JP6991492B2 - Systems and methods to support transportation - Google Patents
Systems and methods to support transportation Download PDFInfo
- Publication number
- JP6991492B2 JP6991492B2 JP2019235268A JP2019235268A JP6991492B2 JP 6991492 B2 JP6991492 B2 JP 6991492B2 JP 2019235268 A JP2019235268 A JP 2019235268A JP 2019235268 A JP2019235268 A JP 2019235268A JP 6991492 B2 JP6991492 B2 JP 6991492B2
- Authority
- JP
- Japan
- Prior art keywords
- power generation
- time
- power
- facility
- computer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims description 18
- 238000010248 power generation Methods 0.000 claims description 152
- 230000005540 biological transmission Effects 0.000 claims description 18
- 230000005611 electricity Effects 0.000 claims description 15
- 238000007726 management method Methods 0.000 description 10
- 238000005516 engineering process Methods 0.000 description 7
- 230000004048 modification Effects 0.000 description 3
- 238000012986 modification Methods 0.000 description 3
- 230000008520 organization Effects 0.000 description 2
- 230000007812 deficiency Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 230000001737 promoting effect Effects 0.000 description 1
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Description
本明細書が開示する技術は、例えば自己託送といった、託送を支援するシステム及び方法に関する。 The techniques disclosed herein relate to systems and methods that support consignment, such as self-consignment.
自己託送とは、自家用発電設備(電気事業の用に供する電気工作物以外の発電用の電気工作物)を設置する者が、当該自家用発電設備を用いて発電した電気を、一般電気事業者が維持し、及び運用する送配電ネットワークを介して、当該自家用発電設備を設置する者の別の場所にある電力需要設備(例えば工場等)に託送する際に、当該一般電気事業者が提供するサービスのことであり、一般電気事業者において特別な料金システムが用意されている。 Self-consignment means that a person who installs a private power generation facility (an electric work for power generation other than an electric work used for an electric business) produces electricity generated by the private power generation facility by a general electric power company. A service provided by the general electric power company when it is consigned to a power demand facility (for example, a factory, etc.) in another location of the person who installs the private power generation facility via the power transmission and distribution network that is maintained and operated. Therefore, a special rate system is prepared for general electric power companies.
また、非化石電源による電気については、通常、その非化石価値を国の設置する非化石価値取引市場へ供出することが義務付けられるが、小売供給ではない自己託送については、この限りではないとされている。そのため、需要家が自己の有する非化石価値量を増大させたい場合に、自己託送は市場価格の変動に晒されない有効な手段となり得る。 In addition, for electricity from non-fossil power sources, it is usually obligatory to provide the non-fossil value to the non-fossil value trading market established by the government, but this does not apply to self-consignment that is not retail supply. ing. Therefore, if the consumer wants to increase the amount of non-fossil value he / she has, self-consignment can be an effective means of not being exposed to fluctuations in market prices.
ここで、自己託送を利用することができる者の範囲については、電気事業法において「電気事業の用に供する電気工作物以外の発電用の電気工作物(非電気事業用電気工作物)を設置する者」、即ち、自家用発電設備を設置する者と規定されている。また、自家用発電設備を設置する者が自己託送を利用するにあたっては、当該者の別の場所にある工場等への送電のみならず、当該者と「経済産業省令で定める密接な関係を有する者の特定規模需要」に応ずるための送電を行うことも可能とされている。 Here, regarding the range of persons who can use self-consignment, the Electricity Business Law states that "electrical facilities for power generation (electrical facilities for non-electrical business) other than electric facilities used for electric business are installed. It is defined as a person who installs a private power generation facility. In addition, when a person who installs a private power generation facility uses self-consignment, not only power transmission to a factory, etc. in another place of the person concerned, but also a person who has a "close relationship specified by the Ordinance of the Ministry of Economy, Trade and Industry" with the person concerned. It is also possible to transmit electricity to meet the "specific scale demand".
このように、自己託送の制度化は、ネットワーク利用の公平性確保に資するものであり、また、需給ひっ迫したエリアへの自己託送は需給緩和につながるものとして、自己託送の円滑な利用を可能とするための環境整備も進められている。 In this way, the institutionalization of self-consignment contributes to ensuring the fairness of network use, and self-consignment to areas where supply and demand is tight leads to easing supply and demand, enabling smooth use of self-consignment. The environment for this is also being improved.
また、自己託送に関連する技術の開発も進められており、例えば特許文献1には、自己託送を支援する装置及び方法が開示されている。
Further, development of a technique related to self-consignment is also in progress. For example,
自己託送を利用する場合、例えば需要家は、自家用発電設備による発電計画を立案し、かつ、電力需要設備による需要計画も立案して、不足する電力については他の調達先を事前に確保することが求められる(いわゆる計画値同時同量)。また、発電計画及び需要計画については、所定の単位時間(例えば30分単位)で区分された複数の時間枠毎の計画値を、国の設置する電力広域的運営推進機関(略称、広域機関又はOCCTO)へ事前に(例えば前日までに)報告しなければならない。 When using self-consignment, for example, the consumer should formulate a power generation plan using private power generation equipment and also a demand plan using power demand equipment, and secure other suppliers in advance for the shortage of power. Is required (so-called planned value simultaneous equal amount). In addition, for power generation plans and demand plans, the planned values for each of multiple time frames divided by a predetermined unit time (for example, 30 minutes) are set by the OCCTO (abbreviated as OCCTO). Must be reported to OCCTO in advance (eg by the day before).
しかしながら、例えば自家用発電設備が、太陽光発電といった再生可能エネルギー電源である場合、天気の予期しない変化(又は不変化)といった想定外の事象に対応して、報告済みの発電計画を修正することが必要となることも多い。この点に関して、広域機関へ報告後の発電計画及び需要計画は、その後の状況に応じて変更可能であるが、各時間枠の所定時間前(例えば1時間前)であるゲートクローズ時点を過ぎた後は、一切の変更が原則として禁止される。そして、計画値に対して実績値に過不足が生じたときは、一般電気事業者が調整力を用いてそれを補填又は吸収し、需要家に対しては、ペナルティ的なインバランス料金が従量的に課せられる。このようなインバランス料金を避けるために、需要家は、時間枠毎のゲートクローズ時点を常に考慮しながら、予想されるインバランスに対して臨機応変に対策を講じる必要がある。このことは、自己託送を利用する需要家に限られず、託送を利用する全ての者にとって大きな負担となっている。 However, if the private power generation facility is a renewable energy source such as solar power, it may be possible to revise the reported power generation plan in response to unexpected events such as unexpected changes (or unchanged) in the weather. Often needed. In this regard, the power generation plan and demand plan after reporting to the OCCTO can be changed according to the situation thereafter, but the gate closing time, which is a predetermined time before each time frame (for example, one hour before), has passed. After that, all changes are prohibited in principle. Then, when there is an excess or deficiency in the actual value with respect to the planned value, the general electric power company compensates or absorbs it by using the adjusting power, and the penalty imbalance fee is paid to the consumer. Is imposed on the target. In order to avoid such imbalance charges, consumers need to take appropriate measures against expected imbalances while always considering the gate closing time for each time frame. This is a heavy burden not only for consumers who use self-consignment but also for all who use consignment.
以上を鑑み、本明細書は、計画値と実績値との間で生じるインバランスを回避又は抑制し得る技術を提供し、もって自己託送をはじめとする託送のさらなる利用を促進することを目的とする。 In view of the above, it is an object of the present specification to provide a technique capable of avoiding or suppressing an imbalance between a planned value and an actual value, thereby promoting further utilization of consignment including self-consignment. do.
本明細書が開示する技術は、発電設備を用いて発電された電気を、一般送配電事業者の送配電ネットワークを介して、前記発電設備とは別の場所にある電力需要設備へ送電する託送を支援するシステムに具現化される。特に限定されないが、その託送は自己託送であってよく、この場合、発電設備は自家用発電設備であってよい。この託送(又は自己託送)を支援するシステムは、少なくとも一つのコンピュータを備え、前記少なくとも一つのコンピュータは、前記発電設備による発電量の計画値を、所定の単位時間で区分された複数の時間枠毎に記述する発電計画データを取得し、前記発電計画データの取得後に、前記複数の時間枠の少なくとも一つについて、前記発電設備による発電量の予測値を記述する発電予測データを取得し、前記発電計画データに記述された前記計画値が、前記発電予測データに記述された前記予測値と相違する時間枠を、インバランス時間枠として特定し、前記インバランス時間枠から所定時間前のゲートクローズ時点を算出し、現時点が前記ゲートクローズ時点よりも前であるのか否かを判定する。 The technology disclosed in the present specification is a consignment that transmits electricity generated by a power generation facility to a power demand facility located at a location different from the power generation facility via a power transmission and distribution network of a general power transmission and distribution business operator. It is embodied in a system that supports. Although not particularly limited, the consignment may be self-consignment, and in this case, the power generation facility may be a private power generation facility. The system that supports this consignment (or self-consignment) includes at least one computer, and the at least one computer sets a planned value of the amount of power generated by the power generation facility into a plurality of time frames divided by a predetermined unit time. The power generation plan data described for each is acquired, and after the acquisition of the power generation plan data, the power generation prediction data describing the predicted value of the power generation amount by the power generation facility is acquired for at least one of the plurality of time frames, and the above. A time frame in which the planned value described in the power generation plan data differs from the predicted value described in the power generation forecast data is specified as an imbalance time frame, and the gate is closed a predetermined time before the imbalance time frame. The time point is calculated, and it is determined whether or not the current time point is before the gate closing time point.
上記したシステムによると、例えば広域機関に報告された発電計画を記述する発電計画データと、その後に天気予報等を考慮して作成された発電予測データとをコンピュータに与えることで、インバランスが生じ得るインバランス時間枠が特定されるとともに、そのインバランス時間枠がゲートクローズ時点を過ぎたものであるのか否かも判定される。これにより、自己託送といった託送を利用する者(又はそれに関与する他の者)は、予測されたインバランスに対して、広域機関に報告済みの発電計画を修正すべきか、発電設備において稼働調整を行うべきか等、適切な対策を容易に選択することができる。なお、システムによる判定結果は、需要家等の利用に限られず、本システムでさらに利用されてもよく、その他のシステムで利用されてもよい。 According to the above system, for example, imbalance occurs by giving the computer the power generation plan data that describes the power generation plan reported to the OCCTO and the power generation prediction data created in consideration of the weather forecast. The imbalance time frame to be obtained is specified, and it is also determined whether or not the imbalance time frame has passed the gate closing time. As a result, those who use consignment such as self-consignment (or others involved in it) should revise the power generation plan reported to the OCCTO for the predicted imbalance, or adjust the operation of the power generation equipment. Appropriate measures such as whether to take can be easily selected. The determination result by the system is not limited to the use by consumers and the like, and may be further used in this system or may be used in other systems.
本技術の一実施形態において、前記少なくとも一つのコンピュータは、現時点が前記ゲートクローズ時点後であれば、前記発電設備又はその管理者に対して、前記インバランス時間枠における発電量の調整指示を出力してもよい。このような構成によると、ゲートクローズ時点後であっても、実際の発電量を調整することによって、計画値と実績値との間で生じるインバランスを回避又は抑制することができる。ここで、少なくとも一つのコンピュータが出力する調整指示は、発電設備を直接的に制御する制御信号であってもよいし、あるいは、発電設備の管理者に対して発電設備の稼働調整を促す指示であってもよい。 In one embodiment of the present technology, the at least one computer outputs an instruction for adjusting the amount of power generation in the imbalance time frame to the power generation facility or its manager if the current time is after the gate close time. You may. According to such a configuration, even after the gate is closed, the imbalance between the planned value and the actual value can be avoided or suppressed by adjusting the actual power generation amount. Here, the adjustment instruction output by at least one computer may be a control signal that directly controls the power generation equipment, or is an instruction for urging the manager of the power generation equipment to adjust the operation of the power generation equipment. There may be.
上記に加え、又は代えて、前記少なくとも一つのコンピュータは、現時点が前記ゲートクローズ時点後であれば、前記電力需要設備又はその管理者に対して、前記インバランス時間枠における需要量の調整指示を出力してもよい。このような構成によると、ゲートクローズ時点後であっても、実際の需要量を調整することによって、計画値と実績値との間で生じるインバランスを回避又は抑制することができる。ここで、少なくとも一つのコンピュータが出力する調整指示は、電力需要設備を直接的に制御する制御信号であってもよいし、あるいは、電力需要設備の管理者に対して電力需要設備の稼働調整を促す指示であってもよい。 In addition to or instead of the above, the at least one computer instructs the power demand equipment or its manager to adjust the demand amount in the imbalance time frame if the current time is after the gate closing time. It may be output. According to such a configuration, even after the gate is closed, the imbalance between the planned value and the actual value can be avoided or suppressed by adjusting the actual demand amount. Here, the adjustment instruction output by at least one computer may be a control signal that directly controls the power demand equipment, or the manager of the power demand equipment may be informed of the operation adjustment of the power demand equipment. It may be an instruction to urge.
本技術の一実施形態において、前記少なくとも一つのコンピュータは、現時点が前記ゲートクローズ時点前であれば、前記発電計画データに記述された前記インバランス時間枠の前記計画値を、前記発電予測データに記述された前記予測値に基づいて修正してもよい。このような構成によると、修正後の発電計画データに基づいて、広域機関に報告済みの発電計画をゲートクローズ時点前に修正することができ、計画値と実績値との間で生じるインバランスを回避又は抑制することができる。ここで、広域機関に対する修正の処理は、本システムによって自動で行われてもよいし、人手を介して行われてもよい。 In one embodiment of the present technology, if the current time is before the gate closing time, the at least one computer converts the planned value of the imbalance time frame described in the power generation plan data into the power generation prediction data. It may be modified based on the described predicted value. With such a configuration, based on the revised power generation plan data, the power generation plan reported to the OCCTO can be revised before the gate close time, and the imbalance between the planned value and the actual value can be created. It can be avoided or suppressed. Here, the correction process for the OCCTO may be performed automatically by this system or may be performed manually.
本技術の一実施形態において、前記少なくとも一つのコンピュータは、前記電力需要設備による需要量の計画値を、前記複数の時間枠毎に記述する需要計画データをさらに取得し、前記発電計画データに記述された前記インバランス時間枠の前記計画値を修正するときは、前記需要計画データに記述された前記インバランス時間枠の前記計画値を併せて修正してもよい。このような構成によると、発電計画の修正に合わせて、広域機関に報告済みの需要計画もゲートクローズ時点前に修正することができ、計画値同時同量の要請を満たすことができる。ここで、広域機関に対する修正の処理は、本システムによって自動で行われてもよいし、人手を介して行われてもよい。 In one embodiment of the present technology, the at least one computer further acquires demand planning data for describing the planned value of the demand amount by the power demand equipment for each of the plurality of time frames, and describes the planned value in the power generation planning data. When modifying the planned value of the imbalance time frame, the planned value of the imbalance time frame described in the demand planning data may also be modified. According to such a configuration, the demand plan reported to the OCCTO can be revised before the gate close time in accordance with the revision of the power generation plan, and the request for the same amount of planned values can be satisfied. Here, the correction process for the OCCTO may be performed automatically by this system or may be performed manually.
本技術の一実施形態において、前記発電設備は、再生可能エネルギー電源を含んでもよい。この場合、前記再生可能エネルギー電源は、太陽光発電設備であってもよい。本技術は、発電設備が再生可能エネルギー電源であって、想定外の外的要因によって発電量が変動しやすい形態の託送に対して、好適に採用することができる。 In one embodiment of the present technology, the power generation facility may include a renewable energy power source. In this case, the renewable energy power source may be a photovoltaic power generation facility. This technology can be suitably adopted for consignment in which the power generation facility is a renewable energy power source and the amount of power generation is likely to fluctuate due to unexpected external factors.
本技術は、発電設備(例えば自家用発電設備)を用いて発電された電気を、一般送配電事業者の送配電ネットワークを介して、前記発電設備とは別の場所にある電力需要設備へ送電する託送(例えば自己託送)を支援する方法にも具現化される。この方法は、前記発電設備による発電量の計画値を、所定の単位時間で区分された複数の時間枠毎に記述する発電計画データを、少なくとも一つのコンピュータに記憶させる工程と、前記発電計画データの記憶後に、前記複数の時間枠の少なくとも一つについて、前記発電設備による発電量の予測値を記述する発電予測データを、前記少なくとも一つのコンピュータに記憶させる工程と、前記少なくとも一つのコンピュータが、前記発電計画データに記述された前記計画値が、前記発電予測データに記述された前記予測値と相違する時間枠を、インバランス時間枠として特定する工程と、前記少なくとも一つのコンピュータが、前記インバランス時間枠から所定時間前のゲートクローズ時点を算出し、現時点が前記ゲートクローズ時点よりも前であるのか否かを判定する工程とを備える。 This technology transmits electricity generated by a power generation facility (for example, a private power generation facility) to a power demand facility located at a location different from the power generation facility via the transmission and distribution network of a general power transmission and distribution business operator. It is also embodied in a method of supporting consignment (for example, self-consignment). In this method, at least one computer stores power generation plan data in which the planned value of the amount of power generated by the power generation facility is described for each of a plurality of time frames divided by a predetermined unit time, and the power generation plan data. After the storage, the step of storing the power generation prediction data describing the predicted value of the amount of power generation by the power generation facility in the at least one computer for at least one of the plurality of time frames, and the step of storing the power generation prediction data in the at least one computer. A step of specifying a time frame in which the planned value described in the power generation plan data differs from the predicted value described in the power generation prediction data as an imbalance time frame, and the at least one computer performs the in. A step of calculating a gate closing time point before a predetermined time from a balance time frame and determining whether or not the current time point is before the gate closing time point is provided.
上記した方法によっても、自己託送といった託送を利用する者、又はそれをサポートする者は、予測されたインバランスに対して、広域機関に報告済みの発電計画を修正すべきか、発電設備において稼働調整を行うべきか等、適切な対策を容易に選択することができる。 Even with the above method, those who use consignment such as self-consignment or those who support it should revise the power generation plan reported to the OCCTO for the predicted imbalance, or adjust the operation in the power generation facility. Appropriate measures can be easily selected, such as whether or not to take measures.
ここで、本明細書における自家用発電設備は、電力需要設備を設置する者、即ち、自己託送を利用する需要家が所有するものに限定されない。例えば、自家用発電設備及びその設置場所は、第三者が所有するものであってもよく、当該第三者との契約等によって、需要家がその使用権を有するものであってもよい。あるいは、第三者が自家用発電設備を所有及び運用してもよく、この場合、自家用発電設備が発電した電気を、送配電ネットワークへの供給点よりも手前で需要家が購入すればよい。いずれの場合でも、自家用発電設備から送配電ネットワークへ電気を供給する者は需要家であり、その電気は需要家の別の場所にある電力需要設備へ送電されることから、当該自家用発電設備はその需要家が設置する非電気事業用電気工作物とみなされ、その託送は自己託送に該当すると解釈される。 Here, the private power generation facility in the present specification is not limited to the one owned by the person who installs the power demand facility, that is, the consumer who uses the self-consignment. For example, the private power generation facility and its installation location may be owned by a third party, or the consumer may have the right to use the power generation facility by a contract with the third party. Alternatively, a third party may own and operate the private power generation facility, in which case the consumer may purchase the electricity generated by the private power generation facility before the supply point to the transmission / distribution network. In either case, the person who supplies electricity from the private power generation facility to the transmission and distribution network is the consumer, and that electricity is transmitted to the power demand facility in another location of the consumer. It is considered to be an electric facility for non-electrical business installed by the consumer, and the consignment is interpreted as a self-consignment.
図面を参照して、実施例の支援システム10について説明する。本実施例の支援システム10は、自己託送を支援するものであり、より正確には、自己託送に関わる者(提供者や利用者、あるいはそれらの支援者)を支援するシステムである。図1に示すように、支援システム10は、少なくとも一つのコンピュータ12を用いて構成されている。なお、支援システム10を構成するコンピュータ12の具体的な態様は特に限定されない。支援システム10を構成するコンピュータ12の一部は、地理的に離れて配置されてもよい。また、支援システム10を構成するコンピュータ12の一部又は全部は、既存する他のコンピュータ(例えば、スマートメータ22、32や、設備管理コンピュータ24、34)に組み込まれてもよい。
The
前述したように、自己託送では、自家用発電設備20(電気事業の用に供する電気工作物以外の発電用の電気工作物)を設置する者が、当該自家用発電設備20を用いて発電した電気を、一般電気事業者が維持し、及び運用する送配電ネットワーク40を介して、当該自家用発電設備20を設置する者の別の場所にある電力需要設備30(例えば工場等)に託送する。そして、自己託送を利用することができる者の範囲については、自家用発電設備20を設置する者のみに限られず、当該者と経済産業省令で定める密接な関係を有する者も含まれるとされている。
As described above, in self-consignment, a person who installs a private power generation facility 20 (an electric facility for power generation other than an electric facility used for an electric business) uses the private
上記の点に関して、本実施例で例示する自己託送は、電力需要設備30を設置する需要家Bによる自己託送ではあるものの、自家用発電設備20の所有及び運用については、需要家Bと密接な関係を有しない者A(以下、発電提供者A)によって行われている。しかしながら、自家用発電設備20が発電した電気は、発電提供者Aと需要家Bとの間の契約により、送配電ネットワーク40への供給点(即ち、スマートメータ22)よりも手前において、需要家に譲渡されている。従って、自家用発電設備20によって発電した電気を、送配電ネットワーク40へ供給する者は需要家Bであり、その電気は需要家Bの別の場所にある電力需要設備30へ送電されることから、当該自家用発電設備20はその需要家Bが設置する非電気事業用電気工作物とみなされ、その託送は自己託送に該当すると解釈される。
Regarding the above points, although the self-consignment exemplified in this embodiment is self-consignment by the consumer B who installs the electric
ここで、自家用発電設備20は、例えば太陽光発電設備といった、再生可能エネルギー電源であってよい。また、特に限定されないが、自家用発電設備20は、スマートメータ22を介して送配電ネットワーク40に接続されるとよく、電力需要設備30についても、スマートメータ32を介して送配電ネットワーク40に接続されるとよい。
Here, the private
次に、支援システム10について説明する。前述したように、支援システム10は、少なくとも一つのコンピュータ12を備える。そのコンピュータ12は、自家用発電設備20及びその設備管理コンピュータ24と、通信可能に接続されている。支援システム10のコンピュータ12は、自家用発電設備20の設備管理コンピュータ24から、発電計画データ26及び発電予測データ28を取得することができる。
Next, the
発電計画データ26は、自家用発電設備20による発電量の計画値を、所定の単位時間で区分された複数の時間枠毎に記述する。一例ではあるが、本実施例では、広域機関からの要請に応じて、30分単位で発電量の計画値が記述されている。自己託送を利用する需要家Bは、計画値同時同量の制度に応じて、自家用発電設備20による発電計画を立案し、かつ、電力需要設備30による需要計画も立案して、事前に(現状は前日までに)広域機関へ報告することが義務付けられている。本実施例における発電計画データ26は、広域機関へ報告済みの発電計画を記述するものである。
The power
一方、発電予測データ28は、広域機関へ発電計画の報告後に(例えば、当日に)、最新の天気予報等を考慮して作成されるものであり、発電計画と同じように区分された複数の時間枠について、自家用発電設備20による発電量の予測値を記述する。なお、発電予測データ28は、複数の時間枠の全てではなく、少なくとも一つの時間枠について、発電量の予測値を記述するものであってもよい。
On the other hand, the power
支援システム10のコンピュータ12は、発電計画データ26及び発電予測データ28を取得すると、両データ26、28を用いてインバランス時間枠を特定する。インバランス時間枠とは、発電計画データ26に記述された計画値が、発電予測データ28に記述された予測値と相違する時間枠を意味する。コンピュータ12は、両データ26、28に記述された計画値及び予測値を、時間枠毎に比較することによって、インバランス時間枠を特定することができる。
When the
インバランス時間枠が特定された場合、そのままでは、広域機関へ報告した計画値に対して実績値が相違してしまう。この場合、一般電気事業者が調整力を用いてそれを補填又は吸収し、それに応じたインバランス料金が需要家Bに課せられてしまう。インバランス料金を回避又は抑制するためには、予想されるインバランスを未然に回避又は抑制する必要があり、そのためには、インバランス時間枠に対するゲートクローズ時点(例えば1時間前)を考慮して、適切な対策を講じることが有効である。 If the imbalance time frame is specified, the actual value will differ from the planned value reported to the OCCTO as it is. In this case, the general electric power company compensates or absorbs it by using the adjusting power, and the imbalance charge corresponding to it is imposed on the consumer B. In order to avoid or suppress the imbalance fee, it is necessary to avoid or suppress the expected imbalance in advance, and for that purpose, consider the time when the gate is closed for the imbalance time frame (for example, one hour before). , It is effective to take appropriate measures.
上記の点に関して、支援システム10のコンピュータ12は、インバランス時間枠を特定すると、そのインバランス時間枠から所定時間前(例えば1時間前)のゲートクローズ時点を算出し、現時点がゲートクローズ時点よりも前であるのか否かを判定する。これにより、支援システム10のコンピュータ12は、例えば需要家B(又は発電提供者A)に対して、予想されるインバランス及びそのインバランス時間枠を教示するだけでなく、予想されたインバランス時間枠が既にゲートクローズされているのか否か、即ち、広域機関に対する発電計画の修正が間に合うのか否かも教示することができる。
Regarding the above points, when the
支援システム10のコンピュータ12はさらに、現時点がゲートクローズ時点後であれば、自家用発電設備20又はその管理者である発電提供者Aに対して、インバランス時間枠における発電量の調整指示を出力してもよい。このような構成によると、ゲートクローズ時点後であっても、実際の発電量を調整することによって、計画値と実績値との間で生じるインバランスを回避又は抑制することができる。なお、コンピュータ12が出力する調整指示は、自家用発電設備20を直接的に制御する制御信号であってもよいし、あるいは、発電提供者Aに対して自家用発電設備20の稼働調整を促す指示であってもよい。発電提供者Aに対する指示は、例えば、自家用発電設備20の設備管理コンピュータ24を介して可視的に表示されてもよい。
If the current time is after the gate is closed, the
支援システム10のコンピュータ12はさらに、現時点がゲートクローズ時点後であれば、電力需要設備30又はその管理者である需要家Bに対して、インバランス時間枠における需要量の調整指示を出力してもよい。このような構成によると、ゲートクローズ時点後であっても、実際の需要量を調整することによって、計画値と実績値との間で生じるインバランスを回避又は抑制することができる。ここで、コンピュータ12が出力する調整指示は、電力需要設備30を直接的に制御する制御信号であってもよいし、あるいは、需要家Bに対して電力需要設備30の稼働調整を促す指示であってもよい。そして、需要家Bに対する指示は、例えば、電力需要設備30の設備管理コンピュータ34を介して可視的に表示されてもよい。
If the current time is after the gate is closed, the
一方、支援システム10のコンピュータ12は、現時点がゲートクローズ時点前であれば、発電計画データ26に記述されたインバランス時間枠の計画値を、発電予測データに記述された予測値に基づいて修正してもよい。このような構成によると、修正後の発電計画データに基づいて、広域機関に報告済みの発電計画をゲートクローズ時点前に修正することができ、計画値と実績値との間で生じるインバランスを回避又は抑制することができる。ここで、広域機関に対する修正の処理は、支援システム10によって自動で行われてもよいし、発電提供者A等の人手を介して行われてもよい。後者の場合、支援システム10は、発電計画データ26に対して実施したデータ修正の内容を、自家用発電設備20の設備管理コンピュータ24へ送信するように構成されてもよい。
On the other hand, if the current time is before the gate closing time, the
図1に示すように、支援システム10のコンピュータ12は、電力需要設備30及びその設備管理コンピュータ34とも通信可能に接続されており、その設備管理コンピュータ34から需要計画データ36をさらに取得してもよい。需要計画データ36は、例えば広域機関へ報告済みの需要計画を記述するものであって、電力需要設備30による需要量の計画値を、所定の単位時間(ここでは30分単位)で区分された複数の時間枠毎に記述するとよい。この場合、支援システム10のコンピュータ12は、発電計画データ26に記述されたインバランス時間枠の計画値を修正したときに、需要計画データ36に記述された当該インバランス時間枠の計画値を併せて修正してもよい。このような構成によると、発電計画の修正に合わせて、広域機関に報告済みの需要計画もゲートクローズ時点前に修正することができ、計画値同時同量の要請を満たすことができる。ここで、広域機関に対する修正の処理は、支援システム10によって自動で行われてもよいし、需要家B等の人手を介して行われてもよい。
As shown in FIG. 1, the
以上のように、本実施例の支援システム10及びそれを用いた支援方法によると、計画値と実績値との間で生じるインバランスを効果的に回避又は抑制することが可能となる。自己託送を利用する者にとっては、ペナルティ的なインバランス料金を回避又は抑制することが可能となるので、自己託送のさらなる利用の促進が期待される。
As described above, according to the
特許請求の範囲に記載された技術には、以上に例示した具体例を様々に変形、変更したものが含まれる。本明細書または図面に説明した技術要素は、単独で、あるいは各種の組み合わせによって技術的有用性を発揮するものであり、出願時の請求項に記載された組み合わせに限定されるものではない。また、本明細書又は図面に例示した技術は、複数の目的を同時に達成し得るものであり、そのうちの一つの目的を達成することだけでも、技術的有用性を持つものである。 The techniques described in the claims include various modifications and modifications of the specific examples exemplified above. The technical elements described herein or in the drawings exhibit their technical usefulness alone or in various combinations, and are not limited to the combinations described in the claims at the time of filing. Further, the techniques exemplified in the present specification or the drawings can achieve a plurality of objectives at the same time, and achieving only one of the objectives has technical usefulness.
10:支援システム
12:コンピュータ
20:自家用発電設備
22:スマートメータ
24:自家用発電設備の設備管理コンピュータ
26:発電計画データ
28:発電予測データ
30:電力需要設備
32:スマートメータ
34:電力需要設備の設備管理コンピュータ
36:需要計画データ
40:送配電ネットワーク
10: Support system 12: Computer 20: Private power generation equipment 22: Smart meter 24: Equipment management computer for private power generation equipment 26: Power generation plan data 28: Power generation forecast data 30: Power demand equipment 32: Smart meter 34: Power demand equipment Equipment management computer 36: Demand planning data 40: Power transmission and distribution network
Claims (9)
少なくとも一つのコンピュータを備え、前記少なくとも一つのコンピュータは、
前記発電設備による発電量の計画値を、所定の単位時間で区分された複数の時間枠毎に記述する発電計画データを取得し、
前記発電計画データの取得後に、前記複数の時間枠の少なくとも一つについて、前記発電設備による発電量の予測値を記述する発電予測データを取得し、
前記発電計画データに記述された前記計画値が、前記発電予測データに記述された前記予測値と相違する時間枠を、インバランス時間枠として特定し、
前記インバランス時間枠から所定時間前のゲートクローズ時点を算出し、現時点が前記ゲートクローズ時点よりも前であるのか否かを判定する、
システム。 It is a system that supports consignment of transmitting electricity generated by a power generation facility to a power demand facility located in a location different from the power generation facility via the power transmission and distribution network of a general power transmission and distribution business operator.
It comprises at least one computer, said at least one computer.
Acquire power generation plan data that describes the planned value of the amount of power generated by the power generation facility for each of a plurality of time frames divided by a predetermined unit time.
After acquiring the power generation plan data, power generation prediction data describing the predicted value of the amount of power generated by the power generation facility is acquired for at least one of the plurality of time frames.
A time frame in which the planned value described in the power generation plan data differs from the predicted value described in the power generation prediction data is specified as an imbalance time frame.
A gate closing time before a predetermined time is calculated from the imbalance time frame, and it is determined whether or not the current time is before the gate closing time.
system.
前記電力需要設備による需要量の計画値を、前記複数の時間枠毎に記述する需要計画データをさらに取得し、
前記発電計画データに記述された前記インバランス時間枠の前記計画値を修正するときは、前記需要計画データに記述された前記インバランス時間枠の前記計画値を併せて修正する、請求項1から5のいずれか一項に記載のシステム。 The at least one computer
Further, the demand plan data for describing the planned value of the demand amount by the electric power demand facility for each of the plurality of time frames is further acquired.
From claim 1, when the planned value of the imbalance time frame described in the power generation plan data is revised, the planned value of the imbalance time frame described in the demand plan data is also revised. The system according to any one of 5.
前記発電設備による発電量の計画値を、所定の単位時間で区分された複数の時間枠毎に記述する発電計画データを、少なくとも一つのコンピュータに記憶させる工程と、
前記発電計画データの記憶後に、前記複数の時間枠の少なくとも一つについて、前記発電設備による発電量の予測値を記述する発電予測データを、前記少なくとも一つのコンピュータに記憶させる工程と、
前記少なくとも一つのコンピュータが、前記発電計画データに記述された前記計画値が、前記発電予測データに記述された前記予測値と相違する時間枠を、インバランス時間枠として特定する工程と、
前記少なくとも一つのコンピュータが、前記インバランス時間枠から所定時間前のゲートクローズ時点を算出し、現時点が前記ゲートクローズ時点よりも前であるのか否かを判定する工程と、
を備える方法。 It is a method to support the consignment of transmitting the electricity generated by the power generation facility to the power demand facility located in a place different from the power generation facility via the power transmission and distribution network of the general power transmission and distribution business operator.
A process of storing power generation plan data in which at least one computer describes the planned value of the amount of power generated by the power generation facility for each of a plurality of time frames divided by a predetermined unit time.
After storing the power generation plan data, a step of storing the power generation prediction data describing the predicted value of the amount of power generated by the power generation facility in the at least one computer for at least one of the plurality of time frames.
A step in which the at least one computer specifies a time frame in which the planned value described in the power generation plan data differs from the predicted value described in the power generation forecast data as an imbalance time frame.
A step in which the at least one computer calculates a gate closing time point before a predetermined time from the imbalance time frame, and determines whether or not the current time point is before the gate closing time point.
How to prepare.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2019235268A JP6991492B2 (en) | 2019-12-25 | 2019-12-25 | Systems and methods to support transportation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2019235268A JP6991492B2 (en) | 2019-12-25 | 2019-12-25 | Systems and methods to support transportation |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2021103489A JP2021103489A (en) | 2021-07-15 |
JP6991492B2 true JP6991492B2 (en) | 2022-01-12 |
Family
ID=76755275
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2019235268A Active JP6991492B2 (en) | 2019-12-25 | 2019-12-25 | Systems and methods to support transportation |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP6991492B2 (en) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20140125125A1 (en) | 2012-04-13 | 2014-05-08 | Virtual Electric Inc. | Method and apparatus to form a virtual power generation collective from a distributed network of local generation facilities |
JP2017163780A (en) | 2016-03-11 | 2017-09-14 | 大阪瓦斯株式会社 | Self consignment support apparatus and self consignment system |
JP2017182698A (en) | 2016-03-31 | 2017-10-05 | 株式会社東芝 | Power demand management supporting system, power demand management supporting method, and power demand management supporting program |
JP2017224208A (en) | 2016-06-16 | 2017-12-21 | 株式会社東芝 | Storage battery control system, method and program |
JP2018077574A (en) | 2016-11-07 | 2018-05-17 | 株式会社オプティマイザー | Electric power demand procurement supporting system, information processing apparatus, information processing method and information processing program |
JP2018093652A (en) | 2016-12-06 | 2018-06-14 | 株式会社東芝 | Charge/discharge planning device, method and program |
JP2018174623A (en) | 2017-03-31 | 2018-11-08 | 積水化学工業株式会社 | Power management device, and application power generation amount calculation method |
-
2019
- 2019-12-25 JP JP2019235268A patent/JP6991492B2/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20140125125A1 (en) | 2012-04-13 | 2014-05-08 | Virtual Electric Inc. | Method and apparatus to form a virtual power generation collective from a distributed network of local generation facilities |
JP2017163780A (en) | 2016-03-11 | 2017-09-14 | 大阪瓦斯株式会社 | Self consignment support apparatus and self consignment system |
JP2017182698A (en) | 2016-03-31 | 2017-10-05 | 株式会社東芝 | Power demand management supporting system, power demand management supporting method, and power demand management supporting program |
JP2017224208A (en) | 2016-06-16 | 2017-12-21 | 株式会社東芝 | Storage battery control system, method and program |
JP2018077574A (en) | 2016-11-07 | 2018-05-17 | 株式会社オプティマイザー | Electric power demand procurement supporting system, information processing apparatus, information processing method and information processing program |
JP2018093652A (en) | 2016-12-06 | 2018-06-14 | 株式会社東芝 | Charge/discharge planning device, method and program |
JP2018174623A (en) | 2017-03-31 | 2018-11-08 | 積水化学工業株式会社 | Power management device, and application power generation amount calculation method |
Also Published As
Publication number | Publication date |
---|---|
JP2021103489A (en) | 2021-07-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US6529839B1 (en) | Energy coordination system | |
US10423185B2 (en) | Systems and methods for regulating a microgrid | |
JP2017182698A (en) | Power demand management supporting system, power demand management supporting method, and power demand management supporting program | |
WO2017170018A1 (en) | Power control device, power control method, and program | |
JP6471566B2 (en) | Power distribution management device, method and program | |
KR102699654B1 (en) | UNIFIED OPERATION SYSTEM for DISTRIBUTED RESOURCES | |
Gómez | Electricity distribution | |
JP2002123578A (en) | Electric power retail system | |
JP6373645B2 (en) | Power management equipment | |
WO2020039632A1 (en) | Power transmission loss calculation device and power transmission loss calculation method | |
JP2002084660A (en) | Control method for generator | |
JP6991492B2 (en) | Systems and methods to support transportation | |
US20150340865A1 (en) | Power control | |
Pérez Arriaga et al. | Electricity services in a more distributed energy system | |
JP2015049779A (en) | System and method for examining introduction of distributed power source | |
JP2023095550A (en) | Power control system and power control apparatus | |
WO2017026097A1 (en) | Electricity storage control system, instruction control system, electricity storage control device, electricity storage control method, and program | |
JP2005135266A (en) | Electric power transaction support system | |
JP2002010499A (en) | Electric power supply control system | |
KR102594831B1 (en) | System for renewable energy capability prediction and development plan | |
JP2020004164A (en) | Photovoltaic power generation output estimation device and output estimation method | |
WO2023026676A1 (en) | Electric power adjustment device, electric power adjustment system, base location adjustment device, control method, computer program, and data structure | |
JP7069655B2 (en) | Aggregation device, power demand control method, and power demand control program | |
JP2022184637A (en) | Supply-demand management system, supply-demand management method and program | |
Deuschle et al. | EnBW SMIGHT: Addressing the Energy and Mobility Transition as Electricity Grid Operator |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20210423 |
|
A871 | Explanation of circumstances concerning accelerated examination |
Free format text: JAPANESE INTERMEDIATE CODE: A871 Effective date: 20210423 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20210721 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20210824 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20210831 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20211102 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20211126 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 6991492 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |