JP7368927B1 - power management system - Google Patents
power management system Download PDFInfo
- Publication number
- JP7368927B1 JP7368927B1 JP2022150410A JP2022150410A JP7368927B1 JP 7368927 B1 JP7368927 B1 JP 7368927B1 JP 2022150410 A JP2022150410 A JP 2022150410A JP 2022150410 A JP2022150410 A JP 2022150410A JP 7368927 B1 JP7368927 B1 JP 7368927B1
- Authority
- JP
- Japan
- Prior art keywords
- power
- amount
- employees
- work
- control unit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 230000005611 electricity Effects 0.000 claims abstract description 30
- 238000007599 discharging Methods 0.000 claims 3
- 238000007726 management method Methods 0.000 abstract description 16
- 238000010586 diagram Methods 0.000 abstract description 7
- 230000000694 effects Effects 0.000 description 2
- 238000004146 energy storage Methods 0.000 description 1
- 238000010248 power generation Methods 0.000 description 1
Images
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
【課題】電力計画の見通しを安定させやすい電力管理システムを提供する。【解決手段】本発明にかかる電力管理システム1は、従業員が従事する事業所に通勤する通勤予定日が記録されているスケジュールデータベース3と、従業員が事業所の設備への放電に供する電気自動車(EV2)を出勤時に使用するか否かが記録されている従業員データベース4と、スケジュールデータベース3と従業員データベース4とに基づいて、特定の日に通勤してきたすべてのEV2から供給を受けられる電力量である総蓄電容量の情報を出力する制御部5と、を備える。【選択図】図1An object of the present invention is to provide a power management system that easily stabilizes the outlook for power planning. [Solution] The power management system 1 according to the present invention includes a schedule database 3 in which the scheduled commuting days of employees to the workplace where they work are recorded, and electricity that the employees use to discharge to the equipment of the business office. Based on the employee database 4, which records whether or not a car (EV2) is used for work, the schedule database 3, and the employee database 4, the system receives supplies from all EV2s commuting to work on a particular day. and a control unit 5 that outputs information on the total storage capacity, which is the amount of power consumed. [Selection diagram] Figure 1
Description
本発明は、電力管理システムに関する。 The present invention relates to a power management system.
特許文献1には、電気自動車(EVともいう)に蓄電された電力を電力網に供給(売電)することが開示されている。
EVは、移動体としてだけでなく、走行しないときは蓄電と放電が可能な蓄電池としての機能を果たすことができる。例えば、オフィスや工場等の施設に設けられる設備の電力消費量が多い時間にEVから設備に電力を供給できる。 EVs can function not only as moving objects, but also as storage batteries that can store and discharge electricity when not traveling. For example, electric power can be supplied from the EV to equipment installed in facilities such as offices and factories during times when the equipment consumes a lot of power.
ところで、施設内の設備がEVから電力供給を受けられる電力量である蓄電容量は、施設の敷地内に停まっているEVの数によって決まる。しかし、近年は在宅勤務等の普及によりすべての従業員が通勤するとは限らないので、例えば次の日に設備がどれだけの蓄電容量を確保できるのか、わからない可能性があり、電力計画に影響を及ぼすことがあった。 Incidentally, the power storage capacity, which is the amount of power that equipment within a facility can receive from EVs, is determined by the number of EVs parked within the premises of the facility. However, in recent years, due to the spread of telecommuting, not all employees commute to work, so for example, it may not be possible to know how much energy storage capacity the equipment can secure the next day, which may affect power planning. There were times when it had a negative impact.
本発明は、電力計画の見通しを安定させやすい電力管理システムを提供する。 The present invention provides a power management system that easily stabilizes the outlook for power planning.
本発明の一側面に係る電力管理システムは、
従業員が従事する事業所に通勤する通勤予定日が記録されているスケジュールデータベースと、
従業員が前記事業所の設備への放電に供する電気自動車を出勤時に使用するか否かが記録されている従業員データベースと、
前記スケジュールデータベースと前記従業員データベースとに基づいて、特定の日に通勤してきたすべての前記電気自動車から供給を受けられる電力量である総蓄電容量の情報を出力する制御部と、を備える。
A power management system according to one aspect of the present invention includes:
A schedule database that records the scheduled commuting dates for employees to work at their workplaces;
an employee database in which it is recorded whether or not the employee uses an electric vehicle to discharge electricity to the equipment of the business office when going to work;
and a control unit that outputs information on a total storage capacity, which is the amount of power that can be supplied from all the electric vehicles commuting to work on a specific day, based on the schedule database and the employee database.
本発明によれば、電力計画の見通しを安定させやすい電力管理システムを提供できる。 According to the present invention, it is possible to provide a power management system that easily stabilizes the outlook for power planning.
以下、本発明の実施形態について図面を参照しながら説明する。本図面に示された各部材の寸法は、説明の便宜上、実際の各部材の寸法とは異なる場合がある。 Embodiments of the present invention will be described below with reference to the drawings. The dimensions of each member shown in this drawing may differ from the actual dimensions of each member for convenience of explanation.
電力管理システム1は、従業員が出勤に使用する電気自動車(以下、EV2と呼ぶ)と事業所との間で行われる電力のやり取りを管理するシステムである。本実施形態では、事業主と社員との間に、社員が通勤に用いるEV2から事業所へ電力を供給してもよい旨の契約が交わされている。このような契約では、一度の電力供給の際に供給される最大の電力量や、電力を供給した際の対価などが取り決められている。
本実施形態では、事業所の一例としてオフィスの場合を例示する。図1は、本実施形態に係る電力管理システム1のブロック図である。図1に示すように、電力管理システム1は、スケジュールデータベース3と、従業員データベース4と、制御部5と、を備える。
The
In this embodiment, an office will be exemplified as an example of a business establishment. FIG. 1 is a block diagram of a
図2は、2022年6月15日(特定の日の一例)におけるスケジュールデータベース3の一例を示す図である。スケジュールデータベース3には、社員を特定する社員番号と、社員ごとの出勤予定時刻および退勤予定時刻と、社員がどこで勤務するかを示した出社種別と、が記録されている。出社種別について、「オフィス」は、社員がオフィスに来て勤務することを示している。「在宅勤務」は、社員が社員の自宅で勤務することを示している。
FIG. 2 is a diagram showing an example of the
図3は、図2と同日における従業員データベース4の一例を示す図である。従業員データベース4には、社員番号と、EV2からオフィスに電力を供給してもよい最大の電力量である利用可能蓄電量が記録されている。利用可能蓄電量は、社員が乗車するEV2の車種やEV2からオフィスに提供できる電力量を定めた契約内容によって異なっていてもよく、すべてのEV2において一律の利用可能蓄電量であってもよい。車種に応じてEV2に搭載されている蓄電池の容量が異なっているためである。さらに、月内においてEV2からオフィスへの電力供給に寄与した回数を示す月内貢献回数および月内においてEV2からオフィスへ供給した電力量を示す月内受電量等が、従業員データベース4に記録されてもよい。
なお、本実施形態のスケジュールデータベース3および従業員データベース4は、電力管理システム1において管理されることに同意した従業員のみを表記しているが、電力管理システム1に参加しない従業員の情報が記録されてもよい。
FIG. 3 is a diagram showing an example of the
Note that although the
次に、図1から図3を用いて、電力管理システム1における制御部5について説明する。図1に示すように、制御部5は総蓄電容量算出部51を備える。総蓄電容量は、EV2から供給可能な利用可能蓄電量の総和である。総蓄電容量算出部51は時間帯ごとの総蓄電容量を算出する。
Next, the
ただし、総蓄電容量は時間帯ごとに変化しうる。例えば、図2に示すように9時から12時までは社員番号1234と社員番号5678の社員がオフィスに出勤している。このため、図3から算出すると、総蓄電容量は、社員番号1234のEV2の利用可能蓄電量30と社員番号9012のEV2の利用可能蓄電量50の和である80となる。しかしながら、社員番号9012は12時で退勤するので、12時から12時50分までは社員番号1234のみがオフィスに出勤中である。したがって、総蓄電容量は、社員番号1234のEV2の利用可能蓄電量である30となる。
However, the total storage capacity can change depending on the time of day. For example, as shown in FIG. 2, employees with
得られた総蓄電容量は、制御部5内の記録装置(図示せず)に記録されたり、事業主や社員等に通知されたりすることで、事業主や社員はその日ごとの時間帯ごとの蓄電容量を知ることができる。
The obtained total storage capacity is recorded in a recording device (not shown) in the
このようにして算出された蓄電容量は、事業所が電力供給会社などから供給される電力とは別に、事業所が自由に使える電力である。このため、例えば、事業者は電力供給会社と契約する最大電力量(デマンド量)を、実際に事業に必要な電力量よりも低く契約しておき、不足の電力を蓄電容量で賄うことができる。これにより、事業者は電力供給会社へ支払う電気料金を抑制することができる。
本実施形態にかかる電力管理システム1によれば、総蓄電容量算出部51はスケジュールデータベース3と従業員データベース4とを参照して、EV2から供給可能な電力量である時間帯ごとの総蓄電容量を算出し、その結果を出力する。在宅勤務やフレックスタイム制などによって、総蓄電容量の把握が直感的に困難な状況においても、事業主は出力された総蓄電容量を基に、電力を多く消費する作業をどの時間帯に行っても良いのか把握でき、事業計画を立てやすい。また、総蓄電容量を多く確保できる時間帯に、電力を多く消費する作業を行うことで、追加の発電設備の投資や電気料金の値上げを抑えることができる。
The power storage capacity calculated in this way is power that the business office can freely use, separate from the power supplied to the business office from an electric power supply company or the like. For this reason, for example, a business operator can contract with an electricity supply company for a maximum amount of electricity (demand amount) that is lower than the amount of electricity actually required for the business, and then cover the electricity shortage with storage capacity. . This allows businesses to reduce the electricity charges they pay to power supply companies.
According to the
また、本実施形態の従業員データベース4には、従業員それぞれのEV2に応じて利用可能蓄電量が記録されている。これにより、より正確に総蓄電容量を見積もることができる。
Further, in the
次に、総蓄電容量算出部51が総蓄電容量を算出した結果、総蓄電容量が事前に予定されていた事業計画に必要な電力量に対して不足していた場合について説明する。
Next, a case will be described in which the total power storage
図1に示すように、制御部5は、必要電力予測部11と通信可能に接続されている。必要電力予測部11は、事業計画を入力することで、事業計画に必要な電力量である必要電力量を算出できる。制御部5は、必要電力予測部11から必要電力量を取得できる。
As shown in FIG. 1, the
制御部5は、電力分配器12と通信可能に接続されている。電力分配器12は、EV2と接続されていて、オフィスからEV2に対して電力の供給と、EV2からオフィスに対しての電力の供給と、を開始および停止することができる。
The
制御部5は通信装置53を備えている。通信装置53は、従業員が保有している従業員端末13と通信することが可能である。通信装置53を介して、制御部5は従業員に対して通知を行うことができる。
The
図4は、制御部5による従業員への通知する際のフローチャートである。なお図4では、電力管理システム1によって例えば、2022年6月15日(特定の日の一例)の電力を管理する場合を例示している。また、ステップS1~S4およびS6は2022年6月15日の前日までに行う。ステップS5は2022年6月15日以降に行う。まず制御部5は、2022年6月15日について必要電力予測部11から必要電力量を取得する(ステップS1)。次に制御部5は、2022年6月15日について前述の通りに時間帯ごとの総蓄電容量を算出する(ステップS2)。
FIG. 4 is a flowchart when the
ここで制御部5は、総蓄電容量と必要電力量とを比較して、総蓄電容量が常に必要電力量を上回っているかを判別する(ステップS3)。総蓄電容量が必要電力量を下回る時間帯があった場合(ステップS3においてNo)、制御部5はこの日において在宅勤務あるいは休暇をとる予定の従業員に対して、オフィスへの出勤を促す通知を行う(ステップS4)。
Here, the
在宅勤務や休暇を予定する社員がオフィスへの出勤に切り替えると、総蓄電容量は増加し、必要電力量を上回る可能性がある。このように、通知を行うことによって、事業計画を変更したり、電力事業者から電力を多めに購入したりしなくとも、予定通りの事業を行うことが期待できる。 When employees switch from working from home or planning vacations to coming to the office, the total storage capacity increases, potentially exceeding the amount of electricity needed. In this way, by providing notification, it can be expected that the business can be carried out as planned without changing the business plan or purchasing a large amount of electricity from the electric power company.
通知を行う対象は、必ずしもすべての従業員を対象としなくてもよい。例えば、図2において社員番号3456、2345、6789の3名が在宅勤務の予定となっている。このうちいずれかの社員が出勤すれば、必要電力量を賄えるだけの総蓄電容量が得られるのであれば、休暇取得予定の社員番号7890に対して通知を行わなくてもよい。制御部5は、オフィスへの出勤に変更した場合に総蓄電容量が必要電力量を上回る、少なくとも必要最低限以上の人数の社員に対して通知を行う。
Notifications do not necessarily have to be made to all employees. For example, in FIG. 2, three employees with
ステップS4において通知を行った社員の中で、実際に特定の日に出勤するように予定を変更した社員について、制御部5は貢献情報記録部52を介して貢献情報を従業員データベース4に記録する。図3の例では、制御部5は、貢献情報の記録として、当該従業員について月内貢献回数のカウントを1増加し、EV2から受け取った電力量を月内受電量に加算する。
Among the employees who notified in step S4, the
このように、制御部5が貢献情報を出力することで、オフィスの事業者は、出勤しない予定を覆して出勤することで蓄電容量の確保に貢献してくれた従業員に貢献情報を活用できる。例えば、貢献情報に基づいて、事業者は従業員に対して特典を付与することが可能となる。特典によって、従業員は、通知に応じやすくなるので、必要電力量分の総蓄電容量を確保しやすくなる。
In this way, by the
特定の日において、総蓄電容量が必要電力量を常に上回っていた場合(ステップS3においてYes)、制御部5はこの日においてオフィスに出勤予定の従業員に対して、在宅勤務や休暇に予定を変更してもよい通知を行ってもよい(ステップS6)。
If the total storage capacity always exceeds the required power amount on a specific day (Yes in step S3), the
このように、過剰に蓄電容量を確保できそうな場合は、休暇または在宅勤務に変更してもよい通知により、例えば出勤率を低減する要請に応じやすくなる。 In this way, if it seems possible to secure an excessive amount of power storage capacity, it becomes easier to respond to a request to reduce the attendance rate, for example, by notifying the user that the employee may change to vacation or working from home.
ステップS6において通知を行う人数は、仮に通知を行った従業員全員が在宅勤務や休暇に予定を変更したとしても、総蓄電容量が必要電力量を常に下回らないように通知を出すことが望ましい。これによって、出勤率を低減しつつ十分な総蓄電容量を確保できる。 Regarding the number of people to be notified in step S6, it is desirable to issue notifications so that the total storage capacity will not fall below the required amount of power at all times, even if all of the notified employees change their schedules to work from home or take vacations. This makes it possible to secure sufficient total power storage capacity while reducing the attendance rate.
過剰に蓄電容量を確保できそうな場合は、休暇または在宅勤務に変更してもよい通知を送る従業員の優先順位の決定のために、貢献情報が使用されてもよい。 If excess storage capacity is likely to be available, contribution information may be used to prioritize employees to be notified of leave or work from home.
例えば、図2において出勤予定の従業員である社員番号1234、5678、9012の3名について、通知を行う優先順位を(1)社員番号1234、(2)社員番号9012、(3)社員番号5678の順としてもよい。これは、月内貢献回数がこの順に多いからである。
For example, in Figure 2, for three employees with
別の例として、通知を行う優先順位を(1)社員番号1234、(2)社員番号5678、(3)社員番号9012の順としてもよい。これは、月内受電量がこの順に多いからである。
As another example, the order of priority for notification may be (1)
このように総蓄電容量に余裕がある場合は、貢献情報に応じて休暇または在宅勤務に変更してもよい通知を行うことで、貢献度の高い従業員に対して出勤態様を選ぶ機会をより多く与えることができる。 In this way, if there is sufficient total storage capacity, employees with high contributions can be given more opportunities to choose their work style by notifying them that they can change to vacation or working from home depending on their contribution information. You can give a lot.
以上、実施形態に基づいて本発明を説明した。本実施形態は本開示の一例であって、上述した実施形態に限定されず、適宜、変形、改良等が自在である。その他、上述した実施形態における各構成要素の材質、形状、寸法、数値、形態、数、配置場所等は、本発明を開示できるものであれば任意であり、限定されない。 The present invention has been described above based on the embodiments. This embodiment is an example of the present disclosure, and is not limited to the embodiment described above, and can be modified, improved, etc. as appropriate. In addition, the material, shape, size, numerical value, form, number, arrangement location, etc. of each component in the above-described embodiments are arbitrary as long as they can disclose the present invention, and are not limited.
例えば、本実施形態において、総蓄電容量と必要電力量とを比較して、総蓄電容量が必要電力量を下回る時間帯があった場合に、制御部が在宅勤務あるいは休暇をとる予定の従業員に対して、オフィスへの出勤を促す通知を行う形態について説明した。しかしながら、必要電力量との比較について、本実施形態の例示に限られない。 For example, in the present embodiment, when the total storage capacity and the required amount of electricity are compared, and if there is a time period in which the total storage capacity is less than the required amount of electricity, the control unit will notify the employee who is scheduled to work from home or take vacation. We explained how to send notifications to employees to encourage them to come to the office. However, the comparison with the required power amount is not limited to the example of this embodiment.
例えば、総蓄電容量および電気供給会社から供給される契約電力量の合計と必要電力量とを比較して、総蓄電容量および電気供給会社から供給される契約電力量の合計が必要電力量を下回る時間帯があった場合に、制御部が在宅勤務あるいは休暇をとる予定の従業員に対して、オフィスへの出勤を促す通知を行ってもよい。通知を受けた従業員全員がオフィスへ出勤すると、少なくとも総蓄電容量および契約電力量の合計が必要電力量を上回るように、通知する人数が決められてもよい。また、通知にしたがって、出勤予定でなかった従業員が出勤した場合には貢献情報が出力されるように構成されてもよい。 For example, when comparing the total power storage capacity and the total contracted power amount supplied by the electricity supply company with the required power amount, the total power storage capacity and the contracted power amount supplied by the power supply company are less than the required power amount. If there is a time slot, the control unit may notify employees who are scheduled to work from home or take vacation to urge them to come to the office. The number of people to be notified may be determined so that at least the sum of the total power storage capacity and the contracted power amount exceeds the required power amount when all of the notified employees go to work in the office. Furthermore, the system may be configured such that contribution information is output when an employee who was not scheduled to come to work comes to work in accordance with the notification.
また、総蓄電容量および電気供給会社から供給される契約電力量の合計が必要電力量を上回る時間帯があった場合に、制御部がオフィスへ出勤する予定の社員に対して、休暇または在宅勤務に変更してもよい通知を行ってもよい。通知を受けた全員が休暇や在宅勤務に変更となっても総蓄電容量および契約電力量の合計が必要電力量を上回るように、通知する人数が決められてもよい。 In addition, if there is a time period in which the total storage capacity and the contracted amount of electricity supplied by the electricity supply company exceeds the required amount of electricity, the control department will notify employees who are scheduled to go to the office to take leave or work from home. You may notify that the changes may be made. The number of people to be notified may be determined so that even if everyone who has received the notification goes on vacation or changes to working from home, the total power storage capacity and contracted power amount will exceed the required power amount.
いずれの場合も本実施形態と同様の効果が得られる。 In either case, the same effects as in this embodiment can be obtained.
1 電力管理システム
2 EV
3 スケジュールデータベース
4 従業員データベース
5 制御部
11 必要電力予測部
12 電力分配器
13 従業員端末
51 総蓄電容量算出部
52 貢献情報記録部
53 通信装置
1
3
Claims (11)
従業員が前記事業所の設備への放電に供する電気自動車を出勤時に使用するか否かが記録されている従業員データベースと、
前記スケジュールデータベースと前記従業員データベースとに基づいて、特定の日に通勤してきたすべての前記電気自動車から供給を受けられる電力量である総蓄電容量の情報を出力する制御部と、を備える
電力管理システム。 A schedule database that records the scheduled commuting dates for employees to work at their workplaces;
an employee database in which it is recorded whether or not the employee uses an electric vehicle to discharge electricity to the equipment of the business office when going to work;
a control unit that outputs information on a total storage capacity, which is the amount of power that can be supplied from all the electric vehicles commuting to work on a specific day, based on the schedule database and the employee database. system.
請求項1に記載の電力管理システム。 The employee database records an available amount of power storage, which is a power storage capacity that can be used for discharging to the equipment of the business office, in each of the electric vehicles used by each employee.
The power management system according to claim 1.
さらに、特定の日に前記設備が消費する電力量である消費電力予測量を取得し、
前記総蓄電容量が前記消費電力予測量を下回る場合に、前記設備への放電に供する前記電気自動車を通勤時に使用する従業員であって、特定の日に通勤しない予定の従業員に、特定の日の通勤を促す通知を行う、
請求項1に記載の電力管理システム。 The control unit includes:
Furthermore, obtain a predicted power consumption amount, which is the amount of power consumed by the equipment on a specific day,
If the total power storage capacity is less than the predicted power consumption amount, an employee who uses the electric vehicle for commuting to discharge electricity to the facility and who does not plan to commute on a particular day will receive a specific Provides notifications to encourage people to commute during the day,
The power management system according to claim 1.
請求項3に記載の電力管理システム。 The control unit is configured to at least control the total power storage capacity to exceed the predicted power consumption amount when all employees who have received the notification change their schedules to commute to work on a specific day in accordance with the notification. giving said notice to the necessary number of employees;
The power management system according to claim 3.
さらに、特定の日に前記設備が消費する電力量である消費電力予測量を取得し、
前記総蓄電容量と電気供給会社から供給される契約電力量との合計が前記消費電力予測量を下回る場合に、前記設備への放電に供する前記電気自動車を通勤時に使用する従業員であって、特定の日に通勤しない予定の従業員に、特定の日の通勤を促す通知を行う、
請求項1に記載の電力管理システム。 The control unit includes:
Furthermore, obtain a predicted power consumption amount, which is the amount of power consumed by the equipment on a specific day,
An employee who uses the electric vehicle for commuting to discharge electricity to the facility when the sum of the total storage capacity and the contracted power amount supplied by the electricity supply company is less than the predicted power consumption amount, Sending notifications to employees who do not plan to commute on a specific day to encourage them to commute on a specific day;
The power management system according to claim 1.
請求項5に記載の電力管理システム。 The control unit determines that when all employees who have received the notification change their schedules to commute to work on a specific day in accordance with the notification, the total power storage capacity and the contracted power amount are equal to the power consumption. providing said notification to at least the required number of employees in excess of the expected amount;
The power management system according to claim 5.
請求項3~6のいずれか一項に記載の電力管理システム。 When the control unit determines that the employee who received the notification has come to work on a specific day, the control unit outputs contribution information.
The power management system according to any one of claims 3 to 6.
請求項3に記載の電力管理システム。 When the control unit determines that the total power storage capacity exceeds the predicted power consumption amount, the control unit controls the electric vehicle that is used for discharging electricity to the equipment when going to work and is scheduled to work on a specific day. Notifying employees that they may take vacation or work from home on specific dates;
The power management system according to claim 3.
請求項8に記載の電力管理システム。 The control unit determines the number of employees such that the total power storage capacity does not fall below the predicted power consumption amount if all employees who received the notification change their schedules so as not to commute on a specific day in accordance with the notification. giving the said notice to the employees of
The power management system according to claim 8.
請求項5に記載の電力管理システム。 When the control unit determines that the sum of the total power storage capacity and the contracted power amount exceeds the predicted power consumption amount, the control unit controls an employee who uses the electric vehicle for discharging to the equipment when going to work, Notifying employees who are scheduled to work on certain days that they may take vacation or work from home on certain days;
The power management system according to claim 5.
請求項10に記載の電力管理システム。 The control unit determines that when all employees who have received the notification change their schedules so as not to commute on a specific day in accordance with the notification, the total of the recorded total storage capacity and the contracted power amount is equal to the power consumption. giving said notification to a number of employees not less than the predicted amount;
The power management system according to claim 10.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2022150410A JP7368927B1 (en) | 2022-09-21 | 2022-09-21 | power management system |
JP2023175840A JP2024045093A (en) | 2022-09-21 | 2023-10-11 | Power Management System |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2022150410A JP7368927B1 (en) | 2022-09-21 | 2022-09-21 | power management system |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2023175840A Division JP2024045093A (en) | 2022-09-21 | 2023-10-11 | Power Management System |
Publications (2)
Publication Number | Publication Date |
---|---|
JP7368927B1 true JP7368927B1 (en) | 2023-10-25 |
JP2024044706A JP2024044706A (en) | 2024-04-02 |
Family
ID=88418557
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2022150410A Active JP7368927B1 (en) | 2022-09-21 | 2022-09-21 | power management system |
JP2023175840A Pending JP2024045093A (en) | 2022-09-21 | 2023-10-11 | Power Management System |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2023175840A Pending JP2024045093A (en) | 2022-09-21 | 2023-10-11 | Power Management System |
Country Status (1)
Country | Link |
---|---|
JP (2) | JP7368927B1 (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2007282383A (en) | 2006-04-07 | 2007-10-25 | Kyushu Institute Of Technology | Method and system for levelling power load |
JP2012196028A (en) | 2011-03-16 | 2012-10-11 | Mitsubishi Electric Corp | Electric power management system |
JP2012249505A (en) | 2011-05-31 | 2012-12-13 | Toshiba Corp | Power supply system |
US20150217657A1 (en) | 2014-02-05 | 2015-08-06 | Electronics And Telecommunications Research Institute | Device and method for reducing peak load of electric energy within building using electric vehicle |
-
2022
- 2022-09-21 JP JP2022150410A patent/JP7368927B1/en active Active
-
2023
- 2023-10-11 JP JP2023175840A patent/JP2024045093A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2007282383A (en) | 2006-04-07 | 2007-10-25 | Kyushu Institute Of Technology | Method and system for levelling power load |
JP2012196028A (en) | 2011-03-16 | 2012-10-11 | Mitsubishi Electric Corp | Electric power management system |
JP2012249505A (en) | 2011-05-31 | 2012-12-13 | Toshiba Corp | Power supply system |
US20150217657A1 (en) | 2014-02-05 | 2015-08-06 | Electronics And Telecommunications Research Institute | Device and method for reducing peak load of electric energy within building using electric vehicle |
Also Published As
Publication number | Publication date |
---|---|
JP2024045093A (en) | 2024-04-02 |
JP2024044706A (en) | 2024-04-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Liu et al. | Distributed operation management of battery swapping-charging systems | |
US20220121260A1 (en) | Power distribution management based on distributed networking protocol analytics | |
Xie et al. | Optimal service pricing and charging scheduling of an electric vehicle sharing system | |
Liu et al. | Optimal EV charging scheduling by considering the limited number of chargers | |
Lee et al. | Optimal fleet, battery, and charging infrastructure planning for reliable electric bus operations | |
JP4713623B2 (en) | Charge / discharge management device | |
Wang et al. | Two-stage admission and scheduling mechanism for electric vehicle charging | |
Dong et al. | The PHEV charging scheduling and power supply optimization for charging stations | |
JP2012249505A (en) | Power supply system | |
Zaher et al. | Optimal operation of battery exchange stations for electric vehicles | |
Wang et al. | Pricing-aware real-time charging scheduling and charging station expansion for large-scale electric buses | |
Juul et al. | Real-time scheduling of electric vehicles for ancillary services | |
Sundström et al. | Charging service elements for an electric vehicle charging service provider | |
Esmailirad et al. | An extended m/m/k/k queueing model to analyze the profit of a multiservice electric vehicle charging station | |
KR20190000038A (en) | Method of optimum power demand management using electric vehicle and apparatus thereof | |
Athulya et al. | Electric vehicle recharge scheduling in a shopping mall charging station | |
Keiser et al. | A distributed multi-operator W2V2G management approach | |
Freund et al. | Agent-based integration of an electric car sharing fleet into a smart distribution feeder | |
JP7368927B1 (en) | power management system | |
KR102295922B1 (en) | Microgrid System Capable of the Power Supply According to the priority | |
Abbas et al. | A heuristically optimized comprehensive charging scheme for large‐scale EV integration | |
JP7535921B2 (en) | Power management method, power management device, and computer program | |
Suman et al. | An optimally controlled charging scheme motivating EV owners for supporting grid stability | |
CA3210841A1 (en) | Device and method for designing e-charging infrastructures and the associated supply networks on public and private sites, in particular vehicle service facilities | |
Xu et al. | Optimal operation of battery swapping-charging systems considering quality-of-service constraints |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20220921 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20230912 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A821 Effective date: 20230911 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20231011 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 7368927 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |