JP7216763B2 - Distribution board measurement work support system, measurement work management device, measurement work terminal device, measurement work management program, and measurement work terminal program - Google Patents

Distribution board measurement work support system, measurement work management device, measurement work terminal device, measurement work management program, and measurement work terminal program Download PDF

Info

Publication number
JP7216763B2
JP7216763B2 JP2021071556A JP2021071556A JP7216763B2 JP 7216763 B2 JP7216763 B2 JP 7216763B2 JP 2021071556 A JP2021071556 A JP 2021071556A JP 2021071556 A JP2021071556 A JP 2021071556A JP 7216763 B2 JP7216763 B2 JP 7216763B2
Authority
JP
Japan
Prior art keywords
measurement work
measurement
image data
information
branch breaker
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2021071556A
Other languages
Japanese (ja)
Other versions
JP2022166383A (en
Inventor
康彦 椎谷
正男 渡辺
和秀 高桑
あゆ 小畑
Original Assignee
日本電設工業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 日本電設工業株式会社 filed Critical 日本電設工業株式会社
Priority to JP2021071556A priority Critical patent/JP7216763B2/en
Publication of JP2022166383A publication Critical patent/JP2022166383A/en
Application granted granted Critical
Publication of JP7216763B2 publication Critical patent/JP7216763B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Distribution Board (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

本発明は、分電盤測定作業支援システム、測定作業管理装置、測定作業端末装置、測定作業管理プログラム、及び、測定作業端末プログラムに関する。 The present invention relates to a distribution board measurement work support system, a measurement work management device, a measurement work terminal device, a measurement work management program, and a measurement work terminal program.

従来、建物に設置された分電盤の試験や点検を実施する際、絶縁抵抗等の電気特性値を測定する測定装置が使用されている(例えば、特許文献1参照)。 2. Description of the Related Art Conventionally, when testing or inspecting a distribution board installed in a building, a measuring device for measuring electrical characteristic values such as insulation resistance is used (see, for example, Patent Literature 1).

特開2013-145185号公報JP 2013-145185 A

測定装置を用いた分電盤の測定作業は、施工業者の事務所等で行われる作業と、分電盤の施工現場で行われる作業とがある。具体的には、事務所等にて、分電盤の施工図として作成された盤図から回路番号や負荷名称を記録用紙に転記することで、分電盤の記録用紙が事前に用意される。施工現場では、測定装置により電気特性値を測定する測定者と、その測定した測定結果を事前に用意された記録用紙に記録する記録者の2名体制で実施される。そして、その記録用紙に記載された盤図の情報(回路番号や負荷名称等)や測定結果が、事務所等に設置されたコンピュータでデータ入力されることで、所定の様式に沿った試験成績表が作成される。そのため、記録用紙を用意し、分電盤の電気特性値を測定し、試験成績表を作成するという一連の測定作業は、多くの人手と手間を要し、転記ミス、測定ミス、記録ミス、データ入力ミス等の人為的な作業ミスが発生しやすい、という問題点があった。 The work of measuring a distribution board using a measuring device includes work performed in the office of a contractor and work performed at a construction site of the distribution board. Specifically, the distribution board recording paper is prepared in advance by transcribing the circuit number and load name from the board drawing created as the construction drawing of the distribution board in the office, etc. . At the construction site, the measurement is carried out by a system of two people: a measurer who measures electrical property values using a measuring device, and a recorder who records the measurement results on a recording sheet prepared in advance. The board diagram information (circuit number, load name, etc.) and measurement results recorded on the recording sheet are entered into a computer installed in the office, etc., and the test results are obtained in accordance with a prescribed format. A table is created. Therefore, a series of measurement tasks, such as preparing recording paper, measuring the electrical characteristic values of the distribution board, and creating a test report, requires a lot of manpower and time and effort. There is a problem that human error such as data input error is likely to occur.

本発明は、上記のような事情を鑑みてなされたものであって、分電盤の測定作業における作業効率の向上と作業ミスの低減を図ることが可能な分電盤測定作業支援システム、測定作業管理装置、測定作業端末装置、測定作業管理プログラム、及び、測定作業端末プログラムを提供することを目的とする。 SUMMARY OF THE INVENTION The present invention has been made in view of the circumstances as described above. An object of the present invention is to provide a work management device, a measurement work terminal device, a measurement work management program, and a measurement work terminal program.

本発明は、上記課題を解決するものであって、本発明の一実施形態に係る分電盤測定作業支援システムは、
複数の分岐ブレーカを有する分電盤の測定作業を管理する測定作業管理装置と、
前記測定作業にて使用され、前記分岐ブレーカの電気特性値を測定する分電盤測定器と通信可能に構成された測定作業端末装置とを備える分電盤測定作業支援システムであって、
前記測定作業管理装置は、
前記分電盤の施工図として作成されたイメージデータ形式の盤図に対して画像処理を行い、複数の前記分岐ブレーカが配置された配置状態を示す分岐ブレーカ配置情報と、複数の前記分岐ブレーカにそれぞれ付された回路番号及び負荷名称を含むイメージ領域をそれぞれ切り出した複数の回路番号画像データ及び複数の負荷名称画像データとを取得する盤図情報取得部と、
前記分岐ブレーカ配置情報、複数の前記回路番号画像データ及び複数の前記負荷名称画像データを含む測定作業シート情報を作成する測定作業シート情報作成部と、
前記分電盤測定器により前記電気特性値が測定された測定結果を示す測定結果情報を、前記測定作業端末装置を介して取得する測定結果情報取得部と、
前記測定作業シート情報及び前記測定結果情報に基づいて、測定結果シート情報を作成する測定結果シート情報作成部とを備え、
前記測定作業端末装置は、
前記測定作業管理装置により作成された前記測定作業シート情報を、前記測定作業管理装置から取得する測定作業シート情報取得部と、
前記測定作業シート情報に含まれる前記分岐ブレーカ配置情報に従って複数の前記回路番号画像データ及び複数の前記負荷名称画像データが並べられて配置されるとともに、複数の前記分岐ブレーカに対する前記測定結果の入力欄がそれぞれ設けられた測定作業シート画面を表示部に表示させる表示処理部と、
前記測定作業シート画面において測定対象の前記分岐ブレーカが特定された状態で、前記分電盤測定器から前記電気特性値を受信したとき、当該電気特性値を当該分岐ブレーカに対する前記入力欄に表示させるとともに、当該分岐ブレーカに対する前記測定結果として取得する測定器連携処理部と、
前記測定結果に基づいて、前記測定結果情報を作成する測定結果情報作成部とを備える。
The present invention is intended to solve the above problems, and a distribution board measurement work support system according to an embodiment of the present invention includes:
a measurement work management device for managing measurement work of a distribution board having a plurality of branch breakers;
A distribution board measurement work support system that is used in the measurement work and includes a distribution board measuring instrument that measures the electrical characteristic value of the branch breaker and a measurement work terminal device configured to be communicable,
The measurement work management device
Image processing is performed on a panel diagram in image data format created as a construction drawing of the distribution panel, branch breaker arrangement information indicating an arrangement state in which the plurality of branch breakers are arranged, and information on the arrangement of the plurality of branch breakers. A board diagram information acquisition unit that acquires a plurality of circuit number image data and a plurality of load name image data obtained by cutting out an image area including the circuit number and the load name respectively attached,
a measurement work sheet information creation unit that creates measurement work sheet information including the branch breaker arrangement information, the plurality of circuit number image data, and the plurality of load name image data;
a measurement result information acquisition unit configured to acquire, via the measurement operation terminal device, measurement result information indicating the measurement result of the electrical characteristic value measured by the distribution board measuring device;
a measurement result sheet information creation unit that creates measurement result sheet information based on the measurement work sheet information and the measurement result information;
The measurement work terminal device
a measurement work sheet information acquisition unit that acquires the measurement work sheet information created by the measurement work management device from the measurement work management device;
A plurality of the circuit number image data and a plurality of the load name image data are aligned and arranged according to the branch breaker arrangement information included in the measurement work sheet information, and an input field for the measurement results for the plurality of branch breakers. a display processing unit that causes the display unit to display a measurement work sheet screen provided with
When the electrical characteristic value is received from the distribution board measuring device in a state where the branch breaker to be measured is specified on the measurement work sheet screen, the electrical characteristic value is displayed in the input field for the branch breaker. together with a measuring instrument cooperation processing unit that acquires the measurement result for the branch breaker;
a measurement result information creating unit that creates the measurement result information based on the measurement result.

本発明の一実施形態に係る分電盤測定作業支援システムによれば、まず、測定作業管理装置が、イメージデータ形式の盤図に対して画像処理を行い、分岐ブレーカ配置情報と、複数の回路番号画像データ及び複数の負荷名称画像データとを取得し、測定作業シート情報を作成する。次に、測定作業端末装置が、その測定作業シート情報に含まれる分岐ブレーカ配置情報に従って複数の回路番号画像データ及び複数の負荷名称画像データが並べられて配置されるとともに、複数の分岐ブレーカに対する電気特性値の測定結果の入力欄がそれぞれ設けられた測定作業シート画面を表示部に表示させ、分電盤測定器から電気特性値を受信したとき、当該電気特性値を分岐ブレーカに対する入力欄に表示させるとともに、当該分岐ブレーカに対する測定結果として取得し、測定結果情報を作成する。そして、測定作業管理装置が、測定作業シート情報及び測定結果情報に基づいて、測定結果シート情報を作成する。 According to the distribution board measurement work support system according to one embodiment of the present invention, first, the measurement work management device performs image processing on the board diagram in the image data format to obtain branch breaker layout information and a plurality of circuits. Number image data and a plurality of load name image data are acquired to create measurement work sheet information. Next, according to the branch breaker arrangement information included in the measurement work sheet information, the measurement work terminal device aligns the plurality of circuit number image data and the plurality of load name image data and arranges the electric power supply to the plurality of branch breakers. A measurement work sheet screen with input fields for the measurement results of characteristic values is displayed on the display unit, and when an electrical characteristic value is received from the distribution board measuring instrument, the electrical characteristic value is displayed in the input field for the branch breaker. In addition to obtaining the measurement result for the branch breaker, measurement result information is created. Then, the measurement work management device creates measurement result sheet information based on the measurement work sheet information and the measurement result information.

そのため、測定作業端末装置の表示部には、測定作業管理装置によりイメージデータ形式の盤図から取得された測定作業シート情報(分岐ブレーカ配置情報と、複数の回路番号画像データ及び複数の負荷名称画像データとを含む)に基づく測定作業シート画面が表示されるので、作業者は、その測定作業シート画面を視認しながら分電盤測定器により複数の分岐ブレーカに対する電気特性値の測定作業を行うことで、実物の分電盤における分岐ブレーカの配置と、測定作業シート画面上の分岐ブレーカの配置とを対比しつつ、測定作業シート画面の入力欄に表示された電気特性値の測定結果を確認することができる。そして、その測定結果が、測定作業端末装置により測定結果情報として自動的に取得(記録)されるとともに、例えば、試験成績表として利用可能な測定結果シート情報が、測定作業管理装置により測定作業シート情報及び測定結果情報に基づいて作成されるので、作業者は、測定結果の記録やデータ入力といった作業を省略することができる。したがって、分電盤の測定作業における作業効率の向上と作業ミスの低減を図ることができる。 Therefore, on the display of the measurement work terminal device, the measurement work sheet information (branch breaker arrangement information, multiple circuit number image data and multiple load name images) acquired from the board diagram in the image data format by the measurement work management device data) is displayed, the worker can measure electrical characteristic values for multiple branch breakers using a distribution board measuring instrument while viewing the measurement work sheet screen. , while comparing the arrangement of the branch breakers on the actual distribution board with the arrangement of the branch breakers on the measurement work sheet screen, check the measurement results of the electrical characteristic values displayed in the input fields of the measurement work sheet screen. be able to. Then, the measurement result is automatically obtained (recorded) as measurement result information by the measurement work terminal device, and measurement result sheet information that can be used as, for example, a test report is sent to the measurement work sheet by the measurement work management device. Since it is created based on information and measurement result information, the operator can omit work such as recording measurement results and data input. Therefore, it is possible to improve work efficiency and reduce work mistakes in the measurement work of the distribution board.

上記以外の課題、構成及び効果は、後述する発明を実施するための形態にて明らかにされる。 Problems, configurations, and effects other than the above will be clarified in the mode for carrying out the invention, which will be described later.

本発明の実施形態に係る分電盤測定作業支援システム1の一例を示す全体図である。BRIEF DESCRIPTION OF THE DRAWINGS It is a general view which shows an example of the distribution board measurement work assistance system 1 which concerns on embodiment of this invention. 分電盤10の一例を示す概略図である。1 is a schematic diagram showing an example of a distribution board 10; FIG. 盤図11の一例を示す概略図である。FIG. 12 is a schematic diagram showing an example of a board drawing 11; 本発明の実施形態に係る測定作業管理装置2の一例を示すブロック図である。1 is a block diagram showing an example of a measurement work management device 2 according to an embodiment of the present invention; FIG. 本発明の実施形態に係る測定作業端末装置3の一例を示すブロック図である。1 is a block diagram showing an example of a measurement work terminal device 3 according to an embodiment of the present invention; FIG. 本発明の実施形態に係る測定作業管理装置2における測定作業シート情報12の作成処理の一例を示すフロー図である。4 is a flowchart showing an example of processing for creating measurement work sheet information 12 in the measurement work management device 2 according to the embodiment of the present invention; FIG. 本発明の実施形態に係る測定作業管理装置2における測定作業シート情報12の作成処理(図6の続き)の一例を示すフロー図である。FIG. 7 is a flowchart showing an example of a process (continued from FIG. 6) for creating measurement work sheet information 12 in the measurement work management device 2 according to the embodiment of the present invention; 本発明の実施形態に係る測定作業端末装置3における測定結果情報14の作成処理の一例を示すフロー図である。4 is a flowchart showing an example of processing for creating measurement result information 14 in the measurement work terminal device 3 according to the embodiment of the present invention; FIG. 本発明の実施形態に係る測定作業端末装置3における測定結果情報14の作成処理(図8の続き)の一例を示すフロー図である。FIG. 9 is a flowchart showing an example of a process (continued from FIG. 8) for creating measurement result information 14 in the measurement work terminal device 3 according to the embodiment of the present invention; 本発明の実施形態に係る測定作業管理装置2における測定結果シート情報15の作成処理の一例を示すフロー図である。4 is a flowchart showing an example of processing for creating measurement result sheet information 15 in the measurement work management device 2 according to the embodiment of the present invention; FIG.

以下、本発明の一実施形態について添付図面を参照しつつ説明する。 An embodiment of the present invention will be described below with reference to the accompanying drawings.

図1は、本発明の実施形態に係る分電盤測定作業支援システム1の一例を示す全体図である。図2は、分電盤10の一例を示す概略図である。図3は、図2の分電盤10を表す盤図11の一例を示す概略図である。 FIG. 1 is an overall view showing an example of a distribution board measurement work support system 1 according to an embodiment of the present invention. FIG. 2 is a schematic diagram showing an example of the distribution board 10. As shown in FIG. FIG. 3 is a schematic diagram showing an example of a board drawing 11 representing the distribution board 10 of FIG. 2 .

分電盤測定作業支援システム1は、分電盤10の測定作業を管理する測定作業管理装置2と、測定作業にて使用されるとともに、分電盤測定器4と通信可能に構成された測定作業端末装置3とを備える。なお、図1では、測定作業端末装置3及び分電盤測定器4が1つずつ図示されているが、分電盤測定作業支援システム1は、複数の測定作業管理装置2、複数の測定作業端末装置3又は複数の分電盤測定器4を備えるものでもよい。 The distribution board measurement work support system 1 includes a measurement work management device 2 that manages the measurement work of the distribution board 10, and a measurement work management device 2 that is used in the measurement work and is configured to communicate with the distribution board measuring instrument 4. and a work terminal device 3 . Although FIG. 1 shows one measurement work terminal device 3 and one distribution board measuring instrument 4, the distribution board measurement work support system 1 includes a plurality of measurement work management devices 2, a plurality of measurement work A terminal device 3 or a plurality of distribution board measuring devices 4 may be provided.

分電盤10は、図2に示すように、外部の系統電源に接続される主幹ブレーカ100と、複数の分岐ブレーカ101とを有する。複数の分岐ブレーカ101の各々は、主幹ブレーカ100から分岐された分岐回路103(詳細は不図示)が接続される電源端子部101aと、各種の負荷が接続される負荷端子部101bとを備える。複数の分岐ブレーカ101は、分岐回路103を挟んで両側に配置されており、分岐回路103の左側に対して縦方向(上下方向)に並べられて配置された左側ブロック102Lと、分岐回路103の右側に対して縦方向(上下方向)に並べられて配置された右側ブロック102Rとが設けられる。 The distribution board 10 has a main breaker 100 connected to an external system power supply and a plurality of branch breakers 101, as shown in FIG. Each of the plurality of branch breakers 101 includes a power terminal portion 101a to which a branch circuit 103 (details not shown) branched from the main breaker 100 is connected, and a load terminal portion 101b to which various loads are connected. A plurality of branch circuit breakers 101 are arranged on both sides of the branch circuit 103 . A right block 102R is arranged in a vertical direction (vertical direction) with respect to the right side.

盤図11は、例えば、分電盤10の製作会社が、分電盤10が設置される建物の設計図書に基づいて分電盤10の施工図として作成したものであり、イメージデータ形式のデジタルデータとして提供される。盤図11は、図3に示すように、複数の分岐ブレーカ101の配置状態が、左側ブロック102Lに対応する左側表領域110Lと、右側ブロック102Rに対応する右側表領域110Rとに表されるとともに、分岐回路103の結線状態が、結線領域113に表される。左側表領域110L及び右側表領域110Rには、各分岐ブレーカ101にそれぞれ付された回路番号111及び負荷名称112が表される。盤図11は、例えば、CADシステムから所定のイメージデータ形式で出力されたものでもよいし、用紙に印刷出力された図面がスキャナ等の画像読取装置により読み取られることでイメージデータ形式のデジタルデータに変換されたものでもよい。 The board drawing 11 is, for example, created as a working drawing of the distribution board 10 by the manufacturing company of the distribution board 10 based on the design document of the building in which the distribution board 10 is installed, and is a digital image data format. Provided as data. The board diagram 11, as shown in FIG. 3, shows the arrangement of a plurality of branch breakers 101 in a left table area 110L corresponding to the left block 102L and a right table area 110R corresponding to the right block 102R. , the connection state of the branch circuit 103 is represented in the connection area 113 . The left table area 110L and the right table area 110R display the circuit number 111 and the load name 112 assigned to each branch breaker 101, respectively. The board drawing 11 may be, for example, one output from a CAD system in a predetermined image data format. It may be converted.

分電盤測定器4は、主幹ブレーカ100及び分岐ブレーカ101の電気特性値を測定する測定器である。分電盤測定器4は、その構成として、図1に示すように、測定器本体40と、測定器本体40に接続された測定プローブ41とを備える。電気特性値は、分岐ブレーカ101から負荷までの配線状態や、主幹ブレーカ100及び分岐ブレーカ101の機能を確認するために測定される電気的なパラメータであり、例えば、絶縁抵抗、電流値、電圧値等である。本実施形態では、分電盤測定器4は、分岐ブレーカ101の電気特性値として、負荷端子部101b側の絶縁抵抗を測定する場合を中心に説明する。 The distribution board measuring device 4 is a measuring device that measures electrical characteristic values of the main breaker 100 and the branch breaker 101 . As shown in FIG. 1 , the distribution board measuring instrument 4 includes a measuring instrument main body 40 and a measuring probe 41 connected to the measuring instrument main body 40 . The electrical characteristic value is an electrical parameter that is measured to confirm the wiring state from the branch breaker 101 to the load and the function of the main breaker 100 and the branch breaker 101. For example, insulation resistance, current value, and voltage value. etc. In the present embodiment, the distribution board measuring instrument 4 will be described mainly in the case of measuring the insulation resistance on the side of the load terminal portion 101b as the electrical characteristic value of the branch breaker 101. FIG.

測定器本体40は、作業者が測定プローブ41を把持して分岐ブレーカ101の負荷端子部101bに接触させることで、絶縁抵抗等の電気特性値を測定する測定機能と、そのときの測定結果を表示する測定結果表示機能を有する。また、測定器本体40は、例えば、Bluetooth(登録商標)、WiFi(登録商標)、赤外線等の通信規格に基づく無線通信機能を有し、測定作業端末装置3との間で各種のデータ(測定値や測定時の設定値等)を送受信する。例えば、測定器本体40は、絶縁抵抗等の電気特性値を測定したときの測定値13を測定作業端末装置3に送信する。 The measuring instrument main body 40 has a measuring function of measuring electrical characteristic values such as insulation resistance when an operator holds the measuring probe 41 and brings it into contact with the load terminal portion 101b of the branch breaker 101, and outputs the measurement result at that time. It has a measurement result display function. In addition, the measuring instrument body 40 has a wireless communication function based on communication standards such as Bluetooth (registered trademark), WiFi (registered trademark), infrared rays, etc., and exchanges various data (measurement values, setting values at the time of measurement, etc.). For example, the measuring instrument main body 40 transmits the measured value 13 when measuring an electrical characteristic value such as insulation resistance to the measurement work terminal device 3 .

測定作業管理装置2は、汎用又は専用のコンピュータで構成され、例えば、据置型コンピュータや携帯型コンピュータが使用される。測定作業管理装置2は、イメージデータ形式の盤図11が入力されてその盤図11に対して画像処理を行い、測定作業シート情報12を作成し、測定作業端末装置3に出力する。また、測定作業管理装置2は、測定結果情報14が入力されて、測定作業シート情報12及び測定結果情報14に基づいて測定結果シート情報15を作成する。測定結果シート情報15は、例えば、試験成績表と呼ばれる所定の様式に沿って作成されて、例えば、用紙に印刷出力されてもよいし、デジタルデータとして提供されてもよい。 The measurement work management device 2 is composed of a general-purpose or dedicated computer, and for example, a stationary computer or a portable computer is used. The measurement work management device 2 receives the board drawing 11 in image data format, performs image processing on the board drawing 11 , creates measurement work sheet information 12 , and outputs it to the measurement work terminal device 3 . The measurement work management device 2 also receives the measurement result information 14 and creates the measurement result sheet information 15 based on the measurement work sheet information 12 and the measurement result information 14 . The measurement result sheet information 15 may be created according to a predetermined format called a test report, for example, and may be printed out on paper or provided as digital data.

測定作業端末装置3は、汎用又は専用のコンピュータで構成され、例えば、タブレット端末やスマートフォン等の携帯型コンピュータが使用される。測定作業端末装置3は、測定作業管理装置2から測定作業シート情報12が入力されて、その測定作業シート情報12に基づく測定作業シート画面を表示する。また、測定作業端末装置3は、作業者が分電盤測定器4を使用して測定作業を行うことで分電盤測定器4により測定された各分岐ブレーカ101に対する測定値13を分電盤測定器4から順次受信し、その受信した各分岐ブレーカ101の測定値13に基づく測定結果情報14を作成し、測定作業管理装置2に出力する。 The measurement work terminal device 3 is composed of a general-purpose or dedicated computer, and for example, a mobile computer such as a tablet terminal or a smart phone is used. The measurement work terminal device 3 receives the measurement work sheet information 12 from the measurement work management device 2 and displays a measurement work sheet screen based on the measurement work sheet information 12 . In addition, the measurement work terminal device 3 outputs the measured value 13 for each branch breaker 101 measured by the distribution board measuring device 4 by the worker performing the measurement work using the distribution board measuring device 4 to the distribution board. It sequentially receives from the measuring device 4 , creates measurement result information 14 based on the received measurement values 13 of each branch breaker 101 , and outputs it to the measurement work management device 2 .

なお、測定作業管理装置2と測定作業端末装置3との間のデータの受け渡しは、有線又は無線の通信網を介して行われてもよいし、外部の記憶装置や記憶媒体を介して行われてもよい。また、分電盤測定作業支援システム1において、複数種類の盤図11の各々について、測定作業シート情報12、測定結果情報14及び測定結果シート情報15等が作成される場合には、例えば、分電盤10の名称等に基づいて固有のファイル名を付与することで識別可能に管理される。 Data transfer between the measurement work management device 2 and the measurement work terminal device 3 may be performed via a wired or wireless communication network, or may be performed via an external storage device or storage medium. may In addition, in the distribution board measurement work support system 1, when the measurement work sheet information 12, the measurement result information 14, the measurement result sheet information 15, etc. are created for each of a plurality of types of board diagrams 11, for example, By assigning a unique file name based on the name of the electric board 10 or the like, the file is managed so as to be identifiable.

図4は、本発明の実施形態に係る測定作業管理装置2の一例を示すブロック図である。 FIG. 4 is a block diagram showing an example of the measurement work management device 2 according to the embodiment of the invention.

測定作業管理装置2は、HDD、SSD、メモリ等により構成される記憶部20と、CPU、GPU等のプロセッサにより構成される制御部21と、キーボード、マウス等により構成される入力部22と、ディスプレイ、スピーカ等により構成される表示部23と、所定の通信規格(有線及び無線のいずれでもよい)に基づく通信網とのインターフェースである通信部24と、プリンタ、スキャナ、USBメモリ、外付HDD等の外部機器とのインターフェースである外部機器インターフェース(I/F)部25と、CD、DVD等の記憶媒体とのインターフェースであるメディア入出力部26とを備える。なお、入力部22及び表示部23は、タッチパネル等の共用の装置で構成されていてもよい。 The measurement work management device 2 includes a storage unit 20 configured by HDD, SSD, memory, etc., a control unit 21 configured by processors such as CPU, GPU, etc., an input unit 22 configured by keyboard, mouse, etc. A display unit 23 composed of a display, a speaker, etc., a communication unit 24 as an interface with a communication network based on a predetermined communication standard (either wired or wireless), a printer, a scanner, a USB memory, and an external HDD. and an external device interface (I/F) unit 25 as an interface with external devices such as CD, DVD, etc., and a media input/output unit 26 as an interface with storage media such as CDs and DVDs. Note that the input unit 22 and the display unit 23 may be configured by a shared device such as a touch panel.

記憶部20には、基本プログラムであるオペレーティングシステム(OS)、測定作業管理装置2の動作を制御する測定作業管理プログラム200、測定作業管理プログラム200にて使用される各種のデータ(盤図11、測定作業シート情報12、測定結果情報14及び測定結果シート情報15等)、表計算処理を実行する表計算ソフトウエア、文書作成処理を実行する文書作成ソフトウエア、及び、ウェブブラウザソフトウェア等が記憶されている。 The storage unit 20 stores an operating system (OS) as a basic program, a measurement work management program 200 that controls the operation of the measurement work management device 2, and various data used in the measurement work management program 200 (board diagram 11, Measurement work sheet information 12, measurement result information 14, measurement result sheet information 15, etc.), spreadsheet software for executing spreadsheet processing, document creation software for executing document creation processing, web browser software, and the like are stored. ing.

なお、測定作業管理プログラム200及び測定作業管理プログラム200で使用される各種のデータは、基本的には記憶部20に記憶されているが、これらのプログラムやデータは、通信部24や外部機器I/F部25を介して外部の記憶装置から取得されてもよいし、メディア入出力部26を介して記憶媒体から取得されてもよい。また、測定作業管理プログラム200で使用される各種のデータは、表計算ソフトウエアや文書作成ソフトウエア及びウェブブラウザソフトウェアにて表示・編集可能な形式で作成されるのが好ましい。 Although the measurement work management program 200 and various data used in the measurement work management program 200 are basically stored in the storage unit 20, these programs and data are stored in the communication unit 24 and the external equipment I It may be obtained from an external storage device via the /F unit 25 or from a storage medium via the media input/output unit 26 . Various data used in the measurement work management program 200 are preferably created in a format that can be displayed and edited by spreadsheet software, document creation software, and web browser software.

制御部21は、測定作業管理プログラム200を実行することにより、盤図情報取得部210、測定作業シート情報作成部211、表示処理部212、測定結果情報取得部213、測定結果シート情報作成部214、代用データ受付部215、基準値受付部216、及び、基準値判定部217として機能する。各部の詳細は後述する。 By executing the measurement work management program 200, the control unit 21 controls a board diagram information acquisition unit 210, a measurement work sheet information creation unit 211, a display processing unit 212, a measurement result information acquisition unit 213, and a measurement result sheet information creation unit 214. , a substitute data reception unit 215 , a reference value reception unit 216 , and a reference value determination unit 217 . Details of each part will be described later.

図5は、本発明の実施形態に係る測定作業端末装置3の一例を示すブロック図である。 FIG. 5 is a block diagram showing an example of the measurement work terminal device 3 according to the embodiment of the invention.

測定作業端末装置3は、測定作業管理装置2と同様に構成される。すなわち、測定作業端末装置3は、HDD、SSD、メモリ等により構成される記憶部30と、CPU、GPU等のプロセッサにより構成される制御部31と、キーボード、マウス等により構成される入力部32と、ディスプレイ等により構成される表示部33と、所定の通信規格(有線及び無線のいずれでもよい)に基づく通信網とのインターフェースである通信部34と、プリンタ、スキャナ、USBメモリ等の外部機器とのインターフェースである外部機器インターフェース(I/F)部35と、CD、DVD等の記憶媒体とのインターフェースであるメディア入出力部36とを備える。なお、入力部32及び表示部33は、タッチパネル等の共用の装置で構成されていてもよい。 The measurement work terminal device 3 is configured similarly to the measurement work management device 2 . That is, the measurement work terminal device 3 includes a storage unit 30 configured by HDD, SSD, memory, etc., a control unit 31 configured by processors such as CPU, GPU, etc., and an input unit 32 configured by keyboard, mouse, etc. , a display unit 33 configured by a display or the like, a communication unit 34 as an interface with a communication network based on a predetermined communication standard (either wired or wireless), and external devices such as printers, scanners, and USB memories. and an external device interface (I/F) section 35, which is an interface with the device, and a media input/output section 36, which is an interface with storage media such as CDs and DVDs. Note that the input unit 32 and the display unit 33 may be configured by a shared device such as a touch panel.

記憶部30には、基本プログラムであるオペレーティングシステム(OS)、測定作業端末装置3の動作を制御する測定作業端末プログラム300、測定作業端末プログラム300にて使用される各種のデータ(盤図11、測定作業シート情報12、測定結果情報14及び測定結果シート情報15等)、表計算処理を実行する表計算ソフトウエア、文書作成処理を実行する文書作成ソフトウエア、及び、ウェブブラウザソフトウェア等が記憶されている。 The storage unit 30 stores an operating system (OS) as a basic program, a measurement work terminal program 300 for controlling the operation of the measurement work terminal device 3, various data used in the measurement work terminal program 300 (board diagram 11, Measurement work sheet information 12, measurement result information 14, measurement result sheet information 15, etc.), spreadsheet software for executing spreadsheet processing, document creation software for executing document creation processing, web browser software, and the like are stored. ing.

なお、測定作業端末プログラム300及び測定作業端末プログラム300で使用される各種のデータは、基本的には記憶部30に記憶されているが、これらのプログラムやデータは、通信部34や外部機器I/F部35を介して外部の記憶装置から取得されてもよいし、メディア入出力部26を介して記憶媒体から取得されてもよい。また、測定作業端末プログラム300で使用される各種のデータは、表計算ソフトウエア、文書作成ソフトウエア及びウェブブラウザソフトウェアにて表示・編集可能な形式で作成されるのが好ましい。 Note that the measurement work terminal program 300 and various data used in the measurement work terminal program 300 are basically stored in the storage unit 30, but these programs and data are stored in the communication unit 34 and the external device I It may be obtained from an external storage device via the /F unit 35 or may be obtained from a storage medium via the media input/output unit 26 . Various data used in the measurement work terminal program 300 are preferably created in a format that can be displayed and edited by spreadsheet software, document preparation software, and web browser software.

制御部31は、測定作業端末プログラム300を実行することにより、測定作業シート情報取得部310、表示処理部311、測定器連携処理部312、測定結果情報作成部313、代用データ受付部314、基準値受付部315、及び、基準値判定部316として機能する。各部の詳細は後述する。 By executing the measurement work terminal program 300, the control section 31 obtains a measurement work sheet information acquisition section 310, a display processing section 311, a measuring instrument cooperation processing section 312, a measurement result information creation section 313, a substitute data reception section 314, a reference It functions as a value reception unit 315 and a reference value determination unit 316 . Details of each part will be described later.

以下、測定作業管理装置2及び測定作業端末装置3の各部の機能と、測定作業管理装置2及び測定作業端末装置3による一連の動作について、図6乃至図10を参照して説明する。その際、具体例については、図2に示す分電盤10、及び、図3に示す盤図11を参照して説明する。 The functions of each part of the measurement work management device 2 and the measurement work terminal device 3 and a series of operations by the measurement work management device 2 and the measurement work terminal device 3 will be described below with reference to FIGS. 6 to 10. FIG. At that time, a specific example will be described with reference to the distribution board 10 shown in FIG. 2 and the board drawing 11 shown in FIG.

(1)測定作業シート情報12の作成処理
図6は、本発明の実施形態に係る測定作業管理装置2における測定作業シート情報12の作成処理の一例を示すフロー図である。測定作業シート情報12の作成処理として、作業者が、測定作業管理装置2を操作して、図3に示す盤図11に対する測定作業シート情報12が作成される場合について説明する。
(1) Processing for Creating Measurement Work Sheet Information 12 FIG. 6 is a flowchart showing an example of processing for creating measurement work sheet information 12 in the measurement work management device 2 according to the embodiment of the present invention. As the processing for creating the measurement work sheet information 12, a case where the operator operates the measurement work management device 2 to create the measurement work sheet information 12 for the board diagram 11 shown in FIG. 3 will be described.

盤図情報取得部210は、分電盤10を表すイメージデータ形式の盤図11に対して画像処理を行い、複数の分岐ブレーカ101が配置された配置状態を示す分岐ブレーカ配置情報と、複数の分岐ブレーカ101にそれぞれ付された回路番号111及び負荷名称112を含むイメージ領域をそれぞれ切り出した複数の回路番号画像データ114及び複数の負荷名称画像データ115とを取得する。 The board diagram information acquisition unit 210 performs image processing on the board diagram 11 in the image data format representing the distribution board 10, and obtains branch breaker arrangement information indicating the arrangement state in which the plurality of branch breakers 101 are arranged, and a plurality of branch breaker arrangement information. A plurality of circuit number image data 114 and a plurality of load name image data 115 obtained by cutting out an image area including the circuit number 111 and the load name 112 assigned to the branch breaker 101 are obtained.

例えば、盤図情報取得部210は、データ指定用のダイアログ等を表示部23に表示させて、測定作業の対象とする盤図11を指定する指定操作を入力部22を介して受け付けることで、その盤図11を読み込んで、盤図情報取得画面16を表示部23に表示させる。盤図情報取得画面16には、図6に示すように、測定作業の対象とする盤図11を表示する表示領域160と、盤図11の左側表領域110Lの範囲を指定する左側表領域指定ボタン161Lと、盤図11の右側表領域110Rの範囲を指定する右側表領域指定ボタン161Rと、盤図11に対する画像処理の実行を指示する盤図情報取得実行ボタン162と設けられる。 For example, the board diagram information acquisition unit 210 causes the display unit 23 to display a data designation dialog or the like, and receives a designation operation via the input unit 22 to designate the board diagram 11 as the target of the measurement work. The board map 11 is read and the board map information acquisition screen 16 is displayed on the display unit 23 . As shown in FIG. 6, the board chart information acquisition screen 16 includes a display area 160 for displaying the board chart 11 to be measured, and a left table area designation area for designating the range of the left table area 110L of the board chart 11. A button 161L, a right table area designation button 161R for designating the range of the right table area 110R of the board diagram 11, and a board diagram information acquisition execution button 162 for instructing execution of image processing for the board diagram 11 are provided.

図6に示す盤図情報取得画面16では、表示領域160に、図3に示す盤図11の左側表領域110Lが部分的に表示されている。盤図情報取得画面16において、左側表領域指定ボタン161L又は右側表領域指定ボタン161Rが押下操作された場合、盤図情報取得部210は、例えば、範囲指定ボックス163を表示部23に表示させて、その範囲指定ボックス163内に左側表領域110L又は右側表領域110Rが収まるように範囲指定ボックス163の位置やサイズが調節されることで、左側表領域110L又は右側表領域110Rの範囲指定を受け付ける。 In the board chart information acquisition screen 16 shown in FIG. 6, the left side table area 110L of the board chart 11 shown in FIG. When the left table area specification button 161L or the right table area specification button 161R is pressed on the board information acquisition screen 16, the board information acquisition unit 210 causes the display unit 23 to display the range specification box 163, for example. By adjusting the position and size of the range specification box 163 so that the left side table area 110L or the right side table area 110R fits within the range specification box 163, the range specification of the left side table area 110L or the right side table area 110R is accepted. .

盤図情報取得部210は、盤図情報取得実行ボタン162が押下操作されることで、範囲指定を受け付けた左側表領域110L及び右側表領域110Rに対して画像処理を行い、左側表領域110Lの枠線の配置状態と、右側表領域110Rの枠線の配置状態とをそれぞれ取得する。枠線の配置状態は、例えば、縦方向に分割された枠の行数(図3の例では、左側表領域110Lは6行、右側表領域110Rは6行)が、分岐ブレーカ101の数として取得される。また、枠線の配置状態は、横方向に分割された枠のうち、回路番号111が記載された枠の列位置(図3の例では、左側表領域110Lの第4列目及び5列目、右側表領域110Rの第1列目及び2列目)と、負荷名称112が記載された枠の列位置(図3の例では、左側表領域110Lの第1列目、右側表領域110Rの第5列目)とが取得される。 When the board map information acquisition execution button 162 is pressed, the board map information acquisition unit 210 performs image processing on the left table area 110L and the right table area 110R for which the range designation has been accepted, and performs image processing on the left table area 110L. The arrangement state of the frame line and the arrangement state of the frame line of the right front region 110R are obtained. For example, the number of lines in the vertically divided frame (in the example of FIG. 3, 6 lines in the left side table area 110L and 6 lines in the right side table area 110R) corresponds to the number of branch breakers 101. is obtained. In addition, the arrangement state of the frame lines is determined by the column position of the frame in which the circuit number 111 is written among the horizontally divided frames (in the example of FIG. 3, the fourth and fifth columns of the left table region 110L , the first and second columns of the right table area 110R), and the column position of the frame in which the load name 112 is described (in the example of FIG. 3, the first column of the left table area 110L and the right table area 110R). 5th column) is acquired.

そして、盤図情報取得部210は、左側表領域110L及び右側表領域110Rのそれぞれにて回路番号111が記載された列位置に対して6行分の枠内の画像を切り出すことで、複数の回路番号画像データ114を取得する。本実施形態では、2列分の枠内の画像がそれぞれ切り出されることで1組の画像として回路番号画像データ114が取得される。また、盤図情報取得部210は、左側表領域110L及び右側表領域110Rのそれぞれにて負荷名称112が記載された列位置に対して6行分の枠内の画像を切り出すことで、複数の負荷名称画像データ115を取得する。その際、盤図情報取得部210は、回路番号画像データ114及び負荷名称画像データ115をそれぞれ切り出したブロック位置、行位置及び列位置を、分岐ブレーカ配置情報に記憶する。 Then, the board diagram information acquisition unit 210 cuts out the images within the frames of six rows for the column positions where the circuit numbers 111 are written in each of the left side table area 110L and the right side table area 110R. Acquire the circuit number image data 114 . In the present embodiment, the circuit number image data 114 is obtained as a set of images by cutting out the images within the two columns of frames. In addition, the board diagram information acquisition unit 210 cuts out an image within a frame of six rows with respect to the column position where the load name 112 is described in each of the left table area 110L and the right table area 110R. The load name image data 115 is acquired. At this time, the board diagram information acquisition unit 210 stores the block position, row position, and column position of the circuit number image data 114 and the load name image data 115, respectively, in the branch breaker arrangement information.

なお、盤図情報取得部210は、範囲指定ボックス163が作業者により調節させることで左側表領域110L及び右側表領域110Rの範囲指定を受け付ける代わりに、画像処理により左側表領域110L及び右側表領域110Rを特定するようにしてもよい。 Note that instead of accepting range designation of the left table area 110L and right table area 110R by adjusting the range designation box 163 by the operator, the board diagram information acquisition unit 210 performs image processing to obtain the left table area 110L and the right table area. 110R may be specified.

図7は、本発明の実施形態に係る測定作業管理装置2における測定作業シート情報12の作成処理(図6の続き)の一例を示すフロー図である。 FIG. 7 is a flow chart showing an example of the process (continuation of FIG. 6) of creating the measurement work sheet information 12 in the measurement work management device 2 according to the embodiment of the present invention.

測定作業シート情報作成部211は、盤図情報取得部210により盤図11から取得された分岐ブレーカ配置情報、複数の回路番号画像データ114及び複数の負荷名称画像データ115を含む測定作業シート情報12を作成する。そして、測定作業シート情報作成部211は、その測定作業シート情報12を、通信網又は外部の記憶装置や記憶媒体を介して測定作業端末装置3に出力する。 The measurement work sheet information creation unit 211 prepares the measurement work sheet information 12 including the branch breaker arrangement information acquired from the board diagram 11 by the board diagram information acquisition unit 210, the plurality of circuit number image data 114, and the plurality of load name image data 115. to create Then, the measurement work sheet information creating unit 211 outputs the measurement work sheet information 12 to the measurement work terminal device 3 via a communication network or an external storage device or storage medium.

表示処理部212は、測定作業シート情報作成部211により作成された測定作業シート情報12に基づいて、盤図情報取得結果画面17を表示部23に表示させる。盤図情報取得結果画面17には、図7に示すように、測定作業シート情報12に含まれる分岐ブレーカ配置情報に従って複数の回路番号画像データ114及び複数の負荷名称画像データ115が並べられて配置されるとともに、複数の分岐ブレーカ101に対する電気特性値の測定結果が入力される入力欄170(測定前のため、空欄)がそれぞれ設けられる。なお、表示処理部212は、盤図情報取得部210から分岐ブレーカ配置情報、複数の回路番号画像データ114及び複数の負荷名称画像データ115を受け取ることで、盤図情報取得結果画面17を表示部23に表示させるようにしてもよい。 The display processing unit 212 causes the display unit 23 to display the board diagram information acquisition result screen 17 based on the measurement work sheet information 12 created by the measurement work sheet information creation unit 211 . As shown in FIG. 7, on the board diagram information acquisition result screen 17, a plurality of circuit number image data 114 and a plurality of load name image data 115 are arranged and arranged according to the branch breaker arrangement information included in the measurement work sheet information 12. In addition, an input field 170 (blank field because measurement has not yet been performed) is provided for inputting the measurement results of the electrical characteristic values for the plurality of branch breakers 101 . The display processing unit 212 receives the branch breaker arrangement information, the plurality of circuit number image data 114, and the plurality of load name image data 115 from the board diagram information acquisition unit 210, and displays the board diagram information acquisition result screen 17 on the display unit. 23 may be displayed.

代用データ受付部215は、回路番号画像データ114又は負荷名称画像データ115に対して、当該回路番号画像データ114又は当該負荷名称画像データ115の代用データとなる回路番号テキストデータ又は負荷名称テキストデータを受け付ける。例えば、代用データ受付部215は、盤図情報取得結果画面17にて、対象となる回路番号画像データ114又は負荷名称画像データ115が選択されて、削除キー等による削除操作が行われた場合、その回路番号画像データ114又は負荷名称画像データ115を削除してテキスト入力ボックスを表示させることで、回路番号テキストデータ又は負荷名称テキストデータを受け付ける。 The substitute data reception unit 215 supplies circuit number text data or load name text data as substitute data for the circuit number image data 114 or the load name image data 115 to the circuit number image data 114 or the load name image data 115. accept. For example, when the target circuit number image data 114 or load name image data 115 is selected on the board diagram information acquisition result screen 17 and a delete operation is performed using a delete key or the like, the substitute data receiving unit 215 By deleting the circuit number image data 114 or the load name image data 115 and displaying a text input box, the circuit number text data or load name text data is accepted.

基準値受付部216は、絶縁抵抗に対する基準値として複数の設定基準値を受け付ける。例えば、基準値受付部216は、設定基準値の入力欄171A~171Cが盤図情報取得結果画面17に設けられて、法定に定められた法定基準値、施主により定められた施主基準値、施工業者により定められた施工業者基準値等のように、各設定基準値の入力や変更を受け付ける。設定基準値には、初期値が予め設定されていてもよい。基準値受付部216により受け付けられた複数の設定基準値は、測定作業シート情報12に含まれるようにすることで測定作業端末装置3に引き継がれる。 Reference value reception unit 216 receives a plurality of set reference values as reference values for insulation resistance. For example, the reference value receiving unit 216 is provided with input fields 171A to 171C for setting reference values on the board map information acquisition result screen 17, and the legal reference values stipulated by law, the client reference values stipulated by the client, the construction Accepts input and modification of each setting reference value, such as a contractor reference value determined by a contractor. An initial value may be set in advance as the setting reference value. A plurality of set reference values received by the reference value receiving unit 216 are included in the measurement work sheet information 12 so that the measurement work terminal device 3 takes over.

なお、測定作業シート情報12には、分電盤10の名称、分電盤10が設置される建物や場所、測定作業に関する付加情報、分電盤測定器4に関する付加情報等が、属性情報として含まれていてもよい。この場合、属性情報は、回路番号画像データ114及び負荷名称画像データ115と同様に、盤図11に対する画像処理により取得されてもよいし、属性情報の入力欄が、盤図情報取得結果画面17に設けられてもよい。 The measurement work sheet information 12 includes attribute information such as the name of the distribution board 10, the building and location where the distribution board 10 is installed, additional information related to the measurement work, and additional information related to the distribution board measuring instrument 4. may be included. In this case, the attribute information may be acquired by image processing for the board diagram 11 in the same way as the circuit number image data 114 and the load name image data 115, and the input fields for the attribute information may be changed to the board diagram information acquisition result screen 17. may be provided in

上記の測定作業シート情報12の作成処理において、測定作業シート情報12に含まれる回路番号画像データ114及び負荷名称画像データ115は、盤図11において回路番号111及び負荷名称112がそれぞれ記載された領域の画像が盤図情報取得部210によりそのまま切り出されたものである。そのため、例えば、回路番号111及び負荷名称112に対して光学的文字認識処理(OCR)を行ったような場合、OCRの誤認識に起因する表記ミスの可能性が懸念されるが、盤図情報取得部210により取得された回路番号画像データ114及び負荷名称画像データ115を用いる場合には、表記ミスの懸念がなく、盤図11との整合性を担保することができる。また、回路番号画像データ114及び負荷名称画像データ115に対する代用データが代用データ受付部215により受け付けられるため、作業者は、必要に応じて回路番号111及び負荷名称112を変更することができる。 In the process of creating the measurement work sheet information 12 described above, the circuit number image data 114 and the load name image data 115 included in the measurement work sheet information 12 are stored in areas in which the circuit number 111 and the load name 112 are respectively described on the board diagram 11. The image of is cut out as it is by the board map information acquisition unit 210 . Therefore, for example, when optical character recognition processing (OCR) is performed on the circuit number 111 and the load name 112, there is a possibility of notation errors due to misrecognition of OCR. When the circuit number image data 114 and the load name image data 115 acquired by the acquisition unit 210 are used, there is no fear of notation errors, and consistency with the board drawing 11 can be ensured. Also, since substitute data for the circuit number image data 114 and the load name image data 115 are received by the substitute data receiving unit 215, the operator can change the circuit number 111 and the load name 112 as necessary.

(2)測定結果情報14の作成処理
図8は、本発明の実施形態に係る測定作業端末装置3における測定結果情報14の作成処理の一例を示すフロー図である。測定結果情報14の作成処理として、作業者が、測定作業端末装置3及び分電盤測定器4を操作して、図2に示す分電盤10における各分岐ブレーカ101の電気特性値(絶縁抵抗)を測定することで、測定結果情報14が作成される場合について説明する。
(2) Processing of Creating Measurement Result Information 14 FIG. 8 is a flowchart showing an example of processing of creating measurement result information 14 in the measurement work terminal device 3 according to the embodiment of the present invention. As the process of creating the measurement result information 14, the operator operates the measurement work terminal device 3 and the distribution board measuring instrument 4 to obtain the electrical characteristic values (insulation resistance ), the measurement result information 14 is created.

測定作業シート情報取得部310は、測定作業管理装置2により作成された測定作業シート情報12を、測定作業管理装置2から通信網又は外部の記憶装置や記憶媒体を介して取得する。 The measurement work sheet information acquisition unit 310 acquires the measurement work sheet information 12 created by the measurement work management device 2 from the measurement work management device 2 via a communication network or an external storage device or storage medium.

表示処理部311は、測定作業シート情報取得部310により取得された測定作業シート情報12に基づいて、測定作業シート画面18を表示部23に表示させる。測定作業シート画面18には、測定作業管理装置2の盤図情報取得結果画面17(図7参照)と同様の情報が表示される。したがって、測定作業シート画面18には、図8に示すように、分岐ブレーカ配置情報に従って複数の回路番号画像データ114及び複数の負荷名称画像データ115が並べられて配置されるとともに、複数の分岐ブレーカ101に対する電気特性値の測定結果の入力欄180がそれぞれ設けられる。また、測定作業シート画面18には、測定作業の対象とする分電盤10が新設か改修かを指定する新設改修指定ボタン181と、測定作業が施工業者による自主検査か施主等の立会による立会検査かを指定する検査態様指定ボタン182と、複数の分岐ブレーカ101に対する電気特性値を測定するときの測定順序を横移動か縦移動かで指定する測定順序指定ボタン183と、定格測定電圧を選択する測定電圧指定リストボックス184と、絶縁抵抗に対する基準値を選択する絶縁抵抗基準値選択ボタン185と、測定作業の開始を指示する測定開始ボタン186とが設けられる。 The display processing unit 311 causes the display unit 23 to display the measurement work sheet screen 18 based on the measurement work sheet information 12 acquired by the measurement work sheet information acquisition unit 310 . The measurement work sheet screen 18 displays the same information as the board diagram information acquisition result screen 17 (see FIG. 7) of the measurement work management device 2 . Therefore, on the measurement work sheet screen 18, as shown in FIG. 8, a plurality of circuit number image data 114 and a plurality of load name image data 115 are arranged and arranged according to the branch breaker arrangement information, and a plurality of branch breakers are arranged. An input field 180 for the measurement result of the electrical characteristic value for 101 is provided. Also, on the measurement work sheet screen 18, there is a new installation/repair specification button 181 for specifying whether the distribution board 10 to be measured is newly installed or repaired, and a self-inspection by the contractor or witnessed by the owner or the like. Select an inspection mode designation button 182 for designating an inspection, a measurement order designation button 183 for designating whether the measurement order for measuring electrical characteristic values for a plurality of branch breakers 101 is horizontal movement or vertical movement, and a rated measurement voltage. A measurement voltage designation list box 184 for selecting the measurement voltage, an insulation resistance reference value selection button 185 for selecting a reference value for insulation resistance, and a measurement start button 186 for instructing the start of measurement work are provided.

図8に示す測定作業シート画面18では、新設改修指定ボタン181にて「新設」、検査態様指定ボタン182にて「自主検査」、測定順序指定ボタン183にて「横移動」、測定電圧指定リストボックス184にて「一般:500V 機器損傷:250V」、絶縁抵抗基準値選択ボタン185にて「施工業者基準値:10MΩ」がそれぞれ指定又は選択されている。また、絶縁抵抗基準値選択ボタン185には、絶縁抵抗の設定基準値がそれぞれ表示されている。 On the measurement work sheet screen 18 shown in FIG. 8, the installation/repair designation button 181 is for "new construction", the inspection mode designation button 182 is for "self-inspection", the measurement order designation button 183 is for "lateral movement", and the measurement voltage designation list is displayed. "General: 500 V equipment damage: 250 V" is specified or selected in the box 184, and "Constructor standard value: 10 MΩ" is selected in the insulation resistance standard value selection button 185, respectively. Also, the insulation resistance reference value selection button 185 displays the set reference value of the insulation resistance.

代用データ受付部314は、測定作業管理装置2の代用データ受付部215と同様の機能を有し、回路番号画像データ114又は負荷名称画像データ115に対して、当該回路番号画像データ114又は当該負荷名称画像データ115の代用データとなる回路番号テキストデータ又は負荷名称テキストデータを受け付ける。例えば、代用データ受付部314は、測定作業シート画面18にて、対象となる回路番号画像データ114又は負荷名称画像データ115が選択されて、削除キー等による削除操作が行われた場合、その回路番号画像データ114又は負荷名称画像データ115を削除してテキスト入力ボックスを表示させることで、回路番号テキストデータ又は負荷名称テキストデータを受け付ける。 The substitute data receiving unit 314 has the same function as the substitute data receiving unit 215 of the measurement work management device 2, and receives the circuit number image data 114 or the load name image data 115 from the circuit number image data 114 or the load name image data 115. Accepts circuit number text data or load name text data as substitute data for the name image data 115 . For example, when the target circuit number image data 114 or load name image data 115 is selected on the measurement work sheet screen 18 and a delete operation is performed using a delete key or the like, the substitute data receiving unit 314 By deleting the number image data 114 or the load name image data 115 and displaying the text input box, the circuit number text data or the load name text data is accepted.

基準値受付部315は、測定作業管理装置2の基準値受付部216と同様の機能を有し、絶縁抵抗に対する基準値として複数の設定基準値を受け付ける。例えば、基準値受付部315は、絶縁抵抗基準値選択ボタン185のいずれかが長押しのタップ操作等により押下操作された場合、数値入力ボックスを表示させることで、当該絶縁抵抗基準値選択ボタン185に対応する設定基準値の入力や変更を受け付ける。なお、測定作業シート情報12が、複数の設定基準値を含む場合には、それらを引き継ぐようにしてもよい。 The reference value reception unit 315 has the same function as the reference value reception unit 216 of the measurement work management device 2, and receives a plurality of set reference values as reference values for insulation resistance. For example, when any one of the insulation resistance reference value selection buttons 185 is pressed by a long-press tap operation or the like, the reference value reception unit 315 displays a numerical value input box so that the insulation resistance reference value selection button 185 can be pressed. Receives input and change of setting reference values corresponding to . Incidentally, when the measurement work sheet information 12 includes a plurality of setting reference values, they may be inherited.

図9は、本発明の実施形態に係る測定作業端末装置3における測定結果情報14の作成処理(図8の続き)の一例を示すフロー図である。 FIG. 9 is a flowchart showing an example of the process of creating the measurement result information 14 (continued from FIG. 8) in the measurement work terminal device 3 according to the embodiment of the present invention.

測定器連携処理部312は、測定作業シート画面18において測定対象の分岐ブレーカ101が特定された状態で分電盤測定器4から電気特性値(測定値13)を受信したとき、当該電気特性値を当該分岐ブレーカ101に対する入力欄180に表示させるとともに、当該分岐ブレーカ101に対する測定結果として取得する。また、測定器連携処理部312は、測定対象の分岐ブレーカ101を示す測定対象識別情報187を測定作業シート画面18に表示させ、分電盤測定器4から電気特性値(測定値13)を受信することで当該分岐ブレーカ101に対する測定結果を取得したとき、当該分岐ブレーカ101に対して縦方向又は横方向に隣接する分岐ブレーカ101に対して測定対象識別情報187を表示させる。 When the measuring device cooperation processing unit 312 receives an electrical characteristic value (measured value 13) from the distribution board measuring device 4 with the branch breaker 101 to be measured specified on the measurement work sheet screen 18, the electrical characteristic value is displayed in the input field 180 for the branch breaker 101 and acquired as the measurement result for the branch breaker 101 . In addition, the measuring device cooperation processing unit 312 displays the measuring target identification information 187 indicating the branch breaker 101 to be measured on the measurement work sheet screen 18, and receives the electrical characteristic value (measured value 13) from the distribution board measuring device 4. By doing so, when the measurement result for the branch breaker 101 is acquired, the measurement target identification information 187 is displayed for the branch breaker 101 adjacent to the branch breaker 101 in the vertical direction or the horizontal direction.

例えば、測定器連携処理部312は、測定開始ボタン186が押下操作されることで測定作業を開始し、測定順序指定ボタン183にて選択された測定順序に従って次の測定対象の分岐ブレーカ101を順に特定するとともに、分電盤測定器4からの測定値13の受信待ち状態に移行する。その際、測定器連携処理部312は、測定対象の分岐ブレーカ101を示す測定対象識別情報187を測定作業シート画面18に表示させる。図9に示す測定作業シート画面18では、「事務所コンセント」の「測定2」の入力欄180に対して、測定対象識別情報187が太枠にて表示されている。なお、測定対象識別情報187は、太枠に限られず、他と区別可能な表示態様であればよく、例えば、枠線又は枠内の色や模様等を適宜変更してもよい。 For example, the measuring device cooperation processing unit 312 starts the measurement work when the measurement start button 186 is pressed, and the branch breaker 101 to be measured next is sequentially selected according to the measurement order selected by the measurement order designation button 183. As soon as it is specified, it shifts to a state of waiting for reception of the measured value 13 from the distribution board measuring device 4 . At that time, the measuring device cooperation processing unit 312 causes the measurement work sheet screen 18 to display the measurement target identification information 187 indicating the branch breaker 101 to be measured. On the measurement work sheet screen 18 shown in FIG. 9, measurement object identification information 187 is displayed in a bold frame in the input field 180 of "measurement 2" of "office outlet". Note that the measurement object identification information 187 is not limited to a thick frame, and may be displayed in a manner distinguishable from others.

作業者が、図9に示す測定作業シート画面18に表示された測定対象識別情報187を視認し、その測定対象識別情報187が示す分岐ブレーカ101(「事務所コンセント」の「測定2」)に分電盤測定器4の測定プローブ41を当接させて絶縁抵抗を測定することで、分電盤測定器4は、その絶縁抵抗の測定値13を測定作業端末装置3に送信する。その結果、受信待ち状態の測定器連携処理部312は、分電盤測定器4から絶縁抵抗の測定値13を受信し、その絶縁抵抗の測定値13である「10」を「事務所コンセント」の「測定2」の入力欄180に表示させる。なお、図9では、絶縁抵抗の測定値13が、施工業者基準値の「10MΩ」を超える場合には、「10」と表示するようにしている。 The operator visually recognizes the measurement target identification information 187 displayed on the measurement work sheet screen 18 shown in FIG. By contacting the measurement probe 41 of the distribution board measuring device 4 to measure the insulation resistance, the distribution board measuring device 4 transmits the measured value 13 of the insulation resistance to the measurement work terminal device 3 . As a result, the measuring device cooperation processing unit 312 in the reception waiting state receives the measured value 13 of the insulation resistance from the distribution board measuring device 4, and sets “10”, which is the measured value 13 of the insulation resistance, to the “office outlet”. is displayed in the input field 180 of "measurement 2". In addition, in FIG. 9, when the measured value 13 of the insulation resistance exceeds the contractor's standard value of "10 MΩ", "10" is displayed.

そして、図9に示す測定作業シート画面18では、測定順序指定ボタン183にて「横移動」が指定されているため、測定器連携処理部312は、「事務所コンセント」の「測定2」に対して横方向(右方向)に隣接する「事務所コンセント」の「線間」を、次の測定対象の分岐ブレーカ101として特定し、当該分岐ブレーカ101(「事務所コンセント」の「線間」)に対して測定対象識別情報187を表示させる。 On the measurement work sheet screen 18 shown in FIG. 9, the measurement order specification button 183 specifies "lateral movement". On the other hand, the "line space" of the "office outlet" adjacent in the lateral direction (right direction) is specified as the branch breaker 101 to be measured next, and the branch breaker 101 ("line space" of the "office outlet") is specified. ) to display the measurement object identification information 187 .

上記のような分岐ブレーカ101に対する測定作業が繰り返し行われて、全ての分岐ブレーカ101に対する測定作業が行われると、各分岐ブレーカ101の入力欄180には、絶縁抵抗の測定値13がそれぞれ表示される。その際、測定器連携処理部312は、測定対象識別情報187を横方向(又は縦方向)に順次移動させることになるが、最も右側の列(又は最も下側の行)まで移動した場合には、測定対象識別情報187を次の行の最も左側の列(又は次の列の最も上側の行)に移動させるようにすればよい。なお、作業者が、任意の分岐ブレーカ101に対して測定作業を行いたい場合には、測定器連携処理部312は、例えば、タップ操作等により作業者が測定作業を行いたい分岐ブレーカ101の指定を受け付けることで、当該分岐ブレーカ101に対して測定対象識別情報187を移動させるようにすればよい。 When the measurement work for the branch breakers 101 as described above is repeatedly performed and the measurement work for all the branch breakers 101 is performed, the measured value 13 of the insulation resistance is displayed in the input field 180 of each branch breaker 101. be. At that time, the measuring device cooperation processing section 312 sequentially moves the measurement object identification information 187 in the horizontal direction (or the vertical direction). , the measurement object identification information 187 should be moved to the leftmost column of the next row (or the uppermost row of the next column). When the operator wishes to perform measurement work on an arbitrary branch breaker 101, the measuring instrument cooperation processing unit 312 designates the branch breaker 101 on which the operator wishes to perform measurement work, for example, by tapping. is received, the measurement target identification information 187 may be moved to the branch breaker 101 concerned.

基準値判定部316は、分岐ブレーカ101に対する測定結果として取得された絶縁抵抗と、複数の設定基準値から選択された設定基準値とを比較し、絶縁抵抗が設定基準値以上であるか否かを判定する。そして、基準値判定部316は、その判定結果を、例えば、絶縁抵抗が設定基準値以上であることを示す「良」(良判定情報188A)、及び、絶縁抵抗が設定基準値未満であることを示す「否」(否判定情報188B)として、測定作業シート画面18に表示させる。 The reference value determination unit 316 compares the insulation resistance obtained as the measurement result for the branch breaker 101 with a set reference value selected from a plurality of set reference values, and determines whether the insulation resistance is equal to or greater than the set reference value. judge. Then, the reference value judging section 316 determines the result of the judgment, for example, "good" (good judgment information 188A) indicating that the insulation resistance is equal to or higher than the set reference value, or that the insulation resistance is less than the set reference value. is displayed on the measurement work sheet screen 18 as "no" (no judgment information 188B).

図9に示す測定作業シート画面18では、絶縁抵抗基準値選択ボタン185にて「施工業者基準値:10MΩ」が選択されているため、基準値判定部316は、分電盤測定器4から受信した絶縁抵抗の測定値13と、施工業者基準値である「10MΩ」とを比較する。そして、絶縁抵抗の測定値13が10MΩ以上である場合には、例えば、「トイレ照明(200V)」の「測定2」のように、入力欄180の背景を白色とする良判定情報188Aが表示され、10MΩ未満である場合には、例えば、「事務所照明(200V)」の「測定2」のように、入力欄180の背景をグレー色とする否判定情報188Bが表示される。なお、良判定情報188A及び否判定情報188Bは、上記の例に限られず、良否が区別可能な表示態様であればよく、例えば、枠線又は枠内の色や模様等を適宜変更してもよい。 On the measurement work sheet screen 18 shown in FIG. 9 , “Constructor reference value: 10 MΩ” is selected by the insulation resistance reference value selection button 185 , so the reference value determination unit 316 receives from the distribution board measuring instrument 4 The measured value 13 of the insulation resistance obtained is compared with the contractor's standard value of "10 MΩ". Then, when the measured value 13 of the insulation resistance is 10 MΩ or more, for example, like "measurement 2" of "toilet lighting (200 V)", good judgment information 188A with a white background in the input field 180 is displayed. If it is less than 10 MΩ, the negative determination information 188B is displayed with a gray background in the input field 180, such as "measurement 2" of "office lighting (200 V)". In addition, the good judgment information 188A and the bad judgment information 188B are not limited to the above example, and may be displayed in a manner in which the quality can be distinguished. good.

測定結果情報作成部313は、分電盤測定器4により各分岐ブレーカ101の電気特性値が測定されたときの測定結果(絶縁抵抗等の測定値13)に基づいて、測定結果情報14を作成する。そして、測定結果情報作成部313は、その測定結果情報14を、通信網又は外部の記憶装置や記憶媒体を介して測定作業管理装置2に出力する。 The measurement result information creation unit 313 creates measurement result information 14 based on the measurement results (measured values 13 such as insulation resistance) when the electrical characteristic values of each branch breaker 101 are measured by the distribution board measuring instrument 4. do. Then, the measurement result information creating unit 313 outputs the measurement result information 14 to the measurement work management device 2 via a communication network or an external storage device or storage medium.

上記の測定結果情報14の作成処理において、表示処理部311により表示された測定作業シート画面18には、盤図11から取得された分岐ブレーカ配置情報に従って回路番号画像データ114及び負荷名称画像データ115が並べられて配置される。そのため、作業者は、実物の分電盤10における分岐ブレーカ101の配置と対比しながら測定作業を行うことができる。また、測定器連携処理部312により、分電盤測定器4からの測定値13の取得(受信)と、入力欄180への測定値13の表示や測定対象識別情報187の表示とが連携されるので、作業者は測定作業の進捗状況を容易に把握することができる。そして、基準値判定部316により測定値13と設定基準値とが比較されて、その比較の結果として良判定情報188A及び否判定情報188Bが表示されるので、作業者は、測定値13の良否を容易に把握することができる。 In the process of creating the measurement result information 14 described above, the circuit number image data 114 and the load name image data 115 are displayed on the measurement work sheet screen 18 displayed by the display processing unit 311 according to the branch breaker arrangement information acquired from the board diagram 11. are arranged side by side. Therefore, the operator can perform the measurement work while comparing the arrangement of the branch breakers 101 on the actual distribution board 10 . Further, the acquisition (reception) of the measured value 13 from the distribution board measuring device 4 and the display of the measured value 13 in the input field 180 and the display of the measurement target identification information 187 are coordinated by the measuring device cooperation processing unit 312. Therefore, the worker can easily grasp the progress of the measurement work. Then, the reference value determination unit 316 compares the measured value 13 with the set reference value, and as a result of the comparison, the good judgment information 188A and the bad judgment information 188B are displayed. can be easily grasped.

(3)測定結果シート情報15の作成処理
図10は、本発明の実施形態に係る測定作業管理装置2における測定結果シート情報15の作成処理の一例を示すフロー図である。
(3) Processing of Creating Measurement Result Sheet Information 15 FIG. 10 is a flowchart showing an example of processing of creating measurement result sheet information 15 in the measurement work management device 2 according to the embodiment of the present invention.

測定結果情報取得部213は、分電盤測定器4により各分岐ブレーカ101の電気特性値が測定された測定結果(絶縁抵抗等の測定値13)を示す測定結果情報14を、測定作業端末装置3を介して取得する。 The measurement result information acquisition unit 213 obtains the measurement result information 14 indicating the measurement result (measured value 13 of insulation resistance, etc.) of the electrical characteristic value of each branch breaker 101 measured by the distribution board measuring device 4 to the measurement work terminal device. 3.

測定結果シート情報作成部214は、測定作業シート情報作成部211により作成された測定作業シート情報12と、測定結果情報取得部213により取得された測定結果情報14とに基づいて、測定結果シート情報15を作成する。なお、測定結果シート情報15は、例えば、試験成績表と呼ばれる所定の様式に沿って作成されたものであり、例えば、用紙に印刷出力されてもよいし、デジタルデータとして提供されてもよい。 The measurement result sheet information creation unit 214 creates measurement result sheet information based on the measurement work sheet information 12 created by the measurement work sheet information creation unit 211 and the measurement result information 14 acquired by the measurement result information acquisition unit 213. Create 15. The measurement result sheet information 15 is, for example, created according to a predetermined format called a test report, and may be printed out on paper or provided as digital data.

表示処理部212は、測定作業シート情報作成部211により作成された測定作業シート情報12と、測定結果情報取得部213により取得された測定結果情報14とに基づいて、測定結果シート画面19を表示部23に表示させる。測定結果シート画面19は、盤図情報取得結果画面17(図7参照)と同様の情報が表示されるとともに、各分岐ブレーカ101に対する電気特定値の測定結果が表示される。したがって、測定結果シート画面19には、図10に示すように、分岐ブレーカ配置情報に従って複数の回路番号画像データ114及び複数の負荷名称画像データ115が並べられて配置されるとともに、複数の分岐ブレーカ101に対する電気特性値の測定結果が入力された入力欄190(測定結果情報14に含まれる絶縁抵抗等の測定結果が入力済み)がそれぞれ設けられる。なお、表示処理部212は、測定結果シート情報作成部214から測定結果シート情報15を受け取ることで、測定結果シート画面19を表示部23に表示させるようにしてもよい。 The display processing unit 212 displays the measurement result sheet screen 19 based on the measurement work sheet information 12 created by the measurement work sheet information creation unit 211 and the measurement result information 14 acquired by the measurement result information acquisition unit 213. display on the part 23. The measurement result sheet screen 19 displays the same information as the board diagram information acquisition result screen 17 (see FIG. 7), and also displays the measurement result of the electrical specific value for each branch breaker 101 . Therefore, as shown in FIG. 10, a plurality of circuit number image data 114 and a plurality of load name image data 115 are arranged and arranged on the measurement result sheet screen 19 according to the branch breaker arrangement information. Input fields 190 (in which measurement results such as insulation resistance included in the measurement result information 14 have been input) are provided for inputting measurement results of electrical characteristic values for 101 . The display processing unit 212 may display the measurement result sheet screen 19 on the display unit 23 by receiving the measurement result sheet information 15 from the measurement result sheet information creation unit 214 .

基準値判定部217は、測定作業端末装置3の基準値判定部316と同様の機能を有し、分岐ブレーカ101に対する測定結果として取得された絶縁抵抗と、設定基準値の入力欄191A~191Cにて複数の設定基準値から選択された設定基準値とを比較し、絶縁抵抗が設定基準値以上であるか否かを判定する。そして、基準値判定部217は、その判定結果を、例えば、絶縁抵抗が設定基準値以上であることを示す「良」、及び、絶縁抵抗が設定基準値未満であることを示す「否」として、測定結果シート画面19に表示させる。 The reference value determination unit 217 has the same function as the reference value determination unit 316 of the measurement work terminal device 3, and inputs the insulation resistance obtained as the measurement result for the branch breaker 101 and the set reference value into the input fields 191A to 191C. is compared with a set reference value selected from a plurality of set reference values, and it is determined whether or not the insulation resistance is equal to or greater than the set reference value. Then, the reference value determination unit 217 outputs the determination result as, for example, “good” indicating that the insulation resistance is equal to or greater than the set reference value, and “fail” indicating that the insulation resistance is less than the set reference value. , is displayed on the measurement result sheet screen 19 .

上記の測定結果シート情報15の作成処理において、測定結果シート情報15は、測定結果シート情報作成部214により、盤図11に対する画像処理により取得された測定作業シート情報12と、その測定作業シート情報12に基づいて測定作業シート画面18を表示する測定作業端末装置3及び分電盤測定器4が連携することで取得された測定結果情報14とを組み合わせることで作成される。そのため、作業者は、分電盤10の測定作業に際して記録用紙を用意したり、測定結果を記録用紙に記録したり、測定結果をデータ入力したりといった煩雑な作業を行うことなく、測定結果シート情報15に基づく試験成績表を短時間で正確に作成することができる。 In the process of creating the measurement result sheet information 15 described above, the measurement result sheet information 15 is generated by the measurement result sheet information creation unit 214 by the measurement work sheet information 12 acquired by image processing for the board diagram 11 and the measurement work sheet information It is created by combining the measurement result information 14 acquired by the cooperation of the measurement work terminal device 3 displaying the measurement work sheet screen 18 based on 12 and the distribution board measuring device 4 . Therefore, the operator does not need to prepare a recording sheet, record the measurement results on the recording sheet, or input the data of the measurement results when measuring the distribution board 10, without performing the measurement result sheet. A test report based on the information 15 can be created accurately in a short time.

以上のように、本実施形態に係る分電盤測定作業支援システム1によれば、測定作業端末装置3の表示部33には、測定作業管理装置2によりイメージデータ形式の盤図11から取得された測定作業シート情報12(分岐ブレーカ配置情報と、複数の回路番号画像データ114及び複数の負荷名称画像データ115とを含む)に基づく測定作業シート画面18(図8、図9参照)が表示されるので、作業者は、その測定作業シート画面18を視認しながら分電盤測定器4により複数の分岐ブレーカ101に対する電気特性値の測定作業を行うことで、実物の分電盤10における分岐ブレーカ101の配置と、測定作業シート画面18上の分岐ブレーカ101の配置とを対比しつつ、測定作業シート画面18の入力欄180に表示された電気特性値の測定結果を確認することができる。そして、その測定結果が、測定作業端末装置3により測定結果情報14として自動的に取得(記録)されるとともに、例えば、試験成績表として利用可能な測定結果シート情報15が、測定作業シート情報12及び測定結果情報14に基づいて測定作業管理装置2により作成されるので、作業者は、測定結果の記録やデータ入力といった作業を省略することができる。したがって、分電盤10の測定作業における作業効率の向上と作業ミスの低減を図ることができる。 As described above, according to the distribution board measurement work support system 1 according to the present embodiment, the display unit 33 of the measurement work terminal device 3 displays the data acquired from the board diagram 11 in the image data format by the measurement work management device 2. A measurement work sheet screen 18 (see FIGS. 8 and 9) based on the measurement work sheet information 12 (including branch breaker arrangement information, a plurality of circuit number image data 114, and a plurality of load name image data 115) is displayed. Therefore, the operator can measure the electrical characteristic values of the plurality of branch breakers 101 using the distribution board measuring instrument 4 while visually checking the measurement work sheet screen 18, thereby measuring the branch breakers in the actual distribution board 10. 101 and the arrangement of the branch breakers 101 on the measurement work sheet screen 18, the measurement results of the electrical characteristic values displayed in the input field 180 of the measurement work sheet screen 18 can be confirmed. Then, the measurement result is automatically obtained (recorded) as measurement result information 14 by the measurement work terminal device 3, and measurement result sheet information 15 that can be used as, for example, a test report is converted into measurement work sheet information 12. and the measurement result information 14 by the measurement work management device 2, the operator can omit the work of recording the measurement results and data input. Therefore, it is possible to improve work efficiency and reduce work errors in the measurement work of the distribution board 10 .

(他の実施形態)
以上、本発明の実施形態について説明したが、本発明は上記実施形態に限定されるものではなく、本発明の技術的思想を逸脱しない範囲で適宜変更可能である。
(Other embodiments)
Although the embodiments of the present invention have been described above, the present invention is not limited to the above embodiments, and can be modified as appropriate without departing from the technical idea of the present invention.

例えば、上記実施形態では、測定作業管理装置2及び測定作業端末装置3が、代用データ受付部をそれぞれ備えるものとして説明したが、測定作業管理装置2及び測定作業端末装置3の少なくとも一方が、代用データ受付部を備えていればよい。また、上記実施形態では、測定作業管理装置2及び測定作業端末装置3が、基準値受付部及び基準値判定部をそれぞれ備えるものとして説明したが、測定作業管理装置2及び測定作業端末装置3の少なくとも一方が、基準値受付部及び基準値判定部を備えていればよい。 For example, in the above embodiment, the measurement work management device 2 and the measurement work terminal device 3 are each provided with a substitute data receiving unit, but at least one of the measurement work management device 2 and the measurement work terminal device 3 can substitute All that is necessary is to have a data reception unit. Further, in the above-described embodiment, the measurement work management device 2 and the measurement work terminal device 3 are described as having the reference value reception unit and the reference value determination unit, respectively. At least one of them may include the reference value receiving unit and the reference value determining unit.

また、上記実施形態では、分電盤10が有する複数の分岐ブレーカ101が、図2に示すように、分岐回路103の左右両側に配置される場合について説明したが、分岐ブレーカ101の配置や数は適宜変更されてもよい。例えば、複数の分岐ブレーカ101は、上下両側に設けられていてもよいし、左右片側にだけ設けられていてもよいし、上下片側にだけ設けられていてもよい。 Further, in the above embodiment, a case has been described in which the plurality of branch breakers 101 of the distribution board 10 are arranged on both the left and right sides of the branch circuit 103 as shown in FIG. may be changed as appropriate. For example, the plurality of branch breakers 101 may be provided on both upper and lower sides, may be provided on only one of the left and right sides, or may be provided on one of the upper and lower sides.

また、上記実施形態では、盤図情報取得結果画面17、測定作業シート画面18及び測定結果シート画面19の入力欄が、各分岐ブレーカ101に対して1行ずつ用意されているが、例えば、自主検査時の測定値と、立会検査時の測定値とを別々に入力できるように、各分岐ブレーカ101に対して2行ずつ用意されるようにしてもよい。 In the above-described embodiment, the board diagram information acquisition result screen 17, the measurement work sheet screen 18, and the measurement result sheet screen 19 are provided with one line of input fields for each branch breaker 101; Two lines may be prepared for each branch breaker 101 so that the measured value at the time of inspection and the measured value at the time of witnessed inspection can be input separately.

また、上記実施形態では、測定作業管理プログラム200及び測定作業端末プログラム300は、記憶部20及び記憶部30に記憶されたものとして説明した。これに対し、測定作業管理プログラム200及び測定作業端末プログラム300は、インストール可能な形式又は実行可能な形式のファイルでCD-ROM、DVD等のコンピュータで読み取り可能な記憶媒体に記録されて提供されてもよい。また、測定作業管理プログラム200及び測定作業端末プログラム300は、インターネット等のネットワーク経由でダウンロードさせることにより提供されてもよい。 Further, in the above embodiment, the measurement work management program 200 and the measurement work terminal program 300 have been described as being stored in the storage section 20 and the storage section 30, respectively. On the other hand, the measurement work management program 200 and the measurement work terminal program 300 are recorded in a computer-readable storage medium such as CD-ROM, DVD, etc. and provided as files in an installable format or an executable format. good too. Moreover, the measurement work management program 200 and the measurement work terminal program 300 may be provided by being downloaded via a network such as the Internet.

1…分電盤測定作業支援システム、2…測定作業管理装置、3…測定作業端末装置、
4…分電盤測定器、10…分電盤、11…盤図、12…測定作業シート情報、
13…測定値、14…測定結果情報、15…測定結果シート情報、
16…盤図情報取得画面、17…盤図情報取得結果画面、
18…測定作業シート画面、19…測定結果シート画面、
20…記憶部、21…制御部、22…入力部、23…表示部、24…通信部、
25…外部機器I/F部、26…メディア入出力部、
30…記憶部、31…制御部、32…入力部、33…表示部、34…通信部、
35…外部機器I/F部、36…メディア入出力部、
40…測定器本体、41…測定プローブ、
100…主幹ブレーカ、101…分岐ブレーカ、101a…電源端子部、
101b…負荷端子部、102L…左側ブロック、102R…右側ブロック、
103…分岐回路、110L…左側表領域、110R…右側表領域、
111…回路番号、112…負荷名称、113…結線領域、
114…回路番号画像データ、115…負荷名称画像データ、160…表示領域、
161L…左側表領域指定ボタン、161R…右側表領域指定ボタン、
162…盤図情報取得実行ボタン、163…範囲指定ボックス
181…新設改修指定ボタン、182…検査態様指定ボタン、
183…測定順序指定ボタン、184…測定電圧指定リストボックス、
185…絶縁抵抗基準値選択ボタン、186…測定開始ボタン、
187…測定対象識別情報、188A…良判定情報、188B…否判定情報、
200…測定作業管理プログラム、210…盤図情報取得部、
211…測定作業シート情報作成部、212…表示処理部、
213…測定結果情報取得部、214…測定結果シート情報作成部、
215…代用データ受付部、216…基準値受付部、217…基準値判定部、
300…測定作業端末プログラム、310…測定作業シート情報取得部、
311…表示処理部、312…測定器連携処理部、313…測定結果情報作成部、
314…代用データ受付部、315…基準値受付部、316…基準値判定部
1... Distribution board measurement work support system, 2... Measurement work management device, 3... Measurement work terminal device,
4... distribution board measuring instrument, 10... distribution board, 11... board diagram, 12... measurement work sheet information,
13... Measurement value, 14... Measurement result information, 15... Measurement result sheet information,
16... board information acquisition screen, 17... board information acquisition result screen,
18... Measurement work sheet screen, 19... Measurement result sheet screen,
20... Storage unit, 21... Control unit, 22... Input unit, 23... Display unit, 24... Communication unit,
25... External device I/F section, 26... Media input/output section,
30... Storage unit, 31... Control unit, 32... Input unit, 33... Display unit, 34... Communication unit,
35... External device I/F section, 36... Media input/output section,
40... Measuring instrument main body, 41... Measuring probe,
DESCRIPTION OF SYMBOLS 100... Main breaker, 101... Branch breaker, 101a... Power supply terminal part,
101b... load terminal portion, 102L... left block, 102R... right block,
103...Branch circuit, 110L...Left table area, 110R...Right table area,
111... circuit number, 112... load name, 113... connection area,
114... circuit number image data, 115... load name image data, 160... display area,
161L...Left table area designation button, 161R...Right table area designation button,
162 -- Board map information acquisition execution button, 163 -- Range designation box 181 -- New repair designation button, 182 -- Inspection mode designation button,
183... Measurement order specification button, 184... Measurement voltage specification list box,
185...Insulation resistance reference value selection button, 186...Measurement start button,
187... Measurement object identification information, 188A... Good judgment information, 188B... Bad judgment information,
200... Measurement work management program, 210... Board diagram information acquisition unit,
211 ... measurement work sheet information creation unit, 212 ... display processing unit,
213 ... measurement result information acquisition unit, 214 ... measurement result sheet information creation unit,
215 ... substitute data reception unit, 216 ... reference value reception unit, 217 ... reference value determination unit,
300... measurement work terminal program, 310... measurement work sheet information acquisition unit,
311... display processing unit, 312... measuring instrument cooperation processing unit, 313... measurement result information creating unit,
314... substitute data receiving unit, 315... reference value receiving unit, 316... reference value determining unit

Claims (8)

複数の分岐ブレーカを有する分電盤の測定作業を管理する測定作業管理装置と、
前記測定作業にて使用され、前記分岐ブレーカの電気特性値を測定する分電盤測定器と通信可能に構成された測定作業端末装置とを備える分電盤測定作業支援システムであって、
前記測定作業管理装置は、
前記分電盤の施工図として作成されたイメージデータ形式の盤図に対して画像処理を行い、複数の前記分岐ブレーカが配置された配置状態を示す分岐ブレーカ配置情報と、複数の前記分岐ブレーカにそれぞれ付された回路番号及び負荷名称を含むイメージ領域をそれぞれ切り出した複数の回路番号画像データ及び複数の負荷名称画像データとを取得する盤図情報取得部と、
前記分岐ブレーカ配置情報、複数の前記回路番号画像データ及び複数の前記負荷名称画像データを含む測定作業シート情報を作成する測定作業シート情報作成部と、
前記分電盤測定器により前記電気特性値が測定された測定結果を示す測定結果情報を、前記測定作業端末装置を介して取得する測定結果情報取得部と、
前記測定作業シート情報及び前記測定結果情報に基づいて、測定結果シート情報を作成する測定結果シート情報作成部とを備え、
前記測定作業端末装置は、
前記測定作業管理装置により作成された前記測定作業シート情報を、前記測定作業管理装置から取得する測定作業シート情報取得部と、
前記測定作業シート情報に含まれる前記分岐ブレーカ配置情報に従って複数の前記回路番号画像データ及び複数の前記負荷名称画像データが並べられて配置されるとともに、複数の前記分岐ブレーカに対する前記測定結果の入力欄がそれぞれ設けられた測定作業シート画面を表示部に表示させる表示処理部と、
前記測定作業シート画面において測定対象の前記分岐ブレーカが特定された状態で、前記分電盤測定器から前記電気特性値を受信したとき、当該電気特性値を当該分岐ブレーカに対する前記入力欄に表示させるとともに、当該分岐ブレーカに対する前記測定結果として取得する測定器連携処理部と、
前記測定結果に基づいて、前記測定結果情報を作成する測定結果情報作成部とを備える、
分電盤測定作業支援システム。
a measurement work management device for managing measurement work of a distribution board having a plurality of branch breakers;
A distribution board measurement work support system that is used in the measurement work and includes a distribution board measuring instrument that measures the electrical characteristic value of the branch breaker and a measurement work terminal device configured to be communicable,
The measurement work management device
Image processing is performed on a panel diagram in image data format created as a construction drawing of the distribution panel, branch breaker arrangement information indicating an arrangement state in which the plurality of branch breakers are arranged, and information on the arrangement of the plurality of branch breakers. A board diagram information acquisition unit that acquires a plurality of circuit number image data and a plurality of load name image data obtained by cutting out an image area including the circuit number and the load name respectively attached,
a measurement work sheet information creation unit that creates measurement work sheet information including the branch breaker arrangement information, the plurality of circuit number image data, and the plurality of load name image data;
a measurement result information acquisition unit configured to acquire, via the measurement operation terminal device, measurement result information indicating the measurement result of the electrical characteristic value measured by the distribution board measuring device;
a measurement result sheet information creation unit that creates measurement result sheet information based on the measurement work sheet information and the measurement result information;
The measurement work terminal device
a measurement work sheet information acquisition unit that acquires the measurement work sheet information created by the measurement work management device from the measurement work management device;
A plurality of the circuit number image data and a plurality of the load name image data are aligned and arranged according to the branch breaker arrangement information included in the measurement work sheet information, and an input field for the measurement results for the plurality of branch breakers. a display processing unit that causes the display unit to display a measurement work sheet screen provided with
When the electrical characteristic value is received from the distribution board measuring device in a state where the branch breaker to be measured is specified on the measurement work sheet screen, the electrical characteristic value is displayed in the input field for the branch breaker. together with a measuring instrument cooperation processing unit that acquires the measurement result for the branch breaker;
a measurement result information creation unit that creates the measurement result information based on the measurement result,
Distribution board measurement work support system.
前記測定作業管理装置及び前記測定作業端末装置の少なくとも一方は、
前記回路番号画像データ又は前記負荷名称画像データに対して、当該回路番号画像データ又は当該負荷名称画像データの代用データとなる回路番号テキストデータ又は負荷名称テキストデータを受け付ける代用データ受付部をさらに備える、
請求項1に記載の分電盤測定作業支援システム。
At least one of the measurement work management device and the measurement work terminal device
Further comprising a substitute data reception unit that receives circuit number text data or load name text data as substitute data for the circuit number image data or the load name image data, for the circuit number image data or the load name image data;
The distribution board measurement work support system according to claim 1.
前記電気特性値は、
絶縁抵抗であり、
前記測定作業管理装置及び前記測定作業端末装置の少なくとも一方は、
前記絶縁抵抗に対する基準値として複数の設定基準値を受け付ける基準値受付部と、
前記分岐ブレーカに対する前記測定結果として取得された前記絶縁抵抗と、複数の前記設定基準値から選択された前記設定基準値とを比較し、前記絶縁抵抗が前記設定基準値以上であるか否かを判定する基準値判定部とをさらに備える、
請求項1又は請求項2に記載の分電盤測定作業支援システム。
The electrical characteristic value is
is the insulation resistance,
At least one of the measurement work management device and the measurement work terminal device
a reference value receiving unit that receives a plurality of set reference values as reference values for the insulation resistance;
comparing the insulation resistance obtained as the measurement result for the branch breaker with the set reference value selected from the plurality of set reference values, and determining whether the insulation resistance is equal to or greater than the set reference value; Further comprising a reference value determination unit for determining,
The distribution board measurement work support system according to claim 1 or 2.
前記測定器連携処理部は、
前記測定対象の前記分岐ブレーカを示す測定対象識別情報を前記測定作業シート画面に表示させ、
前記分電盤測定器から前記電気特性値を受信することで当該分岐ブレーカに対する前記測定結果を取得したとき、当該分岐ブレーカに対して縦方向又は横方向に隣接する前記分岐ブレーカに対して前記測定対象識別情報を表示させる、
請求項1乃至請求項3のいずれか一項に記載の分電盤測定作業支援システム。
The measuring instrument cooperation processing unit
displaying measurement target identification information indicating the branch breaker to be measured on the measurement work sheet screen;
When the measurement result for the branch breaker is obtained by receiving the electrical characteristic value from the distribution board measuring instrument, the measurement is performed for the branch breaker adjacent to the branch breaker in the vertical direction or the horizontal direction. display object identification information,
The distribution board measurement work support system according to any one of claims 1 to 3.
複数の分岐ブレーカを有する分電盤の施工図として作成されたイメージデータ形式の盤図に対して画像処理を行い、複数の前記分岐ブレーカが配置された配置状態を示す分岐ブレーカ配置情報と、複数の前記分岐ブレーカにそれぞれ付された回路番号及び負荷名称を含むイメージ領域をそれぞれ切り出した複数の回路番号画像データ及び複数の負荷名称画像データとを取得する盤図情報取得部と、
前記分岐ブレーカ配置情報、複数の前記回路番号画像データ及び複数の前記負荷名称画像データを含む測定作業シート情報を作成する測定作業シート情報作成部とを備える、
測定作業管理装置。
Image processing is performed on a panel diagram in an image data format created as a construction drawing of a distribution board having a plurality of branch breakers, and branch breaker arrangement information indicating an arrangement state in which the plurality of branch breakers are arranged; A board diagram information acquisition unit for acquiring a plurality of circuit number image data and a plurality of load name image data obtained by cutting out image areas containing circuit numbers and load names respectively attached to the branch breakers of
a measurement work sheet information creation unit that creates measurement work sheet information including the branch breaker arrangement information, the plurality of circuit number image data, and the plurality of load name image data;
Measurement work management device.
複数の分岐ブレーカを有する分電盤の施工図として作成されたイメージデータ形式の盤図から取得された測定作業シート情報であって、複数の前記分岐ブレーカが配置された配置状態を示す分岐ブレーカ配置情報と、複数の前記分岐ブレーカにそれぞれ付された回路番号及び負荷名称を含むイメージ領域がそれぞれ切り出された複数の回路番号画像データ及び複数の負荷名称画像データとを含む前記測定作業シート情報を取得する測定作業シート情報取得部と、
前記測定作業シート情報に含まれる前記分岐ブレーカ配置情報に従って複数の前記回路番号画像データ及び複数の前記負荷名称画像データが並べられて配置されるとともに、複数の前記分岐ブレーカに対する測定結果の入力欄がそれぞれ設けられた測定作業シート画面を表示部に表示させる表示処理部と、
前記測定作業シート画面において測定対象の前記分岐ブレーカが特定された状態で、前記分岐ブレーカの電気特性値を測定する分電盤測定器から前記電気特性値を受信したとき、当該電気特性値を当該分岐ブレーカに対する前記入力欄に表示させるとともに、当該分岐ブレーカに対する前記測定結果として取得する測定器連携処理部とを備える、
測定作業端末装置。
Branch breaker arrangement measurement work sheet information acquired from a board drawing in image data format created as a construction drawing of a distribution board having a plurality of branch breakers, the branch breaker arrangement indicating the arrangement state in which the plurality of branch breakers are arranged. a plurality of circuit number image data and a plurality of load name image data obtained by cutting out an image area including the circuit number and the load name attached to each of the plurality of branch breakers; a measurement work sheet information acquisition unit that
A plurality of the circuit number image data and a plurality of the load name image data are arranged and arranged according to the branch breaker arrangement information included in the measurement work sheet information, and an input field for measurement results for the plurality of branch breakers is provided. a display processing unit for displaying a measurement work sheet screen provided for each on a display unit;
In a state where the branch breaker to be measured is specified on the measurement work sheet screen, when the electrical characteristic value is received from a distribution board measuring instrument for measuring the electrical characteristic value of the branch breaker, the electrical characteristic value is a measuring instrument cooperation processing unit that displays in the input field for the branch breaker and obtains the measurement result for the branch breaker,
Measuring work terminal equipment.
コンピュータを、
請求項1乃至請求項4のいずれか一項に記載の測定作業管理装置が備える各部として機能させる、
測定作業管理プログラム。
the computer,
Functioning as each unit included in the measurement work management device according to any one of claims 1 to 4,
Measurement work management program.
コンピュータを、
請求項1乃至請求項4のいずれか一項に記載の測定作業端末装置が備える各部として機能させる、
測定作業端末プログラム。
the computer,
Functioning as each unit included in the measurement work terminal device according to any one of claims 1 to 4,
Measurement work terminal program.
JP2021071556A 2021-04-21 2021-04-21 Distribution board measurement work support system, measurement work management device, measurement work terminal device, measurement work management program, and measurement work terminal program Active JP7216763B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2021071556A JP7216763B2 (en) 2021-04-21 2021-04-21 Distribution board measurement work support system, measurement work management device, measurement work terminal device, measurement work management program, and measurement work terminal program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2021071556A JP7216763B2 (en) 2021-04-21 2021-04-21 Distribution board measurement work support system, measurement work management device, measurement work terminal device, measurement work management program, and measurement work terminal program

Publications (2)

Publication Number Publication Date
JP2022166383A JP2022166383A (en) 2022-11-02
JP7216763B2 true JP7216763B2 (en) 2023-02-01

Family

ID=83851499

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2021071556A Active JP7216763B2 (en) 2021-04-21 2021-04-21 Distribution board measurement work support system, measurement work management device, measurement work terminal device, measurement work management program, and measurement work terminal program

Country Status (1)

Country Link
JP (1) JP7216763B2 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016166761A (en) 2015-03-09 2016-09-15 日置電機株式会社 Measurement data processor, measurement system, and measurement data processing program
JP2020034365A (en) 2018-08-29 2020-03-05 日置電機株式会社 Measured data processing device, measuring system, and measured data processing program
JP2020076601A (en) 2018-11-06 2020-05-21 日置電機株式会社 Measurement data processing device, measurement system and measurement data processing program
JP2020190811A (en) 2019-05-20 2020-11-26 日置電機株式会社 Portable terminal, measurement system, and program

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100741507B1 (en) * 2005-12-27 2007-07-20 주식회사 케이이피 System for electrical safety diagnostic using Personal Digital Assistants

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016166761A (en) 2015-03-09 2016-09-15 日置電機株式会社 Measurement data processor, measurement system, and measurement data processing program
JP2020034365A (en) 2018-08-29 2020-03-05 日置電機株式会社 Measured data processing device, measuring system, and measured data processing program
JP2020076601A (en) 2018-11-06 2020-05-21 日置電機株式会社 Measurement data processing device, measurement system and measurement data processing program
JP2020190811A (en) 2019-05-20 2020-11-26 日置電機株式会社 Portable terminal, measurement system, and program

Also Published As

Publication number Publication date
JP2022166383A (en) 2022-11-02

Similar Documents

Publication Publication Date Title
JPS6332604A (en) System and method for controlling mechanical process by computer
US10410124B1 (en) Display for displaying lifting capacity of a lifting machine and related methods
JP7167386B1 (en) Indication content output system, indication content output method and program
JP2016126769A (en) Inspection result output device, inspection result output method, and program
US20200125245A1 (en) Control device, communication terminal, and control system
CN113420355A (en) Floor processing method and device and electronic equipment
JP7312581B2 (en) Concrete structure management device, information processing system, concrete structure management method, and program
JP7216763B2 (en) Distribution board measurement work support system, measurement work management device, measurement work terminal device, measurement work management program, and measurement work terminal program
JP7554889B2 (en) CONCRETE STRUCTURE MANAGEMENT DEVICE, INFORMATION PROCESSING SYSTEM, CONCRETE STRUCTURE MANAGEMENT METHOD, AND PROGRAM
JP2024019350A (en) Information processing apparatus, information processing method, and program
JP6993112B2 (en) Strength evaluation method and strength evaluation program for train line support structures
JP2009174977A (en) Inspection device and inspection program for electronic component
JP2013164313A (en) Screen display data editing device and screen display editing method
JP2006190115A (en) Program and system for designing/managing conductor path of optical cable
JP2021069177A (en) Information processing device, method using information processing device, and program to cause information processing device to execute procedure
JP2020095493A (en) Facility inspection support program, facility inspection support method, and facility inspection support system
WO2024180697A1 (en) Determination result output system, determination result output method, and program
JP2023101398A (en) Information processing device and information processing method
WO2024180692A1 (en) Pass/fail determination system, pass/fail determination method, and program
KR102321077B1 (en) Safty inspection service using interworking of column screen and legend screen
WO2024180699A1 (en) Electronic slate output system, determination result output method, and program
JP2002149869A (en) Forming method of garage certificate application and formation support system thereof
JP2024027898A (en) Information processing apparatus, information processing method, information processing program, and information processing system
JP7387406B2 (en) Information provision device, information provision method, and program
WO2022254564A1 (en) Construction work management system, construction work management method, and program

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20211101

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20230111

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20230120

R150 Certificate of patent or registration of utility model

Ref document number: 7216763

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150