JP7390943B2 - 地盤評価方法および地盤評価装置 - Google Patents
地盤評価方法および地盤評価装置 Download PDFInfo
- Publication number
- JP7390943B2 JP7390943B2 JP2020044298A JP2020044298A JP7390943B2 JP 7390943 B2 JP7390943 B2 JP 7390943B2 JP 2020044298 A JP2020044298 A JP 2020044298A JP 2020044298 A JP2020044298 A JP 2020044298A JP 7390943 B2 JP7390943 B2 JP 7390943B2
- Authority
- JP
- Japan
- Prior art keywords
- ground
- hole
- value
- drilling
- distance
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000011156 evaluation Methods 0.000 title claims description 53
- 238000005553 drilling Methods 0.000 claims description 59
- 238000000926 separation method Methods 0.000 claims description 31
- 239000002689 soil Substances 0.000 claims description 25
- 230000000704 physical effect Effects 0.000 claims description 23
- 238000000034 method Methods 0.000 claims description 6
- 238000012545 processing Methods 0.000 description 12
- 238000011835 investigation Methods 0.000 description 9
- 238000009412 basement excavation Methods 0.000 description 8
- 238000010276 construction Methods 0.000 description 7
- 238000013461 design Methods 0.000 description 6
- 238000010586 diagram Methods 0.000 description 6
- 230000000694 effects Effects 0.000 description 3
- 230000007423 decrease Effects 0.000 description 2
- 230000035515 penetration Effects 0.000 description 2
- 238000012360 testing method Methods 0.000 description 2
- 238000009430 construction management Methods 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 238000011160 research Methods 0.000 description 1
Images
Landscapes
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Description
次に、本発明に係る地盤評価方法の実施の形態について説明する。
図1に示すように、本実施の形態に係る地盤評価方法は、孔の掘削に伴う周辺の対象地盤の物性変化を評価する方法であって、以下のステップS1~S4の手順を有する。
ステップS1は、事前に把握されている孔の掘削に伴う地盤のN値と掘削した孔からの離隔距離の関係を利用して、地盤の緩みの影響範囲と程度に関する特性を規定するものである。より具体的には、事前に把握されている図7のような関係に基づいて、後述の図3の関係、図4の関係を作成し、作成した関係から、地盤の緩みの影響範囲と程度に関する特性を規定する。
ステップS2は、孔を掘削する前に実施した地盤調査の結果から、対象地盤のN値を取得するものである。例えば、建築物の設計・施工計画の策定に必要な基礎資料の収集を目的として、孔掘削前に実施される地盤調査結果のみを利用する。具体的には、標準貫入試験などから得られる地盤のN値を判定指標とする。可能であれば、地盤の緩み領域とその程度を評価しておくべき地点の近傍で実施された地盤調査結果を採用することが望ましい。
ステップS3は、対象地盤に掘削される孔からの離隔距離を設定するものである。
ステップS4は、上記のステップS1で規定した下限値に対して、上記のステップS2で取得した対象地盤のN値と、ステップS3で設定した離隔距離を当てはめて、孔を掘削した後の離隔距離における対象地盤のN値(物性変化)を評価するものである。
次に、本実施の形態の実施例を説明する。なお、ステップS1における下限値(特性)の規定が完了しているものとする。
次に、本発明に係る地盤評価装置の実施の形態について説明する。
図2に示すように、本実施の形態に係る地盤評価装置10は、孔の掘削に伴う周辺の対象地盤の物性変化を評価するものであって、特性規定手段12と、N値取得手段14と、離隔距離設定手段16と、評価手段18とを有する。
12 特性規定手段
14 N値取得手段
16 離隔距離設定手段
18 評価手段
Claims (2)
- 孔の掘削に伴う周辺の対象地盤の物性変化を評価する地盤評価方法であって、
事前に把握されている孔の掘削に伴う地盤のN値と掘削した孔からの離隔距離の関係を利用して、地盤の緩みの影響範囲と程度に関する特性を規定するステップと、
孔を掘削する前に実施した地盤調査の結果から、対象地盤のN値を取得するステップと、
対象地盤に掘削される孔からの離隔距離を設定するステップと、
規定した特性に対して、対象地盤のN値と孔からの離隔距離を当てはめて、孔を掘削した後の離隔距離における対象地盤のN値を評価するステップとを有することを特徴とする地盤評価方法。 - 孔の掘削に伴う周辺の対象地盤の物性変化を評価する地盤評価装置であって、
事前に把握されている孔の掘削に伴う地盤のN値と掘削した孔からの離隔距離の関係を利用して、地盤の緩みの影響範囲と程度に関する特性を規定する特性規定手段と、
孔を掘削する前に実施した地盤調査の結果から、対象地盤のN値を取得するN値取得手段と、
対象地盤に掘削される孔からの離隔距離を設定する離隔距離設定手段と、
規定した特性に対して、対象地盤のN値と孔からの離隔距離を当てはめて、孔を掘削した後の離隔距離における対象地盤のN値を評価する評価手段とを有することを特徴とする地盤評価装置。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2020044298A JP7390943B2 (ja) | 2020-03-13 | 2020-03-13 | 地盤評価方法および地盤評価装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2020044298A JP7390943B2 (ja) | 2020-03-13 | 2020-03-13 | 地盤評価方法および地盤評価装置 |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2021143559A JP2021143559A (ja) | 2021-09-24 |
JP7390943B2 true JP7390943B2 (ja) | 2023-12-04 |
Family
ID=77766076
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2020044298A Active JP7390943B2 (ja) | 2020-03-13 | 2020-03-13 | 地盤評価方法および地盤評価装置 |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP7390943B2 (ja) |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2017014818A (ja) | 2015-07-02 | 2017-01-19 | 鹿島建設株式会社 | 地盤強度の判定方法、及び、トンネルの掘削方法 |
JP2020023819A (ja) | 2018-08-07 | 2020-02-13 | 鹿島建設株式会社 | 地下構造物用立坑及びその構築方法 |
-
2020
- 2020-03-13 JP JP2020044298A patent/JP7390943B2/ja active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2017014818A (ja) | 2015-07-02 | 2017-01-19 | 鹿島建設株式会社 | 地盤強度の判定方法、及び、トンネルの掘削方法 |
JP2020023819A (ja) | 2018-08-07 | 2020-02-13 | 鹿島建設株式会社 | 地下構造物用立坑及びその構築方法 |
Also Published As
Publication number | Publication date |
---|---|
JP2021143559A (ja) | 2021-09-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Livneh et al. | Axial testing and numerical modeling of square shaft helical piles under compressive and tensile loading | |
Yue et al. | Automatic monitoring of rotary-percussive drilling for ground characterization—illustrated by a case example in Hong Kong | |
Misra et al. | Analytical solution for micropile design under tension and compression | |
Moayedi et al. | Evaluation of maintained load test (MLT) and pile driving analyzer (PDA) in measuring bearing capacity of driven reinforced concrete piles | |
Chae et al. | Uplift capacity of belled pile in weathered sandstones | |
Weaver et al. | Response of 0.6 m cast-in-steel-shell pile in liquefied soil under lateral loading | |
Chatterjee1a et al. | Dynamic analyses and field observations on piles in Kolkata city | |
KR101789967B1 (ko) | 풍화토와 풍화암반의 sda매입말뚝 선단지지력 산정방법 | |
JP7390943B2 (ja) | 地盤評価方法および地盤評価装置 | |
Mostafa | Lateral response evaluation of single piles based on pressuremeter test results (using Foxta) versus standard penetration test results (using Lpile) | |
Clough et al. | The development of pressuremeter testing | |
Hwan Cho et al. | Laterally loaded drilled shafts embedded in soft rock | |
Bray et al. | Seismic displacement design of earth retaining structures | |
Niroumand et al. | Design and construction of helical anchors in soils | |
Sarker et al. | Applicability of standard penetration test in Bangladesh and graphical representation of SPT-N value | |
Shaban et al. | Interpretation of in situ state parameters of piezocone penetration tests in high pile rebound soils | |
Vytiniotis et al. | Lateral soil movements due to pile driving: a case study in soft clays | |
Belbas | The capacity of driven steel H-piles in lacustrine clay, till and karst bedrock: a Winnipeg case study | |
Zhussupbekov et al. | Prediction of axial bearing capacity of piles by SPT and PMT-based approach | |
Li | Axial and lateral behavior of helical piles under static loads | |
Haberfield | Practical experience with piled raft design for tall buildings | |
Lanyi | Behaviour of helical pile groups and individual piles under compressive loading in a cohesive soil | |
Richardson | A case study on pile relaxation in dilative silts | |
Mijena | A comparison of friction piles bearing capacity based on theoretical and empirical mathematical models | |
Ruberti | Investigation of installation torque and torque-to-capacity relationship of screw-piles and helical anchors |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20230213 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20231026 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20231107 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20231121 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 7390943 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |