JP7154468B2 - Information processing device, information processing method and information processing program - Google Patents

Information processing device, information processing method and information processing program Download PDF

Info

Publication number
JP7154468B2
JP7154468B2 JP2022544236A JP2022544236A JP7154468B2 JP 7154468 B2 JP7154468 B2 JP 7154468B2 JP 2022544236 A JP2022544236 A JP 2022544236A JP 2022544236 A JP2022544236 A JP 2022544236A JP 7154468 B2 JP7154468 B2 JP 7154468B2
Authority
JP
Japan
Prior art keywords
performance
unit
elements
information processing
improvement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2022544236A
Other languages
Japanese (ja)
Other versions
JPWO2022059183A1 (en
Inventor
直輝 伊藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Corp
Original Assignee
Mitsubishi Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Corp filed Critical Mitsubishi Electric Corp
Publication of JPWO2022059183A1 publication Critical patent/JPWO2022059183A1/ja
Application granted granted Critical
Publication of JP7154468B2 publication Critical patent/JP7154468B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/418Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM]
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/04Manufacturing
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Description

本開示は、性能を改善するための分析を行う技術に関する。 The present disclosure relates to techniques for performing analysis to improve performance.

工場等の生産システムでは、品質、コスト、納期、生産数量といった管理指標の内、時々の状況に応じて優先目標が設定される。そして、設定された優先目標を達成すべく生産管理が行われる。
優先目標はKGI(Key Goal Indicator)と呼ばれる。例えば、KGIに品質を設定した場合、品質の目標値を達成するよう日々の生産管理が行われる。生産管理とは、生産システムから現在の運用状況の情報を収集して現在値と目標値を比較し、現在値が目標値を達成していない場合は現在値が目標値を達成するように改善活動を行うことである。改善活動とは、生産システム内の設備の増強、パラメタの調整、作業員の教育、作業手順の見直し、材料及び/又は在庫の見直し等の活動である。
In a production system such as a factory, priority targets are set according to the situation from time to time, among management indicators such as quality, cost, delivery date, and production quantity. Production control is then carried out to achieve the set priority targets.
A priority goal is called KGI (Key Goal Indicator). For example, when quality is set in KGI, daily production control is performed so as to achieve the target value of quality. Production management collects information on the current operational status from the production system, compares the current value with the target value, and if the current value does not achieve the target value, makes improvements so that the current value achieves the target value. To do an activity. Improvement activities are activities such as enhancement of equipment in the production system, adjustment of parameters, education of workers, review of work procedures, review of materials and/or inventory, and the like.

従来、このような改善活動は生産システム管理者の経験によって行われることが多く、必ずしも優先目標の達成に寄与しない改善活動又は効果の低い改善活動が行われる、という課題があった。
このような課題に対して、近年では生産システムのIoT(Internet of Things)化を進めることで解決が図られている。具体的には、以下のような活動により課題が解決される。ある生産システムにおけるKGIの現在値に加え、その時々の生産システム内の工程、設備、設備内の機器の状態について詳細なデータが収集される。そして、収集したデータを分析することで生産システム内のデータの関係性が明らかにされる。そして、明らかにされた関係性を生産管理の参考にする。
Conventionally, such improvement activities have often been carried out based on the experience of production system managers, and there has been the problem that improvement activities that do not necessarily contribute to the achievement of priority goals or that have low effectiveness are carried out.
In recent years, efforts have been made to solve such problems by promoting IoT (Internet of Things) in production systems. Specifically, the issues will be resolved through the following activities. In addition to the current value of KGI in a certain production system, detailed data is collected on the status of the processes, equipment, and equipment within the equipment within the production system at any given time. Then, by analyzing the collected data, relationships of data within the production system are clarified. Then, the clarified relationship is used as a reference for production control.

例えば特許文献1では、それぞれが複数の工程及び/又は複数の設備の管理指標である複数のKPI(Key Performance Indicator)のそれぞれの関係性の階層構造が定義される。また、特許文献1では、KPIを算出するための情報が工程及び/又は設備から収集される。そして、特許文献1では、各KPIを相関分析することで異常が発生した際に管理者に異常を通知するアラームが効率的に選別される。 For example, Patent Literature 1 defines a hierarchical structure of relationships among a plurality of KPIs (Key Performance Indicators), each of which is a management index for a plurality of processes and/or a plurality of facilities. Further, in Patent Literature 1, information for calculating KPI is collected from processes and/or equipment. In Patent Document 1, correlation analysis is performed on each KPI to efficiently select an alarm that notifies an administrator of an abnormality when an abnormality occurs.

特開2019-117464号公報JP 2019-117464 A

しかしながら、特許文献1の技術で用いられる相関分析では、収集した情報が外れ値であった場合の影響が大きいため、この影響を取り除くための煩雑な前処理が必要となる。また、相関分析では異なる工程のKPIについて1:1で関係を分析するため、例えばKGIと複数のKPIとの間の関係性といった1対多の情報の関係性については分析することができないという課題がある。 However, in the correlation analysis used in the technique of Patent Literature 1, when the collected information is an outlier, the influence is large, so complicated preprocessing is required to remove this influence. In addition, since correlation analysis analyzes 1:1 relationships for KPIs in different processes, it is not possible to analyze one-to-many information relationships, such as the relationship between a KGI and multiple KPIs. There is

このように、特許文献1の技術では、生産システムのように多数の要素で構成されるシステムにおいて改善活動を行う場合、KGIを改善しようとする要素、すなわち性能を改善しようとする要素と他の複数の要素との関係性を分析することが困難である。このため、特許文献1の技術では、性能を改善しようとする要素の性能の改善に寄与する他の要素を特定することが容易ではない、という課題がある。 As described above, in the technique of Patent Document 1, when performing improvement activities in a system composed of a large number of elements such as a production system, an element to improve KGI, that is, an element to improve performance and other elements It is difficult to analyze relationships with multiple factors. Therefore, with the technique of Patent Document 1, there is a problem that it is not easy to identify other elements that contribute to improving the performance of the element whose performance is to be improved.

本開示は、このような課題を解決することを主な目的の一つとしている。より具体的には、本開示は、性能を改善すべき要素の性能の改善に寄与する要素の特定を効率的に行うことを主な目的とする。 One of the main purposes of the present disclosure is to solve such problems. More specifically, the main object of the present disclosure is to efficiently identify elements that contribute to improving the performance of elements whose performance should be improved.

本開示に係る情報処理装置は、
3以上の要素のうち性能を改善させるべき要素を指定要素として指定する指定部と、
前記指定要素以外の要素の中から前記指定要素と有意な関係にある2以上の要素を関連要素として抽出する抽出部と、
前記抽出部により抽出された2以上の関連要素の各々の性能が前記指定要素の性能に与える影響を分析して、前記2以上の関連要素の中から、前記指定要素の性能の改善のために性能を改善させるべき関連要素である改善対象関連要素を推定する推定部とを有する。
The information processing device according to the present disclosure is
a designation unit that designates, as a designated element, an element whose performance should be improved among the three or more elements;
an extraction unit that extracts two or more elements having a significant relationship with the designated element from elements other than the designated element as related elements;
analyzing the influence of the performance of each of the two or more related elements extracted by the extracting unit on the performance of the designated element, and selecting from among the two or more related elements to improve the performance of the designated element an estimating unit for estimating an improvement target related element, which is a related element whose performance should be improved.

本開示によれば、性能を改善すべき要素の性能の改善に寄与する要素の特定を効率的に行うことができる。 According to the present disclosure, it is possible to efficiently identify an element that contributes to improving the performance of an element whose performance should be improved.

実施の形態1に係る改善箇所分析装置の機能構成例を示す図。FIG. 2 is a diagram showing a functional configuration example of the improvement point analysis device according to the first embodiment; FIG. 実施の形態1に係る改善箇所分析装置のハードウェア構成例を示す図。FIG. 2 is a diagram showing a hardware configuration example of the improvement point analysis device according to the first embodiment; FIG. 実施の形態1に係る情報モデルの構成例を示す図。4 is a diagram showing a configuration example of an information model according to Embodiment 1; FIG. 実施の形態1に係る設定項目の例を示す図。4 is a diagram showing an example of setting items according to the first embodiment; FIG. 実施の形態1に係る評価部の動作例を示すフローチャート。4 is a flowchart showing an operation example of an evaluation unit according to Embodiment 1; 実施の形態1に係る評価部による評価結果の例を示す図。4A and 4B are diagrams showing examples of evaluation results by an evaluation unit according to the first embodiment; FIG. 実施の形態1に係る評価部による評価結果の例を示す図。4A and 4B are diagrams showing examples of evaluation results by an evaluation unit according to the first embodiment; FIG. 実施の形態1に係る改善箇所分析部の動作例を示すフローチャート。4 is a flow chart showing an example of the operation of an improvement point analysis unit according to Embodiment 1; 実施の形態1に係る改善箇所分析部の動作例を示すフローチャート。4 is a flow chart showing an example of the operation of an improvement point analysis unit according to Embodiment 1; 実施の形態1に係る分析対象の例を示す図。FIG. 4 is a diagram showing an example of an analysis target according to Embodiment 1; FIG. 実施の形態1に係る分析条件の例を示す図。4 is a diagram showing an example of analysis conditions according to Embodiment 1; FIG. 実施の形態1に係る改善箇所分析部の分析結果の例を示す図。FIG. 10 is a diagram showing an example of an analysis result of an improvement point analysis unit according to the first embodiment; FIG. 実施の形態2に係る設定項目の例を示す図。FIG. 10 is a diagram showing an example of setting items according to the second embodiment; FIG. 実施の形態2に係る分析条件の例を示す図。FIG. 10 is a diagram showing an example of analysis conditions according to Embodiment 2; FIG. 実施の形態2により得られる効果の例を示す図。FIG. 10 is a diagram showing an example of effects obtained by the second embodiment; 実施の形態3に係る設定項目の例を示す図。FIG. 11 is a diagram showing an example of setting items according to the third embodiment; FIG. 実施の形態4に係る情報モデルの構成例を示す図。FIG. 11 is a diagram showing a configuration example of an information model according to Embodiment 4; 実施の形態4に係る分析条件の例を示す図。FIG. 11 is a diagram showing an example of analysis conditions according to Embodiment 4; 実施の形態4に係る改善箇所分析部の動作例を示すフローチャート。13 is a flow chart showing an operation example of an improvement part analysis unit according to the fourth embodiment; 実施の形態5に係る分析条件の例を示す図。FIG. 10 is a diagram showing an example of analysis conditions according to Embodiment 5; 実施の形態5に係る出力例を示す図。FIG. 11 is a diagram showing an output example according to Embodiment 5; 実施の形態6に係る改善箇所分析装置の機能構成例を示す図。FIG. 11 is a diagram showing a functional configuration example of an improved portion analysis device according to Embodiment 6; 実施の形態6に係る改善実績の例を示す図。FIG. 12 is a diagram showing an example of an improvement record according to Embodiment 6; FIG. 実施の形態6に係る分析条件の例を示す図。FIG. 12 is a diagram showing an example of analysis conditions according to Embodiment 6; 実施の形態6に係る出力例を示す図。FIG. 12 is a diagram showing an output example according to Embodiment 6; 実施の形態7に係る分析条件の例を示す図。FIG. 12 is a diagram showing an example of analysis conditions according to Embodiment 7; 実施の形態7に係る機械学習装置の機能構成例を示す図。FIG. 13 is a diagram showing a functional configuration example of a machine learning device according to Embodiment 7; 実施の形態7に係る機械学習装置の動作例を示すフローチャート。14 is a flowchart showing an operation example of a machine learning device according to Embodiment 7; 実施の形態7に係る分析結果出力の補正手順を示すフローチャート。FIG. 11 is a flowchart showing a procedure for correcting an analysis result output according to Embodiment 7; FIG. 実施の形態7に係るニューラルネットワークの例を示す図。FIG. 13 is a diagram showing an example of a neural network according to Embodiment 7;

以下、実施の形態を図を用いて説明する。以下の実施の形態の説明及び図面において、同一の符号を付したものは、同一の部分又は相当する部分を示す。 Embodiments will be described below with reference to the drawings. In the following description of the embodiments and drawings, the same reference numerals denote the same or corresponding parts.

実施の形態1.
***構成の説明***
図1は、本実施の形態に係る改善箇所分析装置100の機能構成例を示す。
本実施の形態に係る改善箇所分析装置100は、ネットワーク300を介して分析対象200と接続されている。本実施の形態では、分析対象200は生産システムである。
改善箇所分析装置100は情報処理装置に相当する。また、改善箇所分析装置100の動作手順は情報処理方法に相当する。
Embodiment 1.
*** Configuration description ***
FIG. 1 shows a functional configuration example of an improved portion analysis apparatus 100 according to this embodiment.
Improvement point analysis apparatus 100 according to the present embodiment is connected to analysis target 200 via network 300 . In this embodiment, the analysis target 200 is a production system.
The improvement point analysis device 100 corresponds to an information processing device. Further, the operation procedure of the improvement point analysis device 100 corresponds to an information processing method.

図1に示すように、改善箇所分析装置100は、情報記憶部101、評価部102、改善箇所分析部103及び情報収集部104を有する。
情報記憶部101、評価部102、改善箇所分析部103及び情報収集部104の詳細は後述する。
As shown in FIG. 1 , the improvement point analysis device 100 has an information storage unit 101 , an evaluation unit 102 , an improvement point analysis unit 103 and an information collection unit 104 .
Details of the information storage unit 101, the evaluation unit 102, the improvement point analysis unit 103, and the information collection unit 104 will be described later.

図2は、改善箇所分析装置100のハードウェア構成例を示す。
改善箇所分析装置100は、コンピュータである。
改善箇所分析装置100は、ハードウェアとして、プロセッサ901、記憶装置902及び通信インタフェース903を備える。プロセッサ901、記憶装置902及び通信インタフェース903は、相互にバス905により接続される。
記憶装置902はプログラム904を記憶する。プログラム904は、図1に示す評価部102、改善箇所分析部103及び情報収集部104の機能を実現するためのプログラムである。
プロセッサ901は記憶装置902からプログラム904を読み出し、プログラム904を実行する。プロセッサ901がプログラム904を実行することにより、後述する評価部102、改善箇所分析部103及び情報収集部104の機能が実現される。
プログラム904は、情報処理プログラムに相当する。
また、図示は省略しているが、記憶装置902は、プログラム904以外に、本実施の形態に係る改善箇所分析装置100の機能の実現に必要な各種情報を記憶している。図1に示す情報記憶部101は記憶装置902により実現される。
通信インタフェース903は、分析対象200である生産システムとの通信に用いられる。
FIG. 2 shows a hardware configuration example of the improvement point analysis device 100 .
The improvement point analysis device 100 is a computer.
The improvement point analysis apparatus 100 includes a processor 901, a storage device 902, and a communication interface 903 as hardware. Processor 901 , storage device 902 and communication interface 903 are interconnected by bus 905 .
Storage device 902 stores program 904 . A program 904 is a program for realizing the functions of the evaluation unit 102, the improvement part analysis unit 103, and the information collection unit 104 shown in FIG.
Processor 901 reads program 904 from storage device 902 and executes program 904 . By executing the program 904 by the processor 901, the functions of the evaluation unit 102, the improvement part analysis unit 103, and the information collection unit 104, which will be described later, are realized.
The program 904 corresponds to an information processing program.
Although not shown, the storage device 902 stores, in addition to the program 904, various kinds of information necessary for realizing the functions of the improvement point analysis apparatus 100 according to this embodiment. The information storage unit 101 shown in FIG. 1 is implemented by a storage device 902 .
A communication interface 903 is used for communication with the production system that is the analysis target 200 .

図3は、本実施の形態で用いられる情報モデルの構成例を示す。
情報モデルでは、分析対象200である生産システムを構成する複数の要素が示される。また、情報モデルでは、各要素間の関係を、階層構造及び/又は論理構造により示す。図3において、実線は階層構造による関係性を示しており、破線矢印は論理構造による関係性を示している。
FIG. 3 shows a configuration example of an information model used in this embodiment.
The information model shows a plurality of elements that constitute the production system that is the analysis target 200 . Also, in the information model, relationships between elements are indicated by hierarchical structure and/or logical structure. In FIG. 3, solid lines indicate relationships based on the hierarchical structure, and dashed arrows indicate relationships based on the logical structure.

図3の情報モデルでは、階層として、生産ライン、工程、設備及び機器が含まれる。
そして、階層:生産ラインを構成する要素として、「製品A生産リードタイム」が定義されている。図3は、生産システムのKGIとして「製品A生産リードタイム」を設定して生産管理する例を示している。
「製品A生産リードタイム」の下位の階層として、生産システムの各工程のリードタイムである、「工程#1リードタイム」、「工程#2リードタイム」及び「工程#3リードタイム」が定義されている。「工程#1リードタイム」、「工程#2リードタイム」及び「工程#3リードタイム」は、「製品A生産リードタイム」と階層構造による関係性で接続されている。つまり、「工程#1リードタイム」、「工程#2リードタイム」及び「工程#3リードタイム」は、「製品A生産リードタイム」に影響を与え得る。更に、各工程は生産プロセスに基づいた論理構造による関係性で接続されている。ここでは「工程#1」、「工程#2」、「工程#3」の順に生産が行われている例を示している。なお、本明細書では、「リードタイム」は所要時間の意味である。つまり、「製品A生産リードタイム」は製品Aの生産を完了するのに要する所要時間である。
設備及び機器の階層についても同様に上位階層の要素との関係性が示される。
具体的には、階層:設備を構成する要素として、「設備#1-1リードタイム」、「設備#1-2リードタイム」、「設備#2-1リードタイム」、「設備#3-1リードタイム」及び「設備#3-2リードタイム」が定義されている。「設備#1-1リードタイム」及び「設備#1-2リードタイム」は「工程#1リードタイム」に影響を与え得る。また、「設備#2-1リードタイム」は「工程#2リードタイム」に影響を与え得る。また、「設備#3-1リードタイム」と「設備#3-2リードタイム」は「工程#3リードタイム」に影響を与え得る。
また、階層:機器を構成する要素として、「PLC#1-1-1サイクルタイム」、「サーボ#1-1-2モータ電流値」、「センサ#1-1-3対象角度」、「PLC#1-2-1サイクルタイム」及び「ロボット#1-2-2到達率」が定義されている。「PLC#1-1-1サイクルタイム」、「サーボ#1-1-2モータ電流値」及び「センサ#1-1-3対象角度」は「設備#1-1リードタイム」に影響を与え得る。また、「PLC#1-2-1サイクルタイム」及び「ロボット#1-2-2到達率」は、「設備#1-2リードタイム」に影響を与え得る。更に、「サーボ#1-1-2モータ電流値」は、「PLC#1-1-1サイクルタイム」及び「センサ#1-1-3対象角度」に影響を与え得る。また、「センサ#1-1-3対象角度」は「ロボット#1-2-2到達率」に影響を与え、「ロボット#1-2-2到達率」は「PLC#1-2-1サイクルタイム」に影響を与え得る。
In the information model of FIG. 3, the hierarchy includes production lines, processes, facilities and equipment.
"Product A production lead time" is defined as an element constituting the hierarchy: production line. FIG. 3 shows an example of setting "product A production lead time" as the KGI of the production system and managing production.
"Process #1 lead time,""Process#2 lead time," and "Process #3 lead time," which are the lead times of each process in the production system, are defined as a hierarchy below "Product A production lead time." ing. "Process #1 lead time", "Process #2 lead time" and "Process #3 lead time" are connected to "Product A production lead time" in a hierarchical structure. That is, the "process #1 lead time", the "process #2 lead time" and the "process #3 lead time" can affect the "product A production lead time". Furthermore, each process is connected with a relationship by a logical structure based on the production process. Here, an example is shown in which production is performed in order of "process #1", "process #2", and "process #3". In this specification, "lead time" means required time. In other words, "product A production lead time" is the time required to complete the production of product A.
Similarly, for the hierarchy of equipment and equipment, the relationship with the elements of the higher hierarchy is shown.
Specifically, the hierarchy: "equipment #1-1 lead time", "equipment #1-2 lead time", "equipment #2-1 lead time", "equipment #3-1 Lead Time” and “Equipment #3-2 Lead Time” are defined. "Equipment #1-1 Lead Time" and "Equipment #1-2 Lead Time" can affect "Process #1 Lead Time". Also, the "equipment #2-1 lead time" can affect the "process #2 lead time." In addition, "equipment #3-1 lead time" and "equipment #3-2 lead time" can affect "process #3 lead time".
Hierarchy: Elements that make up the device are "PLC #1-1-1 cycle time", "servo #1-1-2 motor current value", "sensor #1-1-3 target angle", "PLC #1-2-1 cycle time” and “robot #1-2-2 reach rate” are defined. "PLC #1-1-1 cycle time", "servo #1-1-2 motor current value" and "sensor #1-1-3 target angle" affect "equipment #1-1 lead time" obtain. In addition, "PLC #1-2-1 cycle time" and "robot #1-2-2 arrival rate" can affect "equipment #1-2 lead time". Furthermore, "Servo #1-1-2 Motor Current Value" can affect "PLC #1-1-1 Cycle Time" and "Sensor #1-1-3 Target Angle". Also, "sensor #1-1-3 target angle" affects "robot #1-2-2 reach rate", and "robot #1-2-2 reach rate" affects "PLC #1-2-1 can affect cycle time.

ここで、図1に示す情報記憶部101、評価部102、改善箇所分析部103及び情報収集部104を説明する。 Here, the information storage unit 101, evaluation unit 102, improvement point analysis unit 103, and information collection unit 104 shown in FIG. 1 will be described.

情報記憶部101は、図3に例示した情報モデルを記憶する。
また、情報記憶部101は、後述する設定項目を記憶する。
また、情報記憶部101は、評価部102による評価結果を記憶する。
また、情報記憶部101は、改善箇所分析部103による分析結果を記憶する。
また、情報記憶部101は、情報収集部104により収集された情報を記憶する。
The information storage unit 101 stores the information model illustrated in FIG.
The information storage unit 101 also stores setting items to be described later.
Also, the information storage unit 101 stores evaluation results by the evaluation unit 102 .
Further, the information storage unit 101 stores analysis results by the improvement part analysis unit 103 .
The information storage unit 101 also stores information collected by the information collection unit 104 .

評価部102は、分析対象200に含まれる要素ごとに、性能の基準に性能が合致するか否かを評価する。評価部102は、各要素が要素ごとに定義された性能の基準に性能が合致するか否かを評価する。
また、上述のように各要素は複数の階層を構成しているが、評価部102は、階層ごとに異なる時間幅で各要素の性能が性能の基準に合致するか否かを評価してもよい。
更に、評価部102は、評価を行う度に、評価結果を出力してもよい。
The evaluation unit 102 evaluates whether or not the performance of each element included in the analysis target 200 meets the performance criteria. The evaluation unit 102 evaluates whether or not the performance of each element matches the performance criteria defined for each element.
In addition, although each element constitutes a plurality of layers as described above, the evaluation unit 102 may evaluate whether the performance of each element meets the performance standard in a time period different for each layer. good.
Furthermore, the evaluation unit 102 may output an evaluation result each time evaluation is performed.

改善箇所分析部103は、評価部102による評価結果に基づき、分析対象200に含まれる要素のうち性能を改善させるべき要素を指定要素として指定する。
また、改善箇所分析部103は、推定した改善対象関連要素(後述)を新たな指定要素に指定することもある。更に、改善箇所分析部103は、新たな改善対象関連要素を推定する度に、推定した新たな改善対象関連要素を新たな指定要素に指定することを繰り返してもよい。
Based on the evaluation result by the evaluation unit 102, the improvement part analysis unit 103 designates an element whose performance should be improved among the elements included in the analysis object 200 as a designated element.
Further, the improvement part analysis unit 103 may designate an estimated improvement target related element (described later) as a new designated element. Further, the improvement portion analysis unit 103 may repeat designating the estimated new improvement target related element as a new designated element each time it estimates a new improvement target related element.

また、改善箇所分析部103は、指定要素以外の要素の中から指定要素と有意な関係にある1以上の要素を関連要素として抽出する。本実施の形態では、指定要素と関連要素との1:1の関係についても分析可能であるため、改善箇所分析部103は1以上の要素を関連要素として抽出する例を説明する。1つの指定要素に対して複数の関連要素の各々との関係を分析する場合は、改善箇所分析部103は2以上の要素を関連要素として抽出する。「有意な関係」とは、指定要素の性能に影響を与え得る関係である。より具体的には、図3の情報モデルにおいて、指定要素と実線(階層構造による関係性)で接続された下位の階層の要素又は指定要素に向かう破線矢印(論理構造による関係性)の起点に位置する要素である。
例えば、評価部102により「製品A生産リードタイム」が指定要素に指定された場合は、改善箇所分析部103は、「製品A生産リードタイム」と有意な関係になる要素(関連要素)として、「工程#1リードタイム」、「工程#2リードタイム」及び「工程#3リードタイム」を抽出する。また、例えば、評価部102により「工程#2リードタイム」が指定要素に指定された場合は、改善箇所分析部103は、「工程#2リードタイム」と有意な関係になる要素(関連要素)として、「工程#1リードタイム」及び「設備#2-1リードタイム」を抽出する。なお、「性能」とは、測定及び/又は計算により得られる値である。例えば、「製品A生産リードタイム」の性能は、各工程の所要時間を測定し、各工程の所要時間を加算して得られる時間である。また、例えば、「サーボ#1-1-2モータ電流値」の性能は、サーボ#1-1-2に対して実際に測定を行って得られたモータ電流値である。
Further, the improvement point analysis unit 103 extracts one or more elements having a significant relationship with the designated element from elements other than the designated element as related elements. In this embodiment, a 1:1 relationship between a specified element and a related element can also be analyzed, so an example in which the improvement point analysis unit 103 extracts one or more elements as related elements will be described. When analyzing the relationship between one designated element and each of a plurality of related elements, the improvement part analysis unit 103 extracts two or more elements as related elements. A "significant relationship" is a relationship that can affect the performance of the specified element. More specifically, in the information model of FIG. It is a positioned element.
For example, when the evaluation unit 102 designates "product A production lead time" as a designated element, the improvement point analysis unit 103 determines that the element (related element) having a significant relationship with "product A production lead time" is: "Process #1 lead time", "Process #2 lead time" and "Process #3 lead time" are extracted. Further, for example, when the evaluation unit 102 designates "process #2 lead time" as a designated element, the improvement point analysis unit 103 determines an element (related element) that has a significant relationship with "process #2 lead time". , "process #1 lead time" and "equipment #2-1 lead time" are extracted. "Performance" is a value obtained by measurement and/or calculation. For example, the performance of "product A production lead time" is the time obtained by measuring the time required for each process and adding the time required for each process. Also, for example, the performance of "servo #1-1-2 motor current value" is a motor current value obtained by actually measuring servo #1-1-2.

また、改善箇所分析部103は、抽出した1以上の関連要素の各々の性能が指定要素の性能に与える影響を分析して、1以上の関連要素の中から、指定要素の性能の改善のために性能を改善させるべき関連要素である改善対象関連要素を推定する。改善箇所分析部103は、指定要素の性能が改善されること(又は悪化すること)を結論部に用い、1以上の関連要素の各々の性能が改善されること(又は悪化すること)を条件部に用いたアソシエーション分析を行って、改善対象関連要素を推定する。アソシエーション分析については後述する。
また、改善箇所分析部103は、複数の改善対象関連要素を推定した場合に、各々の改善対象関連要素の性能が他の改善対象関連要素の性能に与える影響を分析して、複数の改善対象関連要素の間に優先順位を設定する。
また、改善箇所分析部103は、評価部102により新たな指定要素が指定された場合に、新たな指定要素と有意な関係にある、新たな指定要素以外の1以上の要素を新たな関連要素として抽出する。そして、改善箇所分析部103は、抽出した1以上の新たな関連要素の各々の性能が新たな指定要素の性能に与える影響を分析して、1以上の新たな関連要素の中から、新たな指定要素の性能の改善のために性能を改善させるべき新たな関連要素を新たな改善対象関連要素として推定する。
また、改善箇所分析部103は、新たな指定要素を指定する度に、指定した新たな指定要素以外の1以上の要素を新たな関連要素として抽出することを繰り返し、また、1以上の新たな関連要素を抽出する度に、新たな改善対象関連要素を推定することを繰り返してもよい。
なお、改善箇所分析部103は指定部、抽出部及び推定部に相当する。また、改善箇所分析部103により行われる処理は指定処理、抽出処理及び推定処理に相当する。
In addition, the improvement part analysis unit 103 analyzes the influence of the performance of each of the extracted one or more related elements on the performance of the specified element, and selects, from among the one or more related elements, Estimate the relevant element to be improved, which is the relevant element whose performance should be improved. The improvement part analysis unit 103 uses the fact that the performance of the designated element is improved (or deteriorated) in the conclusion part, and the condition is that the performance of each of the one or more related elements is improved (or deteriorated). We estimate the related elements to be improved by performing the association analysis used for the part. Association analysis will be described later.
In addition, when estimating a plurality of improvement target related elements, the improvement part analysis unit 103 analyzes the influence of the performance of each improvement target related element on the performance of other improvement target related elements, Set priorities among related elements.
Further, when a new specified element is specified by the evaluation unit 102, the improvement part analysis unit 103 converts one or more elements other than the new specified element, which have a significant relationship with the new specified element, into a new related element. Extract as Then, the improvement part analysis unit 103 analyzes the influence of the performance of each of the extracted one or more new related elements on the performance of the new specified element, and selects the new specified element from among the one or more new related elements. In order to improve the performance of the designated element, a new related element whose performance should be improved is estimated as a new improvement target related element.
In addition, each time a new specified element is specified, the improvement part analysis unit 103 repeats extracting one or more elements other than the specified new specified element as new related elements, and extracts one or more new specified elements. Estimation of a new related element to be improved may be repeated each time a related element is extracted.
Note that the improvement point analysis unit 103 corresponds to a designation unit, an extraction unit, and an estimation unit. Processing performed by the improvement point analysis unit 103 corresponds to designation processing, extraction processing, and estimation processing.

ここで、アソシエーション分析について説明する。
複数の情報の間の関係性を分析する手法として、アソシエーション分析(バスケット分析、アソシエーションルール等とも呼ばれる)が知られている。
アソシエーション分析では、統計情報が入力として用いられ、条件部と結論部の関係について支持度、信頼度、リフト値が算出される。支持度とは、全データ数の内、条件部と結論部を共に含むデータの割合である。信頼度とは、条件部を含むデータ数の内、条件部と結論部を共に含むデータの割合である。リフト値は、信頼度を、結論部を含むデータ数で割って得られる値である。一般的にリフト値が1より大きい場合に、条件部が結論部に与える影響が大きく、結論部と条件部の間に関係があると定量的に判断できる。
しかしながら、アソシエーション分析では入力となる情報の組み合わせごとに支持度、信頼度、リフト値を算出する必要があることから計算量が膨大となる。このため、情報の種類が多い生産システムにアソシエーション分析を単純に適用することができないという課題がある。
本実施の形態では、改善箇所分析部103は、アソシエーション分析に含まれる複数の計算項目(支持度、信頼度、リフト値)のうちのいずれかの計算項目において計算維持条件が不成立の場合に、複数の計算項目のうちの未計算の計算項目の計算を行わない。このようにすることで、本実施の形態では、情報の種類が多い生産システムにもアソシエーション分析を効果的に適用する。
Here, association analysis will be described.
Association analysis (also called basket analysis, association rule, etc.) is known as a technique for analyzing relationships between a plurality of pieces of information.
In association analysis, statistical information is used as input, and support, confidence, and lift values are calculated for the relation between the condition part and the conclusion part. The degree of support is the ratio of data that includes both the condition part and the conclusion part among the total number of data. Reliability is the ratio of data including both the condition part and the conclusion part to the number of data including the condition part. A lift value is a value obtained by dividing the reliability by the number of data including the conclusion part. Generally, when the lift value is greater than 1, the effect of the conditional part on the conclusion part is large, and it can be quantitatively determined that there is a relationship between the conclusion part and the conditional part.
However, in association analysis, the amount of calculation is enormous because it is necessary to calculate the support, reliability, and lift value for each combination of input information. For this reason, there is a problem that association analysis cannot be simply applied to a production system with many types of information.
In the present embodiment, the improvement point analysis unit 103, when the calculation maintenance condition is not satisfied in any of the plurality of calculation items (support, reliability, lift value) included in the association analysis, Do not calculate uncalculated calculation items among multiple calculation items. By doing so, in the present embodiment, the association analysis is effectively applied even to a production system with many types of information.

情報収集部104は、分析対象200である生産システムから、図3に示す各要素についての情報を収集する。
例えば、情報収集部104は、図3に示す要素ごとに性能を収集する。具体的には、情報収集部104は、「製品A生産リードタイム」の性能として、測定された各工程の所要時間を収集し、各工程の所要時間を加算して製品Aの生産に要する時間を得る。また、情報収集部104は、「サーボ#1-1-2モータ電流値」の性能として、サーボ#1-1-2を実際に測定して得られたモータ電流値を収集する。
情報収集部104は、収集した情報を情報記憶部101に格納する。
The information collection unit 104 collects information about each element shown in FIG. 3 from the production system that is the analysis target 200 .
For example, the information collection unit 104 collects performance for each element shown in FIG. Specifically, the information collection unit 104 collects the measured time required for each process as the performance of the "product A production lead time", adds the time required for each process, and obtains the time required to produce product A. get The information collecting unit 104 also collects the motor current value obtained by actually measuring the servo #1-1-2 as the performance of the "servo #1-1-2 motor current value".
Information collecting unit 104 stores the collected information in information storage unit 101 .

図4は、情報収集部104の設定項目の例を示す。
情報収集部104は、図4に示す設定項目に従って、情報モデルに含まれる各要素の情報を収集する。
図4では、情報収集部104の設定項目として、要素、収集対象、監視期間、判定基準が定義されている。
図4の設定項目のうち、要素の欄には、情報モデルに含まれる要素が示される。
収集対象の欄には、情報の収集方法が示される。収集方法としては、生産システム内に存在するいずれかの機器から直接情報を収集する方法と、いずれかの機器から収集した情報を基に計算する方法がある。機器から直接情報を収集する場合は、収集対象の欄に情報収集元の機器が示される。
監視期間の欄には、判定基準を適用する時間幅が示される。
判定基準の欄には、評価部102での評価に用いられる基準、つまり性能の基準が示される。
情報収集部104により収集された情報は、記憶内容に示すように、時系列データとして評価部102で保持される。
FIG. 4 shows an example of setting items of the information collection unit 104. As shown in FIG.
The information collection unit 104 collects information of each element included in the information model according to the setting items shown in FIG.
In FIG. 4, as setting items of the information collecting unit 104, an element, a collection target, a monitoring period, and a criterion are defined.
Among the setting items in FIG. 4, the elements included in the information model are shown in the element column.
The collection target column shows the information collection method. As a collection method, there are a method of directly collecting information from any device existing in the production system, and a method of calculation based on information collected from any device. When collecting information directly from a device, the device from which the information is collected is indicated in the collection target column.
The monitoring period column shows the time width for which the criterion is applied.
The criteria used for evaluation by the evaluation unit 102, that is, performance criteria, are shown in the criteria column.
The information collected by the information collection unit 104 is held in the evaluation unit 102 as time-series data as shown in the storage content.

***動作の説明***
図5は、評価部102の動作例を示すフローチャートである。
図6は、評価部102の評価結果の例をグラフ形式で示す。
図7は、評価部102の評価結果の例を表形式で示す。
図8は、改善箇所分析部103の動作例を示すフローチャートである。
図9は、図8のステップS204の詳細を示すフローチャートである。
図10は、本実施の形態に係る分析対象の例を示す。
図11は、本実施の形態に係る分析条件の例を示す。
図12は、改善箇所分析部103の分析結果の例を示す。
以降、図1~図12を参照しながら本実施の形態に係る改善箇所分析装置100の動作例を説明する。
***Description of operation***
FIG. 5 is a flowchart showing an operation example of the evaluation unit 102. As shown in FIG.
FIG. 6 shows an example of the evaluation result of the evaluation unit 102 in graph form.
FIG. 7 shows an example of evaluation results of the evaluation unit 102 in tabular form.
FIG. 8 is a flow chart showing an operation example of the improvement point analysis unit 103 .
FIG. 9 is a flow chart showing details of step S204 in FIG.
FIG. 10 shows an example of an analysis target according to this embodiment.
FIG. 11 shows an example of analysis conditions according to this embodiment.
FIG. 12 shows an example of the analysis result of the improvement point analysis unit 103. As shown in FIG.
Hereinafter, an operation example of the improvement point analysis apparatus 100 according to the present embodiment will be described with reference to FIGS. 1 to 12. FIG.

事前設定フェーズ
生産システムの管理者あるいは設計者は、生産システムの管理のため、図3に示す情報モデルと図4に示す設定項目を生成する。そして、生産システムの管理者あるいは設計者は、生成した情報モデルと設定項目を改善箇所分析装置100の情報記憶部101に格納する。
情報モデル及び設定項目は、生産システムの設計情報を基に生成することが望ましい。
Presetting Phase The production system manager or designer generates the information model shown in FIG. 3 and the setting items shown in FIG. 4 for management of the production system. Then, the administrator or designer of the production system stores the generated information model and setting items in the information storage unit 101 of the improvement point analysis device 100 .
The information model and setting items are desirably generated based on the design information of the production system.

情報収集フェーズ
情報収集部104は、図4の設定項目に基づき、分析対象200である生産システムから情報を収集する。そして、収集した情報を情報記憶部101に格納する。
なお、情報収集部104は、改善箇所分析装置100以外の外部装置が収集した情報を外部装置から取得し、外部装置から取得した情報を設定項目に対応付けて情報記憶部101に格納してもよい。
Information Collecting Phase The information collecting unit 104 collects information from the production system, which is the analysis target 200, based on the setting items in FIG. Then, the collected information is stored in the information storage unit 101 .
Note that the information collecting unit 104 may acquire information collected by an external device other than the improvement point analysis device 100 from the external device, and store the information acquired from the external device in the information storage unit 101 in association with the setting items. good.

評価フェーズ
次に、評価フェーズとして、評価部102が図5に示すフローチャートを行う。
具体的には、評価部102は、図4に示す設定項目を情報記憶部101から読み込む(ステップS101)。
次に、評価部102は、情報収集部104により収集された情報を情報記憶部101から読み込む(ステップS102)。
次に、情報収集部104は、設定項目と収集された情報とを用いて各要素の性能の評価を行い、評価結果を情報記憶部101に格納する(ステップS103)。つまり、情報収集部104は、設定項目に示す要素ごとに、監視期間の単位で、情報収集部104により収集された情報が判定基準に合致するか否かを判定する。なお、「製品A生産リードタイム」のように「収集対象」が「算出」と定義されている場合は、評価部102は、情報収集部104により収集された情報に基づく計算を行い、計算により得られた値と判定基準とを比較する。
Evaluation Phase Next, as an evaluation phase, the evaluation unit 102 performs the flowchart shown in FIG.
Specifically, the evaluation unit 102 reads the setting items shown in FIG. 4 from the information storage unit 101 (step S101).
Next, the evaluation unit 102 reads the information collected by the information collection unit 104 from the information storage unit 101 (step S102).
Next, the information collecting unit 104 evaluates the performance of each element using the set items and the collected information, and stores the evaluation result in the information storage unit 101 (step S103). In other words, the information collecting unit 104 determines whether or not the information collected by the information collecting unit 104 matches the determination criteria for each element indicated by the setting item in units of monitoring periods. Note that when the "collection target" is defined as "calculation" such as "product A production lead time", the evaluation unit 102 performs calculation based on the information collected by the information collection unit 104, and the calculation Compare the obtained value with a criterion.

図6及び図7は、評価部102による評価結果の例を示す。図6は評価結果をグラフ形式で示しており、図7は評価結果を表形式で示している。
例えば、「製品A生産リードタイム」は判定基準が閾値X1である。評価部102は、ある監視期間で「製品A生産リードタイム」の性能(所要時間)が閾値X1を上回った場合はHIGH(バイナリ値における1)と評価する。また、評価部102は、別の監視期間で「製品A生産リードタイム」の性能(所要時間)が閾値X1以下であった場合はLOW(バイナリ値における0)と評価する。本実施の形態では、「製品A生産リードタイム」をKGIに設定しているため、「製品A生産リードタイム」の性能(所要時間)が判定基準より高い(=HIGH)場合は生産性が低下していることを意味する。
なお、評価部102は、評価結果を逐次、HMI(Human Machine Interface)に出力してもよい。このように構成すれば、生産システムの改善担当者がHMIを参照することで生産システムの状況をリアルタイムに理解し、改善要否を判断することができる。
6 and 7 show examples of evaluation results by the evaluation unit 102. FIG. FIG. 6 shows the evaluation results in graph form, and FIG. 7 shows the evaluation results in tabular form.
For example, "product A production lead time" has threshold value X1 as the criterion. The evaluation unit 102 evaluates the performance (required time) of "product A production lead time" to be HIGH (binary value of 1) when the performance (required time) exceeds the threshold value X1 during a certain monitoring period. Moreover, the evaluation unit 102 evaluates as LOW (0 in binary value) when the performance (required time) of the "product A production lead time" is equal to or less than the threshold value X1 in another monitoring period. In this embodiment, "product A production lead time" is set to KGI, so if the performance (required time) of "product A production lead time" is higher than the criterion (=HIGH), productivity will decrease. means that
Note that the evaluation unit 102 may sequentially output evaluation results to an HMI (Human Machine Interface). With this configuration, the person in charge of improvement of the production system can understand the situation of the production system in real time by referring to the HMI, and can judge the necessity of improvement.

改善箇所分析フェーズ
生産システムの改善担当者は、評価部102による評価結果を参照し、KGIに対する評価部102の評価状況から改善要否を判断する。例えば、図6及び図7に示すように、「製品A生産リードタイム」が判定基準より高い、つまり生産性が低下している期間が複数回存在する場合は、生産システムの改善担当者は、改善が必要であると判断する。
改善が必要と判断した場合は、生産システムの改善担当者は改善箇所分析装置100に改善箇所分析部103による分析を指示する。
改善箇所分析部103は、生産システムの改善担当者からの指示に基づき、図8のフローを実行する。
なお、ここでは生産システムの改善担当者からの指示に基づき、改善箇所分析部103が図8のフローを実行する例を示すが、改善箇所分析部103が図8のフローを周期的に実行してもよい。あるいは評価部102による評価結果が規定数蓄積した場合に改善箇所分析部103が図8のフローを実行してもよい。更に、改善箇所分析部103が評価部102による評価結果を参照して改善要否を判定し、改善が必要と判定した場合に、図8のフローを実行してもよい。
Improvement Point Analysis Phase The person in charge of improvement of the production system refers to the evaluation result by the evaluation unit 102 and judges whether or not improvement is necessary based on the evaluation status of the evaluation unit 102 for the KGI. For example, as shown in FIGS. 6 and 7, if the "product A production lead time" is higher than the criterion, that is, if there are multiple periods in which productivity is declining, the person in charge of improving the production system should: Decide that improvement is necessary.
When it is determined that improvement is necessary, the person in charge of improvement of the production system instructs the improvement point analysis device 100 to perform analysis by the improvement point analysis unit 103 .
The improvement point analysis unit 103 executes the flow of FIG. 8 based on instructions from the person in charge of improvement of the production system.
Here, an example is shown in which the improvement point analysis unit 103 executes the flow of FIG. 8 based on instructions from the person in charge of improvement of the production system. may Alternatively, the improvement point analysis unit 103 may execute the flow of FIG. 8 when a specified number of evaluation results by the evaluation unit 102 are accumulated. Furthermore, the improvement part analysis unit 103 may refer to the evaluation result by the evaluation unit 102 to determine whether or not improvement is necessary, and when it is determined that improvement is necessary, the flow of FIG. 8 may be executed.

図8に示すように、改善箇所分析部103は、図3に示す情報モデルを情報記憶部101から読み込む(ステップS201)。
また、改善箇所分析部103は、評価部102による評価結果を情報記憶部101から読み込む(ステップS202)。
ステップS201とステップS202は順序が入れ替わってもよいし、ステップS201とステップS202が並行して行われてもよい。
As shown in FIG. 8, the improvement point analysis unit 103 reads the information model shown in FIG. 3 from the information storage unit 101 (step S201).
Further, the improvement point analysis unit 103 reads the evaluation result by the evaluation unit 102 from the information storage unit 101 (step S202).
The order of step S201 and step S202 may be changed, or step S201 and step S202 may be performed in parallel.

次に、改善箇所分析部103は、分析対象である指定要素を指定し、分析条件の設定又は読み込みを行う(ステップS203)。
改善箇所分析部103は、生産システムの改善担当者の指示に従って指定要素を指定してもよいし、評価部102による評価結果を分析して指定要素を指定してもよい。例えば、改善箇所分析部103は、複数回にわたって性能が判定基準に合致していない要素のうちで最上位の階層の要素を指定要素に指定する。
なお、分析条件の詳細は後述する。
Next, the improvement point analysis unit 103 designates a designated element to be analyzed, and sets or reads analysis conditions (step S203).
The improvement point analysis unit 103 may specify the specified elements according to the instruction of the person in charge of improvement of the production system, or may specify the specified elements by analyzing the evaluation result by the evaluation unit 102 . For example, the improvement point analysis unit 103 designates, as the designated element, the element of the highest layer among the elements whose performance does not meet the criteria for a plurality of times.
Details of the analysis conditions will be described later.

次に、改善箇所分析部103は、分析を行い、分析結果を情報記憶部101に格納する(ステップS204)。
また、更に分析を続ける場合(ステップS205でYES)は、処理がステップS203に戻り、改善箇所分析部103が新たな指定要素を指定する。改善箇所分析部103は、例えば、ステップS204で得られた改善対象関連要素を新たな指定要素に指定する。
Next, the improvement point analysis unit 103 performs analysis and stores the analysis result in the information storage unit 101 (step S204).
If the analysis is to be continued further (YES in step S205), the process returns to step S203, and the improvement point analysis unit 103 designates a new designated element. The improvement part analysis unit 103 designates, for example, the improvement target related element obtained in step S204 as a new designated element.

図9は、ステップS204の詳細を示す。以下、図9を参照してステップS204の詳細を説明する。 FIG. 9 shows details of step S204. The details of step S204 will be described below with reference to FIG.

まず、改善箇所分析部103は、情報モデルからアソシエーション分析における結論部と条件部の有意な組み合わせを抽出する(ステップS2041)。
有意な組み合わせとは、結論部及と条件部が情報モデルにおける階層構造による関係性、論理構造による関係性の両観点で矛盾がないことを示す。すなわち、有意な組み合わせとは、結論部と条件部が階層構造による関係性において正しい方向で接続されている、あるいは論理構造による関係性において正しい方向で接続されていることを意味する。結論部の要素と階層構造による関係性において正しい方向で接続されている要素及び結論部の要素と論理構造による関係性において正しい方向で接続されている要素は、結論部の要素の性能に影響を与え得る要素である。
具体的には、改善箇所分析部103は、ステップS203で指定された指定要素を結論部に設定する。そして、改善箇所分析部103は、情報モデルに基づき、指定要素と階層構造による関係性において正しい方向で接続されている要素及び指定要素と論理構造による関係性において正しい方向で接続されている要素を条件部に設定する。条件部に設定される要素が関連要素に相当する。
例えば、改善箇所分析部103がステップS203で「製品A生産リードタイム」を指定要素に指定した場合に、改善箇所分析部103は、「製品A生産リードタイム」と階層構造による関係性において正しい方向で接続されている「工程#1リードタイム」、「工程#2リードタイム」及び「工程#3リードタイム」を関連要素として抽出する。
この場合は、改善箇所分析部103は、図10に示すように、「製品A生産リードタイムの値が判定基準より高くなる」ことを結論部に設定し、「工程#1リードタイム」、「工程#2リードタイム」及び「工程#3リードタイム」を条件部に設定する。
また、例えば、改善箇所分析部103がステップS203で「工程#1リードタイム」を指定要素に指定した場合は、「工程#2リードタイム」及び「工程#3リードタイム」は論理構造による関係性と矛盾し、有意な組み合わせとはならない(工程#2又は工程#3のリードタイムに変化があっても、工程#1のリードタイムは変化しない)。このため、改善箇所分析部103は「工程#2リードタイム」及び「工程#3リードタイム」は関連要素として抽出しない。
First, the improvement part analysis unit 103 extracts a significant combination of the conclusion part and the condition part in the association analysis from the information model (step S2041).
A significant combination means that the concluding part and the conditional part are not inconsistent from the viewpoint of both the relationship based on the hierarchical structure and the relationship based on the logical structure in the information model. In other words, a significant combination means that the concluding part and the conditional part are connected in the correct direction in the relationship based on the hierarchical structure, or in the correct direction in the relationship based on the logical structure. Elements that are connected in the correct direction in a hierarchical relationship with the conclusion element and elements that are connected in the correct direction in the logical structure relationship with the conclusion element do not affect the performance of the conclusion element. element that can be given.
Specifically, the improvement point analysis unit 103 sets the specified element specified in step S203 to the conclusion part. Then, based on the information model, the improvement part analysis unit 103 identifies elements that are connected in the correct direction in the relationship between the specified element and the hierarchical structure, and elements that are connected in the correct direction in the relationship between the specified element and the logical structure. Set in the conditional part. Elements set in the condition part correspond to related elements.
For example, when the improvement point analysis unit 103 designates "product A production lead time" as a designated element in step S203, the improvement point analysis unit 103 determines that the relationship between "product A production lead time" and the hierarchical structure is in the correct direction. "process #1 lead time", "process #2 lead time" and "process #3 lead time" connected by are extracted as related elements.
In this case, as shown in FIG. 10, the improvement point analysis unit 103 sets "the value of the product A production lead time is higher than the criterion" in the conclusion part, and sets "process #1 lead time", ""process#2 lead time" and "process #3 lead time" are set in the condition part.
Further, for example, when the improvement point analysis unit 103 designates "process #1 lead time" as a designated element in step S203, the relationship between "process #2 lead time" and "process #3 lead time" is based on the logical structure. and does not result in a significant combination (even if there is a change in the lead time of process #2 or #3, the lead time of process #1 does not change). Therefore, the improvement point analysis unit 103 does not extract "process #2 lead time" and "process #3 lead time" as related elements.

次に、改善箇所分析部103は、抽出した条件部及び結論部の組み合わせに対してアソシエーション分析を実行する(ステップS2042)。
ここでは、改善箇所分析部103は、アソシエーション分析における支持度、信頼度及びリフト値を計算するものとする。これらの計算項目の計算順序は特に定めない。
改善箇所分析部103は、分析条件を参照して、いずれかの計算項目において計算維持条件が不成立の場合は、未計算の計算項目の計算を停止してもよい。このように構成することでアソシエーション分析の計算量を削減できる。
図11は、分析条件の例を示す。
図11の分析条件では、分析対象の区間(時間幅)、アソシエーション分析の各計算項目の計算維持条件が定義されている。
なお、図11の例では、区間の条件を階層にかかわらず一定の区間としている。上位の階層の要素ほど長い周期で収集されることが一般的であり、下位の階層の要素の変化が上位の階層に伝わるまで一定の遅延を含む場合がある。このような場合は上位の階層の要素と下位の階層の要素で分析対象とする区間(時間幅)をずらして設定するとよい。
また、図11の例では、リフト値の計算維持条件が1以上であり、支持度の計算維持条件が0.001より大きく、信頼度の計算維持条件が0.001より大きいことが示される。
Next, the improvement part analysis unit 103 performs association analysis on the combination of the extracted condition part and conclusion part (step S2042).
Here, the improvement point analysis unit 103 is assumed to calculate the support, reliability and lift value in the association analysis. The calculation order of these calculation items is not specified.
The improvement point analysis unit 103 may refer to the analysis conditions and stop the calculation of the uncalculated calculation items when the calculation maintenance condition is not satisfied for any calculation item. By configuring in this way, the amount of calculation for association analysis can be reduced.
FIG. 11 shows an example of analysis conditions.
In the analysis conditions of FIG. 11, the interval (time width) to be analyzed and the calculation maintenance conditions of each calculation item of the association analysis are defined.
In addition, in the example of FIG. 11, the section condition is a constant section regardless of the hierarchy. Elements in higher layers are generally collected at longer intervals, and there may be a certain delay until changes in elements in lower layers are propagated to higher layers. In such a case, it is preferable to set the interval (time width) to be analyzed by shifting the element of the upper layer and the element of the lower layer.
The example of FIG. 11 also shows that the lift value calculation maintenance condition is 1 or more, the support calculation maintenance condition is greater than 0.001, and the reliability calculation maintenance condition is greater than 0.001.

図12は、改善箇所分析部103による分析結果の例を示す。
なお、図12において、支持度、信頼度及びリフト値のすべてが斜線で打ち消されている組み合わせは、有意な組み合わせではないためアソシエーション分析の対象とならなかった組み合わせである。
FIG. 12 shows an example of an analysis result by the improvement point analysis unit 103. As shown in FIG.
Note that in FIG. 12, the combinations in which the support, confidence, and lift values are all shaded out are not significant combinations and thus were not subjected to association analysis.

図12の上段は、改善箇所分析部103が、製品A生産リードタイムに各工程のリードタイムが与える影響を分析して得られた結果を示す。上述した通り、改善箇所分析部103は有意な組み合わせのみ抽出して分析する。このため、図12の上段では、「製品A生産リードタイム」を結論部に設定し、「工程#1リードタイム」、「工程#2リードタイム」及び「工程#3リードタイム」の各々を条件部に設定して行ったアソシエーション分析の結果を示す。
図12の上段の例では、「工程#1リードタイム」が判定基準より高い(=HIGH)場合を条件部にしたアソシエーション分析と「工程#2リードタイム」が判定基準より高い(=HIGH)場合を条件部にしたアソシエーション分析において、リフト値が1より大きい。このため、「工程#1リードタイム」及び「工程#2リードタイム」が「製品A生産リードタイム」の悪化の要因である可能性が高い。従って、改善箇所分析部103は「工程#1リードタイム」及び「工程#2リードタイム」を改善対象関連要素と推定する。つまり、改善箇所分析部103は、「製品A生産リードタイム」の性能を改善するために性能を改善させるべき要素として、「工程#1リードタイム」及び「工程#2リードタイム」を抽出する。
The upper part of FIG. 12 shows the result obtained by analyzing the influence of the lead time of each process on the product A production lead time by the improvement point analysis unit 103 . As described above, the improvement point analysis unit 103 extracts and analyzes only significant combinations. Therefore, in the upper part of FIG. 12, "product A production lead time" is set in the conclusion part, and each of "process #1 lead time", "process #2 lead time" and "process #3 lead time" is set as a condition. Shown are the results of an association analysis that was performed using a set of parts.
In the example in the upper part of FIG. 12, the association analysis is performed with the case where the "process #1 lead time" is higher than the criterion (=HIGH) as the conditional part, and the case where the "process #2 lead time" is higher than the criterion (=HIGH). is the conditional part of the association analysis, the lift value is greater than 1. Therefore, there is a high possibility that the "process #1 lead time" and the "process #2 lead time" are the factors that cause the deterioration of the "product A production lead time". Therefore, the improvement point analysis unit 103 estimates the “process #1 lead time” and the “process #2 lead time” as related elements to be improved. In other words, the improvement point analysis unit 103 extracts the “process #1 lead time” and the “process #2 lead time” as elements whose performance should be improved in order to improve the performance of the “product A production lead time”.

図12の下段は、改善箇所分析部103が、「工程#1リードタイム」、「工程#2リードタイム」及び「工程#3リードタイム」の各々が他の工程のリードタイムに与える影響を分析して得られた結果を示す。
図12の上段では、リフト値が1より大きい組み合わせが複数あることから、改善箇所分析部103は、各工程のリードタイムが他の工程のリードタイムに与える影響も分析している。つまり、改善箇所分析部103は、各工程を新たな指定要素として指定し、また、新たな指定要素として指定した工程以外の工程を新たな関連要素として抽出して、アソシエーション分析を行う。
図12の下段の例では、「工程#1リードタイム」が判定基準より高い(=HIGH)場合を条件部に設定し、「工程#2リードタイム」が高くなることを結論部に設定したアソシエーション分析において、リフト値が1より大きい。従って、「工程#1リードタイム」が「工程#2リードタイム」の悪化の要因である可能性が高い。従って、改善箇所分析部103は、「工程#2リードタイム」の性能を改善するために性能を改善させるべき要素として、「工程#1リードタイム」を抽出する。
この結果、改善箇所分析部103は、「工程#1リードタイム」を最優先の改善対象関連要素と推定する。つまり、改善箇所分析部103は、「製品A生産リードタイム」の性能の改善のために「工程#1リードタイム」が最も有効な改善対象関連要素であると判定し、「工程#2リードタイム」が次に有効な改善対象関連要素であると判定する。
図12の上段の例のように複数の改善対象関連要素が得られた場合に、改善箇所分析部103は、図12の下段の例のように、複数の改善対象関連要素の間に優先順位を設定する。
The lower part of FIG. 12 shows that the improvement point analysis unit 103 analyzes the influence of each of "process #1 lead time", "process #2 lead time" and "process #3 lead time" on the lead times of other processes. and the results obtained.
In the upper part of FIG. 12, since there are a plurality of combinations with lift values greater than 1, the improvement point analysis unit 103 also analyzes the influence of the lead time of each process on the lead time of other processes. That is, the improvement point analysis unit 103 designates each process as a new designated element, extracts processes other than the process designated as the new designated element as a new related element, and performs association analysis.
In the example in the lower part of FIG. 12, the association is set in the condition part when the "process #1 lead time" is higher than the criterion (=HIGH), and in the conclusion part when the "process #2 lead time" is higher. The lift value is greater than 1 in the analysis. Therefore, there is a high possibility that the "process #1 lead time" is the cause of the deterioration of the "process #2 lead time". Therefore, the improvement point analysis unit 103 extracts the "process #1 lead time" as an element whose performance should be improved in order to improve the performance of the "process #2 lead time".
As a result, the improvement point analysis unit 103 estimates the "process #1 lead time" as the top priority improvement target related element. That is, the improvement point analysis unit 103 determines that the "process #1 lead time" is the most effective improvement target related element for improving the performance of the "product A production lead time", and determines that the "process #2 lead time ” is the next effective improvement target related element.
When a plurality of improvement target related elements are obtained as in the example in the upper part of FIG. 12, the improvement part analysis unit 103 assigns priorities among the plurality of improvement target related elements as in the example in the lower part of FIG. set.

以上の分析結果から、改善箇所分析部103は、「製品A生産リードタイム悪化は工程#1リードタイムの悪化と工程#2リードタイムの悪化が要因である」と推定することができる。また、改善箇所分析部103は、「工程#2リードタイムの悪化は、工程#1リードタイム悪化が要因である」と推定することができる。このため、改善箇所分析部103は、「先ずは、両リードタイムの悪化の要因である工程#1リードタイムを改善すべきである」と生産システムの改善担当者に改善箇所を提案することができる。
改善箇所分析部103は、このような分析結果(改善箇所の提案)をHMIに出力し、また、分析結果を情報記憶部101に格納する(ステップS2043)。
From the above analysis results, the improvement point analysis unit 103 can estimate that "the deterioration of the production lead time of the product A is caused by the deterioration of the process #1 lead time and the deterioration of the process #2 lead time". Further, the improvement point analysis unit 103 can estimate that "the worsening of the process #2 lead time is caused by the worsening of the process #1 lead time". For this reason, the improvement point analysis unit 103 can propose an improvement point to the person in charge of improvement of the production system, saying, "First, the process #1 lead time, which is the cause of the deterioration of both lead times, should be improved." can.
The improvement point analysis unit 103 outputs such an analysis result (improvement point proposal) to the HMI, and stores the analysis result in the information storage unit 101 (step S2043).

更に、改善箇所分析部103は、必要に応じて「工程#1リードタイム」の悪化の要因について分析の深堀を行うことができる(図8のステップS205)。
具体的には、改善箇所分析部103は、図3の情報モデルの階層構造の関係性に基づき、「工程#1リードタイム」を新たな指定要素として結論部に設定し、「設備#1-1リードタイム」及び「設備#1-2リードタイム」を新たな関連要素として条件部に設定したアソシエーション分析を行う。
設備階層の分析が完了した後、改善箇所分析部103は、更に必要に応じて機器階層の要素を新たな関連要素として条件部に設定したアソシエーション分析を行ってもよい。このようにして、改善箇所分析部103は、分析の深堀を行うことができる。なお、分析条件として、このような分析の深堀の繰り返し回数を設けてもよい。
Furthermore, the improvement point analysis unit 103 can perform a deeper analysis of factors that cause deterioration of the "process #1 lead time" as necessary (step S205 in FIG. 8).
Specifically, based on the relationship of the hierarchical structure of the information model in FIG. 1 lead time” and “equipment #1-2 lead time” are set in the condition part as new related elements to perform the association analysis.
After the analysis of the equipment hierarchy is completed, the improvement point analysis unit 103 may further perform association analysis in which the element of the equipment hierarchy is set as a new related element in the conditional part as necessary. In this manner, the improvement point analysis unit 103 can perform a deeper analysis. As an analysis condition, the number of repetitions of such deep analysis may be provided.

***実施の形態の効果の説明***
以上、本実施の形態によれば、性能を改善すべき要素の性能の改善に寄与する要素の特定を効率的に行うことができる。
つまり、本実施の形態に係る改善箇所分析装置100は、情報モデルに定義した階層構造及び論理構造による関係性を参照しつつKGIと複数の情報の関係性を段階的かつ論理的に分析する。このため、本実施の形態によれば、KGIの改善に寄与する改善箇所の特定を効率的に行うことができる。
***Description of the effect of the embodiment***
As described above, according to the present embodiment, it is possible to efficiently specify the elements that contribute to the improvement of the performance of the elements whose performance should be improved.
In other words, the improvement point analysis apparatus 100 according to the present embodiment analyzes the relationship between the KGI and a plurality of pieces of information in a stepwise and logical manner while referring to the relationship based on the hierarchical structure and logical structure defined in the information model. For this reason, according to the present embodiment, it is possible to efficiently specify an improvement location that contributes to the improvement of KGI.

また、本実施の形態によれば、評価部102が評価結果を逐次HMIに出力することで、生産システムの改善担当者が生産システムの状況をリアルタイムに理解し、改善要否を即座に判断することができる。 In addition, according to the present embodiment, the evaluation unit 102 sequentially outputs the evaluation results to the HMI, so that the person in charge of improvement of the production system can understand the situation of the production system in real time and immediately judge whether or not improvement is necessary. be able to.

また、本実施の形態によれば、改善箇所分析部103が分析条件を参照して、いずれかの計算項目が計算維持条件に該当しない場合は未計算の計算項目の計算を行わないため、分析時の計算量を削減することができる。 Further, according to the present embodiment, the improvement point analysis unit 103 refers to the analysis conditions, and if any of the calculation items does not meet the calculation maintenance conditions, the uncalculated calculation items are not calculated. The amount of time calculation can be reduced.

また、本実施の形態によれば、改善箇所分析部103による分析の深堀のための繰り返し回数を設けることで、生産システムの改善担当者が改善箇所分析装置100の最終結果を待たずとも、自身の経験が通用する範囲で分析結果を得ることができ、改善活動を効率化できる。 Further, according to the present embodiment, by setting the number of repetitions for deepening the analysis by the improvement point analysis unit 103, the person in charge of improvement of the production system does not have to wait for the final result of the improvement point analysis device 100. Analysis results can be obtained within the range of experience, and improvement activities can be made more efficient.

また、本実施の形態によれば、改善箇所分析部103は、階層の異なる分析対象である場合に、階層に応じて分析区間を調整できるため、有効に分析を行うことができる。 Further, according to the present embodiment, the improvement point analysis unit 103 can adjust the analysis section according to the hierarchy when the analysis target is in a different hierarchy, so that the analysis can be performed effectively.

実施の形態2.
***目的***
実施の形態1では、単一の判定基準による評価で得られた評価結果をバイナリ化している。実施の形態1の方法では、特に情報モデルにおける機器階層の改善を図る際、機器階層の要素がいずれの値となった場合に指定要素の性能に影響を与えるのかを明確に分析できない可能性がある。
実施の形態2は、このような課題の解決を主な目的としている。
本実施の形態では、主に実施の形態1との差異を説明する。
なお、以下で説明していない事項は、実施の形態1と同様である。
Embodiment 2.
***Purpose***
In Embodiment 1, evaluation results obtained by evaluation based on a single criterion are binarized. In the method of Embodiment 1, especially when trying to improve the device hierarchy in the information model, there is a possibility that it will not be possible to clearly analyze which values of the device hierarchy elements will affect the performance of the specified elements. be.
The main object of the second embodiment is to solve such problems.
In this embodiment, differences from the first embodiment will be mainly described.
Matters not described below are the same as those in the first embodiment.

***構成の説明**
本実施の形態においても、改善箇所分析装置100の構成は図1及び図2に示す通りである。
本実施の形態では、実施の形態1で示した情報収集における設定項目(図4)に、図13に示すように、追加の判定基準を設ける。更に、図14に示すように、分析条件(図11)に細分化条件を設ける。
図13では、情報収集における設定項目の内、「センサ#1-1-3対象角度」について、判定基準の一つ目に閾値X6を設定し、さらに追加の判定基準として閾値X7及びX8を設定している。更に、図14では、細分化の条件として、リフト値が2より大きい場合と、支持度が0.5より大きい場合を設定している。
*** Configuration description ***
Also in the present embodiment, the configuration of the improved portion analysis apparatus 100 is as shown in FIGS. 1 and 2. FIG.
In the present embodiment, as shown in FIG. 13, additional determination criteria are provided to the setting items (FIG. 4) for information collection shown in the first embodiment. Furthermore, as shown in FIG. 14, the analysis conditions (FIG. 11) are provided with subdivision conditions.
In FIG. 13, for "sensor #1-1-3 target angle" among the setting items for information collection, threshold X6 is set as the first determination criterion, and threshold values X7 and X8 are set as additional determination criteria. is doing. Furthermore, in FIG. 14, as conditions for subdivision, the case where the lift value is greater than 2 and the case where the degree of support is greater than 0.5 are set.

***動作の説明***
本実施の形態では、改善箇所分析フェーズの完了までは実施の形態1と同一の動作が行われる。
このとき、図12に示すような分析結果が得られ、更に、図14の分析条件の細分化の条件を満たしている場合に、評価部102は、図13の追加の判定基準で更に評価を行う。
図15は実施の形態2における効果の例を示す。
つまり、本実施の形態では、改善箇所分析部103が「設備#1-1リードタイム」を結論部、「センサ#1-1-3対象角度」を条件部に設定してアソシエーション分析を行っている。そして、改善箇所分析部103は、「センサ#1-1-3対象角度」を改善対象関連要素として推定している。そして、アソシエーション分析の結果が上述した細分化の条件(図14)を満たしている。このため、評価部102が細分化として、改善対象関連要素である「センサ#1-1-3対象角度」の性能が追加の判定基準である判定基準2(閾値X7及びX8)に合致するか否かの評価を行っている。図15は、判定基準2を用いた評価により得られた評価結果を示す。
図15では図示を省略しているが、細分化により新たに判定基準2を用いて分析した結果(リフト値、支持度、信頼度)についても併せて示すことが可能である。この場合は、「センサ#1-1-3対象角度」が具体的にどの値となった場合に「センサ#1-1-3対象角度」が「設備#1-1リードタイム」の性能の悪化に影響するかを分析することができる。
***Description of operation***
In this embodiment, the same operation as in the first embodiment is performed until the improvement point analysis phase is completed.
At this time, when an analysis result as shown in FIG. 12 is obtained, and further, when the conditions for subdividing the analysis conditions in FIG. conduct.
FIG. 15 shows an example of the effects of the second embodiment.
In other words, in the present embodiment, the improvement point analysis unit 103 sets the “equipment #1-1 lead time” to the conclusion part and the “sensor #1-1-3 target angle” to the condition part to perform the association analysis. there is Then, the improvement portion analysis unit 103 estimates the “sensor #1-1-3 target angle” as the improvement target related element. Then, the result of the association analysis satisfies the subdivision conditions (FIG. 14) described above. For this reason, the evaluation unit 102 subdivides whether the performance of the improvement target related element "sensor #1-1-3 target angle" matches the additional determination criteria 2 (thresholds X7 and X8). We are evaluating whether or not FIG. 15 shows evaluation results obtained by evaluation using criterion 2. FIG.
Although not shown in FIG. 15, it is also possible to show the results (lift value, degree of support, degree of reliability) newly analyzed using criterion 2 by segmentation. In this case, when the “sensor #1-1-3 target angle” becomes a specific value, the “sensor #1-1-3 target angle” is the performance of “equipment #1-1 lead time” It can be analyzed whether it affects deterioration.

***実施の形態の効果の説明***
以上のように、本実施の形態では、複数の判定基準を設け、評価部102が複数の判定基準を適用するための細分化の条件を設けている。このため、本実施の形態によれば、単一の判定基準における評価結果を複数の判定基準により細分化することができ、指定要素の性能に影響を与え得る要素が具体的にいずれの値となった場合に指定要素の性能に影響を与えるかを明確に判断することができる。
***Description of the effect of the embodiment***
As described above, in the present embodiment, a plurality of determination criteria are provided, and subdivision conditions are provided for the evaluation unit 102 to apply the plurality of determination criteria. For this reason, according to the present embodiment, the evaluation result based on a single criterion can be subdivided by a plurality of criteria, and the element that can affect the performance of the designated element can be specified with any specific value. It is possible to clearly determine whether it will affect the performance of the specified element when it becomes.

実施の形態3.
***目的***
実施の形態1及び2では、情報収集部104における設定項目の判定基準及び改善箇所分析部103における分析条件について、設計情報等を参考に予め値を設定することを前提としている。
しかしながら、設計情報が得られない場合及び設計情報と生産システムの実態に差異がある場合には、実施の形態1及び2における効果が得られない可能性がある。
実施の形態3は、このような課題の解決を主な目的としている。
本実施の形態では、主に実施の形態1との差異を説明する。
なお、以下で説明していない事項は、実施の形態1と同様である。
Embodiment 3.
***Purpose***
In Embodiments 1 and 2, it is assumed that the criteria for setting items in the information collecting unit 104 and the analysis conditions in the improvement point analyzing unit 103 are set in advance with reference to design information or the like.
However, if the design information cannot be obtained or if there is a difference between the design information and the actual state of the production system, the effects of the first and second embodiments may not be obtained.
The main object of the third embodiment is to solve such problems.
In this embodiment, differences from the first embodiment will be mainly described.
Matters not described below are the same as those in the first embodiment.

***構成の説明***
本実施の形態においても、改善箇所分析装置100の構成は図1及び図2に示す通りである。但し、本実施の形態では、情報収集部104の判定基準の設定方法を図16に示すようにする。
図16では、情報収集部104の設定項目における判定基準に、収集した情報に対する統計処理を定義している。統計処理は、例えば「平均値」のように設定される。これ以外にも、平均値に標準偏差を考慮したもの(平均値±標準偏差)、度数分布における最頻値、極小値なども好適であるがこれらに限定しない。
*** Configuration description ***
Also in the present embodiment, the configuration of the improved portion analysis apparatus 100 is as shown in FIGS. 1 and 2. FIG. However, in this embodiment, the method of setting the determination criteria of the information collecting unit 104 is as shown in FIG.
In FIG. 16 , statistical processing for collected information is defined as a determination criterion in the setting items of the information collection unit 104 . Statistical processing is set, for example, as "average value". In addition to this, an average value with standard deviation taken into consideration (average value±standard deviation), a mode value in a frequency distribution, a local minimum value, etc. are also suitable, but are not limited to these.

***動作の説明***
本実施の形態では、情報収集と評価フェーズの途中まで実施の形態1と同一の動作を行う。
本実施の形態では、図5のフローチャートにおいて、ステップS103で、評価部102は、情報収集部104により収集され、情報記憶部101において記憶されている情報に対する統計処理を行う。そして、評価部102は、統計処理の結果を図16の判定基準に設定する。そして評価部102は、情報収集部104により収集され、情報記憶部101において記憶されている個々の情報と、判定基準として設定された統計処理の結果とを比較して評価を行う。その後、評価部102は、評価結果を情報記憶部101に格納する。
以降、改善箇所分析フェーズでは実施の形態1と同一の動作が行われる。
***Description of operation***
In this embodiment, the same operation as in the first embodiment is performed until the middle of the information collection and evaluation phases.
In this embodiment, in the flowchart of FIG. 5, the evaluation unit 102 performs statistical processing on the information collected by the information collection unit 104 and stored in the information storage unit 101 in step S103. Then, the evaluation unit 102 sets the result of the statistical processing as the criterion of FIG. 16 . The evaluation unit 102 performs evaluation by comparing each piece of information collected by the information collection unit 104 and stored in the information storage unit 101 with the result of statistical processing set as a criterion. After that, the evaluation unit 102 stores the evaluation result in the information storage unit 101 .
After that, in the improvement point analysis phase, the same operation as in the first embodiment is performed.

***実施の形態の効果の説明***
以上のように、本実施の形態では、判定基準として統計処理の結果を設定するため、分析対象の設計値が得られない場合においても実施の形態1及び2の効果を得ることができる。
また、判定基準として統計処理の結果を設定することで、判定基準を予め設定しなければならないという手間を削減することができる。
***Description of the effect of the embodiment***
As described above, in the present embodiment, the result of statistical processing is set as the criterion, so that the effects of the first and second embodiments can be obtained even when the design value of the analysis object cannot be obtained.
In addition, by setting the result of statistical processing as the determination criterion, it is possible to reduce the trouble of having to set the determination criterion in advance.

実施の形態4.
***目的***
実施の形態1から3では、情報モデルで階層構造及び/又は論理構造による関係性を定義することを前提としている。
しかしながら、特に機器階層においては、設計者が生産システムの設計者と異なる等の理由から機器の情報を厳密に定義することが困難である。このため、階層構造及び/又は論理構造による関係性を正確に定義できない場合がある。関係性が誤って定義されている場合又は関係性が定義できない場合は、誤った分析結果が出力されることがある。また、想定されるすべての組み合わせに対する分析が発生することがある。このような場合には、効率が低下する。
実施の形態4は、このような課題の解決を主な目的としている。
本実施の形態では、主に実施の形態1との差異を説明する。
なお、以下で説明していない事項は、実施の形態1と同様である。
Embodiment 4.
***Purpose***
Embodiments 1 to 3 are premised on defining relationships based on a hierarchical structure and/or a logical structure in an information model.
However, especially in the device hierarchy, it is difficult to strictly define device information because the designer differs from the designer of the production system. Therefore, it may not be possible to accurately define hierarchical and/or logical relationships. Incorrect analysis results may be output if the relationship is defined incorrectly or if the relationship cannot be defined. Also, analysis for all possible combinations may occur. In such cases, efficiency is reduced.
The main object of the fourth embodiment is to solve such problems.
In this embodiment, differences from the first embodiment will be mainly described.
Matters not described below are the same as those in the first embodiment.

***構成の説明***
本実施の形態においても、改善箇所分析装置100の構成は図1及び図2に示す通りである。本実施の形態では、情報モデルの構成と改善箇所分析部103の分析条件及びフローチャートが異なる。
図17は、実施の形態4に係る情報モデルの例を示す。図17では、機器階層において、階層構造及び論理構造による関係性が定義されていない。つまり、図17に示す情報モデルでは、機器階層に存在する要素のみが定義されている。
図18は、実施の形態4における分析条件での追加項目を示す。図18では、分析条件に関係性に関する項目を追加している。関係性に関する条件として、例えば「機器階層の関係性については自動生成する」等を定義することが考えられる。機器階層以外の階層の関係性を自動生成することを定義してもよいし、自動生成以外の方法により関係性を生成するように定義してもよい。更に、一度生成した関係性を定期的に確認するように定義してもよい。
図19は、図8のステップS204(分析の実行及び記憶)において改善箇所分析部103が追加で行う手順を示す。
*** Configuration description ***
Also in the present embodiment, the configuration of the improved portion analysis apparatus 100 is as shown in FIGS. 1 and 2. FIG. In this embodiment, the configuration of the information model and the analysis conditions and flow chart of the improvement part analysis unit 103 are different.
FIG. 17 shows an example of an information model according to the fourth embodiment. In FIG. 17, relationships based on hierarchical structure and logical structure are not defined in the device hierarchy. In other words, in the information model shown in FIG. 17, only elements existing in the device hierarchy are defined.
FIG. 18 shows additional items in analysis conditions in the fourth embodiment. In FIG. 18, items related to relationships are added to the analysis conditions. As a condition regarding the relationship, for example, it is conceivable to define "automatically generate the relationship of the device hierarchy". It may be defined to automatically generate relationships in layers other than the device layer, or it may be defined to generate relationships by a method other than automatic generation. Furthermore, it may be defined to periodically check the relationship once created.
FIG. 19 shows a procedure additionally performed by the improvement portion analysis unit 103 in step S204 (execution and storage of analysis) in FIG.

***動作の説明***
情報収集フェーズ、評価フェーズ及び図8のステップS203までは、実施の形態1と同一の動作が行われる。
ステップS204では、図9のフローに先立ち、図19のフローが行われる。つまり、いずれかの要素間の関係が不明な場合に、改善箇所分析部103が、関係が不明な要素間の関係を推定し、当該要素間の関係性を自動生成する。
具体的には、改善箇所分析部103は、図18の設定項目を参照し、機器階層について関係性を自動生成するために図19のフローを実行する。
図19では、機器階層に含まれる要素のうち、上位層である設備階層との階層構造が定義されている「PLC#1-1-1サイクルタイム」と、特段の関係性が定義されていない「サーボ#x-1モータ電流値」との間の関係性を自動生成する手順を示している。
はじめに、ステップS301において、改善箇所分析部103は、「PLC#1-1-1サイクルタイム」と「サーボ#x-1モータ電流値」とについてアソシエーション分析を実行する。図19の例では、改善箇所分析部103は、「PLC#1-1-1サイクルタイム」が判定基準よりも高い(=HIGH)ことを条件部に設定し、「サーボ#x-1モータ電流値」が判定基準より高い(=HIGH)ことを結論部に設定した組合せ(以下、「組合せ1」という)の支持度、信頼度、リフト値を算出している。更に、改善箇所分析部103は、「サーボ#x-1モータ電流値」が判定基準よりも高い(=HIGH)ことを条件部に設定し、「PLC#1-1-1サイクルタイム」が判定基準より高い(=HIGH)ことを結論部に設定した組合せ(以下、「組合せ2」という)の支持度、信頼度、リフト値を算出している。なお、情報の意味が未知である場合は、改善箇所分析部103はそれぞれの要素の値が判定基準よりも低い(=LOW)場合の組合せを含めてアソシエーション分析を実行することが望ましい。
次に、ステップS302において、改善箇所分析部103は、ステップS301の分析結果を評価する。ここでは、改善箇所分析部103は、分析結果の支持度、信頼度、リフト値について、どちらの組み合わせで高い値が得られたかを評価している。つまり、改善箇所分析部103は、組合せ1と組合せ2のいずれで高い値が得られたかを評価する。アソシエーション分析においてはリフト値の評価結果が1より大きいと条件部と結論部との間に関係性があると評価できる。このため、改善箇所分析部103は、リフト値を重視するよう各項目の結果に重みを設けて評価を行ってもよい。これら重みについては、図18の設定項目に設けるとよい。また、関係性を生成する条件についても、同様に図18の設定項目に設けるとよい。
最後に、ステップS303において、改善箇所分析部103は、評価結果を参照して要素間の関係性を構築し、構築した要素間の関係性を情報記憶部101に記憶する。
図19の例では「サーボ#x-1モータ電流値」が判定基準よりも高いことを条件部に設定し、「PLC#1-1-1サイクルタイム」が判定基準よりも高いことを結論部に設定した組み合わせ(組合せ1)において、支持度、信頼度、リフト値が高い。このため、改善箇所分析部103は、「サーボ#x-1モータ電流値」が「PLC#1-1-1サイクルタイム」の性能に影響を与えるという関係性を情報モデルに追加する。
なお、本例では「PLC#1-1-1サイクルタイム」と「サーボ#x-1モータ電流値」との間の関係性を自動生成する手順を示した。図17に示した、関係性が定義されていない「センサ#x-2対象角度」及び「ロボット#x-3到達率」についても、改善箇所分析部103は同様の手順で関係性を自動生成する。
***Description of operation***
The same operations as in the first embodiment are performed in the information gathering phase, the evaluation phase, and step S203 in FIG.
In step S204, prior to the flow of FIG. 9, the flow of FIG. 19 is performed. That is, when the relationship between any of the elements is unknown, the improvement part analysis unit 103 estimates the relationship between the elements whose relationship is unknown, and automatically generates the relationship between the elements.
Specifically, the improvement point analysis unit 103 refers to the setting items in FIG. 18 and executes the flow in FIG. 19 to automatically generate the relationship for the device hierarchy.
In FIG. 19, among the elements included in the device hierarchy, no particular relationship is defined with "PLC#1-1-1 cycle time", which defines a hierarchical structure with the equipment hierarchy, which is the upper layer. It shows the procedure for automatically generating the relationship between "servo #x-1 motor current value".
First, in step S301, the improvement point analysis unit 103 performs association analysis on "PLC #1-1-1 cycle time" and "servo #x-1 motor current value". In the example of FIG. 19, the improvement point analysis unit 103 sets in the condition part that "PLC#1-1-1 cycle time" is higher than the criterion (=HIGH), and "servo #x-1 motor current The support, reliability, and lift value of the combination (hereinafter referred to as "combination 1") whose conclusion is set that the "value" is higher (=HIGH) than the criterion is calculated. Furthermore, the improvement point analysis unit 103 sets the condition part that the “servo #x-1 motor current value” is higher than the judgment reference (=HIGH), and the “PLC #1-1-1 cycle time” is judged. The support, reliability, and lift value of a combination (hereinafter referred to as “combination 2”) whose conclusion is set to be higher than the standard (=HIGH) are calculated. If the meaning of the information is unknown, it is desirable that the improvement part analysis unit 103 performs association analysis including combinations where the value of each element is lower than the criterion (=LOW).
Next, in step S302, the improvement point analysis unit 103 evaluates the analysis result of step S301. Here, the improvement point analysis unit 103 evaluates which combination yields the highest support, reliability, and lift value of the analysis results. In other words, the improvement point analysis unit 103 evaluates which of combination 1 and combination 2 yields a higher value. In association analysis, if the evaluation result of the lift value is greater than 1, it can be evaluated that there is a relationship between the condition part and the conclusion part. For this reason, the improvement point analysis unit 103 may perform evaluation by assigning weights to the results of each item so as to emphasize the lift value. These weights may be provided in the setting items in FIG. Also, the conditions for generating relationships may be provided in the setting items in FIG. 18 as well.
Finally, in step S<b>303 , the improvement point analysis unit 103 refers to the evaluation result to construct the relationship between the elements, and stores the constructed relationship between the elements in the information storage unit 101 .
In the example of FIG. 19, it is set in the condition part that "servo #x-1 motor current value" is higher than the criterion, and the conclusion part is set that "PLC#1-1-1 cycle time" is higher than the criterion. In the combination (combination 1) set to , the support, reliability, and lift value are high. Therefore, the improvement point analysis unit 103 adds to the information model the relationship that the "servo #x-1 motor current value" affects the performance of the "PLC #1-1-1 cycle time".
In this example, the procedure for automatically generating the relationship between "PLC #1-1-1 cycle time" and "servo #x-1 motor current value" is shown. For the "sensor #x-2 target angle" and "robot #x-3 reach rate" shown in FIG. 17, the relationship is automatically generated by the same procedure. do.

***実施の形態の効果の説明***
以上のように、本実施の形態では、いずれかの要素間の関係が不明な場合に、改善箇所分析部103が、関係が不明な要素間の関係を推定し、当該要素間の関係性を自動生成する。このため、本実施の形態によれば、情報モデルに階層構造及び/又は論理構造による関係性を正確に定義できない場合においても、実際に収集した情報を基に要素間の関係性を構築することができ、分析を効率よく行うことができるようになる。
また、要素間の関係性を誤って定義した場合においても、実際に収集した情報を基に要素間の関係性を評価することで、情報モデルを修正することができる。
***Description of the effect of the embodiment***
As described above, in the present embodiment, when the relationship between any of the elements is unknown, the improvement part analysis unit 103 estimates the relationship between the elements whose relationship is unknown, and determines the relationship between the elements. Generate automatically. For this reason, according to the present embodiment, even when the relationship based on the hierarchical structure and/or the logical structure cannot be accurately defined in the information model, it is possible to construct the relationship between the elements based on the actually collected information. can be used, and the analysis can be performed efficiently.
Also, even if the relationship between elements is defined incorrectly, the information model can be corrected by evaluating the relationship between the elements based on the actually collected information.

実施の形態5.
***目的***
実施の形態1から4では、分析結果を支持度、信頼度、リフト値といった複数項目で出力している。改善箇所となる要素は、これら複数項目の出力を勘案して判断する必要がある。しかしながら、いずれの要素が改善箇所であるか、特に分析に不慣れである生産システム管理者には判断が難しいという課題がある。
実施の形態5は、このような課題の解決を主な目的としている。
本実施の形態では、主に実施の形態1との差異を説明する。
なお、以下で説明していない事項は、実施の形態1と同様である。
Embodiment 5.
***Purpose***
In Embodiments 1 to 4, analysis results are output in multiple items such as support, reliability, and lift value. Elements to be improved need to be determined by considering the output of these multiple items. However, there is a problem that it is difficult for a production system manager who is particularly unfamiliar with analysis to determine which element is an improvement point.
The main purpose of the fifth embodiment is to solve such problems.
In this embodiment, differences from the first embodiment will be mainly described.
Matters not described below are the same as those in the first embodiment.

***構成の説明***
本実施の形態においても、改善箇所分析装置100の構成は図1及び図2に示す通りである。本実施の形態では、改善箇所分析部103の分析条件が異なる。
図20は、実施の形態5に係る分析条件を示す。図20では、図11と比較して、新たに分析結果出力の項目を追加している。分析結果出力の条件として、例えば、算出式「A1+A2+A3」が定義される。なお、「A1」は支持度が0.1より大きい場合に1、支持度が0.1より小さい場合に0が設定される。同様に、「A2」は信頼度が0.1より大きい場合に1、信頼度が0.1より小さい場合に0が設定される。「A3」はリフト値が1以上の場合にリフト値がそのまま設定され、リフト値が1より小さい場合に0が設定される。
なお、支持度、信頼度及びリフト値のいずれかを重視するよう算出式を調整してもよい。例えば重みαを用いてA1+A2+A3×αのように調整する。重みαは、生産システムの設計者又は改善担当者が設定する。
本実施の形態では、図20に示すように、改善箇所分析部103が、アソシエーション分析に含まれる複数の計算項目についての複数の計算値を用いた計算を行い、複数の計算値を用いた計算の計算値を出力する。
*** Configuration description ***
Also in the present embodiment, the configuration of the improved portion analysis apparatus 100 is as shown in FIGS. 1 and 2. FIG. In this embodiment, the analysis conditions of the improvement point analysis unit 103 are different.
FIG. 20 shows analysis conditions according to the fifth embodiment. In FIG. 20, compared with FIG. 11, an analysis result output item is newly added. For example, a calculation formula “A1+A2+A3” is defined as a condition for outputting analysis results. "A1" is set to 1 when the degree of support is greater than 0.1, and 0 when the degree of support is less than 0.1. Similarly, "A2" is set to 1 when the reliability is greater than 0.1, and set to 0 when the reliability is less than 0.1. For "A3", the lift value is set as it is when the lift value is 1 or more, and 0 is set when the lift value is less than 1.
Note that the calculation formula may be adjusted so as to emphasize any one of the support, reliability, and lift value. For example, the weight α is used to adjust A1+A2+A3×α. The weight α is set by the production system designer or the person in charge of improvement.
In the present embodiment, as shown in FIG. 20, the improvement point analysis unit 103 performs calculation using a plurality of calculated values for a plurality of calculation items included in the association analysis. output the calculated value of

***動作の説明***
情報収集フェーズ、評価フェーズ及び改善箇所分析フェーズの図9のステップS2042までは実施の形態1と同一の動作が行われる。
ステップS2043では、改善箇所分析部103は、図20の分析結果出力の算出式に従って分析結果出力を算出し、算出結果を出力し、また、算出結果を情報記憶部101に格納する。
図21は、実施の形態5に係る出力の一例を示す。図21に示すように、本実施の形態に係る出力では、図20の分析結果出力の算出式に従って得られた分析結果が含まれる。
***Description of operation***
The same operations as in the first embodiment are performed up to step S2042 in FIG. 9 in the information collection phase, evaluation phase, and improvement point analysis phase.
In step S2043, the improvement point analysis unit 103 calculates the analysis result output according to the analysis result output calculation formula of FIG.
FIG. 21 shows an example of output according to the fifth embodiment. As shown in FIG. 21, the output according to the present embodiment includes analysis results obtained according to the analysis result output calculation formula of FIG.

***実施の形態の効果の説明***
以上のように、本実施の形態では、分析条件に分析結果出力の算出方法が定義され、当該算出方法に従って算出された分析結果が出力される。このため、本実施の形態によれば、分析に不慣れである生産システム管理者がいずれの要素が改善箇所であるか容易に判断できるようになる。
***Description of the effect of the embodiment***
As described above, in the present embodiment, the analysis conditions define a calculation method for outputting analysis results, and the analysis results calculated according to the calculation method are output. Therefore, according to the present embodiment, a production system manager who is unfamiliar with analysis can easily determine which element is to be improved.

実施の形態6.
***目的***
実施の形態5では、改善箇所の分析結果出力のための算出式を生産システムの設計者又は改善担当者が適宜設定する必要がある。しかしながら、特に複雑な生産システムにおいては分析結果出力と実際の改善箇所が異なっている可能性がある。
実施の形態6は、このような課題の解決を主な目的としている。
本実施の形態では、主に実施の形態5との差異を説明する。
なお、以下で説明していない事項は、実施の形態5と同様である。
Embodiment 6.
***Purpose***
In the fifth embodiment, it is necessary for the production system designer or the person in charge of improvement to appropriately set the calculation formula for outputting the analysis result of the improvement portion. However, especially in a complicated production system, there is a possibility that the analysis result output and the actual improvement points are different.
The sixth embodiment is mainly intended to solve such problems.
In this embodiment, differences from the fifth embodiment will be mainly described.
Matters not described below are the same as in the fifth embodiment.

***構成の説明***
図22は、実施の形態6に係る改善箇所分析装置100の構成例を示す。図22の構成では、図1の構成に、改善実績記憶部105が追加されている。改善実績記憶部105には改善実績が記憶されている。改善実績記憶部105以外は、図1の示すものと同じである。
図23は、改善実績記憶部105が記憶する改善実績の例を示す。図23に示す改善実績には、発生した事象と、事象の要因(改善箇所)が含まれる。事象及び要因については、具体的な値を含めて詳細に記述することが望ましい。改善実績は、分析対象を稼働していく中で改善担当者が記述する。あるいは、同種の分析対象の改善実績が存在する場合は、同種の分析対象の改善実績を流用してもよい。但し、この場合は、別の分析対象の改善実績であることがわかるように記述することが望ましい。または、実施の形態5に示した分析結果出力を参照した改善担当者がHMIを通して分析結果出力に対して与えた正誤の評価結果又は数値を伴う評価結果を改善実績としてもよい。このとき、改善実績記憶部105に記述した内容は、情報モデル内に関係性が定義されていることが望ましい。情報モデル内に関係性が定義されていない場合、情報モデル内に関係性が定義されるよう構成しても良い。
図24は、実施の形態6に係る分析条件の例を示す。図24では、分析結果出力の条件として、改善実績を出力に反映する算出式が定義されている。図24では、補正値「A4」として改善実績数が記述されており、また、算出式にも「A4」が含まれている。
*** Configuration description ***
FIG. 22 shows a configuration example of an improved portion analysis device 100 according to the sixth embodiment. In the configuration of FIG. 22, an improvement result storage unit 105 is added to the configuration of FIG. The improvement record storage unit 105 stores the improvement record. The components other than the improvement performance storage unit 105 are the same as those shown in FIG.
FIG. 23 shows an example of improvement results stored in the improvement result storage unit 105. As shown in FIG. The improvement record shown in FIG. 23 includes the event that occurred and the cause of the event (improvement point). Events and factors should be described in detail, including specific values. Improvement achievements are described by the person in charge of improvement while the analysis target is in operation. Alternatively, if there is an improvement record for the same type of analysis target, the improvement record for the same type of analysis target may be used. However, in this case, it is desirable to describe it so that it can be understood that it is the improvement performance of another analysis target. Alternatively, an evaluation result of correctness or wrongness given to the output of the analysis result through the HMI by the person in charge of improvement who referred to the output of the analysis result shown in Embodiment 5 or an evaluation result accompanied by a numerical value may be used as the improvement result. At this time, it is desirable that the relationship between the contents described in the improvement result storage unit 105 is defined in the information model. If the relationship is not defined in the information model, the relationship may be defined in the information model.
24 shows an example of analysis conditions according to Embodiment 6. FIG. In FIG. 24, as a condition for outputting the analysis result, a calculation formula for reflecting the improvement performance in the output is defined. In FIG. 24, the actual number of improvements is described as the correction value "A4", and "A4" is also included in the calculation formula.

***動作の説明***
情報収集フェーズ、評価フェーズ及び改善箇所分析フェーズの図9のステップS2042までは実施の形態1と同一の動作が行われる。
ステップS2043では、改善箇所分析部103は、図24の分析結果出力の算出式に従って分析結果出力を算出し、算出結果を出力し、また、算出結果を情報記憶部101に格納する。つまり、ステップS2043では、改善箇所分析部103は、アソシエーション分析における条件部に相当する関連要素に対する改善実績を用いて、算出式「A1+A2+A3」により得られる計算値を補正し、補正後の計算値を出力する。
図25は実施の形態6に係る分析結果出力の一例を示す。図25に示すように、本実施の形態では、図23の改善実績を補正値として出力し、また、改善実績数に基づく補正後の分析結果出力を出力する。
***Description of operation***
The same operations as in the first embodiment are performed up to step S2042 in FIG. 9 in the information collection phase, evaluation phase, and improvement point analysis phase.
In step S2043, the improvement point analysis unit 103 calculates the analysis result output according to the analysis result output calculation formula of FIG. That is, in step S2043, the improvement part analysis unit 103 corrects the calculated value obtained by the calculation formula "A1+A2+A3" using the improvement results for the related element corresponding to the conditional part in the association analysis, and obtains the calculated value after correction. Output.
FIG. 25 shows an example of analysis result output according to the sixth embodiment. As shown in FIG. 25, in the present embodiment, the improvement results in FIG. 23 are output as correction values, and the analysis result output after correction based on the number of improvement results is output.

***実施の形態の効果の説明***
以上のように、本実施の形態では、改善実績を記憶し、改善実績に合わせて分析結果出力を補正する。このため、本実施の形態によれば、生産システムの実態に即した改善箇所を出力することができる。
***Description of the effect of the embodiment***
As described above, in the present embodiment, the improvement results are stored, and the analysis result output is corrected according to the improvement results. For this reason, according to the present embodiment, it is possible to output improvement points that are in line with the actual state of the production system.

実施の形態7.
***目的***
実施の形態5及び6では、算出式を用いて分析結果出力を算出し、得られた分析結果出力を出力することで、より確度の高い分析結果が得られる。
しかしながら、大規模あるいは複雑な生産システムの場合、要素の種類が膨大かつ要素間の関係性が複雑である。このため、分析対象の実態に即した分析結果出力となるよう算出式を定義することが困難な場合がある。
実施の形態7は、このような課題の解決を主な目的としている。
本実施の形態では、主に実施の形態5との差異を説明する。
なお、以下で説明していない事項は、実施の形態5と同様である。
Embodiment 7.
***Purpose***
In Embodiments 5 and 6, analysis result output is calculated using a calculation formula, and the obtained analysis result output is output, thereby obtaining an analysis result with higher accuracy.
However, in the case of a large-scale or complicated production system, the types of elements are enormous and the relationships between the elements are complicated. For this reason, it may be difficult to define a calculation formula so as to produce an analysis result output that is in line with the actual state of the object to be analyzed.
Embodiment 7 is mainly intended to solve such problems.
In this embodiment, differences from the fifth embodiment will be mainly described.
Matters not described below are the same as in the fifth embodiment.

***構成の説明***
図26は、実施の形態7に係る分析条件の設定を示す。図26では、図20又は図24における分析結果出力を、後述する機械学習を用いて学習した学習済みモデルを活用して算出することが設定されている。
図27は、改善箇所分析装置100が活用する機械学習装置400の構成例を示す。機械学習装置400は、データ取得部401、教師データ取得部402、学習部403、学習済みモデル記憶部405及び出力部404を備える。機械学習装置400は、ハードウェア構成として、図2と同様に、プロセッサ、記憶装置、通信インタフェース及びバスを備える。データ取得部401、教師データ取得部402、学習部403は、例えば、プログラムにより実現される。当該プログラムはプロセッサにより実行される。学習済みモデル記憶部405は記憶装置により実現される。
*** Configuration description ***
FIG. 26 shows setting of analysis conditions according to the seventh embodiment. In FIG. 26, it is set that the analysis result output in FIG. 20 or FIG. 24 is calculated using a learned model learned using machine learning, which will be described later.
FIG. 27 shows a configuration example of a machine learning device 400 utilized by the improvement point analysis device 100. As shown in FIG. The machine learning device 400 includes a data acquisition unit 401 , a teacher data acquisition unit 402 , a learning unit 403 , a trained model storage unit 405 and an output unit 404 . The machine learning device 400 includes a processor, a storage device, a communication interface, and a bus as hardware configuration, as in FIG. 2 . The data acquisition unit 401, the teacher data acquisition unit 402, and the learning unit 403 are implemented by, for example, programs. The program is executed by a processor. A trained model storage unit 405 is realized by a storage device.

データ取得部401は、図10、図11、図20及び図24に示す条件部、結論部、支持度、信頼度、リフト値を状態変数として取得する。なお、データ取得部401は、図6及び図7に示す評価部102の評価結果を取得してもよい。
教師データ取得部402は、図23の改善実績に示される要因及び事象を取得する。
学習部403は、データ取得部401から出力される条件部、結論部、支持度、信頼度、リフト値及び教師データ取得部402から出力される要因及び事象の組合せに基づいて作成されるデータセットに基づいて、出力の補正方法を学習する。すなわち、学習部403は、改善箇所分析装置100の改善箇所分析部103の分析結果である条件部、結論部、支持度、信頼度、リフト値と、実際の改善実績である要因及び事象から分析結果出力の補正方法を推測する学習済みモデルを生成する。ここで、データセットは、状態変数及び教師データを互いに関連付けたデータである。
The data acquisition unit 401 acquires the condition part, the conclusion part, the degree of support, the degree of reliability, and the lift value shown in FIGS. 10, 11, 20, and 24 as state variables. Note that the data acquisition unit 401 may acquire the evaluation result of the evaluation unit 102 shown in FIGS. 6 and 7. FIG.
The teacher data acquisition unit 402 acquires the factors and events shown in the improvement results in FIG. 23 .
The learning unit 403 creates a data set based on the combination of the condition part, the conclusion part, the support, the reliability, and the lift value output from the data acquisition unit 401 and the factors and events output from the teacher data acquisition unit 402. Learn how to correct the output based on That is, the learning unit 403 analyzes from the condition part, the conclusion part, the degree of support, the degree of reliability, the lift value, which are the analysis results of the improvement point analysis unit 103 of the improvement point analysis device 100, and the factors and events that are the actual improvement results. Generate a trained model that infers how to correct the result output. Here, the data set is data in which state variables and teacher data are associated with each other.

なお、機械学習装置400は、改善箇所分析装置100の出力の補正方法を学習するために使用されるが、例えば、ネットワークを介して改善箇所分析装置100に接続された、改善箇所分析装置100とは別個の装置であってもよい。また、機械学習装置400は、改善箇所分析装置100に内蔵されていてもよい。さらに、機械学習装置400は、クラウドサーバ上に存在していてもよい。 The machine learning device 400 is used to learn a correction method for the output of the improvement point analysis device 100. For example, the improvement point analysis device 100 connected to the improvement point analysis device 100 via a network and the may be a separate device. Further, the machine learning device 400 may be built in the improvement point analysis device 100 . Furthermore, machine learning device 400 may reside on a cloud server.

学習部403が用いる学習アルゴリズムはどのようなものを用いてもよい。本実施の形態では、一例として、ニューラルネットワークを適用した場合について説明する。
学習部403は、例えば、ニューラルネットワークモデルに従って、いわゆる教師あり学習により、出力の補正方法を学習する。ここで、教師あり学習とは、ある入力と結果(ラベル)のデータの組を大量に機械学習装置400に与えることで、それらのデータセットにある特徴を学習し、入力から結果を推定するモデルをいう。
ニューラルネットワークは、複数のニューロンからなる入力層、複数のニューロンからなる中間層(隠れ層)及び複数のニューロンからなる出力層で構成される。中間層は、1層でもよいし、又は2層以上でもよい。
例えば、図30に示すような3層のニューラルネットワークであれば、複数の入力データが入力層(X1‐X3)に入力されると、各入力データの値に重みW1(w11‐w16)を掛けて重みW1が掛けられた各入力データが中間層(Y1‐Y2)に入力される。そして、中間層(Y1‐Y2)の結果にさらに重みW2(w21‐w26)を掛けて重みW2が掛けられた中間層(Y1‐Y2)の結果が出力層(Z1‐Z3)から出力される。出力結果は、重みW1の値と重みW2の値によって変わる。
本願において、ニューラルネットワークは、データ取得部401によって取得される条件部、結論部、支持度、信頼度、リフト値、並びに、教師データ取得部402によって取得される要因及び事象の組合せに基づいて作成されるデータセットに従って、いわゆる教師あり学習により、出力の補正方法を学習する。
すなわち、ニューラルネットワークは、入力層に条件部、結論部、支持度、信頼度、リフト値を入力して出力層から出力された結果が、要因及び事象に近づくように重みW1とW2を調整することで学習する。
また、ニューラルネットワークは、いわゆる教師なし学習によって、出力の補正方法を学習することもできる。教師なし学習とは、入力データのみを大量に機械学習装置400に与えることで、機械学習装置400が入力データがどのような分布をしているか学習する。教師なし学習では、対応する教師出力データを与えなくても、入力データに対して圧縮、分類、整形等を行って学習することが可能である。つまり、教師なし学習では、複数のデータセットにある特徴を似た者同士にクラスタリングすることができる。クラスタリングの結果を使って、何らかの基準を設けてクラスタリング結果を最適にするような出力の割り当てを行うことで、出力の予測を実現することできる。また、教師なし学習と教師あり学習の中間的な問題設定として、半教師あり学習がある。半教師あり学習では、一部のみ入力データと出力データの組が存在し、それ以外は入力データのみが存在する。
Any learning algorithm may be used by the learning unit 403 . In this embodiment, as an example, a case where a neural network is applied will be described.
The learning unit 403 learns an output correction method by, for example, so-called supervised learning according to a neural network model. Here, supervised learning is a model in which a large amount of data sets of certain inputs and results (labels) are given to the machine learning device 400 to learn features in those data sets and estimate results from the inputs. Say.
A neural network consists of an input layer consisting of a plurality of neurons, an intermediate layer (hidden layer) consisting of a plurality of neurons, and an output layer consisting of a plurality of neurons. The intermediate layer may be one layer, or two or more layers.
For example, in a three-layer neural network as shown in FIG. 30, when a plurality of input data are input to the input layer (X1-X3), each input data value is multiplied by a weight W1 (w11-w16). Each input data multiplied by the weight W1 is input to the intermediate layer (Y1-Y2). Then, the result of the intermediate layer (Y1-Y2) is further multiplied by the weight W2 (w21-w26), and the result of the intermediate layer (Y1-Y2) multiplied by the weight W2 is output from the output layer (Z1-Z3). . The output result varies depending on the value of weight W1 and the value of weight W2.
In the present application, the neural network is created based on the combination of the condition part, the conclusion part, the support, the reliability, and the lift value obtained by the data obtaining unit 401, and the factors and events obtained by the teacher data obtaining unit 402. The output correction method is learned by so-called supervised learning according to the data set obtained.
That is, the neural network adjusts the weights W1 and W2 so that the results output from the output layer by inputting the condition part, the conclusion part, the support, the confidence, and the lift value to the input layer are closer to the factors and events. Learn by doing.
Neural networks can also learn how to correct their outputs by so-called unsupervised learning. In unsupervised learning, a large amount of only input data is given to the machine learning device 400 so that the machine learning device 400 learns how the input data are distributed. In unsupervised learning, it is possible to learn by compressing, classifying, shaping, etc. input data without giving corresponding teacher output data. In other words, unsupervised learning can cluster similar features in multiple datasets. Using the results of clustering, output prediction can be realized by setting some criteria and assigning outputs so as to optimize the clustering results. Semi-supervised learning is an intermediate problem setting between unsupervised learning and supervised learning. In semi-supervised learning, there are pairs of input data and output data only in some cases, and only input data in other cases.

学習部403は、以上のような学習を実行することで学習済みモデルを生成する。
学習済みモデル記憶部405は、学習部403で生成された学習済みモデルを記憶する。
出力部404は、学習済みモデルを利用して得られる、改善箇所分析装置100の分析結果出力の補正方法を出力する。すなわち、データ取得部401に条件部、結論部、支持度、信頼度、リフト値を入力することで、出力部404から学習済みモデルに基づいて条件部、結論部、支持度、信頼度、リフト値に適した出力の補正方法を得ることができる。
なお、本実施の形態では、機械学習装置400の出力部404が、学習部403での学習で得られた学習済みモデルを用いて分析結果出力の補正方法を改善箇所分析装置100に出力する例を説明するが、改善箇所分析装置100が学習済みモデルを取得し、この学習済みモデルに基づいて分析結果出力の補正方法を取得するようにしてもよい。
The learning unit 403 generates a trained model by executing the above learning.
A trained model storage unit 405 stores the trained model generated by the learning unit 403 .
The output unit 404 outputs a method for correcting the analysis result output of the improvement point analysis device 100, which is obtained using the learned model. That is, by inputting the condition part, the conclusion part, the support, the reliability, and the lift value to the data acquisition unit 401, the condition part, the conclusion part, the support, the reliability, and the lift value are obtained from the output unit 404 based on the learned model. A method of correcting the output suitable for the value can be obtained.
In this embodiment, the output unit 404 of the machine learning device 400 uses the learned model obtained by the learning unit 403 to output the analysis result output correction method to the improvement location analysis device 100. However, the improvement point analysis apparatus 100 may acquire a learned model and acquire a correction method for the analysis result output based on this learned model.

***動作の説明***
次に、図28を用いて、機械学習装置400が学習する処理について説明する。図28は機械学習装置400の学習処理に関するフローチャートである。
始めに、ステップS401において、データ取得部401は条件部、結論部、支持度、信頼度、リフト値を状態変数として取得する。
次に、ステップS402において、教師データ取得部402は改善実績である要因及び事象を取得する。なお、本実施の形態では上述の順でデータを取得するものとしたが、条件部、結論部、支持度、信頼度、リフト値、及び要因及び事象を関連づけて入力できればよく、これらのステップが同時に実行されてもよいし、逆順に実行されてもよい。
さらに、ステップS403において、学習部403は、データ取得部401によって取得された条件部、結論部、支持度、信頼度、リフト値、並びに、教師データ取得部402によって取得された要因及び事象の組合せに基づいて作成されるデータセットに従って、いわゆる教師あり学習により、分析結果出力の補正方法を学習し、学習済みモデルを生成する。
最後に、ステップS404において、学習済みモデル記憶部405は、学習部403が生成した学習済みモデルを記憶する。
***Description of operation***
Next, the processing that the machine learning device 400 learns will be described with reference to FIG. 28 . FIG. 28 is a flowchart relating to learning processing of machine learning device 400 .
First, in step S401, the data acquisition unit 401 acquires the condition part, conclusion part, support, reliability, and lift value as state variables.
Next, in step S402, the training data acquisition unit 402 acquires factors and events that are improvement results. In the present embodiment, the data are acquired in the order described above, but it is sufficient to input the condition part, the conclusion part, the support, the reliability, the lift value, and the factors and events in association with each other. They may be executed simultaneously or in reverse order.
Furthermore, in step S403, the learning unit 403 acquires the combination of the condition part, the conclusion part, the support, the reliability, and the lift value acquired by the data acquisition unit 401, and the factors and events acquired by the teacher data acquisition unit 402. According to the data set created based on, by so-called supervised learning, a correction method for analysis result output is learned, and a trained model is generated.
Finally, in step S<b>404 , the learned model storage unit 405 stores the learned model generated by the learning unit 403 .

次に、図29を用いて、機械学習装置400を使って分析結果出力の補正方法を得るための処理を説明する。
始めに、ステップS501において、データ取得部401は、条件部、結論部、支持度、信頼度、リフト値を取得する。
次に、ステップS502において、学習部403は学習済みモデル記憶部405に記憶された学習済みモデルに条件部、結論部、支持度、信頼度、リフト値を入力し、分析結果出力の補正方法を得る。学習部403は得られた分析結果出力の補正方法を出力部404に出力する。
更に、ステップS503において、出力部404は、学習済みモデルにより得られた分析結果出力の補正方法を出力する。
最後に、ステップS504において、改善箇所分析装置100の改善箇所分析部は、出力された分析結果出力の補正方法を用いて、分析結果を補正し、補正後の分析結果を出力する。これにより、生産システムの実態に即した改善箇所を出力することができる。
Next, with reference to FIG. 29, a process for obtaining a correction method for analysis result output using the machine learning device 400 will be described.
First, in step S501, the data acquisition unit 401 acquires the condition part, the conclusion part, the support, the reliability, and the lift value.
Next, in step S502, the learning unit 403 inputs the condition part, the conclusion part, the degree of support, the degree of reliability, and the lift value to the learned model stored in the learned model storage unit 405, and selects a correction method for the analysis result output. obtain. The learning unit 403 outputs the obtained analysis result output correction method to the output unit 404 .
Furthermore, in step S503, the output unit 404 outputs a correction method for the analysis result output obtained by the learned model.
Finally, in step S504, the improvement point analysis unit of the improvement point analysis apparatus 100 corrects the analysis result using the method for correcting the outputted analysis result output, and outputs the corrected analysis result. As a result, it is possible to output improvement points that are in line with the actual state of the production system.

なお、本実施の形態では、学習部403が用いる学習アルゴリズムに教師あり学習を適用した場合について説明したが、これに限られるものではない。学習アルゴリズムについては、教師あり学習以外にも、強化学習、教師なし学習、又は半教師あり学習等を適用することも可能である。
また、学習部403は、複数の改善箇所分析装置100から収集されるデータセットに従って、出力の補正方法を学習するようにしてもよい。
なお、学習部403は、同一のエリアで使用される複数の改善箇所分析装置100からデータセットを取得してもよい。或いは、学習部403は、異なるエリアで独立して動作する複数の改善箇所分析装置100から収集されるデータセットを利用して分析結果出力の補正方法を学習してもよい。さらに、学習部403は、データセットを収集する改善箇所分析装置100を途中で追加することも可能である。或いは、学習部403は、逆に、データセットを収集する改善箇所分析装置100から、いずれかの改善箇所分析装置100を途中で除去することも可能である。
さらに、ある改善箇所分析装置100に関して分析結果出力の補正方法を学習した機械学習装置400を、これとは別の改善箇所分析装置100に適用し、当該別の改善箇所分析装置100に関して分析結果出力の補正方法を再学習して更新するようにしてもよい。
また、学習部403に用いられる学習アルゴリズムとしては、特徴量そのものの抽出を学習する、深層学習(Deep Learning)を用いることもでき、他の公知の方法、例えば遺伝的プログラミング、機能論理プログラミング、サポートベクターマシンなどに従って機械学習を実行してもよい。
***実施の形態の効果の説明***
以上のように、本実施の形態では、機械学習を活用して分析結果出力の補正方法を取得する。このため、本実施の形態によれば、分析対象が大規模あるいは複雑な生産システムであっても、生産システムの実態に即した改善箇所を出力することができる。
In this embodiment, a case where supervised learning is applied to the learning algorithm used by learning unit 403 has been described, but the present invention is not limited to this. In addition to supervised learning, it is also possible to apply reinforcement learning, unsupervised learning, semi-supervised learning, and the like as learning algorithms.
Also, the learning unit 403 may learn an output correction method according to data sets collected from a plurality of improvement point analysis devices 100 .
Note that the learning unit 403 may acquire data sets from a plurality of improvement point analysis devices 100 used in the same area. Alternatively, the learning unit 403 may learn the analysis result output correction method using data sets collected from a plurality of improvement point analysis devices 100 operating independently in different areas. Furthermore, the learning unit 403 can also add the improvement point analysis device 100 that collects data sets in the middle. Alternatively, the learning unit 403 can conversely remove any of the improvement point analysis devices 100 from the improvement point analysis devices 100 that collect data sets.
Furthermore, the machine learning device 400 that has learned the method of correcting the analysis result output for a certain improvement point analysis device 100 is applied to another improvement point analysis device 100, and the analysis result is output for the other improvement point analysis device 100. may be re-learned and updated.
In addition, as a learning algorithm used in the learning unit 403, deep learning (Deep Learning) that learns to extract the feature amount itself can be used, and other known methods such as genetic programming, functional logic programming, support Machine learning may be performed according to vector machines and the like.
***Description of the effect of the embodiment***
As described above, in the present embodiment, machine learning is utilized to obtain a correction method for analysis result output. Therefore, according to the present embodiment, even if the analysis target is a large-scale or complicated production system, it is possible to output improvement points that are in line with the actual state of the production system.

以上、実施の形態1~7を説明したが、これらの実施の形態のうち、2つ以上を組み合わせて実施しても構わない。
あるいは、これらの実施の形態のうち、1つを部分的に実施しても構わない。
あるいは、これらの実施の形態のうち、2つ以上を部分的に組み合わせて実施しても構わない。
また、これらの実施の形態に記載された構成及び手順を必要に応じて変更してもよい。
Embodiments 1 to 7 have been described above, but two or more of these embodiments may be combined for implementation.
Alternatively, one of these embodiments may be partially implemented.
Alternatively, two or more of these embodiments may be partially combined for implementation.
Also, the configurations and procedures described in these embodiments may be changed as necessary.

***ハードウェア構成の補足説明***
最後に、改善箇所分析装置100のハードウェア構成の補足説明を行う。
図2に示すプロセッサ901は、プロセッシングを行うIC(Integrated Circuit)である。
プロセッサ901は、CPU(Central Processing Unit)、DSP(Digital Signal Processor)等である。
図2に示す記憶装置902は、RAM(Random Access Memory)、ROM(Read Only Memory)、フラッシュメモリ、HDD(Hard Disk Drive)等である。
図2に示す通信インタフェース903は、データの通信処理を実行する電子回路である。
通信インタフェース903は、例えば、通信チップ又はNIC(Network Interface Card)である。
*** Supplementary explanation of hardware configuration ***
Finally, a supplementary description of the hardware configuration of the improvement point analysis device 100 will be given.
A processor 901 shown in FIG. 2 is an IC (Integrated Circuit) that performs processing.
The processor 901 is a CPU (Central Processing Unit), a DSP (Digital Signal Processor), or the like.
The storage device 902 shown in FIG. 2 is RAM (Random Access Memory), ROM (Read Only Memory), flash memory, HDD (Hard Disk Drive), or the like.
The communication interface 903 shown in FIG. 2 is an electronic circuit that executes data communication processing.
The communication interface 903 is, for example, a communication chip or a NIC (Network Interface Card).

また、補助記憶装置902には、OS(Operating System)も記憶されている。
そして、OSの少なくとも一部がプロセッサ901により実行される。
プロセッサ901はOSの少なくとも一部を実行しながら、プログラム904を実行する。
プロセッサ901がOSを実行することで、タスク管理、メモリ管理、ファイル管理、通信制御等が行われる。
また、評価部102、改善箇所分析部103及び情報収集部104の処理の結果を示す情報、データ、信号値及び変数値の少なくともいずれかが、記憶装置902、プロセッサ901内のレジスタ及びキャッシュメモリの少なくともいずれかに記憶される。
また、プログラム904は、磁気ディスク、フレキシブルディスク、光ディスク、コンパクトディスク、ブルーレイ(登録商標)ディスク、DVD等の可搬記録媒体に格納されていてもよい。そして、プログラム904が格納された可搬記録媒体を流通させてもよい。
The auxiliary storage device 902 also stores an OS (Operating System).
At least part of the OS is executed by the processor 901 .
The processor 901 executes a program 904 while executing at least part of the OS.
Task management, memory management, file management, communication control, and the like are performed by the processor 901 executing the OS.
In addition, at least one of information, data, signal values, and variable values indicating the processing results of the evaluation unit 102, the improvement part analysis unit 103, and the information collection unit 104 is stored in the storage device 902, the register in the processor 901, and the cache memory. stored in at least one.
The program 904 may also be stored in a portable recording medium such as a magnetic disk, flexible disk, optical disk, compact disk, Blu-ray (registered trademark) disk, DVD, or the like. Then, a portable recording medium storing the program 904 may be distributed.

また、評価部102、改善箇所分析部103及び情報収集部104の「部」を、「回路」又は「工程」又は「手順」又は「処理」に読み替えてもよい。
また、改善箇所分析装置100は、処理回路により実現されてもよい。処理回路は、例えば、ロジックIC(Integrated Circuit)、GA(Gate Array)、ASIC(Application Specific Integrated Circuit)、FPGA(Field-Programmable Gate Array)である。
この場合は、評価部102、改善箇所分析部103及び情報収集部104は、それぞれ処理回路の一部として実現される。
なお、本明細書では、プロセッサと処理回路との上位概念を、「プロセッシングサーキットリー」という。
つまり、プロセッサと処理回路とは、それぞれ「プロセッシングサーキットリー」の具体例である。
Also, the “units” of the evaluation unit 102, the improvement point analysis unit 103, and the information collection unit 104 may be read as “circuit”, “process”, “procedure”, or “processing”.
Further, the improvement point analysis device 100 may be realized by a processing circuit. The processing circuits are, for example, logic ICs (Integrated Circuits), GAs (Gate Arrays), ASICs (Application Specific Integrated Circuits), and FPGAs (Field-Programmable Gate Arrays).
In this case, the evaluation unit 102, the improvement point analysis unit 103, and the information collection unit 104 are each realized as part of the processing circuit.
In this specification, the general concept of processors and processing circuits is referred to as "processing circuitry."
Thus, processors and processing circuitry are each examples of "processing circuitry."

100 改善箇所分析装置、101 情報記憶部、102 評価部、103 改善箇所分析部、104 情報収集部、105 改善実績記憶部、200 分析対象、300 ネットワーク、400 機械学習装置、401 データ取得部、402 教師データ取得部、403 学習部、404 出力部、405 学習済みモデル記憶部、901 プロセッサ、902 記憶装置、903 通信インタフェース、904 プログラム、905 バス。 100 improvement point analysis device 101 information storage unit 102 evaluation unit 103 improvement point analysis unit 104 information collection unit 105 improvement result storage unit 200 analysis object 300 network 400 machine learning device 401 data acquisition unit 402 Teacher Data Acquisition Unit 403 Learning Unit 404 Output Unit 405 Trained Model Storage Unit 901 Processor 902 Storage Device 903 Communication Interface 904 Program 905 Bus.

Claims (18)

3以上の要素のうち性能を改善させるべき要素を指定要素として指定する指定部と、
前記指定要素以外の要素の中から前記指定要素と有意な関係にある2以上の要素を関連要素として抽出する抽出部と、
前記抽出部により抽出された2以上の関連要素の各々の性能が前記指定要素の性能に与える影響を分析して、前記2以上の関連要素の中から、前記指定要素の性能の改善のために性能を改善させるべき関連要素である改善対象関連要素を推定する推定部とを有する情報処理装置。
a designation unit that designates, as a designated element, an element whose performance should be improved among the three or more elements;
an extraction unit that extracts two or more elements having a significant relationship with the designated element from elements other than the designated element as related elements;
analyzing the influence of the performance of each of the two or more related elements extracted by the extracting unit on the performance of the designated element, and selecting from among the two or more related elements to improve the performance of the designated element An information processing apparatus having an estimation unit that estimates an improvement target related element, which is a related element whose performance should be improved.
前記推定部は、
複数の改善対象関連要素を推定した場合に、各々の改善対象関連要素の性能が他の改善対象関連要素の性能に与える影響を分析して、前記複数の改善対象関連要素の間に優先順位を設定する請求項1に記載の情報処理装置。
The estimation unit
When estimating a plurality of related elements to be improved, analyze the influence of the performance of each related element to be improved on the performance of other related elements to be improved, and prioritize among the plurality of related elements to be improved. The information processing apparatus according to claim 1, wherein the setting is performed.
前記指定部は、
前記推定部により推定された前記改善対象関連要素を新たな指定要素に指定し、
前記抽出部は、
前記新たな指定要素と有意な関係にある、前記新たな指定要素以外の2以上の要素を新たな関連要素として抽出し、
前記推定部は、
前記抽出部により抽出された2以上の新たな関連要素の各々の性能が前記新たな指定要素の性能に与える影響を分析して、前記2以上の新たな関連要素の中から、前記新たな指定要素の性能の改善のために性能を改善させるべき新たな関連要素を新たな改善対象関連要素として推定する請求項1に記載の情報処理装置。
The specifying unit is
Designating the improvement target related element estimated by the estimation unit as a new designated element;
The extractor is
Extracting two or more elements other than the new designated element that have a significant relationship with the new designated element as new related elements,
The estimation unit
analyzing the influence of the performance of each of the two or more new related elements extracted by the extracting unit on the performance of the new designated element, and selecting the new designated element from among the two or more new related elements; 2. The information processing apparatus according to claim 1, wherein a new related element whose performance should be improved is estimated as a new improvement target related element in order to improve the performance of the element.
前記指定部は、
前記推定部により新たな改善対象関連要素が推定される度に、推定された新たな改善対象関連要素を新たな指定要素に指定することを繰り返し、
前記抽出部は、
前記指定部により新たな指定要素が指定される度に、指定された新たな指定要素以外の2以上の要素を新たな関連要素として抽出することを繰り返し、
前記推定部は、
前記抽出部により2以上の新たな関連要素が抽出される度に、新たな改善対象関連要素を推定することを繰り返す請求項3に記載の情報処理装置。
The specifying unit is
Each time a new improvement target related element is estimated by the estimation unit, repeatedly designating the estimated new improvement target related element as a new designated element,
The extractor is
Repeatedly extracting two or more elements other than the new specified element as new related elements each time a new specified element is specified by the specifying unit,
The estimation unit
4. The information processing apparatus according to claim 3, wherein each time two or more new related elements are extracted by the extraction unit, estimation of a new related element to be improved is repeated.
前記推定部は、
前記指定要素の性能が改善されることを結論部に用い、前記2以上の関連要素の各々の性能が改善されることを条件部に用いたアソシエーション分析を行って、前記改善対象関連要素を推定する請求項1に記載の情報処理装置。
The estimation unit
estimating the related element to be improved by performing an association analysis using in the conclusion part that the performance of the specified element is improved and using in the condition part that the performance of each of the two or more related elements is improved; The information processing apparatus according to claim 1.
前記推定部は、
前記アソシエーション分析に含まれる複数の計算項目のうちのいずれかの計算項目において計算維持条件が不成立の場合に、前記複数の計算項目のうちの未計算の計算項目の計算を行わない請求項5に記載の情報処理装置。
The estimation unit
6. The method according to claim 5, wherein when a calculation maintenance condition is not satisfied for any calculation item among the plurality of calculation items included in the association analysis, calculation of the uncalculated calculation item among the plurality of calculation items is not performed. The information processing device described.
前記情報処理装置は、更に、
要素ごとに、性能の基準に性能が合致するか否かを評価する評価部を有し、
前記指定部は、
前記評価部により性能の基準に性能が合致しないと評価された要素を前記指定要素として指定する請求項1に記載の情報処理装置。
The information processing device further includes
Each element has an evaluation unit that evaluates whether the performance meets the performance criteria,
The specifying unit is
2. The information processing apparatus according to claim 1, wherein an element whose performance is evaluated by said evaluation unit as not meeting a performance standard is designated as said designated element.
前記評価部は、
各要素の性能が要素ごとに定義された性能の基準に合致するか否かを評価する請求項7に記載の情報処理装置。
The evaluation unit
8. The information processing apparatus according to claim 7, wherein the performance of each element is evaluated as to whether or not it meets a performance standard defined for each element.
前記3以上の要素は複数の階層を構成しており、
前記評価部は、
階層ごとに異なる時間幅で各要素の性能が性能の基準に合致するか否かを評価する請求項7に記載の情報処理装置。
The three or more elements constitute a plurality of hierarchies,
The evaluation unit
8. The information processing apparatus according to claim 7, wherein whether or not the performance of each element meets a performance standard is evaluated in a time period different for each layer.
前記評価部は、
評価を行う度に、評価結果を出力する請求項7に記載の情報処理装置。
The evaluation unit
8. The information processing apparatus according to claim 7, wherein the evaluation result is output each time the evaluation is performed.
前記評価部は、
前記推定部により推定された改善対象関連要素に追加の性能の基準が定義されており、前記追加の性能の基準を前記改善対象関連要素に適用するための条件が成立する場合に、前記改善対象関連要素の性能が前記追加の性能の基準に合致するか否かを評価する請求項7に記載の情報処理装置。
The evaluation unit
An additional performance standard is defined for the improvement target related element estimated by the estimating unit, and if a condition for applying the additional performance standard to the improvement target related element is established, the improvement target related element 8. The information processing apparatus according to claim 7, wherein it is evaluated whether or not the performance of the related element meets the criterion of the additional performance.
前記評価部は、
統計処理により得られた前記性能の基準を用いて評価を行う請求項7に記載の情報処理装置。
The evaluation unit
8. The information processing apparatus according to claim 7, wherein evaluation is performed using the performance criteria obtained by statistical processing.
前記推定部は、
前記3以上の要素のうちのいずれか2以上の要素の間の関係が不明の場合に、関係が不明な要素の間の関係を推定する請求項1に記載の情報処理装置。
The estimation unit
2. The information processing apparatus according to claim 1, wherein, when the relationship between any two or more of the three or more elements is unknown, the relationship between the elements whose relationship is unknown is estimated.
前記推定部は、
前記アソシエーション分析に含まれる複数の計算項目についての複数の計算値を用いた計算を行い、前記複数の計算値を用いた計算の計算値を出力する請求項5に記載の情報処理装置。
The estimation unit
6. The information processing apparatus according to claim 5, wherein calculation is performed using a plurality of calculated values for a plurality of calculation items included in the association analysis, and a calculated value of the calculation using the plurality of calculated values is output.
前記推定部は、
前記アソシエーション分析に含まれる複数の計算項目についての複数の計算値を用いた計算により得られる計算値を前記2以上の関連要素のうちの少なくともいずれかに対する改善実績に基づいて補正し、補正後の計算値を出力する請求項5に記載の情報処理装置。
The estimation unit
A calculated value obtained by calculation using a plurality of calculated values for a plurality of calculated items included in the association analysis is corrected based on the improvement performance for at least one of the two or more related factors, and after correction 6. The information processing apparatus according to claim 5, which outputs a calculated value.
前記推定部は、
前記アソシエーション分析に含まれる複数の計算項目についての複数の計算値を用いた計算により得られる計算値の補正方法を機械学習により取得し、取得した補正方法により前記複数の計算値を用いた計算により得られる計算値を補正し、補正後の計算値を出力する請求項5に記載の情報処理装置。
The estimation unit
Obtaining by machine learning a method for correcting calculated values obtained by calculation using a plurality of calculated values for a plurality of calculation items included in the association analysis, and performing calculation using the plurality of calculated values according to the obtained correction method 6. The information processing apparatus according to claim 5, wherein the obtained calculated value is corrected, and the corrected calculated value is output.
コンピュータが、3以上の要素のうち性能を改善させるべき要素を指定要素として指定し、
前記コンピュータが、前記指定要素以外の要素の中から前記指定要素と有意な関係にある2以上の要素を関連要素として抽出し、
前記コンピュータが、抽出された2以上の関連要素の各々の性能が前記指定要素の性能に与える影響を分析して、前記2以上の関連要素の中から、前記指定要素の性能の改善のために性能を改善させるべき関連要素である改善対象関連要素を推定する情報処理方法。
the computer designates an element whose performance should be improved among the three or more elements as a designated element;
The computer extracts two or more elements having a significant relationship with the designated element from elements other than the designated element as related elements,
The computer analyzes the influence of the performance of each of the extracted two or more related elements on the performance of the designated element, and selects the designated element from among the two or more related elements to improve the performance of the designated element. An information processing method for estimating an improvement target related element, which is a related element whose performance should be improved.
3以上の要素のうち性能を改善させるべき要素を指定要素として指定する指定処理と、
前記指定要素以外の要素の中から前記指定要素と有意な関係にある2以上の要素を関連要素として抽出する抽出処理と、
前記抽出処理により抽出された2以上の関連要素の各々の性能が前記指定要素の性能に与える影響を分析して、前記2以上の関連要素の中から、前記指定要素の性能の改善のために性能を改善させるべき関連要素である改善対象関連要素を推定する推定処理とをコンピュータに実行させる情報処理プログラム。
a designation process for designating an element whose performance should be improved among the three or more elements as a designated element;
an extraction process of extracting two or more elements having a significant relationship with the specified element from among elements other than the specified element as related elements;
analyzing the influence of the performance of each of the two or more related elements extracted by the extraction process on the performance of the designated element, and selecting among the two or more related elements to improve the performance of the designated element An information processing program for causing a computer to execute an estimation process of estimating an improvement target related element, which is a related element whose performance should be improved.
JP2022544236A 2020-09-18 2020-09-18 Information processing device, information processing method and information processing program Active JP7154468B2 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2020/035512 WO2022059183A1 (en) 2020-09-18 2020-09-18 Information processing device, information processing method, and information processing program

Publications (2)

Publication Number Publication Date
JPWO2022059183A1 JPWO2022059183A1 (en) 2022-03-24
JP7154468B2 true JP7154468B2 (en) 2022-10-17

Family

ID=80776087

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2022544236A Active JP7154468B2 (en) 2020-09-18 2020-09-18 Information processing device, information processing method and information processing program

Country Status (4)

Country Link
JP (1) JP7154468B2 (en)
CN (1) CN116194945A (en)
TW (1) TW202230060A (en)
WO (1) WO2022059183A1 (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009104523A (en) 2007-10-25 2009-05-14 Sharp Corp Method and device for extracting poor factor, process stabilization support system, program, and computer readable storage medium
JP2018195130A (en) 2017-05-18 2018-12-06 パナソニックIpマネジメント株式会社 Abnormality-cause-estimating device, abnormality-cause-estimating method, and abnormality-cause-estimating program
WO2020149389A1 (en) 2019-01-17 2020-07-23 日本電気株式会社 Process improvement support device, process improvement support method, and recording medium storing process improvement support program

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10249683A (en) * 1997-03-14 1998-09-22 Omron Corp Process improving and supporting method and device thereof
JP2002006930A (en) * 2000-06-20 2002-01-11 Hitachi Ltd Process history tracing system
JP2019049940A (en) * 2017-09-12 2019-03-28 安川情報システム株式会社 Abnormal process estimating method, abnormal process estimating apparatus, and abnormal process estimating program

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009104523A (en) 2007-10-25 2009-05-14 Sharp Corp Method and device for extracting poor factor, process stabilization support system, program, and computer readable storage medium
JP2018195130A (en) 2017-05-18 2018-12-06 パナソニックIpマネジメント株式会社 Abnormality-cause-estimating device, abnormality-cause-estimating method, and abnormality-cause-estimating program
WO2020149389A1 (en) 2019-01-17 2020-07-23 日本電気株式会社 Process improvement support device, process improvement support method, and recording medium storing process improvement support program

Also Published As

Publication number Publication date
JPWO2022059183A1 (en) 2022-03-24
WO2022059183A1 (en) 2022-03-24
TW202230060A (en) 2022-08-01
CN116194945A (en) 2023-05-30

Similar Documents

Publication Publication Date Title
CN104350471B (en) Method and system for detecting anomalies in real-time in processing environment
JP5962190B2 (en) Method and apparatus for predicting short-term power load
US9208209B1 (en) Techniques for monitoring transformation techniques using control charts
US20150120263A1 (en) Computer-Implemented Systems and Methods for Testing Large Scale Automatic Forecast Combinations
JP6299759B2 (en) Prediction function creation device, prediction function creation method, and program
JP6521096B2 (en) Display method, display device, and program
JP2018180759A (en) System analysis system and system analysis method
EP3795975A1 (en) Abnormality sensing apparatus, abnormality sensing method, and abnormality sensing program
EP4053757A1 (en) Degradation suppression program, degradation suppression method, and information processing device
JP6489235B2 (en) System analysis method, system analysis apparatus, and program
CN111680085A (en) Data processing task analysis method and device, electronic equipment and readable storage medium
JP7274434B2 (en) Diversion design support system and diversion design support method
JP7154468B2 (en) Information processing device, information processing method and information processing program
JP7212292B2 (en) LEARNING DEVICE, LEARNING METHOD AND LEARNING PROGRAM
Liu et al. Residual useful life prognosis of equipment based on modified hidden semi-Markov model with a co-evolutional optimization method
WO2019073512A1 (en) System analysis method, system analysis device, and program
JP2007164346A (en) Decision tree changing method, abnormality determination method, and program
US11636377B1 (en) Artificial intelligence system incorporating automatic model updates based on change point detection using time series decomposing and clustering
JP5826892B1 (en) Change point detection apparatus, change point detection method, and computer program
US11651271B1 (en) Artificial intelligence system incorporating automatic model updates based on change point detection using likelihood ratios
US11762562B2 (en) Performance analysis apparatus and performance analysis method
US20230297095A1 (en) Monitoring device and method for detecting anomalies
US20220172002A1 (en) Dynamic and continuous composition of features extraction and learning operation tool for episodic industrial process
US20210373987A1 (en) Reinforcement learning approach to root cause analysis
US11438277B2 (en) Allocation method, allocating device, and computer-readable recording medium

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20220721

A871 Explanation of circumstances concerning accelerated examination

Free format text: JAPANESE INTERMEDIATE CODE: A871

Effective date: 20220721

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20220906

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20221004

R150 Certificate of patent or registration of utility model

Ref document number: 7154468

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150