JP7228143B2 - Work management system - Google Patents

Work management system Download PDF

Info

Publication number
JP7228143B2
JP7228143B2 JP2021048155A JP2021048155A JP7228143B2 JP 7228143 B2 JP7228143 B2 JP 7228143B2 JP 2021048155 A JP2021048155 A JP 2021048155A JP 2021048155 A JP2021048155 A JP 2021048155A JP 7228143 B2 JP7228143 B2 JP 7228143B2
Authority
JP
Japan
Prior art keywords
work
approval
unit
input
management system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2021048155A
Other languages
Japanese (ja)
Other versions
JP2022147058A (en
Inventor
崇 荒木
Original Assignee
株式会社伸和トータルエンジニアリング
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社伸和トータルエンジニアリング filed Critical 株式会社伸和トータルエンジニアリング
Priority to JP2021048155A priority Critical patent/JP7228143B2/en
Publication of JP2022147058A publication Critical patent/JP2022147058A/en
Application granted granted Critical
Publication of JP7228143B2 publication Critical patent/JP7228143B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Description

本発明は、作業管理システムに関する。 The present invention relates to a work management system.

従来、例えば、建設現場などにおいて、作業者が作業を報告するための報告書を手書きで記載し、カメラなどで現場の写真を撮影している。そして、作業者が現場から職場に戻った後、報告書を清書し、または、パーソナルコンピュータで入力し、写真のデータを取り込み、帳票を作成して、上司や関係者への回覧を行っている。 2. Description of the Related Art Conventionally, at a construction site or the like, for example, a worker manually writes a report for reporting work, and photographs the site with a camera or the like. Then, after the worker returns to the workplace from the site, he or she writes a report or inputs it on a personal computer, imports the photo data, creates a form, and circulates it to his superiors and related parties. .

本発明に関連する技術として、例えば、特許文献1には、業務命令者側の端末または業務遂行者側の端末から任意に閲覧可能な所定のWEBサイトとして機能し、前記業務命令者側の端末から業務命令情報を受信入力し、前記業務遂行者側の端末から前記業務命令情報に対する業務完了報告を受信入力するメインサーバーと、前記業務命令情報と前記業務完了報告のデータを読み出し可能に蓄積するデータ蓄積手段とを備えたことを特徴とする業務処理システムが開示されている。 As a technology related to the present invention, for example, in Patent Document 1, it functions as a predetermined WEB site that can be arbitrarily browsed from the terminal of the business commander side or the terminal of the business executor side, and the terminal of the business commander side a main server for receiving and inputting work order information from a terminal on the side of the person performing the work, and for receiving and inputting a work completion report for the work order information from the terminal of the person performing the work; A business processing system characterized by comprising data storage means is disclosed.

また、特許文献2には、業務を処理する者を指定する指示手段と指示者に対する業務報告を実行する報告手段と前記業務報告を承認する承認手段とを有する業務モジュールと、前記業務モジュールによる実行結果に基づき、前記指示手段により指定した指示者、前記報告手段により実行する報告者、または前記承認手段により承認する承認者を含む指示系統に係る情報を記録する系統記憶手段と、前記業務モジュールによる指示系統に係る情報を組み合わせて業務を管理する管理手段とを備える業務管理システムが開示されている。 Further, Patent Document 2 discloses a business module having an instruction means for designating a person who processes business, a reporting means for executing a business report to the instructor, and an approval means for approving the business report; System storage means for recording, based on the results, information related to a command system including an instructor designated by the instruction means, a reporter executed by the reporting means, or an approver who approves by the approval means; A business management system is disclosed that includes management means for managing business by combining information related to a chain of command.

特開2003-16238号公報JP-A-2003-16238 特開2004-287575号公報JP 2004-287575 A

近年、上記特許文献1,2に示すような業務管理システムが開発されているが、建設現場などでは複数の作業者がそれぞれ報告書を作成する必要がある。一般的に、これらの報告書は一人が編集している間は、他人は閲覧のみ可能な状態で編集ができないため、効率が悪い。 In recent years, work management systems such as those disclosed in Patent Documents 1 and 2 have been developed. In general, these reports are inefficient because while one person is editing them, other people can only view them and cannot edit them.

本発明の目的は、複数の作業者が同時に編集することを可能とする作業管理システムを提供することである。 SUMMARY OF THE INVENTION An object of the present invention is to provide a work management system that allows a plurality of workers to edit simultaneously.

本発明に係る作業管理システムは、建設現場において作業を行う複数の作業者が前記建設現場の建物を撮影した写真を含む作業内容を報告し、複数の管理者が複数のセルを含んで構成された前記作業内容の管理を行うための作業管理システムであって、前記複数の作業者が前記建物の写真に対するコメントが記載された電子的な付箋を含む前記作業内容を入力するための入力部と、前記入力部により入力された前記作業内容に基づいて帳票を作成する帳票作成部と、前記帳票作成部により作成された前記帳票について承認を行う前記複数の管理者の順番である承認ルートを決定する承認ルート決定部と、 前記帳票に基づいて作業全体の工程管理を行うための工程管理部と、前記承認ルート決定部により決定された前記承認ルートの中から特定の前記管理者の承認を飛ばすように順番を組み替える承認者組み替え部と、前記作業内容に基づいた作業工程の進捗を把握する前記管理者への承認を促すためにメールを送信する決定を行い、かつ、前記メールの送信を停止する決定を行うことも可能な送信決定部と、を備え、前記入力部は、前記複数の作業者による前記作業内容の同時編集を許可し、前記複数のセルのうち同一のセルに対する各編集保存操作がなされるたびに該保存操作を行った前記作業者の編集内容によって前記作業内容を上書することを特徴とする。

A work management system according to the present invention is configured such that a plurality of workers working at a construction site report work details including photographs of buildings at the construction site , and a plurality of managers include a plurality of cells. a work management system for managing the work content, the input unit for the plurality of workers to input the work content including an electronic sticky note on which a comment on the photograph of the building is written; , a form creating unit for creating a form based on the work content input by the input unit, and an approval route, which is the order of the plurality of managers who approve the form created by the form creating unit, is determined. a process control unit for performing process control of the entire work based on the form; and skipping the approval of a specific manager from among the approval routes determined by the approval route determination unit. and a decision to send an email to the manager who grasps the progress of the work process based on the work content to prompt approval, and to send the email. a transmission decision unit capable of deciding to stop, wherein the input unit permits simultaneous editing of the work content by the plurality of workers, and each editing of the same cell among the plurality of cells is performed. The work content is overwritten by the edited content of the worker who performed the save operation every time the save operation is performed.

また、本発明に係る作業管理システムにおいて、前記承認ルート決定部により決定された前記承認ルートの中から特定の前記管理者の順番を組み替える承認者組み替え部を備えることが好ましい。 Also, the work management system according to the present invention preferably includes an approver rearrangement section for rearranging the order of the specific manager from among the approval routes determined by the approval route determination section.

また、本発明に係る作業管理システムにおいて、前記作業内容に基づいた作業工程の進捗を把握する前記管理者へのメールの送信の有無を決定する送信決定部を備えることが好ましい。 Moreover, the work management system according to the present invention preferably includes a transmission determination unit that determines whether or not to transmit an e-mail to the manager who grasps the progress of the work process based on the work content.

本発明によれば、複数の作業者が同時に編集することが出来る。 According to the present invention, multiple workers can edit simultaneously.

本発明に係る実施形態において、作業管理システムを示す図である。1 is a diagram showing a work management system in an embodiment according to the present invention; FIG. 従来の建設現場等における業務報告などを管理する流れを示す図である。FIG. 10 is a diagram showing a conventional flow of managing work reports and the like at a construction site or the like;

以下に、本発明に係る実施の形態について添付図面を参照しながら詳細に説明する。以下では、全ての図面において同様の要素には同一の符号を付し、重複する説明を省略する。また、本文中の説明においては、必要に応じそれ以前に述べた符号を用いるものとする。 BEST MODE FOR CARRYING OUT THE INVENTION Embodiments according to the present invention will be described in detail below with reference to the accompanying drawings. In the following, the same reference numerals are given to the same elements in all the drawings, and redundant explanations are omitted. Also, in the explanation in the text, the reference numerals mentioned before are used as necessary.

図1は、本発明に係る実施形態の作業管理システム10を示す図である。図2は、従来の建設現場等における業務報告などを管理する流れを示す図である。 FIG. 1 is a diagram showing a work management system 10 according to an embodiment of the invention. FIG. 2 is a diagram showing a conventional flow of managing work reports and the like at a construction site or the like.

作業管理システム10は、複数の作業者4(図1の例では、現場担当者)が作業内容を報告し、複数の管理者6(図1の例では、現場関係者)が作業内容等の管理を行うためのシステムである。 In the work management system 10, a plurality of workers 4 (in the example of FIG. 1, the person in charge on site) reports the work content, and a plurality of managers 6 (in the example of FIG. 1, the person concerned on the site) reports the work content, etc. It is a system for managing.

また、作業管理システム10は、ネットワーク2を介して複数の作業者4と、複数の管理者6に接続され、さらに、作業内容などが登録されることにより形成されるデータなどを管理するデータ管理者8も接続されている。 Further, the work management system 10 is connected to a plurality of workers 4 and a plurality of managers 6 via the network 2, and further manages data formed by registering work contents and the like. Person 8 is also connected.

作業管理システム10は、入力部12と、帳票作成部14と、承認ルート決定部16と、工程管理部18と、承認者組み替え部20と、送信決定部22とを備える。 The work management system 10 includes an input unit 12 , a form creation unit 14 , an approval route determination unit 16 , a process control unit 18 , an approver rearrangement unit 20 and a transmission determination unit 22 .

入力部12は、複数の作業者4が作業内容について、スマートフォンやタブレット端末を用いて電子的に入力をする機能を有している。作業内容としては、作業者4が行った作業の詳細について記載するほか、例えば、保守作業現場などにおいて、建物などにヒビ割れなどがあった場合に、カメラで撮影した写真を、入力部12を用いてアップロードするとともに、「ヒビ割れあり、即修復の必要あり」等のコメントを手書きで入力してもよい。 The input unit 12 has a function of electronically inputting work contents by a plurality of workers 4 using a smartphone or a tablet terminal. In addition to describing the details of the work performed by the worker 4 as the work content, for example, when there is a crack in a building at a maintenance work site, etc., a photograph taken with a camera is input to the input unit 12. In addition to uploading the file, a handwritten comment such as "there is a crack and needs to be repaired immediately" may be input.

なお、入力部12を用いて、作業者4が入力した作業内容は、各管理者6に共有され、作業内容に対して電子的な付箋などを用いて、例えば、「ワレ箇所に腐食がないか要確認!」といったメモを付することも出来る。 The work content input by the worker 4 using the input unit 12 is shared with each manager 6, and an electronic sticky note is attached to the work content, for example, "There is no corrosion in the cracked part." It is also possible to attach a memo such as "Confirmation required!".

入力部12は、作業者4が作業入力をしやすいように様々な工夫が施されており、例えば、作業日などの日付は日付ダイアログから選択させ、所属チームや担当者名をプルダウンリストから選択することができ、ラジオボタンやチェックボックスの中から予めテンプレートで設定登録した内容を選択させることができる。これにより、迅速に入力させることができるとともに、使用する文言を統一することも出来る。また、入力部12は、イメージファイル(例えば、PDF、jpeg、png)を用いて入力することができる。 The input unit 12 is designed in various ways so that the worker 4 can easily input work. For example, the worker 4 can select a date such as a work date from a date dialog, and select a team or person in charge from a pull-down list. It is possible to select contents set and registered in advance in a template from among radio buttons and check boxes. As a result, it is possible to prompt input, and also to unify the wording to be used. Also, the input unit 12 can input using an image file (eg, PDF, jpeg, png).

入力部12は、複数の作業者4による作業内容の同時編集を許可し、各編集に対する保存操作がなされるたびに保存操作を行った作業者4の編集内容によって作業内容を上書する。 The input unit 12 permits simultaneous editing of work contents by a plurality of workers 4, and overwrites the work contents with the edited contents of the worker 4 who performed the save operation each time a save operation is performed for each edit.

作業内容は、従来の紙の報告書のフォーマットが電子化されたものであり、複数のセルが結合されている。ここで、同時編集は、同一のセル内でも行うことができ、この場合、複数の作業者4が編集して保存した場合に、最後に保存操作をした作業者4の編集の内容によって上書き保存されることになる。 The work content is an electronic form of the traditional paper report format, and multiple cells are combined. Here, simultaneous editing can be performed even within the same cell. In this case, when a plurality of workers 4 edit and save, the content of editing by the worker 4 who performed the last saving operation is overwritten and saved. will be

帳票作成部14は、入力部12により入力された作業内容に基づいて自動的に帳票を作成する。具体的には、作業者4が入力部12を用いて作業内容を入力することで完成した報告書が自動的に帳票として生成されて複数の管理者6に共有され、管理者6の中から選択される承認者に承認してもらうことができるようになる。 The form creating unit 14 automatically creates a form based on the work content input by the input unit 12 . Specifically, when the worker 4 inputs the work content using the input unit 12, a completed report is automatically generated as a form and shared by a plurality of managers 6, and the manager 6 It becomes possible to have the selected approver approve it.

承認ルート決定部16は、帳票作成部14により作成された帳票について承認を行う複数の管理者6の順番である承認ルートを決定する。例えば、管理者6が、Aさん、Bさん、Cさん、Dさん、Eさん、Fさんの6人が存在する場合に、Aさん→Dさん→Bさん→Fさん→Cさん→Eさんの順番で承認してもらうように設定することが出来る。 The approval route determination unit 16 determines an approval route, which is the order of a plurality of managers 6 who approve the forms created by the form creation unit 14 . For example, if there are six administrators 6, Mr. A, Mr. B, Mr. C, Mr. D, Mr. E, and Mr. F, Mr. A → Mr. D → Mr. B → Mr. F → Mr. C → Mr. E You can set it to be approved in the order of

工程管理部18は、帳票作成部14によって作成された帳票に基づいて、建設現場等における作業全体の工程管理を行う。これにより、管理者6は、例えば、作業工程全体の中で、現在、どの工程まで進んでいるのか等について把握することができる。 The process control section 18 performs process control of the entire work at a construction site or the like based on the form created by the form creation section 14 . As a result, the manager 6 can grasp, for example, which process has progressed in the entire work process.

承認者組み替え部20は、承認ルート決定部16により決定された承認ルートの中から特定の管理者の順番を組み替える機能を有する。例えば、上記のように、承認ルートをAさん→Dさん→Bさん→Fさん→Cさん→Eさんの順番で承認してもらうようにされた場合に、Bさんがお休みなどの場合に承認作業が滞ってしまうため、Bさんの承認を飛ばした状態の承認ルート(Aさん→Dさん→Fさん→Cさん→Eさん)に変更することができる。 The approver rearranging section 20 has a function of rearranging the order of a specific manager in the approval route determined by the approval route determining section 16 . For example, as shown above, if the approval route is to be approved in the order of Mr. A → Mr. D → Mr. B → Mr. F → Mr. C → Mr. E, if Mr. B is absent, etc. Since the approval work will be delayed, it is possible to change to an approval route (Mr. A→Mr. D→Mr. F→Mr. C→Mr. E) in which Mr. B's approval is skipped.

送信決定部22は、作業内容に基づいた作業工程の進捗を把握する管理者6へのメールの送信の有無を決定する。具体的には、管理者6の中の上記承認者に対して、承認を促すためのメールを送信し、その他の作業内容を管理者6に共有してもらうためのメールを送信するように設定することができる。 The transmission determination unit 22 determines whether or not to transmit an e-mail to the manager 6 who grasps the progress of the work process based on the work content. Specifically, it is set so that an email is sent to the above-mentioned approver in the administrator 6 to prompt approval, and an email is sent to have the administrator 6 share other work details. can do.

ただし、これらのメールが多数来てしまうと管理者6は大切なメールがその他のメールに埋もれて見逃してしまう虞があるため、メールを送信しないように設定することも出来る。 However, if a large number of such e-mails arrive, the administrator 6 may miss important e-mails that are buried among other e-mails.

続いて、上記構成の作業管理システム10の作用について説明する。図2に示されるように、従来の建設現場では以下のような業務報告等がなされていた。具体的には、作業現場において、作業者4は、報告書の用紙を事前に準備し、カメラで写真撮影をして、会社又は事務所に戻って業務報告書作成作業を行っていた。このようなやり方であれば、報告用のメモを取りながら写真を撮影する必要があり、時間が足りないことが多い。また、報告書の用紙を紛失してしまうことがある。 Next, the operation of the work management system 10 configured as described above will be described. As shown in FIG. 2, the following business reports have been made at conventional construction sites. Specifically, at the work site, the worker 4 prepares a report form in advance, takes a picture with a camera, and returns to the company or office to create a business report. With such an approach, it is often necessary to take pictures while taking notes for the report, which is often not enough time. In addition, the paper of the report may be lost.

作業員4が会社又事務所に帰った後は、建設現場で書いた手書きのメモを見ながら、報告書(帳票)の清書を行い、カメラで撮影したデータをパーソナルコンピュータなどで取り込む。このようなやり方であれば、転記漏れが発生し、必要な現場の写真が写っていないなどといった課題がある。また、作業者4は、この作業をするためにわざわざ会社又は事務所に戻る必要がある。 After the worker 4 returns to the company or office, he makes a fair copy of the report (form) while looking at the handwritten memo written at the construction site, and takes in the data photographed by the camera with a personal computer or the like. With such a method, there is a problem that transcription omissions occur and necessary photographs of the site are not included. In addition, the worker 4 has to go all the way back to the company or office to do this work.

この後、上司や関係者などの管理者6に帳票を回覧し、承認をもらう必要がある。このようなやり方であれば、回覧をスムーズに行うことができず、帳票が紛失してしまう虞がある。 After that, it is necessary to circulate the form to the manager 6 such as a superior or related parties and obtain approval. With such a method, circulation cannot be performed smoothly, and there is a risk that the form will be lost.

また、従来は、このように作業者4によって作成され、承認者である管理者6に回覧された帳票などに基づいて、データ管理者8は、データを入力し、帳票をファイリングし、予備として複製するなどの作業が必要であった。このようなやり方では、作業者4によって書き方がバラバラであったり、入力漏れがあったり、誤字脱字があるなど、データ管理者8が正確にデータを入力できないという課題がある。 Further, conventionally, based on the forms created by the worker 4 and circulated to the administrator 6 who is the approver, the data manager 8 inputs data, files the forms, and reserves them. Work such as duplication was necessary. In such a method, there is a problem that the data manager 8 cannot input the data accurately, for example, the way of writing is different depending on the worker 4, there is an omission of input, or there is a misspelling.

このような課題に対して、本発明の実施形態に係る作業管理システム10は顕著な効果を発揮する。 The work management system 10 according to the embodiment of the present invention exerts a remarkable effect on such problems.

作業管理システム10によれば、入力部12の機能を用いて、作業者4は現場で手書きメモを残すとともに、カメラで撮影した写真をアップロードすることができ、または、必要に応じてイメージファイルを挿入することができる。作業者4は、会社又は事務所に戻らずとも現場で報告書を作成することができ、写真もすぐに反映できるともに、管理者6にも迅速に報告することができる。 According to the work management system 10, using the function of the input unit 12, the worker 4 can leave a handwritten memo at the site, upload a photograph taken with a camera, or upload an image file as necessary. can be inserted. The worker 4 can create a report on site without returning to the company or office, can immediately reflect the photos, and can also quickly report to the manager 6.例文帳に追加

また、入力部12を用いて作業者4が入力した作業内容が管理者6に共有され、管理者6から作業者4に対して確認事項などがある場合は、電子的な付箋などのメモ機能などにより、作業者4に通知することが出来る。 In addition, the work content input by the worker 4 using the input unit 12 is shared with the manager 6, and if there are items to be confirmed by the manager 6 to the worker 4, a memo function such as an electronic sticky note is provided. For example, the operator 4 can be notified.

そして、入力部12によって入力された作業内容に基づいて帳票作成部14で帳票が作成され、承認ルート決定部16により決定された承認者(管理者6)に電子的に回覧される。これにより、管理者6は端末されあればどこにいてもすぐに確認することができるとともに、スムーズに承認することができるという利点がある。 Then, a form is created by the form creation section 14 based on the work contents input by the input section 12, and is electronically circulated to the approver (administrator 6) determined by the approval route determination section 16. FIG. As a result, there is an advantage that the administrator 6 can immediately check the information wherever he/she is at the terminal, and can smoothly approve the information.

また、データ管理者8は、従来の紙の報告書を確認しつつ手入力する必要がないため、統計データ・過去データ・在庫管理などのデータの正確性が向上する。 In addition, since the data manager 8 does not need to manually enter data while confirming the conventional paper report, the accuracy of data such as statistical data, past data, and inventory control is improved.

次いで、作業管理システム10によれば、複数の作業者4による作業内容の同時編集を許可し、各編集に対する保存操作がなされるたびに保存操作を行った作業者4の編集内容によって作業内容を上書する。これにより、複数の作業者4が同時に報告書を作成する作業を行うことができるため、効率がよくなるという利点がある。 Next, according to the work management system 10, simultaneous editing of the work content by a plurality of workers 4 is permitted, and each time a save operation is performed for each edit, the work content is saved according to the edited content of the worker 4 who performed the save operation. Overwrite. As a result, a plurality of workers 4 can work to create reports at the same time, so there is an advantage that efficiency is improved.

さらに、作業管理システム10によれば、承認ルート上の承認者(管理者6)が不在で承認が滞ってしまった場合に、当該承認者を飛ばすように組み替えさせた承認ルートに変更して回覧させることができるため、短時間で回覧を終えることができる。なお、飛ばした承認者については、その他の承認者の承認完了後に承認させるようにルートを組み替えてもよい。 Furthermore, according to the work management system 10, when the approver (administrator 6) on the approval route is absent and the approval is delayed, the approval route is changed so that the approver is skipped, and the approval route is circulated. Therefore, the circulation can be completed in a short time. It should be noted that the route may be rearranged so that the skipped approver is approved after the completion of the approval of the other approvers.

また、作業管理システム10によれば、送信決定部22の機能により、作業内容に基づいた作業工程の進捗を把握する管理者6へのメールの送信の有無を決定することが出来る。これにより、報告先を選定することができるため、必要な情報のみを必要な人に対してのみ送信することができるため、より的確に管理者6に報告することができるという効果を奏する。 Further, according to the work management system 10, the function of the transmission determination unit 22 can determine whether or not to send an email to the manager 6 who grasps the progress of the work process based on the work content. As a result, since it is possible to select the report destination, it is possible to transmit only necessary information to only necessary persons, so that there is an effect that it is possible to report to the manager 6 more accurately.

2 ネットワーク、4 作業者、6 管理者、8 データ管理者、10 作業管理システム、12 入力部、14 帳票作成部、16 承認ルート決定部、18 工程管理部、20 承認者組み替え部、22 送信決定部。
2 network, 4 operator, 6 manager, 8 data manager, 10 work management system, 12 input unit, 14 form creation unit, 16 approval route determination unit, 18 process control unit, 20 approver rearrangement unit, 22 transmission decision Department.

Claims (1)

建設現場において作業を行う複数の作業者が前記建設現場の建物を撮影した写真を含む作業内容を報告し、複数の管理者が複数のセルを含んで構成された前記作業内容の管理を行うための作業管理システムであって、
前記複数の作業者が前記建物の写真に対するコメントが記載された電子的な付箋を含む前記作業内容を入力するための入力部と、
前記入力部により入力された前記作業内容に基づいて帳票を作成する帳票作成部と、
前記帳票作成部により作成された前記帳票について承認を行う前記複数の管理者の順番である承認ルートを決定する承認ルート決定部と、
前記帳票に基づいて作業全体の工程管理を行うための工程管理部と、
前記承認ルート決定部により決定された前記承認ルートの中から特定の前記管理者の承認を飛ばすように順番を組み替える承認者組み替え部と、
前記作業内容に基づいた作業工程の進捗を把握する前記管理者への承認を促すためにメールを送信する決定を行い、かつ、前記メールの送信を停止する決定を行うことも可能な送信決定部と、
を備え、
前記入力部は、前記複数の作業者による前記作業内容の同時編集を許可し、前記複数のセルのうち同一のセルに対する各編集保存操作がなされるたびに該保存操作を行った前記作業者の編集内容によって前記作業内容を上書することを特徴とする作業管理システム。
For a plurality of workers working at a construction site to report work details including photographs taken of buildings at the construction site , and for a plurality of managers to manage the work details including a plurality of cells. A work management system for
an input unit for the plurality of workers to input the work content including electronic sticky notes with comments on the photograph of the building ;
a form creating unit that creates a form based on the work content input by the input unit;
an approval route determination unit that determines an approval route that is the order of the plurality of managers who approve the form created by the form creation unit;
a process control unit for performing process control of the entire work based on the form;
an approver rearrangement unit that rearranges the order of the approval route determined by the approval route determination unit so as to skip the approval of a specific manager;
A transmission decision capable of making a decision to send an email to urge approval from the manager who grasps the progress of the work process based on the work content, and also making a decision to stop sending the email. Department and
with
The input unit permits simultaneous editing of the work content by the plurality of workers, and the worker who has performed the save operation each time a save operation for each edit is performed on the same cell among the plurality of cells. A work management system characterized in that the work content is overwritten by the edited content of the work.
JP2021048155A 2021-03-23 2021-03-23 Work management system Active JP7228143B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2021048155A JP7228143B2 (en) 2021-03-23 2021-03-23 Work management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2021048155A JP7228143B2 (en) 2021-03-23 2021-03-23 Work management system

Publications (2)

Publication Number Publication Date
JP2022147058A JP2022147058A (en) 2022-10-06
JP7228143B2 true JP7228143B2 (en) 2023-02-24

Family

ID=83462884

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2021048155A Active JP7228143B2 (en) 2021-03-23 2021-03-23 Work management system

Country Status (1)

Country Link
JP (1) JP7228143B2 (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002108785A (en) 2000-09-27 2002-04-12 Zaza International:Kk Electronic mail advertisement system
JP2004252506A (en) 2003-02-17 2004-09-09 Ricoh Co Ltd Electronic document circulation system
JP2007156678A (en) 2005-12-02 2007-06-21 Canon Software Inc Workflow system and pending electronic document processing method
JP2007323427A (en) 2006-06-01 2007-12-13 Hitachi Ltd Business flow management device, business flow management method and program
JP2017117011A (en) 2015-12-21 2017-06-29 トッパン・フォームズ株式会社 Method and system for providing document service

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002108785A (en) 2000-09-27 2002-04-12 Zaza International:Kk Electronic mail advertisement system
JP2004252506A (en) 2003-02-17 2004-09-09 Ricoh Co Ltd Electronic document circulation system
JP2007156678A (en) 2005-12-02 2007-06-21 Canon Software Inc Workflow system and pending electronic document processing method
JP2007323427A (en) 2006-06-01 2007-12-13 Hitachi Ltd Business flow management device, business flow management method and program
JP2017117011A (en) 2015-12-21 2017-06-29 トッパン・フォームズ株式会社 Method and system for providing document service

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
羽山 博,エクセル超活用入門 目からウロコの開眼!エクセル新常識 変更履歴とブックの共有,アスキー.PC,日本,株式会社アスキー,2004年05月01日,第7巻 第5号,p.122~125

Also Published As

Publication number Publication date
JP2022147058A (en) 2022-10-06

Similar Documents

Publication Publication Date Title
US20110258561A1 (en) Method, system and program product for participating in social media sites on behalf of entity
KR20040110968A (en) Maintenance and inspection system and method
JP5451086B2 (en) Workflow management apparatus, method, and program
US20050108232A1 (en) Electronic submittal method and system
Brooks et al. A study to support BIM turnover to facility managers for use after construction
JP2022177104A (en) Information processor
US7089488B2 (en) Electric form handling system, electric form handling program, computer-readable recording medium recording the same and electric form handling method
KR102560784B1 (en) System and method for providing task tracking
JP7228143B2 (en) Work management system
US20080275889A1 (en) Method and system for assessing the staffing needs of an organization
JP2006126941A (en) Image processor, image processing method, image processing control program, and storage medium
US7484179B2 (en) Integrated work management and tracking
JP4252196B2 (en) Construction inspection system, construction inspection information display device, and construction inspection method for buildings
JP2003016019A (en) Information managing apparatus, communication terminal, information managing system, information managing method, recording medium, and program
US20190347595A1 (en) Automated analysis of digital production data for improved production efficiency
US20210374678A1 (en) Kanban-based work processing device and work processing method
CN109376018A (en) The operation method and program instruction of message threads
US20130205224A1 (en) Electronic data plate system for collaboration amongst multiple disparate parties
CN114997832A (en) Offline acquisition method of financial data, computer equipment and storage medium
JP2003248747A (en) Electronic document processing system, electronic document processing program, computer readable recording medium recording program thereof and electronic document processing method
KR102411460B1 (en) System and Method for verifying vessel design drawings
US20190102371A1 (en) Immigration data management
JP2017004428A (en) Information management device and program
US20240037468A1 (en) Method of monitoring project process and outcome
KR102584298B1 (en) Management Method of Safety Assessment Work in Buildings, and Worker's Terminal Being Installed with Program for Executing the Method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20210323

A871 Explanation of circumstances concerning accelerated examination

Free format text: JAPANESE INTERMEDIATE CODE: A871

Effective date: 20210323

A975 Report on accelerated examination

Free format text: JAPANESE INTERMEDIATE CODE: A971005

Effective date: 20210423

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20210713

A601 Written request for extension of time

Free format text: JAPANESE INTERMEDIATE CODE: A601

Effective date: 20210910

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20211015

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20220118

A601 Written request for extension of time

Free format text: JAPANESE INTERMEDIATE CODE: A601

Effective date: 20220317

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20220712

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20221003

C60 Trial request (containing other claim documents, opposition documents)

Free format text: JAPANESE INTERMEDIATE CODE: C60

Effective date: 20221003

A911 Transfer to examiner for re-examination before appeal (zenchi)

Free format text: JAPANESE INTERMEDIATE CODE: A911

Effective date: 20221020

C21 Notice of transfer of a case for reconsideration by examiners before appeal proceedings

Free format text: JAPANESE INTERMEDIATE CODE: C21

Effective date: 20221025

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20230110

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20230131

R150 Certificate of patent or registration of utility model

Ref document number: 7228143

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150