JP6945911B1 - How to build openwork brick wall lumber - Google Patents

How to build openwork brick wall lumber Download PDF

Info

Publication number
JP6945911B1
JP6945911B1 JP2021115413A JP2021115413A JP6945911B1 JP 6945911 B1 JP6945911 B1 JP 6945911B1 JP 2021115413 A JP2021115413 A JP 2021115413A JP 2021115413 A JP2021115413 A JP 2021115413A JP 6945911 B1 JP6945911 B1 JP 6945911B1
Authority
JP
Japan
Prior art keywords
brick
dowel
openwork
end side
stage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2021115413A
Other languages
Japanese (ja)
Other versions
JP2023012022A (en
Inventor
田島 洋
洋 田島
勝代 小貫
勝代 小貫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hiro Corp KK
Original Assignee
Hiro Corp KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hiro Corp KK filed Critical Hiro Corp KK
Priority to JP2021115413A priority Critical patent/JP6945911B1/en
Application granted granted Critical
Publication of JP6945911B1 publication Critical patent/JP6945911B1/en
Publication of JP2023012022A publication Critical patent/JP2023012022A/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

【課題】積み上げられたレンガが部分的に破損した場合でも、全体的に組み直すことなく、破損したレンガだけを交換する。【解決手段】第1段のレンガの左端側と第2段のレンガの右端側とが上下に重なり、各段において左右に隣接するレンガが間欠的に配置されるように、各段を互い違いに積み上げた透かしレンガ積み壁材の構築方法であって、上面の左端側および右端側に上ダボ穴を空け、下面の左端側および右端側に前記上ダボ穴より浅い下ダボ穴を空けたレンガと、レンガの上ダボ穴からその上側のレンガの下ダボ穴まで挿し込まれるダボピンと、ダボピンを貫通可能に水平方向へ突出させることでレンガを載置する支持金具とを有し、ダボピンは、軸体の下に下ダボ穴の長さ以上に収縮可能なバネ材が取り付けられ、レンガの上ダボ穴に押し込んだときに支持金具にその上側のレンガが載置されるまで支持金具で収縮を維持させる。【選択図】図1PROBLEM TO BE SOLVED: To replace only a damaged brick without reassembling the whole brick even when the stacked bricks are partially damaged. SOLUTION: Each stage is staggered so that the left end side of the first stage brick and the right end side of the second stage brick are vertically overlapped and adjacent bricks on the left and right are intermittently arranged in each stage. A method of constructing a piled open-air brick wall material, in which an upper dowel hole is made on the left end side and the right end side of the upper surface, and a lower dowel hole shallower than the upper dowel hole is made on the left end side and the right end side of the lower surface. It has a dowel pin that is inserted from the upper dowel hole of the brick to the lower dowel hole of the brick above it, and a support bracket on which the brick is placed by projecting the dowel pin in the horizontal direction so that it can be penetrated. A spring material that can be shrunk beyond the length of the lower dowel hole is attached under the body, and when pushed into the upper dove hole of the brick, the support metal fitting keeps shrinking until the upper brick is placed on the support metal fitting. Let me. [Selection diagram] Fig. 1

Description

本発明は、レンガを積み上げてデザイン性のある外壁を形成するための透かしレンガ積み壁材の構築方法に関する。 The present invention relates to a method for constructing an openwork brick wall material for stacking bricks to form an outer wall having a design.

建物の外壁の仕上方法として、下地材にモルタルで壁材を貼着する湿式工法や、下地材に固定した支持金具に壁材を係止して接着剤で貼着する乾式工法などがある。壁材としては、タイルや石材のほかにレンガなども用いられる。レンガの左端側に別のレンガの右端側を重ねることを交互に繰り返して隙間のある状態で積み上げた透かしレンガ積みという積み方もある。 As a finishing method for the outer wall of a building, there are a wet method in which the wall material is attached to the base material with mortar, and a dry method in which the wall material is locked to a support metal fitting fixed to the base material and attached with an adhesive. In addition to tiles and stones, bricks are also used as wall materials. There is also a method of stacking openwork bricks, in which the right end side of another brick is piled up on the left end side of the brick alternately, and the bricks are piled up with a gap.

透かしレンガ積みでは、レンガが重なる部分に鉄筋を通した上で下から上に順次積み上げていく。特許文献1に記載されているように、ガラスレンガの上下面に係留溝が形成され、係留溝に係合片を嵌入させて支持する発明も開示されている。 In openwork brick stacking, reinforcing bars are passed through the overlapping parts of the bricks, and then the bricks are stacked in order from bottom to top. As described in Patent Document 1, an invention is also disclosed in which a mooring groove is formed on the upper and lower surfaces of a glass brick, and an engaging piece is fitted and supported in the mooring groove.

特開2007−154648号公報JP-A-2007-154648

しかしながら、物が当たってレンガが割れたり、経年劣化によりレンガが脆くなったり、部分的に破損する場合がある。鉄筋を通している場合も、係留溝に係合片を嵌入させている場合も、中間部に配置されているレンガのみを交換することはできない。一度積み上げたレンガは、上から順に破損したレンガまで解体する必要がある。 However, the brick may be cracked by hitting an object, the brick may become brittle due to aging, or it may be partially damaged. It is not possible to replace only the bricks located in the middle, whether through the reinforcing bars or when the engaging pieces are fitted into the mooring grooves. Once stacked bricks, it is necessary to dismantle the damaged bricks in order from the top.

そこで、本発明は、積み上げられたレンガが部分的に破損した場合でも、全体的に組み直すことなく、破損したレンガだけを交換可能な透かしレンガ積み壁材の構築方法を提供することを目的とする。 Therefore, an object of the present invention is to provide a method for constructing an openwork brick wall material in which only the damaged bricks can be replaced without reassembling the whole bricks even if the stacked bricks are partially damaged. ..

上記の課題を解決するために、本発明は、第1段のレンガの左端側と第2段のレンガの右端側とが上下に重なり、各段において左右に隣接するレンガが間欠的に配置されるように、各段を互い違いに積み上げた透かしレンガ積み壁材の構築方法であって、上面の左端側および右端側に上ダボ穴を空け、下面の左端側および右端側に前記上ダボ穴より浅い下ダボ穴を空けたレンガと、前記レンガの上ダボ穴からその上側のレンガの下ダボ穴まで挿し込まれるダボピンと、前記ダボピンを貫通可能に水平方向へ突出させることで前記レンガを載置する支持金具と、を有し、前記ダボピンは、軸体の下に前記下ダボ穴の長さ以上に収縮可能なバネ材が取り付けられ、前記レンガの上ダボ穴に押し込んだときに前記支持金具にその上側のレンガが載置されるまで前記支持金具で収縮を維持させる、ことを特徴とする。 In order to solve the above problems, in the present invention, the left end side of the first stage brick and the right end side of the second stage brick are overlapped vertically, and the bricks adjacent to the left and right are intermittently arranged in each stage. As described above, it is a method of constructing an open-air brick wall material in which each stage is alternately piled up. A brick with a shallow lower dowel hole, a dowel pin that is inserted from the upper dowel hole of the brick to the lower dowel hole of the brick above it, and the brick are placed by projecting the dowel pin in the horizontal direction so as to penetrate. The support metal fitting has a support metal fitting, and the dowel pin has a spring material that can be shrunk to a length equal to or longer than the length of the lower dove hole under the shaft body, and is pushed into the upper dove hole of the brick. The support metal fitting keeps the shrinkage until the brick on the upper side is placed on the brick.

前記透かしレンガ積み壁材の構築方法において、前記支持金具は、下地材に当接させる背板から前記レンガを載置するための載板を切り出すことで前記レンガと前記下地材を接着するための空部を設け、さらに前記空部に前記下地材から浮くようにブリッジを形成することで接着剤を絡ませる、ことを特徴とする。 In the method of constructing the openwork brick wall material, the support metal fitting is for adhering the brick and the base material by cutting out a mounting plate for mounting the brick from a back plate that is brought into contact with the base material. An empty portion is provided, and a bridge is formed in the empty portion so as to float from the base material so that the adhesive is entangled.

前記透かしレンガ積み壁材の構築方法において、前記バネ材は、前記ダボピンの軸体と同径のコイルバネである、ことを特徴とする。 In the method for constructing the openwork brick wall material, the spring material is a coil spring having the same diameter as the shaft body of the dowel pin.

前記透かしレンガ積み壁材の構築方法において、前記レンガとその上側のレンガとの間に前記ダボピンを囲むようにモルタル又はゴムの目地材が充填される、ことを特徴とする。 The method for constructing the openwork brick wall material is characterized in that a mortar or rubber joint material is filled between the brick and the brick above the openwork brick so as to surround the dowel pin.

本発明によれば、積み上げられたレンガが部分的に破損した場合でも、全体的に組み直すことなく、破損したレンガだけを交換することができる。交換対象のレンガのみを破壊する等して取り除き、新たなレンガを上下から支持した状態で嵌め込むことができる。 According to the present invention, even if the stacked bricks are partially damaged, only the damaged bricks can be replaced without reassembling the entire bricks. Only the brick to be replaced can be removed by destroying it, and a new brick can be fitted while being supported from above and below.

本発明である透かしレンガ積み壁材の構築方法によって構築された外壁の正面図である。It is a front view of the outer wall constructed by the construction method of the openwork brick wall material of this invention. 本発明である透かしレンガ積み壁材の構築方法によって構築された外壁の横断面図である。It is a cross-sectional view of the outer wall constructed by the construction method of the openwork brick wall material of this invention. 本発明である透かしレンガ積み壁材の構築方法によって湿式で構築された外壁の縦断面図である。It is a vertical cross-sectional view of the outer wall constructed by the wet method by the construction method of the openwork brick wall material of this invention. 本発明である透かしレンガ積み壁材の構築方法によって乾式で構築された外壁の縦断面図である。It is a vertical cross-sectional view of the outer wall constructed by the dry method by the construction method of the openwork brick wall material of this invention. 本発明である透かしレンガ積み壁材の構築方法で使用する支持金具を示す斜視図である。It is a perspective view which shows the support metal fitting used in the construction method of the openwork brick wall material of this invention. 本発明である透かしレンガ積み壁材の構築方法で使用するダボ用金具を示す三面図である。It is a three-sided view which shows the metal fitting for a dowel used in the construction method of the openwork brick wall material of this invention. 本発明である透かしレンガ積み壁材の構築方法で使用する補助プレートを示す三面図である。It is a three-view view which shows the auxiliary plate used in the construction method of the openwork brick wall material of this invention. 本発明である透かしレンガ積み壁材の構築方法で使用するダボピンの斜視図である。It is a perspective view of the dowel pin used in the construction method of the openwork brick wall material of this invention. 本発明である透かしレンガ積み壁材の構築方法で使用するダボピンの正面図である。It is a front view of the dowel pin used in the construction method of the openwork brick wall material of this invention. 本発明である透かしレンガ積み壁材の構築方法によって構築された外壁においてレンガを交換する状況を説明する図である。It is a figure explaining the situation of exchanging bricks in the outer wall constructed by the construction method of the openwork brick wall material of this invention.

以下に、本発明の実施形態について図面を参照して詳細に説明する。同一機能を有するものは同一符号を付け、その繰り返しの説明は省略する場合がある。 Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings. Those having the same function are designated by the same reference numerals, and the repeated description thereof may be omitted.

まず、本発明である透かしレンガ積み壁材の構造について説明する。なお、レンガのある側を前側または表側とし、下地材のある側を後側または裏側とする。 First, the structure of the openwork brick wall material of the present invention will be described. The side with the brick is the front side or the front side, and the side with the base material is the rear side or the back side.

図1は、透かしレンガ積み壁材の構築方法によって構築された外壁の正面図である。図2(a)は、外壁をA−Aで切断した第1段の横断面図であり、図2(b)は、外壁をB−Bで切断した第2段の横断面図である。図3は、外壁をC−Cで切断した縦断面図であり、湿式工法で構築した例である。図4は、外壁をC−Cで切断した縦断面図であり、乾式工法で構築した例である。 FIG. 1 is a front view of an outer wall constructed by a method of constructing an openwork brick wall material. FIG. 2A is a cross-sectional view of the first stage in which the outer wall is cut by AA, and FIG. 2B is a cross-sectional view of the second stage in which the outer wall is cut by BB. FIG. 3 is a vertical cross-sectional view of the outer wall cut by CC, and is an example of construction by a wet method. FIG. 4 is a vertical cross-sectional view of the outer wall cut by CC, and is an example of construction by a dry method.

図1に示すように、外壁100を複数のレンガ200(200a、200b)を使用した透かしレンガ積み壁材で構築する場合、第1段のレンガ200aの左端側と第2段のレンガ200bの右端側とが上下に重なり、各段において左右に隣接するレンガ200が間欠的に配置されるように、各段を互い違いに積み上げられる。 As shown in FIG. 1, when the outer wall 100 is constructed of openwork brick wall materials using a plurality of bricks 200 (200a, 200b), the left end side of the first stage brick 200a and the right end of the second stage brick 200b. The bricks 200 are stacked alternately so that the bricks 200 adjacent to the left and right are arranged intermittently in each stage so that the sides overlap each other.

レンガ200は、粘土などを型に入れ、窯で焼き固めた建築材料であり、主に直方体状のものを積み上げて外壁を形成するのに用いられていた。現在では、木造や鉄筋コンクリート造の外壁の表面に、タイルのように仕上材として貼り付ける場合もある。また、古い建物を解体したときに得られたアンティークレンガを板状に切断加工したスライスレンガとして再利用することもある。 The brick 200 is a building material in which clay or the like is placed in a mold and baked in a kiln, and is mainly used for stacking rectangular parallelepiped shapes to form an outer wall. Nowadays, it is sometimes attached as a finishing material like tiles to the surface of the outer wall of wooden or reinforced concrete structures. In addition, antique bricks obtained when an old building is demolished may be reused as sliced bricks cut into plates.

レンガ200は、横長の直方体状であり、外壁100の下地材110に固定された支持金具に載置される。支持金具は、縦長のダボ用金具400と補助プレート500のセットであり、複数本が横方向に所定の間隔を置いて配置され、縦に複数のレンガ200を載置可能である。 The brick 200 has a horizontally long rectangular parallelepiped shape, and is placed on a support metal fitting fixed to a base material 110 of the outer wall 100. The support metal fitting is a set of a vertically long dowel metal fitting 400 and an auxiliary plate 500, and a plurality of the support metal fittings are arranged at predetermined intervals in the horizontal direction, and a plurality of bricks 200 can be placed vertically.

レンガ200のうち、第1段のレンガ200aは、1つ目の左端側を第1の支持金具に、右端側を第2の支持金具に載せ、2つ目の左端側を第3の支持金具に、右端側を第4の支持金具に載せ、1つ目と2つ目の間が空けられる。第2段のレンガ200bは、1つ目の左端側を第2の支持金具に、右端側を第3の支持金具に載せ、第1段のレンガ200aとは横に半分ずらす。第3段は、第1段と同様にすると、各段が互い違いになる。 Of the bricks 200, in the first-stage brick 200a, the first left end side is placed on the first support metal fitting, the right end side is placed on the second support metal fitting, and the second left end side is placed on the third support metal fitting. The right end side is placed on the fourth support metal fitting, and a space is provided between the first and the second. The first left end side of the second stage brick 200b is placed on the second support metal fitting, and the right end side is placed on the third support metal fitting, and the first stage brick 200a is laterally displaced by half. If the third stage is the same as the first stage, the stages are staggered.

第2の支持金具に、第1段のレンガ200aの右端側と、第2段のレンガ200bの左端側が載り、レンガ200aとレンガ200bに上下に重なった部分が生じるので、そこをダボピン600で上下に連結する。 The right end side of the brick 200a of the first stage and the left end side of the brick 200b of the second stage are placed on the second support metal fitting, and a part overlapping the brick 200a and the brick 200b is generated. Connect to.

図2、3に示すように、レンガ200の上面には、左端側に上ダボ穴210a、右端側に上ダボ穴210bが空けられ、下面には、左端側に下ダボ穴220a、右端側に下ダボ穴220bが空けられる。第1段のレンガ200aの右端側のダボ穴210b、220bと、第2段のレンガ200bの左端側のダボ穴210a、220aとは、一直線上に空くことになる。 As shown in FIGS. The lower dowel hole 220b is opened. The dowel holes 210b and 220b on the right end side of the brick 200a in the first stage and the dowel holes 210a and 220a on the left end side of the brick 200b in the second stage are vacated in a straight line.

上ダボ穴210はレンガ200の中央付近まで深く空けられ、下ダボ穴220は上ダボ穴210より浅く空けられる。レンガ200bの上ダボ穴210からその上側のレンガ200aの下ダボ穴220までダボピン600が挿し込まれる。なお、ダボピン600が抜け落ちないように、上ダボ穴210は下ダボ穴220に貫通させない。 The upper dowel hole 210 is drilled deep to the vicinity of the center of the brick 200, and the lower dowel hole 220 is drilled shallower than the upper dowel hole 210. The dowel pin 600 is inserted from the upper dowel hole 210 of the brick 200b to the lower dowel hole 220 of the brick 200a above it. The upper dowel hole 210 is not penetrated through the lower dowel hole 220 so that the dowel pin 600 does not come off.

支持金具は、留具120で下地材110に固定される。留具120は、下地材110にプラグを埋め込み、ビス等をプラグに螺合させる等すれば良い。さらに、支持金具に載置されたレンガ200は、弾性系などの接着剤130で下地材110に貼着される。 The support metal fitting is fixed to the base material 110 by the fastener 120. The fastener 120 may be formed by embedding a plug in the base material 110 and screwing a screw or the like into the plug. Further, the brick 200 placed on the support metal fitting is attached to the base material 110 with an adhesive 130 such as an elastic system.

第2段のレンガ200bと、その上側にある第1段のレンガ200aとの間には、ダボピン600を囲むように目地材300が充填される。図3に示すように、モルタル等を使用して湿式で施工しても良いし、図4に示すように、クロロプレンゴム等を使用して乾式で施工しても良い。 A joint material 300 is filled between the second-stage brick 200b and the first-stage brick 200a above the second-stage brick 200b so as to surround the dowel pin 600. As shown in FIG. 3, mortar or the like may be used for wet construction, or as shown in FIG. 4, chloroprene rubber or the like may be used for dry construction.

図5は、透かしレンガ積み壁材の構築方法で使用する支持金具(ダボ用金具および補助プレート)を示す斜視図である。図6は、透かしレンガ積み壁材の構築方法で使用するダボ用金具を示す(a)平面図(b)正面図(c)右側面図である。図7は、透かしレンガ積み壁材の構築方法で使用する補助プレートを示す(a)平面図(b)正面図(c)右側面図である。 FIG. 5 is a perspective view showing a support metal fitting (a metal fitting for a dowel and an auxiliary plate) used in a method for constructing an openwork brick wall material. FIG. 6 is a plan view (a) plan view (b) front view (c) right side view showing a metal fitting for a dowel used in a method for constructing an openwork brick wall material. FIG. 7 is a plan view (a) plan view (b) front view (c) right side view showing an auxiliary plate used in a method for constructing an openwork brick wall material.

図5に示すように、支持金具は、ダボ用金具400の後側に補助プレート500を配置して前後に重ねたものである。なお、ダボ用金具400の前側に補助プレート500を重ねるように成形しても良いし、ダボ用金具400と補助プレート500を一体成形した支持金具でも良い。 As shown in FIG. 5, the support metal fittings are formed by arranging auxiliary plates 500 on the rear side of the dowel metal fittings 400 and stacking them in the front-rear direction. The auxiliary plate 500 may be formed so as to overlap the front side of the dowel metal fitting 400, or the support metal fitting in which the dowel metal fitting 400 and the auxiliary plate 500 are integrally molded may be used.

支持金具は、下地材110に当接させるダボ用金具400の背板410からレンガ200を載置するための載板430を切り出すことでレンガ200と下地材110を接着するための空部440を設け、さらに空部440に下地材110から浮くように補助プレート500でブリッジ530を形成することで接着剤130を絡ませる。 The support metal fitting has an empty space 440 for adhering the brick 200 and the base material 110 by cutting out a mounting plate 430 for mounting the brick 200 from the back plate 410 of the dowel metal fitting 400 that comes into contact with the base material 110. The adhesive 130 is entwined by forming a bridge 530 with the auxiliary plate 500 so as to float from the base material 110 in the empty space 440.

ダボ用金具400と補助プレート500を重ねたとき、補助プレート500のブリッジ530を、ダボ用金具400の空部440に通し、ダボ用金具400の表側に突出させる。レンガ200と下地材110の間の接着剤130の中にブリッジ530が通ることで、接着剤130の剥離が抑制される。 When the dowel metal fitting 400 and the auxiliary plate 500 are overlapped, the bridge 530 of the auxiliary plate 500 is passed through the empty space 440 of the dowel metal fitting 400 and protrudes to the front side of the dowel metal fitting 400. By passing the bridge 530 through the adhesive 130 between the brick 200 and the base material 110, peeling of the adhesive 130 is suppressed.

また、ダボ用金具400の留孔460と、補助プレート500の通孔540は、支持金具を下地材110に固定するための留具120を通すための孔であり、下地材110まで抜けるように位置を合わせれば良い。 Further, the retaining hole 460 of the dowel metal fitting 400 and the through hole 540 of the auxiliary plate 500 are holes for passing the fastener 120 for fixing the support metal fitting to the base material 110, and can be pulled out to the base material 110. All you have to do is align them.

図6に示すように、ダボ用金具400は、縦長の背板410の左右両端を前側に折り曲げて垂立させた側板420を設けることで、レンガ200と下地材110の間に空間を確保するとともに、支持金具を下地材110に固定するための留具120の頭部を収容するための空間が確保される。 As shown in FIG. 6, the dowel metal fitting 400 secures a space between the brick 200 and the base material 110 by providing the side plates 420 in which the left and right ends of the vertically long back plate 410 are bent forward and erected. At the same time, a space for accommodating the head of the fastener 120 for fixing the support metal fitting to the base material 110 is secured.

ダボ用金具400の背板410に逆U字状に切り出して、前側へ水平方向に突出させた載板430にピン孔450を空けることで、載板430にレンガ200aを載せたときに、下側のレンガ200bから上方に突出するダボピン600を貫通させ、レンガ200同士を上下に連結可能となる。 By cutting out the back plate 410 of the dowel metal fitting 400 in an inverted U shape and making a pin hole 450 in the mounting plate 430 protruding horizontally to the front side, when the brick 200a is placed on the mounting plate 430, the lower part is The dowel pins 600 protruding upward from the side bricks 200b are penetrated, and the bricks 200 can be connected up and down.

載板430を切り出すことで形成された空部440は、支持金具が配置された場所において、下地材110からレンガ200まで接着剤130を通すための隙間となる。また、補助プレート500のブリッジ530を通すための隙間にもなる。 The empty space 440 formed by cutting out the mounting plate 430 serves as a gap for passing the adhesive 130 from the base material 110 to the brick 200 at the place where the support metal fittings are arranged. It also serves as a gap for passing the bridge 530 of the auxiliary plate 500.

図7に示すように、補助プレート500は、縦長の後板510に対して、ダボ用金具400の空部440と重なる位置において、ブリッジ530と間隙520が設けられる。間隙520を空ける際に、間欠的に複数(例えば2本)の縦線状の部分を残し、前側に押し上げるようにプレス加工することでブリッジ530を形成すれば良い。 As shown in FIG. 7, the auxiliary plate 500 is provided with a bridge 530 and a gap 520 at a position overlapping the empty portion 440 of the dowel fitting 400 with respect to the vertically long rear plate 510. When the gap 520 is opened, the bridge 530 may be formed by intermittently leaving a plurality of (for example, two) vertical line-shaped portions and pressing them so as to push them up to the front side.

図8は、透かしレンガ積み壁材の構築方法で使用するダボピンの斜視図である。図9は、ダボピンの正面図である。図10は、透かしレンガ積み壁材の構築方法によって構築された外壁においてレンガを交換する状況を説明する図である。 FIG. 8 is a perspective view of a dowel pin used in a method for constructing an openwork brick wall material. FIG. 9 is a front view of the dowel pin. FIG. 10 is a diagram illustrating a situation in which bricks are exchanged in an outer wall constructed by a method of constructing an openwork brick wall material.

図8、9に示すように、ダボピン600は、軸体610の下に下ダボ穴220の長さ以上に収縮可能なバネ材620が取り付けられる。バネ材620は、ダボピン600の軸体610と同径のコイルバネ等が用いられる。 As shown in FIGS. 8 and 9, in the dowel pin 600, a spring material 620 that can be contracted to a length equal to or longer than the length of the lower dowel hole 220 is attached under the shaft body 610. As the spring material 620, a coil spring or the like having the same diameter as the shaft body 610 of the dowel pin 600 is used.

外壁100を新設する場合は、下から順にレンガ200を積み上げていけば良い。ダボ用金具400の載板430にレンガ200を載せ、上側に載せるレンガ200の下ダボ穴220に挿せるように、ピン孔450及び上ダボ穴210にダボピン600を通しておけば良い。 When constructing a new outer wall 100, the bricks 200 may be stacked in order from the bottom. The brick 200 may be placed on the mounting plate 430 of the dowel metal fitting 400, and the dowel pin 600 may be passed through the pin hole 450 and the upper dowel hole 210 so that the brick 200 can be inserted into the lower dowel hole 220 of the brick 200 to be placed on the upper side.

図10に示すように、既設の外壁100において途中のレンガ200aを交換する場合は、既に載置されている下側のレンガ200bの上ダボ穴210にダボピン600bを押し込んで、ダボ用金具400の載板430を利用して、ダボピン600bのバネ材620の収縮を維持させる。なお、載板430のピン孔450を開閉式にしても良いし、ピン孔450を塞ぐために板材などのシャッターを介在させても良い。 As shown in FIG. 10, when replacing the brick 200a in the middle of the existing outer wall 100, the dowel pin 600b is pushed into the upper dowel hole 210 of the lower brick 200b already placed, and the dowel metal fitting 400 is used. The mounting plate 430 is used to maintain the contraction of the spring material 620 of the dowel pin 600b. The pin hole 450 of the mounting plate 430 may be opened / closed, or a shutter such as a plate material may be interposed to close the pin hole 450.

交換対象のレンガ200aの上ダボ穴210にダボピン600aを挿し、既に載置されている上側のレンガ200cを利用して、ダボピン600aのバネ材620の収縮を維持させつつ、レンガ200aを嵌め込む。 The dowel pin 600a is inserted into the upper dowel hole 210 of the brick 200a to be replaced, and the brick 200a is fitted while maintaining the contraction of the spring material 620 of the dowel pin 600a by using the upper brick 200c already placed.

レンガ200aが嵌め込まれると、ダボピン600aはバネ材620の収縮が解除されて上側のレンガ200cの下ダボ穴220に入り込む。また、レンガ200aが載置された載板430のピン孔450を開放することで、ダボピン600bのバネ材620の収縮が解除され、レンガ200aの下ダボ穴220に入り込む。 When the brick 200a is fitted, the dowel pin 600a is released from the contraction of the spring material 620 and enters the lower dowel hole 220 of the upper brick 200c. Further, by opening the pin hole 450 of the mounting plate 430 on which the brick 200a is placed, the contraction of the spring material 620 of the dowel pin 600b is released, and the brick 200a enters the lower dowel hole 220 of the brick 200a.

本発明によれば、積み上げられたレンガが部分的に破損した場合でも、全体的に組み直すことなく、破損したレンガだけを交換することができる。交換対象のレンガのみを破壊する等して取り除き、新たなレンガを上下から支持した状態で嵌め込むことができる。 According to the present invention, even if the stacked bricks are partially damaged, only the damaged bricks can be replaced without reassembling the entire bricks. Only the brick to be replaced can be removed by destroying it, and a new brick can be fitted while being supported from above and below.

以上、本発明の実施例を述べたが、これらに限定されるものではない。例えば、透かしレンガ積みだけでなく、他のレンガ積みにも適用することができる。また、レンガだけでなく、タイル、樹脂、木材、石材などの壁材にも適用することができる。 Examples of the present invention have been described above, but the present invention is not limited thereto. For example, it can be applied not only to openwork brickwork but also to other brickwork. Further, it can be applied not only to bricks but also to wall materials such as tiles, resins, woods and stones.

100:外壁
110:下地材
120:留具
130:接着剤
200:レンガ
210:上ダボ穴
220:下ダボ穴
300:目地材
400:ダボ用金具
410:背板
420:側板
430:載板
440:空部
450:ピン孔
460:留孔
500:補助プレート
510:後板
520:間隙
530:ブリッジ
540:通孔
600:ダボピン
610:軸体
620:バネ材
100: Outer wall 110: Base material 120: Fastener 130: Adhesive 200: Brick 210: Upper dowel hole 220: Lower dowel hole 300: Joint material 400: Dowel metal fittings 410: Back plate 420: Side plate 430: Mounting plate 440: Empty 450: Pin hole 460: Retain hole 500: Auxiliary plate 510: Rear plate 520: Gap 530: Bridge 540: Through hole 600: Dowel pin 610: Shaft body 620: Spring material

Claims (4)

第1段のレンガの左端側と第2段のレンガの右端側とが上下に重なり、各段において左右に隣接するレンガが間欠的に配置されるように、各段を互い違いに積み上げた透かしレンガ積み壁材の構築方法であって、
上面の左端側および右端側に上ダボ穴を空け、下面の左端側および右端側に前記上ダボ穴より浅い下ダボ穴を空けたレンガと、
前記レンガの上ダボ穴からその上側のレンガの下ダボ穴まで挿し込まれるダボピンと、
前記ダボピンを貫通可能に水平方向へ突出させることで前記レンガを載置する支持金具と、を有し、
前記ダボピンは、軸体の下に前記下ダボ穴の長さ以上に収縮可能なバネ材が取り付けられ、前記レンガの上ダボ穴に押し込んだときに前記支持金具にその上側のレンガが載置されるまで前記支持金具で収縮を維持させる、
ことを特徴とする透かしレンガ積み壁材の構築方法。
Openwork bricks in which the left end side of the first stage brick and the right end side of the second stage brick are stacked one above the other, and the bricks adjacent to the left and right are arranged intermittently in each stage. It is a method of constructing a building wall material,
Brick with upper dowel holes on the left and right ends of the upper surface and lower dowel holes shallower than the upper dowel holes on the left and right ends of the lower surface.
A dowel pin that is inserted from the upper dowel hole of the brick to the lower dowel hole of the brick above it,
It has a support bracket on which the brick is placed by projecting the dowel pin in the horizontal direction so as to be penetrateable.
A spring material that can be shrunk beyond the length of the lower dowel hole is attached to the dowel pin under the shaft body, and when the dowel pin is pushed into the upper dowel hole of the brick, the upper brick is placed on the support metal fitting. The support bracket keeps shrinking until
A method of constructing openwork brick wall materials.
前記支持金具は、下地材に当接させる背板から前記レンガを載置するための載板を切り出すことで前記レンガと前記下地材を接着するための空部を設け、さらに前記空部に前記下地材から浮くようにブリッジを形成することで接着剤を絡ませる、
ことを特徴とする請求項1に記載の透かしレンガ積み壁材の構築方法。
The support metal fitting is provided with an empty portion for adhering the brick and the base material by cutting out a mounting plate for placing the brick from a back plate that is brought into contact with the base material, and further, the empty portion is provided with an empty portion. The adhesive is entwined by forming a bridge so that it floats from the base material.
The method for constructing an openwork brick wall material according to claim 1.
前記バネ材は、前記ダボピンの軸体と同径のコイルバネである、
ことを特徴とする請求項1又は2に記載の透かしレンガ積み壁材の構築方法。
The spring material is a coil spring having the same diameter as the shaft body of the dowel pin.
The method for constructing an openwork brick wall material according to claim 1 or 2.
前記レンガとその上側のレンガとの間に前記ダボピンを囲むようにモルタル又はゴムの目地材が充填される、
ことを特徴とする請求項1乃至3の何れか一に記載の透かしレンガ積み壁材の構築方法。
A mortar or rubber joint material is filled between the brick and the brick above it so as to surround the dowel pin.
The method for constructing an openwork brick wall material according to any one of claims 1 to 3, wherein the openwork brick wall material is constructed.
JP2021115413A 2021-07-13 2021-07-13 How to build openwork brick wall lumber Active JP6945911B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2021115413A JP6945911B1 (en) 2021-07-13 2021-07-13 How to build openwork brick wall lumber

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2021115413A JP6945911B1 (en) 2021-07-13 2021-07-13 How to build openwork brick wall lumber

Publications (2)

Publication Number Publication Date
JP6945911B1 true JP6945911B1 (en) 2021-10-06
JP2023012022A JP2023012022A (en) 2023-01-25

Family

ID=77915193

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2021115413A Active JP6945911B1 (en) 2021-07-13 2021-07-13 How to build openwork brick wall lumber

Country Status (1)

Country Link
JP (1) JP6945911B1 (en)

Also Published As

Publication number Publication date
JP2023012022A (en) 2023-01-25

Similar Documents

Publication Publication Date Title
KR101691690B1 (en) Connections
KR100707134B1 (en) Improvements in or relating to building elements and methods in relation to same
AU2014275575B2 (en) Method and apparatus for forming a formwork for a concrete slab
CA2492250C (en) A molding equipment and method to manufacture stackable inter-engaging bricks, blocks, stones and the like with a smooth or embossed face
CN110130529A (en) A kind of prefabricated assembled wall block
JP6945911B1 (en) How to build openwork brick wall lumber
US1725200A (en) Wall tie
KR101588115B1 (en) Prefab double wall using truss deck and manufacturing method thereof
JP2008509302A (en) Masonry building blocks
JP6770771B1 (en) Beam bottom formwork
JP2002013226A (en) Block body
EP0111484A1 (en) Improvement in cement block walls
KR101639996B1 (en) Coupling Device for Apartment House Masonry Wall
JP3199083U (en) Intermediate unit block body for civil engineering building blocks
US11041318B1 (en) Load transfer plate apparatus
KR102261341B1 (en) Assembly type block
KR20200008077A (en) Concrete forming assembly
JP7416547B2 (en) Auxiliary parts and construction methods
JP7049692B2 (en) Masonry construction method
KR100717410B1 (en) Panel for both incorner and outcorner form for concrete structur
JP6545639B2 (en) Heat insulation type foundation of a building, separator used therefor, and construction method
JP3199085U (en) Top-end unit block body of a civil engineering building block
KR101827603B1 (en) Brick Connectors for Assembly
KR101456836B1 (en) Interial and exterial finish building material of building structure and method for buildin constructing using the same
KR200317090Y1 (en) Tapered Hollow Precast Concrete Pannel

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20210713

A871 Explanation of circumstances concerning accelerated examination

Free format text: JAPANESE INTERMEDIATE CODE: A871

Effective date: 20210713

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20210831

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20210908

R150 Certificate of patent or registration of utility model

Ref document number: 6945911

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150