JP7191762B2 - Temporary snow fence - Google Patents

Temporary snow fence Download PDF

Info

Publication number
JP7191762B2
JP7191762B2 JP2019078349A JP2019078349A JP7191762B2 JP 7191762 B2 JP7191762 B2 JP 7191762B2 JP 2019078349 A JP2019078349 A JP 2019078349A JP 2019078349 A JP2019078349 A JP 2019078349A JP 7191762 B2 JP7191762 B2 JP 7191762B2
Authority
JP
Japan
Prior art keywords
bolt
main
fence
pillars
temporary
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2019078349A
Other languages
Japanese (ja)
Other versions
JP2020176419A (en
Inventor
博幸 田中
みなみ 荒木
泰地 河越
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
East Japan Railway Co
Original Assignee
East Japan Railway Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by East Japan Railway Co filed Critical East Japan Railway Co
Priority to JP2019078349A priority Critical patent/JP7191762B2/en
Publication of JP2020176419A publication Critical patent/JP2020176419A/en
Application granted granted Critical
Publication of JP7191762B2 publication Critical patent/JP7191762B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
  • Mutual Connection Of Rods And Tubes (AREA)

Description

本発明は、仮設用の防雪柵に関し、特に鉄道の線路脇の軌道から離れた位置に設置して有効な吹きだめ式の仮設防雪柵に関するものである。 TECHNICAL FIELD The present invention relates to a temporary snow fence, and more particularly to a snow trap type temporary snow fence that is effective when installed at a position away from the railroad tracks.

冬季に積雪が多い地域においては、風によって運ばれて来る雪が鉄道線路上へ堆積して列車の運行を妨げることがある。そこで、風による吹きだまりの発生を減らすために線路脇に防雪柵が設置されることがある。防雪柵には、防雪の仕方の違いから吹きだめ式や吹き止め式、吹き払い式があり、さらに常設柵と仮設柵がある。吹き止め式は、軌道の近傍に設置すると防雪の効果が高いため、常設柵と設置されることが多い。しかし、特に強い風が吹く区間では、常設柵を設置する場合、強度が非常に高い柵を設置しなくてはならず、膨大な費用を要するという課題がある。 In areas with heavy snowfall in winter, wind-blown snow accumulates on railroad tracks and hinders train operations. Therefore, in order to reduce the occurrence of snowdrifts caused by the wind, snow fences are sometimes installed beside the tracks. Depending on the method of snow protection, snow protection fences are classified into the snow storage type, the blowing off type, and the blowing off type, and there are permanent fences and temporary fences. The blow-stop type is often installed with a permanent fence because it is highly effective in preventing snow when installed near the track. However, in sections where particularly strong winds blow, when installing a permanent fence, it is necessary to install a fence with extremely high strength, which poses the problem of requiring enormous costs.

一方、吹きだめ式の防雪柵は、軌道から数10メートル離れた位置に設置して、柵と軌道とのスペースに吹きだまりを生じさせることで、線路上への吹きだまりの発生を減らすというもので、風を完全に遮断するのではなく逃がす機能を有しており、それほど高い強度を必要としないので設置コストを抑えることができるが、線路脇に吹きだまりを生じさせる広いスペースを必要とする。そのため、常設柵とするには用地買収が必要になってしまう。そこで、強い風が吹く区間では、冬の間だけ線路脇の畑等の期間限定で借り受けた土地に、線路上への吹きだまりの発生を減らすため仮設の防雪柵を設置する方策が採用されている。 On the other hand, a drift-type snow fence is installed several tens of meters away from the track, and by creating a drift in the space between the fence and the track, it is possible to reduce the occurrence of drift on the track. It has the function of letting the wind escape rather than blocking it completely, and it does not require a very high strength, so installation costs can be kept down, but it requires a large space that creates drifts on the side of the track. Therefore, land acquisition is required to make it a permanent fence. Therefore, in sections where strong winds blow, temporary snow fences are installed on land that is rented for a limited period only during the winter, such as fields beside the tracks, to reduce the occurrence of snowdrifts on the tracks. .

特開平8-205348号公報JP-A-8-205348

従来の吹きだめ式の仮設防雪柵には、例えば直線上に並べて設置した複数の主柱間に横架した複数の横棒によって風を減衰させるためのスノコをほぼ垂直姿勢に保持するとともに、各主柱の前後にそれぞれ打ち込んだ2本の杭と主柱の上方部との間に斜め方向の控柱を設けて柱同士を紐で結合し、各主柱を前後から支えるように構成したものがある。
上記のような構成を有する従来の仮設防雪柵は、主柱および控柱として木材(丸太)を使用するとともに、主柱と控柱とを結合する紐として縄を用い、スノコも植物由来の材料で形成されたものが用いられていた。そのため、柵の耐用年数が短いとともに、結合用の紐(縄)は使い捨てであったため長期的に見た時のコストが高くつく。また、作業に熟練を要するとともに多くの人手を必要とし、構築に要するのべ作業時間が長いという課題があった。
Conventional snowdrift-type temporary snow fences, for example, have horizontal bars suspended between main pillars arranged in a straight line to attenuate the wind. A structure in which two piles driven into the front and rear of the main pillar and the upper part of the main pillar are connected to each other by connecting the pillars with strings to support each main pillar from the front and back. There is
The conventional temporary snow fence with the above structure uses lumber (logs) as the main posts and the stay posts, rope is used as the string that connects the main posts and the stay posts, and the drainboard is also made of plant-derived material. was used. Therefore, the useful life of the fence is short, and since the binding string (rope) is disposable, the long-term cost is high. In addition, there is a problem that the work requires skill and a lot of manpower, and the total work time required for construction is long.

なお、仮設防雪柵に関する発明としては、複数の防雪板を上下方向に平行に並べた状態で主柱により保持し、さらに主柱を斜め下方から支える控柱を設けるとともに、主柱を折り畳み可能に構成することによって、解体後の格納を容易にするようにしたものがある(特許文献1)。しかし、上記防雪柵は、特許文献1の公報に記載されているように、道路脇の路肩に設置される吹き払い式の防雪柵に関するものであり、軌道から数10メートル離れた位置に設置される吹きだめ式の防雪柵として使用するには不向きである。 In addition, as an invention related to temporary snow fences, multiple snow protection plates are arranged in parallel in the vertical direction and held by the main pillars. There is a structure that facilitates storage after disassembly (Patent Document 1). However, as described in the publication of Patent Document 1, the above-mentioned snow fence relates to a blow-off type snow fence installed on the shoulder of the road, and is installed at a position several tens of meters away from the track. It is unsuitable for use as a drift-type snow fence.

本発明は上記のような問題点に着目してなされたもので、多くの人手および熟練を必要とせずに短時間で構築することができ、のべ作業時間を短縮することができる吹きだめ式の仮設防雪柵を提供することを目的とする。
本発明の他の目的は、構成する部品の耐用年数を高めることができ、それによって長期的に見た時のコストを低減することができる吹きだめ式の仮設防雪柵を提供することを目的とする。
The present invention has been made in view of the above-mentioned problems, and can be constructed in a short time without requiring many manpower and skills, and can shorten the total working time. The purpose is to provide a temporary snow fence.
Another object of the present invention is to provide a drift-type temporary snow fence that can increase the service life of the constituent parts, thereby reducing costs in the long run. do.

上記課題を解決するために、本発明は、
1本の線上に沿って所定の間隔で立設された複数本の主柱と、前記複数本の主柱のそれぞれの間に張設された複数枚のネットと、前記複数本の主柱をそれぞれ斜め下方から支える複数本の控柱と、前記複数本の控柱のそれぞれの下端を地面に固定するための複数本の杭とを有する仮設防雪柵において、
前記複数枚のネットは、それぞれ少なくとも上縁および下縁に袋部が形成され、両端に係止金具を備え前記上縁および下縁に形成された袋部にそれぞれ挿通され2本の主柱間に水平状態で横架された少なくとも2本の横棒によってほぼ垂直な姿勢にて張設され、
前記複数本の主柱の所定高さ位置にはそれぞれ水平方向に突出する締結用ネジが植設され、
前記係止金具には、前記締結用ネジの頭部が挿通可能な大きさの円形穴と、前記頭部よりも小さく前記締結用ネジの軸部の径よりも大きな幅を有し前記円形穴の上方にて水平方向に沿って設けられた長穴と、前記円形穴と前記長穴を接続する連通部と、を有するだるま穴が形成されており、前記係止金具は前記締結用ネジの軸部が前記長穴内に位置した状態で前記締結用ネジによって対応する前記主柱に結合されているように構成したものである。
In order to solve the above problems, the present invention
A plurality of main pillars erected at predetermined intervals along a single line, a plurality of nets stretched between each of the plurality of main pillars, and the plurality of main pillars. A temporary snow guard fence having a plurality of stay pillars each supporting from diagonally below and a plurality of piles for fixing the lower ends of each of the plurality of stay pillars to the ground,
Each of the plurality of nets has a bag portion formed at least on the upper edge and the lower edge thereof, and has locking metal fittings at both ends thereof, and is inserted through the bag portions formed on the upper edge and the lower edge. stretched in a substantially vertical posture by at least two horizontal bars horizontally placed on the
Fastening screws protruding in the horizontal direction are implanted at predetermined height positions of the plurality of main pillars,
The locking fitting has a circular hole with a size that allows the head of the fastening screw to pass through, and a circular hole with a width that is smaller than the head and greater than the diameter of the shaft of the fastening screw. A daruma hole having an elongated hole provided along the horizontal direction above and a communicating portion connecting the circular hole and the elongated hole is formed, and the locking fitting is the fastening screw. The shaft portion is configured to be coupled to the corresponding main column by the fastening screw while positioned in the elongated hole.

上記のような構成を有する仮設防雪柵によれば、ネットの上縁および下縁に形成された袋部にそれぞれ両端に係止金具を備えた横棒(支持パイプ)を挿通し、横棒を持ち上げて端部の係止金具にあるだるま穴を主柱に設けられている締結用ネジ(ピンボルト)に係合させることで、簡単に横棒を主柱間に横架させてネットを垂下させることができる。また、係止金具が係合された締結用ネジ(ピンボルト)を回して締め付けるだけで横棒を主柱に固定することができるため、多くの人手や熟練を必要とせずに短時間で仮設防雪柵を構築することができ、のべ作業時間を短縮することができる。 According to the temporary snow fence having the above configuration, horizontal rods (support pipes) having locking fittings at both ends are inserted into the bag portions formed at the upper and lower edges of the net, and the horizontal rods are By lifting it up and engaging the bolt holes in the locking metal fittings at the ends with the fastening screws (pin bolts) provided on the main pillars, the horizontal rods can be easily hung between the main pillars to allow the net to hang down. be able to. In addition, since the horizontal rod can be fixed to the main pillar simply by turning and tightening the fastening screw (pin bolt) engaged with the locking fitting, the temporary snow protection can be completed in a short period of time without the need for a lot of manpower or skill. A fence can be constructed and the total work time can be shortened.

ここで、望ましくは、前記係止金具に設けられている前記だるま穴の長穴は、中央が上方へ向かって膨らむように湾曲して形成されているようにする。
かかる構成によれば、ネットの袋部に挿通された横棒(支持パイプ)の両端が係止される2本の主柱の上端の高さがずれた状態で設置されることで、横棒が水平面に対して傾斜した姿勢で支持されたとしても、ピンボルトとの接線が水平となるので、横棒を均等に支持することができ、防雪柵を安定した状態に構築することができる。
Here, desirably, the long hole of the daruma hole provided in the locking metal fitting is curved so that the center bulges upward.
According to such a configuration, the horizontal rods (support pipes) inserted through the bag portion of the net are locked at the two ends of the main pillars. Even if the pole is supported in an inclined posture with respect to the horizontal plane, the tangential line to the pin bolt becomes horizontal, so that the horizontal bar can be evenly supported and the snow guard fence can be constructed in a stable state.

また、望ましくは、前記複数枚のネットは、上縁と下縁との間にそれぞれ第3の袋部が形成され、該第3の袋部には、両端に前記係止金具を備えた第3の横棒がそれぞれ挿通され、前記第3の横棒の両端の前記係止金具は前記主柱の対応する位置に設けられた締結用ネジに結合されているようにする。
これにより、ネットの上縁と下縁との間に第3の袋部が形成されこの袋部に第3の横棒が挿通されて、両端の係止金具によって主柱に結合されるため、ネットの高さ方向の長さが長くても風により大きく膨らんで防雪効果が低下するのを回避することができる。
Preferably, each of the plurality of nets has a third bag portion formed between an upper edge and a lower edge, and each of the third bag portions is provided with the locking fittings at both ends. 3 horizontal rods are respectively inserted, and the locking metal fittings at both ends of the third horizontal rod are coupled to fastening screws provided at corresponding positions of the main pillar.
As a result, a third bag portion is formed between the upper edge and the lower edge of the net, and the third horizontal bar is inserted through this bag portion and coupled to the main pole by locking metal fittings at both ends. Even if the length of the net in the height direction is long, it is possible to prevent the net from greatly expanding due to the wind and lowering the snowproof effect.

また、望ましくは、前記複数本の杭は、下部にそれぞれ螺旋刃が形成されたアンカー杭であり、
前記控柱の下端部と前記アンカー杭は、頭部が山形をなすUボルトと該Uボルトの2本の脚部がそれぞれ挿通される2個のボルト挿通穴を有するベースプレートと前記Uボルトの2本の脚部に螺合される2個のナットとを備えた複数組の結合金具によって結合されているようにする。
上記のような構成によれば、下部にそれぞれ螺旋刃が形成されたアンカー杭を用いているため、控柱を固定する杭を容易に地中へ打設することができるとともに、頭部が山形をなすUボルトを有する複数組の結合金具を用いて控柱の下部と杭とを結合するため、控柱との結合強度を高めることができる。
Preferably, the plurality of piles are anchor piles each having a helical blade formed at the bottom,
The lower end of the stay pillar and the anchor pile have a U bolt with a chevron-shaped head and two bolt insertion holes into which the two legs of the U bolt are inserted, respectively. It is connected by a plurality of sets of fittings with two nuts screwed onto the legs of the book.
According to the above-described configuration, since the anchor piles each having a helical blade formed at the bottom thereof are used, the piles for fixing the stand-up posts can be easily driven into the ground, and the heads thereof are chevron-shaped. Since a plurality of sets of fittings having U bolts are used to connect the lower part of the brace and the pile, the strength of the connection with the brace can be increased.

さらに、望ましくは、前記アンカー杭は、少なくとも上部の断面が円形をなし、
前記Uボルトは、前記2本の脚部の間隔が前記アンカー杭の径の1.5~2.5倍の大きさを有するように形成され、
前記ベースプレートに形成されている前記2個のボルト挿通穴は前記Uボルトの2本の脚部の並びと同一の方向に沿って長い長穴として形成され、
前記ベースプレートが前記控柱の下端部に接合し、前記Uボルトの内側が前記アンカー杭の上部に接合した状態で、前記控柱と前記アンカー杭とが前記結合金具によって結合されているようにする。
上記のような構成によれば、杭と控柱の傾き(角度)がずれたとしても、Uボルトの脚部が長穴内部で移動することで杭と控柱の傾きのずれを吸収しつつ両者を強固に結合することができ、それによって設置された防雪柵の安定性を高めることができる。
Further, desirably, the anchor pile has a circular cross-section at least at the top,
The U-bolt is formed so that the distance between the two legs is 1.5 to 2.5 times the diameter of the anchor pile,
The two bolt insertion holes formed in the base plate are formed as elongated holes along the same direction as the alignment of the two legs of the U-bolt,
The base plate is joined to the lower end of the stay pillar, and the inside of the U-bolt is joined to the upper part of the anchor pile, and the stay pillar and the anchor pile are joined by the joint fitting. .
According to the configuration as described above, even if the inclination (angle) of the pile and the stay pillar is misaligned, the leg of the U bolt moves inside the long hole, thereby absorbing the inclination deviation of the pile and the stay pillar. Both can be strongly combined, thereby increasing the stability of the installed snow fence.

本発明に係る仮設防雪柵およびその構築方法によれば、多くの人手および熟練を必要とせずに短時間で構築することができ、のべ作業時間を短縮することができる。また、仮設防雪柵を構成する部品の耐用年数を高めることができ、それによって長期的に見た時のコストを低減することができるという効果がある。 According to the temporary snow fence and the construction method thereof according to the present invention, it can be constructed in a short time without requiring many manpower and skill, and the total work time can be shortened. In addition, it is possible to increase the service life of the parts that constitute the temporary snow fence, which has the effect of reducing costs in the long term.

本発明に係る仮設防雪柵の一実施形態を示す斜視図である。BRIEF DESCRIPTION OF THE DRAWINGS It is a perspective view which shows one Embodiment of the temporary snow fence which concerns on this invention. 実施形態の仮設防雪柵を構成する主柱と左右の控柱との連結構造の一例を示す要部拡大斜視図である。Fig. 2 is an enlarged perspective view of a main part showing an example of a connection structure between a main pole and left and right standoff poles that constitute the temporary snow fence of the embodiment; 実施形態の仮設防雪柵を構成する主柱と支持パイプとネットとの関係を示す要部拡大斜視図である。Fig. 3 is an enlarged perspective view of a main part showing the relationship between main posts, support pipes, and nets that constitute the temporary snow fence of the embodiment; 実施形態の仮設防雪柵を構成する端部の主柱とネットとの関係を示す拡大斜視図である。It is an enlarged perspective view which shows the relationship between the main pillar of the edge part which comprises the temporary snow fence of embodiment, and a net. (A)は実施形態の仮設防雪柵を構成する支持パイプ(横棒)の一例を示す正面図、(B)は端部の拡大斜視図である。(A) is a front view showing an example of a support pipe (horizontal bar) that constitutes the temporary snow guard fence of the embodiment, and (B) is an enlarged perspective view of the end. (A)は実施形態の仮設防雪柵を構成するアンカー杭の構成例を示す正面図、(B)はアンカー杭を地中に設置した状態を示す拡大斜視図である。(A) is a front view showing a configuration example of an anchor pile that constitutes the temporary snow protection fence of the embodiment, and (B) is an enlarged perspective view showing a state in which the anchor pile is installed underground. アンカー杭への控柱の結合手段(山形Uボルト)の構成例を示すもので、(A)は結合手段の分解正面図、(B)はベースプレートを示す平面図である。FIG. 10 shows a configuration example of connecting means (angle U-bolt) of a stand-up post to an anchor pile, (A) is an exploded front view of the connecting means, and (B) is a plan view showing a base plate.

以下、図面を参照しながら、本発明に係る仮設防雪柵およびその構築方法の実施形態について説明する。
図1には、本発明に係る仮設防雪柵の一実施形態の斜視図が示されている。図1に示すように、本実施形態の仮設防雪柵は、直線上に並べて設置した複数の主柱11A~11F間にそれぞれ風を減衰させるためのネット12A~12Eがほぼ垂直姿勢となるように張設されている。また、主柱11A~11Fには、中間部よりやや上の位置から斜め下方へ向かって延びる2本の控柱13A,13Bがそれぞれ設けられている。
EMBODIMENT OF THE INVENTION Hereinafter, embodiment of the temporary snow fence which concerns on this invention, and its construction method is described, referring drawings.
FIG. 1 shows a perspective view of one embodiment of a temporary snow fence according to the present invention. As shown in FIG. 1, the temporary snow guard fence of this embodiment has nets 12A to 12E for attenuating the wind between a plurality of main pillars 11A to 11F arranged in a straight line so that they are in a substantially vertical posture. is stretched. Each of the main posts 11A to 11F is provided with two standoff posts 13A and 13B extending obliquely downward from a position slightly above the intermediate portion.

特に限定されるものでないが、上記主柱11A~11F及び控柱13A,13Bは角柱パイプで形成されている。また、主柱11A~11Fの下端には、側面視で台形をなす台座部が設けられており、台座部の下面を地面に載置させることで、高さを揃えることができるようになっている。
一方、控柱13A,13Bの下端部は、後述するように地中に打設されたアンカー杭に結合され、アンカー杭を介して地面にしっかりと固定され、主柱11A~11Fを前後から支えるように構成されている。
Although not particularly limited, the main pillars 11A to 11F and the standoff pillars 13A and 13B are formed of prismatic pipes. In addition, at the lower ends of the main pillars 11A to 11F, pedestals that form a trapezoid when viewed from the side are provided. there is
On the other hand, the lower ends of the standoff pillars 13A and 13B are connected to anchor piles driven into the ground as will be described later, and are firmly fixed to the ground via the anchor piles to support the main pillars 11A to 11F from the front and rear. is configured as

さらに、上記主柱11A~11Fのうち両端に位置する主柱11Aと11Fのネットと反対側の側部には、上端部から左右斜め下方へ向かって延びる2本の側部控柱13C,13Dがそれぞれ設けられ、側部控柱13C,13Dによって主柱11A,11Fを介して柵全体を左右から支えるように構成されている。
側部控柱13C,13Dの上端は、図2に示すように、主柱11A(11F)の上端部に固着されたブラケット14に、ピンボルト15によって回転可能に連結されている。図示しないが、前後の控柱13A,13Bも上端が各主柱11A~11Fの中間部にピンボルトによって回転可能に連結されている。これによって、控柱13A,13Bおよび13C,13Dは、折り畳み可能な構成となっている。
Further, on the sides of the main posts 11A and 11F located at both ends of the main posts 11A to 11F opposite to the net, there are two side stay posts 13C and 13D extending obliquely downward to the left and right from the upper ends. are provided respectively, and are configured to support the entire fence from the left and right via the main posts 11A and 11F by the side braces 13C and 13D.
The upper ends of the side stay posts 13C and 13D are rotatably connected by pin bolts 15 to brackets 14 fixed to the upper ends of the main posts 11A (11F), as shown in FIG. Although not shown, the upper ends of the front and rear standoff posts 13A and 13B are also rotatably connected to intermediate portions of the main posts 11A to 11F by pin bolts. As a result, the stay posts 13A, 13B and 13C, 13D are configured to be foldable.

また、図2および図3に示すように、各主柱11の前面と背面には、ネット12を垂下する支持パイプ16の端部の係止金具61を係止するためのピンボルト17A,17Bがそれぞれ植設されている。ピンボルト17A,17Bにはそれぞれ一対のナットが螺合されており、一対のナットで係止金具61を挟持することで支持パイプ16の端部を主柱11に結合するように構成されている。
一方、上記ネット12A~12Eは耐久性の高い合成樹脂繊維で形成されており、透過率は設置される区間における想定風速に応じて選択される。具体的には、想定風速が7~13m/秒の区間では、例えば60%程度の透過率のものを選択すると良い。
As shown in FIGS. 2 and 3, pin bolts 17A and 17B are provided on the front and rear surfaces of each main column 11 for locking metal fittings 61 at the ends of the support pipes 16 from which the net 12 hangs. planted respectively. A pair of nuts are screwed to each of the pin bolts 17A and 17B, and the ends of the support pipe 16 are connected to the main column 11 by holding the locking fitting 61 between the pair of nuts.
On the other hand, the nets 12A to 12E are made of highly durable synthetic resin fibers, and the transmittance is selected according to the assumed wind speed in the installation section. Specifically, in the section where the assumed wind speed is 7 to 13 m/sec, it is preferable to select a material with a transmittance of about 60%, for example.

また、各ネット12A~12Eは、上端と下端に沿って直径5cm程度のパイプを挿通可能な大きさの袋部21a,21bがそれぞれ設けられているとともに、中間部にも同様な大きさの袋部21cが水平方向に沿ってそれぞれ設けられている。そして、各ネット12A~12Eは袋部21aに挿通された支持パイプ16によって垂下され、袋部21b,21c挿通されたパイプによって撓みが抑制されるように構成されている。
なお、各袋部21a~21cは、帆布のような丈夫な生地で形成され、ネットの端部を挟持した状態で縫製されている。
Each of the nets 12A to 12E is provided with bag portions 21a and 21b having a size through which a pipe having a diameter of about 5 cm can be inserted along the upper end and the lower end, respectively, and a bag of the same size is provided in the intermediate portion. A portion 21c is provided along the horizontal direction. Each of the nets 12A to 12E is suspended by the support pipe 16 inserted through the bag portion 21a, and is configured to be restrained from bending by the pipes inserted through the bag portions 21b and 21c.
Each of the bag portions 21a to 21c is made of strong fabric such as canvas, and is sewn while holding the ends of the net.

さらに、各ネット12A~12Eの左右の端には、図3に示すように、補強部22a,22bが形成されている。そして、補強部22a,22bには、所定の間隔をおいて、紐を通す複数の穴23が形成され、穴23の縁にはハトメが被着されているとともに、これらの穴23に対応して主柱11A~11Fには対をなす係止ピン30が植設されている。
そのため、上記各穴23に紐を通して、対応する主柱11の係止ピン30に絡めるようにして結びつけることで、各ネット12A~12Eの両端を主柱11A~11Fに係止することができ、それによって、ネットが風を受けた際に大きく撓んで両端が主柱11A~11Fから離れてしまわないように構成されている。
Furthermore, as shown in FIG. 3, reinforcing portions 22a and 22b are formed at the left and right ends of each of the nets 12A to 12E. A plurality of holes 23 through which strings are passed are formed in the reinforcing portions 22a and 22b at predetermined intervals. A pair of locking pins 30 are implanted on the main posts 11A to 11F.
Therefore, by passing a string through each of the holes 23 and tying it around the locking pin 30 of the corresponding main pole 11, both ends of each of the nets 12A to 12E can be locked to the main poles 11A to 11F. As a result, when the net is exposed to the wind, it is configured so that both ends are not separated from the main pillars 11A to 11F due to large bending.

なお、ネット両端の穴23に通す紐としては、例えば表面が繊維で覆われたゴム紐のような伸び代を有しかつ引っ張りに強い紐を使用すると良い。このような紐を使用することで、強い風を受けた際に紐が伸びることによって、ある程度風を逃がすことができ、それによって柵の倒壊やネットの破損を回避することができる。
また、ネット両端の穴23に通す紐として、伸び特性を有していない強靭な紐を使用することも可能であり、その場合には、紐の長さを長めに設定して、ネットの両端と主柱との間にゆとりのある状態にして係止すると良い。このようにすることによって、強い風を受けた際の柵の倒壊やネットの破損を回避することができる。
As the string to be passed through the holes 23 at both ends of the net, it is preferable to use a string that has a stretch margin and is strong against pulling, such as a rubber string whose surface is covered with fibers. By using such a string, when a strong wind is received, the string stretches, allowing the wind to escape to some extent, thereby avoiding collapse of the fence and damage to the net.
It is also possible to use a strong string that does not have stretchability as the string to be passed through the holes 23 at both ends of the net. and the main pillar. By doing so, it is possible to avoid collapsing of the fence and damage of the net when receiving a strong wind.

次に、図5を用いて、上記袋部21a~21cに挿通されてネット12A~12Eを垂下したり撓みを抑制したりする支持パイプ(横棒)16について説明する。
図5(A)に示すように、支持パイプ16は、例えば直径が約5cmで長さがおよそ2mの鉄製のパイプであり、両端にだるま穴を有する係止金具61A,61Bが固着されている。係止金具61A,61Bには、図5(B)に示すように、中央部よりやや下方、先端側にある円形の大径穴62aと、該大径穴62aの上方にほぼ水平方向に沿って形成された長穴62bと、大径穴62aと長穴62bとを接続する連通部62cとからなる変形だるま穴62が形成されている。
Next, the support pipes (horizontal bars) 16 that are inserted through the bag portions 21a to 21c to suspend the nets 12A to 12E and suppress deflection will be described with reference to FIG.
As shown in FIG. 5(A), the support pipe 16 is, for example, an iron pipe having a diameter of about 5 cm and a length of about 2 m. . As shown in FIG. 5(B), the locking fittings 61A and 61B have a circular large-diameter hole 62a slightly below the central portion and on the tip side, and a substantially horizontal hole 62a above the large-diameter hole 62a. A modified daruma hole 62 is formed, which includes an elongated hole 62b formed by a slant and a communicating portion 62c connecting the large diameter hole 62a and the elongated hole 62b.

上記大径穴62aは、図2に示すように、主柱11A~11Fの側面に植設されたピンボルト17Aの頭部のナット17Cを挿通可能な大きさを有し、長穴62bと連通部62cはピンボルト17Aの頭部のナット17Cの径よりも小さく胴部よりもやや大きな幅を有するように設計されている。
これにより、支持パイプ16の一端を持ち上げて係止金具61Aまたは61Bの大径穴62aにピンボルト17Aの頭部に螺合されているナット17Cを挿通させた後、連通部62cを通って長穴62bへピンボルト17Aの胴部を移動させることによって、係止金具61Aをピンボルト17Aに対して抜けを防止しつつ係止させることができる。
なお、螺合されているナット17Cを緩めた状態で変形だるま穴62に嵌合させ、支持パイプ16の先端の位置が決まったらナット17Cを締め付けることで、係止金具61A,61Bを主柱11A~11Fにしっかりと固定することができる。
As shown in FIG. 2, the large-diameter hole 62a is large enough to allow the nut 17C on the head of the pin bolt 17A, which is embedded in the side surface of the main pillars 11A to 11F, to be inserted therethrough. 62c is designed to have a width smaller than the diameter of the nut 17C on the head of the pin bolt 17A and slightly larger than the body.
As a result, after one end of the support pipe 16 is lifted and the nut 17C screwed to the head of the pin bolt 17A is inserted into the large diameter hole 62a of the locking fitting 61A or 61B, the long hole is passed through the communicating portion 62c. By moving the body portion of the pin bolt 17A to 62b, the locking fitting 61A can be locked to the pin bolt 17A while preventing it from coming off.
It is to be noted that the screwed nut 17C is loosened and fitted into the deformed pothole 62, and when the position of the tip of the support pipe 16 is determined, the nut 17C is tightened so that the locking fittings 61A and 61B are attached to the main pillar 11A. It can be firmly fixed to ~11F.

上記のようにだるま穴62に長穴62bが形成されていると、支持パイプ16の両端が係止される2本の主柱の上端間の距離がばらついたとしても、その差を吸収して支持パイプ16の両端を2本の主柱に連結することができ、作業時間を短縮することができる。
また、変形だるま穴62の長穴62bは、中央が上方へ向かって少し膨らむように湾曲して形成されている。これにより、支持パイプ16の両端が係止される2本の主柱の上端の高さがずれた状態で設置されることで、支持パイプ16が水平面に対して傾斜して支持されたとしても、支持パイプ16を均等に支持することができる。そのため、防雪柵を安定させることができる。
If the long hole 62b is formed in the daruma hole 62 as described above, even if the distance between the upper ends of the two main pillars to which both ends of the support pipe 16 are locked varies, the difference can be absorbed. Both ends of the support pipe 16 can be connected to the two main pillars, and the work time can be shortened.
Further, the elongated hole 62b of the deformed daruma hole 62 is curved so that the center swells slightly upward. As a result, even if the support pipe 16 is tilted with respect to the horizontal plane and supported by the support pipe 16 being installed in a state in which the heights of the upper ends of the two main pillars to which both ends of the support pipe 16 are locked are deviated, , the support pipe 16 can be evenly supported. Therefore, the snow fence can be stabilized.

例えば、支持パイプ16が水平面に対して傾斜した状態で支持されたとすると、長穴62bも傾くこととなる。一方、支持パイプ16にはネット12の重量および風圧による荷重がかかる。そのため、長穴62bが湾曲せず平坦であり傾斜していると、分力が生じてパイプの低い側へより多くの力が作用してしまう。
しかるに、長穴62bが上方へ向かって少し膨らむように湾曲していると、ピンボルト17A,17Bとの接線が水平となるので、分力が発生せず左右ほぼ均等に支持パイプ16を支持することができる。また、長穴62bが湾曲していると、支持パイプ16の軸方向へのずれを抑制する効果がある。
For example, if the support pipe 16 is supported in an inclined state with respect to the horizontal plane, the long hole 62b will also be inclined. On the other hand, the support pipes 16 are loaded by the weight of the net 12 and the wind pressure. Therefore, if the elongated hole 62b is not curved but flat and inclined, a force component is generated and more force acts on the lower side of the pipe.
However, if the long hole 62b is curved so as to bulge slightly upward, the tangential line to the pin bolts 17A and 17B becomes horizontal, so that no force component is generated and the support pipe 16 can be supported almost evenly on the left and right sides. can be done. In addition, if the elongated hole 62b is curved, there is an effect of suppressing the displacement of the support pipe 16 in the axial direction.

次に、図6を用いて、上記控柱13A,13Bを地面に固定するためのアンカー杭の構成と控柱とアンカー杭との結合構造について説明する。
本実施形態の仮設防雪柵においては、アンカー杭18として、図6(A)に示すように、パイプの下部に螺旋状の刃を有する杭が使用され、かかるアンカー杭18を、図6(B)に示すように、地面に対して斜めに打設するように構成されている。なお、このアンカー杭18は、電動工具を用いて回転させることで打設することができる。
Next, with reference to FIG. 6, the construction of anchor piles for fixing the above-mentioned stay pillars 13A and 13B to the ground and the joint structure between the stay pillars and the anchor piles will be described.
In the temporary snow fence of this embodiment, as shown in FIG. ), it is configured to be cast obliquely to the ground. The anchor pile 18 can be driven by rotating it using an electric tool.

さらに、アンカー杭18は端部を30~50cmほど露出した状態で打設され、その露出した部位に、図7(A)に示すような頭部が山形をなす2本のUボルト91とベースプレート92と一対のナット93A,93Bとからなる結合金具19によって、図6(B)に示すように、控柱13がアンカー杭18と結合されるように構成されている。ベースプレート92には、控柱13が係合する切欠き92cが形成されている。
Uボルト91の一対の脚部91a,91bの間隔は通常のUボルトの間隔よりも広く、例えば結合対象のアンカー杭18のパイプ径の2倍前後の距離をおくように設定され、この脚部91a,91bの先端側に雌ネジ部が形成されている。また、ベースプレート92には、図7(B)に示すように、Uボルト91の脚部91a,91bが挿通可能であってUボルト91の本体と平行な方向に長い長穴92a,92bが形成されている。
Further, the anchor pile 18 is driven with its end portion exposed by about 30 to 50 cm, and two U-bolts 91 having mountain-shaped heads and a base plate are attached to the exposed portion as shown in FIG. 7(A). As shown in FIG. 6(B), the stay post 13 is connected to the anchor pile 18 by a joint 19 consisting of a joint 92 and a pair of nuts 93A and 93B. The base plate 92 is formed with a notch 92c with which the stay post 13 is engaged.
The distance between the pair of legs 91a and 91b of the U-bolt 91 is wider than that of a normal U-bolt. A female threaded portion is formed on the distal end side of 91a and 91b. Further, as shown in FIG. 7(B), the base plate 92 is formed with long holes 92a and 92b through which the legs 91a and 91b of the U-bolt 91 can be inserted and which are elongated in a direction parallel to the body of the U-bolt 91. It is

上記のように構成された結合金具19を2組使用することで、図6(B)に示すように、アンカー杭18に対して異なる角度をなす控柱13を結合させたい場合にも、Uボルト91とベースプレート92との間にアンカー杭18および控柱13を抱きかかえるようにして、Uボルト91の脚部91a,91bが長穴92a,92b内で適切な位置に移動することで、両者を強固に結合することができる。
また、Uボルト91が山形をなしているため、ナット93A,93Bを回して締め付ける際に、Uボルト91がアンカー杭18から反力を受けて脚部91a,91bが長穴92a,92b内でスライドすることで適切な位置へ移動する。そのため、手による位置調整が不要であり、効率よく作業を実施することができる。
なお、Uボルト91の一対の脚部91a,91bの間隔は、大きすぎると結合金具19が大型化してしまう一方、小さすぎるとアンカー杭18と控柱13のなす角度を調整する機能が低下するので、アンカー杭18のパイプ径の1.5~2.5倍とするのが望ましい。
By using two sets of fittings 19 configured as described above, as shown in FIG. The anchor pile 18 and the stay post 13 are held between the bolt 91 and the base plate 92, and the legs 91a and 91b of the U-bolt 91 are moved to appropriate positions within the elongated holes 92a and 92b. can be strongly bonded.
In addition, since the U-bolt 91 is mountain-shaped, when the nuts 93A and 93B are turned and tightened, the U-bolt 91 receives a reaction force from the anchor pile 18, and the leg portions 91a and 91b are pushed into the elongated holes 92a and 92b. Move to the appropriate position by sliding. Therefore, manual position adjustment is not required, and work can be carried out efficiently.
If the distance between the pair of legs 91a and 91b of the U-bolt 91 is too large, the fitting 19 will become large. Therefore, it is desirable to set the diameter to 1.5 to 2.5 times the pipe diameter of the anchor pile 18 .

次に、上記実施形態の仮設防雪柵の構築方法について説明する。
仮設防雪柵を構築するにあたっては、先ず柵を設けたい位置(設置ライン)を決定し、その設置ラインから両側方へ所定距離(控柱13A,13Bの開く幅)だけ離れた位置に、所定のピッチ(ネットの幅+α)で、アンカー杭18の対を打設する。また、各ネット12の袋部21a~21cに支持パイプ16を挿通したものを用意する。
続いて、控柱13A,13Bを開きながら主柱11をアンカー杭18の対の中心に立てて、上記結合金具19を用いて控柱13A,13Bの下端部をアンカー杭18に結合する。控柱13Cまたは13Dを有する柵の両端の主柱11に関しては、控柱13C,13D用に打設したアンカー杭18に控柱13C,13Dの下端部を結合する。
Next, a construction method of the temporary snow fence of the above embodiment will be described.
When constructing a temporary snow fence, first determine the position (installation line) where you want to install the fence, and then place the specified A pair of anchor piles 18 are driven at a pitch (net width + α). In addition, the nets 12 having the support pipes 16 inserted through the bag portions 21a to 21c are prepared.
Next, the main pillar 11 is erected at the center of the pair of anchor piles 18 while the stay pillars 13A and 13B are opened, and the lower ends of the stay pillars 13A and 13B are joined to the anchor pile 18 using the coupling fittings 19 described above. As for the main posts 11 at both ends of the fence having the stay posts 13C or 13D, the lower ends of the stay posts 13C and 13D are connected to the anchor piles 18 driven for the stay posts 13C and 13D.

その後、先端にフックを有する持ち上げ用のロッドのフックに、ネット12の上部の袋部21aに挿通された支持パイプ16の端部を引っ掛けて持ち上げ、支持パイプ16の端部の係止金具61の大径穴62aを、主柱11の上端にあるピンボルト17Aの頭部に螺合されているナット17Cを挿通させるようにして嵌合させる。支持パイプ16の反対側の端部の係止金具61も同様にして他の主柱11のピンボルトに嵌合させる。また、ネット12の中間と下部の袋部21b,21cに挿通されている支持パイプ16についても同様にして、端部の係止金具61を主柱11の中間と下部にあるピンボルトの頭部(ナットを含む)に嵌合させる。 After that, the end of the support pipe 16 inserted into the upper bag portion 21a of the net 12 is hooked on the hook of a lifting rod having a hook at the tip to lift it, and the locking fitting 61 at the end of the support pipe 16 is lifted. A nut 17C screwed to the head of a pin bolt 17A at the upper end of the main column 11 is inserted into the large-diameter hole 62a. The locking fitting 61 at the opposite end of the support pipe 16 is also fitted to the pin bolt of the other main column 11 in the same manner. Similarly, for the support pipe 16 inserted through the bag portions 21b and 21c in the middle and the lower part of the net 12, the locking metal fittings 61 at the ends are attached to the heads of the pin bolts in the middle and the lower part of the main column 11 ( (including nut).

次に、立設されている主柱11に梯子を立てかけて、ピンボルト17A,17Bの端部に螺後されているナット17Cを回して締め付け、支持パイプ16の端部の係止金具61を主柱11の上端に固定する。また、ネット12の中間と下部の袋部21b,21cに挿通されている支持パイプ16の端部の係止金具61も同様にして、主柱11に固定する。その後、ネット12の側部に設けられているハトメの穴にそれぞれ紐を通して主柱11の係止ピン30に絡めるようにして結びつける。以上の作業によって、一連の仮設防雪柵の構築が完了する。
また、上記仮設防雪柵の解体作業は、上記と逆の手順によって実施することができる。
Next, the ladder is leaned against the erected main post 11, the nuts 17C screwed on the ends of the pin bolts 17A and 17B are turned and tightened, and the locking fittings 61 at the ends of the support pipes 16 are mainly tightened. It is fixed to the upper end of the pillar 11 . Similarly, locking metal fittings 61 at the ends of the support pipes 16 inserted through the bag portions 21b and 21c in the middle and lower portions of the net 12 are also fixed to the main poles 11. As shown in FIG. After that, strings are passed through eyelet holes provided in the side portions of the net 12, respectively, and are tied around the locking pins 30 of the main pillars 11.例文帳に追加The construction of a series of temporary snow fences is completed by the above work.
Moreover, dismantling work of the said temporary snow guard fence can be implemented by a procedure reverse to the above.

以上、本発明の実施形態について説明したが、本発明は上記実施形態に限定されるものではなく、種々の変形や変更が可能である。例えば、上記実施形態では、主柱11A~11Fおよび控柱13A,13Bとして角柱パイプを使用したが、円筒状の丸パイプを使用するようにしても良い。
また、前記実施形態では、螺旋状の刃を有するアンカー杭を使用したが、杭に関しては従来と同様に、ハンマーで打ち込むタイプの杭を使用するようにしても良い。
なお、本発明の仮設防雪柵は、鉄道軌道に対する防雪柵に限定されず、道路に対する防雪柵にも利用することができる。
Although the embodiments of the present invention have been described above, the present invention is not limited to the above embodiments, and various modifications and changes are possible. For example, in the above embodiment, prismatic pipes are used as the main posts 11A to 11F and the standoff posts 13A, 13B, but cylindrical round pipes may be used.
Also, in the above embodiment, anchor piles having spiral blades are used, but as for the piles, hammer-driven piles may be used as in the conventional case.
In addition, the temporary snow fence of the present invention is not limited to the snow fence for railroad tracks, and can be used for the snow fence for roads.

11A~11F 主柱
12A~12E ネット
21a,21b 袋部
13A~13C 控柱
15 ピンボルト
16 支持パイプ
17A,17B ピンボルト
18 アンカー杭
19 結合金具
30 係止ピン
61A,61B 係止金具
62 変形だるま穴
91 Uボルト
92 ベースプレート
11A-11F Main post 12A-12E Net 21a, 21b Bag portion 13A-13C Standing post 15 Pin bolt 16 Support pipe 17A, 17B Pin bolt 18 Anchor pile 19 Joint fitting 30 Locking pin 61A, 61B Locking fitting 62 Deformed pothole 91U bolt 92 base plate

Claims (5)

1本の線上に沿って所定の間隔で立設された複数本の主柱と、前記複数本の主柱のそれぞれの間に張設された複数枚のネットと、前記複数本の主柱をそれぞれ斜め下方から支える複数本の控柱と、前記複数本の控柱のそれぞれの下端を地面に固定するための複数本の杭とを有する仮設防雪柵であって、
前記複数枚のネットは、それぞれ少なくとも上縁および下縁に袋部が形成され、両端に係止金具を備え前記上縁および下縁に形成された袋部にそれぞれ挿通され2本の主柱間に水平状態で横架された少なくとも2本の横棒によってほぼ垂直な姿勢にて張設され、
前記複数本の主柱の所定高さ位置にはそれぞれ水平方向に突出する締結用ネジが植設され、
前記係止金具には、前記締結用ネジの頭部が挿通可能な大きさの円形穴と、前記頭部よりも小さく前記締結用ネジの軸部の径よりも大きな幅を有し前記円形穴の上方にて水平方向に沿って設けられた長穴と、前記円形穴と前記長穴を接続する連通部と、を有するだるま穴が形成されており、前記係止金具は前記締結用ネジの軸部が前記長穴内に位置した状態で前記締結用ネジによって対応する前記主柱に結合されていることを特徴とする仮設防雪柵。
A plurality of main pillars erected at predetermined intervals along a single line, a plurality of nets stretched between each of the plurality of main pillars, and the plurality of main pillars. A temporary snow guard fence having a plurality of stay pillars each supporting from diagonally below and a plurality of piles for fixing the lower ends of each of the plurality of stay pillars to the ground,
Each of the plurality of nets has a bag portion formed at least on the upper edge and the lower edge thereof, and has locking metal fittings at both ends thereof, and is inserted through the bag portions formed on the upper edge and the lower edge. stretched in a substantially vertical posture by at least two horizontal bars horizontally placed on the
Fastening screws protruding in the horizontal direction are implanted at predetermined height positions of the plurality of main pillars,
The locking fitting has a circular hole with a size that allows the head of the fastening screw to pass through, and a circular hole with a width that is smaller than the head and greater than the diameter of the shaft of the fastening screw. A daruma hole having an elongated hole provided along the horizontal direction above and a communicating portion connecting the circular hole and the elongated hole is formed, and the locking fitting is the fastening screw. A temporary snow protection fence, wherein a shaft is positioned in the elongated hole and connected to the corresponding main pillar by the fastening screw.
前記係止金具に設けられている前記だるま穴の長穴は、中央が上方へ向かって膨らむように湾曲して形成されていることを特徴とする請求項1に記載の仮設防雪柵。 2. The temporary snow guard fence according to claim 1, wherein the elongated hole of the daruma hole provided in the locking metal fitting is curved so that the center bulges upward. 前記複数枚のネットは、上縁と下縁との間にそれぞれ第3の袋部が形成され、該第3の袋部には、両端に前記係止金具を備えた第3の横棒がそれぞれ挿通され、前記第3の横棒の両端の前記係止金具は前記主柱の対応する位置に設けられた締結用ネジに結合されていることを特徴とする請求項1又は2に記載の仮設防雪柵。 Each of the plurality of nets has a third bag portion formed between an upper edge and a lower edge, and the third bag portion has a third horizontal bar having the locking fittings at both ends. 3. The fastener according to claim 1 or 2, wherein said locking metal fittings at both ends of said third horizontal bar are coupled to fastening screws provided at corresponding positions of said main column. Temporary snow fence. 前記複数本の杭は、下部にそれぞれ螺旋刃が形成されたアンカー杭であり、
前記控柱の下端部と前記アンカー杭は、頭部が山形をなすUボルトと該Uボルトの2本の脚部がそれぞれ挿通される2個のボルト挿通穴を有するベースプレートと前記Uボルトの2本の脚部に螺合される2個のナットとを備えた複数組の結合金具によって結合されていることを特徴とする請求項1~3のいずれかに記載の仮設防雪柵。
The plurality of piles are anchor piles each having a helical blade formed at the bottom,
The lower end of the stay pillar and the anchor pile have a U bolt with a chevron-shaped head and two bolt insertion holes into which the two legs of the U bolt are inserted, respectively. The temporary snow fence according to any one of claims 1 to 3, characterized in that the temporary snow fence is connected by a plurality of sets of fittings having two nuts screwed onto the legs of the book.
前記アンカー杭は、少なくとも上部の断面が円形をなし、
前記Uボルトは、前記2本の脚部の間隔が前記アンカー杭の径の1.5~2.5倍の大きさを有するように形成され、
前記ベースプレートに形成されている前記2個のボルト挿通穴は前記Uボルトの2本の脚部の並びと同一の方向に沿って長い長穴として形成され、
前記ベースプレートが前記控柱の下端部に接合し、前記Uボルトの内側が前記アンカー杭の上部に接合した状態で、前記控柱と前記アンカー杭とが前記結合金具によって結合されていることを特徴とする請求項4に記載の仮設防雪柵。
At least the upper portion of the anchor pile has a circular cross section,
The U-bolt is formed so that the distance between the two legs is 1.5 to 2.5 times the diameter of the anchor pile,
The two bolt insertion holes formed in the base plate are formed as elongated holes along the same direction as the alignment of the two legs of the U-bolt,
The base plate is joined to the lower end of the stay pillar, and the inside of the U-bolt is joined to the upper part of the anchor pile, and the stay pillar and the anchor pile are joined by the joint fitting. The temporary snow fence according to claim 4.
JP2019078349A 2019-04-17 2019-04-17 Temporary snow fence Active JP7191762B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2019078349A JP7191762B2 (en) 2019-04-17 2019-04-17 Temporary snow fence

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2019078349A JP7191762B2 (en) 2019-04-17 2019-04-17 Temporary snow fence

Publications (2)

Publication Number Publication Date
JP2020176419A JP2020176419A (en) 2020-10-29
JP7191762B2 true JP7191762B2 (en) 2022-12-19

Family

ID=72937621

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2019078349A Active JP7191762B2 (en) 2019-04-17 2019-04-17 Temporary snow fence

Country Status (1)

Country Link
JP (1) JP7191762B2 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005256376A (en) 2004-03-11 2005-09-22 Sekisui Jushi Co Ltd Wind-snow protection fence
JP4980031B2 (en) 2006-11-10 2012-07-18 Ntn株式会社 Rolling bearing crowning design method
JP5852304B2 (en) 2009-10-25 2016-02-03 テクトロニクス・インコーポレイテッドTektronix,Inc. Signature curve generating apparatus and method
JP2017106284A (en) 2015-12-11 2017-06-15 三菱ケミカルインフラテック株式会社 Windshield snow prevention net and windshield snow prevention net fence

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5246043Y2 (en) * 1972-10-25 1977-10-19
JPS5852304U (en) * 1981-10-07 1983-04-09 日本警備保障株式会社 Mounting base structure
JPH026715U (en) * 1988-06-28 1990-01-17
JP2001069861A (en) * 1999-08-31 2001-03-21 Yoshisuke Aoyanagi Wind-breaking net device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005256376A (en) 2004-03-11 2005-09-22 Sekisui Jushi Co Ltd Wind-snow protection fence
JP4980031B2 (en) 2006-11-10 2012-07-18 Ntn株式会社 Rolling bearing crowning design method
JP5852304B2 (en) 2009-10-25 2016-02-03 テクトロニクス・インコーポレイテッドTektronix,Inc. Signature curve generating apparatus and method
JP2017106284A (en) 2015-12-11 2017-06-15 三菱ケミカルインフラテック株式会社 Windshield snow prevention net and windshield snow prevention net fence

Also Published As

Publication number Publication date
JP2020176419A (en) 2020-10-29

Similar Documents

Publication Publication Date Title
US10329781B2 (en) Safety barrier netting system
US9464397B1 (en) Removable anchoring system and uses thereof
US20120228442A1 (en) Portable modular monopole tower foundation
US9528285B2 (en) Safety barrier netting system with rigid panel net supports and stopper mechanisms
JP5005659B2 (en) Rock fall protection net structure
US6256942B1 (en) Stake system
US9388589B2 (en) Work platform system including suspended paneled portion and method of implementing same
GB2458312A (en) Fence Panel Support Apparatus
US10883233B2 (en) Work platform system including suspended paneled portion and method of implementing same
JP6114537B2 (en) Rockfall protection device and rockfall protection method
US5732935A (en) Golf barrier cross bracing system
US20070080333A1 (en) Fence system
JP7191762B2 (en) Temporary snow fence
JP3954414B2 (en) Protective body using net
US7051838B1 (en) Scaffolding system, integral safety rail therefor and methods of making the same
KR20100029693A (en) Framework for cultivating ginseng
CN210264154U (en) Tensile formula protection network of snow ice field slide
US20150167262A1 (en) Crosswind deflection element for preventing sedimentation
KR101097288B1 (en) Mesh fence su
JP3174304U (en) Steel retaining fence
US20210283486A1 (en) Releasable net apparatus and system
JP3946208B2 (en) Wind resistant pipe house
WO2014189539A1 (en) Work platform system including suspended paneled portion and method of implementing same
JP3174363U (en) Steel retaining fence
CN205529947U (en) Prevent mud -rock flow road fence

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20220222

TRDD Decision of grant or rejection written
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20221130

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20221206

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20221207

R150 Certificate of patent or registration of utility model

Ref document number: 7191762

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150