JP6732100B2 - エネルギ発生装置のための制御器目標値の出力方法、該方法のための装置及び該装置を有するシステム - Google Patents
エネルギ発生装置のための制御器目標値の出力方法、該方法のための装置及び該装置を有するシステム Download PDFInfo
- Publication number
- JP6732100B2 JP6732100B2 JP2019505474A JP2019505474A JP6732100B2 JP 6732100 B2 JP6732100 B2 JP 6732100B2 JP 2019505474 A JP2019505474 A JP 2019505474A JP 2019505474 A JP2019505474 A JP 2019505474A JP 6732100 B2 JP6732100 B2 JP 6732100B2
- Authority
- JP
- Japan
- Prior art keywords
- target value
- controller
- data packet
- period
- future
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000000034 method Methods 0.000 title claims description 35
- 230000005540 biological transmission Effects 0.000 description 17
- 230000005611 electricity Effects 0.000 description 3
- 230000004044 response Effects 0.000 description 3
- 230000006978 adaptation Effects 0.000 description 2
- 230000007774 longterm Effects 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 230000008901 benefit Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 230000010485 coping Effects 0.000 description 1
- 230000003247 decreasing effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000000605 extraction Methods 0.000 description 1
- 239000002803 fossil fuel Substances 0.000 description 1
- ZZUFCTLCJUWOSV-UHFFFAOYSA-N furosemide Chemical compound C1=C(Cl)C(S(=O)(=O)N)=CC(C(O)=O)=C1NCC1=CC=CO1 ZZUFCTLCJUWOSV-UHFFFAOYSA-N 0.000 description 1
- 230000001771 impaired effect Effects 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 230000007246 mechanism Effects 0.000 description 1
- 230000008439 repair process Effects 0.000 description 1
- 230000002123 temporal effect Effects 0.000 description 1
- 230000036962 time dependent Effects 0.000 description 1
- 230000003442 weekly effect Effects 0.000 description 1
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F03—MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
- F03D—WIND MOTORS
- F03D7/00—Controlling wind motors
- F03D7/02—Controlling wind motors the wind motors having rotation axis substantially parallel to the air flow entering the rotor
- F03D7/028—Controlling wind motors the wind motors having rotation axis substantially parallel to the air flow entering the rotor controlling wind motor output power
- F03D7/0284—Controlling wind motors the wind motors having rotation axis substantially parallel to the air flow entering the rotor controlling wind motor output power in relation to the state of the electric grid
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F03—MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
- F03D—WIND MOTORS
- F03D7/00—Controlling wind motors
- F03D7/02—Controlling wind motors the wind motors having rotation axis substantially parallel to the air flow entering the rotor
- F03D7/04—Automatic control; Regulation
- F03D7/042—Automatic control; Regulation by means of an electrical or electronic controller
- F03D7/047—Automatic control; Regulation by means of an electrical or electronic controller characterised by the controller architecture, e.g. multiple processors or data communications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F03—MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
- F03D—WIND MOTORS
- F03D7/00—Controlling wind motors
- F03D7/02—Controlling wind motors the wind motors having rotation axis substantially parallel to the air flow entering the rotor
- F03D7/04—Automatic control; Regulation
- F03D7/042—Automatic control; Regulation by means of an electrical or electronic controller
- F03D7/048—Automatic control; Regulation by means of an electrical or electronic controller controlling wind farms
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
- H02J13/00006—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
- H02J13/00006—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment
- H02J13/00016—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment using a wired telecommunication network or a data transmission bus
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
- H02J13/00006—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment
- H02J13/00028—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment involving the use of Internet protocols
-
- H02J13/0062—
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/38—Arrangements for parallely feeding a single network by two or more generators, converters or transformers
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/38—Arrangements for parallely feeding a single network by two or more generators, converters or transformers
- H02J3/381—Dispersed generators
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/38—Arrangements for parallely feeding a single network by two or more generators, converters or transformers
- H02J3/46—Controlling of the sharing of output between the generators, converters, or transformers
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/38—Arrangements for parallely feeding a single network by two or more generators, converters or transformers
- H02J3/46—Controlling of the sharing of output between the generators, converters, or transformers
- H02J3/466—Scheduling the operation of the generators, e.g. connecting or disconnecting generators to meet a given demand
- H02J3/472—For selectively connecting the AC sources in a particular order, e.g. sequential, alternating or subsets of sources
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2300/00—Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
- H02J2300/20—The dispersed energy generation being of renewable origin
- H02J2300/28—The renewable source being wind energy
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/72—Wind turbines with rotation axis in wind direction
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/76—Power conversion electric or electronic aspects
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E40/00—Technologies for an efficient electrical power generation, transmission or distribution
- Y02E40/70—Smart grids as climate change mitigation technology in the energy generation sector
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/12—Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation
- Y04S10/123—Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation the energy generation units being or involving renewable energy sources
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S40/00—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
- Y04S40/12—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment
- Y04S40/124—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment using wired telecommunication networks or data transmission busses
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- Sustainable Development (AREA)
- Sustainable Energy (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Wind Motors (AREA)
- Control Of Eletrric Generators (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Description
・1つの現在目標値と複数の将来目標値とを含むデータパケットをデータ入力部によって受信すること、
・受信したデータパケットの将来目標値を記憶装置に格納すること、
・前記データパケットの現在目標値を、データ出力部によって、エネルギ発生装置、とりわけ少なくとも1つの風力発電装置又は少なくとも1つのウインドパーク又はクラスタ制御器のための制御器目標値として出力すること、
を含み、
・前記データパケットの受信後に更なるデータパケットが受信されない予規定期間の経過後、前記格納された将来目標値のうちの第1将来目標値がデータ出力部によって次の制御器目標値として出力される(形態1)。
本発明の第2の視点により、とりわけ本発明の方法を実行するために、少なくとも1つのエネルギ発生装置、とりわけ少なくとも1つの風力発電装置又は少なくとも1つのウインドパーク又は少なくとも1つのクラスタ制御器のための制御器目標値を出力する装置が提供される。該装置は、
・1つの現在目標値と複数の将来目標値とを含むデータパケットを受信するデータ入力部、
・データパケットの将来目標値を格納する記憶装置、
・エネルギ発生装置、とりわけ少なくとも1つの風力発電装置又は少なくとも1つのウインドパーク又はクラスタ制御器のための制御器目標値として、前記データパケットの現在目標値を出力するデータ出力部、
・前記データパケットの受信後に更なるデータパケットが受信されない予規定期間の経過後、第1の格納された将来目標値をデータ出力部によって次の制御器目標値として出力するよう構成された制御ユニット
を含む(形態9)。
(形態1)上記第1の視点参照。
(形態2)形態1の方法において、
記憶装置に格納された将来目標値は、更なるデータパケットのその都度の受信後に、該更なるデータパケットの将来目標値によって上書きされることが好ましい。
(形態3)形態1又は2の方法において、
各目標値には夫々1つの目標値有効期間が割り当てられており、
制御器目標値として現在出力される現在目標値の目標値有効期間に相当する予規定期間であって、データパケットの受信後更なるデータパケットが受信されない予規定期間の経過後、前記格納された将来目標値が、データ出力部によって、夫々の目標値の夫々の目標値有効期間に相当する期間中に、更なるデータパケットが受信されない限り、制御器目標値として出力されることが好ましい。
(形態4)形態1又は2の方法において、
格納された将来目標値の各々には1つのタイムスタンプ(Zeitstempel)が割り当てられており、
データパケットの受信後に更なるデータパケットが受信されない予規定期間の経過後、前記格納された将来目標値が、データ出力部によって、順次、前記タイムスタンプに対応する時点においてそれぞれ、更なるデータパケットが受信されない限り、次の制御器目標値として出力されることが好ましい。
(形態5)形態4に記載の方法において、
前記タイムスタンプは夫々異なる時点に対応し、
これらのタイムスタンプに対応する時点の時間間隔はそれらの時間的順序に応じて増大することが好ましい。
(形態6)形態1又は2の方法において、
前記格納された将来目標値には1つのシーケンス(Reihenfolge)が割り当てられており、
データパケットの受信後に更なるデータパケットが受信されない予規定期間の経過後に並びに該予規定期間の各々の新たな経過後、更なる予規定期間の各々の経過後又は時間的に増大する期間の各々の経過後に、前記目標値の夫々1つが、更なるデータパケットが受信されない限り、そのシーケンスに応じて出力されることが好ましい。
(形態7)形態1〜6の何れかの方法において、
すべての格納された将来目標値が、順次、制御器目標値として出力された場合、予規定基準値が制御器目標値として出力されることが好ましい。
(形態8)形態1〜7の何れかの方法において、
予規定期間及び/又は更なる予規定期間は最大で1分間、最大で2分間又は最大で5分間に相当し及び/又は少なくとも10の、少なくとも20の又は少なくとも50の将来目標値が1つのデータパケットによって受信されることが好ましい。
(形態9)上記第2の視点参照。
(形態10)形態9の装置において、
前記制御ユニットは、記憶装置に格納された将来目標値を、更なるデータパケットのその都度の受信後に、該更なるデータパケットの将来目標値によって上書きするよう構成されていることが好ましい。
(形態11)形態9又は10の装置において、
格納された将来目標値の各々には1つのタイムスタンプが割り当てられ又は各目標値には1つの目標値有効期間が割り当てられており、
前記制御ユニットは、目標値をある期間にそのタイムスタンプ又はその目標値有効期間に応じてデータ出力部において制御器目標値として出力するよう構成されていることが好ましい。
(形態12)形態11の装置において、
前記タイムスタンプは夫々異なる時点に対応し、
これらのタイムスタンプに対応する時点の時間間隔はそれらの時間的順序に応じて増大することが好ましい。
(形態13)形態11又は12の装置において、
前記格納された将来目標値には1つのシーケンス(Reihenfolge)が割り当てられており、
前記制御ユニットは、データパケットの受信後に更なるデータパケットが受信されない予規定期間の経過後に並びに該予規定期間の各々の新たな経過後、更なる予規定期間の各々の経過後又は時間的に増大する期間の各々の経過後に、前記目標値の夫々1つを、更なるデータパケットが受信されない限り、そのシーケンスに応じて出力するよう構成されていることが好ましい。
(形態14)形態9〜13の何れかの装置において、
該装置は、エネルギ発生装置の、とりわけウインドパークの制御器の領域に又はクラスタ制御器の領域に配されていることが好ましい。
(形態15)形態9〜14の何れかの装置と、エネルギ発生装置の制御器、ウインドパーク制御器及び/又はクラスタ制御器とを有するシステムであって、
該装置は、該エネルギ発生装置の制御器、該ウインドパーク制御器及び/又は該クラスタ制御器に組み込まれていることが好ましい。
(形態16)形態15のシステムにおいて、
該システムは、付加的に、現在目標値及び将来目標値を決定するよう、夫々1つの現在目標値と複数の将来目標値とを含むデータパケットを生成するよう、及び、データ接続手段を介してエネルギ発生装置の制御器、とりわけウインドパーク制御器及び/又はクラスタ制御器へ伝送するするよう構成されたコントロールセンタを含むことが好ましい。
更なる実施形態は図面において詳細に説明される実施例に基づき明らかとなる。
なお、特許請求の範囲に付記した図面参照符号は専ら発明の理解を助けるためのものであり、本発明を図示の態様に限定することは意図していない。
Claims (16)
- 少なくとも1つのエネルギ発生装置(200)、とりわけ少なくとも1つの風力発電装置(100)又は少なくとも1つのウインドパーク(112)又は少なくとも1つのクラスタ制御器(18)のための制御器目標値(54)を出力する方法であって、以下のステップ:
・1つの現在目標値(48)と複数の将来目標値(40)とを含むデータパケット(33)をデータ入力部(32)によって受信(60)すること、
・受信したデータパケット(33)の将来目標値(40)を記憶装置(36)に格納(62)すること、
・前記データパケット(33)の現在目標値(48)を、データ出力部(34)によって、エネルギ発生装置(200)、とりわけ少なくとも1つの風力発電装置(100)又は少なくとも1つのウインドパーク(112)又はクラスタ制御器(18)のための制御器目標値(54)として出力(64)すること、
を含み、
・前記データパケット(33)の受信(60)後に更なるデータパケット(33)が受信されない予規定期間の経過後、前記格納された将来目標値(40)のうちの第1将来目標値がデータ出力部(34)によって次の制御器目標値(54)として出力される、
方法。 - 請求項1に記載の方法において、
記憶装置(36)に格納された将来目標値(40)は、更なるデータパケット(33)のその都度の受信後に、該更なるデータパケット(33)の将来目標値(40)によって上書きされる、
方法。 - 請求項1又は2に記載の方法において、
各目標値(40、48)には夫々1つの目標値有効期間が割り当てられており、
制御器目標値として現在出力される現在目標値(48)の目標値有効期間に相当する予規定期間であって、データパケット(33)の受信(60)後更なるデータパケット(33)が受信されない予規定期間の経過後、前記格納された将来目標値(40)が、データ出力部(34)によって、夫々の目標値(40、48)の夫々の目標値有効期間に相当する期間中に、更なるデータパケット(33)が受信されない限り、制御器目標値(54)として出力される、
方法。 - 請求項1又は2に記載の方法において、
格納された将来目標値(40)の各々には1つのタイムスタンプ(Zeitstempel)が割り当てられており、
データパケット(33)の受信(60)後に更なるデータパケット(33)が受信されない予規定期間の経過後、前記格納された将来目標値(40)が、データ出力部(34)によって、順次、前記タイムスタンプに対応する時点においてそれぞれ、更なるデータパケット(33)が受信されない限り、次の制御器目標値(54)として出力される、
方法。 - 請求項4に記載の方法において、
前記タイムスタンプは夫々異なる時点に対応し、
これらのタイムスタンプに対応する時点の時間間隔はそれらの時間的順序に応じて増大する、
方法。 - 請求項1又は2に記載の方法において、
前記格納された将来目標値(40)には1つのシーケンス(Reihenfolge)が割り当てられており、
データパケット(33)の受信(60)後に更なるデータパケット(33)が受信されない予規定期間の経過後に並びに該予規定期間の各々の新たな経過後、更なる予規定期間の各々の経過後又は時間的に増大する期間の各々の経過後に、前記目標値(40)の夫々1つが、更なるデータパケット(33)が受信されない限り、そのシーケンスに応じて出力される、
方法。 - 請求項1〜6の何れかに記載の方法において、
すべての格納された将来目標値(40)が、順次、制御器目標値(54)として出力された場合、予規定基準値が制御器目標値(54)として出力される、
方法。 - 請求項1〜7の何れかに記載の方法において、
予規定期間及び/又は更なる予規定期間は最大で1分間、最大で2分間又は最大で5分間に相当し及び/又は少なくとも10の、少なくとも20の又は少なくとも50の将来目標値(40)が1つのデータパケット(33)によって受信される、
方法。 - とりわけ請求項1〜8の何れかに記載の方法を実行するために、少なくとも1つのエネルギ発生装置(200)、とりわけ少なくとも1つの風力発電装置(100)又は少なくとも1つのウインドパーク(112)又は少なくとも1つのクラスタ制御器(18)のための制御器目標値(54)を出力する装置であって、
・1つの現在目標値(48)と複数の将来目標値(40)とを含むデータパケット(33)を受信(60)するデータ入力部(32)、
・データパケット(33)の将来目標値(40)を格納する記憶装置(36)、
・エネルギ発生装置(200)、とりわけ少なくとも1つの風力発電装置(100)又は少なくとも1つのウインドパーク(112)又はクラスタ制御器(18)のための制御器目標値(54)として、前記データパケット(33)の現在目標値(48)を出力(64)するデータ出力部(34)、
・前記データパケット(33)の受信(60)後に更なるデータパケット(33)が受信されない予規定期間の経過後、第1の格納された将来目標値(40)をデータ出力部(34)によって次の制御器目標値(54)として出力するよう構成された制御ユニット(52)
を含む、
装置。 - 請求項9に記載の装置において、
前記制御ユニット(52)は、記憶装置(36)に格納された将来目標値(40)を、更なるデータパケット(33)のその都度の受信後に、該更なるデータパケット(33)の将来目標値(40)によって上書きするよう構成されている、
装置。 - 請求項9又は10に記載の装置において、
格納された将来目標値(40)の各々には1つのタイムスタンプが割り当てられ又は各目標値(40、48)には1つの目標値有効期間が割り当てられており、
前記制御ユニット(52)は、目標値(40、48)をある期間にそのタイムスタンプ又はその目標値有効期間に応じてデータ出力部(34)において制御器目標値(54)として出力するよう構成されている、
装置。 - 請求項11に記載の装置において、
前記タイムスタンプは夫々異なる時点に対応し、
これらのタイムスタンプに対応する時点の時間間隔はそれらの時間的順序に応じて増大する、
装置。 - 請求項11又は12に記載の装置において、
前記格納された将来目標値(40)には1つのシーケンス(Reihenfolge)が割り当てられており、
前記制御ユニット(52)は、データパケット(33)の受信(60)後に更なるデータパケット(33)が受信されない予規定期間の経過後に並びに該予規定期間の各々の新たな経過後、更なる予規定期間の各々の経過後又は時間的に増大する期間の各々の経過後に、前記目標値(40)の夫々1つを、更なるデータパケット(33)が受信されない限り、そのシーケンスに応じて出力するよう構成されている、
装置。 - 請求項9〜13の何れかに記載の装置において、
該装置(30)は、エネルギ発生装置(200)の、とりわけウインドパーク(112)の制御器(10)の領域に又はクラスタ制御器(18)の領域に配されている、
装置。 - 請求項9〜14の何れかに記載の装置(30)と、エネルギ発生装置(200)の制御器(10)、ウインドパーク制御器(10)及び/又はクラスタ制御器(18)とを有するシステムであって、
該装置(30)は、該エネルギ発生装置(200)の制御器(10)、該ウインドパーク制御器(10)及び/又は該クラスタ制御器(18)に組み込まれている、
システム。 - 請求項15に記載のシステムにおいて、
該システムは、付加的に、現在目標値(48)及び将来目標値(40)を決定するよう、夫々1つの現在目標値(48)と複数の将来目標値(40)とを含むデータパケット(33)を生成するよう、及び、データ接続手段(16、20)を介してエネルギ発生装置(200)の制御器(10)、とりわけウインドパーク制御器(10)及び/又はクラスタ制御器(18)へ伝送するするよう構成されたコントロールセンタ(14)を含む、
システム。
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE102016114254.9 | 2016-08-02 | ||
DE102016114254.9A DE102016114254A1 (de) | 2016-08-02 | 2016-08-02 | Verfahren zum Ausgeben eines Reglersollwerts für einen Energieerzeuger sowie Vorrichtung dazu und System damit |
PCT/EP2017/068643 WO2018024530A1 (de) | 2016-08-02 | 2017-07-24 | Verfahren zum ausgeben eines reglersollwerts für einen energieerzeuger sowie vorrichtung dazu und system damit |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2019528662A JP2019528662A (ja) | 2019-10-10 |
JP6732100B2 true JP6732100B2 (ja) | 2020-07-29 |
Family
ID=59579604
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2019505474A Expired - Fee Related JP6732100B2 (ja) | 2016-08-02 | 2017-07-24 | エネルギ発生装置のための制御器目標値の出力方法、該方法のための装置及び該装置を有するシステム |
Country Status (11)
Country | Link |
---|---|
US (1) | US10900466B2 (ja) |
EP (1) | EP3494305B1 (ja) |
JP (1) | JP6732100B2 (ja) |
KR (1) | KR102106404B1 (ja) |
CN (1) | CN109563811B (ja) |
BR (1) | BR112019001585A2 (ja) |
CA (1) | CA3031010C (ja) |
DE (1) | DE102016114254A1 (ja) |
DK (1) | DK3494305T3 (ja) |
RU (1) | RU2706861C1 (ja) |
WO (1) | WO2018024530A1 (ja) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US10570883B2 (en) * | 2017-12-22 | 2020-02-25 | General Electric Company | System and method for protecting wind turbines during wind gusts |
DK3772150T3 (da) | 2019-08-02 | 2023-10-02 | Gen Electric | Fremgangsmåde til at drive en vindmøllepark |
RU2754455C1 (ru) * | 2020-12-18 | 2021-09-02 | Евгений Николаевич Коптяев | Способ управления электроэнергетической системой с ветрогенераторами |
CN114330097A (zh) * | 2021-11-26 | 2022-04-12 | 中国华能集团清洁能源技术研究院有限公司 | 一种异构数据与深度学习的风电集群功率预测方法及设备 |
Family Cites Families (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102005053185A1 (de) * | 2005-11-04 | 2007-05-10 | Nordex Energy Gmbh | Verfahren zum Übertragen von Daten an eine Windenergieanlage und Windenergieanlage selbst |
DE102007036444A1 (de) * | 2007-08-02 | 2009-02-05 | Nordex Energy Gmbh | Windpark mit einer Vielzahl von Windenergieanlagen sowie Verfahren zum Betreiben des Windparks |
CA2703285C (en) * | 2007-10-23 | 2013-10-08 | Repower Systems Ag | Arrangement and method for operation of a wind energy installation or of a wind farm |
DE102009014012B4 (de) * | 2009-03-23 | 2014-02-13 | Wobben Properties Gmbh | Verfahren zum Betreiben einer Windenergieanlage |
DE102010006527A1 (de) * | 2010-02-01 | 2011-08-04 | RWE Rheinland Westfalen Netz AG, 45128 | Anpassen von Lastprofilen und/oder Einspeiseprofilen |
WO2012068488A2 (en) * | 2010-11-19 | 2012-05-24 | Alektrona Corporation | Remote asset control systems and methods |
DE102011003799C5 (de) | 2011-02-08 | 2017-10-26 | Wobben Properties Gmbh | Verfahren zum Bestimmen entgangener Energie |
US9049078B2 (en) * | 2011-08-31 | 2015-06-02 | Eneroc, Inc. | NOC-oriented control of a demand coordination network |
US9774216B2 (en) * | 2012-07-10 | 2017-09-26 | Hitachi, Ltd. | System and method for controlling power system |
US9406094B2 (en) * | 2012-08-14 | 2016-08-02 | Stem Inc. | Method and apparatus for delivering power using external data |
CA2908965C (en) | 2013-04-04 | 2020-01-07 | General Electric Company | Multi-farm wind power generation system |
DE102013207209A1 (de) * | 2013-04-22 | 2014-10-23 | Wobben Properties Gmbh | Windpark und Verfahren zum Steuern eines Windparks |
WO2015145655A1 (ja) * | 2014-03-27 | 2015-10-01 | 三菱電機株式会社 | 空調管理システム |
DE102015200209A1 (de) * | 2015-01-09 | 2016-07-14 | Wobben Properties Gmbh | Verfahren zum Autorisieren für Steuerzugriffe auf Windenergieanlagen sowie Schnittstelle von Windenergieanlagen und Zertifizierungsstelle |
-
2016
- 2016-08-02 DE DE102016114254.9A patent/DE102016114254A1/de not_active Withdrawn
-
2017
- 2017-07-24 CN CN201780048517.XA patent/CN109563811B/zh active Active
- 2017-07-24 KR KR1020197005577A patent/KR102106404B1/ko active IP Right Grant
- 2017-07-24 WO PCT/EP2017/068643 patent/WO2018024530A1/de unknown
- 2017-07-24 DK DK17751041.9T patent/DK3494305T3/da active
- 2017-07-24 JP JP2019505474A patent/JP6732100B2/ja not_active Expired - Fee Related
- 2017-07-24 US US16/321,349 patent/US10900466B2/en active Active
- 2017-07-24 BR BR112019001585-0A patent/BR112019001585A2/pt not_active Application Discontinuation
- 2017-07-24 RU RU2019104893A patent/RU2706861C1/ru active
- 2017-07-24 CA CA3031010A patent/CA3031010C/en active Active
- 2017-07-24 EP EP17751041.9A patent/EP3494305B1/de active Active
Also Published As
Publication number | Publication date |
---|---|
US10900466B2 (en) | 2021-01-26 |
CN109563811B (zh) | 2020-08-18 |
DE102016114254A1 (de) | 2018-02-08 |
CA3031010C (en) | 2021-01-12 |
EP3494305A1 (de) | 2019-06-12 |
RU2706861C1 (ru) | 2019-11-21 |
JP2019528662A (ja) | 2019-10-10 |
DK3494305T3 (da) | 2020-08-24 |
WO2018024530A1 (de) | 2018-02-08 |
CA3031010A1 (en) | 2018-02-08 |
US20190178229A1 (en) | 2019-06-13 |
KR102106404B1 (ko) | 2020-05-04 |
KR20190032542A (ko) | 2019-03-27 |
CN109563811A (zh) | 2019-04-02 |
BR112019001585A2 (pt) | 2019-05-07 |
EP3494305B1 (de) | 2020-07-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP6732100B2 (ja) | エネルギ発生装置のための制御器目標値の出力方法、該方法のための装置及び該装置を有するシステム | |
EP3289656B1 (en) | Failsafe power profile for a distributed generation management system | |
US9690267B2 (en) | Selective droop response control for a wind turbine power plant | |
EP2634420B1 (en) | Control device for wind-powered electricity-generating device, wind farm, and control method for wind-powered electricity generating device | |
US7949434B2 (en) | Method for controlling a wind energy park | |
RU2719400C1 (ru) | Способ эксплуатации парка ветровых установок | |
EP2863513B1 (en) | Compensation of frequency deviations in grids with high turbine penetration | |
RU2733063C1 (ru) | Способ управления электрической распределительной сетью | |
EP2284392B1 (en) | Wind power plant, wind power plant controller and method of controlling a wind power plant | |
CN106877404B (zh) | 一种发输电联合动态增容方法及系统 | |
AU2015287133A1 (en) | System and method for determining the suitability of a plurality of electrical producers and consumers which are operated in a network as a virtual power plant for providing control power | |
JP2012039802A (ja) | 風力発電システムの発電出力スケジュール制御方法 | |
CN110945737B (zh) | 风电场中能量产生误差的控制 | |
EP2662945A1 (en) | Distributed power generation system, controlling means and method for controlling the power generation of the system | |
KR102258945B1 (ko) | 컨트롤러, 특히 풍력 발전 단지의 풍력 발전 단지 컨트롤러로부터 유닛으로 제어 조절 변수를 전송하기 위한 방법 그리고 제어되는 유닛 및 컨트롤러 | |
US11566603B2 (en) | Method of controlling a wind farm | |
EP3922842A1 (en) | Method of controlling a wind turbine | |
RU2756719C2 (ru) | Способ предоставления набора данных, способ приема набора данных, регулятор ветропарка, блок ветропарка и ветропарк | |
CN112889196A (zh) | 动态风力发电站 | |
US20220329069A1 (en) | Method for operating an electrical storage station |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20190305 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20200310 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20200519 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20200616 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20200707 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 6732100 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
LAPS | Cancellation because of no payment of annual fees |