JP7130695B2 - Jigs for erecting structures - Google Patents

Jigs for erecting structures Download PDF

Info

Publication number
JP7130695B2
JP7130695B2 JP2020079571A JP2020079571A JP7130695B2 JP 7130695 B2 JP7130695 B2 JP 7130695B2 JP 2020079571 A JP2020079571 A JP 2020079571A JP 2020079571 A JP2020079571 A JP 2020079571A JP 7130695 B2 JP7130695 B2 JP 7130695B2
Authority
JP
Japan
Prior art keywords
erecting
jig
curvature
flange
main body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2020079571A
Other languages
Japanese (ja)
Other versions
JP2021173116A (en
Inventor
延光 長井
孝仁 菊池
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taihei Dengyo Kaisha Ltd
Original Assignee
Taihei Dengyo Kaisha Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taihei Dengyo Kaisha Ltd filed Critical Taihei Dengyo Kaisha Ltd
Priority to JP2020079571A priority Critical patent/JP7130695B2/en
Publication of JP2021173116A publication Critical patent/JP2021173116A/en
Application granted granted Critical
Publication of JP7130695B2 publication Critical patent/JP7130695B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Description

この発明は、本体と本体から張り出す2つのフランジ部を有するT形断面の端部を備えた構造物の立て起こし用治具に関するものである、 The present invention relates to a jig for erecting a structure, which has a main body and two flanges protruding from the main body, and which has a T-shaped cross-sectional end.

特許文献1には、コンクリート構造物を簡単に立て起こすことが可能な立て起こし具が開示されている。この立て起こし具は、コンクリート構造物に開けられた穴にボルト接合されるベース部を有しており、ベース部が有する湾曲面に沿ってコンクリート構造物を立て起こすことにより、コンクリート構造物を滑らかに立て起こすことができる。 Patent Literature 1 discloses a erecting tool capable of easily erecting a concrete structure. This erecting tool has a base part that is bolted to a hole drilled in a concrete structure, and erects the concrete structure along the curved surface of the base part, thereby smoothing the concrete structure. can stand up.

特開2016-50413号公報JP 2016-50413 A

ところで、図6に示すような本体2と本体2から張り出す2つのフランジ部3A、3Bを有するT形断面の端部を備えた大型の構造物1が、例えば、ボイラー鉄骨の大梁に用いられている。従来、横倒しにされた構造物1をボイラー鉄骨等における設置位置まで持ち上げる場合、横倒しにされた状態から2基のクレーンで構造物1の両端部を吊り上げつつ、地面から浮かした状態で立て起こし、立った状態のまま構造物1が設置される高さまで持ち上げていた。そのため、2基のクレーンを用意すること、2基のクレーンを配置可能な敷地を用意することが必要となるためコスト高になり、また、2基のクレーンが連携して構造物1を吊り上げる必要があるため作業時間が掛かるといった問題があった。 By the way, a large-sized structure 1 having a T-shaped cross-sectional end having a main body 2 and two flanges 3A and 3B projecting from the main body 2 as shown in FIG. ing. Conventionally, when lifting a structure 1 that has been laid sideways to an installation position on a boiler steel frame or the like, while lifting both ends of the structure 1 from the sideways state with two cranes, the structure 1 is raised from the ground. It was lifted up to the height at which the structure 1 was installed while standing. Therefore, it is necessary to prepare two cranes and prepare a site where two cranes can be arranged, which increases the cost, and the two cranes need to work together to lift the structure 1. There was a problem that it took a long time to work.

そこで、1基のクレーンで横倒しにされた構造物1を立て起こすために、特許文献1に開示されている立て起こし具を用いる場合、特許文献1の立て起こし具は構造物1に立て起こし具を取り付けるための穴が必要であるという問題がある。 Therefore, when the erecting tool disclosed in Patent Document 1 is used to erect a structure 1 that has been overturned by a single crane, the erecting tool disclosed in Patent Document 1 is applied to the structure 1. The problem is that a hole is required for mounting the

本発明は、こうした事情に鑑み、本体と本体から張り出す2つのフランジ部を有するT形断面の端部を備えた構造物を1基のクレーンで立て起こすことができる立て起こし用治具であって、構造物そのものに穴を形成したり、立て起こし用治具を取り付けるためのアタッチメントを必要としたりしない立て起こし用治具を提供することを課題とする。 In view of these circumstances, the present invention provides a jig for erecting a structure having a main body and two flange portions projecting from the main body and having a T-shaped cross-sectional end, which can be erected by a single crane. It is therefore an object of the present invention to provide a erecting jig which does not require an attachment for attaching the erecting jig or a hole formed in the structure itself.

この発明は、上記課題を達成するためになされたものであって、下記を特徴とするものである。 The present invention has been made to achieve the above objects, and is characterized by the following.

請求項1記載の発明は、本体と前記本体から張り出す2つのフランジ部を有するT形断面の端部を備えた構造物の立て起こし用治具であって、一方の前記フランジ部に取り付けられる第1の分割体と、他方の前記フランジ部に取り付けられる第2の分割体と、前記第1の分割体と前記第2の分割体とを接合する接合手段と、を備え、前記接合手段により接合された立て起こし用治具の外周形状が、第1の曲率を有する第1の曲部と、直線部と、前記第1の曲率と異なる第2の曲率を有する第2の曲部と、を有することを特徴とする。 The invention according to claim 1 is a jig for erecting a structure comprising a main body and two flanges protruding from the main body and end portions of a T-shaped cross section, wherein the jig is attached to one of the flanges. a first split body, a second split body attached to the other flange portion, and joining means for joining the first split body and the second split body; The outer peripheral shape of the joined erecting jig includes a first curved portion having a first curvature, a straight portion, a second curved portion having a second curvature different from the first curvature, characterized by having

請求項2に記載の発明は、請求項1に記載の立て起こし用治具であって、前記第1の曲部と、前記直線部と、前記第2の曲部と、に相当する連続面を有し、前記連続面における前記直線部に相当する直線面を地面に接地させた際に、前記構造物の重心が、前記直線面の範囲の何れかの点と、前記構造物の吊点の間に位置することを特徴とする。 The invention according to claim 2 is the jig for erecting according to claim 1, wherein a continuous surface corresponding to the first curved portion, the straight portion, and the second curved portion and when the linear plane corresponding to the linear portion in the continuous plane is grounded on the ground, the center of gravity of the structure is any point in the range of the linear plane and the hanging point of the structure characterized by being located between

請求項3に記載の発明は、請求項1又は2に記載の立て起こし用治具であって、前記第2の曲率が、前記第1の曲率より高いことを特徴とする。 The invention according to claim 3 is the jig for erecting according to claim 1 or 2, characterized in that the second curvature is higher than the first curvature.

請求項4に記載の発明は、請求項1乃至3の何れか一項に記載の立て起こし用治具であって、前記第1の分割体は、前記一方の前記フランジ部と嵌合する第1の嵌合溝を有し、前記第2の分割体は、前記他方の前記フランジ部と嵌合する第2の嵌合溝を有することを特徴とする。 The invention according to claim 4 is the jig for erecting according to any one of claims 1 to 3, wherein the first split body is a second split body that is fitted with the one flange portion. It has one fitting groove, and the second divided body has a second fitting groove that fits with the other flange portion.

請求項5に記載の発明は、請求項1乃至4の何れか一項に記載の立て起こし用治具であって、前記第1の分割体は、前記本体の一の面に当接する第1の当接板を有し、前記第2の分割体は、前記本体の一の面の裏側の面に当接する第2の当接板を有することを特徴とする。 The invention according to claim 5 is the jig for erecting according to any one of claims 1 to 4, wherein the first split body is a first split body that abuts on one surface of the main body. and the second divided body has a second contact plate that contacts a surface on the back side of the one surface of the main body.

この発明によれば、構造物の一端部に第1の曲部に相当する部分を形成することができることから、構造物の他端部を1基のクレーンで吊り上げつつ、第1の曲部を利用して、容易に構造物を立て起こすことができる。また、立て起こし用治具を取り付けるための穴を構造物に形成する必要や、立て起こし用治具を取り付けるためのアタッチメントを用意する必要もない。さらに、直線部で構造物を安定して静止させて、構造物の確認を行うことができる。 According to this invention, since a portion corresponding to the first curved portion can be formed at one end of the structure, the first curved portion can be formed while lifting the other end of the structure with a single crane. It can be used to erect structures easily. In addition, there is no need to form a hole in the structure for attaching the erecting jig or to prepare an attachment for attaching the erecting jig. Furthermore, the structure can be stably stopped at the straight portion and the structure can be confirmed.

構造物に立て起こし用治具を取り付けた際の構造物端部の側断面図である。FIG. 4 is a side cross-sectional view of an end portion of a structure when the erecting jig is attached to the structure; (A)は立て起こし用治具における第1の分割体の平面図であり、(B)は同正面図であり、(C)は同側面図である。(A) is a plan view of a first divided body in the jig for erecting, (B) is a front view of the same, and (C) is a side view of the same. (A)は立て起こし用治具における第2の分割体の平面図であり、(B)は同正面図であり、(C)は同側面図である。(A) is a plan view of a second divided body in the jig for erecting, (B) is a front view of the same, and (C) is a side view of the same. 立て起こし用治具の側面図である。FIG. 4 is a side view of a jig for erecting; (A)-(J)は立て起こし用治具を用いて構造物を立て起こす際の工程図である。(A) to (J) are process diagrams for erecting a structure using a jig for erecting. (A)は構造物の斜視図であり、(B)は同側面図である。(A) is a perspective view of a structure, and (B) is a side view of the same.

本発明の実施形態について図面を参照しながら説明する。 An embodiment of the present invention will be described with reference to the drawings.

まず、図1-図4を用いて、本実施形態に係る構造物1の立て起こし用治具10の構成について説明する。 First, the configuration of a jig 10 for erecting a structure 1 according to the present embodiment will be described with reference to FIGS. 1 to 4. FIG.

立て起こし用治具10は、第1の分割体20と、第2の分割体30と、を含む。 The erecting jig 10 includes a first split body 20 and a second split body 30 .

図2に示すように、第1の分割体20は、構造物1への取り付け時に(図5(A)参照)水平に設置されるフランジ21を有する。フランジ21の左右端部近傍の底面には2つの基板22が立設されている(2つの基板22は同様の構造となっているため、以下では一方の基板22について説明する)。フランジ21には、複数の挿通孔21aが形成されており、その一部は、基板22が設けられている位置よりもフランジ21の端部側に形成されている。 As shown in FIG. 2, the first split body 20 has a flange 21 that is installed horizontally when attached to the structure 1 (see FIG. 5(A)). Two substrates 22 are erected on the bottom surface near the left and right ends of the flange 21 (because the two substrates 22 have the same structure, one substrate 22 will be described below). A plurality of insertion holes 21a are formed in the flange 21, some of which are formed closer to the end of the flange 21 than the position where the substrate 22 is provided.

基板22は、フランジ21から背面方向(図2(A)において上方向)に延設されており、その端部上面には、構造物1の本体2に当接する当接板23が固設されている。また、当接板23が荷重に十分耐えられるように、基板22の両側面と当接板23がそれぞれなす直角部に第1リブ24、第2リブ25が設けられている。 The substrate 22 extends from the flange 21 in the rearward direction (upward in FIG. 2A), and a contact plate 23 is fixed on the upper surface of the end to contact the main body 2 of the structure 1. ing. In addition, first ribs 24 and second ribs 25 are provided at right angles between both side surfaces of the substrate 22 and the contact plate 23 so that the contact plate 23 can withstand the load.

基板22の底面から正面にかけて、立て起こし用治具10が構造物1を立て起こす際に、地面に接する接地板26が設けられている。図2(C)に示すように、接地板26は、第1平面部26a、第1曲面部26b及び第2平面部26cを含む。 A ground plate 26 is provided from the bottom to the front of the substrate 22 to contact the ground when the erecting jig 10 erects the structure 1 . As shown in FIG. 2C, the ground plate 26 includes a first plane portion 26a, a first curved portion 26b and a second plane portion 26c.

基板22には、フランジ21に接する部分と当接板23に接する部分の間に、嵌合部27が形成されており(図2(C)参照)、嵌合部27には、構造物1のフランジ部3Bが嵌合するようになっている。 A fitting portion 27 is formed in the substrate 22 between a portion in contact with the flange 21 and a portion in contact with the contact plate 23 (see FIG. 2C). The flange portion 3B of is fitted.

図3に示すように、第2の分割体30は、構造物1への取り付け時に(図5(A)参照)水平に配置されるフランジ31を有する。フランジ31の左右端部近傍の底面には2つの基板32が立設されている(2つの基板32は同様の構造となっているため、以下では一方の基板32について説明する)。フランジ31には、複数の挿通孔31aが形成されており、その一部は、基板32が設けられている位置よりもフランジ31の端部側に形成されている。 As shown in FIG. 3, the second split body 30 has a flange 31 that is horizontally arranged when attached to the structure 1 (see FIG. 5(A)). Two substrates 32 are erected on the bottom surface near the left and right ends of the flange 31 (because the two substrates 32 have the same structure, one substrate 32 will be described below). A plurality of insertion holes 31a are formed in the flange 31, some of which are formed closer to the end of the flange 31 than the position where the substrate 32 is provided.

基板32は、フランジ31から背面方向に延設されており、その端部下面には、構造物1の本体2に当接する当接板33が固設されている。また、当接板33が荷重に十分耐えられるように、基板32の両側面と当接板33がそれぞれなす直角部に第1リブ34、第2リブ35が設けられている。 The base plate 32 extends from the flange 31 in the rearward direction, and a contact plate 33 that contacts the main body 2 of the structure 1 is fixed to the lower surface of the end portion of the base plate 32 . In addition, first ribs 34 and second ribs 35 are provided at right angles between both side surfaces of the substrate 32 and the contact plate 33 so that the contact plate 33 can withstand the load sufficiently.

基板32の上面から正面にかけて、立て起こし用治具10が構造物1を立て起こす際に、地面に接する接地板36が設けられている。図3(C)に示すように、接地板36は、第3平面部36a、第2曲面部36b及び第4平面部36cを含む。 A ground plate 36 that contacts the ground when the erecting jig 10 erects the structure 1 is provided from the upper surface to the front of the substrate 32 . As shown in FIG. 3C, the ground plate 36 includes a third plane portion 36a, a second curved portion 36b and a fourth plane portion 36c.

基板32には、フランジ31に接する部分と当接板33に接する部分の間に、嵌合部37が形成されており(図3(C)参照)、嵌合部37には、構造物1のフランジ部3Aが嵌合するようになっている。 A fitting portion 37 is formed in the substrate 32 between a portion in contact with the flange 31 and a portion in contact with the contact plate 33 (see FIG. 3C). flange portion 3A is fitted.

次に、立て起こし用治具10の構造物1への取り付け方法について説明する。まず、図1に示すように、第2の分割体30の嵌合部37と構造物1のフランジ部3Aが嵌合するように、第2の分割体30を上方より載置する。 Next, a method for attaching the erecting jig 10 to the structure 1 will be described. First, as shown in FIG. 1, the second split body 30 is placed from above so that the fitting portion 37 of the second split body 30 and the flange portion 3A of the structure 1 are fitted.

次いで、第1の分割体20の嵌合部27と構造物1のフランジ部3Bが嵌合するように下方より第1の分割体20を支持する。そうすると、第1の分割体20のフランジ21と、第2の分割体30のフランジ31とが接するので、それぞれの全ての挿通孔21aと挿通孔31aについて、相互に位置合わせをした上でボルト(図示しない)を挿通しナット(図示しない)と締結する。つまり、第1の分割体20と第2の分割体30をフランジ21、31でボルト接合する。このとき、当接板23及び当接板33がそれぞれ本体2を面で押しつけるため、より確実に立て起こし用治具10が構造物1に取り付けられる。 Next, the first divided body 20 is supported from below so that the fitting portion 27 of the first divided body 20 and the flange portion 3B of the structure 1 are fitted. Then, since the flange 21 of the first divided body 20 and the flange 31 of the second divided body 30 are in contact with each other, the bolts ( (not shown) is fastened with an insertion nut (not shown). That is, the first split body 20 and the second split body 30 are bolted together at the flanges 21 and 31 . At this time, the contact plate 23 and the contact plate 33 press the main body 2 with their surfaces, so that the erecting jig 10 is attached to the structure 1 more reliably.

これにより、立て起こし用治具10を取り付けるため穴を構造物1に形成したり、立て起こし用治具10を取り付けるためのアタッチメントを用いたりせずに、構造物1に対して立て起こし用治具10を取り付けることができる。 As a result, the erecting jig can be attached to the structure 1 without forming a hole in the structure 1 for attaching the erecting jig 10 or using an attachment for attaching the erecting jig 10 . Tool 10 can be attached.

図4に示すように、第1の分割体20と第2の分割体30を接合すると、接地板26と、接地板36とが連接して外周面が形成される。この外周面の側面形状は、第1の曲率を有する第1の曲部(第1曲面部26bに相当)と、直線部(第2平面部26c及び第3平面部36aからなる平面部Fに相当)と、第1の曲率よりも高い曲率である第2の曲率を有する第2の曲部(第2曲面部36bに相当)と、を有する。 As shown in FIG. 4, when the first split body 20 and the second split body 30 are joined, the ground plate 26 and the ground plate 36 are connected to each other to form an outer peripheral surface. The side shape of this outer peripheral surface is composed of a first curved portion (corresponding to the first curved surface portion 26b) having a first curvature and a straight portion (a flat portion F consisting of a second flat portion 26c and a third flat portion 36a). and a second curved portion (corresponding to the second curved surface portion 36b) having a second curvature that is higher than the first curvature.

次に、図5を用いて、立て起こし用治具10を取り付けた構造物1を立て起こす際の工程について説明する。図5において符号Gは構造物1の重心を示す。 Next, a process for erecting the structure 1 to which the erecting jig 10 is attached will be described with reference to FIG. In FIG. 5, symbol G indicates the center of gravity of the structure 1. As shown in FIG.

まず、構造物1をクレーン(図示しない)で持ち上げるために、横出しの状態になっている構造物1(図5(A)参照)における、立て起こし用治具10が取り付けられている一端部とは逆側の他端部に吊点P2を設定し玉掛を行う。 First, in order to lift the structure 1 with a crane (not shown), one end portion of the structure 1 (see FIG. 5A) that is in a laterally protruding state, to which the erecting jig 10 is attached. A hanging point P2 is set at the other end on the opposite side to perform slinging.

次いで、構造物1の他端部をクレーンで吊り上げ、立て起こし用治具10の第1曲面部26bの曲面を利用して支持点P1で構造物1を立て起こしていく(図5(B)-図5(D)参照)。このように、第1曲面部26bの曲面を利用して構造物1を立て起こすことにより、立て起こしに掛かる荷重が軽減され、1基のクレーンで構造物1を立て起こすことができ、クレーンを配置するための用地も縮小することができる。 Next, the other end of the structure 1 is lifted by a crane, and the structure 1 is raised at the support point P1 using the curved surface of the first curved surface portion 26b of the jig 10 for raising (FIG. 5B). - see FIG. 5(D)). In this way, by erecting the structure 1 using the curved surface of the first curved surface portion 26b, the load applied to the erection is reduced, and the structure 1 can be erected by a single crane. The site for placement can also be reduced.

次いで、さらに、構造物1の他端部をクレーンで吊り上げ、平面部Fを利用して構造物1を斜めの状態で静止させる(図5(E)参照)。このとき、図5(E)において、構造物1の重心Gが平面部F(P1)の範囲の何れかの点と吊点P2の間にあることで安定した状態で構造物1を支持することができる。これにより、構造物1を吊り上げる前に地上付近で構造物1のチェックを行うことができる。なお、構造物1の重心Gの位置は、構造物1の材質や形状等によって異なる。そのため、立て起こす構造物1に応じて、その構造物1の重心Gが平面部F(P1)の範囲の何れかの点と吊点P2の間となるように、立て起こし用治具10の外周面の側面形状を設計することとする。 Next, the other end of the structure 1 is further lifted by a crane, and the structure 1 is stopped in an oblique state using the plane portion F (see FIG. 5(E)). At this time, in FIG. 5(E), the structure 1 is stably supported by the center of gravity G of the structure 1 being between any point in the range of the flat portion F (P1) and the hanging point P2. be able to. As a result, the structure 1 can be checked near the ground before the structure 1 is lifted. Note that the position of the center of gravity G of the structure 1 varies depending on the material, shape, and the like of the structure 1 . Therefore, depending on the structure 1 to be erected, the erecting jig 10 is set so that the center of gravity G of the structure 1 is between any point in the range of the flat portion F (P1) and the hanging point P2. The side shape of the outer peripheral surface is designed.

次いで、さらに、構造物1の他端部をクレーンで吊り上げ、立て起こし用治具10の第2曲面部36bの曲面を利用して支持点P1で構造物1を立て起こしていき(図5(F)参照)、構造物1を鉛直に立たせた状態で静止させる(図5(G)参照)。この状態で、地面Bと平面部Fの間に楔Kを配置する(図5(G)、図5(H)参照)。このように、楔Kを配置することにより、構造物1を安定した状態で構造物1を鉛直姿勢で支持することができるため、別途、構造物1を鉛直姿勢で支持するための仮受け台が不要となる。 Next, the other end of the structure 1 is further lifted by a crane, and the structure 1 is raised at the support point P1 using the curved surface of the second curved surface portion 36b of the jig 10 for raising (Fig. 5 ( F)), and the structure 1 is left standing vertically (see FIG. 5(G)). In this state, the wedge K is placed between the ground B and the plane portion F (see FIGS. 5(G) and 5(H)). By arranging the wedges K in this way, the structure 1 can be supported in a vertical posture while the structure 1 is in a stable state. becomes unnecessary.

次いで、第1の分割体20と第2の分割体30を接合しているボルトを取り外し、立て起こし用治具10を分解し、構造物1から第2の分割体30を取り外す(図5(I)参照)。このとき、第2曲面部36bを利用することにより取り外しが容易になる。次いで、構造物1から第1の分割体20を取り外す(図5(J)参照)。 Next, the bolts joining the first split body 20 and the second split body 30 are removed, the erecting jig 10 is disassembled, and the second split body 30 is removed from the structure 1 (FIG. 5 ( I)). At this time, removal is facilitated by using the second curved surface portion 36b. Next, the first divided body 20 is removed from the structure 1 (see FIG. 5(J)).

以上説明した本実施形態に係る立て起こし用治具10は、本体2と本体2から張り出す2つのフランジ部3A、3Bを有するT形断面の端部を備えた構造物1の立て起こし用治具であって、フランジ部3A(「一方のフランジ部」の一例)に取り付けられる第1の分割体20と、フランジ部3B(「他方のフランジ部」の一例)に取り付けられる第2の分割体30と、第1の分割体20と第2の分割体30とを接合するボルト・ナット(「接合手段」の一例)と、ボルト・ナットにより接合された立て起こし用治具10の外周形状が、第1の曲率を有する第1曲面部26b(「第1の曲部」に相当する曲面)と、平面部F(「直線部」に相当する平面)と、第1の曲率と異なる第2の曲率を有する第2曲面部36b(「第2の曲部」に相当する曲面)と、を有する。 The erecting jig 10 according to the present embodiment described above is a jig for erecting a structure 1 having a main body 2 and two flanges 3A and 3B protruding from the main body 2 and having a T-shaped cross-sectional end. A first split body 20 attached to the flange portion 3A (an example of "one flange portion") and a second split body attached to the flange portion 3B (an example of "the other flange portion"). 30, bolts and nuts (an example of “joining means”) joining the first divided body 20 and the second divided body 30, and the erecting jig 10 joined by the bolts and nuts have an outer peripheral shape. , a first curved surface portion 26b (a curved surface corresponding to the “first curved portion”) having a first curvature, a plane portion F (a flat surface corresponding to the “straight portion”), and a second and a second curved surface portion 36b (a curved surface corresponding to the “second curved portion”) having a curvature of .

したがって、本実施形態に係る立て起こし用治具10によれば、構造物1の一端部に第1曲面部26bを形成することができることから、構造物1の他端部(吊点P2)を1基のクレーンで吊り上げつつ、第1曲面部26bを利用して、容易に構造物1を立て起こすことができる。また、立て起こし用治具10を取り付けるための穴を構造物1に形成する必要や、立て起こし用治具00を取り付けるためのアタッチメントを用意する必要もない。さらに、平面部Fで構造物1を安定して静止させて、構造物1の確認を行うことができる。 Therefore, according to the erecting jig 10 according to the present embodiment, since the first curved surface portion 26b can be formed at one end portion of the structure 1, the other end portion (hanging point P2) of the structure 1 can be The structure 1 can be easily erected using the first curved surface portion 26b while being lifted by one crane. Further, there is no need to form a hole in the structure 1 for mounting the erecting jig 10 or prepare an attachment for mounting the erecting jig 00 . Furthermore, the structure 1 can be stably stopped on the plane portion F and the structure 1 can be confirmed.

1 構造物
2 本体
3A、3B フランジ部
10 立て起こし用治具
20 第1の分割体
21 フランジ
21a 挿通孔
22 基板
23 当接板
24 第1リブ
25 第2リブ
26 接地板
26a 第1平面部
26b 第1曲面部
26c 第2平面部
27 嵌合溝
30 第1の分割体
31 フランジ
31a 挿通孔
32 基板
33 当接板
34 第1リブ
35 第2リブ
36 接地板
36a 第3平面部
36b 第2曲面部
36c 第4平面部
37 嵌合溝
B 地面
F 平面部
K 楔
P1 支持点
P2 吊点
G 重心
1 structure 2 main body 3A, 3B flange portion 10 erecting jig 20 first divided body 21 flange 21a insertion hole 22 substrate 23 contact plate 24 first rib 25 second rib 26 ground plate 26a first plane portion 26b First curved surface portion 26c Second flat surface portion 27 Fitting groove 30 First divided body 31 Flange 31a Insertion hole 32 Board 33 Contact plate 34 First rib 35 Second rib 36 Ground plate 36a Third flat surface portion 36b Second curved surface Part 36c Fourth plane portion 37 Fitting groove B Ground F Plane portion K Wedge P1 Support point P2 Hanging point G Center of gravity

Claims (5)

本体と前記本体から張り出す2つのフランジ部を有するT形断面の端部を備えた構造物の立て起こし用治具であって、
一方の前記フランジ部に取り付けられる第1の分割体と、他方の前記フランジ部に取り付けられる第2の分割体と、
前記第1の分割体と前記第2の分割体とを接合する接合手段と、を備え、
前記接合手段により接合された立て起こし用治具の外周形状が、第1の曲率を有する第1の曲部と、直線部と、前記第1の曲率と異なる第2の曲率を有する第2の曲部と、を有することを特徴とする立て起こし用治具。
A jig for erecting a structure comprising a main body and an end portion of a T-shaped cross section having two flange portions projecting from the main body,
a first split body attached to one of the flange portions, and a second split body attached to the other flange portion;
a joining means for joining the first divided body and the second divided body,
The outer peripheral shape of the erecting jig joined by the joining means has a first curved portion having a first curvature, a straight portion, and a second curvature having a second curvature different from the first curvature. A jig for erecting, comprising: a curved portion;
請求項1に記載の立て起こし用治具であって、
前記第1の曲部と、前記直線部と、前記第2の曲部と、に相当する連続面を有し、
前記連続面における前記直線部に相当する直線面を地面に接地させた際に、前記構造物の重心が、前記直線面の範囲の何れかの点と、前記構造物の吊点の間に位置することを特徴とする立て起こし用治具。
The erecting jig according to claim 1,
a continuous surface corresponding to the first curved portion, the straight portion, and the second curved portion;
The center of gravity of the structure is positioned between any point in the range of the straight line and the suspension point of the structure when the straight line corresponding to the straight line portion of the continuous plane is grounded on the ground. A jig for erecting, characterized by:
請求項1又は2に記載の立て起こし用治具であって、
前記第2の曲率が、前記第1の曲率より高いことを特徴とする立て起こし用治具。
The erecting jig according to claim 1 or 2,
The erecting jig, wherein the second curvature is higher than the first curvature.
請求項1乃至3の何れか一項に記載の立て起こし用治具であって、
前記第1の分割体は、前記一方の前記フランジ部と嵌合する第1の嵌合溝を有し、前記第2の分割体は、前記他方の前記フランジ部と嵌合する第2の嵌合溝を有することを特徴とする立て起こし用治具。
The erecting jig according to any one of claims 1 to 3,
The first split body has a first fitting groove that fits with the one flange part, and the second split body has a second fitting groove that fits with the other flange part. A jig for erecting, characterized by having a matching groove.
請求項1乃至4の何れか一項に記載の立て起こし用治具であって、
前記第1の分割体は、前記本体の一の面に当接する第1の当接板を有し、前記第2の分割体は、前記本体の一の面の裏側の面に当接する第2の当接板を有することを特徴とする立て起こし用治具。
The erecting jig according to any one of claims 1 to 4,
The first divided body has a first contact plate that contacts one surface of the main body, and the second divided body has a second contact plate that contacts the back surface of the one surface of the main body. A jig for erecting, characterized by having a contact plate of
JP2020079571A 2020-04-28 2020-04-28 Jigs for erecting structures Active JP7130695B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2020079571A JP7130695B2 (en) 2020-04-28 2020-04-28 Jigs for erecting structures

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2020079571A JP7130695B2 (en) 2020-04-28 2020-04-28 Jigs for erecting structures

Publications (2)

Publication Number Publication Date
JP2021173116A JP2021173116A (en) 2021-11-01
JP7130695B2 true JP7130695B2 (en) 2022-09-05

Family

ID=78279505

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2020079571A Active JP7130695B2 (en) 2020-04-28 2020-04-28 Jigs for erecting structures

Country Status (1)

Country Link
JP (1) JP7130695B2 (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000247568A (en) 1999-02-26 2000-09-12 Toshiba Corp Suspending jig, standing jig and angle regulating jig
JP2017190201A (en) 2016-04-12 2017-10-19 株式会社ディッグ Suspender

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0622484Y2 (en) * 1989-12-25 1994-06-15 住友金属工業株式会社 Reversing jig for shaped steel
JPH0437190U (en) * 1990-07-24 1992-03-27
JP2596392Y2 (en) * 1993-09-28 1999-06-14 大成建設株式会社 PC board erection jig
JP6370167B2 (en) * 2014-08-29 2018-08-08 鹿島建設株式会社 Raising tool and raising method

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000247568A (en) 1999-02-26 2000-09-12 Toshiba Corp Suspending jig, standing jig and angle regulating jig
JP2017190201A (en) 2016-04-12 2017-10-19 株式会社ディッグ Suspender

Also Published As

Publication number Publication date
JP2021173116A (en) 2021-11-01

Similar Documents

Publication Publication Date Title
JP5178443B2 (en) Truss type setting beam
JP4078367B2 (en) Cable-stayed cable fixing structure
JP6655840B2 (en) Crane equipment used at the construction site of reinforced concrete buildings
JP7130695B2 (en) Jigs for erecting structures
JP5888796B2 (en) Gantry
CN209353366U (en) Tower crane bridgeware
JP4669955B2 (en) Anchor frame
JPWO2017195233A1 (en) Support
JP5192444B2 (en) Wall panel fixing structure
CN112573344B (en) Use method of hoisting and turning-over device for super-large concrete prefabricated stand plate
WO2005007551A1 (en) Working scaffold system of elevator
JP6108512B1 (en) Suspension scaffold and installation method
CN218231502U (en) Hoist, wallboard and wallboard hoisting structure for wallboard installation
JPH04354782A (en) Coupling structure for elevator guide rail and method of laying guide rail
JP6959860B2 (en) Building unit transport jig
KR20170027119A (en) Turnover jig
JP2004083264A (en) Beam attaching device
JPH0415881Y2 (en)
JP2018162607A (en) Floor panel, floor structure, floor structure construction method and floor structure reuse method
JP2012177266A (en) Hanging jig and mounting structure of the same, and method for lifting balcony unit
JP6914822B2 (en) Formwork method and formwork unit for lifting
CN107628567B (en) Lifting method of crown block track beam
JP6922130B2 (en) Construction method of steel materials on the outer wall of a building
US20220282474A1 (en) Module for separate conveyance, structure for plant, and method of constructing structure for plant
KR20220057812A (en) Support pillar for mounting C-leg

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20210910

TRDD Decision of grant or rejection written
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20220727

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20220802

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20220824

R150 Certificate of patent or registration of utility model

Ref document number: 7130695

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150