JP7176139B2 - 多連式油圧ビッガー割岩工法 - Google Patents
多連式油圧ビッガー割岩工法 Download PDFInfo
- Publication number
- JP7176139B2 JP7176139B2 JP2021571962A JP2021571962A JP7176139B2 JP 7176139 B2 JP7176139 B2 JP 7176139B2 JP 2021571962 A JP2021571962 A JP 2021571962A JP 2021571962 A JP2021571962 A JP 2021571962A JP 7176139 B2 JP7176139 B2 JP 7176139B2
- Authority
- JP
- Japan
- Prior art keywords
- rock
- bigger
- hole
- split
- drilled
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C37/00—Other methods or devices for dislodging with or without loading
- E21C37/02—Other methods or devices for dislodging with or without loading by wedges
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Drilling And Exploitation, And Mining Machines And Methods (AREA)
- Earth Drilling (AREA)
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| PCT/JP2020/032152 WO2022044154A1 (ja) | 2020-08-26 | 2020-08-26 | 多連式油圧ビッガー割岩工法 |
Publications (3)
| Publication Number | Publication Date |
|---|---|
| JPWO2022044154A1 JPWO2022044154A1 (https=) | 2022-03-03 |
| JPWO2022044154A5 JPWO2022044154A5 (https=) | 2022-08-05 |
| JP7176139B2 true JP7176139B2 (ja) | 2022-11-21 |
Family
ID=80352884
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2021571962A Active JP7176139B2 (ja) | 2020-08-26 | 2020-08-26 | 多連式油圧ビッガー割岩工法 |
Country Status (2)
| Country | Link |
|---|---|
| JP (1) | JP7176139B2 (https=) |
| WO (1) | WO2022044154A1 (https=) |
Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2018193678A (ja) | 2017-05-12 | 2018-12-06 | 株式会社増岡組 | トンネル掘削方法 |
Family Cites Families (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS6095096A (ja) * | 1983-10-28 | 1985-05-28 | 古河機械金属株式会社 | ベンチカツト工法におけるさく孔方式 |
| JPS61242262A (ja) * | 1985-04-16 | 1986-10-28 | 三菱重工業株式会社 | 構造物の表層剥離方法 |
| JPS635092U (https=) * | 1986-06-27 | 1988-01-13 | ||
| JP4856920B2 (ja) * | 2005-09-22 | 2012-01-18 | 高周波熱錬株式会社 | 破砕方法および破砕具 |
| KR101657143B1 (ko) * | 2014-12-04 | 2016-09-13 | 박재현 | 시공 기간 단축을 위한 무진동 할암 방식 터널시공방법 |
-
2020
- 2020-08-26 WO PCT/JP2020/032152 patent/WO2022044154A1/ja not_active Ceased
- 2020-08-26 JP JP2021571962A patent/JP7176139B2/ja active Active
Patent Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2018193678A (ja) | 2017-05-12 | 2018-12-06 | 株式会社増岡組 | トンネル掘削方法 |
Also Published As
| Publication number | Publication date |
|---|---|
| JPWO2022044154A1 (https=) | 2022-03-03 |
| WO2022044154A1 (ja) | 2022-03-03 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| Yin et al. | Use of indentation tests to study the influence of confining stress on rock fragmentation by a TBM cutter | |
| CN113153292B (zh) | 煤矿井下采煤工作面水力压裂快速过坚硬岩石断层的方法 | |
| Haimson | Fracture-like borehole breakouts in high-porosity sandstone: are they caused by compaction bands? | |
| US11994028B2 (en) | Mining method | |
| Song et al. | Development of lab-scale rock drill apparatus for testing performance of a drill bit | |
| Jiang et al. | Numerical investigation of rock breaking by a dish-shape cutter with advance slotting | |
| Li et al. | Theoretical and numerical analysis of the rock breaking process by impact hammer | |
| JP7176139B2 (ja) | 多連式油圧ビッガー割岩工法 | |
| JP7176138B2 (ja) | 多連式油圧ビッガー割岩装置 | |
| KR101400797B1 (ko) | 다수의 자유면 형성을 이용한 미진동 굴착방법 | |
| RU1153628C (ru) | Способ добычи блочного камня | |
| RU2366891C1 (ru) | Способ образования врубовой полости | |
| Zhang et al. | Experimental and numerical analyses of rock damage behavior and fragmentation mechanism under enlarged hole impact conditions | |
| JP7061853B2 (ja) | 岩盤類の掘削部位からの掘削物を資材として採取することにより資材を製造する方法 | |
| CN205689124U (zh) | 一种旋挖钻机成桩入岩钻具系统 | |
| CN1938497B (zh) | 钻探设备、方法和系统 | |
| Hrehova et al. | Mining technology with drilling-blasting operations | |
| Kotwica | New Mining Tools and Methods for Roadheader Mining Heads | |
| Tambovtsev | Estimation of main fracture initiation energy in separating stone blocks from rock mass by impact on plastic material in drillhole | |
| JPWO2022044154A5 (https=) | ||
| LU601524B1 (en) | A method for controlling large blasting blocks of sand gravel cemented rock with staggered detonation in holes | |
| JPH0313686A (ja) | 立坑の掘削方法 | |
| CN120175343B (zh) | 高应力破碎矿体盘区梯段卸压与中深孔充填一体化采矿法 | |
| CN210459217U (zh) | 一种冲击钻孔桩卡钻处理工具 | |
| Wang et al. | Experimental investigation and field application of deep hard rock fragmentation using conical pick |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A529 | Written submission of copy of amendment under article 34 pct |
Free format text: JAPANESE INTERMEDIATE CODE: A5211 Effective date: 20211203 |
|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20220121 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20221014 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20221109 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 7176139 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |