveillance camera, and corrects the power demand using the estimated number of people.

以上、第1情報、第2情報の例について説明したが、第1情報および第2情報のうち1つの情報によって電力需要の予測値が補正されてもよいし、2つ以上の情報によって電力需要の予測値が補正されてもよい。例えば、分析部12は、上記時間差を考慮した上で第1情報、第2情報と電力需要の実績値と電力需要の予測値とを用いて、テナントごと、または業態ごとに機械学習により電力需要の予測値を補正するための学習済みモデルを生成してもよい。 Although examples of the first information and the second information have been described above, the predicted value of the power demand may be corrected by one of the first information and the second information, or the predicted value of the power demand may be corrected by two or more pieces of information. For example, the analysis unit 12 may generate a trained model for correcting the predicted value of the power demand by machine learning for each tenant or each business type, using the first information, the second information, the actual value of the power demand, and the predicted value of the power demand, taking into account the time difference.

次に、分析部12が補正情報を生成する場合の補正情報生成処理手順について説明する。図14は、本実施の形態の補正情報の生成処理手順の一例を示すフローチャートである。なお、AEMS1は、BEMS2-1~2-3から取得した補正前の予測値も過去の予測値として記憶部15に残しておく。AEMS1の分析部12は、通信部14を介して、BEMS2-1~2-3から第1情報を取得し(ステップS1)、外部システム5から第2情報を取得する(ステップS2)。また、分析部12は、通信部14を介して、BEMS2-1~2-3から実績情報を取得する(ステップS3)。なお、ステップS1,S2で取得する第1情報、第2情報は、実績情報に対応する日時の情報を含むとする。また、この実績情報は、BEMS2-1~2-3の管理する各ビルで計測された電力需要の実績値であり、感染症による社会的状況の変化が反映された日時、気象警報の発令された日時のものが含まれることが望ましい。 Next, a correction information generation process procedure when the analysis unit 12 generates correction information will be described. FIG. 14 is a flowchart showing an example of the correction information generation process procedure of this embodiment. The AEMS 1 also stores the pre-correction predicted values acquired from the BEMS 2-1 to 2-3 in the memory unit 15 as past predicted values. The analysis unit 12 of the AEMS 1 acquires first information from the BEMS 2-1 to 2-3 via the communication unit 14 (step S1) and acquires second information from the external system 5 (step S2). The analysis unit 12 also acquires performance information from the BEMS 2-1 to 2-3 via the communication unit 14 (step S3). The first information and second information acquired in steps S1 and S2 include information on the date and time corresponding to the performance information. The performance information is the actual value of the power demand measured in each building managed by the BEMS 2-1 to 2-3, and preferably includes the date and time when the change in the social situation due to the infectious disease is reflected and the date and time when a weather warning is issued.

分析部12は、同一または類似する日時の第1情報、第2情報、補正前の予測値、実績情報に含まれる電力需要の実績値をデータセットとして用いて、補正情報(補正モデル)を生成する(ステップS4)。補正情報は、上述したように例えば、機械学習により生成される学習済みモデルである。 The analysis unit 12 generates corrected information (corrected model) using the first information, the second information, the predicted value before correction, and the actual value of the power demand included in the actual information for the same or similar date and time as a data set (step S4). The corrected information is, for example, a trained model generated by machine learning as described above.

次に、本実施の形態のAEMS1における電力需要の補正について説明する。図15は、本実施の形態のAEMS1における電力需要の補正処理手順の一例を示すフローチャートである。AEMS1は、需要量すなわち電力需要の予測値をBEMS2-1~2-3から取得し(ステップS11)、第1情報をBEMS2-1~2-3から取得し(ステップS12)、第2情報を外部システム5から取得する(ステップS13)。詳細には、通信部14が、BEMS2-1~2-3から電力需要の予測値および第1情報を受信し記憶部15に格納し、外部システム5から第2情報を取得し記憶部15に格納する。次に、AEMS1は、第1情報、第2情報および補正情報(補正モデル)を用いて予測値を補正する(ステップS14)。詳細には、補正部13が、記憶部15に格納されている第1情報、第2情報および補正情報を用いて記憶部15に格納されている予測値を補正する。なお、上述したように第1情報および第2情報の両方が用いられてもよいし一方が用いられてもよい。 Next, the correction of the power demand in the AEMS 1 of this embodiment will be described. FIG. 15 is a flowchart showing an example of a correction process procedure of the power demand in the AEMS 1 of this embodiment. The AEMS 1 acquires the demand amount, i.e., the predicted value of the power demand from the BEMS 2-1 to 2-3 (step S11), acquires the first information from the BEMS 2-1 to 2-3 (step S12), and acquires the second information from the external system 5 (step S13). In detail, the communication unit 14 receives the predicted value of the power demand and the first information from the BEMS 2-1 to 2-3 and stores them in the memory unit 15, and acquires the second information from the external system 5 and stores them in the memory unit 15. Next, the AEMS 1 corrects the predicted value using the first information, the second information, and the correction information (correction model) (step S14). In detail, the correction unit 13 corrects the predicted value stored in the memory unit 15 using the first information, the second information, and the correction information stored in the memory unit 15. As described above, both the first information and the second information may be used, or only one of them may be used.

なお、第1情報および第2情報として様々な情報を考慮して補正を行うことで補正の精度を向上させることができるが、一方で使用する情報が増えるとデータ格納のための容量と処理時間が増加する。このため、AEMS1は、第1情報および第2情報のうちより電力需要に与える影響が大きい情報を選択して使用するようにしてもよい。図16は、ビルの位置と駅の位置の一例を示す模式図である。図16に示すように、AEMS1の管理する地域内にビル#1~ビル#3が存在し、ビル#1がS駅に近く、ビル#2はT駅に近く、ビル#3はS駅からの距離とT駅からの距離とが同程度であったとする。ビル#1~#3がそれぞれBEMS2-1~2-3が管理するビルであるとすると、BEMS2-1の電力需要の予測値の補正にはS駅の乗降者数を用いることが望ましく、BEMS2-2の電力需要の予測値の補正にはT駅の乗降者数を用いることが望ましく、BEMS2-3の電力需要の予測値の補正にはT駅の乗降者数とS駅の乗降者数との両方を用いることが望ましいと考えられる。例えば、分析部12が、駅ごとの乗降者数と電力需要との相関を求めて、相関の弱い情報は入力から除去するようにしてもよい。または、各情報を考慮したモデルと考慮しないモデルとの両方で実際に補正を行って、当該情報の影響度を評価し、影響度の小さいものを除去するようにしてもよい。 Note that the accuracy of the correction can be improved by making the correction while taking into account various pieces of information as the first information and the second information, but on the other hand, as the amount of information used increases, the capacity for data storage and the processing time increase. For this reason, AEMS1 may select and use the information that has the greater impact on power demand from the first information and the second information. Figure 16 is a schematic diagram showing an example of the locations of buildings and stations. As shown in Figure 16, it is assumed that buildings #1 to #3 exist within an area managed by AEMS1, building #1 is close to station S, building #2 is close to station T, and building #3 is about the same distance from station S and station T. If buildings #1 to #3 are managed by BEMS 2-1 to 2-3, respectively, it is considered that the number of passengers boarding and alighting at station S is desirably used to correct the predicted value of the power demand of BEMS 2-1, the number of passengers boarding and alighting at station T is desirably used to correct the predicted value of the power demand of BEMS 2-2, and both the number of passengers boarding and alighting at station T and the number of passengers boarding and alighting at station S are desirably used to correct the predicted value of the power demand of BEMS 2-3. For example, the analysis unit 12 may obtain a correlation between the number of passengers boarding and alighting at each station and the power demand, and remove information with a weak correlation from the input. Alternatively, correction may be actually performed using both a model that takes each piece of information into account and a model that does not take each piece of information into account, the degree of influence of the information may be evaluated, and information with a small degree of influence may be removed.

なお、上記の例では、AEMS1が補正部13を備えたが、各BEMS2-1~2-3が分析部12および補正部13を備え、各BEMS2-1~2-3が予測値を補正してもよい。また、各BEMS2-1~2-3が第1情報を用いた補正を行い、AEMS1が第2情報を用いた補正を行うといった2段階の補正を行ってもよい。また、上記の例では、AEMS1が分析部12を備えたが、AEMS1とは別の装置が分析部12を備え、AEMS1が当該別の装置から補正情報を取得するようにしてもよい。また、AEMS1とは別の装置が分析部12を備え、各BEMS2-1~2-3が補正部13を備えて当該別の装置から補正情報を取得してもよい。 In the above example, AEMS1 is provided with the correction unit 13, but each BEMS2-1 to 2-3 may be provided with the analysis unit 12 and the correction unit 13, and each BEMS2-1 to 2-3 may correct the predicted value. Also, two-stage correction may be performed, in which each BEMS2-1 to 2-3 performs correction using the first information and AEMS1 performs correction using the second information. Also, in the above example, AEMS1 is provided with the analysis unit 12, but a device other than AEMS1 may be provided with the analysis unit 12, and AEMS1 may obtain correction information from the other device. Also, a device other than AEMS1 may be provided with the analysis unit 12, and each BEMS2-1 to 2-3 may be provided with the correction unit 13 and obtain correction information from the other device.

以上のように、本実施の形態では、電力需要に影響を与える可能性のある情報である需要影響情報と需要影響情報と電力需要との相関が高くなる時間差とを用いて、電力需要の予測値を補正するようにした。このため、電力需要の予測精度を向上させることができる。 As described above, in this embodiment, the predicted value of the power demand is corrected using the demand impact information, which is information that may affect the power demand, and the time difference at which the correlation between the demand impact information and the power demand is high. This makes it possible to improve the accuracy of the power demand forecast.

以上の実施の形態に示した構成は、一例を示すものであり、別の公知の技術と組み合わせることも可能であるし、実施の形態同士を組み合わせることも可能であるし、要旨を逸脱しない範囲で、構成の一部を省略、変更することも可能である。 The configurations shown in the above embodiments are merely examples, and may be combined with other known technologies, or the embodiments may be combined with each other. In addition, parts of the configurations may be omitted or modified without departing from the spirit of the invention.

1 AEMS、2-1~2-3 BEMS、3 ビルセキュリティ管理システム、4 勤務管理システム、5 外部システム、11 需給管理部、12 分析部、13 補正部、14,21 通信部、15,23 記憶部、16 表示部、22 需要予測部。 1 AEMS, 2-1 to 2-3 BEMS, 3 Building security management system, 4 Work management system, 5 External system, 11 Supply and demand management unit, 12 Analysis unit, 13 Correction unit, 14, 21 Communication unit, 15, 23 Memory unit, 16 Display unit, 22 Demand forecast unit.

Claims (16)

電力融通を行う地域全体の電力の需給を管理する地域エネルギー管理装置と、
前記地域においてそれぞれに定められた領域の電力を管理する複数の施設エネルギー管理装置と、
を備え、
前記複数の施設エネルギー管理装置は、過去の電力需要の実績値を用いて対応する前記領域の電力需要の予測値を求め、前記予測値を前記地域エネルギー管理装置へ送信し、
前記地域エネルギー管理装置は、前記領域の電力需要に影響する可能性のある情報である需要影響情報に対応して設定された基準時刻と電力需要の時刻との時間差のうち、前記需要影響情報の前記領域の電力需要との相関より設定された時間差と、前記需要影響情報とを用いて前記予測値を補正し、補正された前記予測値を用いて、前記地域全体の需給を管理し、
前記需要影響情報は、駅の乗降者数を含み、
前記地域エネルギー管理装置は、取得済の前記需要影響情報および前記電力需要を用いて、前記基準時刻と前記電力需要の時刻との時間差ごとの、前記需要影響情報と前記電力需要との相関値を算出し、算出した相関値を用いて、前記予測値の前記補正に用いる前記時間差を設定することを特徴とする地域エネルギー管理システム。
A regional energy management device that manages the supply and demand of electricity in the entire region where the power exchange is carried out;
A plurality of facility energy management devices each managing power in a region defined in the area;
Equipped with
The facility energy management devices calculate a predicted value of the power demand of the corresponding area using a past actual value of the power demand, and transmit the predicted value to the local energy management device;
the regional energy management device corrects the predicted value using the demand impact information and a time difference between a reference time set in response to demand impact information, which is information that may affect the power demand of the region, and the time of the power demand, the time difference being set based on a correlation between the demand impact information and the power demand of the region, and uses the demand impact information to manage supply and demand throughout the region;
The demand impact information includes the number of passengers boarding and alighting at a station,
The regional energy management device uses the acquired demand impact information and power demand to calculate a correlation value between the demand impact information and the power demand for each time difference between the reference time and the time of the power demand, and uses the calculated correlation value to set the time difference to be used for the correction of the predicted value.
電力融通を行う地域全体の電力の需給を管理する地域エネルギー管理装置と、
前記地域においてそれぞれに定められた領域の電力を管理する複数の施設エネルギー管理装置と、
を備え、
前記複数の施設エネルギー管理装置は、過去の電力需要の実績値を用いて対応する前記領域の電力需要の予測値を求め、前記予測値を前記地域エネルギー管理装置へ送信し、
前記地域エネルギー管理装置は、前記領域の電力需要に影響する可能性のある情報である需要影響情報に対応して設定された基準時刻と電力需要の時刻との時間差のうち、前記需要影響情報の前記領域の電力需要との相関より設定された時間差と、前記需要影響情報とを用いて前記予測値を補正し、補正された前記予測値を用いて、前記地域全体の需給を管理し、
前記需要影響情報は、気象警報を含み、
前記地域エネルギー管理装置は、取得済の前記需要影響情報および前記電力需要を用いて、前記基準時刻と前記電力需要の時刻との時間差ごとの、前記需要影響情報と前記電力需要との相関値を算出し、算出した相関値を用いて、前記予測値の前記補正に用いる前記時間差を設定することを特徴とする地域エネルギー管理システム。
A regional energy management device that manages the supply and demand of electricity in the entire region where the power exchange is carried out;
A plurality of facility energy management devices each managing power in a region defined in the area;
Equipped with
The facility energy management devices calculate a predicted value of the power demand of the corresponding area using a past actual value of the power demand, and transmit the predicted value to the local energy management device;
the regional energy management device corrects the predicted value using the demand impact information and a time difference between a reference time set in response to demand impact information, which is information that may affect the power demand of the region, and the time of the power demand, the time difference being set based on a correlation between the demand impact information and the power demand of the region, and uses the demand impact information to manage supply and demand throughout the region;
The demand impact information includes a weather warning;
The regional energy management device uses the acquired demand impact information and power demand to calculate a correlation value between the demand impact information and the power demand for each time difference between the reference time and the time of the power demand, and uses the calculated correlation value to set the time difference to be used for the correction of the predicted value.
前記領域はビルであることを特徴とする請求項1または2に記載の地域エネルギー管理システム。 The local energy management system according to claim 1 or 2, characterized in that the area is a building. 前記需要影響情報は、前記施設エネルギー管理装置が前記ビルにおいて取得する第1情報と、前記地域エネルギー管理システム外の外部システムから取得する第2情報とを含むことを特徴とする請求項3に記載の地域エネルギー管理システム。 The regional energy management system according to claim 3, characterized in that the demand impact information includes first information acquired by the facility energy management device in the building and second information acquired from an external system outside the regional energy management system. 前記第1情報は、前記ビルに入居するテナントの従業員の勤務形態を示す情報を含むことを特徴とする請求項4に記載の地域エネルギー管理システム。 The local energy management system according to claim 4, characterized in that the first information includes information indicating the working patterns of employees of tenants residing in the building. 前記第1情報は、前記ビルに入居するテナントの営業時間を示す情報を含むことを特徴とする請求項4または5に記載の地域エネルギー管理システム。 The local energy management system according to claim 4 or 5, wherein the first information includes information indicating business hours of tenants in the building. 前記第1情報は、前記ビル内の各居室の入退出管理情報を含むことを特徴とする請求項4から6のいずれか1つに記載の地域エネルギー管理システム。 The local energy management system according to any one of claims 4 to 6, characterized in that the first information includes entry and exit management information for each room in the building. 前記第1情報は、前記ビルの扉の開閉回数を含むことを特徴とする請求項4から7のいずれか1つに記載の地域エネルギー管理システム。 The local energy management system according to any one of claims 4 to 7, characterized in that the first information includes the number of times the doors of the building are opened and closed. 前記第1情報は、前記ビルの窓の開閉回数を含むことを特徴とする請求項4から8のいずれか1つに記載の地域エネルギー管理システム。 The local energy management system according to any one of claims 4 to 8, characterized in that the first information includes the number of times the windows of the building are opened and closed. 前記第1情報は、前記ビルのエレベーターの昇降回数を含むことを特徴とする請求項4から9のいずれか1つに記載の地域エネルギー管理システム。 The local energy management system according to any one of claims 4 to 9, characterized in that the first information includes the number of times the elevator in the building goes up and down. 前記第2情報は、携帯電話の位置情報を含むことを特徴とする請求項4から10のいずれか1つに記載の地域エネルギー管理システム。 The local energy management system according to any one of claims 4 to 10, characterized in that the second information includes mobile phone location information. 前記地域エネルギー管理装置は、前記需要影響情報および前記実績値を用いて機械学習により学習された補正モデルを用いて、前記予測値の前記補正に用いる補正値を推論し、前記補正値を用いて前記予測値を補正することを特徴とする請求項1から11のいずれか1つに記載の地域エネルギー管理システム。 The local energy management system according to any one of claims 1 to 11, characterized in that the local energy management device uses a correction model learned by machine learning using the demand impact information and the actual values to infer a correction value to be used in the correction of the predicted value, and corrects the predicted value using the correction value. 電力融通を行う地域全体の電力の需給を管理する地域エネルギー管理装置であって、
前記地域においてそれぞれに定められた領域の電力を管理する複数の施設エネルギー管理装置から、過去の電力需要の実績値を用いて算出された対応する前記領域の電力需要の予測値を受信し、前記領域の電力需要に影響する可能性のある情報である需要影響情報を受信する通信部と、
前記需要影響情報に対応して設定された基準時刻と電力需要の時刻との時間差のうち、前記需要影響情報の前記領域の電力需要との相関より設定された時間差と、前記需要影響情報とを用いて前記予測値を補正する補正部と、
補正された前記予測値を用いて、前記地域全体の需給を管理する需給管理部と、
を備え、
取得済の前記需要影響情報および前記電力需要を用いて、前記基準時刻と前記電力需要の時刻との時間差ごとの、前記需要影響情報と前記電力需要との相関値を算出し、算出した相関値を用いて、前記予測値の前記補正に用いる前記時間差を設定し、
前記需要影響情報は、駅の乗降者数を含むことを特徴とする地域エネルギー管理装置。
A regional energy management device that manages the supply and demand of electricity in an entire region where power interchange is performed,
a communication unit that receives, from a plurality of facility energy management devices that manage the power of corresponding areas defined in the region, predicted values of power demand for the corresponding areas calculated using actual values of power demand in the past, and receives demand impact information that may affect the power demand for the corresponding areas;
a correction unit that corrects the predicted value by using a time difference between a reference time set corresponding to the demand impact information and a time of the power demand, the time difference being set based on a correlation between the demand impact information and the power demand in the region, and the demand impact information;
a supply and demand management unit that manages supply and demand in the entire area by using the corrected predicted value;
Equipped with
calculating a correlation value between the demand impact information and the power demand for each time difference between the reference time and the time of the power demand, using the demand impact information and the power demand that have been acquired, and setting the time difference to be used for the correction of the predicted value, using the calculated correlation value;
A regional energy management device, wherein the demand impact information includes the number of passengers boarding and alighting at stations.
電力融通を行う地域において、それぞれに定められた領域の電力を管理する施設エネルギー管理装置であって、
過去の電力需要の実績値を用いて対応する前記領域の電力需要の予測値を求める需要予測部と、
前記領域の電力需要に影響する可能性のある情報である需要影響情報に対応して設定された基準時刻と電力需要の時刻との時間差のうち、前記需要影響情報の前記領域の電力需要との相関より設定された時間差と、前記需要影響情報とを用いて前記予測値を補正する補正部と、
を備え、
取得済の前記需要影響情報および前記電力需要を用いて、前記基準時刻と前記電力需要の時刻との時間差ごとの、前記需要影響情報と前記電力需要との相関値を算出し、算出した相関値を用いて、前記予測値の前記補正に用いる前記時間差を設定し、
前記需要影響情報は、駅の乗降者数を含むことを特徴とする施設エネルギー管理装置。
A facility energy management device that manages the power of a respective defined area in a region where power interchange is performed,
a demand forecasting unit that obtains a forecast value of the power demand of the corresponding area by using a past actual value of the power demand;
a correction unit that corrects the predicted value using a time difference between a reference time and a time of power demand that is set based on a correlation between the demand impact information and the power demand of the region, the time difference being set in accordance with demand impact information that is information that may affect the power demand of the region, and the demand impact information;
Equipped with
calculating a correlation value between the demand impact information and the power demand for each time difference between the reference time and the time of the power demand, using the demand impact information and the power demand that have been acquired, and setting the time difference to be used for the correction of the predicted value, using the calculated correlation value;
A facility energy management device, wherein the demand impact information includes the number of passengers boarding and alighting at stations.
過去の電力需要の実績値を用いて、電力融通を行う地域における定められた複数の領域のそれぞれの電力需要の予測値を求めるステップと、
前記領域の電力需要に影響する可能性のある情報である需要影響情報に対応して設定された基準時刻と電力需要の時刻との時間差のうち、前記需要影響情報の前記領域の電力需要との相関より設定された時間差と、前記需要影響情報とを用いて前記予測値を補正し、補正された前記予測値を用いて、前記地域全体の需給を管理するステップと、
を含み、
前記需要影響情報は、駅の乗降者数を含み、
前記予測値の前記補正に用いる前記時間差は、取得済の前記需要影響情報および前記電力需要を用いて算出される、前記基準時刻と前記電力需要の時刻との時間差ごとの前記需要影響情報と前記電力需要との相関値、を用いて算出されることを特徴とする需要予測方法。
A step of calculating a predicted value of power demand for each of a plurality of defined regions in a region where power interchange is performed, using a past actual value of power demand;
a step of correcting the predicted value using the demand impact information and a time difference between a reference time set in accordance with demand impact information, which is information that may affect the power demand of the region, and the time of the power demand, the time difference being set based on a correlation between the demand impact information and the power demand of the region, and the demand impact information, and managing the supply and demand of the entire region using the corrected predicted value;
Including,
The demand impact information includes the number of passengers boarding and alighting at a station,
A demand forecasting method characterized in that the time difference used for the correction of the predicted value is calculated using the demand impact information and the electricity demand that have already been acquired, and a correlation value between the demand impact information and the electricity demand for each time difference between the reference time and the time of the electricity demand.
過去の電力需要の実績値を用いて、電力融通を行う地域における定められた複数の領域のそれぞれの電力需要の予測値を求めるステップと、
前記領域の電力需要に影響する可能性のある情報である需要影響情報に対応して設定された基準時刻と電力需要の時刻との時間差のうち、前記需要影響情報の前記領域の電力需要との相関より設定された時間差と、前記需要影響情報とを用いて前記予測値を補正し、補正された前記予測値を用いて、前記地域全体の需給を管理するステップと、
をコンピュータに実行させ、
前記需要影響情報は、駅の乗降者数を含み、
前記予測値の前記補正に用いる前記時間差は、取得済の前記需要影響情報および前記電力需要を用いて算出される、前記基準時刻と前記電力需要の時刻との時間差ごとの前記需要影響情報と前記電力需要との相関値、を用いて算出されることを特徴とする需要予測プログラム。
A step of calculating a predicted value of power demand for each of a plurality of defined regions in a region where power interchange is performed, using actual values of past power demand;
a step of correcting the predicted value using the demand impact information and a time difference between a reference time set in accordance with demand impact information, which is information that may affect the power demand of the region, and the time of the power demand, the time difference being set based on a correlation between the demand impact information and the power demand of the region, and the demand impact information, and managing the supply and demand of the entire region using the corrected predicted value;
Run the following on your computer:
The demand impact information includes the number of passengers boarding and alighting at a station,
A demand forecasting program characterized in that the time difference used for the correction of the predicted value is calculated using the demand impact information and the electricity demand that have already been acquired, and a correlation value between the demand impact information and the electricity demand for each time difference between the reference time and the time of the electricity demand.
JP2020195396A 2020-11-25 2020-11-25 Regional energy management system, regional energy management device, facility energy management device, demand forecasting method, and demand forecasting program Active JP7489904B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2020195396A JP7489904B2 (en) 2020-11-25 2020-11-25 Regional energy management system, regional energy management device, facility energy management device, demand forecasting method, and demand forecasting program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2020195396A JP7489904B2 (en) 2020-11-25 2020-11-25 Regional energy management system, regional energy management device, facility energy management device, demand forecasting method, and demand forecasting program

Publications (2)

Publication Number Publication Date
JP2022083834A JP2022083834A (en) 2022-06-06
JP7489904B2 true JP7489904B2 (en) 2024-05-24

Family

ID=81855349

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2020195396A Active JP7489904B2 (en) 2020-11-25 2020-11-25 Regional energy management system, regional energy management device, facility energy management device, demand forecasting method, and demand forecasting program

Country Status (1)

Country Link
JP (1) JP7489904B2 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012194700A (en) 2011-03-15 2012-10-11 Toshiba Corp Energy demand forecasting device and program
JP2013192364A (en) 2012-03-14 2013-09-26 Mitsubishi Electric Corp Community energy management system and community energy management method
JP2015097059A (en) 2013-11-15 2015-05-21 株式会社日立パワーソリューションズ Power demand prediction system and power demand prediction method
JP2017153333A (en) 2016-02-26 2017-08-31 国立大学法人九州大学 Power demand prediction device and power demand prediction system including the same, and power demand predication method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012194700A (en) 2011-03-15 2012-10-11 Toshiba Corp Energy demand forecasting device and program
JP2013192364A (en) 2012-03-14 2013-09-26 Mitsubishi Electric Corp Community energy management system and community energy management method
JP2015097059A (en) 2013-11-15 2015-05-21 株式会社日立パワーソリューションズ Power demand prediction system and power demand prediction method
JP2017153333A (en) 2016-02-26 2017-08-31 国立大学法人九州大学 Power demand prediction device and power demand prediction system including the same, and power demand predication method

Also Published As

Publication number Publication date
JP2022083834A (en) 2022-06-06

Similar Documents

Publication Publication Date Title
US11763266B2 (en) Smart parking lot system
US11018890B2 (en) Building system with a dynamic space graph with temporary relationships
US11631493B2 (en) Systems and methods for managing building wellness
Cancelo et al. Forecasting the electricity load from one day to one week ahead for the Spanish system operator
Shauman Gender asymmetry in family migration: Occupational inequality or interspousal comparative advantage?
US20130226320A1 (en) Policy-driven automated facilities management system
US7778855B2 (en) Automatic self-optimizing queue management system
Zhu et al. Time-series approaches for forecasting the number of hospital daily discharged inpatients
JP4386748B2 (en) Air conditioning load prediction method, air conditioning load prediction device, air conditioning load prediction program, and recording medium
WO2013099323A1 (en) Power control system and method for controlling power
US20120143810A1 (en) Rules engine with database triggering
CN101751614A (en) Method for forecasting customer flow grade and air conditioner temperature control method applying same
CN111344733B (en) Apparatus and method for processing heterogeneous data to determine inflow in time and space
Howard et al. Implicit sensing of building occupancy count with information and communication technology data sets
CA3106434A1 (en) Building management system with space graphs
US20230367033A1 (en) Automated system and method for managing weather related energy use
CN112686417A (en) Subway large passenger flow prediction method and system and electronic equipment
KR20230117317A (en) Method For Predicting Peak Power Usage Time and Server using the method
JP7489904B2 (en) Regional energy management system, regional energy management device, facility energy management device, demand forecasting method, and demand forecasting program
JP2002297884A (en) Systems for business analysis, business support, and business evaluation
Sharif Probability Models for Health Care Operations with Application to Emergency Medicine
CN118378844B (en) Intelligent park management method and system
Pathirana et al. Customer Behavior and Occupancy Patterns in Shopping Malls: Insights for Decision-Making and Future Prospects
Zhong et al. Machine Learning for Emergency Service Optimization: A Real-World Application
Ito et al. Innovating multiagent algorithms for smart city: An overview

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20221104

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20230927

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20231003

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20231122

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20240213

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20240327

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20240416

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20240514

R150 Certificate of patent or registration of utility model

Ref document number: 7489904

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150