JP6766429B2 - Capacity database construction device - Google Patents

Capacity database construction device Download PDF

Info

Publication number
JP6766429B2
JP6766429B2 JP2016088504A JP2016088504A JP6766429B2 JP 6766429 B2 JP6766429 B2 JP 6766429B2 JP 2016088504 A JP2016088504 A JP 2016088504A JP 2016088504 A JP2016088504 A JP 2016088504A JP 6766429 B2 JP6766429 B2 JP 6766429B2
Authority
JP
Japan
Prior art keywords
work
worker
time
acquisition unit
information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2016088504A
Other languages
Japanese (ja)
Other versions
JP2017199152A (en
Inventor
俊行 都築
俊行 都築
敏雄 青能
敏雄 青能
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JTEKT Corp
Original Assignee
JTEKT Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JTEKT Corp filed Critical JTEKT Corp
Priority to JP2016088504A priority Critical patent/JP6766429B2/en
Priority to DE102017108710.9A priority patent/DE102017108710A1/en
Priority to US15/496,118 priority patent/US11068812B2/en
Priority to CN201710281315.1A priority patent/CN107315393B/en
Publication of JP2017199152A publication Critical patent/JP2017199152A/en
Application granted granted Critical
Publication of JP6766429B2 publication Critical patent/JP6766429B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • General Factory Administration (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

本発明は、能力データベース構築装置に関するものである。 The present invention relates to a capability database construction device.

複数の処理機械(例えば、工作機械、産業ロボットなど)により構成される生産設備は、複数の対象物についての生産計画に従って実行される。ここで、生産設備には、作業者が全く関与しない完全自動化設備や、作業者が関与する非完全自動化設備が存在する。非完全自動化設備において、複数の処理機械による処理をするために、作業者は、例えば、処理機械の段取り替え、対象物の搬入出、処理機械の起動操作などの作業を行うことがある。 A production facility composed of a plurality of processing machines (for example, machine tools, industrial robots, etc.) is executed according to a production plan for a plurality of objects. Here, the production equipment includes a fully automated equipment in which a worker is not involved at all and a non-fully automated equipment in which a worker is involved. In a non-fully automated facility, in order to perform processing by a plurality of processing machines, an operator may perform operations such as setup change of the processing machine, loading / unloading of an object, and start operation of the processing machine.

そこで、生産計画に基づいて、複数の処理機械による処理と複数の処理機械に対する作業者による作業とに関する実行順序が規定された工程計画を決定し、作業者は、工程計画に従って作業を実行する。工程計画における作業者による作業として、例えば、処理機械の段取り替え、処理機械へ対象物の搬入、処理機械の起動操作の順に実行され、その後に処理機械による処理が実行される。 Therefore, based on the production plan, a process plan in which the execution order regarding the processing by the plurality of processing machines and the work by the workers on the plurality of processing machines is defined is determined, and the workers execute the work according to the process plans. As the work by the worker in the process plan, for example, the setup of the processing machine is executed, the object is carried into the processing machine, and the operation of starting the processing machine is executed in this order, and then the processing by the processing machine is executed.

ここで、作業者によって、作業能力が異なる。全ての作業を行うことができる熟練作業者もいれば、特定の作業しか行うことができない未熟作業者もいる。また、作業者によって、作業に要する時間も異なる。ここで、工程計画において、作業者による作業は、標準的な作業時間に基づいて決定されることが一般的である。そのため、作業者の作業能力を把握することは重要である。 Here, the working ability differs depending on the worker. Some skilled workers can perform all tasks, while others are immature workers who can only perform specific tasks. In addition, the time required for the work differs depending on the worker. Here, in the process plan, the work by the worker is generally determined based on the standard working time. Therefore, it is important to understand the working ability of the worker.

特許文献1には、作業員の作業実績に基づいて、作業員の技能を管理する技能管理システムが記載されている。技能管理システムは、作業員位置送信装置と技能管理装置を備える。作業員位置送信装置は、作業員の位置する作業エリアIDを取得し、作業員IDと作業エリアIDとを含む作業員位置データを送信する。技能管理装置は、作業員位置データを受信すると、時刻に関連づけてメモリに記憶するとともに、所定のタイミングで、作業員IDおよび作業エリアIDで関連づけられる時刻から、作業員の作業エリアにおける作業時間を算出して、作業員ID、作業エリアIDおよび作業時間を関連づけた作業時間データを記憶する作業員位置データ取得手段と、作業時間データに記憶された作業エリアIDを作業IDに変換するとともに、作業時間データの作業時間に基づいて、作業員データの作業員IDおよび作業IDに関連づけられた実績時間を更新する作業時間更新手段とを備える。 Patent Document 1 describes a skill management system that manages the skills of workers based on the work performance of the workers. The skill management system includes a worker position transmission device and a skill management device. The worker position transmission device acquires the work area ID in which the worker is located, and transmits the worker position data including the worker ID and the work area ID. When the skill management device receives the worker position data, it stores it in the memory in association with the time, and at a predetermined timing, the work time in the worker's work area is calculated from the time associated with the worker ID and the work area ID. A worker position data acquisition means that calculates and stores work time data associated with a worker ID, a work area ID, and a work time, and a work area ID stored in the work time data are converted into a work ID, and work is performed. A work time update means for updating the worker ID of the worker data and the actual time associated with the work ID based on the work time of the time data is provided.

特許文献2には、作業者間の通信効率、作業者の選択の効率を向上させ、高速なタスクの処理を行う自律協調制御装置が記載されている。この装置は、制御対象の状態から作業手順を決定し、その実行を管理する作業フロー管理手段と、作業フロー管理手段から命令された作業をタスクに分割し、タスク処理の管理を行う作業実行手段と、作業実行手段におけるタスクの処理制御中にタスクの属性とシステム内の作業者の能力を比較して、タスクの処理制御を支援する処理能力判定手段と、作業実行手段で実行完了した結果を基に、各作業者の能力値を変更する学習手段とを備える。 Patent Document 2 describes an autonomous coordinated control device that improves communication efficiency between workers and efficiency of worker selection, and performs high-speed task processing. This device determines a work procedure from the state of the controlled object, manages the execution of the work flow management means, divides the work instructed by the work flow management means into tasks, and manages the task processing. And, the processing capacity determination means that supports the processing control of the task by comparing the attribute of the task and the ability of the worker in the system during the processing control of the task in the work execution means, and the result of execution completion by the work execution means. Based on this, it is provided with a learning means for changing the ability value of each worker.

特許文献3には、生産計画に支障を出さずに、効率的に作業者の能力育成を行うことが可能な各作業工程への各作業者の配置態様を決定することのできる人員配置システムが記載されている。 Patent Document 3 describes a personnel allocation system capable of determining an arrangement mode of each worker in each work process capable of efficiently developing the ability of the operator without disturbing the production plan. Are listed.

人員配置システムは、製品の生産計画台数を含む生産計画情報が記憶された生産計画データベースと、製造工程における要素作業別の標準時間を含む要素作業情報が記憶された要素作業情報データベースと、各作業者の要素作業別のサイクルタイムを含む作業者情報が記憶された作業者情報データベースと、生産計画台数に基づいてタクトタイムを算出し、該タクトタイムと要素作業別の標準時間とに基づいて複数の作業工程に各要素作業を振り分け、各要素作業が振り分けられた各作業工程への各作業者の配置態様をタクトタイムと各作業者の要素作業別のサイクルタイムとに基づいて決定する人員配置決定手段とを備える。さらに、各作業者の要素作業別のサイクルタイムを調査するサイクルタイム調査手段を備え、該サイクルタイム調査手段にて調査された各作業者の要素作業別のサイクルタイムを元に作業者情報データベースの作業者情報を更新する。 The staffing system includes a production plan database that stores production plan information including the production plan number of products, an element work information database that stores element work information including standard time for each element work in the manufacturing process, and each work. A worker information database that stores worker information including cycle times for each elemental work of the person, and a plurality of tact times are calculated based on the planned number of production units, and the tact time and the standard time for each elemental work are used. Each element work is assigned to each work process, and the arrangement mode of each worker in each work process to which each element work is assigned is determined based on the tact time and the cycle time for each element work of each worker. It has a means of determination. Further, a cycle time investigating means for investigating the cycle time for each elemental work of each worker is provided, and the worker information database is provided based on the cycle time for each elemental work of each worker investigated by the cycle time investigating means. Update worker information.

特開2010−97490号公報Japanese Unexamined Patent Publication No. 2010-97490 特開平11−96011号公報JP-A-11-96011 特開2007−293690号公報Japanese Unexamined Patent Publication No. 2007-293690

複数の処理機械により構成される非完全自動化設備を対象とした場合には、作業者がどの位置から当該作業を開始したか、さらには作業者がどの位置にて当該作業を完了したによって、当該作業に要する作業時間は変化する。特に、1人の作業者が担当する処理機械の数が多いほど、作業ごとの作業時間を公正に評価されているとはいえない。 When targeting a non-fully automated facility consisting of multiple processing machines, the relevant work depends on the position where the worker started the work and the position where the worker completed the work. The work time required for the work changes. In particular, the greater the number of processing machines that one worker is in charge of, the less fair the working hours for each work are evaluated.

本発明は、複数の処理機械を構成する設備を対象とした場合に、公正に作業能力を評価することができる能力データベース構築装置を提供することを目的とする。 An object of the present invention is to provide a capacity database construction device capable of fairly evaluating work capacity when targeting equipment constituting a plurality of processing machines.

本発明に係る能力データベース構築装置は、複数の処理機械を備える設備を対象とし、前記複数の処理機械に対する作業者による作業能力のデータベースを構築する装置であって、前記設備における所定のホームポジションにおいて作業を開始及び完了したものとして、作業者による作業の開始時刻及び完了時刻を取得する作業状態取得部と、作業者により実行される作業種別を取得する作業種別取得部と、前記作業種別毎の作業時間を作業能力として記憶する能力データベースと、前記作業状態取得部により取得された情報及び前記作業種別取得部により取得された情報に基づいて、前記能力データベースの情報を更新するデータベース更新部とを備える。 The capacity database construction device according to the present invention is a device for constructing a database of work capacity by a worker for the plurality of processing machines for equipment provided with a plurality of processing machines, and at a predetermined home position in the equipment. Assuming that the work has been started and completed, a work state acquisition unit that acquires the start time and completion time of the work by the worker, a work type acquisition unit that acquires the work type executed by the worker, and each work type. An ability database that stores work time as work ability, and a database update unit that updates information in the ability database based on information acquired by the work state acquisition unit and information acquired by the work type acquisition unit. Be prepared.

本発明に係る能力データベース構築装置によれば、作業状態取得部は、所定のホームポジションを基準として、作業者による作業の開始時刻及び完了時刻を取得している。従って、作業者が設備のどの位置にいるとしても、ホームポジションを基準に作業時間を決定している。そのため、能力データベースに記憶される作業能力は、作業者の公正な作業能力を評価した結果とできる。 According to the ability database construction device according to the present invention, the work state acquisition unit acquires the start time and the completion time of the work by the worker based on the predetermined home position. Therefore, no matter where the worker is in the equipment, the working time is determined based on the home position. Therefore, the work ability stored in the ability database can be the result of evaluating the fair work ability of the worker.

本実施形態の設備の配置図である。It is a layout drawing of the equipment of this embodiment. 設備の内部構成を示す図である。It is a figure which shows the internal structure of the equipment. 図2の作業者端末(ホーム端末、携帯端末、操作盤)において、作業開始時の操作手順及び表示内容を示す図である。It is a figure which shows the operation procedure and display contents at the start of work in the worker terminal (home terminal, mobile terminal, operation panel) of FIG. 図2の作業者端末(ホーム端末、携帯端末、操作盤)において、作業完了時の操作手順及び表示内容を示す図である。It is a figure which shows the operation procedure and display contents at the time of work completion in the worker terminal (home terminal, mobile terminal, operation panel) of FIG. 図1及び図2に示す管理装置の構成を示す。The configuration of the management device shown in FIGS. 1 and 2 is shown. 図4の表示装置に表示される内容であって、初期工程計画、工程実績及び更新工程計画(予定計画)が表示される。The contents displayed on the display device of FIG. 4, the initial process plan, the process result, and the update process plan (planned plan) are displayed. 図4の工程計画更新部による処理を示すフローチャートである。It is a flowchart which shows the process by the process plan update part of FIG. 図4の能力データベースに記憶される作業者の作業能力の第一例を示す図である。It is a figure which shows the first example of the work ability of a worker stored in the ability database of FIG. 図4の能力データベースに記憶される作業者の作業能力の第二例を示す図である。It is a figure which shows the 2nd example of the work ability of a worker stored in the ability database of FIG. 図4の能力データベースに記憶される作業者の作業実績情報を示す図である。It is a figure which shows the work performance information of a worker stored in the ability database of FIG. 図4の作業状態取得部における作業開始時刻推定部による処理を示すフローチャートである。It is a flowchart which shows the process by the work start time estimation part in the work state acquisition part of FIG. 図4の作業状態取得部における作業完了時刻推定部による処理を示すフローチャートである。It is a flowchart which shows the process by the work completion time estimation part in the work state acquisition part of FIG. 図4の全作業者状態取得部により取得される情報を示す図である。It is a figure which shows the information acquired by the all worker state acquisition part of FIG. 図4の次作業決定部による処理を示すフローチャートである。It is a flowchart which shows the process by the next work decision part of FIG.

(1.設備1の構成)
本発明の実施形態の能力データベース構築装置を適用した設備1の構成について、図1を参照して説明する。設備1は、例えば、種々の対象物の生産を行う生産設備、対象物の搬送を行う物流設備などである。本実施形態においては、設備1は、機械加工を行う生産設備を例にあげる。また、当該設備1は、作業者が関与する非完全自動化設備である。つまり、設備1は、設備1を構成する処理機械MC1−MC8の処理を全て自動で稼働するのではなく、各処理機械MC1−MC8に対する作業者による作業を必要とする。
(1. Configuration of equipment 1)
The configuration of the facility 1 to which the capability database construction device of the embodiment of the present invention is applied will be described with reference to FIG. The equipment 1 is, for example, a production equipment for producing various objects, a distribution equipment for transporting the objects, and the like. In the present embodiment, the equipment 1 is, for example, a production equipment for machining. Further, the equipment 1 is a non-fully automated equipment in which a worker is involved. That is, the equipment 1 does not automatically operate all the processing of the processing machines MC1-MC8 constituting the equipment 1, but requires the work by the operator for each processing machine MC1-MC8.

図1に示すように、設備1は、8台の処理機械MC1−MC8、ホーム端末HP、複数の携帯端末W、管理装置Mを備える。生産の対象物は、例えば、円筒状の部材であるとする。 As shown in FIG. 1, the equipment 1 includes eight processing machines MC1-MC8, a home terminal HP, a plurality of mobile terminals W, and a management device M. The object of production is, for example, a cylindrical member.

処理機械MC1−MC8は、例えば、マシニングセンタ、旋盤、研削盤などの工作機械であり、処理機械MC1からMC8の順は、工程順である。処理機械MC1−MC8は、2列に配列されており、各列の処理機械MC1−MC8は、正面同士が対向するように配列される。 The processing machines MC1-MC8 are machine tools such as a machining center, a lathe, and a grinding machine, and the order of the processing machines MC1 to MC8 is the process order. The processing machines MC1-MC8 are arranged in two rows, and the processing machines MC1-MC8 in each row are arranged so that the front surfaces face each other.

処理機械MC1−MC8は、順に、外形の荒加工を行う旋盤、外形の中仕上げ加工を行う研削盤、内形の荒加工を行う旋盤、内形の中仕上げ加工を行う研削盤、外形のストレート部の仕上げ加工を行う研削盤、外形のテーパ部の仕上げ加工を行う研削盤、内形のストレート部の仕上げ加工を行う研削盤、内形のテーパ部の仕上げ加工を行う研削盤である。 The processing machines MC1-MC8 are, in order, a lathe that roughens the outer shape, a grinding machine that performs intermediate finishing of the outer shape, a lathe that roughens the inner shape, a grinding machine that performs intermediate finishing of the inner shape, and a straight of the outer shape. A lathe that finishes the part, a lathe that finishes the tapered part of the outer shape, a lathe that finishes the straight part of the inner shape, and a grinding machine that finishes the tapered part of the inner shape.

ホーム端末HPは、設備1のホームポジションPに設置される。ホームポジションPは、設備1の基準となる位置であって、作業上の観点から規定される位置である。ここで、ホーム端末HPは、作業者に対して作業指示を行うと共に、作業者による作業開始情報及び作業完了情報の入力処理を行うための装置である。作業者は、作業を開始及び完了の都度、ホーム端末HPにて入力処理を行う。そこで、作業者の移動距離の観点から、ホーム端末HPが設置されるホームポジションPは、設備1全体における中央付近としている。なお、ホーム端末HPが設置されるホームポジションPは、設備1の中央付近に限らず、設備1を構成する処理機械MC1−MC8の配列に応じて適宜決定される。 The home terminal HP is installed at the home position P of the equipment 1. The home position P is a reference position of the equipment 1 and is a position defined from the viewpoint of work. Here, the home terminal HP is a device for giving a work instruction to a worker and inputting work start information and work completion information by the worker. The worker performs input processing on the home terminal HP each time the work is started and completed. Therefore, from the viewpoint of the moving distance of the worker, the home position P where the home terminal HP is installed is set to be near the center of the entire facility 1. The home position P where the home terminal HP is installed is not limited to the vicinity of the center of the equipment 1, but is appropriately determined according to the arrangement of the processing machines MC1-MC8 constituting the equipment 1.

携帯端末Wは、ホーム端末HPと同様の機能を有し、作業者が携帯可能な端末である。つまり、携帯端末Wは、作業者に対して作業指示を行うと共に、作業者による作業開始情報及び作業完了情報の入力処理を行うための装置である。携帯端末Wは、ハンディタイプ、装着タイプの何れでもよい。ハンディタイプの例としては、タブレット、携帯電話、スマートフォンのような非装着型デバイスなどがある。装着タイプの例としては、腕バンドタイプ、眼鏡タイプ、イヤホンタイプ、ヘルメット取付タイプなどがある。 The mobile terminal W has the same function as the home terminal HP and is a terminal that can be carried by an operator. That is, the mobile terminal W is a device for giving a work instruction to the worker and inputting the work start information and the work completion information by the worker. The mobile terminal W may be either a handy type or a wearable type. Examples of handy types include non-wearable devices such as tablets, mobile phones and smartphones. Examples of wearing types include arm band type, eyeglass type, earphone type, and helmet mounting type.

ここで、ホーム端末HPと携帯端末Wとは、同様の機能を有するため、何れか一方を選択的に用いることができる。両者を用いる場合には、例えば、未熟作業者は、ホーム端末HPのみを使用し、熟練作業者は、ホーム端末HP及び携帯端末の両者を使用可能とすることもできる。後述するが、携帯端末Wを用いる場合には、作業能力の一つしての作業時間を推定することになるため、作業者の作業能力を正確に把握することができない。そこで、作業者の作業能力がある程度安定した状態になるまで、すなわち熟練作業者になれば、携帯端末Wを使用できるようにするとよい。 Here, since the home terminal HP and the mobile terminal W have the same functions, either one can be selectively used. When both are used, for example, an inexperienced worker can use only the home terminal HP, and a skilled worker can use both the home terminal HP and the mobile terminal. As will be described later, when the mobile terminal W is used, the working time as one of the working abilities is estimated, so that the working abilities of the worker cannot be accurately grasped. Therefore, it is preferable to enable the mobile terminal W to be used until the working ability of the worker becomes stable to some extent, that is, when the worker becomes a skilled worker.

管理装置Mは、処理機械MC1−MC8による処理、及び、処理機械MC1−MC8に対する作業者による作業について管理する。詳細には、管理装置Mは、稼働実績の把握機能、更新工程計画の作成機能、作業者に対する次作業指示機能、作業者の能力データベースの構築機能(本発明の能力データベース構築装置に相当する)を有する。管理装置Mは、処理機械MC1−MC8及びホーム端末HPと、有線又は無線の通信ネットワークにより接続される。管理装置Mは、携帯端末Wと無線の通信ネットワークにより接続される。 The management device M manages the processing by the processing machines MC1-MC8 and the work by the operator on the processing machines MC1-MC8. Specifically, the management device M has an operation record grasping function, an update process plan creation function, a next work instruction function for the worker, and a worker ability database construction function (corresponding to the ability database construction device of the present invention). Has. The management device M is connected to the processing machines MC1-MC8 and the home terminal HP by a wired or wireless communication network. The management device M is connected to the mobile terminal W by a wireless communication network.

(2.処理機械、ホーム端末及び携帯端末の内部構成)
次に、処理機械MC1−MC8、ホーム端末HP及び携帯端末Wの内部構成について、図2を参照して説明する。
(2. Internal configuration of processing machine, home terminal and mobile terminal)
Next, the internal configurations of the processing machines MC1-MC8, the home terminal HP, and the mobile terminal W will be described with reference to FIG.

処理機械MC1−MC8は、機械本体11、制御装置12、操作盤13及び機械撮像装置14を備える。操作盤13は、入力部13aと表示部13bとを備える。機械撮像装置14は、処理機械MC1−MC8の周囲を撮像し、特に作業者の動作情報を撮像するための装置である。 The processing machines MC1-MC8 include a machine body 11, a control device 12, an operation panel 13, and a machine imaging device 14. The operation panel 13 includes an input unit 13a and a display unit 13b. The machine imaging device 14 is a device for imaging the surroundings of the processing machines MC1-MC8, and particularly for capturing motion information of an operator.

ホーム端末HPは、入力部21と表示部22とを備える。携帯端末Wは、入力部31、表示部32、位置センサ33、携帯撮像装置34、生体情報センサ35、加速度センサ36を備える。携帯端末Wの位置センサ33は、設備1内において携帯端末W自身の位置を認識するためのセンサであって、例えばGPSセンサである。携帯撮像装置34は、作業者の視界を撮像する。生体情報センサ35は、作業者の脈波や呼吸波を検出する。加速度センサ36は、作業者の動き(例えば、歩行状態、起立状態など)に応じた信号を検出する。 The home terminal HP includes an input unit 21 and a display unit 22. The mobile terminal W includes an input unit 31, a display unit 32, a position sensor 33, a mobile imaging device 34, a biological information sensor 35, and an acceleration sensor 36. The position sensor 33 of the mobile terminal W is a sensor for recognizing the position of the mobile terminal W itself in the equipment 1, and is, for example, a GPS sensor. The portable imaging device 34 captures the field of view of the operator. The biological information sensor 35 detects the pulse wave and the respiratory wave of the worker. The acceleration sensor 36 detects a signal according to the movement of the operator (for example, walking state, standing state, etc.).

操作盤13の入力部13a、ホーム端末HPの入力部21、及び、携帯端末Wの入力部31は、例えば、タッチ操作による入力が可能なタッチパネル、機械式ボタンなどである。 The input unit 13a of the operation panel 13, the input unit 21 of the home terminal HP, and the input unit 31 of the mobile terminal W are, for example, a touch panel capable of input by touch operation, a mechanical button, and the like.

(3.作業者端末の構成及び操作手順)
操作盤13、ホーム端末HP及び携帯端末Wは、作業者に対する指示を行うと共に、作業者による入力処理を行うための装置であるため、以下において、総称して作業者端末13,HP,Wと称する。作業者端末13,HP,Wの構成について、図3A及び図3Bを参照して説明する。
(3. Configuration and operation procedure of worker terminal)
Since the operation panel 13, the home terminal HP, and the mobile terminal W are devices for giving instructions to the worker and performing input processing by the worker, they are collectively referred to as the worker terminals 13, HP, and W below. Refer to. The configurations of the worker terminals 13, HP, and W will be described with reference to FIGS. 3A and 3B.

作業者端末13、HP,Wは、図3A及び図3Bに示すように、次作業又は現在作業を表示するための作業表示欄41、次作業候補の一覧を表示するための候補欄42、作業者名ボタン、作業者毎に作業の開始ボタン、完了ボタン、キャンセルボタンを表示する入力欄43を備える。 As shown in FIGS. 3A and 3B, the worker terminals 13, HP, and W have a work display column 41 for displaying the next work or the current work, a candidate column 42 for displaying a list of next work candidates, and a work. It is provided with an input field 43 for displaying a person name button, a work start button, a completion button, and a cancel button for each worker.

作業表示欄41には、作業対象の処理機械MC1−MC8、及び、作業種別が記載される。さらに、作業表示欄41には、図3Aに示すように、次作業を開始しようとする作業者に対して次作業を指示する欄として機能するとともに、図3Bに示すように、現在作業の完了処理をしようとする作業者に対して現在作業を表示する欄として機能する。 In the work display column 41, the processing machines MC1-MC8 to be worked and the work type are described. Further, as shown in FIG. 3A, the work display column 41 functions as a column for instructing the worker who is about to start the next work to perform the next work, and as shown in FIG. 3B, the current work is completed. It functions as a column for displaying the current work to the worker who is going to process.

候補欄42には、現在作業者により実行できる作業(以下、次作業候補と称する)が表示されており、作業対象の処理機械MC1−MC8、及び、作業種別が記載される。さらに、候補欄42には、複数の次作業候補が表示される場合には、優先順位も表示される。 In the candidate column 42, the work that can be executed by the worker (hereinafter referred to as the next work candidate) is displayed, and the processing machines MC1-MC8 to be worked and the work type are described. Further, in the candidate column 42, when a plurality of next work candidates are displayed, the priority order is also displayed.

次に、作業者が次作業を開始する場合において、作業者による操作手順について図3Aを参照して説明する。ここで、作業者端末13,HP,Wの候補欄42には、現在実行可能な次作業候補が常時表示されている。そして、現在作業を行っていない作業者は、作業者端末13、HP,Wの自身の作業者名ボタンをタッチする(図3Aの(1)にて図示)。そうすると、作業者端末13,HP,Wの作業表示欄41には、次作業が表示される(図3Aの(2)にて図示)。この次作業は、候補欄42に表示されている次作業候補の中の一つである。つまり、作業者は、作業者端末13,HP,Wにより次作業を指示される。続いて、作業者は、開始ボタンをタッチして(図3Aの(3)にて図示)、指示された次作業に取りかかる。 Next, when the worker starts the next work, the operation procedure by the worker will be described with reference to FIG. 3A. Here, in the candidate column 42 of the worker terminals 13, HP, and W, the next work candidate that can be executed at present is always displayed. Then, the worker who is not currently working touches his / her own worker name button on the worker terminal 13, HP, W (shown in (1) of FIG. 3A). Then, the next work is displayed in the work display column 41 of the worker terminals 13, HP, and W (shown in (2) of FIG. 3A). This next work is one of the next work candidates displayed in the candidate column 42. That is, the worker is instructed to perform the next work by the worker terminals 13, HP, and W. Subsequently, the operator touches the start button (shown in (3) of FIG. 3A) and starts the next work instructed.

次に、作業者が現在作業を完了する場合において、作業者による操作手順について図3Aを参照して説明する。処理機械MC1−MC8における作業を完了した作業者は、作業者端末13、HP,Wの自身の作業者名ボタンをタッチする(図3Bの(1)にて図示)。そうすると、作業者端末13,HP,Wの作業表示欄41には、現在行っていた作業が表示される(図3Bの(2)にて図示)。つまり、作業者は、作業表示欄41にて、現在行っていた作業を確認できる。続いて、作業者は、完了ボタンをタッチして(図3Bの(3)にて図示)又は処理機械MC1−MC8からの信号等により、現在行っていた作業を完全に完了する。 Next, when the worker currently completes the work, the operation procedure by the worker will be described with reference to FIG. 3A. A worker who has completed the work on the processing machines MC1-MC8 touches his / her own worker name button on the worker terminals 13, HP, and W (shown in (1) of FIG. 3B). Then, the work currently being performed is displayed in the work display column 41 of the worker terminals 13, HP, and W (shown in (2) of FIG. 3B). That is, the worker can confirm the work currently being performed in the work display column 41. Subsequently, the operator touches the completion button (shown in (3) of FIG. 3B) or receives a signal from the processing machines MC1-MC8 or the like to completely complete the work currently being performed.

(4.管理装置の概要)
次に、管理装置Mの概要について、図4を参照して説明する。管理装置Mは、図4に示すように、工程計画記憶部51、機械状態取得部52、実行作業者取得部53、位置情報取得部54、作業状態取得部55、工程実績記憶部56、能力データベース57、次作業候補抽出部58、全作業者状態取得部59、次作業決定部60、初期工程計画取得部61、工程計画更新部62、表示装置63、作業種別取得部64、機械撮像情報取得部71、視界情報取得部72、生体情報取得部73、加速度情報取得部74、操作順序情報取得部75、データベース更新部76を備える。
(4. Outline of management device)
Next, the outline of the management device M will be described with reference to FIG. As shown in FIG. 4, the management device M includes a process plan storage unit 51, a machine state acquisition unit 52, an execution worker acquisition unit 53, a position information acquisition unit 54, a work state acquisition unit 55, a process result storage unit 56, and an ability. Database 57, next work candidate extraction unit 58, all worker status acquisition unit 59, next work decision unit 60, initial process plan acquisition unit 61, process plan update unit 62, display device 63, work type acquisition unit 64, machine imaging information The acquisition unit 71, the visibility information acquisition unit 72, the biological information acquisition unit 73, the acceleration information acquisition unit 74, the operation order information acquisition unit 75, and the database update unit 76 are provided.

管理装置Mを構成する各部のうち、機械状態取得部52は、処理機械MC1−MC8の制御装置12から処理機械MC1−MC8の現在状態(稼働状態)に関する情報を取得する。機械撮像情報取得部71は、処理機械MC1−MC8の機械撮像装置14により札奏された情報を取得する。また、実行作業者取得部53、位置情報取得部54、作業状態取得部55、視界情報取得部72、生体情報取得部73、加速度情報取得部74、操作順序情報取得部75は、作業者端末13,HP,Wから、実行作業者の情報、位置情報、作業状態に関する情報、視界情報、生体情報、加速度情報、操作順序情報を取得する。 Among the units constituting the management device M, the machine state acquisition unit 52 acquires information on the current state (operating state) of the processing machine MC1-MC8 from the control device 12 of the processing machine MC1-MC8. The machine image pickup information acquisition unit 71 acquires the information played by the machine image pickup device 14 of the processing machines MC1-MC8. Further, the execution worker acquisition unit 53, the position information acquisition unit 54, the work state acquisition unit 55, the visual field information acquisition unit 72, the biological information acquisition unit 73, the acceleration information acquisition unit 74, and the operation order information acquisition unit 75 are the operator terminals. From 13, HP, W, information on the executing worker, position information, information on the working state, visual field information, biological information, acceleration information, and operation sequence information are acquired.

実行作業者取得部53は、作業者端末13,HP,Wにおいて、タッチされた作業者名ボタンに対応する作業者の情報を、実行作業者として取得する。つまり、実行作業者取得部53は、作業を実行する作業者のID情報(作業者の名称など)を取得する。管理装置Mを構成する他部は、管理装置M内に処理を行う部位であり、後に詳述する。 The execution worker acquisition unit 53 acquires the information of the worker corresponding to the touched worker name button on the worker terminals 13, HP, and W as the execution worker. That is, the execution worker acquisition unit 53 acquires the ID information (name of the worker, etc.) of the worker who executes the work. The other part that constitutes the management device M is a part that performs processing in the management device M, and will be described in detail later.

ここで、管理装置Mは、上述したように、稼働実績の把握機能、更新工程計画の作成機能、作業者に対する次作業指示機能、作業者の能力データベースの構築機能(本発明の能力データベース構築装置に相当する)を有する。稼働実績の把握機能は、工程計画記憶部51、機械状態取得部52、位置情報取得部54、作業状態取得部55、工程実績記憶部56、表示装置63、作業種別取得部64により構成される。 Here, as described above, the management device M has an operation record grasping function, an update process plan creation function, a next work instruction function for the worker, and a worker ability database construction function (the ability database construction device of the present invention). Corresponds to). The operation record grasping function is composed of a process plan storage unit 51, a machine state acquisition unit 52, a position information acquisition unit 54, a work state acquisition unit 55, a process record storage unit 56, a display device 63, and a work type acquisition unit 64. ..

更新工程計画の作成機能は、工程計画記憶部51、工程実績記憶部56、初期工程計画取得部61、工程計画更新部62により構成される。作業者に対する次作業指示機能は、工程計画記憶部51、機械状態取得部52、実行作業者取得部53、位置情報取得部54、作業状態取得部55、能力データベース57、次作業候補抽出部58、全作業者状態取得部59、次作業決定部60により構成される。 The update process plan creation function is composed of a process plan storage unit 51, a process result storage unit 56, an initial process plan acquisition unit 61, and a process plan update unit 62. The next work instruction function for the worker includes a process plan storage unit 51, a machine state acquisition unit 52, an execution worker acquisition unit 53, a position information acquisition unit 54, a work state acquisition unit 55, an ability database 57, and a next work candidate extraction unit 58. , All worker status acquisition unit 59, and next work determination unit 60.

作業者の能力データベースの構築機能は、能力データベース57、位置情報取得部54、作業種別取得部64、機械撮像情報取得部71、視界情報取得部72、生体情報取得部73、加速度情報取得部74、操作順序情報取得部75、データベース更新部76により構成される。 The functions for constructing the ability database of the worker include the ability database 57, the position information acquisition unit 54, the work type acquisition unit 64, the machine imaging information acquisition unit 71, the visual field information acquisition unit 72, the biological information acquisition unit 73, and the acceleration information acquisition unit 74. , Operation order information acquisition unit 75, and database update unit 76.

(5.稼働実績の把握機能)
管理装置Mの稼働実績の把握機能について、図4及び図5を参照して説明する。まずは、稼働実績の把握機能に用いられる初期工程計画、工程実績及び更新工程計画について、図5を参照して説明する。
(5. Operation record grasping function)
The function of grasping the operation record of the management device M will be described with reference to FIGS. 4 and 5. First, the initial process plan, the process result, and the update process plan used for the function of grasping the operation record will be described with reference to FIG.

図5は、表示装置63に表示される内容である。図5には、現在時刻を表すペースメーカー、工程計画記憶部51に記憶される対象物毎の初期工程計画、工程計画記憶部51に記憶される対象物毎の更新工程計画、及び、工程実績記憶部56に記憶される対象物毎の工程実績が表示される。対象物1a,1b,1cは、同種の対象物であって、対象物2a,2b,2cは、同種の対象物である。ここで、対象物とは、生産設備においては生産対象物(工作物、組立品など)であり、物流設備において物流対象物(搬送物)である。また、対象物1a,1b,1cと、対象物2a,2b,2cと、対象物3とは、異種の対象物である。 FIG. 5 shows the contents displayed on the display device 63. FIG. 5 shows a pacemaker representing the current time, an initial process plan for each object stored in the process plan storage unit 51, an update process plan for each object stored in the process plan storage unit 51, and process result storage. The process results for each object stored in the unit 56 are displayed. The objects 1a, 1b, and 1c are objects of the same type, and the objects 2a, 2b, and 2c are objects of the same type. Here, the object is a production object (workpiece, assembly, etc.) in the production equipment, and a distribution object (transported object) in the distribution equipment. Further, the objects 1a, 1b, 1c, the objects 2a, 2b, 2c, and the object 3 are different objects.

ここで、工程計画とは、複数の処理機械MC1−MC8による処理と複数の処理機械に対する作業者による作業とに関する実行順序が規定された計画である。初期工程計画及び更新工程計画は、工程計画記憶部51に記憶されている。初期工程計画とは、対象物の生産計画に基づいて、管理者によって予め決定される。さらに、初期工程計画は、標準の作業能力を有する作業者による作業時間に基づき設定された工程計画である。更新工程計画とは、処理機械の稼働実績及び作業者の作業実績に応じて、初期工程計画を更新した工程計画である。工程実績とは、処理機械MC1−MC8による処理実績、及び、作業者による作業実績を表す。工程実績は、工程実績記憶部56に記憶されている。 Here, the process plan is a plan in which the execution order regarding the processing by the plurality of processing machines MC1-MC8 and the work by the operator on the plurality of processing machines is defined. The initial process plan and the updated process plan are stored in the process plan storage unit 51. The initial process plan is determined in advance by the manager based on the production plan of the object. Further, the initial process plan is a process plan set based on the work time by a worker having a standard work capacity. The update process plan is a process plan in which the initial process plan is updated according to the operation record of the processing machine and the work record of the worker. The process results represent the processing results by the processing machines MC1-MC8 and the work results by the operator. The process results are stored in the process results storage unit 56.

図5において、ペースメーカーの表示より、現在時刻が23時30分頃であることが分かる。初期工程計画は、図5の対象物毎の初期計画欄に表示されている。初期計画欄において、白抜き実線枠は、作業者による作業であり、ハッチング実線枠は、処理機械MC1−MC8による処理である。 In FIG. 5, it can be seen from the display of the pacemaker that the current time is around 23:30. The initial process plan is displayed in the initial plan column for each object in FIG. In the initial plan column, the white solid line frame is the work by the operator, and the hatching solid line frame is the work by the processing machines MC1-MC8.

工程実績は、図5の対象物毎の実績予定欄のうち、白抜き実線枠及びハッチング実線枠である。実績予定欄において、白抜き実線枠は、作業者による作業実績であり、ハッチング実線枠は、処理機械MC1−MC8による処理実績である。更新工程計画は、図5の対象物毎の実績予定欄のうち、白抜き破線枠及びハッチング破線枠である。白抜き破線枠は、作業者による予定作業であり、ハッチング破線枠は、処理機械MC1−MC8による予定処理である。ここで、図5において、黒塗りは、現在実行している処理機械MC1−MC8による処理又は作業者による作業である。また、枠と枠の隙間は、処理機械MC1−MC8による処理も作業者による作業も行われない時間帯である。 The process results are the white solid line frame and the hatching solid line frame in the actual result schedule column for each object in FIG. In the actual result schedule column, the white solid line frame is the work result by the worker, and the hatching solid line frame is the processing result by the processing machines MC1-MC8. The update process plan is a white broken line frame and a hatched broken line frame in the actual result schedule column for each object in FIG. The white dashed line frame is the scheduled work by the operator, and the hatched broken line frame is the scheduled work by the processing machines MC1-MC8. Here, in FIG. 5, blackening is a process performed by the processing machines MC1-MC8 currently being executed or a work performed by an operator. Further, the gap between the frames is a time zone in which neither processing by the processing machines MC1-MC8 nor work by the operator is performed.

ここで、工程実績記憶部56は、処理機械MC1−MC8による処理実績及び作業者による作業実績を記憶する。処理機械MC1−MC8による処理実績は、機械状態取得部52が取得する情報である。機械状態取得部52は、処理機械MC1−MC8の制御装置12から、処理機械MC1−MC8の現在状態(稼働状態)を取得する。 Here, the process record storage unit 56 stores the processing record by the processing machines MC1-MC8 and the work record by the operator. The processing results by the processing machines MC1-MC8 are information acquired by the machine state acquisition unit 52. The machine state acquisition unit 52 acquires the current state (operating state) of the processing machine MC1-MC8 from the control device 12 of the processing machine MC1-MC8.

また、作業者による作業実績は、作業状態取得部55及び作業種別取得部64が取得する情報である。作業状態取得部55は、作業実績の一つとして、作業者による作業状態に関する情報を取得する。ここで、作業者による作業状態に関する情報とは、作業開始時刻、作業完了時刻、並びに、作業中であるか作業完了状態であるかの情報である。 Further, the work record by the worker is information acquired by the work state acquisition unit 55 and the work type acquisition unit 64. The work state acquisition unit 55 acquires information on the work state by the worker as one of the work results. Here, the information on the work state by the worker is the work start time, the work completion time, and the information on whether the work is in progress or the work is completed.

さらに、作業種別取得部64は、作業実績の他の一つとして、作業者が実行する作業種別を取得する。作業種別取得部64は、後述する次作業決定部60により決定された次作業を取得することで、作業種別を取得している。なお、作業状態取得部55の処理及び次作業決定部60の処理の詳細は、後述する。 Further, the work type acquisition unit 64 acquires the work type to be executed by the worker as one of the work results. The work type acquisition unit 64 acquires the work type by acquiring the next work determined by the next work determination unit 60, which will be described later. The details of the processing of the work state acquisition unit 55 and the processing of the next work determination unit 60 will be described later.

(6.更新工程計画作成機能)
次に、管理装置Mの更新工程計画の作成機能について、図4−図6を参照して説明する。更新工程計画の作成機能は、工程計画記憶部51、工程実績記憶部56、初期工程計画取得部61、工程計画更新部62により構成される。
(6. Update process plan creation function)
Next, the function of creating the update process plan of the management device M will be described with reference to FIGS. 4 to 6. The update process plan creation function is composed of a process plan storage unit 51, a process result storage unit 56, an initial process plan acquisition unit 61, and a process plan update unit 62.

初期工程計画取得部61は、工程計画記憶部51に記憶されている初期工程計画を取得する。工程計画更新部62は、初期工程計画取得部61により取得された初期工程計画と、工程実績記憶部56に記憶されている工程実績とに基づいて、図5の破線枠にて示すような更新工程計画を作成する。 The initial process plan acquisition unit 61 acquires the initial process plan stored in the process plan storage unit 51. The process plan update unit 62 updates as shown by the broken line frame in FIG. 5 based on the initial process plan acquired by the initial process plan acquisition unit 61 and the process results stored in the process result storage unit 56. Create a process plan.

詳細には、工程計画更新部62による処理は、図6に示す。更新部62は、初期工程計画取得部61から初期工程計画を取得する(S1)。続いて、更新部62は、工程実績記憶部56に記憶されている実績が更新されたか否かを判定する(S2)。実績が更新されていなければ、更新部62は、更新されるまで判定処理を繰り返す(S2:No)。 Specifically, the process by the process plan update unit 62 is shown in FIG. The update unit 62 acquires the initial process plan from the initial process plan acquisition unit 61 (S1). Subsequently, the update unit 62 determines whether or not the record stored in the process record storage unit 56 has been updated (S2). If the actual result has not been updated, the update unit 62 repeats the determination process until it is updated (S2: No).

一方、実績が更新されていれば、更新部62は、工程実績に基づいて、工程計画を更新する(S3)。続いて、更新部62は、工程計画の全てが実行されたか否かを判定し、まだであればS2に戻り処理を繰り返す(S4:No)。一方、更新部62は、工程計画の全てが実行されていれば(S4:Yes)、処理を終了する。 On the other hand, if the actual result is updated, the update unit 62 updates the process plan based on the process actual result (S3). Subsequently, the update unit 62 determines whether or not all of the process plans have been executed, and if not, returns to S2 and repeats the process (S4: No). On the other hand, the update unit 62 ends the process if all of the process plans are executed (S4: Yes).

つまり、工程計画更新部62は、初期工程計画に対して工程実績に遅れが生じている場合には、この遅れを考慮して、将来の工程計画を決定する。このとき、作業者による作業時間は、標準な作業能力を有する作業者による作業時間に基づいて設定される。 That is, when the process result is delayed with respect to the initial process plan, the process plan update unit 62 determines the future process plan in consideration of this delay. At this time, the working time by the worker is set based on the working time by the worker having a standard working ability.

(7.能力データベース57)
次に、管理装置Mの作業者に対する次作業指示機能に用いられる能力データベース57について、図7A、図7Bを参照して説明する。図7Aは、第一例の能力データベース57であり、図7Bは、第二例の能力データベース57である。
(7. Ability database 57)
Next, the capacity database 57 used for the next work instruction function for the operator of the management device M will be described with reference to FIGS. 7A and 7B. FIG. 7A is the capacity database 57 of the first example, and FIG. 7B is the capacity database 57 of the second example.

能力データベース57は、複数の作業者及び複数の作業種別に関して、作業者毎に作業種別毎の作業能力を記憶する。作業種別としては、例えば、段取り、試加工、異常復帰処理などである。さらに、各情報は、処理機械MC1−MC8毎に記憶されている。 The ability database 57 stores the work ability for each work type for each worker with respect to the plurality of workers and the plurality of work types. The work types include, for example, setup, trial machining, and abnormality recovery processing. Further, each information is stored for each processing machine MC1-MC8.

図7Aに示すように、第一例の能力データベース57は、該当する作業種別について、各作業者が実行可能か否かの情報を有している。図中、○印は、当該作業種別を作業可能であることし表し、×印は、当該作業種別を作業不可であることを表す。作業者Aは、全ての作業種別を作業可能であるのに対して、作業者B,C,Dは、一部の作業種別のみを作業可能である。 As shown in FIG. 7A, the capacity database 57 of the first example has information on whether or not each worker can execute the corresponding work type. In the figure, a circle indicates that the work type can be worked, and a cross indicates that the work type cannot be worked. The worker A can work on all work types, while the workers B, C, and D can work on only some work types.

図7Bに示すように、第二例の能力データベース57は、該当する作業種別について、各作業者が作業可能か否か、作業可能であるとした場合に、習熟度レベルを含む。例えば、第二例の能力データベース57は、各作業者が作業可能である場合に、習熟度レベルとして、標準能力以上を有しているか、標準能力を有していないかを表す。図中、○印は、標準能力以上を有することを表し、△印は、標準能力を有していないことを表し、×印は、当該作業種別の実行不可であることを表す。 As shown in FIG. 7B, the ability database 57 of the second example includes, for the corresponding work type, whether or not each worker can work, and if it is possible to work, the proficiency level. For example, the ability database 57 of the second example shows whether each worker has a standard ability or higher or does not have a standard ability as a proficiency level when each worker can work. In the figure, ◯ indicates that the work type has the standard ability or higher, Δ indicates that the standard ability is not possessed, and × indicates that the work type cannot be executed.

さらに、能力データベース57は、図8に示す作業実績情報を有する。作業実績情報は、作業者毎且つ作業種別毎に、作業時間、機械作業時間、位置情報、生体情報、加速度情報、携帯撮像装置34により撮像された視界情報、機械撮像装置14により撮像された情報、操作手順情報を含む。作業時間とは、ホームポジションPを基準とした場合の作業の開始から完了までの時間である。機械作業時間とは、処理機械MC1−MC8に対して直接作業している時間である。機械作業時間は、操作盤13に対する操作、位置情報、機械撮像情報、視界情報、加速度情報などにより求めることができる。操作手順情報とは、作業者による操作盤13の操作手順に関する情報である。 Further, the capacity database 57 has the work record information shown in FIG. The work record information includes work time, machine work time, position information, biological information, acceleration information, field of view information captured by the portable imaging device 34, and information captured by the machine imaging device 14 for each worker and each work type. , Includes operating procedure information. The working time is the time from the start to the completion of the work when the home position P is used as a reference. The machine working time is the time during which the processing machines MC1-MC8 are directly worked. The machine working time can be obtained from the operation of the operation panel 13, position information, machine imaging information, field of view information, acceleration information, and the like. The operation procedure information is information related to the operation procedure of the operation panel 13 by the operator.

(8.能力データベースの構築機能)
能力データベース57は、上述したように、多数の作業実績情報を有している。この構築処理は、データベース更新部76が行う。つまり、データベース更新部76は、位置情報取得部54、作業種別取得部64、機械撮像情報取得部71、視界情報取得部72、生体情報取得部73、加速度情報取得部74、操作順序情報取得部75から情報を取得して、能力データベース57を更新する。ここで、同一の対象物について複数回の作業を行う場合には、最新の情報を記憶する。
(8. Ability database construction function)
As described above, the capacity database 57 has a large amount of work record information. This construction process is performed by the database update unit 76. That is, the database update unit 76 includes a position information acquisition unit 54, a work type acquisition unit 64, a machine imaging information acquisition unit 71, a field of view information acquisition unit 72, a biological information acquisition unit 73, an acceleration information acquisition unit 74, and an operation order information acquisition unit. The ability database 57 is updated by acquiring information from 75. Here, when the same object is performed a plurality of times, the latest information is stored.

(9.作業状態取得部55による処理)
管理装置Mによる作業者に対する次作業指示機能及び稼働状態の把握機能に用いられる作業状態取得部55による処理について、図3A、図3B、図9及び図10を参照して説明する。作業状態取得部55は、作業開始時刻推定部55a及び作業完了時刻推定部55bを備える。
(9. Processing by work state acquisition unit 55)
The processing by the work state acquisition unit 55 used for the next work instruction function to the worker by the management device M and the operation state grasping function will be described with reference to FIGS. 3A, 3B, 9 and 10. The work state acquisition unit 55 includes a work start time estimation unit 55a and a work completion time estimation unit 55b.

図9に示すように、作業開始時刻推定部55aは、作業者端末13,HP,Wにより開始情報を取得したかを判定する(S11)。すなわち、推定部55aは、作業者が作業者端末13,HP,Wの図3Aに示す開始ボタンをタッチしたか否かを判定する。推定部55aは、開始情報を取得した場合には、操作された作業者端末がホーム端末HPであるか(S12)、ホーム端末HPでなければ携帯端末Wであるか(S13)を判定する。 As shown in FIG. 9, the work start time estimation unit 55a determines whether or not the start information has been acquired by the worker terminals 13, HP, and W (S11). That is, the estimation unit 55a determines whether or not the worker touches the start button shown in FIG. 3A of the worker terminals 13, HP, and W. When the start information is acquired, the estimation unit 55a determines whether the operated worker terminal is the home terminal HP (S12) or the mobile terminal W if it is not the home terminal HP (S13).

作業者がホーム端末HPを操作した場合には(S12:Yes)、推定部55aは、開始ボタンをタッチした現在時刻を開始時刻とする(S14)。作業者が携帯端末Wを操作した場合には(S12:No→S13:Yes)、推定部55aは、位置情報取得部54にて取得された携帯端末Wの位置情報を取得する(S15)。続いて、推定部55aは、作業者の標準移動速度と、携帯端末Wの現在位置からホームポジションPまでの距離に基づいて、作業者の移動時間を推定する(S16)。作業者の標準移動速度は、予め設定されている。続いて、推定部55aは、推定した移動時間を現在時刻に加算した時刻を、開始時刻として推定する(S17)。 When the worker operates the home terminal HP (S12: Yes), the estimation unit 55a sets the current time when the start button is touched as the start time (S14). When the worker operates the mobile terminal W (S12: No → S13: Yes), the estimation unit 55a acquires the position information of the mobile terminal W acquired by the position information acquisition unit 54 (S15). Subsequently, the estimation unit 55a estimates the movement time of the worker based on the standard movement speed of the worker and the distance from the current position of the mobile terminal W to the home position P (S16). The standard moving speed of the worker is preset. Subsequently, the estimation unit 55a estimates the time obtained by adding the estimated travel time to the current time as the start time (S17).

作業者が操作盤13を操作した場合には(S12:No→S13:No)、推定部55aは、作業者の標準移動速度と、操作された操作盤13の位置からホームポジションPまでの距離とに基づいて、作業者の移動時間を推定する(S18)。続いて、推定部55aは、推定した移動時間を現在時刻に加算した時刻を、開始時刻として推定する(S19)。 When the operator operates the operation panel 13 (S12: No → S13: No), the estimation unit 55a determines the standard movement speed of the operator and the distance from the position of the operated operation panel 13 to the home position P. Based on the above, the travel time of the worker is estimated (S18). Subsequently, the estimation unit 55a estimates the time obtained by adding the estimated travel time to the current time as the start time (S19).

図10に示すように、作業完了時刻推定部55bは、作業者端末13,HP,Wにより完了情報を取得したかを判定する(S21)。すなわち、推定部55bは、作業者が作業者端末13,HP,Wの図3Bに示す完了ボタンをタッチしたか否かを判定する。推定部55bは、完了情報を取得した場合には、操作された作業者端末がホーム端末HPであるか(S22)、ホーム端末HPでなければ携帯端末Wであるか(S23)を判定する。 As shown in FIG. 10, the work completion time estimation unit 55b determines whether the completion information has been acquired by the worker terminals 13, HP, and W (S21). That is, the estimation unit 55b determines whether or not the worker has touched the completion button shown in FIG. 3B of the worker terminals 13, HP, and W. When the completion information is acquired, the estimation unit 55b determines whether the operated worker terminal is the home terminal HP (S22) or the mobile terminal W if it is not the home terminal HP (S23).

作業者がホーム端末HPを操作した場合には(S22:Yes)、推定部55bは、完了ボタンをタッチした現在時刻を完了時刻とする(S24)。作業者が携帯端末Wを操作した場合には(S22:No→S23:Yes)、推定部55bは、位置情報取得部54にて取得された携帯端末Wの位置情報を取得する(S25)。続いて、推定部55bは、作業者の標準移動速度と、携帯端末Wの現在位置からホームポジションPまでの距離とに基づいて、作業者の移動時間を推定する(S26)。続いて、推定部55bは、推定した移動時間を現在時刻に加算した時刻を、完了時刻として推定する(S27)。 When the worker operates the home terminal HP (S22: Yes), the estimation unit 55b sets the current time when the completion button is touched as the completion time (S24). When the worker operates the mobile terminal W (S22: No → S23: Yes), the estimation unit 55b acquires the position information of the mobile terminal W acquired by the position information acquisition unit 54 (S25). Subsequently, the estimation unit 55b estimates the movement time of the worker based on the standard movement speed of the worker and the distance from the current position of the mobile terminal W to the home position P (S26). Subsequently, the estimation unit 55b estimates the time obtained by adding the estimated travel time to the current time as the completion time (S27).

作業者が操作盤13を操作した場合には(S22:No→S23:No)、推定部55bは、作業者の標準移動速度と、操作された操作盤13の位置からホームポジションPまでの距離とに基づいて、作業者の移動時間を推定する(S28)。続いて、推定部55bは、推定した移動時間を現在時刻に加算した時刻を、完了時刻として推定する(S29)。 When the operator operates the operation panel 13 (S22: No → S23: No), the estimation unit 55b determines the standard movement speed of the operator and the distance from the position of the operated operation panel 13 to the home position P. Based on the above, the travel time of the worker is estimated (S28). Subsequently, the estimation unit 55b estimates the time obtained by adding the estimated travel time to the current time as the completion time (S29).

(10.全作業者状態取得部59による取得情報)
管理装置Mによる作業者に対する次作業指示機能に用いられる全作業者状態取得部59による処理について、図11を参照して説明する。全作業者状態取得部59は、実行作業者取得部53により取得された実行作業者、及び、作業状態取得部55により取得された作業状態に関する情報を受け取る。詳細には、全作業者状態取得部59は、図11に示すように、作業者毎に、作業開始情報の入力時刻、ホームポジションPを基準とした作業開始の推定時刻(HP作業開始推定時刻)、作業完了情報の入力時刻、ホームポジションPを基準とした作業完了の推定時刻(HP作業完了推定時刻)を有する。
(10. Information acquired by the all worker status acquisition unit 59)
The processing by the all-worker state acquisition unit 59 used for the next work instruction function to the worker by the management device M will be described with reference to FIG. The all worker state acquisition unit 59 receives information on the execution worker acquired by the execution worker acquisition unit 53 and the work state acquired by the work state acquisition unit 55. Specifically, as shown in FIG. 11, the all worker state acquisition unit 59 sets the input time of the work start information and the estimated time of the work start based on the home position P (HP work start estimated time) for each worker. ), The input time of the work completion information, and the estimated time of work completion (HP work completion estimated time) based on the home position P.

さらに、全作業者状態取得部59は、作業者が、作業中であるか、作業完了した状態であるかの情報を有する。全作業者状態取得部59は、作業を開始した後にまだ完了していなければ作業中であると判定し、作業を完了した後にまだ開始していなければ作業完了状態であると判定する。 Further, the all worker state acquisition unit 59 has information on whether the worker is in the process of working or is in the state of completing the work. The all-worker status acquisition unit 59 determines that the work is in progress if it has not been completed after the work has been started, and determines that the work has been completed if it has not been started after the work has been completed.

さらに、全作業者状態取得部59は、作業中の作業者が指示された作業を完了する予測時刻を有する。このとき、全作業者状態取得部59は、次作業決定部60から作業者に指示した作業種別を取得することにより、作業種別に応じた標準作業時間を考慮して、予測時刻を算出する。 Further, the all-worker state acquisition unit 59 has an estimated time at which the working worker completes the instructed work. At this time, the all worker state acquisition unit 59 acquires the work type instructed to the worker from the next work determination unit 60, and calculates the predicted time in consideration of the standard work time according to the work type.

ここで、図11において、作業者Aは、作業中であって、作業開始入力時刻とHP作業開始推定時刻が同時刻である。つまり、作業者Aは、ホーム端末HPを用いて作業開始の操作を行っている。また、作業者Cも同様にホーム端末HPを用いて作業完了の操作を行っている。一方、作業者Dは、作業開始入力時刻とHP作業開始推定時刻が異なる。つまり、作業者Dは、携帯端末W又は操作盤13を用いて操作を行っている。作業者Bも同様である。 Here, in FIG. 11, the worker A is working, and the work start input time and the HP work start estimated time are the same time. That is, the worker A uses the home terminal HP to perform the work start operation. In addition, the worker C also performs the work completion operation using the home terminal HP in the same manner. On the other hand, the worker D has a different work start input time and an HP work start estimated time. That is, the worker D operates using the mobile terminal W or the operation panel 13. The same applies to worker B.

(11.次作業指示機能)
次に、管理装置Mによる作業者に対する次作業指示機能について、図3A、図4及び図12を参照して説明する。作業者に対する次作業指示機能は、工程計画記憶部51、機械状態取得部52、実行作業者取得部53、位置情報取得部54、作業状態取得部55、能力データベース57、次作業候補抽出部58、全作業者状態取得部59、次作業決定部60により構成される。
(11. Next work instruction function)
Next, the next work instruction function for the operator by the management device M will be described with reference to FIGS. 3A, 4 and 12. The next work instruction function for the worker includes a process plan storage unit 51, a machine state acquisition unit 52, an execution worker acquisition unit 53, a position information acquisition unit 54, a work state acquisition unit 55, an ability database 57, and a next work candidate extraction unit 58. , All worker status acquisition unit 59, and next work determination unit 60.

図4に示すように、次作業候補抽出部58は、機械状態取得部52により取得された複数の処理機械MC1−MC8の現在状態、及び、工程計画記憶部51に記憶されている工程計画を取得する。そして、次作業候補抽出部58は、処理機械MC1−MC8の現在状態及び工程計画に基づいて、作業者が行う次作業候補を抽出する。次作業候補は、設備1全体として、現在、作業者による作業を必要とする作業である。この次作業候補は、図3Aの作業者端末13,HP,Wの候補欄42に表示される。次作業候補抽出部58が、複数の次作業候補を抽出する場合には、複数の次作業候補について順位を決定する。順位についても、図3Aの候補欄42に表示される。 As shown in FIG. 4, the next work candidate extraction unit 58 captures the current states of the plurality of processing machines MC1-MC8 acquired by the machine state acquisition unit 52 and the process plan stored in the process plan storage unit 51. get. Then, the next work candidate extraction unit 58 extracts the next work candidate to be performed by the worker based on the current state and the process plan of the processing machines MC1-MC8. The next work candidate is a work that currently requires work by an operator for the entire facility 1. The next work candidate is displayed in the candidate column 42 of the worker terminals 13, HP, and W in FIG. 3A. When the next work candidate extraction unit 58 extracts a plurality of next work candidates, the next work candidate extraction unit 58 determines the order of the plurality of next work candidates. The ranking is also displayed in the candidate column 42 of FIG. 3A.

次に、次作業決定部60が、所定の作業者に対する次作業を決定する。次作業決定部60による処理については、図12を参照して説明する。決定部60は、実行作業者取得部53から実行作業者を取得したか否かを判定する(S31)。つまり、何れかの作業者が作業者端末13,HP,Wにて作業者ボタンをタッチした場合に、決定部60は、実行作業者を取得したと判定する。 Next, the next work determination unit 60 determines the next work for a predetermined worker. The processing by the next work determination unit 60 will be described with reference to FIG. The determination unit 60 determines whether or not the execution worker has been acquired from the execution worker acquisition unit 53 (S31). That is, when any worker touches the worker button on the worker terminals 13, HP, or W, the determination unit 60 determines that the execution worker has been acquired.

決定部60は、実行作業者を取得しなければ、処理を進めることはない(S31:No)。一方、決定部60は、実行作業者を取得したならば(S31:Yes)、全作業者状態取得部59から、当該実行作業者の状態を取得する(S32)。そして、決定部60は、当該実行作業者の状態が作業完了状態であるか否かを判定する(S33)。作業完了状態でなければ(S33:No)、決定部60は、S31に戻り処理を繰り返す。 The determination unit 60 does not proceed with the process unless the execution worker is acquired (S31: No). On the other hand, if the determination unit 60 acquires the execution worker (S31: Yes), the determination unit 60 acquires the status of the execution worker from the all worker state acquisition unit 59 (S32). Then, the determination unit 60 determines whether or not the state of the execution worker is the work completion state (S33). If it is not in the work completion state (S33: No), the determination unit 60 returns to S31 and repeats the process.

一方、作業完了状態であれば(S33:Yes)、次作業候補抽出部58により抽出された次作業候補を取得する(S34)。続いて、決定部60は、実行作業者の作業能力を、能力データベース57から取得する(S35)。続いて、決定部60は、全作業者状態取得部59から、他の作業者の状態を取得する(S36)。例えば、決定部60は、他の作業者で現在次作業を開始可能な状態であるか、他の作業者で間もなく作業を完了する状態であるかなどを取得する。続いて、決定部60は、他の作業者の作業能力を、能力データベース57から取得する(S37)。 On the other hand, if the work is completed (S33: Yes), the next work candidate extracted by the next work candidate extraction unit 58 is acquired (S34). Subsequently, the determination unit 60 acquires the work ability of the execution worker from the ability database 57 (S35). Subsequently, the determination unit 60 acquires the status of another worker from the all worker status acquisition unit 59 (S36). For example, the determination unit 60 acquires whether another worker is currently in a state where the next work can be started, or whether the other worker is in a state where the work will be completed soon. Subsequently, the determination unit 60 acquires the work ability of another worker from the ability database 57 (S37).

最後に、決定部60は、次作業候補、実行作業者の作業能力、他の作業者の状態、他の作業者の作業能力に基づいて、実行作業者に対する次作業を決定する(S38)。決定部60は、上位順位の次作業候補を実行作業者が作業可能か否かを判定し、作業可能な次作業候補を実行作業者の次作業とする。ただし、他の作業者も作業を開始することができる状態の場合には、当該実行作業者の作業能力と他の作業者の作業能力を考慮して、当該実行作業者の次作業を決定する。 Finally, the determination unit 60 determines the next work for the execution worker based on the next work candidate, the work ability of the execution worker, the state of the other worker, and the work ability of the other worker (S38). The determination unit 60 determines whether or not the next work candidate in the higher rank can be worked by the execution worker, and sets the workable next work candidate as the next work of the execution worker. However, if the work can be started by other workers, the next work of the execution worker is determined in consideration of the work ability of the execution worker and the work ability of the other worker. ..

例えば、図7Aに示すように、作業者Aは全ての作業種別の作業が可能であるが、作業者B,C,Dは、一部の作業種別のみの作業が可能である。作業者Aの次作業を決定する場合において、作業者Bが現在次作業を開始可能な状態、又は、作業者Bが間もなく次作業を開始可能な状態であるとする。このとき、作業者Aも作業者Bも作業可能な作業種別が、上位順位の次作業候補となっている場合には、決定部60は、下位順位の次作業候補を作業者Aに対する次作業とする。上位順位の次作業候補は、作業者Bの次作業として指示することができるが、下位順位の次作業候補は、作業者Bの次作業として指示できないことがある。そこで、上位順の次作業候補は、作業者Bに対する次作業とし、下位順位の次作業候補を、作業者Aに対する次作業とすることで、次作業候補を効率的に実行することができる。 For example, as shown in FIG. 7A, the worker A can work in all work types, but the workers B, C, and D can work in only some work types. When deciding the next work of the worker A, it is assumed that the worker B is in a state where the next work can be started at present, or a state in which the worker B can start the next work soon. At this time, if the work type that both the worker A and the worker B can work on is the next work candidate of the higher rank, the determination unit 60 sets the next work candidate of the lower rank as the next work for the worker A. And. The next work candidate of the higher rank can be instructed as the next work of the worker B, but the next work candidate of the lower rank may not be instructed as the next work of the worker B. Therefore, the next work candidate in the upper order is the next work for the worker B, and the next work candidate in the lower order is the next work for the worker A, so that the next work candidate can be efficiently executed.

ただし、下位順位の次作業候補を次作業として決定する場合には、工程計画を考慮する。下位順位の次作業候補を作業者の次作業として決定すると、工程計画に遅延を生じるおそれがある場合には、下位順位の次作業候補を作業者の次作業とするのではなく、やはり上位順位の次作業候補を作業者の次作業とする。 However, when determining the next work candidate in the lower rank as the next work, the process plan is considered. If the next work candidate of the lower rank is determined as the next work of the worker and there is a risk of delay in the process plan, the next work candidate of the lower rank is not set as the next work of the worker, but the next work candidate of the lower rank is also the higher rank. The next work candidate of is set as the next work of the worker.

また、工程計画に遅延が生じないのであれば、次作業決定部60は、標準能力より低い作業能力を有する作業者に対する次作業を決定することもできる。図5において、枠と枠の隙間は、処理機械MC1−MC8による処理も作業者による作業も行われない時間帯である。つまり、次作業決定部60は、この空白時間を利用することで、標準作業時間よりも長めに作業時間を設定して余裕を持たせ、作業能力の低い作業者に対する教育を行うこともできる。 Further, if there is no delay in the process plan, the next work determination unit 60 can determine the next work for the worker having a work capacity lower than the standard capacity. In FIG. 5, the gap between the frames is a time zone in which neither the processing by the processing machines MC1-MC8 nor the work by the operator is performed. That is, by using this blank time, the next work determination unit 60 can set the work time longer than the standard work time to allow a margin and educate the worker having a low work ability.

(12.実施形態の効果)
上記実施形態に係る管理装置Mの能力データベース構築機能(能力データベース構築装置に相当)は、複数の処理機械MC1−MC8を備える設備1を対象とし、複数の処理機械MC1−MC8に対する作業者による作業能力のデータベースを構築する装置である。能力データベース構築機能は、設備1におけるホームポジションPにおいて作業を開始及び完了したものとして、作業者による作業の開始時刻及び完了時刻を取得する作業状態取得部55と、作業者により実行される作業種別を取得する作業種別取得部64と、作業種別毎の作業時間を作業能力として記憶する能力データベース57と、作業状態取得部55により取得された情報及び作業種別取得部64により取得された情報に基づいて、能力データベース57の情報を更新するデータベース更新部76とを備える。
(12. Effect of Embodiment)
The capacity database construction function (corresponding to the capacity database construction device) of the management device M according to the above embodiment targets the equipment 1 provided with the plurality of processing machines MC1-MC8, and the work by the operator on the plurality of processing machines MC1-MC8. It is a device that builds a database of capabilities. The ability database construction function is assumed to have started and completed the work at the home position P in the facility 1, and the work state acquisition unit 55 that acquires the start time and the completion time of the work by the worker and the work type executed by the worker. Based on the work type acquisition unit 64 to acquire the work type, the ability database 57 that stores the work time for each work type as the work capacity, the information acquired by the work state acquisition unit 55, and the information acquired by the work type acquisition unit 64. It also includes a database update unit 76 that updates the information in the capability database 57.

上記能力データベース構築機能によれば、作業状態取得部55は、ホームポジションPを基準として、作業者による作業の開始時刻及び完了時刻を取得している。従って、作業者が設備1のどの位置にいるとしても、ホームポジションPを基準に作業時間を決定している。そのため、能力データベース57に記憶される作業能力は、作業者の公正な作業能力を評価した結果とできる。 According to the ability database construction function, the work state acquisition unit 55 acquires the start time and the completion time of the work by the worker with reference to the home position P. Therefore, no matter where the worker is in the equipment 1, the working time is determined based on the home position P. Therefore, the work ability stored in the ability database 57 can be the result of evaluating the fair work ability of the worker.

また、管理装置Mの能力データベース構築機能は、ホームポジションPに配置され、作業者により作業の開始及び完了を入力されるホーム端末HPを備える。作業状態取得部55は、ホーム端末HPに作業の開始が入力された時刻を開始時刻として取得し、ホーム端末HPに作業の完了が入力された時刻を完了時刻として取得する。ホームポジションPに配置されるホーム端末HPを用いて、作業者による作業の開始及び完了を入力することで、作業状態取得部55は、容易に、ホームポジションPを基準とした作業の開始時刻及び完了時刻を取得することができる。 Further, the ability database construction function of the management device M includes a home terminal HP which is arranged at the home position P and the start and completion of the work are input by the operator. The work state acquisition unit 55 acquires the time when the start of work is input to the home terminal HP as the start time, and acquires the time when the completion of work is input to the home terminal HP as the completion time. By inputting the start and completion of the work by the worker using the home terminal HP arranged at the home position P, the work state acquisition unit 55 can easily set the start time and the work start time based on the home position P. You can get the completion time.

また、管理装置Mの能力データベース構築機能は、ホームポジションPとは異なる位置にて作業者が携帯可能であり、作業者により作業の開始及び完了を入力される携帯端末Wを備える。作業状態取得部55は、携帯端末Wに作業の開始が入力された場合に、入力された時刻と、入力された時の携帯端末Wの位置からホームポジションPの位置までの距離とに基づいて、開始時刻を推定する作業開始時刻推定部55aと、携帯端末Wに作業の完了が入力された場合に、入力された時刻と、入力された時の携帯端末Wの位置からホームポジションPの位置までの距離とに基づいて、完了時刻を推定する作業完了時刻推定部55bとを備える。 Further, the ability database construction function of the management device M includes a mobile terminal W that can be carried by the worker at a position different from the home position P and in which the start and completion of the work are input by the worker. When the start of work is input to the mobile terminal W, the work state acquisition unit 55 is based on the input time and the distance from the position of the mobile terminal W to the position of the home position P at the time of input. , The position of the home position P from the input time and the position of the mobile terminal W at the time of input when the completion of the work is input to the work start time estimation unit 55a for estimating the start time and the mobile terminal W. It is provided with a work completion time estimation unit 55b that estimates the completion time based on the distance to.

作業者が携帯可能な携帯端末Wを用いて、作業者による作業の開始及び完了を入力した場合に、作業状態取得部55は、携帯端末Wの位置とホームポジションPの位置までの距離を考慮して、開始時刻及び完了時刻を推定している。従って、ホームポジションPとは異なる位置に作業者がいるときに、作業者が携帯端末Wにて作業の開始及び完了を入力したとしても、作業状態取得部55は、確実に、ホームポジションPを基準とした作業の開始時刻及び完了時刻を取得することができる。 When the worker inputs the start and completion of the work by the worker using the portable terminal W, the work state acquisition unit 55 considers the distance between the position of the mobile terminal W and the position of the home position P. Then, the start time and the completion time are estimated. Therefore, even if the worker inputs the start and completion of the work on the mobile terminal W when the worker is in a position different from the home position P, the work state acquisition unit 55 surely sets the home position P. It is possible to acquire the start time and the completion time of the reference work.

また、管理装置Mの能力データベース構築機能は、携帯端末Wの位置を取得する位置情報取得部54を備える。作業状態取得部55は、位置情報取得部54により取得される位置に基づいて開始時刻及び完了時刻を推定する。位置情報取得部54が、携帯端末Wの位置を取得することで、作業状態取得部55は、確実に、ホームポジションPを基準とした作業の開始時刻及び完了時刻を取得することができる。 Further, the ability database construction function of the management device M includes a position information acquisition unit 54 that acquires the position of the mobile terminal W. The work state acquisition unit 55 estimates the start time and the completion time based on the position acquired by the position information acquisition unit 54. When the position information acquisition unit 54 acquires the position of the mobile terminal W, the work state acquisition unit 55 can surely acquire the start time and the completion time of the work based on the home position P.

また、管理装置Mの能力データベース構築機能は、複数の処理機械MC1−MC8のそれぞれにおける操作盤13に設けられ、作業者により作業の開始及び完了を入力される入力部13a(操作盤入力装置に相当)を備える。作業状態取得部55は、操作盤13の入力部13aに作業の開始が入力された場合に、入力された時刻と、入力された時の操作盤13の入力部13aの位置からホームポジションPの位置までの距離とに基づいて、前記開始時刻を推定する作業開始時刻推定部55aと、操作盤13の入力部13aに作業の完了が入力された場合に、入力された時刻と、入力された時の操作盤13の入力部13aの位置からホームポジションPの位置までの距離とに基づいて、完了時刻を推定する作業完了時刻推定部55bとを備える。 Further, the capacity database construction function of the management device M is provided on the operation panel 13 of each of the plurality of processing machines MC1-MC8, and the input unit 13a (in the operation panel input device) for inputting the start and completion of the work by the operator. Equivalent). When the start of work is input to the input unit 13a of the operation panel 13, the work state acquisition unit 55 sets the home position P from the input time and the position of the input unit 13a of the operation panel 13 at the time of input. When the work completion is input to the work start time estimation unit 55a for estimating the start time and the input unit 13a of the operation panel 13 based on the distance to the position, the input time and the input time are input. A work completion time estimation unit 55b that estimates the completion time based on the distance from the position of the input unit 13a of the operation panel 13 to the position of the home position P is provided.

作業者が、処理機械MC1−MC8の操作盤13に設けられる入力部13aを用いて、作業者による作業の開始及び完了を入力した場合に、作業状態取得部55は、当該操作盤13の入力部13aの位置とホームポジションPの位置までの距離を考慮して、開始時刻及び完了時刻を推定している。従って、操作盤13を操作可能な位置に作業者がいるときに、作業者が操作盤13の入力部13aにて作業の開始及び完了を入力したとしても、作業状態取得部55は、確実に、ホームポジションPを基準とした作業の開始時刻及び完了時刻を取得することができる。 When the operator inputs the start and completion of the work by the operator using the input unit 13a provided on the operation panel 13 of the processing machines MC1-MC8, the work state acquisition unit 55 inputs the input of the operation panel 13. The start time and the completion time are estimated in consideration of the distance between the position of the unit 13a and the position of the home position P. Therefore, even if the operator inputs the start and completion of the work in the input unit 13a of the operation panel 13 when the operator is in a position where the operation panel 13 can be operated, the work state acquisition unit 55 reliably performs the work state acquisition unit 55. , The start time and the completion time of the work based on the home position P can be acquired.

また、管理装置Mの能力データベース構築機能は、作業者の生体情報取得部73を備える。データベース更新部76は、生体情報取得部73により取得された生体情報に基づいて、能力データベース57の情報を更新する。作業者の体調によって、作業時間が変化することがある。そこで、体調を認識できる生体情報を取得することで、作業者の作業能力を適切に記録することができる。 Further, the ability database construction function of the management device M includes a biological information acquisition unit 73 of the worker. The database update unit 76 updates the information in the ability database 57 based on the biometric information acquired by the biometric information acquisition unit 73. The working time may change depending on the physical condition of the worker. Therefore, by acquiring biometric information that can recognize the physical condition, the working ability of the worker can be appropriately recorded.

また、管理装置Mの能力データベース構築機能は、処理機械MC1−MC8に設けられる機械撮像装置14により撮像される情報を取得する機械撮像情報取得部71を備える。データベース更新部76は、機械撮像情報取得部71により取得された作業者の動作情報に基づいて、能力データベース57の情報を更新する。 Further, the capability database construction function of the management device M includes a machine imaging information acquisition unit 71 that acquires information captured by the machine imaging device 14 provided in the processing machines MC1-MC8. The database update unit 76 updates the information in the capability database 57 based on the operation information of the worker acquired by the machine imaging information acquisition unit 71.

機械撮像装置14により、作業者が処理機械MC1−MC8にて行った作業を記録することができる。つまり、作業者が、処理機械MC1−MC8の近傍にいる時間を把握することもできるし、処理機械MC1−MC8の近傍にてどのような手順で処理しているのかを把握することもできるし、作業者の表情や体調などを把握することもできる。つまり、機械撮像装置14により記録された情報を、能力データベース57に記憶することで、作業者の作業能力を適切に記録することができる。 The machine imaging device 14 can record the work performed by the operator on the processing machines MC1-MC8. That is, it is possible to grasp the time when the worker is in the vicinity of the processing machines MC1-MC8, and it is also possible to grasp what kind of procedure the worker is processing in the vicinity of the processing machines MC1-MC8. , It is also possible to grasp the facial expression and physical condition of the worker. That is, by storing the information recorded by the machine imaging device 14 in the ability database 57, the working ability of the operator can be appropriately recorded.

また、管理装置Mの能力データベース構築機能は、処理機械MC1−MC8の操作盤13に対する操作順序情報を取得する操作順序情報取得部75を備える。データベース更新部76は、操作順序情報取得部75により取得された作業者の操作順序情報に基づいて、能力データベース57の情報を更新する。操作盤13の入力部13aに対する操作順序には、効率の良い操作順序が存在すると考えられる。そこで、操作順序情報を取得することで、作業者の作業能力を適切に記録することができる。 Further, the capability database construction function of the management device M includes an operation order information acquisition unit 75 that acquires operation order information for the operation panel 13 of the processing machines MC1-MC8. The database update unit 76 updates the information in the capability database 57 based on the operation order information of the operator acquired by the operation order information acquisition unit 75. It is considered that there is an efficient operation sequence in the operation sequence for the input unit 13a of the operation panel 13. Therefore, by acquiring the operation order information, the work ability of the worker can be appropriately recorded.

また、管理装置Mの能力データベース構築機能は、作業者が携帯する携帯撮像装置34により撮像される視界情報を取得する視界情報取得部72を備える。データベース更新部76は、視界情報取得部72により撮像された作業者の視界情報に基づいて、能力データベース57の情報を更新する。作業者の視界情報により、作業者がどのように動作したかを把握することができる。つまり、作業者の視界情報を取得することで、作業者の動作が、効率の良い動作であるか否かを把握することができる。その結果、作業者の作業能力を適切に記録することができる。 Further, the ability database construction function of the management device M includes a field of view information acquisition unit 72 that acquires the field of view information imaged by the portable image pickup device 34 carried by the worker. The database update unit 76 updates the information in the ability database 57 based on the worker's field of view information captured by the field of view information acquisition unit 72. From the visual field information of the worker, it is possible to grasp how the worker operates. That is, by acquiring the visual field information of the worker, it is possible to grasp whether or not the movement of the worker is an efficient movement. As a result, the working ability of the worker can be appropriately recorded.

1:設備、 13:操作盤、 14:機械撮像装置、 33:位置センサ、 34:携帯撮像装置、 35:生体情報センサ、 36:加速度センサ、 51:工程計画記憶部、 52:機械状態取得部、 53:実行作業者取得部、 54:位置情報取得部、 55:作業状態取得部、 55a:作業開始時刻推定部、 55b:作業完了時刻推定部、 56:工程実績記憶部、 57:能力データベース、 58:次作業候補抽出部、 59:全作業者状態取得部、 60:次作業決定部、 61:初期工程計画取得部、 62:工程計画更新部、 63:表示装置、 64:作業種別取得部、 71:機械撮像情報取得部、 72:視界情報取得部、 73:生体情報取得部、 74:加速度情報取得部、 75:操作順序情報取得部、 76:データベース更新部、 HP:ホーム端末、 M:管理装置、 MC1―MC8:処理機械、 P:ホームポジション、 W:携帯端末 1: Equipment, 13: Operation panel, 14: Machine imaging device, 33: Position sensor, 34: Portable imaging device, 35: Biological information sensor, 36: Acceleration sensor, 51: Process plan storage unit, 52: Machine status acquisition unit , 53: Execution worker acquisition unit, 54: Position information acquisition unit, 55: Work status acquisition unit, 55a: Work start time estimation unit, 55b: Work completion time estimation unit, 56: Process record storage unit, 57: Capacity database , 58: Next work candidate extraction unit, 59: All worker status acquisition unit, 60: Next work decision unit, 61: Initial process plan acquisition unit, 62: Process plan update unit, 63: Display device, 64: Work type acquisition Unit, 71: Machine imaging information acquisition unit, 72: Vision information acquisition unit, 73: Biometric information acquisition unit, 74: Acceleration information acquisition unit, 75: Operation sequence information acquisition unit, 76: Database update unit, HP: Home terminal, M: Management device, MC1-MC8: Processing machine, P: Home position, W: Mobile terminal

Claims (7)

複数の処理機械を備える設備を対象とし、前記複数の処理機械に対する作業者による作業能力のデータベースを構築する装置であって、
前記設備の基準となる位置である所定のホームポジションを作業者による作業の開始位置及び完了位置とした場合に、作業者による作業の開始時刻及び完了時刻を取得する作業状態取得部と、
作業者により実行される作業種別を取得する作業種別取得部と、
前記作業種別毎の作業時間を作業能力として記憶する能力データベースと、
前記作業状態取得部により取得された情報及び前記作業種別取得部により取得された情報に基づいて、前記能力データベースの情報を更新するデータベース更新部と、
前記所定のホームポジションとは異なる位置にて作業者が携帯可能であり、作業者により作業の開始及び完了を入力される携帯端末と、
を備え
前記作業状態取得部は、
前記携帯端末に作業の開始が入力された場合に、入力された時刻と、入力された時の前記携帯端末の位置から前記所定のホームポジションの位置までの距離とに基づいて、前記開始時刻を推定する作業開始時刻推定部と、
前記携帯端末に作業の完了が入力された場合に、入力された時刻と、入力された時の前記携帯端末の位置から前記所定のホームポジションの位置までの距離とに基づいて、前記完了時刻を推定する作業完了時刻推定部と、
を備える、能力データベース構築装置。
A device for constructing a database of work capacity of workers for the plurality of processing machines for equipment equipped with a plurality of processing machines.
A work state acquisition unit that acquires the start time and completion time of the work by the worker when the predetermined home position , which is the reference position of the equipment , is set as the start position and the finish position of the work by the worker.
Work type acquisition unit that acquires the work type executed by the worker,
An ability database that stores the work time for each work type as work ability,
A database update unit that updates the information of the ability database based on the information acquired by the work state acquisition unit and the information acquired by the work type acquisition unit.
A mobile terminal that can be carried by a worker at a position different from the predetermined home position and in which the worker inputs the start and completion of the work.
Equipped with a,
The work state acquisition unit
When the start of work is input to the mobile terminal, the start time is set based on the input time and the distance from the position of the mobile terminal to the position of the predetermined home position at the time of input. Work start time estimation unit to estimate and
When the completion of work is input to the mobile terminal, the completion time is set based on the input time and the distance from the position of the mobile terminal to the position of the predetermined home position at the time of input. Work completion time estimation unit to estimate and
Ru with a capability database construction apparatus.
前記能力データベース構築装置は、前記携帯端末の位置を取得する位置情報取得部を備え、
前記作業状態取得部は、前記位置情報取得部により取得される位置に基づいて前記開始時刻及び前記完了時刻を推定する、請求項1に記載の能力データベース構築装置。
The capability database construction device includes a position information acquisition unit that acquires the position of the mobile terminal.
The capability database construction device according to claim 1 , wherein the work state acquisition unit estimates the start time and the completion time based on the position acquired by the position information acquisition unit.
複数の処理機械を備える設備を対象とし、前記複数の処理機械に対する作業者による作業能力のデータベースを構築する装置であって、
前記設備の基準となる位置である所定のホームポジションを作業者による作業の開始位置及び完了位置とした場合に、作業者による作業の開始時刻及び完了時刻を取得する作業状態取得部と、
作業者により実行される作業種別を取得する作業種別取得部と、
前記作業種別毎の作業時間を作業能力として記憶する能力データベースと、
前記作業状態取得部により取得された情報及び前記作業種別取得部により取得された情報に基づいて、前記能力データベースの情報を更新するデータベース更新部と、
複数の前記処理機械のそれぞれにおける操作盤に設けられ、作業者により作業の開始及び完了を入力される操作盤入力装置と、
を備え
前記作業状態取得部は、
前記操作盤入力装置に作業の開始が入力された場合に、入力された時刻と、入力された時の前記操作盤入力装置の位置から前記所定のホームポジションの位置までの距離とに基づいて、前記開始時刻を推定する作業開始時刻推定部と、
前記操作盤入力装置に作業の完了が入力された場合に、入力された時刻と、入力された時の前記操作盤入力装置の位置から前記所定のホームポジションの位置までの距離とに基づいて、前記完了時刻を推定する作業完了時刻推定部と、
を備える、能力データベース構築装置。
A device for constructing a database of work capacity of workers for the plurality of processing machines for equipment equipped with a plurality of processing machines.
A work state acquisition unit that acquires the start time and completion time of the work by the worker when the predetermined home position , which is the reference position of the equipment , is set as the start position and the finish position of the work by the worker.
Work type acquisition unit that acquires the work type executed by the worker,
An ability database that stores the work time for each work type as work ability,
A database update unit that updates the information of the ability database based on the information acquired by the work state acquisition unit and the information acquired by the work type acquisition unit.
An operation panel input device provided on the operation panel of each of the plurality of processing machines and for inputting the start and completion of work by an operator,
Equipped with a,
The work state acquisition unit
When the start of work is input to the operation panel input device, based on the input time and the distance from the position of the operation panel input device to the position of the predetermined home position at the time of input. The work start time estimation unit that estimates the start time,
When the completion of work is input to the operation panel input device, based on the input time and the distance from the position of the operation panel input device at the time of input to the position of the predetermined home position. The work completion time estimation unit that estimates the completion time,
Ru with a capability database construction apparatus.
前記能力データベース構築装置は、作業者の体調を認識できる生体情報を取得する生体情報取得部を備え、
前記データベース更新部は、体調によって作業時間が変化する関係を用いて、前記生体情報取得部により取得された生体情報に基づいて、前記能力データベースにおける作業能力としての作業時間を更新する、請求項1−の何れか一項に記載の能力データベース構築装置。
The ability database construction device includes a biometric information acquisition unit that acquires biometric information that can recognize the physical condition of the worker.
The database update unit updates the work time as a work ability in the ability database based on the biometric information acquired by the biometric information acquisition unit , using the relationship that the work time changes depending on the physical condition. − The capability database construction device according to any one of 3 .
前記能力データベース構築装置は、前記処理機械に設けられる機械撮像装置により撮像される作業者の動作情報を取得する機械撮像情報取得部を備え、
前記撮像される作業者の動作情報は、前記処理機械の近傍に作業者がいる時間、前記処理機械の近傍にて作業者が処理している手順、作業者の表情、作業者の体調の少なくとも1つを含み、
前記処理機械の近傍に作業者がいる時間、前記処理機械の近傍にて作業者が処理している手順、作業者の表情、作業者の体調によって、作業時間が変化する関係を有し、
前記データベース更新部は、前記関係を用いて、前記機械撮像情報取得部により取得された作業者の動作情報に基づいて、前記能力データベースにおける作業能力としての作業時間を更新する、請求項1−の何れか一項に記載の能力データベース構築装置。
The capability database construction device includes a machine imaging information acquisition unit that acquires motion information of a worker imaged by a machine imaging device provided in the processing machine.
The imaged motion information of the worker includes at least the time when the worker is in the vicinity of the processing machine, the procedure processed by the worker in the vicinity of the processing machine, the facial expression of the worker, and the physical condition of the worker. Including one
There is a relationship that the working time changes depending on the time when the worker is in the vicinity of the processing machine, the procedure that the worker is processing in the vicinity of the processing machine, the facial expression of the worker, and the physical condition of the worker.
The database update unit updates the work time as a work capacity in the capacity database based on the operation information of the worker acquired by the machine imaging information acquisition unit using the above relationship , claim 1-4. The capability database construction device according to any one of the above.
前記能力データベース構築装置は、前記処理機械の操作盤に対する操作順序情報を取得する操作順序情報取得部を備え、
操作順序には、作業時間に影響を与える効率の良い操作順序が存在し、
前記データベース更新部は、操作順序によって作業時間が変化する関係を用いて、前記操作順序情報取得部により取得された作業者の操作順序情報に基づいて、前記能力データベースにおける作業能力としての作業時間を更新する、請求項1−の何れか一項に記載の能力データベース構築装置。
The capability database construction device includes an operation order information acquisition unit that acquires operation order information for the operation panel of the processing machine.
There is an efficient operation sequence that affects the working time in the operation sequence.
The database update unit calculates the work time as the work capacity in the capacity database based on the operation order information of the worker acquired by the operation order information acquisition unit , using the relationship that the work time changes depending on the operation order. The capability database construction device according to any one of claims 1 to 5 to be updated.
前記能力データベース構築装置は、作業者が携帯する携帯撮像装置により撮像される視界情報を取得する視界情報取得部を備え、
作業者の動作には、作業時間に影響を与える効率の良い動作が存在し、
前記データベース更新部は、前記視界情報取得部により撮像された作業者の視界情報に基づいて作業者の動作を把握し、前記作業者の動作によって作業時間が変化する関係を用いて前記作業者の動作に基づいて前記能力データベースにおける作業能力としての作業時間を更新する、請求項1−の何れか一項に記載の能力データベース構築装置。
The ability database construction device includes a field of view information acquisition unit that acquires field of view information captured by a portable imaging device carried by an operator.
There are efficient movements that affect the working time in the movements of the worker,
The database update unit grasps the operation of the worker based on the field of view information of the worker captured by the field of view information acquisition unit, and uses the relationship that the work time changes depending on the movement of the worker of the worker. The capacity database construction apparatus according to any one of claims 1 to 6 , which updates the working time as a working capacity in the capacity database based on the operation .
JP2016088504A 2016-04-26 2016-04-26 Capacity database construction device Active JP6766429B2 (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
JP2016088504A JP6766429B2 (en) 2016-04-26 2016-04-26 Capacity database construction device
DE102017108710.9A DE102017108710A1 (en) 2016-04-26 2017-04-24 WORK ORDER SYSTEM
US15/496,118 US11068812B2 (en) 2016-04-26 2017-04-25 Work instruction system
CN201710281315.1A CN107315393B (en) 2016-04-26 2017-04-26 Work instruction system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2016088504A JP6766429B2 (en) 2016-04-26 2016-04-26 Capacity database construction device

Publications (2)

Publication Number Publication Date
JP2017199152A JP2017199152A (en) 2017-11-02
JP6766429B2 true JP6766429B2 (en) 2020-10-14

Family

ID=60239464

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2016088504A Active JP6766429B2 (en) 2016-04-26 2016-04-26 Capacity database construction device

Country Status (1)

Country Link
JP (1) JP6766429B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7482091B2 (en) * 2021-09-01 2024-05-13 株式会社東芝 Skill level assessment device, method and program

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0446749A (en) * 1990-06-13 1992-02-17 Joho Syst Kenkyusho:Kk Work result control method
JPH06268A (en) * 1992-06-23 1994-01-11 Brother Ind Ltd Process organizing device
JPH10198484A (en) * 1997-01-09 1998-07-31 Mitsubishi Heavy Ind Ltd Skill evaluating device for operation
JP2005056272A (en) * 2003-08-06 2005-03-03 Toyota Industries Corp System for grasping working hour and system for creating working instruction
JP5027053B2 (en) * 2008-05-30 2012-09-19 株式会社日立製作所 Work analysis apparatus, production management method, and production management system
JP4251373B1 (en) * 2008-07-23 2009-04-08 クオリティ株式会社 Management system, management server, and management program
JP2012078896A (en) * 2010-09-30 2012-04-19 Mitsubishi Heavy Ind Ltd Method and system for updating standard work hour
EP2458466B1 (en) * 2010-11-30 2020-02-26 Industrial Development of Automotivo Components, IDACO corp Automatic supervision and control system
JP6075180B2 (en) * 2013-04-18 2017-02-08 オムロン株式会社 Work management system and work management method

Also Published As

Publication number Publication date
JP2017199152A (en) 2017-11-02

Similar Documents

Publication Publication Date Title
CN107315393B (en) Work instruction system
JP6776601B2 (en) Work instruction system
US11185979B2 (en) Picking system and method for controlling same
US11103322B2 (en) Remote control robot system
Wang et al. Symbiotic human-robot collaborative assembly
JP6836107B2 (en) Work instruction system
EP2931485B1 (en) Bare hand robot path teaching
CN104802186B (en) Make the robot programming device being used for shooting the robot program of workpiece
JP2018045395A (en) Education support device
JP2018045059A (en) Education support device
US20160171772A1 (en) Eyewear operational guide system and method
CN104858876A (en) Visual debugging of robotic tasks
DE10216023B4 (en) Method and apparatus for controlled interaction between a self-propelled robot unit and a human
JP6823018B2 (en) Coordination support device
JP6766429B2 (en) Capacity database construction device
CN116745077A (en) Visualization of robot motion paths and use thereof in robot path planning
Pérez-D’Arpino et al. Experimental assessment of human-robot teaming for multi-step remote manipulation with expert operators
JP6786862B2 (en) Process planning device
CN107391710B (en) Machine operation monitoring system and server
JP2021157648A (en) Recommendation device and program
JP2021010984A (en) Robot and machine learning method
KR20200073588A (en) A production line monitoring system using motion recognition of a workekr and a monitoring method using the same
JP2017019593A (en) Warehouse management system and portable device
JP7208254B2 (en) Work optimization system and work optimization device
JP2023076919A (en) Pseudo force module, and control system including pseudo force module

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20190318

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20200131

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20200218

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20200417

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20200818

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20200831

R150 Certificate of patent or registration of utility model

Ref document number: 6766429

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150