JP7129765B2 - Construction fee processing device, construction fee processing method, and construction fee processing program - Google Patents

Construction fee processing device, construction fee processing method, and construction fee processing program Download PDF

Info

Publication number
JP7129765B2
JP7129765B2 JP2017154780A JP2017154780A JP7129765B2 JP 7129765 B2 JP7129765 B2 JP 7129765B2 JP 2017154780 A JP2017154780 A JP 2017154780A JP 2017154780 A JP2017154780 A JP 2017154780A JP 7129765 B2 JP7129765 B2 JP 7129765B2
Authority
JP
Japan
Prior art keywords
payment
amount
hold
scheduled
date
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2017154780A
Other languages
Japanese (ja)
Other versions
JP2019032779A (en
Inventor
浩史 川口
剛光 上野
Original Assignee
株式会社オービック
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社オービック filed Critical 株式会社オービック
Priority to JP2017154780A priority Critical patent/JP7129765B2/en
Publication of JP2019032779A publication Critical patent/JP2019032779A/en
Priority to JP2022132020A priority patent/JP7397931B2/en
Application granted granted Critical
Publication of JP7129765B2 publication Critical patent/JP7129765B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Financial Or Insurance-Related Operations Such As Payment And Settlement (AREA)

Description

本発明は、工事代金処理装置、工事代金処理方法、および工事代金処理プログラムに関する。 The present invention relates to a construction fee processing device, a construction fee processing method, and a construction fee processing program.

従来、例えば、工事請負出来高管理システムとして特許文献1がある。かかる特許文献1の工事請負出来高管理システムは、管理センタ25には、現場16から送信された工事の進捗内容を確認してその承認を行う進捗内容承認手段2と、承認された工事の出来高数量を累計する出来高数量累計手段3と、承認された工事の出来高数量に基づいて出来高率を計算する出来高率計算手段4と、撮影手段により撮影された現場写真を記憶する現場進捗状況写真管理手段5と、ビデオカメラにより撮影された現場状況把握のための映像を放映する映像放映手段6と、少なくとも工事現場16の立体図又は工事現場周辺地域立体図を作成する立体地図作成手段7と、各手段のデータに基づいて所定期間内の累計データを蓄積する累計データ蓄積手段8と、を備えている。 Conventionally, for example, there is Patent Document 1 as a construction contract performance management system. In the construction contract performance management system of Patent Document 1, the management center 25 includes progress content approval means 2 for confirming and approving the progress content of the construction work transmitted from the site 16, and the approved work progress quantity. a completed quantity accumulating means 3 for accumulating the completed quantity, a completed quantity rate calculating means 4 for calculating the completed quantity rate based on the quantity of completed work for the approved construction work, and a site progress photo management means 5 for storing the site photos taken by the photographing means. , image display means 6 for displaying images taken by a video camera for grasping the site situation, 3D map creation means 7 for creating at least a 3D map of the construction site 16 or a 3D map of the construction site surrounding area, and each means. cumulative data accumulation means 8 for accumulating cumulative data within a predetermined period based on the data of .

また、特許文献1の段落0013には、「図3(b)は受注者が日々の出来高を入力する画面の一例である。受注者は「出来高数量」「出来高率」を入力する。それにより「出来高金額」と「支払金額」が自動的に計算される。支払金額は出来高金額の90%として計算され、残額10%は保留金ファイルへ保留され、支払は工事完了後に一括で支払われる。例えば、一番上の出来高数量「1」、出来高率「10%」のとき出来高金額が「100円」とすると支払金額はその90%の「90円」が支払われる。また確認・承認欄には受注者と発注者側の欄があり、夫々がチェックして確認・承認を行なう。」と記載されている。 In addition, in paragraph 0013 of Patent Document 1, "FIG. 3(b) is an example of a screen for a contractor to input daily output. As a result, the "volume amount" and "payment amount" are automatically calculated. The payment amount is calculated as 90% of the amount of work completed, the remaining 10% is retained in the reserve money file, and payment is made in a lump sum after the work is completed. For example, if the volume of transaction is "1" and the volume rate is "10%", and the amount of transaction is "100 yen", the payment amount is "90 yen" which is 90% of the amount. In the confirmation/approval column, there are columns for the contractor side and the orderer side. ” is stated.

特開2007-47948号公報JP 2007-47948 A

しかしながら、上記特許文献1では、工事代金の保留金額を別途計算して支払時に判断して一括で支払われるため、工事の状況をみながら保留金を支払うことはできない。 However, in Patent Document 1, the reserve amount of the construction fee is separately calculated, determined at the time of payment, and paid in a lump sum.

本発明は、上記に鑑みてなされたものであって、工事代金の保留金の支払いを工事の状況をみながら簡易に処理することができる工事代金処理装置、工事代金処理方法、および工事代金処理プログラムを提供することを目的とする。 The present invention has been made in view of the above, and is a construction fee processing device, a construction fee processing method, and a construction fee processing that can easily process the payment of the reserve money for the construction fee while looking at the situation of the construction. The purpose is to provide a program.

上述した課題を解決し、目的を達成するために、制御部を備えた工事代金処理装置であって、前記制御部は、工事代金の一部の支払いを保留する際の保留金額を決定する保留金額決定手段と、支払いの保留を解除する保留解除手段と、上記保留解除手段にて解除された保留金額の実際の支払予定日を設定して支払処理をする支払処理手段と、を備えたことを特徴とする。 In order to solve the above-described problems and achieve the object, there is provided a construction fee processing device comprising a control unit, wherein the control unit determines a suspension amount when suspending payment of a part of the construction fee. An amount determination means, a hold release means for canceling the payment hold, and a payment processing means for setting the actual scheduled payment date of the hold amount released by the hold release means and performing payment processing. characterized by

また、本発明の好ましい態様によれば、前記保留金額決定手段は、工事代金の保留率を決定し、工事未払金に当該保留金率を乗算して保留金額を算出し、前記保留金額のマイナス明細とプラス明細を作成し、前記マイナス明細の支払予定日に当初の支払予定日を設定し、前記プラス明細の支払予定日に未来日付を設定することが望ましい。 Further, according to a preferred aspect of the present invention, the reserve amount determination means determines the reserve rate of the construction fee, calculates the reserve amount by multiplying the construction payment unpaid by the reserve amount rate, and calculates the reserve amount minus the reserve amount. and plus details, set the original scheduled payment date to the scheduled payment date of the minus details, and set a future date to the scheduled payment date of the plus details.

また、本発明の好ましい態様によれば、前記支払処理手段は、前記保留解除手段にて保留金額が解除された場合に、前記プラス明細の支払予定日の前記未来日付を前記実際の支払予定日に変更することが望ましい。 Further, according to a preferred aspect of the present invention, when the hold amount is canceled by the hold release means, the payment processing means changes the future date of the scheduled payment date of the plus statement to the actual scheduled payment date. It is desirable to change to

また、上述した課題を解決し、目的を達成するために、本発明は、制御部を備えた情報処理装置で実行される工事代金処理方法であって、前記制御部で実行される、工事代金の一部の支払いを保留する際の保留金額を決定する保留金額決定ステップと、支払いの保留を解除する保留解除ステップと、上記保留解除ステップにて解除された保留金額の実際の支払予定日を設定して支払処理をする支払処理ステップと、を含むことが望ましい。 Further, in order to solve the above-described problems and achieve the object, the present invention provides a construction fee processing method executed by an information processing apparatus having a control unit, wherein the construction fee is processed by the control unit. A hold amount determination step for determining a hold amount when holding a part of the payment of, a hold release step for canceling the hold on payment, and the actual scheduled payment date of the hold amount released in the above hold release step and a payment processing step of setting up and processing payments.

また、上述した課題を解決し、目的を達成するために、本発明は、制御部を備えた情報処理装置に実行させるための工事代金処理プログラムであって、前記制御部で実行させるための、工事代金の一部の支払いを保留する際の保留金額を決定する保留金額決定ステップと、支払いの保留を解除する保留解除ステップと、上記保留解除ステップにて解除された保留金額の実際の支払予定日を設定して支払処理をする支払処理ステップと、を含むことを特徴とする。 Further, in order to solve the above-described problems and achieve the object, the present invention provides a construction fee processing program to be executed by an information processing apparatus having a control unit, comprising: A pending amount determination step for determining a pending amount when suspending payment of a portion of the construction fee, a pending release step for releasing the pending payment, and an actual payment schedule for the pending amount released in the above pending release step and a payment processing step of setting a date and performing payment processing.

本発明によれば、工事代金の保留金の支払いを工事の状況をみながら簡易に処理することが可能となるという効果を奏する。 ADVANTAGE OF THE INVENTION According to this invention, it is effective in the ability to process the payment of the reserve money of the construction price simply, looking at the condition of construction.

図1は、工事代金の保留金の概要を説明するための図である。FIG. 1 is a diagram for explaining the outline of the reserve money for the construction fee. 図2は、本実施の形態に係る工事代金処理装置の構成の一例を示すブロック図である。FIG. 2 is a block diagram showing an example of the configuration of the construction fee processing device according to this embodiment. 図3は、支払先マスタ、仕入ヘッダデータ、仕入明細データ、支払予定データのデータ構成例を示す図である。FIG. 3 is a diagram showing a data configuration example of a payee master, purchase header data, purchase detail data, and payment schedule data. 図4は、本実施形態に係る工事代金処理装置の全体の処理の一例を示すフローチャートである。FIG. 4 is a flow chart showing an example of the overall processing of the construction fee processing apparatus according to this embodiment. 図5は、本実施形態に係る処理の具体例を説明するための図である。FIG. 5 is a diagram for explaining a specific example of processing according to the present embodiment. 図6は、本実施の形態に係る工事代金処理装置の出力装置に表示される表示画面の一例を説明するための図である。FIG. 6 is a diagram for explaining an example of a display screen displayed on the output device of the construction fee processing apparatus according to the present embodiment. 図7は、本実施の形態に係る工事代金処理装置の出力装置に表示される表示画面の一例を説明するための図である。FIG. 7 is a diagram for explaining an example of a display screen displayed on the output device of the construction fee processing apparatus according to the present embodiment.

以下に、本発明に係る工事代金処理装置、工事代金処理方法、および工事代金処理プログラムの実施の形態を、図面に基づいて詳細に説明する。なお、本実施形態によりこの発明が限定されるものではない。 BEST MODE FOR CARRYING OUT THE INVENTION An embodiment of a construction fee processing device, a construction fee processing method, and a construction fee processing program according to the present invention will be described in detail below with reference to the drawings. In addition, this invention is not limited by this embodiment.

[1.概要]
建設業界では、元請会社が下請会社に工事を発注する場合、工事代金のうち一部の金額を保留する。この保留金は支払予定日未定のデータの位置づけとなる。保留金は、工事完了などのタイミングで予定支払日を再設定し、支払処理をする。以下では、単位を千円として説明する。
[1. Overview]
In the construction industry, when a prime contractor places an order for construction work to a subcontractor company, part of the construction fee is reserved. This reserve is positioned as data for which the scheduled payment date is undecided. The reserve money will be processed by resetting the scheduled payment date when the construction is completed. In the following explanation, the unit is 1,000 yen.

図1は、工事代金の保留金の概要を説明するための図である。同図は、元請会社が下請会社に工事を例えば¥100で発注した場合の支払(元請会社)と入金(下請会社)の明細の一例を示している。 FIG. 1 is a diagram for explaining the outline of the reserve money for the construction fee. The figure shows an example of the payment (main contractor) and payment (subcontractor) details when the main contractor places an order for construction work to a subcontractor for ¥100, for example.

元請会社の検収時は、未完成工事支出金=¥100/工事未払金=¥100となる。これに対して、下請会社の引渡時は、売掛金=¥100/完成工事代=¥100となる。 At the time of acceptance inspection by the prime contractor, uncompleted construction expenditure = ¥100/construction unpaid = ¥100. On the other hand, at the time of delivery to the subcontractor, accounts receivable=¥100/completion work fee=¥100.

保留金額を¥10とした場合、元請会社の支払時は、工事未払金=¥90/CASH=¥90となる。これに対して、下請会社の入金は、CASH=¥90/売掛金=¥90となる。 If the pending amount is ¥10, the unpaid amount for the work = ¥90/CASH = ¥90 at the time of payment by the main contractor. On the other hand, the deposit of the subcontractor is CASH=¥90/accounts receivable=¥90.

元請会社の保留解除時は、工事未払金=¥10/CASH=¥10となる。これに対して、下請会社の入金は、CASH=¥10/売掛金=¥10となる。 When the main contractor cancels the hold, the unpaid amount for construction = ¥10/CASH = ¥10. On the other hand, the deposit of the subcontractor is CASH=¥10/accounts receivable=¥10.

従来は、保留金額を別途計算して支払時に判断していた。そのため、保留解除の際は工事の状況をみながらの判断ができなかった。 Previously, the reserve amount was calculated separately and determined at the time of payment. As a result, it was not possible to make a decision while looking at the status of the construction work when canceling the suspension.

そこで、本実施の形態では、工事代金の保留金額の支払いを工事の状況をみながら簡易に処理するために、支払先マスタに設定された保留率(保留金率)又は入力画面で指定した保留率に応じて、工事の検収のタイミングで保留する金額をプラス明細とマイナス明細に分割管理することで通常の支払時に対象外とする。そして、保留解除の際は、工事の状況を見ながら、分割管理した保留金を次回の支払サイクルの対象とするかを判断する。 Therefore, in this embodiment, in order to easily process the payment of the amount withheld for the construction fee while observing the status of the construction, Depending on the rate, the amount withheld at the timing of the acceptance inspection of the construction is divided into positive and negative items, and is excluded from the normal payment. Then, when the reservation is released, it is determined whether the divided and managed reserve money is to be included in the next payment cycle while observing the construction status.

すなわち、本実施の形態では、工事の検収時に支払予定を分割しておくことで、支払予定の分割・変更という通常処理を応用し、業界特有の業務フローを簡単にシステム化している。 That is, in the present embodiment, by dividing the payment schedule at the time of acceptance inspection of the construction work, the normal process of dividing and changing the payment schedule is applied, and the business flow unique to the industry is easily systemized.

[2.構成]
本実施形態に係る工事代金処理装置100の構成について、図2を参照して説明する。図2は、工事代金処理装置100の構成の一例を示すブロック図である。
[2. Constitution]
The configuration of the construction fee processing device 100 according to this embodiment will be described with reference to FIG. FIG. 2 is a block diagram showing an example of the configuration of the construction fee processing device 100. As shown in FIG.

工事代金処理装置100は、市販のデスクトップ型パーソナルコンピュータである。なお、工事代金処理装置100は、デスクトップ型パーソナルコンピュータのような据置型情報処理装置に限らず、市販されているノート型パーソナルコンピュータ、PDA(Personal Digital Assistants)、スマートフォン、タブレット型パーソナルコンピュータなどの携帯型情報処理装置であってもよい。 The construction fee processing device 100 is a commercially available desktop personal computer. Note that the construction fee processing device 100 is not limited to a stationary information processing device such as a desktop personal computer, but can be a mobile device such as a commercially available notebook personal computer, PDA (Personal Digital Assistants), a smart phone, a tablet personal computer, or the like. type information processing device.

工事代金処理装置100は、図2に示すように、制御部102と通信インターフェース部104と記憶部106と入出力インターフェース部108と、を備えている。工事代金処理装置100が備えている各部は、任意の通信路を介して通信可能に接続されている。 The construction fee processing device 100 includes a control unit 102, a communication interface unit 104, a storage unit 106, and an input/output interface unit 108, as shown in FIG. Each unit included in the construction fee processing apparatus 100 is communicably connected via an arbitrary communication path.

通信インターフェース部104は、ルータ等の通信装置および専用線等の有線または無線の通信回線を介して、工事代金処理装置100をネットワーク300に通信可能に接続する。通信インターフェース部104は、他の装置と通信回線を介してデータを通信する機能を有する。ここで、ネットワーク300は、工事代金処理装置100とサーバ200とを相互に通信可能に接続する機能を有し、例えばインターネットやLAN(Local Area Network)等である。なお、後述する記憶部106に格納されるデータは、サーバ200に格納されてもよい。 The communication interface unit 104 communicably connects the construction fee processing apparatus 100 to the network 300 via a communication device such as a router and a wired or wireless communication line such as a dedicated line. The communication interface unit 104 has a function of communicating data with another device via a communication line. Here, the network 300 has a function of connecting the construction fee processing apparatus 100 and the server 200 so that they can communicate with each other, and is, for example, the Internet or a LAN (Local Area Network). Note that data stored in the storage unit 106 to be described later may be stored in the server 200 .

入出力インターフェース部108には、入力装置112および出力装置114が接続されている。出力装置114には、モニタ(家庭用テレビを含む)の他、スピーカやプリンタを用いることができる。入力装置112には、キーボード、マウス、およびマイクの他、マウスと協働してポインティングデバイス機能を実現するモニタを用いることができる。なお、以下では、出力装置114をモニタ114とし、入力装置112をキーボード112またはマウス112として記載する場合がある。また、ユーザが出力装置(モニタ)114の画面に表示して、入力装置112で操作することを、「UIを介したユーザ操作」と記載する場合がある。 An input device 112 and an output device 114 are connected to the input/output interface section 108 . The output device 114 can be a monitor (including a home television), a speaker, or a printer. The input device 112 can be a keyboard, a mouse, a microphone, or a monitor that cooperates with the mouse to provide a pointing device function. Note that, hereinafter, the output device 114 may be referred to as the monitor 114 and the input device 112 may be referred to as the keyboard 112 or the mouse 112 . Also, a user's display on the screen of the output device (monitor) 114 and operation with the input device 112 may be described as "user operation via UI".

記憶部106には、各種のデータベース、テーブル、およびファイルなどが格納される。記憶部106には、OS(Operating System)と協働してCPU(Central Processing Unit)に命令を与えて各種処理を行うためのコンピュータプログラムが記録される。記憶部106として、例えば、RAM(Random Access Memory)・ROM(Read Only Memory)等のメモリ装置、ハードディスクのような固定ディスク装置、フレキシブルディスク、および光ディスク等を用いることができる。 The storage unit 106 stores various databases, tables, files, and the like. The storage unit 106 stores a computer program for performing various processes by giving commands to a CPU (Central Processing Unit) in cooperation with an OS (Operating System). As the storage unit 106, for example, memory devices such as RAM (Random Access Memory) and ROM (Read Only Memory), fixed disk devices such as hard disks, flexible disks, and optical disks can be used.

記憶部106は、支払先マスタ106a、仕入ヘッダデータ106b、仕入明細データ106c、支払予定データ106d、及び仕入伝票データファイル106e等を格納する。ユーザは、支払先マスタ106a、仕入ヘッダデータ106b、仕入明細データ106c、支払予定データ106d、及び仕入伝票データファイル106eの内容を出力装置114の画面に表示して確認することが可能となっており、また、UIを介したユーザ操作により、入力・変更・追加等の登録や編集が可能に構成されている。図3は、支払先マスタ106aと、仕入ヘッダデータ106bと、仕入明細データ106cと、支払予定データ106dのデータ構成例を示す図である。 The storage unit 106 stores a payee master 106a, purchase header data 106b, purchase detail data 106c, payment schedule data 106d, a purchase slip data file 106e, and the like. The user can display and confirm the contents of the payee master 106a, the purchase header data 106b, the purchase detail data 106c, the payment schedule data 106d, and the purchase slip data file 106e on the screen of the output device 114. In addition, it is configured such that registration and editing such as input, change, addition, etc. can be performed by user operation via the UI. FIG. 3 is a diagram showing a data configuration example of the payee master 106a, purchase header data 106b, purchase detail data 106c, and payment schedule data 106d.

仕入伝票データファイル106eは、仕入伝票データを格納するためのファイルである。仕入伝票データは、仕入番号、プロジェクト、工事未払金額、支払先、仕入明細番号、費目、及び金額等で構成されている(例えば、図5参照)。ユーザは、入力装置112又はネットワーク300に接続された端末装置を介して、仕入伝票データを工事代金処理装置100に入力し、制御部102は、入力される仕入伝票データを仕入伝票データファイル106eに格納する。制御部102は、仕入伝票データの内容を、仕入ヘッダデータ106b、仕入明細データ106c、及び支払予定データ106dの対応する部分にそれぞれ登録する(反映させる)。 The purchase slip data file 106e is a file for storing purchase slip data. The purchase slip data consists of a purchase number, a project, an unpaid construction amount, a payee, a purchase detail number, an expense item, an amount, etc. (see FIG. 5, for example). The user inputs purchase slip data to the construction fee processing apparatus 100 via the input device 112 or a terminal device connected to the network 300, and the control unit 102 converts the input purchase slip data into the purchase slip data. Store in file 106e. The control unit 102 registers (reflects) the contents of the purchase slip data in corresponding portions of the purchase header data 106b, the purchase detail data 106c, and the payment schedule data 106d.

支払先マスタ106aは、図3に示すように、支払先コード、支払先名、及び工事未払代金の保留率等を対応づけたテーブル等である。制御部102は、UIを介したユーザ操作に応答して、支払先マスタ106aの支払先コード、支払先名、及び工事未払代金の保留率のデータを登録する。ユーザは、支払先マスタ106aに、支払先毎に工事未払代金の保留率を予め登録しておくことができる。 The payee master 106a is, as shown in FIG. 3, a table or the like that associates payee codes, payee names, retention rates of unpaid construction fees, and the like. The control unit 102 registers the payee code, the payee name, and the pending rate data of the unpaid construction fee in the payee master 106a in response to the user's operation via the UI. The user can register in the payee master 106a in advance the retention rate of the unpaid construction fee for each payee.

仕入ヘッダデータ106bは、図3に示すように、仕入番号、支払先コード、支払先名、プロジェクト、及び保留金設定等を対応づけたデータである。制御部102は、支払先マスタ106aの「保留率」を参照して、仕入ヘッダデータ106bの「保留金設定」を登録する。 The purchase header data 106b, as shown in FIG. 3, is data in which the purchase number, the payee code, the payee name, the project, the reserve money setting, etc. are associated with each other. The control unit 102 refers to the "holding rate" of the payee master 106a and registers the "holding money setting" of the purchase header data 106b.

仕入明細データ106cは、図3に示すように、仕入番号、仕入明細番号、費目、及び金額等を対応づけて格納するテーブル等である。 The purchase detail data 106c is, as shown in FIG. 3, a table or the like that stores purchase numbers, purchase detail numbers, expense items, amounts, etc. in association with each other.

支払予定データ106dは、図3に示すように、仕入番号、仕入明細番号、支払予定額、仕入金額、及び支払予定日等を対応づけたデータである。制御部102は、UIを介したユーザ操作に応答して、支払予定データ106dの支払予定日を登録する。また、制御部102は、検収時に、支払予定データ106dについて、保留金額のマイナス明細とプラス明細を登録し、マイナス明細の支払予定日に当初の支払予定日を設定し、プラス明細の支払予定日に未来日付を設定する。さらに、制御部102は、保留の解除時にプラス明細の支払予定日の未来日付を実際の支払予定日に変更する。 As shown in FIG. 3, the payment schedule data 106d is data in which the purchase number, purchase detail number, payment schedule amount, purchase amount, payment schedule date, etc. are associated with each other. The control unit 102 registers the scheduled payment date of the scheduled payment data 106d in response to the user's operation via the UI. Further, at the time of acceptance inspection, the control unit 102 registers negative details and positive details of the reserved amount for the scheduled payment data 106d, sets the initial scheduled payment date for the scheduled payment date for the negative details, and sets the scheduled payment date for the positive details. set a future date to . Furthermore, the control unit 102 changes the future date of the scheduled payment date of the plus statement to the actual scheduled payment date when the suspension is cancelled.

制御部102は、工事代金処理装置100を統括的に制御するCPU等である。制御部102は、OS等の制御プログラム・各種の処理手順等を規定したプログラム・所要データなどを格納するための内部メモリを有し、格納されているこれらのプログラムに基づいて種々の情報処理を実行する。制御部102は、機能概念的に、保留金額決定部102aと、保留解除部102bと、支払処理部102cと、を備えている。制御部102は、仕入伝票データを、仕入ヘッダデータ106b、仕入明細データ106c、支払予定データ106dの対応する部分にそれぞれ登録する(反映させる)。 The control unit 102 is a CPU or the like that comprehensively controls the construction fee processing device 100 . The control unit 102 has an internal memory for storing a control program such as an OS, a program defining various processing procedures, required data, and the like, and performs various information processing based on these stored programs. Run. The control unit 102 functionally and conceptually includes a reserve amount determining unit 102a, a reserve canceling unit 102b, and a payment processing unit 102c. The control unit 102 registers (reflects) the purchase slip data in corresponding portions of the purchase header data 106b, the purchase detail data 106c, and the payment schedule data 106d.

保留金額決定部102aは、工事代金の一部の支払いを保留する際の保留金額を決定する。より具体的には、保留金額決定部102aは、UIを介したユーザ操作に応答して、工事代金の保留率を決定して支払先マスタ106aの「保留率」を登録する。保留金額決定部102aは、工事未払金額に「保留率」を乗算して保留金額を算出する。 The withholding amount determination unit 102a determines a withholding amount when withholding payment of part of the construction fee. More specifically, the pending amount determination unit 102a determines the pending rate of the construction fee and registers the "holding rate" in the payee master 106a in response to the user's operation via the UI. The pending amount determination unit 102a calculates the pending amount by multiplying the unpaid construction amount by the "holding rate".

また、保留金額決定部102aは、支払予定データ106dについて、検収時に保留金を分割管理するために、保留金額のマイナス明細とプラス明細を登録し、マイナス明細の支払い予定日に当初の支払い予定日を設定し、プラス明細の支払予定日に未来日付を設定する。 In addition, regarding the scheduled payment data 106d, the reserved amount determining unit 102a registers negative and positive details of the reserved amount in order to divide and manage the reserved amount at the time of acceptance inspection, and registers the initial scheduled payment date on the scheduled payment date of the negative item. and set a future date for the scheduled payment date of the plus item.

保留解除部102bは、UIを介したユーザ操作に応答して、プロジェクトを指定して支払いの保留を解除する。 The hold release unit 102b designates a project and releases the payment hold in response to a user operation via the UI.

支払処理部102cは、UIを介したユーザ操作に応答して、保留解除部102bにて解除された保留金額の支払予定日を新たに設定して支払処理を行う。具体的には、支払処理部102cは、支払予定データ106dの指定されたプロジェクトのマイナス明細の未来日付を実際の支払予定日に変更する。 The payment processing unit 102c newly sets the scheduled payment date of the pending amount canceled by the pending cancellation unit 102b in response to a user operation via the UI, and performs payment processing. Specifically, the payment processing unit 102c changes the future date of the minus details of the specified project in the payment schedule data 106d to the actual scheduled payment date.

[3.全体の処理の概略]
図2及び図4を参照して、本実施形態における工事代金処理装置100の全体の処理を流れの概略を説明する。図4は、本実施形態における工事代金処理装置100の全体の処理の一例を示すフローチャートである。
[3. Overview of overall processing]
With reference to FIGS. 2 and 4, the outline of the overall processing flow of the construction fee processing apparatus 100 in this embodiment will be described. FIG. 4 is a flow chart showing an example of the overall processing of the construction fee processing device 100 in this embodiment.

保留金額決定部102aは、対象のプロジェクトの仕入伝票単位で工事代金の一部の支払いを保留する際の保留金額を決定する(ステップS1)。より具体的には、保留金額決定部102aは、工事代金の保留率を決定し、工事未払金に当該保留金率を乗算して支払保留金額を算出する。また、保留金額決定部102aは、検収のタイミングで保留金を分割管理し、保留金額のマイナス明細とプラス明細を作成し、マイナス明細の支払い予定日に当初の支払い予定日を設定し、プラス明細の支払い予定日に未来日付を設定する。 The pending amount determination unit 102a determines a pending amount for suspending partial payment of the construction fee for each purchase slip of the target project (step S1). More specifically, the pending amount determination unit 102a determines the pending rate of the construction fee, and multiplies the unpaid amount for the construction work by the pending amount rate to calculate the pending payment amount. In addition, the reserve amount determination unit 102a divides and manages the reserve amount at the timing of acceptance inspection, creates minus details and plus details of the reserve amount, sets the initial scheduled payment date to the scheduled payment date of the minus details, Set a future date for the scheduled payment date of

保留解除部102bは、UIを介したユーザ操作に応答して、プロジェクトを指定して支払いの保留を解除する(ステップS2)。 The hold release unit 102b designates a project and releases the payment hold in response to a user operation via the UI (step S2).

支払処理部102cは、保留解除部102bにて解除された保留金の支払予定日を新たに設定して支払処理を行う(ステップS3)。具体的には、支払処理部102cは、プラス明細の未来日付を実際の支払予定日に変更する。 The payment processing unit 102c newly sets a scheduled payment date for the reserve money canceled by the reserve canceling unit 102b, and performs payment processing (step S3). Specifically, the payment processing unit 102c changes the future date of the plus statement to the actual scheduled payment date.

[4.処理の具体例]
本実施形態に係る工事代金処理装置100の処理の具体例について、図2及び図5を参照して詳細に説明する。図5は、本実施形態に係る工事代金処理装置100の処理の具体例を説明するための図である。
[4. Specific example of processing]
A specific example of processing of the construction fee processing apparatus 100 according to the present embodiment will be described in detail with reference to FIGS. 2 and 5. FIG. FIG. 5 is a diagram for explaining a specific example of processing of the construction fee processing apparatus 100 according to this embodiment.

制御部102は、対象のプロジェクトの仕入伝票データを仕入伝票データファイル106eから読み出す。図5に示す例では、仕入番号(伝票)「No001」、プロジェクト「001-005」、工事未払金「¥315」、支払先名「支払先001」、仕入明細番号「1」の外注費「¥105」、仕入明細番号「2」の外注費「¥210」となっている。また、仕入番号「No051」は、プロジェクト「001-005」、工事未払金「¥315」、支払先名「支払先051」、仕入明細番号「1」の外注費「¥105」、仕入明細番号「2」の外注費「¥210」となっている。制御部102は、仕入伝票データの内容を、仕入ヘッダデータ106b、仕入明細データ106c、及び支払予定データ106dの対応する部分にそれぞれ登録する(反映させる)。 The control unit 102 reads the purchase slip data of the target project from the purchase slip data file 106e. In the example shown in FIG. 5, the subcontracting cost for the supplier number (slip) "No001", the project "001-005", the unpaid construction work fee "¥315", the payee name "payee 001", and the purchase detail number "1" It is "¥105", and the outsourcing cost for the purchase detail number "2" is "¥210". In addition, the purchase number "No051" is the project "001-005", the unpaid construction work "¥315", the payee name "payee 051", the outsourcing cost "¥105" for the purchase detail number "1", the purchase The subcontracting cost for the detail number "2" is "¥210". The control unit 102 registers (reflects) the contents of the purchase slip data in corresponding portions of the purchase header data 106b, the purchase detail data 106c, and the payment schedule data 106d.

支払先マスタ106aには、例えば、仕入先コード「001」、「051」、支払先名「支払先001」、「支払先051」、保留率「10%」、「10%」がそれぞれ登録されている。 For example, supplier codes "001" and "051", supplier names "payee 001" and "payee 051", and hold rates "10%" and "10%" are registered in the payee master 106a, respectively. It is

仕入ヘッダデータ106bには、仕入番号「No001」、仕入先コード「001」、支払先名「支払先0001」、プロジェクト「001-005」が登録される。また、制御部102は、支払先マスタ106aの支払先名「支払先001」の保留率「10%」を参照して、仕入ヘッダデータ106bの保留金設定「10%」を登録する。 In the purchase header data 106b, a purchase number "No001", a supplier code "001", a payee name "payee 0001", and a project "001-005" are registered. Further, the control unit 102 refers to the retention rate "10%" for the name of the payee "001" in the payee master 106a, and registers the reserve money setting "10%" in the purchase header data 106b.

仕入明細データ106cには、仕入番号「No001」、「No001」、仕入明細番号「1」、「2」、費目「外注費」、「外注費」及び金額「¥105」、「¥210」がそれぞれ登録される。 The purchase detail data 106c includes purchase numbers "No001" and "No001", purchase detail numbers "1" and "2", expense items "outsourcing costs" and "outsourcing costs", and amounts "¥105" and "¥ 210” are registered respectively.

支払予定データ106dには、仕入番号「No001」、「No001」、仕入明細番号「1」、「2」、支払予定金額「¥105」、「¥210」が登録される。また、制御部102は、UIを介したユーザ操作(不図示の画面でのユーザ操作)に応じて、例えば、支払予定日「2017/8/10」、「2017/8/10」をそれぞれ登録する。 In the payment schedule data 106d, purchase numbers "No001" and "No001", purchase detail numbers "1" and "2", and payment schedule amounts "¥105" and "¥210" are registered. In addition, the control unit 102 registers, for example, the scheduled payment dates “2017/8/10” and “2017/8/10” in response to user operations via the UI (user operations on screens not shown). do.

制御部102は、検収のタイミングで、保留金を分割管理するために、保留金額のマイナス明細とプラス明細を作成し、マイナス明細の支払い予定日に当初の支払予定日を設定し、プラス明細の支払予定日に未来日付を設定する。制御部102は、例えば、仕入ヘッダデータ106bの仕入番号「No001」の保留金設定「10%」を参照して、支払予定金額「¥315(=¥105+¥210)」の「10%」である保留金額「¥31」のマイナス明細とプラス明細を作成し、仕入明細番号「0」、「0」、支払予定金額「-¥31」、「¥31」、当初の支払予定日である支払予定日「2017/8/10」、未来日付である「2099/12/31」をそれぞれ登録する。 At the timing of acceptance inspection, the control unit 102 creates a negative statement and a positive statement of the reserve amount in order to divide and manage the reserve money, sets the initial scheduled payment date to the scheduled payment date of the negative statement, and sets the scheduled payment date of the positive statement. Set a future date for the scheduled payment date. For example, the control unit 102 refers to the reserve money setting "10%" of the purchase number "No001" of the purchase header data 106b, and determines the "10% Create negative and positive details of the pending amount "¥ 31", purchase details number "0", "0", estimated payment amount "-¥ 31", "¥ 31", initial scheduled payment date The scheduled payment date "2017/8/10" and the future date "2099/12/31" are respectively registered.

支払予定日が「2017/8/10」のものについては、通常の支払いサイクルで支払処理され、仕入明細番号「1」の支払予定金額「¥105」、仕入明細番号「2」の支払予定金額「¥210」、及び仕入明細番号「0」の支払予定金額「-¥31」の合計である「¥284」が支払予定日「2017/8/10」に支払処理(例えば、FB(ファームバンキング)での振込処理)される。仕入明細番号「0」、支払予定金額「¥31」、支払予定日「2099/12/31」については、保留が解除されるまで支払いが保留される。 For items with a scheduled payment date of "2017/8/10", the payment will be processed in the normal payment cycle, and the scheduled payment amount of "¥105" for the purchase statement number "1" and the payment for the purchase statement number "2" will be processed. “¥284”, which is the sum of the planned amount “¥210” and the planned payment amount “-¥31” for the purchase detail number “0”, will be processed for payment on the scheduled payment date “2017/8/10” (for example, FB (firm banking) transfer processing). With respect to the purchase detail number "0", the scheduled payment amount "¥31", and the scheduled payment date "2099/12/31", the payment is suspended until the suspension is released.

制御部102は、UIを介したユーザ操作により、プロジェクトを指定して保留解除が指示されると、制御部102は、指定されたプロジェクトについて、支払予定データ106dのマイナス明細の未来日付を実際の支払予定日に変更する。これにより、変更された支払予定日に保留金が支払われる。具体的には、例えば、制御部102は、UIを介したユーザ操作に応じて、仕入明細番号「0」、支払予定金額「¥31」の支払予定日「2099/12/3」を、例えば、「2017/9/10」に変更する。これにより、保留金額「¥31」が、次の支払いサイクルで処理され、「2017/9/14」に支払処理(例えば、FB(ファームバンキング)で振込処理)される。 When the control unit 102 designates a project and is instructed to release the hold by a user operation via the UI, the control unit 102 converts the future date of the minus details of the scheduled payment data 106d to the actual date for the designated project. Change the payment due date. This causes the retention money to be paid on the changed scheduled payment date. Specifically, for example, the control unit 102 changes the scheduled payment date "2099/12/3" for the purchase detail number "0" and the scheduled payment amount "¥31" according to the user's operation via the UI. For example, change to "2017/9/10". As a result, the reserved amount "¥31" is processed in the next payment cycle, and payment processing (for example, transfer processing by FB (firm banking)) is performed on "2017/9/14".

このように、工事の検収のタイミングで保留金をプラス明細とマイナス明細に分割管理して、保留金を通常の支払時に対象外とし、保留解除の際は、ユーザは、工事の状況を見ながら、分割管理した保留金の実際の支払い日を設定することができる。 In this way, the retention money is divided and managed into positive and negative details at the timing of the acceptance inspection of the construction work, and the retention money is excluded from the normal payment. , can set the actual payment date of the installment managed reserves.

[5.表示画面の一例]
図6及び図7は、本実施の形態に係る工事代金処理装置10の出力装置114に表示される表示画面の一例を説明するための図である。図6は、仕入入力画面の一例を示す図である。図7は、支払先情報画面の一例を示す図である。
[5. Example of display screen]
6 and 7 are diagrams for explaining an example of a display screen displayed on the output device 114 of the construction fee processing apparatus 10 according to this embodiment. FIG. 6 is a diagram showing an example of a purchase input screen. FIG. 7 is a diagram showing an example of a payee information screen.

図6に示す仕入入力画面では、プロジェクト毎に、仕入区分(仕入伝票)単位でのデータの確認・編集が可能となっている。例えば、仕入区分を指定して、支払情報確認ボタン400を押すと、図7に示す支払先情報画面が表示される。支払先情報画面では、支払先の保留金率や支払予定日を設定することができる。 On the purchase input screen shown in FIG. 6, it is possible to check and edit data for each purchase category (purchase slip) for each project. For example, when a purchase category is designated and a payment information confirmation button 400 is pressed, a payee information screen shown in FIG. 7 is displayed. On the payee information screen, you can set the payee's retention rate and scheduled payment date.

以上説明したように、本実施の形態によれば、保留金額決定部102aは、工事代金の一部の支払いを保留する際の保留金額を決定し、保留解除部102bは、支払いの保留を解除し、支払処理部102cは、保留解除部102bにて解除された保留金額の実際の支払予定日を設定して支払処理をすることとしたので、工事代金の保留金額の支払いを工事の状況をみながら簡易に処理することが可能となる。 As described above, according to the present embodiment, the pending amount determination unit 102a determines the pending amount when suspending payment of a part of the construction fee, and the suspension canceling unit 102b cancels the suspension of payment. Then, the payment processing unit 102c sets the actual scheduled payment date for the pending amount released by the pending cancellation unit 102b and performs payment processing. It is possible to process easily while watching.

また、保留金額決定部102aは、保留金率を決定し、工事未払金に当該保留金率を乗算して保留金額を算出し、保留金額のマイナス明細とプラス明細を作成し、マイナス明細の支払予定日に当初の支払予定日を設定し、プラス明細の支払予定日に未来日付を設定することとしたので、簡単な処理により保留金額を分割することが可能となる。 In addition, the reserve amount determination unit 102a determines the reserve amount rate, calculates the reserve amount by multiplying the construction unpaid amount by the reserve amount rate, creates minus details and plus details of the reserve amount, and schedules payment of the minus details. Since the original scheduled payment date is set on the date and the future date is set on the scheduled payment date of the plus item, it is possible to divide the pending amount by simple processing.

また、支払処理部102cは、保留解除部102bにて保留金額が解除された場合に、プラス明細の支払予定日の未来日付を実際の支払予定日に変更することとしたので、工事の状況をみながら保留金の支払予定日を簡単に設定することが可能となる。 In addition, the payment processing unit 102c changes the future date of the scheduled payment date of the plus statement to the actual scheduled payment date when the pending amount is canceled by the suspension canceling unit 102b. It is possible to easily set the scheduled payment date of the reserve money while watching.

[6.他の実施形態]
本発明は、上述した実施形態以外にも、特許請求の範囲に記載した技術的思想の範囲内において種々の異なる実施形態にて実施されてよいものである。
[6. Other embodiments]
The present invention may be implemented in various different embodiments other than the embodiments described above within the scope of the technical idea described in the claims.

例えば、実施形態において説明した各処理のうち、自動的に行われるものとして説明した処理の全部または一部を手動的に行うこともでき、あるいは、手動的に行われるものとして説明した処理の全部または一部を公知の方法で自動的に行うこともできる。 For example, among the processes described in the embodiments, all or part of the processes described as being automatically performed can be manually performed, or all of the processes described as being manually performed Alternatively, some can be done automatically by known methods.

また、本明細書中や図面中で示した処理手順、制御手順、具体的名称、各処理の登録データや検索条件等のパラメータを含む情報、画面例、データベース構成については、特記する場合を除いて任意に変更することができる。 In addition, unless otherwise specified, the processing procedures, control procedures, specific names, information including parameters such as registration data and search conditions for each process, screen examples, and database configurations shown in this specification and drawings can be changed arbitrarily.

また、工事代金処理装置100に関して、図示の各構成要素は機能概念的なものであり、必ずしも物理的に図示の如く構成されていることを要しない。 Also, with respect to the construction fee processing apparatus 100, each component shown in the figure is functionally conceptual, and does not necessarily need to be physically configured as shown in the figure.

例えば、工事代金処理装置100が備える処理機能、特に制御部102にて行われる各処理機能については、その全部または任意の一部を、CPUおよび当該CPUにて解釈実行されるプログラムにて実現してもよく、また、ワイヤードロジックによるハードウェアとして実現してもよい。尚、プログラムは、本実施形態で説明した処理を情報処理装置に実行させるためのプログラム化された命令を含む一時的でないコンピュータ読み取り可能な記録媒体に記録されており、必要に応じて工事代金処理装置100に機械的に読み取られる。すなわち、ROMまたはHDD(Hard Disk Drive)などの記憶部などには、OSと協働してCPUに命令を与え、各種処理を行うためのコンピュータプログラムが記録されている。このコンピュータプログラムは、RAMにロードされることによって実行され、CPUと協働して制御部を構成する。 For example, the processing functions of the construction fee processing device 100, particularly the processing functions performed by the control unit 102, are implemented in whole or in part by a CPU and a program interpreted and executed by the CPU. Alternatively, it may be implemented as hardware using wired logic. The program is recorded on a non-temporary computer-readable recording medium containing programmed instructions for causing the information processing apparatus to execute the processing described in this embodiment, and the construction fee processing is performed as necessary. It is read mechanically by the device 100 . That is, a storage unit such as a ROM or HDD (Hard Disk Drive) stores a computer program for giving commands to the CPU in cooperation with the OS to perform various processes. This computer program is executed by being loaded into the RAM and constitutes a control section in cooperation with the CPU.

また、このコンピュータプログラムは、工事代金処理装置100に対して任意のネットワークを介して接続されたアプリケーションプログラムサーバに記憶されていてもよく、必要に応じてその全部または一部をダウンロードすることも可能である。 In addition, this computer program may be stored in an application program server connected to the construction fee processing apparatus 100 via any network, and it is possible to download all or part of it as necessary. is.

また、本実施形態で説明した処理を実行するためのプログラムを、一時的でないコンピュータ読み取り可能な記録媒体に格納してもよく、また、プログラム製品として構成することもできる。ここで、この「記録媒体」とは、メモリーカード、USB(Universal Serial Bus)メモリ、SD(Secure Digital)カード、フレキシブルディスク、光磁気ディスク、ROM、EPROM(Erasable Programmable Read Only Memory)、EEPROM(登録商標)(Electrically Erasable and Programmable Read Only Memory)、CD-ROM(Compact Disk Read Only Memory)、MO(Magneto-Optical disk)、DVD(Digital Versatile Disk)、および、Blu-ray(登録商標) Disc等の任意の「可搬用の物理媒体」を含むものとする。 Also, the program for executing the processing described in this embodiment may be stored in a non-temporary computer-readable recording medium, or may be configured as a program product. Here, the term "recording medium" refers to memory cards, USB (Universal Serial Bus) memories, SD (Secure Digital) cards, flexible disks, magneto-optical disks, ROMs, EPROMs (Erasable Programmable Read Only Memory), EEPROMs (registered (trademark) (Electrically Erasable and Programmable Read Only Memory), CD-ROM (Compact Disk Read Only Memory), MO (Magneto-Optical disk), DVD (Digital Versatile Disk), and Disc (registered trademark) such as Blu- shall include any "portable physical medium".

また、「プログラム」とは、任意の言語または記述方法にて記述されたデータ処理方法であり、ソースコードまたはバイナリコード等の形式を問わない。なお、「プログラム」は必ずしも単一的に構成されるものに限られず、複数のモジュールやライブラリとして分散構成されるものや、OSに代表される別個のプログラムと協働してその機能を達成するものをも含む。なお、実施形態に示した各装置において記録媒体を読み取るための具体的な構成および読み取り手順ならびに読み取り後のインストール手順等については、周知の構成や手順を用いることができる。 A "program" is a data processing method written in any language or writing method, regardless of the format such as source code or binary code. In addition, the "program" is not necessarily limited to a single configuration, but is distributed as multiple modules or libraries, or cooperates with a separate program represented by the OS to achieve its function. Including things. It should be noted that well-known configurations and procedures can be used for the specific configuration and reading procedure for reading the recording medium in each device shown in the embodiments, the installation procedure after reading, and the like.

記憶部106に格納される各種のデータベース等は、RAM、ROM等のメモリ装置、ハードディスク等の固定ディスク装置、フレキシブルディスク、および、光ディスク等のストレージ手段であり、各種処理やウェブサイト提供に用いる各種のプログラム、テーブル、データベース、および、ウェブページ用ファイル等を格納する。 The various databases and the like stored in the storage unit 106 are storage means such as memory devices such as RAM and ROM, fixed disk devices such as hard disks, flexible disks, and optical disks, and are used for various processes and website provision. programs, tables, databases, and files for web pages.

また、工事代金処理装置100は、既知のパーソナルコンピュータまたはワークステーション等の情報処理装置として構成してもよく、また、任意の周辺装置が接続された当該情報処理装置として構成してもよい。また、工事代金処理装置100は、当該装置に本実施形態で説明した処理を実現させるソフトウェア(プログラムまたはデータ等を含む)を実装することにより実現してもよい。 Further, the construction fee processing apparatus 100 may be configured as an information processing apparatus such as a known personal computer or workstation, or may be configured as the information processing apparatus to which arbitrary peripheral devices are connected. Also, the construction fee processing device 100 may be realized by installing software (including programs, data, etc.) for realizing the processing described in the present embodiment in the device.

更に、装置の分散・統合の具体的形態は図示するものに限られず、その全部または一部を、各種の付加等に応じてまたは機能負荷に応じて、任意の単位で機能的または物理的に分散・統合して構成することができる。すなわち、上述した実施形態を任意に組み合わせて実施してもよく、実施形態を選択的に実施してもよい。 Furthermore, the specific forms of distribution and integration of devices are not limited to those shown in the figures, and all or part of them can be functionally or physically arranged in arbitrary units according to various additions or functional loads. It can be distributed and integrated. In other words, the embodiments described above may be arbitrarily combined and implemented, or the embodiments may be selectively implemented.

100 工事代金処理装置
102 制御部
102a 保留金額決定部
102b 保留解除部
102c 支払処理部
104 通信インターフェース部
106 記憶部
106a 支払先マスタ
106b 仕入ヘッダデータ
106c 仕入明細データ
106d 支払予定データ
106e 仕入伝票データファイル
108 入出力インターフェース部
112 入力装置
114 出力装置
200 サーバ
300 ネットワーク
100 Construction fee processing device
102 control unit
102a Reserve amount determination unit
102b hold release unit
102c payment processor
104 communication interface unit
106 storage unit
106a payee master
106b Purchase header data
106c Purchase details data
106d Scheduled payment data
106e Purchase slip data file
108 input/output interface
112 input device
114 output device 200 server 300 network

Claims (5)

記憶部及び制御部を備えた工事代金処理装置であって、
前記記憶部には、
支払先毎に工事代金の一部の支払いを保留する際の保留率を設定したマスタが格納されており、
前記制御部は、
支払先と、費目と、工事金額とを含む仕入伝票データに基づいて、前記マスタを参照して、当該支払先の保留率に当該工事金額を乗算して保留金額を決定して、保留金額を含む支払予定金額と、支払予定日とを含む支払予定データを作成する保留金額決定手段と、
支払いの保留を解除する保留解除手段と、
上記保留解除手段で支払いの保留が解除された場合に、前記支払予定データの保留金額の実際の支払予定日を設定して支払処理をする支払処理手段と、
を備えた工事代金処理装置。
A construction fee processing device comprising a storage unit and a control unit,
The storage unit contains
A master is stored that sets the hold rate when withholding part of the payment of the construction fee for each payee,
The control unit
Based on the purchase slip data including the payee, the expense item, and the construction amount, the master is referred to, the hold rate of the payee is multiplied by the work amount to determine the hold amount, and the hold amount is determined. a pending amount determining means for creating scheduled payment data including a scheduled payment amount including and a scheduled payment date;
a hold release means for releasing hold on payment;
payment processing means for setting an actual scheduled payment date for the pending amount in the scheduled payment data and performing payment processing when the payment hold is released by the hold release means;
construction fee processing device.
前記支払予定データは、支払予定日を通常の支払サイクルの支払予定日とする前記費目の支払予定金額のレコードと、支払予定日を通常の支払サイクルの支払予定日とする前記保留金額を負の値としたレコードと、支払予定日を未来日付する前記保留金額を正の値としたレコードとを含むことを特徴とする請求項1に記載の工事代金処理装置。 The scheduled payment data includes a record of the scheduled payment amount of the expense item whose scheduled payment date is the scheduled payment date of the normal payment cycle, and a negative record of the reserved amount whose scheduled payment date is the scheduled payment date of the normal payment cycle. 2. The construction fee processing apparatus according to claim 1, further comprising a record in which the scheduled payment date is a future date and a record in which the pending amount is a positive value. 前記支払処理手段は、前記支払予定データについて、通常の支払サイクルの支払予定日に、前記費目の支払予定金額と前記保留金額の負の値との合計金額を支払処理し、上記保留解除手段で支払いの保留が解除された場合に、前記未来日付を実際の支払予定日に変更して、実際の支払予定日に前記保留金額の正の値を支払処理することを特徴とする請求項2に記載の工事代金処理装置。 The payment processing means performs payment processing for the total amount of the scheduled payment amount of the expense item and the negative value of the reserved amount on the scheduled payment date of the normal payment cycle for the scheduled payment data. Claim 2, wherein when the payment hold is released, the future date is changed to the actual scheduled payment date, and the positive value of the hold amount is processed for payment on the actual scheduled payment date. The described construction fee processing device. 記憶部及び制御部を備えた情報処理装置で実行される工事代金処理方法であって、
前記記憶部には、
支払先毎に工事代金の一部の支払いを保留する際の保留率を設定したマスタが格納されており、
前記制御部で実行される、
支払先と、費目と、工事金額とを含む仕入伝票データに基づいて、前記マスタを参照して、当該支払先の保留率に当該工事金額を乗算して保留金額を決定して、保留金額を含む支払予定金額と、支払予定日とを含む支払予定データを作成する保留金額決定ステップと、
支払いの保留を解除する保留解除ステップと、
上記保留解除手段で支払いの保留が解除された場合に、前記支払予定データの保留金額の実際の支払予定日を設定して支払処理をする支払処理ステップと、
を含むことを特徴とする工事代金処理方法。
A construction fee processing method executed by an information processing device having a storage unit and a control unit,
The storage unit contains
A master is stored that sets the hold rate when withholding part of the payment of the construction fee for each payee,
executed by the control unit;
Based on the purchase slip data including the payee, the expense item, and the construction amount, the master is referred to, the hold rate of the payee is multiplied by the work amount to determine the hold amount, and the hold amount is determined. a pending amount determination step of creating scheduled payment data including a scheduled payment amount including and a scheduled payment date;
a release step of releasing the hold on payment;
a payment processing step of setting an actual scheduled payment date for the pending amount in the scheduled payment data and performing payment processing when the suspension of payment is released by the suspension release means;
A construction fee processing method comprising:
記憶部及び制御部を備えた情報処理装置に実行させるための工事代金処理プログラムであって、
前記記憶部には、
支払先毎に工事代金の一部の支払いを保留する際の保留率を設定したマスタが格納されており、
前記制御部において、
支払先と、費目と、工事金額とを含む仕入伝票データに基づいて、前記マスタを参照して、当該支払先の保留率に当該工事金額を乗算して保留金額を決定して、保留金額を含む支払予定金額と、支払予定日とを含む支払予定データを作成する保留金額決定ステップと、
支払いの保留を解除する保留解除ステップと、
上記保留解除手段で支払いの保留が解除された場合に、前記支払予定データの保留金額の実際の支払予定日を設定して支払処理をする支払処理ステップと、
を実行させるための工事代金処理プログラム。
A construction fee processing program to be executed by an information processing device having a storage unit and a control unit,
The storage unit contains
A master is stored that sets the hold rate when withholding part of the payment of the construction fee for each payee,
In the control unit,
Based on the purchase slip data including the payee, the expense item, and the construction amount, the master is referred to, the hold rate of the payee is multiplied by the work amount to determine the hold amount, and the hold amount is determined. a pending amount determination step of creating scheduled payment data including a scheduled payment amount including and a scheduled payment date;
a release step of releasing the hold on payment;
a payment processing step of setting an actual scheduled payment date for the pending amount in the scheduled payment data and performing payment processing when the suspension of payment is released by the suspension release means;
Construction fee processing program for executing
JP2017154780A 2017-08-09 2017-08-09 Construction fee processing device, construction fee processing method, and construction fee processing program Active JP7129765B2 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
JP2017154780A JP7129765B2 (en) 2017-08-09 2017-08-09 Construction fee processing device, construction fee processing method, and construction fee processing program
JP2022132020A JP7397931B2 (en) 2017-08-09 2022-08-22 Construction payment processing device, construction payment processing method, and construction payment processing program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2017154780A JP7129765B2 (en) 2017-08-09 2017-08-09 Construction fee processing device, construction fee processing method, and construction fee processing program

Related Child Applications (1)

Application Number Title Priority Date Filing Date
JP2022132020A Division JP7397931B2 (en) 2017-08-09 2022-08-22 Construction payment processing device, construction payment processing method, and construction payment processing program

Publications (2)

Publication Number Publication Date
JP2019032779A JP2019032779A (en) 2019-02-28
JP7129765B2 true JP7129765B2 (en) 2022-09-02

Family

ID=65523511

Family Applications (2)

Application Number Title Priority Date Filing Date
JP2017154780A Active JP7129765B2 (en) 2017-08-09 2017-08-09 Construction fee processing device, construction fee processing method, and construction fee processing program
JP2022132020A Active JP7397931B2 (en) 2017-08-09 2022-08-22 Construction payment processing device, construction payment processing method, and construction payment processing program

Family Applications After (1)

Application Number Title Priority Date Filing Date
JP2022132020A Active JP7397931B2 (en) 2017-08-09 2022-08-22 Construction payment processing device, construction payment processing method, and construction payment processing program

Country Status (1)

Country Link
JP (2) JP7129765B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7312076B2 (en) * 2019-09-30 2023-07-20 株式会社オービック Payment management data generation device, payment management data generation method, and payment management data generation program
JP7356314B2 (en) 2019-09-30 2023-10-04 株式会社オービック Payment pending data management device, payment pending data management method, and payment pending data management program

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Kシリーズ Super APCO解説書(建設業原価・会計システム) 初版,富士通株式会社,1993年06月01日,第1版,特にp.126,134,137

Also Published As

Publication number Publication date
JP2022159565A (en) 2022-10-17
JP7397931B2 (en) 2023-12-13
JP2019032779A (en) 2019-02-28

Similar Documents

Publication Publication Date Title
JP2022159565A (en) Construction fee settling apparatus, construction fee settling method, and construction fee settling program
JP7445713B2 (en) Allocation work support device, allocation work support method, and allocation work support program
JP7042076B2 (en) Construction price processing equipment, construction price processing method, and construction price processing program
JP7389849B2 (en) Information processing device, information processing method, and information processing program
JP6981758B2 (en) Credit line management device, credit line management method, and credit line management program
JP6850160B2 (en) Payroll processing device, payroll correction processing method, and payroll correction processing program
JP2022062267A (en) Construction fee processing device, construction fee processing method and construction fee processing program
JP2018028843A (en) Debt and credit management device, debt and credit management method, and debt and credit management program
JP2021149405A (en) Management device associating prepayment with transfer, management method associating prepayment with transfer and management program associating prepayment with transfer
JP7190825B2 (en) Contract-related information management device, contract-related information management method, and contract-related information management program
JP7250979B2 (en) Accounting error confirmation work support device, account error confirmation work support method, and account error confirmation work support program
JP7237677B2 (en) Business support device, business support program and business support method
JP7312076B2 (en) Payment management data generation device, payment management data generation method, and payment management data generation program
JP7157563B2 (en) Amount calculation device, amount calculation method, and amount calculation program
JP7261332B2 (en) Automatic work-in-process transfer device, automatic work-in-process transfer method, and automatic work-in-process transfer program
JP7324162B2 (en) Cost output device, cost output method, and cost output program
JP7411517B2 (en) Receivables/Payables Accounting Department Identification Device, Receivables/Payables Accounting Department Identification Method, and Receivables/Payables Accounting Department Identification Program
JP7235539B2 (en) Revenue recording journal entry device, revenue recording journal entry method, and revenue recording journal entry program
JP7200025B2 (en) Claims management device, claims management method, and claims management program
JP7186088B2 (en) Return settlement device, return settlement method, and return settlement program
JP7291088B2 (en) Slip Closing Support Device, Slip Closing Support Method, and Slip Closing Support Program
JP7356314B2 (en) Payment pending data management device, payment pending data management method, and payment pending data management program
JP7064381B2 (en) Miscalculation confirmation business support device, miscalculation confirmation business support method and miscalculation confirmation business support program
JP7122866B2 (en) Business support device, divided amount output method and divided amount output program
JP6971046B2 (en) Receivable selection device, receivable selection method, and receivable selection program

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20200804

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20210414

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20210420

A601 Written request for extension of time

Free format text: JAPANESE INTERMEDIATE CODE: A601

Effective date: 20210611

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20210819

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20220118

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20220316

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20220726

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20220823

R150 Certificate of patent or registration of utility model

Ref document number: 7129765

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150