JP6665455B2 - Work management device, display control method, and program - Google Patents

Work management device, display control method, and program Download PDF

Info

Publication number
JP6665455B2
JP6665455B2 JP2015179125A JP2015179125A JP6665455B2 JP 6665455 B2 JP6665455 B2 JP 6665455B2 JP 2015179125 A JP2015179125 A JP 2015179125A JP 2015179125 A JP2015179125 A JP 2015179125A JP 6665455 B2 JP6665455 B2 JP 6665455B2
Authority
JP
Japan
Prior art keywords
work
procedure
todo
work item
information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2015179125A
Other languages
Japanese (ja)
Other versions
JP2017054401A (en
Inventor
吉田 聡
聡 吉田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Casio Computer Co Ltd
Original Assignee
Casio Computer Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Casio Computer Co Ltd filed Critical Casio Computer Co Ltd
Priority to JP2015179125A priority Critical patent/JP6665455B2/en
Publication of JP2017054401A publication Critical patent/JP2017054401A/en
Application granted granted Critical
Publication of JP6665455B2 publication Critical patent/JP6665455B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Landscapes

  • General Factory Administration (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

本発明は、作業管理装置、表示制御方法及びプログラムに関する。 The present invention relates to a work management device, a display control method, and a program.

従来、スケジュール管理ツールにおいては、開始時刻及び終了時刻が設定されたスケジュールと、最終的な期限及び優先順位が設定されたToDoリスト(作業項目リスト)と、が個別に管理されることが一般的である。
ToDoリストの生成を自動的に行う技術として、利用者が登録した情報に基づいて利用者のメールサーバから電子メールを取得し、送信者の情報、電子メールに含まれる予定やToDo(作業項目)の情報、最も重要な文の情報を抽出し、これらの情報を組み合わせてToDoリストを含む要約を生成する技術が開示されている(例えば、特許文献1参照)。
また、定期的に行わなければならない作業の場合に、作業の繰り返し間隔を定義することで、毎回ToDoの登録を行わなくとも自動的にToDoの生成を行う技術も知られている。
Conventionally, a schedule management tool generally manages a schedule in which a start time and an end time are set, and a ToDo list (work item list) in which a final deadline and a priority are set. It is.
As a technology for automatically generating a ToDo list, an e-mail is acquired from a user's mail server based on information registered by the user, and information on a sender, a schedule included in the e-mail, and a ToDo (work item) (Patent Document 1) discloses a technique of extracting the information of the most important sentence, extracting the information of the most important sentence, and combining the information to generate an abstract including a ToDo list.
In addition, in the case of work that must be performed periodically, there is also known a technique of defining a work repetition interval and automatically generating ToDo without registering ToDo every time.

特開2002−24144号公報JP-A-2002-24144

しかしながら、上記ToDo(作業項目)を自動生成する技術では、1つの作業を完成させるのにいくつかの手順を踏む必要があるような場合であっても、全体を1つのToDoとして生成・管理されることとなる。この場合、作業の進捗管理を細かく行うことができずに曖昧となってしまい、作業の後半に時間的な余裕がなくなるといった不都合が生じる虞がある。
また、作業の進捗管理を適切に行うべく、1つの作業を構成する各手順を個別のToDoとして手動で生成することも可能ではあるが、手順が多くなればなるほどToDoリストに登録する作業が煩雑となってしまい、効率的なToDo管理を行うことができなかった。
However, in the technology for automatically generating a ToDo (work item), even when it is necessary to take several steps to complete one work, the entirety is generated and managed as one ToDo. The Rukoto. In this case, the progress management of the work cannot be performed in detail, which makes the work ambiguous, and there is a possibility that inconvenience such as running out of time in the latter half of the work may occur.
Further, in order to appropriately manage the progress of the work, it is possible to manually generate each procedure constituting one work as an individual ToDo, but as the number of procedures increases, the work of registering in the ToDo list becomes more complicated. Thus, efficient ToDo management could not be performed.

本発明の課題は、1つの作業を構成する各手順に係る作業項目を生成して効率的な作業管理を行うことができるようにすることである。   An object of the present invention is to generate work items related to each procedure constituting one work so that efficient work management can be performed.

上記課題を解決するため、本発明に係る作業管理装置は、Todoリストを表示させる表示制御手段と、作業を構成する複数の手順、当該手順の実行順序及び当該手順毎の必要日数情報を含むテンプレートデータを記憶する記憶手段と、ユーザにより指定された前記作業の完了予定日と前記記憶手段に記憶されたテンプレートデータとに基づいて、前記作業を構成する手順毎に当該手順の期限を含む作業項目をTodoとして生成するとともに生成した作業項目毎に前記表示制御手段による前記Todoリストへの当該生成した作業項目の表示開始日を設定する生成手段と、前記生成手段により生成された作業項目のうち予め定められた手順に対応した作業項目に対して、ユーザにより実施実績情報として当該作業項目の完了日時情報または難易度情報が入力された場合に、前記実施実績情報が次回における当該作業項目に対する前記表示開始日の前記生成手段による設定に反映されるように、前記テンプレートデータにおける前記予め定められた手順に対応した必要日数情報を補正する補正手段と、を備えたことを特徴とする。
また、本発明に係る表示制御方法は、作業を構成する複数の手順、当該手順の実行順序及び当該手順毎の必要日数情報を含むテンプレートデータを記憶する記憶手段を備える作業管理装置が実行するTodoリストの表示制御方法であって、ユーザにより指定された前記作業の完了予定日と、前記記憶手段に記憶されたテンプレートデータとに基づいて、前記作業を構成する手順毎に当該手順の期限を含む作業項目をTodoとして生成するとともに生成した作業項目毎に前記Todoリストへの当該生成した作業項目の表示開始日を設定する生成工程と、前記生成工程で生成された作業項目のうち予め定められた手順に対応した作業項目に対して、ユーザにより実施実績情報として当該作業項目の完了日時情報または難易度情報が入力された場合に、前記実施実績情報が次回における当該作業項目に対する前記表示開始日の前記生成工程による設定に反映されるように、前記テンプレートデータにおける前記予め定められた手順に対応した必要日数情報を補正する補正工程と、を含むことを特徴とする。
また、本発明に係るプログラムは、コンピュータを、Todoリストを表示させる表示制御手段、ユーザにより指定された作業の完了予定日と、前記作業を構成する複数の手順、当該手順の実行順序及び当該手順毎の必要日数情報を含むテンプレートデータを記憶する記憶手段に記憶されたテンプレートデータと、に基づいて、前記作業を構成する手順毎に当該手順の期限を含む作業項目をTodoとして生成するとともに生成した作業項目毎に前記表示制御手段による前記Todoリストへの当該生成した作業項目の表示開始日を設定する生成手段、前記生成手段により生成された作業項目のうち予め定められた手順に対応した作業項目に対して、ユーザにより実施実績情報として当該作業項目の完了日時情報または難易度情報が入力された場合に、前記実施実績情報が次回における当該作業項目に対する前記表示開始日の前記生成手段による設定に反映されるように、前記テンプレートデータにおける前記予め定められた手順に対応した必要日数情報を補正する補正手段、として機能させることを特徴とする。
In order to solve the above-mentioned problem, a work management device according to the present invention includes a display control unit for displaying a Todo list, a template including a plurality of procedures constituting the work, an execution order of the procedure, and necessary number of days information for each procedure. A storage means for storing data, and a work item including a deadline of the procedure for each procedure constituting the work, based on a scheduled completion date of the work specified by a user and template data stored in the storage means. a generating means for setting said display control means according to the display start date of work items thus generated to the Todo list for each work item generated and generates as Todo the advance of the work items generated by the generating means For the work item corresponding to the defined procedure, the user can set the completion date / time information or When the ease information is input, the execution result information corresponds to the predetermined procedure in the template data so that the execution result information is reflected in the setting of the display start date for the next work item by the generation unit. And correction means for correcting the required number of days information .
Further, the display control method according to the present invention is a Todo executed by a work management apparatus including a storage unit for storing a plurality of procedures constituting a work, an execution order of the procedures, and template data including information on the number of days required for each of the procedures. A list display control method, comprising, for each procedure constituting the work, a time limit of the procedure based on a scheduled completion date of the work specified by a user and template data stored in the storage unit. a generation step of setting the display start date of work items thus generated of a work item to the Todo list for each work item generated so as to generate as Todo, a predetermined one of the work items generated in the generation step For the work item corresponding to the procedure, the completion date / time information or difficulty information of the work item is input by the user as the execution result information. In this case, the required number of days information corresponding to the predetermined procedure in the template data is corrected so that the execution result information is reflected in the setting of the display start date for the next work item by the generation step. And a correcting step .
In addition, the program according to the present invention includes a computer, a display control unit for displaying a Todo list, a scheduled completion date of work specified by a user, a plurality of procedures constituting the work, an execution order of the procedure, and the procedure. based on the stored template data storage means for storing template data containing the required number of days information for each, and the work items including the date of the procedure for each procedure constituting the working produces and generates as Todo Generating means for setting a display start date of the generated work item on the Todo list by the display control means for each work item; a work item corresponding to a predetermined procedure among the work items generated by the generating means In response to this, the user inputs completion date / time information or difficulty information of the work item as the performance result information. In this case, the required number of days information corresponding to the predetermined procedure in the template data is corrected so that the execution result information is reflected in the setting of the display start date for the next work item by the generation unit. It is characterized by functioning as a correction means .

本発明によれば、1つの作業を構成する各手順に係る作業項目を生成して効率的な作業管理を行うことができる。   ADVANTAGE OF THE INVENTION According to this invention, the work item which concerns on each procedure which comprises one work can be produced | generated and efficient work management can be performed.

本実施形態に係る作業管理システムの概略構成を示す接続図である。1 is a connection diagram illustrating a schematic configuration of a work management system according to an embodiment. 本実施形態に係るサーバ装置及びクライアント端末の主制御構成を示すブロック図である。FIG. 2 is a block diagram illustrating a main control configuration of a server device and a client terminal according to the embodiment. ToDoデータの一例を示す図である。It is a figure showing an example of ToDo data. ToDoテンプレートデータの一例を示す図である。It is a figure showing an example of ToDo template data. 遅延原因データの一例を示す図である。It is a figure showing an example of delay cause data. 時期要因データの一例を示す図である。It is a figure showing an example of time factor data. チラシ配布作業を構成する各手順の一例を示す図である。It is a figure showing an example of each procedure which constitutes a leaflet distribution work. 作業を構成する各手順に手順番号を付番する処理を示すフローチャートである。It is a flowchart which shows the process which numbers a procedure number to each procedure which comprises an operation | work. ToDoテンプレートデータに基づいてToDoを生成する処理を示すフローチャートである。It is a flowchart which shows the process which produces | generates ToDo based on ToDo template data. 新たに生成されたToDoが追加されたToDoデータの一例を示す図である。It is a figure showing an example of ToDo data to which newly generated ToDo was added. 生成されたToDoが完了した際に、当該ToDoに係るテンプレートの補正値を更新する処理を示すフローチャートである。11 is a flowchart illustrating a process of updating a correction value of a template relating to the ToDo when the generated ToDo is completed.

以下、本発明の実施の形態について、図面を参照して詳細に説明する。   Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings.

まず、本実施形態に係る作業管理システム100の構成について説明する。
作業管理システム100は、図1に示すように、サーバ装置(作業管理装置)1と、複数のクライアント端末2と、を備えて構成されている。この作業管理システム100において、サーバ装置1とクライアント端末2とは、通信ネットワークNにより互いに通信可能に接続されている。通信ネットワークNは、有線LAN(Local Area Network)、無線LAN、移動体通信網、インターネット等を含む通信ネットワークである。なお、クライアント端末2の台数は特に限定されない。
First, the configuration of the work management system 100 according to the present embodiment will be described.
As shown in FIG. 1, the work management system 100 includes a server device (work management device) 1 and a plurality of client terminals 2. In the work management system 100, the server device 1 and the client terminal 2 are communicably connected to each other by a communication network N. The communication network N is a communication network including a wired LAN (Local Area Network), a wireless LAN, a mobile communication network, the Internet, and the like. The number of client terminals 2 is not particularly limited.

サーバ装置1は、PC、WS(Work Station)等の情報機器である。サーバ装置1は、作業スケジュールやToDo(作業項目)等を管理するスケジュール管理サーバである。
サーバ装置1は、通信ネットワークN上に展開された一又は複数のサーバから構成される。なお、本実施形態では、1つの管理サーバより構成されるものとするが、例えば、WEBサーバ、DBサーバ、ストレージサーバ等の複数のサーバ群から構成されてもよい。
サーバ装置1は、図2に示すように、制御部11と、操作部12と、表示部13と、記憶部14と、通信部15と、を備えて構成されている。
The server device 1 is an information device such as a PC and a WS (Work Station). The server device 1 is a schedule management server that manages work schedules, ToDo (work items), and the like.
The server device 1 includes one or a plurality of servers deployed on the communication network N. In the present embodiment, one management server is used. However, for example, a plurality of server groups such as a web server, a DB server, and a storage server may be used.
As illustrated in FIG. 2, the server device 1 includes a control unit 11, an operation unit 12, a display unit 13, a storage unit 14, and a communication unit 15.

制御部11は、サーバ装置1の動作を中央制御する。具体的には、制御部11は、CPU、ROM、RAMなどを備えて構成され、RAMの作業領域に展開されたROMや記憶部14に記憶されたプログラムデータとCPUとの協働により、サーバ装置1の各部を統括制御する。   The control unit 11 centrally controls the operation of the server device 1. Specifically, the control unit 11 is configured to include a CPU, a ROM, a RAM, and the like. The control unit 11 cooperates with the ROM developed in the work area of the RAM and the program data stored in the storage unit 14 and the CPU. The respective parts of the device 1 are generally controlled.

操作部12は、文字入力キー、数字入力キー、その他各種機能に対応付けられたキーなどを有するキーボード、マウス等のポインティングデバイスなどを備え、ユーザからの操作入力を受け付けて、操作入力に応じた操作信号を制御部11へと出力する。   The operation unit 12 includes a keyboard having character input keys, numeric input keys, and keys associated with other various functions, a pointing device such as a mouse, and the like. The operation unit 12 receives an operation input from a user and responds to the operation input. An operation signal is output to the control unit 11.

表示部13は、LCD(Liquid Crystal Display)などのディスプレイを備え、制御部11から出力された表示制御信号に基づいた画像を表示画面に表示する。   The display unit 13 includes a display such as an LCD (Liquid Crystal Display), and displays an image based on a display control signal output from the control unit 11 on a display screen.

記憶部(記憶手段)14は、HDD(Hard Disk Drive)、半導体メモリなどにより構成され、プログラムデータや各種設定データ等のデータを制御部11から読み書き可能に記憶する。また、記憶部14は、作業スケジュールを管理するためのスケジュールデータ141と、ToDoを管理するためのToDoデータ(作業項目データ)142(図3参照)と、稼働日データ143と、ToDoテンプレートデータ(作業項目テンプレートデータ)144(図4参照)と、遅延原因データ145(図5参照)と、時期要因データ146(図6参照)と、を記憶する。   The storage unit (storage unit) 14 is configured by a hard disk drive (HDD), a semiconductor memory, or the like, and stores data such as program data and various setting data so that the control unit 11 can read and write the data. The storage unit 14 also stores schedule data 141 for managing a work schedule, ToDo data (work item data) 142 (see FIG. 3) for managing ToDo, operating day data 143, and ToDo template data ( Work item template data) 144 (see FIG. 4), delay cause data 145 (see FIG. 5), and time factor data 146 (see FIG. 6) are stored.

ToDoデータ(作業項目データ)142は、図3に示すように、ToDo(作業項目)毎に、ToDoを表示開始する日付を示す表示開始日A1、最終的な完了期限を示す期限A2、作業の名称を示すタイトルA3、作業の詳細内容を示す詳細A4、作業の重要度や緊急度を示す優先度A5、現在の状態を示すステータスA6、作業が実際に完了した日を示す完了日A7、テンプレートを参照してToDoを生成した場合に参照したテンプレートの番号を示すテンプレート番号A8、テンプレート内の作業手順の番号を示す手順番号A9、期限A2内に完了することの難易度を示す進捗難易度A10、作業が遅延した場合の原因を示す番号である遅延原因番号A11の各情報により構成されている。   As shown in FIG. 3, the ToDo data (work item data) 142 includes, for each ToDo (work item), a display start date A1 indicating a start date of display of ToDo, a deadline A2 indicating a final completion deadline, and a work period A2. Title A3 indicating the name, detail A4 indicating the details of the work, priority A5 indicating the importance or urgency of the work, status A6 indicating the current state, completion date A7 indicating the date when the work was actually completed, template , A template number A8 indicating the number of the template referred to when the ToDo was generated, a procedure number A9 indicating the number of the work procedure in the template, and a progress difficulty A10 indicating the difficulty of completing within the deadline A2. , A delay cause number A11, which is a number indicating a cause when the work is delayed.

優先度A5は、1〜5で定義され、数字が小さいほど優先度が高くなるようになっている。ステータスA6は、未着手の場合に「1」、仕掛の場合に「2」、完了の場合に「3」が設定される。進捗難易度A10は、余裕で完了した場合に「−1」、予定通りに完了した場合に「0」、予定通りに完了するために無理をした場合に「1」が設定される。遅延原因番号A11は、完了日A7が期限A2を過ぎた場合の原因を示す番号である。   The priority A5 is defined as 1 to 5, and the smaller the number, the higher the priority. In the status A6, "1" is set when not started, "2" is set for a work in progress, and "3" is set for completed. The progress difficulty level A10 is set to “−1” when the task is completed with a margin, “0” when the task is completed as scheduled, and “1” when the task is not completed to be completed as scheduled. The delay cause number A11 is a number indicating a cause when the completion date A7 has passed the deadline A2.

ToDoテンプレートデータ(作業項目テンプレートデータ)144は、図4に示すように、テンプレートの管理番号を示すテンプレート番号B1、ToDoを追加する際に参照するテンプレートの名称を示すテンプレート名B2、テンプレート内の作業手順の番号を示す手順番号B3、作業手順の名称を示す手順名B4、作業手順の詳細を示す手順詳細B5、作業手順の優先度を示す手順優先度B6、作業を完了するのに必要な日数を示す必要日数B7、必要日数B7を計算する基点を示すフラグである相対フラグB8、現在の手順が完了した後に実行する作業手順の番号を示す次手順番号B9、必要日数B7に次回加味する補正値を示す補正値B10の各情報により構成されている。   As shown in FIG. 4, the ToDo template data (work item template data) 144 includes a template number B1 indicating the management number of the template, a template name B2 indicating the name of the template to be referred to when adding the ToDo, an operation in the template. Procedure number B3 indicating the number of the procedure, procedure name B4 indicating the name of the work procedure, procedure details B5 indicating the details of the work procedure, procedure priority B6 indicating the priority of the work procedure, number of days required to complete the work , The relative flag B8 indicating the base point for calculating the required number of days B7, the next procedure number B9 indicating the number of the work procedure to be executed after the current procedure is completed, and the correction to be added to the required number of days B7 next time It is composed of information of a correction value B10 indicating a value.

手順番号B3は、最終作業を「1」として、作業手順と逆順に付番される。手順名B4、手順詳細B5及び手順優先度B6は、ToDoに追加された場合、それぞれタイトルA3、詳細A4及び優先度A5(図3参照)となる。
必要日数B7は、相対フラグB8との組み合わせで使用される。具体的には、相対フラグB8が「0」の場合、最終作業手順完了の何日前までにその作業手順を完了しておく必要があるかを示している。例えば、相対フラグB8が「0」で必要日数B7が「3」の場合は、その作業手順を最終作業手順完了の3日前までに完了しておく必要があることを示している。また、相対フラグB8が「1」の場合、その作業手順を完了するのに必要な日数を示している。例えば、相対フラグB8が「1」で必要日数B7が「1」の場合は、その作業手順を完了するのに必要な日数が1日であることを示している。
補正値B10は、ToDo実行後、設定された期限A2内に作業が完了しなかった場合等に、必要日数B7に次回加味する補正値を示している。
The procedure number B3 is numbered in reverse order to the work procedure, with the last work being “1”. When added to ToDo, the procedure name B4, the procedure details B5, and the procedure priority B6 become the title A3, the details A4, and the priority A5 (see FIG. 3).
The required number of days B7 is used in combination with the relative flag B8. Specifically, when the relative flag B8 is "0", it indicates how many days before the completion of the final work procedure the work procedure needs to be completed. For example, when the relative flag B8 is "0" and the required number of days B7 is "3", it indicates that the work procedure needs to be completed at least three days before the completion of the final work procedure. When the relative flag B8 is "1", it indicates the number of days required to complete the work procedure. For example, when the relative flag B8 is “1” and the required number of days B7 is “1”, it indicates that the number of days required to complete the work procedure is one.
The correction value B10 indicates a correction value to be added to the necessary number of days B7 next time when the work is not completed within the set time limit A2 after the execution of ToDo.

遅延原因データ145は、図5に示すように、遅延要因の管理番号を示す遅延要因番号C1、ToDoを実行する際に遅延が発生した原因を示す遅延原因C2、遅延を補正に反映するか否かを示すフラグである補正反映フラグC3、遅延の原因が時期によるものであるか否かを示すフラグである時期要因フラグC4の各情報により構成されている。   As shown in FIG. 5, the delay cause data 145 includes a delay cause number C1 indicating the management number of the delay cause, a delay cause C2 indicating the cause of the delay when executing ToDo, and whether or not the delay is reflected in the correction. And a timing factor flag C4, which is a flag indicating whether or not the cause of the delay is due to the timing.

時期要因データ146は、図6に示すように、時期による補正を行うテンプレートの番号を示すテンプレート番号D1、時期による補正を行う手順番号を示す手順番号D2、補正対象になる月を示す月D3、時期要因による補正値を示す補正値D4の各情報により構成されている。   As shown in FIG. 6, the timing factor data 146 includes a template number D1 indicating a template number to be corrected by time, a procedure number D2 indicating a procedure number to perform correction by time, a month D3 indicating a month to be corrected, It is composed of information of a correction value D4 indicating a correction value due to a time factor.

通信部15は、通信用IC(Integrated Circuit)及び通信コネクタなどを有する通信インターフェイスであり、制御部11の制御の下、所定の通信プロトコルを用いて通信ネットワークNを介したデータ通信を行う。   The communication unit 15 is a communication interface having a communication IC (Integrated Circuit), a communication connector, and the like, and performs data communication via the communication network N using a predetermined communication protocol under the control of the control unit 11.

クライアント端末2は、PC、タブレット端末、スマートフォン、携帯電話機等の情報機器である。
クライアント端末2は、図2に示すように、制御部21と、操作部22と、表示部23と、記憶部24と、通信部25と、を備えて構成されている。
The client terminal 2 is an information device such as a PC, a tablet terminal, a smartphone, and a mobile phone.
As shown in FIG. 2, the client terminal 2 includes a control unit 21, an operation unit 22, a display unit 23, a storage unit 24, and a communication unit 25.

制御部21は、クライアント端末2の動作を中央制御する。具体的には、制御部21は、CPU、ROM、RAMなどを備えて構成され、RAMの作業領域に展開されたROMや記憶部24に記憶されたプログラムデータとCPUとの協働により、クライアント端末2の各部を統括制御する。   The control unit 21 centrally controls the operation of the client terminal 2. Specifically, the control unit 21 is configured to include a CPU, a ROM, a RAM, and the like. The respective parts of the terminal 2 are totally controlled.

操作部22は、文字入力キー、数字入力キー、その他各種機能に対応付けられたキーなどを有するキーボード、マウス等のポインティングデバイスなどを備え、ユーザからの操作入力を受け付けて、操作入力に応じた操作信号を制御部21へと出力する。   The operation unit 22 includes a keyboard having character input keys, numeric input keys, keys associated with various functions, and the like, a pointing device such as a mouse, and receives an operation input from a user and responds to the operation input. An operation signal is output to the control unit 21.

表示部23は、LCDなどのディスプレイを備え、制御部21から出力された表示制御信号に基づいた画像を表示画面に表示する。例えば、表示部23は、生成されたToDoをToDoリストとしてリスト表示するための画面を表示する。また、表示部23は、完了したToDoの進捗難易度A10及び遅延原因番号A11をユーザが選択可能な画面を表示する。   The display unit 23 includes a display such as an LCD, and displays an image based on a display control signal output from the control unit 21 on a display screen. For example, the display unit 23 displays a screen for listing the generated ToDo as a ToDo list. The display unit 23 displays a screen on which the user can select the progress difficulty level A10 and the delay cause number A11 of the completed ToDo.

記憶部24は、HDD、半導体メモリなどにより構成され、プログラムデータや各種設定データ等のデータを制御部21から読み書き可能に記憶する。   The storage unit 24 is configured by an HDD, a semiconductor memory, or the like, and stores data such as program data and various setting data so that the control unit 21 can read and write the data.

通信部25は、通信用IC及び通信コネクタなどを有する通信インターフェイスであり、制御部21の制御の下、所定の通信プロトコルを用いて通信ネットワークNを介したデータ通信を行う。   The communication unit 25 is a communication interface having a communication IC, a communication connector, and the like, and performs data communication via the communication network N using a predetermined communication protocol under the control of the control unit 21.

次に、本実施形態に係る作業管理システム100のサーバ装置1の動作について、図7〜図11を参照して説明する。
まず、ToDoテンプレートデータ144を作成する処理について、図7及び図8を参照して説明する。本実施形態では、ToDoテンプレートデータ144を作成する作業として、宣伝用のチラシを作成して配布する作業(以下、チラシ配布作業)を例示して説明する。
Next, the operation of the server device 1 of the work management system 100 according to the present embodiment will be described with reference to FIGS.
First, a process of creating the ToDo template data 144 will be described with reference to FIGS. In the present embodiment, as an example of a task for creating the ToDo template data 144, a task of creating and distributing a flyer for an advertisement (hereinafter, a leaflet distribution task) will be described.

チラシ配布作業は、図7に示すように、印刷所を手配する手順(以下、印刷工場手配T1)、チラシ用の原稿を作成する手順(以下、原稿作成T2)、チラシ配布のためのアルバイトを手配する手順(以下、チラシ配布のアルバイト手配T3)、原稿を印刷所に出稿する手順(以下、出稿T4)、印刷所からサンプルが上がってくる手順(以下、サンプル上がりT5)、サンプルを確認する手順(以下、サンプルチェックT6)、最終印刷を指示する手順(以下、最終印刷指示T7)、印刷所より上がってきたチラシを配布する手順(以下、宣伝チラシ配布T8)により構成される。
ユーザは、クライアント端末2の操作部22を操作して、上記の各手順及び手順間の繋がりを登録する。登録された情報は、サーバ装置1に送信される。
サーバ装置1では、上記の登録情報に基づいて、作業を構成する各手順に手順番号を付番する処理を行う。以下、手順番号を付番する処理について、図8のフローチャートを参照して説明する。
As shown in FIG. 7, the flyer distribution work includes a procedure for arranging a printing shop (hereinafter referred to as a printing factory arrangement T1), a procedure for creating a manuscript for a flyer (hereinafter, manuscript creation T2), and arranging a part-time job for distributing a flyer. (Hereinafter referred to as part-time job distribution T3), submitting a manuscript to a print shop (hereinafter referred to as T4), receiving a sample from the print shop (hereinafter referred to as a sample rise T5), and confirming a sample (hereinafter referred to as a sample) , Sample check T6), a procedure for instructing final printing (hereinafter, final printing instruction T7), and a procedure for distributing a flyer sent from a printing shop (hereinafter, advertising flyer distribution T8).
The user operates the operation unit 22 of the client terminal 2 to register the above procedures and the connections between the procedures. The registered information is transmitted to the server device 1.
The server device 1 performs a process of assigning a procedure number to each procedure constituting the work based on the registration information. Hereinafter, the process of assigning the procedure number will be described with reference to the flowchart of FIG.

まず、サーバ装置1の制御部11は、最終手順に手順番号として「1」を付番し、最終手順の次手順番号に、次手順が存在しないことを示す「0」をセットする(ステップS101)。例えば、図7に示す例では、最終手順である「宣伝チラシ配布T8」に1を付番する。   First, the control unit 11 of the server device 1 assigns “1” as the procedure number to the final procedure, and sets “0” indicating that the next procedure does not exist as the next procedure number of the final procedure (step S101). ). For example, in the example shown in FIG. 7, “1” is assigned to “advertising flyer distribution T8” which is the final procedure.

次に、制御部11は、手順番号Nに初期値「1」、次手順番号Npに初期値「0」、付番対象手順Xに「最終手順」をそれぞれセットする(ステップS102)。   Next, the control unit 11 sets an initial value “1” for the procedure number N, an initial value “0” for the next procedure number Np, and “final procedure” for the numbering target procedure X (step S102).

次に、制御部11は、付番対象手順Xに繋がっている1つ前の手順を列挙して並び替え、それらをY(M)とする(ステップS103)。即ち、Y(M)は、M個の要素を持つYの配列である。例えば、図7に示す例において、付番対象手順Xに「最終手順(宣伝チラシ配布T8)」がセットされている場合、付番対象手順Xに繋がっている1つ前の手順は、最終印刷指示T7及びチラシ配布のアルバイト手配T3の2つであり、この2つの手順を並べた配列がY(M)となる。なお、各手順を並び替える方法に関しては、例えば、手順名の並び順や作業を思い付いた順など、任意の方法を採用することができる。ここでは、最終印刷指示T7、チラシ配布のアルバイト手配T3の順に配列されているものとする。   Next, the control unit 11 enumerates and rearranges the immediately preceding procedure connected to the numbering target procedure X, and sets them as Y (M) (step S103). That is, Y (M) is an array of Y having M elements. For example, in the example shown in FIG. 7, when “final procedure (advertisement leaflet distribution T8)” is set in the numbering target procedure X, the immediately preceding procedure connected to the numbering target procedure X is the final printing Instruction T7 and part-time job arrangement T3 for flyer distribution, and the arrangement of these two procedures is Y (M). In addition, as a method of rearranging the respective procedures, for example, an arbitrary method such as a sequence name of the procedure names or an order in which the user comes up with the work can be adopted. Here, it is assumed that the print job is arranged in the order of the final print instruction T7 and the part-time job arrangement T3 for flyer distribution.

次に、制御部11は、Mの配列順を示すLに1をセットし、次手順番号Npに手順番号Nをセットする(ステップS104)。例えば、手順番号Nに1がセットされている場合は、次手順番号Npに「1」がセットされる。   Next, the control unit 11 sets L indicating the arrangement order of M to 1 and sets the procedure number N to the next procedure number Np (step S104). For example, if the procedure number N is set to 1, “1” is set to the next procedure number Np.

次に、制御部11は、付番対象手順XにY(L)をセットする(ステップS105)。例えば、配列順Lに1がセットされている場合は、付番対象手順XにY(1)がセットされる。ステップS103の例示においては、Y(1)は「最終印刷指示T7」であるので、最終印刷指示T7が付番対象手順Xとしてセットされる。   Next, the control unit 11 sets Y (L) in the numbering target procedure X (step S105). For example, when 1 is set in the arrangement order L, Y (1) is set in the numbering target procedure X. In the example of step S103, since Y (1) is "final print instruction T7", final print instruction T7 is set as numbering target procedure X.

次に、制御部11は、手順番号Nに1加算する(ステップS106)。例えば、手順番号Nに1がセットされている場合は、手順番号Nに1加算されて「2」がセットされる。   Next, the control unit 11 adds 1 to the procedure number N (Step S106). For example, when 1 is set to the procedure number N, 1 is added to the procedure number N and “2” is set.

次に、制御部11は、付番対象手順Xに手順番号Nを付番する(ステップS107)。例えば、付番対象手順Xに最終印刷指示T7がセットされ、手順番号Nに2がセットされている場合は、最終印刷指示T7に手順番号として2が付番される。   Next, the control unit 11 numbers the procedure number N to the numbering target procedure X (step S107). For example, when the final printing instruction T7 is set in the numbering target procedure X and 2 is set in the procedure number N, 2 is assigned as the procedure number to the final printing instruction T7.

次に、制御部11は、付番対象手順Xに繋がっている1つ前の手順が存在するか否かを判定する(ステップS108)。例えば、図4に示す例において、付番対象手順Xに「最終印刷指示T7」がセットされている場合、1つ前の手順として「サンプルチェックT6」が繋がっているので、1つ前の手順が存在すると判定する。
制御部11は、1つ前の手順が存在すると判定した場合(ステップS108:YES)、次のステップS109へと移行する。
一方、制御部11は、1つ前の手順が存在しないと判定した場合(ステップS108:NO)、ステップS110へと移行する。
Next, the control unit 11 determines whether or not there is an immediately preceding procedure connected to the numbering target procedure X (step S108). For example, in the example illustrated in FIG. 4, when “final print instruction T7” is set in the numbering target procedure X, “sample check T6” is connected as the immediately preceding procedure, so the immediately preceding procedure is performed. Is determined to exist.
When the control unit 11 determines that the immediately preceding procedure exists (step S108: YES), the process proceeds to the next step S109.
On the other hand, when the control unit 11 determines that the previous procedure does not exist (step S108: NO), the process proceeds to step S110.

次に、制御部11は、Y(M)、M、L、NpをRAM等に設けられたスタックに格納する(ステップS109)。制御部11は、Y(M)、M、L、Npをスタックに格納した後、ステップS103へと移行して、再度付番対象手順Xに繋がっている1つ前の手順を列挙して並び替え、それらをY(M)とする。そして、ステップS104以降の処理を繰り返す。これにより、図7に示す例では、サンプルチェックT6、サンプル上がりT5、出稿T4、…の順に付番されることとなる。   Next, the control unit 11 stores Y (M), M, L, and Np in a stack provided in a RAM or the like (Step S109). After storing the Y (M), M, L, and Np in the stack, the control unit 11 proceeds to step S103, and lists and arranges the immediately preceding procedure connected to the numbering target procedure X again. Instead, they are Y (M). Then, the processing after step S104 is repeated. As a result, in the example shown in FIG. 7, the numbering is performed in the order of sample check T6, sample rise T5, publication T4,.

ステップS108で1つ前の手順が存在しないと判定した場合、制御部11は、配列順LがM以上であるか否かを判定する(ステップS110)。即ち、ステップS103で配列された要素(手順)が全て付番されたか否かを判定する。
制御部11は、配列順LがM以上であると判定した場合(ステップS110:YES)、ステップS103で配列された手順が全て付番されたと判定し、次のステップS111へと移行する。
一方、制御部11は、配列順LがM未満であると判定した場合(ステップS110:NO)、配列順Lに1加算して(ステップS113)ステップS105へと移行し、再度付番対象手順XにY(L)をセットする。これにより、配列順Lが次点の手順が付番対象手順Xとしてセットされる。
If it is determined in step S108 that the immediately preceding procedure does not exist, the control unit 11 determines whether the arrangement order L is equal to or greater than M (step S110). That is, it is determined whether all the elements (procedures) arranged in step S103 have been numbered.
When determining that the arrangement order L is equal to or greater than M (step S110: YES), the control unit 11 determines that all the procedures arranged in step S103 have been numbered, and proceeds to the next step S111.
On the other hand, when determining that the arrangement order L is less than M (step S110: NO), the control unit 11 adds 1 to the arrangement order L (step S113), shifts to step S105, and again performs the numbering target procedure. X is set to Y (L). As a result, the procedure having the next position in the array order L is set as the numbering procedure X.

次に、制御部11は、スタックが空であるか否かを判定する(ステップS111)。
制御部11は、スタックが空であると判定した場合(ステップS111:YES)、処理を終了する。
一方、制御部11は、スタックが空でないと判定した場合(ステップS111:YES)、Y(M)、M、L、Npをスタックから引き出して(ステップS112)ステップS108へと移行し、再度付番対象手順Xに繋がっている1つ前の手順が存在するか否かを判定する。ここで、本実施形態では、データの出し入れにおいて、先入れ後出しの方法が採用される。即ち、ステップS112では、ステップS109で最後に格納されたデータ(Y(M)、M、L、Np)から順に引き出されることとなる。
Next, the control unit 11 determines whether or not the stack is empty (Step S111).
When determining that the stack is empty (step S111: YES), the control unit 11 ends the processing.
On the other hand, if the control unit 11 determines that the stack is not empty (step S111: YES), it pulls out Y (M), M, L, and Np from the stack (step S112), shifts to step S108, and attaches again. It is determined whether or not there is an immediately preceding procedure connected to the number-target procedure X. Here, in the present embodiment, a first-in, first-out method is adopted in taking data in and out. That is, in step S112, the data (Y (M), M, L, Np) stored last in step S109 are sequentially extracted.

以上のように、上記図8に示す処理を行うことで、図7に示すように、作業を構成する各手順に手順番号が付番される。
また、ユーザは、手順番号を付番した各手順に対して、それぞれ必要日数B7を設定する。必要日数B7の設定方法としては、最終作業手順完了の何日前までにその作業手順を完了しておく必要があるかを指定する方法と、その作業手順を完了するのに必要な日数を指定する方法と、の2つの方法が挙げられる。
例えば、図7に示す例では、印刷工場手配T1、チラシ配布のアルバイト手配T3、出稿T4、サンプル上がりT5及び最終印刷指示T7が、最終作業手順完了の何日前までにその作業手順を完了しておく必要があるかを指定する方法で必要日数B7が設定されている。一方、原稿作成T2及びサンプルチェックT6が、その作業手順を完了するのに必要な日数を指定する方法で必要日数B7が設定されている。
従って、印刷工場手配T1、チラシ配布のアルバイト手配T3、出稿T4、サンプル上がりT5及び最終印刷指示T7の相対フラグB8には、「0」が設定される。一方、原稿作成T2及びサンプルチェックT6の相対フラグB8には、「1」が設定される。
By performing the processing shown in FIG. 8 as described above, the procedure numbers are assigned to the respective steps constituting the work as shown in FIG.
Further, the user sets the required number of days B7 for each procedure numbered with the procedure number. As a method for setting the required number of days B7, a method for specifying how many days before the completion of the final work procedure it is necessary to complete the work procedure, and a method for specifying the number of days required for completing the work procedure And two methods.
For example, in the example shown in FIG. 7, the print factory arrangement T1, the part-time job arrangement T3 of the flyer distribution, the submission T4, the sample up T5, and the final print instruction T7 complete the work procedure by a certain number of days before the completion of the final work procedure. The required number of days B7 is set by a method of designating whether it is necessary to keep it. On the other hand, the required number of days B7 is set by a method of designating the number of days required for completing the work procedure in the document creation T2 and the sample check T6.
Accordingly, “0” is set in the relative flag B8 of the printing factory arrangement T1, the part-time job arrangement T3 of the flyer distribution, the publication T4, the sample up T5, and the final print instruction T7. On the other hand, “1” is set in the relative flag B8 of the document creation T2 and the sample check T6.

また、ユーザは、手順番号を付番した各手順に対して、それぞれ手順詳細B5及び手順優先度B6を設定する。手順詳細B5及び手順優先度B6は、ToDoテンプレートデータ144を作成するユーザが任意に設定する項目である。本実施形態では、手順優先度B6が設定されなかった場合に、デフォルト値として「3」が設定されるようになっている。
以上の処理により、ToDoテンプレートデータ144(図4参照)が作成され、記憶部14に記憶される。
In addition, the user sets the procedure details B5 and the procedure priority B6 for each procedure numbered with the procedure number. The procedure details B5 and the procedure priority B6 are items arbitrarily set by the user who creates the ToDo template data 144. In the present embodiment, when the procedure priority B6 is not set, "3" is set as a default value.
Through the above processing, the ToDo template data 144 (see FIG. 4) is created and stored in the storage unit 14.

次に、ToDoテンプレートデータ144に基づいてToDoを生成する処理について、図9のフローチャートを参照して説明する。この処理は、ユーザが記憶部14に記憶されたToDoテンプレートデータ144の一覧から利用したいテンプレートを選択し、当該選択されたテンプレートに係る作業の完了予定日を入力したことを契機として開始される。本実施形態では、チラシ配布作業の最終手順である宣伝チラシ配布T8の完了予定日として、4月7日が入力されたものとして説明する。   Next, a process of generating ToDo based on the ToDo template data 144 will be described with reference to a flowchart of FIG. This process is started when the user selects a template to be used from the list of the ToDo template data 144 stored in the storage unit 14 and inputs a scheduled completion date of the work related to the selected template. In the present embodiment, a description will be given assuming that April 7 is input as the scheduled completion date of the advertisement flyer distribution T8, which is the final procedure of the flyer distribution work.

まず、サーバ装置1の制御部11は、ユーザにより選択されたテンプレート(テンプレート番号B1)の手順レコードを抽出し、先頭レコードを抽出する(ステップS201)。例えば、図4に示す例では、手順番号B3「1」の手順名B4「チラシ配布」のレコードが抽出される。   First, the control unit 11 of the server device 1 extracts the procedure record of the template (template number B1) selected by the user, and extracts the first record (step S201). For example, in the example shown in FIG. 4, a record of the procedure name B4 of the procedure number B3 "1" and "flyer distribution" is extracted.

次に、制御部11は、ステップS201で抽出された先頭レコードの期限A2に、ユーザにより入力された完了予定日を設定する(ステップS202)。本実施形態では、先頭レコードの期限A2に、4月7日が設定される。なお、ここで先頭レコードの期限A2に完了予定日を設定するのは、テンプレートの先頭レコードが最終手順であるためである。   Next, the control unit 11 sets the scheduled completion date input by the user as the deadline A2 of the first record extracted in step S201 (step S202). In the present embodiment, April 7 is set as the time limit A2 of the first record. The completion date is set as the deadline A2 of the first record here because the first record of the template is the final procedure.

次に、制御部11は、ステップS201で抽出された先頭レコードの表示開始日A1を設定する(ステップS203)。本実施形態では、表示開始日A1は、デフォルトとして期限A2の3日前に設定される。これは、ユーザに対して期限A2の数日前にToDoを報知した方が便利であるためである。なお、表示開始日オフセットのデフォルト値は、ユーザにより任意に変更可能としてもよい。   Next, the control unit 11 sets the display start date A1 of the first record extracted in step S201 (step S203). In the present embodiment, the display start date A1 is set as a default three days before the deadline A2. This is because it is more convenient to notify the user of ToDo several days before the deadline A2. Note that the default value of the display start date offset may be arbitrarily changeable by the user.

次に、制御部11は、次のレコードを抽出する(ステップS204)。
次に、制御部11は、ステップS204で抽出されたレコードの期限A2を設定する(ステップS205)。具体的には、制御部11は、相対フラグB8が「0」の場合、「期限A2=入力された完了予定日−(必要日数B7+補正値B10+時期要因補正値)」の式を用いて、期限A2を設定する。時期要因補正値は、テンプレート番号B1、手順番号B3及び期限A2の月をキーとして、時期要因データ146を検索して得られる補正値である。一方、制御部11は、相対フラグB8が「1」の場合、「期限A2=次手順番号の期限A2−1」の式を用いて、期限A2を設定する。
Next, the control unit 11 extracts the next record (Step S204).
Next, the control unit 11 sets a time limit A2 of the record extracted in step S204 (step S205). Specifically, when the relative flag B8 is “0”, the control unit 11 uses an expression of “expiration date A2 = input scheduled completion date− (necessary days B7 + correction value B10 + time factor correction value)”, The term A2 is set. The time factor correction value is a correction value obtained by searching the time factor data 146 using the template number B1, the procedure number B3, and the month of the time limit A2 as keys. On the other hand, when the relative flag B8 is “1”, the control unit 11 sets the time limit A2 using the expression “time limit A2 = time limit A2-1 of next procedure number”.

次に、制御部11は、ステップS204で抽出されたレコードの表示開始日A1を設定する(ステップS206)。具体的には、制御部11は、相対フラグB8が「0」の場合、「表示開始日A1=期限A2−表示開始日オフセット(本実施形態では「3」)」の式を用いて、表示開始日A1を設定する。一方。制御部11は、相対フラグB8が「1」の場合、「表示開始日A1=期限A2−(必要日数B7+補正値B10+時期要因補正値)−表示開始日オフセット」の式を用いて、表示開始日A1を設定する。   Next, the control unit 11 sets the display start date A1 of the record extracted in step S204 (step S206). Specifically, when the relative flag B8 is “0”, the control unit 11 uses the expression “display start date A1 = time limit A2−display start date offset (“ 3 ”in the present embodiment)” to display. The start date A1 is set. on the other hand. When the relative flag B8 is “1”, the control unit 11 starts display using the expression “display start date A1 = expiration date A2- (necessary days B7 + correction value B10 + time factor correction value) −display start date offset”. Set the date A1.

次に、制御部11は、期限A2及び表示開始日A1が未設定のレコードが存在するか否かを判定する(ステップS207)。
制御部11は、未設定のレコードが存在すると判定した場合(ステップS207:YES)、ステップS204へと移行して次のレコードを抽出し、ステップS206までの処理を繰り返す。
一方、制御部11は、未設定のレコードが存在しないと判定した場合(ステップS207:NO)、次のステップS208へと移行する。
Next, the control unit 11 determines whether or not there is a record for which the time limit A2 and the display start date A1 have not been set (step S207).
When determining that there is an unset record (step S207: YES), the control unit 11 proceeds to step S204, extracts the next record, and repeats the processing up to step S206.
On the other hand, when the control unit 11 determines that there is no record that has not been set (step S207: NO), the process proceeds to the next step S208.

次に、制御部11は、ToDoテンプレートデータ144を参照して、手順優先度B6、テンプレート番号B1及び手順番号B3のデータを転記する(ステップS208)。
次に、制御部11は、ステータスA6に未着手であることを示す「1」を設定する(ステップS209)。
Next, the control unit 11 refers to the ToDo template data 144 and transcribes the data of the procedure priority B6, the template number B1, and the procedure number B3 (Step S208).
Next, the control unit 11 sets “1” indicating that the user has not started to the status A6 (step S209).

以上の処理により、ToDoに係るデータが生成され、記憶部14に記憶されたToDoデータ142が更新される(図10参照)。即ち、制御部11は、作業を構成する手順毎に当該手順の期限を含むToDoを生成することで、本発明の生成手段として機能する。そして、このToDoデータ142は、クライアント端末2に送信され、クライアント端末2の表示部23にToDoリストとしてリスト表示される。   Through the above processing, data related to ToDo is generated, and the ToDo data 142 stored in the storage unit 14 is updated (see FIG. 10). That is, the control unit 11 functions as a generation unit of the present invention by generating a ToDo including a time limit of the procedure for each procedure configuring the work. Then, the ToDo data 142 is transmitted to the client terminal 2 and is displayed on the display unit 23 of the client terminal 2 as a ToDo list.

次に、生成されたToDoが完了した際に、当該ToDoに係るテンプレートの必要日数B7を補正する補正値B10を更新する処理について、図11のフローチャートを参照して説明する。この処理は、生成されたToDoが完了したことを示すユーザ操作を検出したことを契機として開始される。   Next, a process of updating the correction value B10 for correcting the required number of days B7 of the template related to the ToDo when the generated ToDo is completed will be described with reference to a flowchart of FIG. This process is started when a user operation indicating that the generated ToDo is completed is detected.

まず、サーバ装置1の制御部11は、完了したToDoに係るレコードのステータスA6に完了であることを示す「3」を設定する(ステップS301)。このステップS301の処理により、完了したToDoは、クライアント端末2の表示部23等に表示されるToDoリストから消去される。   First, the control unit 11 of the server device 1 sets “3” indicating completion to the status A6 of the record related to the completed ToDo (step S301). By the processing in step S301, the completed ToDo is deleted from the ToDo list displayed on the display unit 23 or the like of the client terminal 2.

次に、制御部11は、完了したToDoの進捗難易度A10及び遅延原因番号A11をユーザが選択(入力)可能な画面をクライアント端末2の表示部23に表示させる(ステップS302)。   Next, the control unit 11 causes the display unit 23 of the client terminal 2 to display a screen on which the user can select (input) the completed difficulty level A10 of the completed ToDo and the delay cause number A11 (step S302).

次に、制御部11は、ユーザにより選択された進捗難易度及び遅延原因番号を取得する(ステップS303)。ステップS303で取得された進捗難易度及び遅延原因番号は、それぞれToDoデータ142の進捗難易度A10及び遅延原因番号A11に設定される。なお、ToDoの完了日A7が期限A2内であった場合は、遅延原因番号は選択されず、進捗難易度のみが取得される。   Next, the control unit 11 acquires the progress difficulty and the delay cause number selected by the user (step S303). The progress difficulty and the delay cause number acquired in step S303 are set to the progress difficulty A10 and the delay cause number A11 of the ToDo data 142, respectively. If the completion date A7 of the ToDo is within the time limit A2, the delay cause number is not selected, and only the progress difficulty level is obtained.

次に、制御部11は、ステップS303で取得した進捗難易度に基づいて、補正値B10を更新する(ステップS304)。
例えば、制御部11は、ユーザにより選択された進捗難易度が「余裕を持って完了した」であった場合、「補正値B10=補正値B10(未設定の場合は0)−0.1×必要日数B7」の式を用いて、補正値B10を更新する。また、制御部11は、ユーザにより選択された進捗難易度が「予定通りに完了した」であった場合、従前の補正値B10をそのまま保持する。また、制御部11は、ユーザにより選択された進捗難易度が「予定通りに完了するために無理をした」であった場合、「補正値B10=補正値B10+0.1×必要日数B7」の式を用いて、補正値B10を更新する。
即ち、制御部11は、本発明の更新手段として機能する。
Next, the control unit 11 updates the correction value B10 based on the progress difficulty acquired in step S303 (step S304).
For example, if the progress difficulty selected by the user is “completed with a margin”, the control unit 11 determines that “correction value B10 = correction value B10 (0 if not set) −0.1 × The correction value B10 is updated using the equation of “necessary days B7”. Further, when the progress difficulty selected by the user is “completed as scheduled”, the control unit 11 retains the previous correction value B10 as it is. When the difficulty level of the progress selected by the user is “I tried to complete as scheduled”, the control section 11 calculates the expression “correction value B10 = correction value B10 + 0.1 × number of required days B7”. Is used to update the correction value B10.
That is, the control unit 11 functions as the updating unit of the present invention.

次に、制御部11は、完了したToDoの完了日A7が期限A2内であるか否かを判定する(ステップS305)。
制御部11は、完了したToDoの完了日A7が期限A2内であると判定した場合(ステップS305:YES)、遅延原因番号がユーザにより選択されていないと判定し、処理を終了する。
一方、制御部11は、完了したToDoの完了日A7が期限A2を過ぎていると判定した場合(ステップS305:NO)、次のステップS306へと移行する。
Next, the control unit 11 determines whether the completion date A7 of the completed ToDo is within the time limit A2 (step S305).
When determining that the completion date A7 of the completed ToDo is within the time limit A2 (step S305: YES), the control unit 11 determines that the delay cause number has not been selected by the user, and ends the process.
On the other hand, when the control unit 11 determines that the completion date A7 of the completed ToDo has passed the deadline A2 (step S305: NO), the control unit 11 proceeds to the next step S306.

次に、制御部11は、ステップS303で取得した遅延原因番号に基づいて、補正値B10を更新する(ステップS306)。
例えば、制御部11は、ユーザにより選択された遅延原因番号A11が示すレコードの補正反映フラグC3が「0」であった場合、当該遅延原因による補正を行わないと判定する。
一方、制御部11は、ユーザにより選択された遅延原因番号A11が示すレコードの補正反映フラグC3が「1」であった場合、当該遅延原因による補正を行うと判定し、時期要因フラグC4を参照して補正値B10を更新する。
Next, the control unit 11 updates the correction value B10 based on the delay cause number acquired in Step S303 (Step S306).
For example, when the correction reflection flag C3 of the record indicated by the delay cause number A11 selected by the user is “0”, the control unit 11 determines that the correction based on the delay cause is not performed.
On the other hand, when the correction reflection flag C3 of the record indicated by the delay cause number A11 selected by the user is “1”, the control unit 11 determines that the correction due to the delay cause is performed, and refers to the timing factor flag C4. Then, the correction value B10 is updated.

具体的には、制御部11は、ユーザにより選択された遅延原因番号A11が示すレコードの時期要因フラグC4が「0」であった場合、「補正値B10=補正値B10+遅延日数」の式を用いて、補正値B10を更新する。
また、制御部11は、ユーザにより選択された遅延原因番号A11が示すレコードの時期要因フラグC4が「1」であった場合、時期要因データ146に、テンプレート番号D1、手順番号D2及びToDoの実施月を示す月D3をキーとしたレコードを生成し、補正値D4に遅延日数を設定する。テンプレート番号D1、手順番号D2及び月D3をキーとしたレコードが既に存在する場合は、「補正値D4=補正値D4+遅延日数」の式を用いて、補正値D4を更新する。なお、ステップS304で進捗難易度に係る補正値B10が設定されている場合は、次回以降のToDoの必要日数B7を補正する際、進捗難易度に係る補正値B10と時期要因に係る補正値D4とを加算した値に基づいて補正される。
Specifically, when the time factor flag C4 of the record indicated by the delay cause number A11 selected by the user is “0”, the control unit 11 calculates the expression “correction value B10 = correction value B10 + number of days delayed”. To update the correction value B10.
When the time factor flag C4 of the record indicated by the delay cause number A11 selected by the user is “1”, the control unit 11 performs the execution of the template number D1, the procedure number D2, and the ToDo in the time factor data 146. A record is generated with the month D3 indicating the month as a key, and the number of delay days is set in the correction value D4. If a record using the template number D1, the procedure number D2, and the month D3 as keys already exists, the correction value D4 is updated by using the expression "correction value D4 = correction value D4 + number of days to be delayed". If the correction value B10 relating to the progress difficulty level is set in step S304, the correction value B10 relating to the progress difficulty level and the correction value D4 relating to the timing factor are used to correct the required number of days B7 for ToDo after the next time. Is corrected based on the value obtained by adding.

以上の処理により、生成されたToDo(作業項目)が完了した際に、予め登録されたテンプレートの補正値B10を更新することができるので、次回以降の当該ToDoの必要日数B7に補正値B10を加味することができ、当該ToDoの期限A2の精度を向上することが可能となる。   By the above processing, when the generated ToDo (work item) is completed, the correction value B10 of the template registered in advance can be updated. Therefore, the correction value B10 is added to the required number of days B7 of the ToDo from the next time. It can be added, and the accuracy of the deadline A2 of the ToDo can be improved.

以上のように、本実施形態に係る作業管理システム100のサーバ装置1によれば、作業を構成する複数の手順、当該手順の実行順序及び当該手順毎の必要日数を含むテンプレートデータを記憶しておき、ユーザにより指定された作業の完了予定日と記憶手段(記憶部14)に記憶されたテンプレートデータとに基づいて、作業を構成する手順毎に当該手順の期限を含む作業項目(ToDo)を生成する。
従って、作業の完了予定日を入力するという簡易な操作で作業を構成する手順に係る作業項目(ToDo)を自動的に生成することができる。よって、繰り返し行う作業で比較的長期の準備を必要とする作業であっても、効率的な作業項目管理を行うことができる。
As described above, according to the server device 1 of the work management system 100 according to the present embodiment, the template data including the plurality of procedures constituting the work, the execution order of the procedures, and the required number of days for each procedure is stored. In addition, based on the scheduled completion date of the work specified by the user and the template data stored in the storage means (storage unit 14), a work item (ToDo) including a deadline of the procedure for each procedure constituting the work is stored. Generate.
Therefore, it is possible to automatically generate a work item (ToDo) related to a procedure for configuring a work by a simple operation of inputting a scheduled completion date of the work. Therefore, efficient work item management can be performed even for a work that requires relatively long-term preparation in a repeated work.

また、本実施形態では、生成されたToDoの完了後にユーザにより入力された補正値に係る情報に基づいて、補正値を更新する。例えば、ToDoの進捗難易度や遅延原因に基づいて補正値を更新する。そして、更新された補正値に基づいて必要日数を補正する。
従って、次回以降にToDoを生成する際の期限設定の精度を向上することができる。よって、ToDo管理を更に効率的に行うことができる。
In the present embodiment, the correction value is updated based on information on the correction value input by the user after the completion of the generated ToDo. For example, the correction value is updated based on the difficulty level of the progress of ToDo or the cause of the delay. Then, the required number of days is corrected based on the updated correction value.
Therefore, it is possible to improve the accuracy of the time limit setting when generating ToDo after the next time. Therefore, the ToDo management can be performed more efficiently.

また、本実施形態では、遅延原因が時期要因であるか否かを判定し、時期要因であると判定した場合に、当該時期要因に係る補正値を更新する。そして、作業の完了予定日が時期要因に関わる場合に、更新された当該時期要因に係る補正値に基づいて必要日数を補正する。
従って、季節や時期が原因で通常よりも多く遅延が発生するような場合であっても、期限を適切に設定することができる。よって、ToDo管理の正確性を確保することができる。
Further, in the present embodiment, it is determined whether or not the delay cause is a timing factor, and when it is determined that the delay factor is a timing factor, the correction value related to the timing factor is updated. Then, when the scheduled completion date of the work is related to the timing factor, the required number of days is corrected based on the updated correction value related to the updated timing factor.
Therefore, even in a case where a delay occurs more than usual due to a season or time, a time limit can be appropriately set. Therefore, the accuracy of ToDo management can be ensured.

以上、本発明に係る実施形態に基づいて具体的に説明したが、本発明は上記実施形態に限定されるものではなく、その要旨を逸脱しない範囲で変更可能である。   As described above, the present invention has been specifically described based on the embodiment. However, the present invention is not limited to the above embodiment, and can be changed without departing from the gist of the invention.

例えば、上記実施形態では、生成されたToDoの完了後にユーザにより入力された補正値に係る情報(進捗難易度、遅延原因等)に基づいて補正値を更新するようにしているが、これに限定されるものではない。例えば、補正値を更新しない構成としてもよい。また、進捗難易度に基づく補正値のみを更新する構成としてもよいし、遅延原因に基づく補正値のみを更新する構成としてもよい。   For example, in the above-described embodiment, the correction value is updated based on the information (the degree of difficulty of progress, the cause of delay, etc.) regarding the correction value input by the user after the completion of the generated ToDo, but is not limited thereto. It is not something to be done. For example, a configuration in which the correction value is not updated may be adopted. In addition, only the correction value based on the progress difficulty may be updated, or only the correction value based on the delay cause may be updated.

また、上記実施形態では、更新された補正値に基づいて必要日数を補正するようにしているが、これに限定されるものではない。例えば、ユーザが直接補正値を入力可能な構成とし、更新された補正値で補正する方法とユーザが直接補正値を入力する方法とを任意に選択可能な構成としてもよい。   In the above embodiment, the required number of days is corrected based on the updated correction value. However, the present invention is not limited to this. For example, a configuration is possible in which the user can directly input a correction value, and a configuration in which a method of correcting with the updated correction value and a method of directly inputting the correction value by the user may be arbitrarily selectable.

また、上記実施形態では、ユーザにより入力された進捗難易度A10が「余裕を持って完了した」であった場合、「補正値B10=補正値B10−0.1×必要日数B7」の式を用いて補正値B10を更新するようにしているが、これに限定されるものではない。例えば、作業が前倒しで完了した場合、「補正値B10=補正値B10−前倒しした日数」の式を用いて、補正値B10を更新するようにしてもよい。
また、予め「前倒し要因番号」、「前倒し要因」、「補正反映フラグ」、「時期要因フラグ」を関連付けた前倒し要因データを記憶部14に記憶しておき、ユーザにより「前倒し要因番号」を入力させる構成としてもよい。この場合、入力された前倒し要因に基づいて補正値が更新されることとなる。
また、前倒し要因が時期要因であるか否かを判定し、時期要因であると判定した場合に、当該時期要因に係る補正値を更新するようにしてもよい。この場合、ユーザにより指定された完了予定日が時期要因に関わる場合に、設定された当該時期要因に係る補正値に基づいて必要日数が補正されることとなる。
In the above embodiment, when the progress difficulty A10 input by the user is “completed with a margin”, the equation of “correction value B10 = correction value B10−0.1 × necessary days B7” is used. The correction value B10 is used to update the correction value, but the present invention is not limited to this. For example, when the operation is completed ahead of time, the correction value B10 may be updated using the expression “correction value B10 = correction value B10−number of days moved forward”.
In addition, advance factor data in which “forward factor number”, “forward factor”, “correction reflection flag”, and “time factor flag” are associated with each other is stored in the storage unit 14 in advance, and the user inputs the “forward factor number”. It is good also as a structure to make it. In this case, the correction value is updated based on the input forward factor.
Further, it may be determined whether or not the forward moving factor is a timing factor, and when it is determined that the timing factor is a timing factor, the correction value relating to the timing factor may be updated. In this case, when the scheduled completion date specified by the user is related to the timing factor, the required number of days is corrected based on the set correction value for the timing factor.

また、期限を計算する場合、期限が祝日や日曜日などに重なった場合は、必ず前日になるように期限を調整し、その手順より前の手順は調整した日にちに合わせて全て調整を行うようにしても良い。   Also, when calculating the deadline, if the deadline falls on a holiday or Sunday, adjust the deadline so that it is always the previous day, and make all adjustments before the procedure according to the adjusted date. May be.

また、上記実施形態では、手順番号を各手順に付番した後に必要日数B7を設定するようにしているが、これに限定されるものではない。即ち、手順番号を各手順に付番する前に必要日数B7を設定するようにしてもよい。
また、手順詳細B5及び手順優先度B6に関しても、必要日数B7と同様、手順番号を各手順に付番する前に設定するようにしてもよい。
In the above embodiment, the required number of days B7 is set after the procedure number is assigned to each procedure. However, the present invention is not limited to this. That is, the required number of days B7 may be set before assigning the procedure number to each procedure.
Also, the procedure number B5 and the procedure priority B6 may be set before assigning a procedure number to each procedure, similarly to the required number of days B7.

その他、サーバ装置及びクライアント端末を構成する各装置の細部構成及び各装置の細部動作に関しても、本発明の趣旨を逸脱することのない範囲で適宜変更可能である。   In addition, the detailed configuration of each device and the detailed operation of each device constituting the server device and the client terminal can be appropriately changed without departing from the spirit of the present invention.

本発明のいくつかの実施形態を説明したが、本発明の範囲は、上述の実施形態に限定するものではなく、特許請求の範囲に記載された発明の範囲とその均等の範囲を含む。
以下に、この出願の願書に最初に添付した特許請求の範囲に記載した発明を付記する。付記に記載した請求項の項番は、この出願の願書に最初に添付した特許請求の範囲の通りである。
[付記]
<請求項1>
作業を構成する複数の手順、当該手順の実行順序及び当該手順毎の必要日数を含むテンプレートデータを記憶する記憶手段と、
ユーザにより指定された前記作業の完了予定日と前記記憶手段に記憶されたテンプレートデータとに基づいて、前記作業を構成する手順毎に当該手順の期限を含む作業項目を生成する生成手段と、
を備える作業管理装置。
<請求項2>
前記テンプレートデータは、前記必要日数を補正するための補正値を含み、
前記生成手段により生成された作業項目の完了後にユーザにより入力された前記補正値に係る情報に基づいて、前記テンプレートデータにおける前記補正値を更新する更新手段を備え、
前記生成手段は、次回に前記作業項目を生成する際は、前記更新手段により更新された前記補正値に基づいて、前記必要日数を補正する請求項1に記載の作業管理装置。
<請求項3>
前記補正値に係る情報は、前記作業項目を期限内に完了することの難易度を示す進捗難易度を含み、
前記更新手段は、前記作業項目の進捗難易度に基づいて、前記補正値を更新する請求項2に記載の作業管理装置。
<請求項4>
前記補正値に係る情報は、前記作業項目の遅延原因又は前倒し要因を含み、
前記更新手段は、前記作業項目の遅延原因又は前倒し要因に基づいて、前記補正値を更新する請求項2又は3に記載の作業管理装置。
<請求項5>
前記更新手段は、前記遅延原因又は前記前倒し要因が時期要因であるか否かを判定し、時期要因であると判定した場合に、当該時期要因に係る補正値を更新し、
前記生成手段は、前記作業の完了予定日が前記時期要因に関わる場合に、前記更新手段により更新された当該時期要因に係る補正値に基づいて、前記必要日数を補正する請求項4に記載の作業管理装置。
<請求項6>
作業を構成する複数の手順、当該手順の実行順序及び当該手順毎の必要日数を含むテンプレートデータを記憶する記憶手段を備える作業管理装置の作業管理方法であって、
ユーザにより指定された前記作業の完了予定日と、前記記憶手段に記憶されたテンプレートデータとに基づいて、前記作業を構成する手順毎に当該手順の期限を含む作業項目を生成する工程、
を含む作業管理方法。
<請求項7>
コンピュータを、
ユーザにより指定された作業の完了予定日と、前記作業を構成する複数の手順、当該手順の実行順序及び当該手順毎の必要日数を含むテンプレートデータを記憶する記憶手段に記憶されたテンプレートデータと、に基づいて、前記作業を構成する手順毎に当該手順の期限を含む作業項目を生成する生成手段、
として機能させるためのプログラム。
Although some embodiments of the present invention have been described, the scope of the present invention is not limited to the above-described embodiments, but includes the scope of the invention described in the claims and equivalents thereof.
In the following, the inventions described in the claims first attached to the application form of this application are appended. The item numbers of the appended claims are as set forth in the claims originally attached to the application for this application.
[Appendix]
<Claim 1>
Storage means for storing template data including a plurality of procedures constituting the work, an execution order of the procedures and a required number of days for each of the procedures,
Generating means for generating, based on the scheduled completion date of the work specified by the user and the template data stored in the storage means, a work item including a deadline of the procedure for each procedure configuring the work;
Work management device comprising:
<Claim 2>
The template data includes a correction value for correcting the required number of days,
Update means for updating the correction value in the template data based on information on the correction value input by a user after completion of the work item generated by the generation means,
The work management device according to claim 1, wherein the generation unit corrects the required number of days based on the correction value updated by the update unit when the work item is generated next time.
<Claim 3>
The information related to the correction value includes a progress difficulty indicating a difficulty of completing the work item within a deadline,
The work management device according to claim 2, wherein the update unit updates the correction value based on a progress difficulty level of the work item.
<Claim 4>
The information related to the correction value includes a delay cause or an advance factor of the work item,
4. The work management device according to claim 2, wherein the update unit updates the correction value based on a cause of delay or a cause of advance of the work item. 5.
<Claim 5>
The updating means determines whether the delay cause or the advance factor is a time factor, and when it is determined that the time factor is a time factor, updates the correction value related to the time factor,
5. The method according to claim 4, wherein the generation unit corrects the required number of days based on a correction value related to the timing factor updated by the updating unit when the scheduled completion date of the work is related to the timing factor. 6. Work management device.
<Claim 6>
A work management method for a work management apparatus, comprising a storage unit that stores template data including a plurality of procedures constituting a work, an execution order of the procedures, and a required number of days for each of the procedures,
Generating, based on the scheduled completion date of the work specified by the user and the template data stored in the storage unit, a work item including a deadline of the procedure for each procedure configuring the work;
Work management methods including.
<Claim 7>
Computer
Scheduled completion date of the work specified by the user, template data stored in storage means for storing a plurality of procedures constituting the work, the execution order of the procedures and template data including the required number of days for each procedure, Generating means for generating a work item including a time limit of the procedure for each procedure configuring the work, based on
Program to function as

100 作業管理システム
1 サーバ装置(作業管理装置)
11 制御部(生成手段、更新手段)
12 操作部
13 表示部
14 記憶部(記憶手段)
15 通信部
2 クライアント端末
21 制御部
22 操作部
23 表示部
24 記憶部
25 通信部
100 work management system 1 server device (work management device)
11 control unit (generation means, update means)
12 operation unit 13 display unit 14 storage unit (storage means)
15 communication unit 2 client terminal 21 control unit 22 operation unit 23 display unit 24 storage unit 25 communication unit

Claims (4)

Todoリストを表示させる表示制御手段と、
作業を構成する複数の手順、当該手順の実行順序及び当該手順毎の必要日数情報を含むテンプレートデータを記憶する記憶手段と、
ユーザにより指定された前記作業の完了予定日と前記記憶手段に記憶されたテンプレートデータとに基づいて、前記作業を構成する手順毎に当該手順の期限を含む作業項目をTodoとして生成するとともに生成した作業項目毎に前記表示制御手段による前記Todoリストへの当該生成した作業項目の表示開始日を設定する生成手段と、
前記生成手段により生成された作業項目のうち予め定められた手順に対応した作業項目に対して、ユーザにより実施実績情報として当該作業項目の完了日時情報または難易度情報が入力された場合に、前記実施実績情報が次回における当該作業項目に対する前記表示開始日の前記生成手段による設定に反映されるように、前記テンプレートデータにおける前記予め定められた手順に対応した必要日数情報を補正する補正手段と、
を備えたことを特徴とする作業管理装置。
Display control means for displaying a Todo list;
Storage means for storing template data including a plurality of procedures constituting the work, an execution order of the procedures, and necessary number of days information for each procedure;
Based on the stored template data into the scheduled completion date of the designated the work the storage means by the user, and the work items including the date of the procedure for each procedure constituting the working produces and generates as Todo Generating means for setting a display start date of the generated work item on the Todo list by the display control means for each work item ;
For a work item corresponding to a predetermined procedure among the work items generated by the generation means, when a user inputs completion date / time information or difficulty information of the work item as execution result information, Correction means for correcting the required number of days information corresponding to the predetermined procedure in the template data, so that the execution result information is reflected in the setting by the generation means of the display start date for the next work item;
Work management apparatus characterized by comprising a.
前記生成手段は、前記作業項目毎に当該作業項目に対応する前記手順の期限に基づいて前記表示開始日を設定する、
ことを特徴とする請求項1に記載の作業管理装置。
The generation unit sets the display start date for each of the work items based on a deadline of the procedure corresponding to the work item,
The work management device according to claim 1, wherein:
作業を構成する複数の手順、当該手順の実行順序及び当該手順毎の必要日数情報を含むテンプレートデータを記憶する記憶手段を備える作業管理装置が実行するTodoリストの表示制御方法であって、
ユーザにより指定された前記作業の完了予定日と、前記記憶手段に記憶されたテンプレートデータとに基づいて、前記作業を構成する手順毎に当該手順の期限を含む作業項目をTodoとして生成するとともに生成した作業項目毎に前記Todoリストへの当該生成した作業項目の表示開始日を設定する生成工程と、
前記生成工程で生成された作業項目のうち予め定められた手順に対応した作業項目に対して、ユーザにより実施実績情報として当該作業項目の完了日時情報または難易度情報が入力された場合に、前記実施実績情報が次回における当該作業項目に対する前記表示開始日の前記生成工程による設定に反映されるように、前記テンプレートデータにおける前記予め定められた手順に対応した必要日数情報を補正する補正工程と、
を含むことを特徴とする表示制御方法。
A method for controlling a display of a Todo list executed by a work management apparatus including a storage unit for storing template data including a plurality of procedures constituting a work, an execution order of the procedures, and necessary days information for each of the procedures,
Generated with a scheduled completion date of the designated the work by the user, based on the stored template data in the storage means, it generates a work item containing the date of the procedure for each procedure constituting the working as Todo A generation step of setting a display start date of the generated work item in the Todo list for each work item performed ;
When the user inputs completion date / time information or difficulty information of the work item as execution result information for a work item corresponding to a predetermined procedure among the work items generated in the generation process, A correction step of correcting the required number of days information corresponding to the predetermined procedure in the template data, so that the execution result information is reflected in the setting of the display start date for the next work item in the generation step.
Display control method, which comprises a.
コンピュータを、
Todoリストを表示させる表示制御手段、
ユーザにより指定された作業の完了予定日と、前記作業を構成する複数の手順、当該手順の実行順序及び当該手順毎の必要日数情報を含むテンプレートデータを記憶する記憶手段に記憶されたテンプレートデータと、に基づいて、前記作業を構成する手順毎に当該手順の期限を含む作業項目をTodoとして生成するとともに生成した作業項目毎に前記表示制御手段による前記Todoリストへの当該生成した作業項目の表示開始日を設定する生成手段、
前記生成手段により生成された作業項目のうち予め定められた手順に対応した作業項目に対して、ユーザにより実施実績情報として当該作業項目の完了日時情報または難易度情報が入力された場合に、前記実施実績情報が次回における当該作業項目に対する前記表示開始日の前記生成手段による設定に反映されるように、前記テンプレートデータにおける前記予め定められた手順に対応した必要日数情報を補正する補正手段、
として機能させることを特徴とするプログラム。
Computer
Display control means for displaying a Todo list,
Scheduled completion date of work specified by the user, template data stored in storage means for storing a plurality of procedures constituting the work, execution order of the procedures, and template data including information on the required number of days for each procedure. , based on the display of work items thus generated to the Todo list by the display control means for each work item generated to generate a work item containing the date of the procedure for each procedure constituting the working as Todo Generation means for setting a start date ,
For a work item corresponding to a predetermined procedure among the work items generated by the generation means, when a user inputs completion date / time information or difficulty information of the work item as execution result information, Correction means for correcting the necessary number of days information corresponding to the predetermined procedure in the template data, so that the execution result information is reflected in the setting by the generation means of the display start date for the next work item;
A program characterized by functioning as a program.
JP2015179125A 2015-09-11 2015-09-11 Work management device, display control method, and program Active JP6665455B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2015179125A JP6665455B2 (en) 2015-09-11 2015-09-11 Work management device, display control method, and program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2015179125A JP6665455B2 (en) 2015-09-11 2015-09-11 Work management device, display control method, and program

Publications (2)

Publication Number Publication Date
JP2017054401A JP2017054401A (en) 2017-03-16
JP6665455B2 true JP6665455B2 (en) 2020-03-13

Family

ID=58316851

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2015179125A Active JP6665455B2 (en) 2015-09-11 2015-09-11 Work management device, display control method, and program

Country Status (1)

Country Link
JP (1) JP6665455B2 (en)

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08137946A (en) * 1994-11-11 1996-05-31 Sharp Corp Schedule managing device
JP4177280B2 (en) * 2004-03-25 2008-11-05 東芝ソリューション株式会社 Planning work management support system and planning work management support program
JP4931358B2 (en) * 2005-03-18 2012-05-16 三洋電機株式会社 Electronics
JP2006344015A (en) * 2005-06-09 2006-12-21 Hitachi Information Systems Ltd Inquiry item management system and inquiry item management program
JP4852496B2 (en) * 2007-08-23 2012-01-11 日立Geニュークリア・エナジー株式会社 Project planning method, project planning program, and project planning system

Also Published As

Publication number Publication date
JP2017054401A (en) 2017-03-16

Similar Documents

Publication Publication Date Title
US7092994B2 (en) System, method and apparatus for updating electronic mail recipient lists
US9501256B2 (en) Information processing apparatus, information processing system, and information processing method
US20170083350A1 (en) Information processing device, control method therefor, and program
CN113900561B (en) Form processing method, form processing device, electronic equipment, medium and program product
US20110202574A1 (en) Document management device, document management method and computer readable medium
CN102447689B (en) Information updating prompt method and network client side
US9075598B2 (en) Productized approach for developing multi instance single code base product/application with centralized management
CN109829141A (en) A kind of project table generation method and device
CN113076186A (en) Task processing method and device, electronic equipment and storage medium
JP2017058707A (en) Work management system and program
JP6665455B2 (en) Work management device, display control method, and program
JP2016174229A (en) Information processing system, information processing device, information processing method and program
JP4933506B2 (en) Schedule display system
US11082579B2 (en) Information processing apparatus, method of controlling information processing apparatus and non-transitory computer-readable medium storing program
JP2017102694A (en) Gantt chart generation program, gantt chart generation apparatus and gantt charge generation method
JP2015219740A (en) Information processor, information processing method and program
JP7335172B2 (en) WORK SHIFT GENERATION DEVICE, WORK SHIFT GENERATION METHOD, AND PROGRAM
JP7087506B2 (en) Equipment management equipment, equipment management method, equipment management program and equipment management system
US20220036299A1 (en) Information processing apparatus, delivery schedule output method, and non-transitory recording medium
KR102181579B1 (en) Method for providing patient information sticker service and dental insurance claim system therefor
JP6362775B2 (en) Free time management device, free time management method, computer program, and storage medium
JP2006268179A (en) Information distribution device
JP2007264743A (en) Electronic device, and method and program for maintenance of email information thereof
JP2007087246A (en) Notification device, notification program, notification system, and server machine
JP2024027463A (en) Information processing device and information processing program

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20180323

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20190319

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20190416

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20190425

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20190917

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20190924

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20200121

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20200203

R150 Certificate of patent or registration of utility model

Ref document number: 6665455

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150