JP6594094B2 - Hot water system - Google Patents
Hot water system Download PDFInfo
- Publication number
- JP6594094B2 JP6594094B2 JP2015157409A JP2015157409A JP6594094B2 JP 6594094 B2 JP6594094 B2 JP 6594094B2 JP 2015157409 A JP2015157409 A JP 2015157409A JP 2015157409 A JP2015157409 A JP 2015157409A JP 6594094 B2 JP6594094 B2 JP 6594094B2
- Authority
- JP
- Japan
- Prior art keywords
- hot water
- water supply
- controller
- time
- heat pump
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims description 445
- 238000002485 combustion reaction Methods 0.000 claims description 26
- 238000009835 boiling Methods 0.000 claims description 20
- 239000007789 gas Substances 0.000 claims description 12
- 230000005611 electricity Effects 0.000 claims description 6
- 239000002737 fuel gas Substances 0.000 claims description 4
- 239000008236 heating water Substances 0.000 claims 1
- 238000000034 method Methods 0.000 description 42
- 239000008399 tap water Substances 0.000 description 14
- 235000020679 tap water Nutrition 0.000 description 14
- 239000003507 refrigerant Substances 0.000 description 7
- 125000002066 L-histidyl group Chemical group [H]N1C([H])=NC(C([H])([H])[C@](C(=O)[*])([H])N([H])[H])=C1[H] 0.000 description 6
- 238000002156 mixing Methods 0.000 description 5
- 238000011144 upstream manufacturing Methods 0.000 description 5
- 238000010438 heat treatment Methods 0.000 description 4
- 230000000694 effects Effects 0.000 description 3
- 238000003287 bathing Methods 0.000 description 1
- 235000021152 breakfast Nutrition 0.000 description 1
- 230000001680 brushing effect Effects 0.000 description 1
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 230000003247 decreasing effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000003203 everyday effect Effects 0.000 description 1
- 238000005429 filling process Methods 0.000 description 1
- 239000011810 insulating material Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 230000007420 reactivation Effects 0.000 description 1
- 238000003303 reheating Methods 0.000 description 1
- 238000004904 shortening Methods 0.000 description 1
- 238000010792 warming Methods 0.000 description 1
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24D—DOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
- F24D17/00—Domestic hot-water supply systems
- F24D17/02—Domestic hot-water supply systems using heat pumps
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24D—DOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
- F24D19/00—Details
- F24D19/10—Arrangement or mounting of control or safety devices
- F24D19/1006—Arrangement or mounting of control or safety devices for water heating systems
- F24D19/1051—Arrangement or mounting of control or safety devices for water heating systems for domestic hot water
- F24D19/1054—Arrangement or mounting of control or safety devices for water heating systems for domestic hot water the system uses a heat pump
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24D—DOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
- F24D19/00—Details
- F24D19/10—Arrangement or mounting of control or safety devices
- F24D19/1006—Arrangement or mounting of control or safety devices for water heating systems
- F24D19/1051—Arrangement or mounting of control or safety devices for water heating systems for domestic hot water
- F24D19/1063—Arrangement or mounting of control or safety devices for water heating systems for domestic hot water counting of energy consumption
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24D—DOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
- F24D2200/00—Heat sources or energy sources
- F24D2200/12—Heat pump
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Thermal Sciences (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Heat-Pump Type And Storage Water Heaters (AREA)
Description
本明細書で開示する技術は、給湯システムに関する。 The technology disclosed in this specification relates to a hot water supply system.
特許文献1に、給湯システムが開示されている。その給湯システムは、水を貯えるタンクと、自然環境から吸熱して水を加熱するヒートポンプと、タンクとヒートポンプの間で水を循環させる循環手段と、コントローラと、コントローラと通信可能なリモコンを備えている。コントローラは、循環手段によってタンクとヒートポンプの間で水を循環させながら、ヒートポンプによって水を加熱する沸上運転を実行可能である。コントローラは、給湯システムの過去の給湯の履歴を記憶可能である。コントローラは、給湯システムの過去の給湯の履歴に基いて、時間帯別の給湯パターンを算出可能である。時間帯別の給湯パターンは、時間帯別の給湯使用量を含んでいる。リモコンは、算出された時間帯別の給湯パターンを、ユーザに提示するように構成されている。 Patent Document 1 discloses a hot water supply system. The hot water supply system includes a tank that stores water, a heat pump that absorbs heat from the natural environment and heats the water, a circulation means that circulates water between the tank and the heat pump, a controller, and a remote controller that can communicate with the controller. Yes. The controller can execute a boiling operation in which the water is heated by the heat pump while the water is circulated between the tank and the heat pump by the circulation means. The controller can store a history of past hot water supply of the hot water supply system. The controller can calculate a hot water supply pattern for each time zone based on the past hot water supply history of the hot water supply system. The hot water supply pattern by time zone includes the amount of hot water use by time zone. The remote controller is configured to present the calculated hot water supply pattern for each time zone to the user.
上記の給湯システムでは、ユーザ自身の時間帯別の給湯パターンのみが、比較対象なしに、ユーザに提示される。このため、ユーザが自身の給湯パターンの特徴を正確に把握しにくく、省エネルギーを図るために自身の生活様式をどのように改善すればよいかを、ユーザが的確に理解することが困難であった。 In the hot water supply system described above, only the hot water supply pattern for each user's own time zone is presented to the user without comparison. For this reason, it is difficult for the user to accurately grasp the characteristics of his / her hot water supply pattern, and it is difficult for the user to accurately understand how to improve his / her lifestyle to save energy. .
本明細書では、上記の課題を解決する技術を提供する。本明細書では、給湯システムのユーザに自身の給湯パターンの特徴を正確に把握させることが可能な技術を提供する。 In this specification, the technique which solves said subject is provided. The present specification provides a technique that allows a user of a hot water supply system to accurately grasp the characteristics of his / her hot water supply pattern.
本明細書が開示する給湯システムは、水を貯えるタンクと、自然環境から吸熱して水を加熱するヒートポンプと、タンクとヒートポンプの間で水を循環させる循環手段と、コントローラと、コントローラと通信可能なユーザ端末を備えている。コントローラは、循環手段によってタンクとヒートポンプの間で水を循環させながら、ヒートポンプによって水を加熱する沸上運転を実行可能である。コントローラは、給湯システムの過去の給湯の履歴を記憶可能である。ユーザ端末又はコントローラは、少なくともユーザの家庭の構成人数、居住地域、季節のうちの1つに応じて予め用意されている標準的な時間帯別の給湯パターンを記憶可能である。ユーザ端末又はコントローラは、給湯システムの過去の給湯の履歴に基いて、実際の時間帯別の給湯パターンを算出可能である。時間帯別の給湯パターンは、時間帯別のヒートポンプでの電気使用量と、時間帯別の給湯使用量を含んでいる。ユーザ端末は、標準的な時間帯別の給湯パターンと、実際の時間帯別の給湯パターンを、対比可能にユーザに提示するように構成されている。 The hot water supply system disclosed in this specification is capable of communicating with a tank that stores water, a heat pump that absorbs heat from the natural environment and heats the water, a circulation means that circulates water between the tank and the heat pump, a controller, and the controller. User terminal. The controller can execute a boiling operation in which the water is heated by the heat pump while the water is circulated between the tank and the heat pump by the circulation means. The controller can store a history of past hot water supply of the hot water supply system. User terminal or controller can be stored at least the number of players of a user's home, residential areas, the standard time zone of the hot water supply patterns are prepared in advance according to one of the season. The user terminal or the controller can calculate the hot water supply pattern for each actual time zone based on the past hot water supply history of the hot water supply system. The hot water supply pattern by time zone includes the amount of electricity used by the heat pump by time zone and the amount of hot water usage by time zone. The user terminal is configured to present a standard hot water supply pattern for each time zone and an actual hot water supply pattern for each time zone to the user in a comparable manner.
上記の給湯システムによれば、ユーザは、ユーザ端末を介して、標準的な時間帯別の給湯パターンと、実際の時間帯別の給湯パターン(すなわち、自身の時間帯別の給湯パターン)を見比べることによって、自身の給湯パターンの特徴を正確に把握することができる。これによって、ユーザは、省エネルギーを図るために自身の生活様式をどのように改善すればよいかを、的確に理解することができる。 According to the hot water supply system described above, the user compares a standard hot water supply pattern for each time zone with a hot water supply pattern for each actual time zone (that is, a hot water supply pattern for each time zone) via the user terminal. Thus, the characteristics of the hot water supply pattern can be accurately grasped. Thus, the user can accurately understand how to improve his / her lifestyle in order to save energy.
また、上記の給湯システムでは、時間帯別の給湯パターンとして、時間帯別の給湯使用量だけでなく、時間帯別のヒートポンプでの電気使用量についても、ユーザに提示する。このような構成とすることによって、ユーザは、省エネルギーを図るために自身の生活様式をどのように改善すればよいかを、より的確に理解することができる。 Moreover, in said hot water supply system, not only the hot water supply usage amount according to time slot | zone but the electric usage amount by the heat pump according to time zone is shown to a user as a hot water supply pattern according to time slot | zone. By adopting such a configuration, the user can more accurately understand how to improve his / her lifestyle in order to save energy.
上記の給湯システムは、燃料ガスの燃焼によって水を加熱する燃焼装置をさらに備えていてもよく、時間帯別の給湯パターンが、時間帯別の燃焼装置でのガス使用量をさらに含んでいてもよい。 The hot water supply system may further include a combustion device that heats water by the combustion of fuel gas, and the hot water supply pattern for each time zone may further include the amount of gas used in the combustion device for each time zone. Good.
上記の給湯システムでは、時間帯別の給湯パターンとして、時間帯別の給湯使用量と、時間帯別のヒートポンプでの電気使用量だけでなく、時間帯別の燃焼装置でのガス使用量についても、ユーザに提示する。このような構成とすることによって、ユーザは、省エネルギーを図るために自身の生活様式をどのように改善すればよいかを、より的確に理解することができる。 In the above hot water supply system, as the hot water supply pattern by time zone, not only hot water usage by time zone and electricity usage by heat pump by time zone, but also gas usage by combustion equipment by time zone Present to the user. By adopting such a configuration, the user can more accurately understand how to improve his / her lifestyle in order to save energy.
上記の給湯システムにおいて、ユーザ端末は、過去の給湯の履歴に基いて算出される光熱費が所定値を超える場合に、ユーザにアドバイスを提示するように構成されていてもよい。 In the hot water supply system described above, the user terminal may be configured to present advice to the user when the utility cost calculated based on the history of past hot water supply exceeds a predetermined value.
上記の給湯システムによれば、光熱費を節約するようにユーザに促すことで、省エネルギー化を図ることができる。 According to the hot water supply system described above, energy saving can be achieved by urging the user to save on the utility cost.
(実施例)
図1に示すように、本実施例に係る給湯システム2は、タンク10と、タンク水循環路20と、水道水導入路30と、供給路40と、ヒートポンプ50と、燃焼装置60と、コントローラ100と、ユーザ端末110を備える。
(Example)
As shown in FIG. 1, a hot water supply system 2 according to the present embodiment includes a tank 10, a tank water circulation path 20, a tap water introduction path 30, a supply path 40, a heat pump 50, a combustion device 60, and a controller 100. And a user terminal 110.
ヒートポンプ50は、自然環境である外気から吸熱して、タンク水循環路20内の水を加熱する熱源である。ヒートポンプ50は、図示しないが、冷媒(代替フロン、例えばR410A等)を循環させる冷媒循環路と、外気と冷媒との間で熱交換を行う蒸発器と、冷媒を圧縮して高温高圧にする圧縮器と、タンク水循環路20内の水と高温高圧の冷媒との間で熱交換を行う凝縮器と、熱交換を終えた後の冷媒を減圧させて低温低圧にする膨張弁と、を備えている。また、ヒートポンプ50には、外気温を測定する外気温センサ52が備えられている。 The heat pump 50 is a heat source that absorbs heat from outside air, which is a natural environment, and heats water in the tank water circulation path 20. Although not shown, the heat pump 50 includes a refrigerant circulation path for circulating a refrigerant (alternative CFC, such as R410A), an evaporator for exchanging heat between the outside air and the refrigerant, and compression for compressing the refrigerant to high temperature and high pressure. A condenser that performs heat exchange between the water in the tank water circulation path 20 and the high-temperature and high-pressure refrigerant, and an expansion valve that depressurizes the refrigerant after the heat exchange and lowers the temperature to low pressure. Yes. The heat pump 50 is provided with an outside air temperature sensor 52 that measures the outside air temperature.
タンク10は、ヒートポンプ50によって加熱された温水を貯える。タンク10は、密閉型であり、断熱材によって外側が覆われている。タンク10内には満水まで水が貯留されている。本実施例では、タンク10の容量は100Lである。タンク10には、サーミスタ12、14、16、18がタンク10の高さ方向に所定間隔で取り付けられている。各サーミスタ12、14、16、18は、その取付位置の水の温度を測定する。例えば、各サーミスタ12、14、16、18は、それぞれ、タンク10の上部から6L、12L、30L、50Lの位置の水の温度を測定する。 The tank 10 stores hot water heated by the heat pump 50. The tank 10 is a hermetically sealed type, and the outside is covered with a heat insulating material. Water is stored in the tank 10 until it is full. In this embodiment, the capacity of the tank 10 is 100L. The thermistors 12, 14, 16, and 18 are attached to the tank 10 at predetermined intervals in the height direction of the tank 10. Each thermistor 12, 14, 16, 18 measures the temperature of water at its mounting position. For example, each of the thermistors 12, 14, 16, and 18 measures the temperature of water at positions 6L, 12L, 30L, and 50L from the top of the tank 10, respectively.
タンク水循環路20は、上流端がタンク10の下部に接続されており、下流端がタンク10の上部に接続されている。タンク水循環路20には、循環ポンプ22が介装されている。循環ポンプ22は、タンク水循環路20内の水を上流側から下流側へ送り出す。また、タンク水循環路20は、ヒートポンプ50の熱交換器(図示省略)を通過している。そのため、ヒートポンプ50を作動させると、タンク水循環路20内の水がヒートポンプ50の熱交換器で加熱される。従って、循環ポンプ22とヒートポンプ50とを作動させると、タンク10の下部の水がヒートポンプ50で加熱され、加熱された水がタンク10の上部に戻される。即ち、タンク水循環路20は、タンク10に蓄熱するための水路である。また、タンク水循環路20のヒートポンプ50の上流側には、サーミスタ24が介装されている。サーミスタ24は、タンク10の下部から導出され、ヒートポンプ50を通過する前の水の温度を測定する。 The tank water circulation path 20 has an upstream end connected to the lower part of the tank 10 and a downstream end connected to the upper part of the tank 10. A circulation pump 22 is interposed in the tank water circulation path 20. The circulation pump 22 sends the water in the tank water circulation path 20 from the upstream side to the downstream side. In addition, the tank water circulation path 20 passes through a heat exchanger (not shown) of the heat pump 50. Therefore, when the heat pump 50 is operated, the water in the tank water circulation path 20 is heated by the heat exchanger of the heat pump 50. Therefore, when the circulation pump 22 and the heat pump 50 are operated, the water in the lower part of the tank 10 is heated by the heat pump 50, and the heated water is returned to the upper part of the tank 10. That is, the tank water circulation path 20 is a water path for storing heat in the tank 10. A thermistor 24 is interposed on the upstream side of the heat pump 50 in the tank water circulation path 20. The thermistor 24 is derived from the lower part of the tank 10 and measures the temperature of water before passing through the heat pump 50.
水道水導入路30は、上流端が水道水供給源31に接続されている。水道水導入路30には、サーミスタ32が介装されている。サーミスタ32は、水道水の温度を測定する。水道水導入路30の下流側は、第1導入路30aと第2導入路30bに分岐している。第1導入路30aの下流端は、タンク10の下部に接続されている。第2導入路30bの下流端は、供給路40の途中に接続されている。第2導入路30bの下流端と供給路40との接続部分には、混合弁42が設けられている。混合弁42は、供給路40内を流れる温水に、第2導入路30b内の水を混合させる量を調整する。 The tap water introduction path 30 has an upstream end connected to a tap water supply source 31. A thermistor 32 is interposed in the tap water introduction path 30. The thermistor 32 measures the temperature of tap water. The downstream side of the tap water introduction path 30 branches into a first introduction path 30a and a second introduction path 30b. The downstream end of the first introduction path 30 a is connected to the lower part of the tank 10. The downstream end of the second introduction path 30 b is connected to the supply path 40. A mixing valve 42 is provided at a connection portion between the downstream end of the second introduction path 30 b and the supply path 40. The mixing valve 42 adjusts the amount by which the water in the second introduction path 30 b is mixed with the hot water flowing in the supply path 40.
供給路40は、上流端がタンク10の上部に接続されている。第2導入路30bとの接続部より下流側の供給路40には、燃焼装置60が介装されている。また、燃焼装置60より下流側の供給路40には、サーミスタ44が介装されている。サーミスタ44は、供給される温水の温度を測定する。燃焼装置60は、燃料ガスの燃焼によって水を加熱する。燃焼装置60は、サーミスタ44が測定する温水の温度が、給湯設定温度と一致するように、供給路40内の水を加熱する。供給路40の下流端は、給湯箇所(例えば台所やシャワーなどの給湯栓等)に接続されている。また、供給路40の下流端には、浴槽に湯はりをするための湯はり弁46と、湯はり後の浴槽内の水を追い焚きする追い焚き装置(図示せず)が設けられている。 The upstream end of the supply path 40 is connected to the upper part of the tank 10. A combustion device 60 is interposed in the supply passage 40 on the downstream side of the connecting portion with the second introduction passage 30b. A thermistor 44 is interposed in the supply path 40 on the downstream side of the combustion device 60. The thermistor 44 measures the temperature of the supplied hot water. The combustion device 60 heats water by combustion of fuel gas. The combustion device 60 heats the water in the supply path 40 so that the temperature of the hot water measured by the thermistor 44 matches the hot water supply set temperature. The downstream end of the supply path 40 is connected to a hot water supply location (for example, a hot water tap such as a kitchen or a shower). Further, at the downstream end of the supply path 40, there are provided a hot water valve 46 for hot water filling the bathtub and a reheating device (not shown) for chasing water in the bathtub after hot water filling. .
コントローラ100は、各構成要素と電気的に接続されており、各構成要素の動作を制御する。コントローラ100には、リモコン(図示せず)が接続されている。給湯システム2のユーザは、リモコンを介して、給湯栓へ供給する水の温度である給湯設定温度、浴槽へ供給する水の温度であるふろ設定温度、浴槽への湯はりを完了する時刻である湯はり完了時刻、浴槽へ湯はりした水を保温する時間である保温設定時間などを設定しておくことができる。 The controller 100 is electrically connected to each component and controls the operation of each component. A remote controller (not shown) is connected to the controller 100. The user of the hot water supply system 2 is a hot water supply set temperature, which is the temperature of water supplied to the hot water tap, a bath set temperature, which is the temperature of water supplied to the bathtub, and the time of completing the hot water supply to the bathtub via the remote controller. It is possible to set a hot water completion time, a heat retention setting time that is a time for warming the hot water in the bathtub, and the like.
ユーザ端末110は、コントローラ100と無線により通信可能である。ユーザ端末110は、例えば給湯システム2との連携のための専用のアプリケーションがインストールされたスマートフォンである。ユーザ端末110は、給湯システム2に関連する各種の情報を表示することができる。また、ユーザ端末110は、給湯システム2に関連する各種の操作入力を受け入れることができる。 The user terminal 110 can communicate with the controller 100 wirelessly. The user terminal 110 is a smartphone in which a dedicated application for cooperation with the hot water supply system 2 is installed, for example. The user terminal 110 can display various information related to the hot water supply system 2. In addition, the user terminal 110 can accept various operation inputs related to the hot water supply system 2.
次いで、本実施例の給湯システム2の動作について説明する。給湯システム2は、沸上運転、給湯運転および湯はり運転を実行することができる。なお、本明細書では、給湯システム2の給湯運転と湯はり運転の両方を、給湯システム2による給湯という。以下、各運転について説明する。 Next, the operation of the hot water supply system 2 of the present embodiment will be described. The hot water supply system 2 can perform a boiling operation, a hot water supply operation, and a hot water beam operation. In the present specification, both hot water supply operation and hot water beam operation of the hot water supply system 2 are referred to as hot water supply by the hot water supply system 2. Hereinafter, each operation will be described.
(沸上運転)
沸上運転は、ヒートポンプ50によって、タンク10内の水を加熱する運転である。コントローラ100によって沸上運転の実行が指示されると、ヒートポンプ50が作動するとともに、循環ポンプ22が作動する。循環ポンプ22が作動すると、タンク水循環路20内をタンク10内の水が循環する。即ち、タンク10の下部に存在する水がタンク水循環路20内に導入され、導入された水がヒートポンプ50内の熱交換器を通過する際に、冷媒の熱によって加熱され、加熱された水がタンク10の上部に戻される。これにより、タンク10に高温の水が貯められる。タンク10の上部には、高温の水の層が形成され、下部には、低温の水の層が形成される。
(Boiling operation)
The boiling operation is an operation in which the water in the tank 10 is heated by the heat pump 50. When execution of the boiling operation is instructed by the controller 100, the heat pump 50 is activated and the circulation pump 22 is activated. When the circulation pump 22 is activated, the water in the tank 10 circulates in the tank water circulation path 20. That is, the water existing in the lower part of the tank 10 is introduced into the tank water circulation path 20, and when the introduced water passes through the heat exchanger in the heat pump 50, it is heated by the heat of the refrigerant, and the heated water is Returned to the top of the tank 10. Thereby, hot water is stored in the tank 10. A high temperature water layer is formed in the upper part of the tank 10, and a low temperature water layer is formed in the lower part.
(給湯運転)
給湯運転は、タンク10内の水を給湯箇所に供給する運転である。給湯運転は、上記の沸上運転中にも実行することができる。給湯箇所において給湯栓が開かれると、水道水供給源31からの水圧によって、水道水導入路30(第1導入路30a)からタンク10の下部に水道水が流入する。同時に、タンク10上部の温水が、供給路40を介して給湯箇所に供給される。
(Hot water operation)
The hot water supply operation is an operation for supplying the water in the tank 10 to the hot water supply location. The hot water supply operation can also be executed during the above boiling operation. When the hot water tap is opened at the hot water supply location, tap water flows into the lower portion of the tank 10 from the tap water introduction path 30 (first introduction path 30 a) due to the water pressure from the tap water supply source 31. At the same time, hot water in the upper part of the tank 10 is supplied to the hot water supply location via the supply path 40.
コントローラ100は、タンク10から供給路40に供給される水の温度(即ち、サーミスタ12の測定温度)が、給湯設定温度より高い場合には、混合弁42を開いて第2導入路30bから供給路40に水道水を導入する。従って、タンク10から供給された水と第2導入路30bから供給された水道水とが、供給路40内で混合される。コントローラ100は、給湯箇所に供給される水の温度が、給湯設定温度と一致するように、混合弁42の開度を調整する。一方、コントローラ100は、タンク10から供給路40に供給される水の温度が、給湯設定温度より低い場合には、燃焼装置60を作動させる。従って、供給路40を通過する水が燃焼装置60によって加熱される。コントローラ100は、給湯箇所に供給される水の温度が、給湯設定温度と一致するように、燃焼装置60の出力を制御する。 When the temperature of the water supplied from the tank 10 to the supply path 40 (that is, the measured temperature of the thermistor 12) is higher than the hot water supply set temperature, the controller 100 opens the mixing valve 42 and supplies it from the second introduction path 30b. Tap water is introduced into the road 40. Therefore, the water supplied from the tank 10 and the tap water supplied from the second introduction path 30 b are mixed in the supply path 40. The controller 100 adjusts the opening degree of the mixing valve 42 so that the temperature of the water supplied to the hot water supply location matches the hot water supply set temperature. On the other hand, the controller 100 operates the combustion device 60 when the temperature of the water supplied from the tank 10 to the supply path 40 is lower than the hot water supply set temperature. Accordingly, the water passing through the supply path 40 is heated by the combustion device 60. The controller 100 controls the output of the combustion device 60 so that the temperature of the water supplied to the hot water supply location matches the hot water supply set temperature.
(湯はり運転)
湯はり運転は、タンク10内の水を浴槽に供給する運転である。湯はり運転は、上記の沸上運転中にも実行することができる。リモコンで設定された湯はり完了時刻に基づく湯はり開始時刻になると、コントローラ100は、湯はり弁46を開く。これによって、給湯運転と同様にして、ふろ設定温度に調温された水が浴槽へ供給される。
(Hot water operation)
The hot water operation is an operation of supplying water in the tank 10 to the bathtub. The hot water operation can also be executed during the above boiling operation. When the hot water start time based on the hot water completion time set by the remote controller is reached, the controller 100 opens the hot water valve 46. Thereby, water adjusted to the bath set temperature is supplied to the bathtub in the same manner as in the hot water supply operation.
(沸上運転の学習制御)
図2は、ある1日の間に、給湯が行われる時間帯を模式的に示す図である。なお、本実施例では、2:00を始点とする24時間を、1日を特定するための単位時間としている。
(Learning control for boiling operation)
FIG. 2 is a diagram schematically illustrating a time zone during which hot water is supplied during a certain day. In this embodiment, 24 hours starting from 2:00 is set as a unit time for specifying one day.
一般的には、例えば、6:00〜7:00に最初に給湯が行われる(図2の例では6:00)。最初の給湯は、例えば、朝食の用意や洗面のための給湯である。最初の給湯では、5L〜20L程度の温水が供給される。その後、例えば、11:00〜12:00に二度目の給湯が行われる(図2の例では11:00)。二度目の給湯は、例えば、昼食の用意のための給湯である。二度目の給湯でも、5L〜20L程度の温水が供給される。その後、例えば、20:00に三度目の給湯が行われる(図2の例では20:00)。三度目の給湯は、浴槽への湯はり運転である。湯はり運転では、150L〜180L程度の温水が供給される。その後、例えば、23:00〜0:00に最後の給湯が行われる(図2の例ではおよそ23:00)。最後の給湯は、例えば、歯磨き等のための給湯である。最後の給湯では、5L〜10L程度の温水が供給される。最後の給湯は、0:00頃に終了する。 In general, for example, hot water is supplied first at 6:00 to 7:00 (6:00 in the example of FIG. 2). The first hot water supply is, for example, a hot water supply for breakfast preparation or a washbasin. In the first hot water supply, hot water of about 5 L to 20 L is supplied. Thereafter, for example, the second hot water supply is performed at 11:00 to 12:00 (11:00 in the example of FIG. 2). The second hot water supply is, for example, a hot water supply for preparing lunch. Even in the second hot water supply, hot water of about 5 L to 20 L is supplied. Thereafter, for example, the third hot water supply is performed at 20:00 (20:00 in the example of FIG. 2). The third hot water supply is a hot water operation to the bathtub. In hot water operation, hot water of about 150L to 180L is supplied. Thereafter, for example, the last hot water supply is performed at 23: 00 to 0:00 (approximately 23:00 in the example of FIG. 2). The last hot water supply is, for example, a hot water supply for brushing teeth. In the last hot water supply, hot water of about 5 L to 10 L is supplied. The last hot water supply ends at about 0:00.
本実施例では、コントローラ100は、給湯が行われる度に、給湯が開始された時刻と、給湯が終了した時刻と、給湯で使用された温水の量を示す給湯使用量を、給湯使用実績として記憶する。また、コントローラ100は、ヒートポンプ50による水の加熱を行う度に、加熱が開始された時刻と、加熱が終了した時刻と、ヒートポンプ50での電力使用量を、電力使用実績として記憶する。さらに、コントローラ100は、燃焼装置60による水の加熱を行う度に、加熱が開始された時刻と、加熱が終了した時刻と、燃焼装置60でのガス使用量を、ガス使用実績として記憶する。そして、コントローラ100は、1日分の給湯使用実績と、電力使用実績と、ガス使用実績を、1日分の給湯履歴として記憶する。本実施例では、コントローラ100は、過去の所定期間(例えば1ヶ月間)の各日の給湯履歴を記憶している。 In the present embodiment, every time hot water is supplied, the controller 100 sets the time when the hot water is started, the time when the hot water is finished, and the amount of hot water used indicating the amount of hot water used in the hot water as the actual hot water usage. Remember. Moreover, every time the water is heated by the heat pump 50, the controller 100 stores the time when the heating is started, the time when the heating is completed, and the amount of power used in the heat pump 50 as the power usage record. Furthermore, every time water is heated by the combustion device 60, the controller 100 stores the time when the heating is started, the time when the heating is completed, and the amount of gas used in the combustion device 60 as a gas usage record. And the controller 100 memorize | stores the hot water supply use performance for one day, the electric power use performance, and the gas use performance as a hot water supply history for one day. In the present embodiment, the controller 100 stores the hot water supply history for each day in the past predetermined period (for example, for one month).
続いて、コントローラ100が、24時間毎(時刻が2:00になる毎)に実行する処理について説明する。コントローラ100は、24時間毎に、前日の給湯履歴を新たに記憶する。 Next, processing that the controller 100 executes every 24 hours (every time becomes 2:00) will be described. The controller 100 newly stores the hot water supply history of the previous day every 24 hours.
次いで、コントローラ100は、過去7日分の給湯履歴から、過去7日間において、最初の給湯が開始された時刻(給湯開始時刻)のうち、最も早い時刻を特定する。以下では、この時刻を「給湯開始時刻S1」と呼ぶ。例えば、コントローラ100は、6:00を給湯開始時刻S1として特定する(図2参照)。 Next, the controller 100 specifies the earliest time among the times when the first hot water supply is started (hot water start time) in the past seven days from the hot water supply history for the past seven days. Hereinafter, this time is referred to as “hot water supply start time S1”. For example, the controller 100 specifies 6:00 as the hot water supply start time S1 (see FIG. 2).
また、コントローラ100は、過去7日分の運転履歴から、過去7日間において、湯はり運転が開始された時刻(湯はり開始時刻)のうち、最も早い時刻を特定する。以下では、この時刻を「湯はり開始時刻B1」と呼ぶ。上記の通り、本実施例では、毎日20:00に湯はり運転を開始するように予め設定されている。例えば、コントローラ100は、20:00を湯はり開始時刻B1として特定する(図2参照)。 Moreover, the controller 100 specifies the earliest time among the times when the hot water operation was started (hot water start time) in the past seven days from the operation history for the past seven days. Hereinafter, this time is referred to as “hot water start time B1”. As described above, in this embodiment, it is set in advance to start the hot water operation every day at 20:00. For example, the controller 100 specifies 20:00 as the hot water start time B1 (see FIG. 2).
さらに、コントローラ100は、過去7日分の運転履歴から、過去7日間において、最後の給湯が終了した時刻(給湯終了時刻)のうち、最も遅い時刻を特定する。以下では、この時刻を「給湯終了時刻G1」と呼ぶ。例えば、コントローラ100は、0:00を給湯終了時刻G1として特定する(図2参照)。 Furthermore, the controller 100 specifies the latest time among the times when the last hot water supply was finished (hot water supply end time) in the past seven days from the operation history for the past seven days. Hereinafter, this time is referred to as “hot water supply end time G1”. For example, the controller 100 specifies 0:00 as the hot water supply end time G1 (see FIG. 2).
さらに、コントローラ100は、サーミスタ32が測定する温度TW(即ち、水道水の水温)に基づいて、第1の所定時間α、第2の所定時間β、及び、第3の所定時間γを特定する。 Furthermore, the controller 100 specifies the first predetermined time α, the second predetermined time β, and the third predetermined time γ based on the temperature TW (that is, the water temperature of the tap water) measured by the thermistor 32. .
図2に示すように、温度TWが21℃以上の場合、コントローラ100は、第1の所定時間αとして「20分」を特定する。温度TWが13℃以上21℃未満の場合、コントローラ100は、第1の所定時間αとして「30分」を特定する。温度TWが13℃未満の場合、コントローラ100は、第1の所定時間αとして「45分」を特定する。コントローラ100は、温度TWが高いほど、第1の所定時間αとして、短い時間を特定する。 As shown in FIG. 2, when the temperature TW is 21 ° C. or higher, the controller 100 specifies “20 minutes” as the first predetermined time α. When the temperature TW is not less than 13 ° C. and less than 21 ° C., the controller 100 specifies “30 minutes” as the first predetermined time α. When the temperature TW is less than 13 ° C., the controller 100 specifies “45 minutes” as the first predetermined time α. The controller 100 specifies a shorter time as the first predetermined time α as the temperature TW is higher.
同様に、図2に示すように、温度TWが21℃以上の場合、コントローラ100は、第2の所定時間βとして「40分」を特定する。温度TWが13℃以上21℃未満の場合、コントローラ100は、第2の所定時間βとして「50分」を特定する。温度TWが13℃未満の場合、コントローラ100は、第2の所定時間βとして「60分」を特定する。コントローラ100は、温度TWが高いほど、第2の所定時間βとして、短い時間を特定する。 Similarly, as illustrated in FIG. 2, when the temperature TW is 21 ° C. or higher, the controller 100 specifies “40 minutes” as the second predetermined time β. When the temperature TW is 13 ° C. or higher and lower than 21 ° C., the controller 100 specifies “50 minutes” as the second predetermined time β. When the temperature TW is less than 13 ° C., the controller 100 specifies “60 minutes” as the second predetermined time β. The controller 100 specifies a shorter time as the second predetermined time β as the temperature TW is higher.
さらに同様に、図2に示すように、温度TWが21℃以上の場合、コントローラ100は、第3の所定時間γとして「80分」を特定する。温度TWが13℃以上21℃未満の場合、コントローラ100は、第3の所定時間γとして「50分」を特定する。温度TWが13℃未満の場合、コントローラ100は、第3の所定時間γとして「40分」を特定する。コントローラ100は、温度TWが高いほど、第3の所定時間γとして、長い時間を特定する。 Similarly, as shown in FIG. 2, when the temperature TW is 21 ° C. or higher, the controller 100 specifies “80 minutes” as the third predetermined time γ. When the temperature TW is not less than 13 ° C. and less than 21 ° C., the controller 100 specifies “50 minutes” as the third predetermined time γ. When the temperature TW is less than 13 ° C., the controller 100 specifies “40 minutes” as the third predetermined time γ. The controller 100 specifies a longer time as the third predetermined time γ as the temperature TW is higher.
次いで、コントローラ100は、給湯開始時刻S1から、特定された第1の所定時間αだけ前の時刻である第1のヒートポンプ作動時刻S0を特定する。本実施例では、コントローラ100は、第1のヒートポンプ作動時刻S0が到来すると、後述の第1のヒートポンプ作動処理(図3参照)を開始する。 Next, the controller 100 specifies a first heat pump operation time S0 that is a time before the specified hot water start time S1 by the specified first predetermined time α. In this embodiment, when the first heat pump operation time S0 arrives, the controller 100 starts a first heat pump operation process (see FIG. 3) described later.
また、コントローラ100は、湯はり開始時刻B1から、特定された第2の所定時間βだけ前の時刻である第2のヒートポンプ作動時刻B0を特定する。本実施例では、コントローラ100は、第2のヒートポンプ作動時刻B0が到来すると、後述の第2のヒートポンプ作動処理(図4参照)を開始する。 In addition, the controller 100 specifies a second heat pump operation time B0 that is a time that is a time preceding the specified second predetermined time β from the hot water start time B1. In this embodiment, when the second heat pump operation time B0 arrives, the controller 100 starts a second heat pump operation process (see FIG. 4) described later.
さらに、コントローラ100は、給湯終了時刻G1から、特定された第3の所定時間γだけ前の時刻であるヒートポンプ停止時刻G0を特定する。本実施例では、コントローラ100は、ヒートポンプ停止時刻G0が到来すると、後述のヒートポンプ停止処理を開始する。 Furthermore, the controller 100 specifies the heat pump stop time G0 that is a time before the specified hot water end time G1 by the specified third predetermined time γ. In this embodiment, when the heat pump stop time G0 arrives, the controller 100 starts a heat pump stop process described later.
(第1のヒートポンプ作動処理)
図3は、コントローラ100が実行する第1のヒートポンプ作動処理の内容を示すフローチャートである。上記の通り、第1のヒートポンプ作動時刻S0が到来すると、コントローラ100は、図3の処理を開始する。まず、S10では、コントローラ100は、ヒートポンプ50が作動中であるか否か判断する。ヒートポンプ50が作動している場合、コントローラ100はS10でYESと判断し、S12をスキップしてS14に進む。一方、ヒートポンプ50が作動していない場合、コントローラ100はS10でNOと判断し、S12に進む。
(First heat pump operation process)
FIG. 3 is a flowchart showing the contents of the first heat pump operation process executed by the controller 100. As described above, when the first heat pump operation time S0 arrives, the controller 100 starts the process of FIG. First, in S10, the controller 100 determines whether or not the heat pump 50 is operating. When the heat pump 50 is operating, the controller 100 determines YES in S10, skips S12, and proceeds to S14. On the other hand, when the heat pump 50 is not operating, the controller 100 determines NO in S10 and proceeds to S12.
S12では、コントローラ100は、サーミスタ16が測定する温度(即ち、タンク10の上部から30Lの位置の水温)が、所定の閾値TAより高いか否か判断する。 In S12, the controller 100 determines whether or not the temperature measured by the thermistor 16 (that is, the water temperature at a position 30L from the top of the tank 10) is higher than a predetermined threshold TA.
本実施例では、所定の閾値TAは、「沸上設定温度−10℃」である。沸上設定温度は、例えば47℃である。そのため、所定の閾値TAは、例えば37℃である。S12でYESと判断される場合、少なくとも、タンク10の上部から30Lの位置の水温は閾値TA(例えば37℃)より高い。上記の通り、タンク10の上部には、高温の水の層が形成され、下部には、低温の水の層が形成される。そのため、S12でYESと判断される場合には、タンク10の30Lの位置からタンク上部までの間には、沸上設定温度(例えば47℃)に近い高温の温水が貯められている。即ち、S12でYESと判断される場合には、給湯開始時刻S1の近傍の時刻に行われる予定の最初の給湯に必要な量(5L〜20L程度)の温水がタンク10内に貯められていることを意味する。S12でYESと判断される場合、S18に進む。一方、S12でNOと判断される場合、S14に進む。 In this embodiment, the predetermined threshold TA is “boiling set temperature −10 ° C.”. The boiling set temperature is 47 ° C., for example. Therefore, the predetermined threshold TA is 37 ° C., for example. If YES is determined in S12, at least the water temperature at a position 30 L from the upper part of the tank 10 is higher than a threshold TA (eg, 37 ° C.). As described above, a high-temperature water layer is formed in the upper part of the tank 10, and a low-temperature water layer is formed in the lower part. Therefore, when it is determined YES in S12, high-temperature hot water near the boiling set temperature (for example, 47 ° C.) is stored between the 30L position of the tank 10 and the upper portion of the tank. That is, when it is determined YES in S12, the amount of hot water (about 5L to 20L) necessary for the first hot water supply scheduled to be performed near the hot water supply start time S1 is stored in the tank 10. Means that. If YES is determined in S12, the process proceeds to S18. On the other hand, if NO is determined in S12, the process proceeds to S14.
S14では、コントローラ100は、サーミスタ24が測定する温度(即ち、タンク10の下部から導出され、ヒートポンプ50を通過する前の水の温度)が、所定の閾値TBより高いか否か判断する。 In S14, the controller 100 determines whether or not the temperature measured by the thermistor 24 (that is, the temperature of water derived from the lower part of the tank 10 and before passing through the heat pump 50) is higher than a predetermined threshold value TB.
本実施例では、所定の閾値TBは、「沸上設定温度−5℃」である。沸上設定温度は、例えば47℃である。そのため、所定の閾値TBは、例えば42℃である。S14でYESと判断される場合、タンク10の下部には、閾値TB(例えば42℃)より高い温度の温水が貯められていることになる。即ち、タンク10内の略全体に、沸上設定温度に近い高温の温水が貯められていることになる。以下では、このようなタンク10の状態を「満蓄状態」と呼ぶ場合がある。S14でYESと判断される場合、S18に進む。一方、S14でNOと判断される場合、S16に進む。 In the present embodiment, the predetermined threshold value TB is “boiling set temperature −5 ° C.”. The boiling set temperature is 47 ° C., for example. Therefore, the predetermined threshold value TB is 42 ° C., for example. When YES is determined in S14, hot water having a temperature higher than a threshold value TB (for example, 42 ° C.) is stored in the lower portion of the tank 10. That is, high-temperature hot water close to the boiling set temperature is stored in substantially the entire tank 10. Hereinafter, such a state of the tank 10 may be referred to as a “full state”. If YES is determined in S14, the process proceeds to S18. On the other hand, if NO is determined in S14, the process proceeds to S16.
S16では、コントローラ100は、ヒートポンプ50を作動させる。また、コントローラ100は、循環ポンプ22を回転させる。即ち、コントローラ100は、上記の沸上運転を開始する。これにより、タンク10の下部に存在する水がタンク水循環路20内に導入され、導入された水がヒートポンプ50によって加熱され、加熱された水がタンク10の上部に戻される。これにより、タンク10に高温の水が貯められる。なお、S16の時点で既にヒートポンプ50及び循環ポンプ22が作動している場合、コントローラ100は、ヒートポンプ50及び循環ポンプ22を継続して作動させる。S16を終えると、S10に戻り、コントローラ100は、ヒートポンプ50が作動中であるか否か判断する。この場合、コントローラ100は、S10でYESと判断し、S14に進む。即ち、S16でヒートポンプ50を作動させた後は、コントローラ100は、サーミスタ24が測定する温度が、所定の閾値TBより高くなること(即ちタンク10が満蓄状態になること)を監視する。サーミスタ24が測定する温度が所定の閾値TBより高くなる場合(S14でYES)、S18に進む。 In S <b> 16, the controller 100 operates the heat pump 50. Further, the controller 100 rotates the circulation pump 22. That is, the controller 100 starts the above boiling operation. Thereby, water existing in the lower part of the tank 10 is introduced into the tank water circulation path 20, the introduced water is heated by the heat pump 50, and the heated water is returned to the upper part of the tank 10. Thereby, hot water is stored in the tank 10. When the heat pump 50 and the circulation pump 22 are already operating at the time of S16, the controller 100 continuously operates the heat pump 50 and the circulation pump 22. When S16 ends, the process returns to S10, and the controller 100 determines whether or not the heat pump 50 is operating. In this case, the controller 100 determines YES in S10, and proceeds to S14. That is, after operating the heat pump 50 in S16, the controller 100 monitors whether the temperature measured by the thermistor 24 is higher than the predetermined threshold value TB (that is, the tank 10 is fully charged). When the temperature measured by the thermistor 24 becomes higher than the predetermined threshold value TB (YES in S14), the process proceeds to S18.
S18では、コントローラ100は、ヒートポンプ50及び循環ポンプ22を停止させる。上記の通り、S12でYESと判断される場合には、タンク10内には、既に最初の給湯に必要な量(5L〜20L程度)の温水が貯められているためである。また、S14でYESと判断される場合には、タンク10が満蓄状態であり、タンク10内には、当然に最初の給湯に必要な量(5L〜20L程度)の温水が貯められているためである。S18を終えると、S10に戻り、コントローラ100は、ヒートポンプ50が作動中であるか否か判断する。この場合、コントローラ100は、S10でNOと判断し、S12に進む。即ち、S18でヒートポンプ50を停止させた後は、コントローラ100は、サーミスタ16が測定する温度が、所定の閾値TA以下になる(即ちS12でNOになる)ことを監視する。サーミスタ16が測定する温度が所定の閾値TA以下になる場合(S12でNO)、再びS14に進む。 In S <b> 18, the controller 100 stops the heat pump 50 and the circulation pump 22. As described above, when YES is determined in S <b> 12, this is because the amount of warm water (about 5 L to 20 L) necessary for the initial hot water supply is already stored in the tank 10. When YES is determined in S14, the tank 10 is fully stored, and naturally, the amount of hot water necessary for the first hot water supply (about 5L to 20L) is stored in the tank 10. Because. When S18 ends, the process returns to S10, and the controller 100 determines whether or not the heat pump 50 is operating. In this case, the controller 100 determines NO in S10, and proceeds to S12. That is, after the heat pump 50 is stopped in S18, the controller 100 monitors whether the temperature measured by the thermistor 16 is equal to or lower than the predetermined threshold TA (that is, NO in S12). When the temperature measured by the thermistor 16 is equal to or lower than the predetermined threshold TA (NO in S12), the process proceeds to S14 again.
図3の第1のヒートポンプ作動処理を開始した後、給湯開始時刻S1の近傍の時刻に、最初の給湯運転が実行されると、タンク10上部の温水が、供給路40を介して給湯箇所に供給される。上記の通り、本実施例の給湯システム2では、給湯開始時刻S1において、タンク10内に、給湯に必要な量の温水を貯えておくことができる。即ち、第1の所定時間αは、その時間の間だけヒートポンプ50を作動させることによって、給湯開始時刻S1の時点で、タンク10内に、給湯に必要な量の温水を貯めることが可能となる時間である。 After the first heat pump operation process of FIG. 3 is started, when the first hot water supply operation is executed at a time near the hot water supply start time S1, hot water in the upper part of the tank 10 is supplied to the hot water supply location via the supply path 40. Supplied. As described above, in the hot water supply system 2 of the present embodiment, the amount of hot water necessary for hot water supply can be stored in the tank 10 at the hot water supply start time S1. That is, during the first predetermined time α, by operating the heat pump 50 only during that time, it is possible to store the amount of hot water necessary for hot water supply in the tank 10 at the hot water supply start time S1. It's time.
(第2のヒートポンプ作動処理)
図4は、コントローラ100が実行する第2のヒートポンプ作動処理の内容を示すフローチャートである。上記の通り、第2のヒートポンプ作動時刻B0が到来すると、コントローラ100は、図4の処理を開始する。まず、S30では、コントローラ100は、サーミスタ24が測定する温度(即ち、タンク10の下部から導出され、ヒートポンプ50を通過する前の水の温度)が、所定の閾値TBより高いか否か(即ちタンク10が満蓄状態か否か)判断する。S30でYESと判断される場合、S38に進む。一方、S30でNOと判断される場合、S32に進む。
(Second heat pump operation process)
FIG. 4 is a flowchart showing the contents of the second heat pump operation process executed by the controller 100. As described above, when the second heat pump operation time B0 arrives, the controller 100 starts the process of FIG. First, in S30, the controller 100 determines whether or not the temperature measured by the thermistor 24 (that is, the temperature of water derived from the lower part of the tank 10 and before passing through the heat pump 50) is higher than a predetermined threshold TB (that is, It is determined whether or not the tank 10 is fully charged. If YES is determined in S30, the process proceeds to S38. On the other hand, if NO is determined in S30, the process proceeds to S32.
S32では、コントローラ100は、ヒートポンプ50を作動させる。また、コントローラ100は、循環ポンプ22を回転させる。即ち、コントローラ100は、上記の沸上運転を開始する。なお、S32の時点で既にヒートポンプ50及び循環ポンプ22が作動している場合、コントローラ100は、ヒートポンプ50及び循環ポンプ22を継続して作動させる。S32を終えると、S34に進む。 In S32, the controller 100 operates the heat pump 50. Further, the controller 100 rotates the circulation pump 22. That is, the controller 100 starts the above boiling operation. In addition, when the heat pump 50 and the circulation pump 22 are already operating at the time of S32, the controller 100 continuously operates the heat pump 50 and the circulation pump 22. When S32 ends, the process proceeds to S34.
一方、S38では、ヒートポンプ50及び循環ポンプ22を停止させる。上記の通り、S30でYESと判断される場合には、タンク10は満蓄状態である。そのため、それ以上、ヒートポンプ50及び循環ポンプ22を作動させる必要がない。S38を終えると、S34に進む。 On the other hand, in S38, the heat pump 50 and the circulation pump 22 are stopped. As described above, when YES is determined in S30, the tank 10 is in a fully charged state. Therefore, it is not necessary to operate the heat pump 50 and the circulation pump 22 any more. When S38 ends, the process proceeds to S34.
S34では、コントローラ100は、湯はり開始時刻B1が到来したか否か判断する。S34でYESと判断される場合、S36に進み、湯はり処理(図5参照)を開始する。一方、S34でNOの場合、S30に戻る。 In S34, the controller 100 determines whether or not the hot water start time B1 has arrived. If YES is determined in S34, the process proceeds to S36, and hot water processing (see FIG. 5) is started. On the other hand, if NO in S34, the process returns to S30.
本実施例では、図4の第2のヒートポンプ作動処理が開始された時点で、タンク10内に沸上設定温度の温水が十分に貯められていない場合には、上記のS32でヒートポンプ50を作動させた後、タンク10が満蓄状態になる前に、湯はり開始時刻B1が到来する(S34でYES)。即ち、本実施例では、コントローラ100は、第2のヒートポンプ作動時刻B0にヒートポンプ50を作動させる(S32)と、湯はり開始時刻B1において、サーミスタ24が測定する温度が、所定の閾値TB未満になるように、第2の所定時間βを特定している。 In this embodiment, when the second heat pump operation process of FIG. 4 is started and the hot water at the boiling set temperature is not sufficiently stored in the tank 10, the heat pump 50 is operated in S32 described above. After this, before the tank 10 becomes fully charged, the hot water start time B1 arrives (YES in S34). That is, in the present embodiment, when the controller 100 operates the heat pump 50 at the second heat pump operation time B0 (S32), the temperature measured by the thermistor 24 at the hot water start time B1 is less than the predetermined threshold value TB. Thus, the second predetermined time β is specified.
(湯はり処理)
上記の通り、湯はり開始時刻B1が到来すると、S36において、コントローラ100は、湯はり処理を開始する。図5は、湯はり処理の内容を示すフローチャートである。なお、本実施例では、湯はり開始時刻B1が到来すると、自動的に湯はり処理が開始される例を説明するが、変形例では、ユーザによって所定の湯はり開始操作が行われる場合に、湯はり処理を開始してもよい。
(Hot water treatment)
As described above, when the hot water start time B1 arrives, in S36, the controller 100 starts the hot water processing. FIG. 5 is a flowchart showing the contents of the hot water treatment. In the present embodiment, an example in which the hot water processing is automatically started when the hot water start time B1 arrives will be described, but in a modified example, when a predetermined hot water start operation is performed by the user, Hot water treatment may be started.
図5のS50では、コントローラ100は、湯はり運転を開始する。即ち、コントローラ100は、浴槽の湯はり弁46を開き、浴槽への温水の供給を開始する。次いで、S52では、コントローラ100は、ヒートポンプ50が作動中であるか否か判断する。上記の通り、湯はり開始時刻B1が到来した時点で、タンク10が満蓄状態でなかった場合には、ヒートポンプ50は継続して作動している。その場合、コントローラ100はS52でYESと判断し、S58に進む。一方、湯はり開始時刻B1が到来した時点で、タンク10が満蓄状態であった場合には、ヒートポンプ50は停止している。その場合、コントローラ100はS52でNOと判断し、S54に進む。 In S50 of FIG. 5, the controller 100 starts hot water operation. That is, the controller 100 opens the hot water valve 46 of the bathtub and starts supplying hot water to the bathtub. Next, in S52, the controller 100 determines whether or not the heat pump 50 is operating. As described above, if the tank 10 is not fully charged when the hot water start time B1 arrives, the heat pump 50 is continuously operated. In that case, the controller 100 determines YES in S52, and proceeds to S58. On the other hand, when the hot water start time B1 arrives and the tank 10 is fully charged, the heat pump 50 is stopped. In that case, the controller 100 determines NO in S52, and proceeds to S54.
S54では、コントローラ100は、サーミスタ16が測定する温度が、所定の閾値TA以下になることを監視する。S54でYESの場合、S56に進む。S54でYESの場合、湯はり運転の結果、タンク10内に貯められていた温水(閾値TAより高い温度の温水)の量が残り30L以下まで減少したことを意味する。S56では、コントローラ100は、ヒートポンプ50を作動させるとともに、循環ポンプ22を回転させる。 In S54, the controller 100 monitors that the temperature measured by the thermistor 16 is equal to or lower than a predetermined threshold TA. If YES in S54, the process proceeds to S56. If YES in S54, it means that the amount of hot water (hot water having a temperature higher than the threshold TA) stored in the tank 10 has been reduced to 30 L or less as a result of the hot water operation. In S <b> 56, the controller 100 operates the heat pump 50 and rotates the circulation pump 22.
続くS58では、コントローラ100は、サーミスタ12が測定する温度(即ち、タンク10の上部から6Lの位置の水温)が、ふろ設定温度以下になることを監視する。S58でYESと判断される場合には、タンク10内に貯められていた温水(ふろ設定温度より高い温度の温水)の量が残り6L以下まで減少したことを意味する。以下では、この状態のことを「湯切れ状態」と呼ぶ場合がある。本実施例では、湯はり運転において、150L〜180Lの温水が必要とされる。上記の通り、本実施例では、タンク10の容量は100Lであるため、湯はり運転の途中で必ず湯切れ状態(S58でYES)が発生する。S58でYESと判断される場合(即ち、湯切れ状態の場合)、S60に進む。 In subsequent S <b> 58, the controller 100 monitors that the temperature measured by the thermistor 12 (that is, the water temperature at a position 6 L from the upper part of the tank 10) falls below the set temperature. If YES is determined in S58, it means that the amount of warm water stored in the tank 10 (warm water having a temperature higher than the set temperature) has decreased to the remaining 6L or less. Hereinafter, this state may be referred to as a “hot water state”. In the present embodiment, 150 L to 180 L of hot water is required in hot water operation. As described above, in the present embodiment, since the capacity of the tank 10 is 100 L, a hot water outage condition (YES in S58) always occurs during the hot water operation. If YES is determined in S58 (that is, if the hot water is out), the process proceeds to S60.
S60では、コントローラ100は、燃焼装置60を作動させる。なお、この場合も、コントローラ100は、ヒートポンプ50及び循環ポンプ22を継続して作動させる。この結果、浴槽には、ヒートポンプ50及び燃焼装置60で加熱された温水が供給される。 In S60, the controller 100 operates the combustion device 60. Also in this case, the controller 100 continuously operates the heat pump 50 and the circulation pump 22. As a result, hot water heated by the heat pump 50 and the combustion device 60 is supplied to the bathtub.
次いで、S62では、コントローラ100は、湯はり運転が完了することを監視する。所定量(例えば150L)の温水を浴槽に供給し終えると、コントローラ100は、S62でYESと判断し、S64に進む。 Next, in S62, the controller 100 monitors the completion of the hot water operation. When the predetermined amount (for example, 150 L) of hot water has been supplied to the bathtub, the controller 100 determines YES in S62 and proceeds to S64.
S64では、コントローラ100は、S60で作動させた燃焼装置60を停止させる。なお、この場合も、コントローラ100は、ヒートポンプ50及び循環ポンプ22を所定時間継続して作動させる。S64を終えると、図5の湯はり処理が終了する。同時に、図4の処理も終了する。上記の通り、本実施例の給湯システム2では、湯はり開始時刻B1において、タンク10内に、湯はりのために必要な量の一部の温水を貯えておくことができる。即ち、第2の所定時間βは、その時間の間だけヒートポンプ50を作動させることによって、湯はり開始時刻B1の時点で、タンク10内に、必要な量の温水を貯めることが可能となる時間である。 In S64, the controller 100 stops the combustion device 60 operated in S60. Also in this case, the controller 100 operates the heat pump 50 and the circulation pump 22 continuously for a predetermined time. When S64 ends, the hot water filling process of FIG. 5 ends. At the same time, the process of FIG. As described above, in the hot water supply system 2 of the present embodiment, a part of the hot water necessary for hot water can be stored in the tank 10 at the hot water start time B1. That is, the second predetermined time β is a time during which the necessary amount of hot water can be stored in the tank 10 at the hot water start time B1 by operating the heat pump 50 only during that time. It is.
また、上記の通り、コントローラ100は、第2のヒートポンプ作動時刻B0にヒートポンプ50を作動させる(S32)と、湯はり開始時刻B1において、サーミスタ24が測定する温度が、所定の閾値TB未満になるように、第2の所定時間βを特定している。そのため、湯はり開始時刻B1が到来した時点で、タンク10が満蓄状態でない場合には、浴槽に温水の供給を開始した後も(図5のS50)、ヒートポンプ50を継続して作動させる(図5のS52でYES)。この場合、ヒートポンプ50で水を加熱してタンク10に貯めながら、浴槽に温水を供給することができる。一方、湯はり開始時刻B1において、ヒートポンプ50が停止している場合(図5のS52でNO)、後でヒートポンプ50を再度作動させる必要があり、時間がかかる(図5のS56)。また、湯はり開始時刻B1において、ヒートポンプ50が継続して作動している場合には(図5のS52でYES)、湯はり開始時刻B1において、ヒートポンプ50が停止している場合(図5のS52でNO)と比べて、ヒートポンプ50の停止及び再作動が頻繁に行われることを抑制することができる。即ち、ヒートポンプ50の停止及び再作動によるロスを減らしてエネルギー効率を高くすることができ、さらに、ヒートポンプ50の耐久性の低下を抑制することができる。 As described above, when the controller 100 operates the heat pump 50 at the second heat pump operation time B0 (S32), the temperature measured by the thermistor 24 at the hot water start time B1 becomes less than the predetermined threshold value TB. As described above, the second predetermined time β is specified. Therefore, when the hot water start time B1 arrives and the tank 10 is not fully charged, the heat pump 50 is continuously operated even after the supply of hot water to the bathtub is started (S50 in FIG. 5) ( YES in S52 of FIG. In this case, hot water can be supplied to the bathtub while the water is heated by the heat pump 50 and stored in the tank 10. On the other hand, when the heat pump 50 is stopped at the hot water start time B1 (NO in S52 in FIG. 5), it is necessary to operate the heat pump 50 again later, which takes time (S56 in FIG. 5). Further, when the heat pump 50 is continuously operated at the hot water start time B1 (YES in S52 of FIG. 5), when the heat pump 50 is stopped at the hot water start time B1 (FIG. 5). Compared to NO in S52, frequent stoppage and reactivation of the heat pump 50 can be suppressed. That is, the loss due to the stop and restart of the heat pump 50 can be reduced to increase the energy efficiency, and further, the decrease in the durability of the heat pump 50 can be suppressed.
(ヒートポンプ停止処理)
ヒートポンプ停止時刻G0が到来すると、コントローラ100は、ヒートポンプ停止処理(図示省略)を開始する。即ち、コントローラ100は、ヒートポンプ停止時刻G0の時点で、ヒートポンプ50が作動中である場合、ヒートポンプ50を停止させる。なお、ヒートポンプ50が作動していない場合、コントローラ100は、そのままヒートポンプ50を停止させておく。コントローラ100は、ヒートポンプ停止時刻G0でヒートポンプ50を停止させると、次の日までヒートポンプ50を作動させない。その後、給湯終了時刻G1の近傍の時刻に、最後の給湯運転が終了する。従って、本実施例の給湯システム2では、給湯終了時刻G1において、タンク10内に、過剰な温水を貯えないようにすることができる。即ち、第3の所定時間γは、その時間の間にヒートポンプ50を作動させないことにより、給湯終了時刻G1の時点で、タンク10内に、過剰な温水を貯えないようにすることが可能となる時間である。
(Heat pump stop process)
When the heat pump stop time G0 comes, the controller 100 starts a heat pump stop process (not shown). That is, the controller 100 stops the heat pump 50 when the heat pump 50 is operating at the time of the heat pump stop time G0. If the heat pump 50 is not operating, the controller 100 stops the heat pump 50 as it is. When the controller 100 stops the heat pump 50 at the heat pump stop time G0, the controller 100 does not operate the heat pump 50 until the next day. Thereafter, the last hot water supply operation ends at a time in the vicinity of the hot water supply end time G1. Therefore, in the hot water supply system 2 of the present embodiment, it is possible to prevent excessive hot water from being stored in the tank 10 at the hot water supply end time G1. That is, during the third predetermined time γ, by not operating the heat pump 50 during that time, it is possible to prevent excessive hot water from being stored in the tank 10 at the time of the hot water supply end time G1. It's time.
なお、上記において、コントローラ100は、過去7日分の給湯履歴から、過去7日間における給湯開始時刻の平均時刻を、給湯開始時刻S1として特定してもよい。同様に、コントローラ100は、過去7日分の給湯履歴から、過去7日間における湯はり開始時刻の平均時刻を、湯はり開始時刻B1として特定してもよい。さらに、コントローラ100は、過去7日分の給湯履歴から、過去7日間における給湯終了時刻の平均時刻を、給湯終了時刻G1として特定してもよい。 In addition, in the above, the controller 100 may specify the average time of the hot water supply start time in the past seven days as the hot water supply start time S1 from the hot water supply history for the past seven days. Similarly, the controller 100 may specify the average hot water start time in the past seven days as the hot water start time B1 from the hot water supply history for the past seven days. Furthermore, the controller 100 may specify the average time of the hot water supply end times in the past seven days as the hot water supply end time G1 from the hot water supply history for the past seven days.
上記において、コントローラ100は、温度TWが高くなるほど短い時間を特定するのであれば、上記の手法に限らず、任意の方法によって第1の所定時間αを特定してもよい。従って、例えば、コントローラ100は、温度TWを用いて所定の計算を行い、第1の所定時間αを算出してもよい。同様に、コントローラ100は、温度TWが高くなるほど短い時間を特定するのであれば、任意の方法によって第2の所定時間βを特定してもよい。また、コントローラ100は、温度TWが高くなるほど長い時間を特定するのであれば、任意の方法によって第3の所定時間γを特定してもよい。 In the above, as long as the temperature TW increases, the controller 100 may specify the first predetermined time α by any method, not limited to the above method. Therefore, for example, the controller 100 may perform a predetermined calculation using the temperature TW to calculate the first predetermined time α. Similarly, the controller 100 may specify the second predetermined time β by any method as long as it specifies a shorter time as the temperature TW increases. Further, the controller 100 may specify the third predetermined time γ by any method as long as the time TW increases as the temperature TW increases.
上記において、コントローラ100は、サーミスタ32が測定する水温TWに代えて、外気温センサ52が測定する外気温に基づいて、第1の所定時間α、第2の所定時間β、第3の所定時間γを特定してもよい。また、コントローラ100は、サーミスタ32が測定する水温と外気温センサ52が測定する外気温とに基づいて、第1の所定時間α、第2の所定時間β、第3の所定時間γを特定してもよい。 In the above description, the controller 100 replaces the water temperature TW measured by the thermistor 32 with the first predetermined time α, the second predetermined time β, and the third predetermined time based on the outside air temperature measured by the outside air temperature sensor 52. γ may be specified. Further, the controller 100 specifies the first predetermined time α, the second predetermined time β, and the third predetermined time γ based on the water temperature measured by the thermistor 32 and the outside air temperature measured by the outside air temperature sensor 52. May be.
(実際のデータと標準的なデータの比較表示)
図6に示すように、本実施例の給湯システム2では、ユーザ端末110において、標準的な時間帯別の給湯パターンと、実際の時間帯別の給湯パターンを、対比可能に表示可能である。図6に示す例では、ユーザ端末110の画面112に、標準的な時間帯別の電気使用量、ガス使用量および給湯使用量のグラフ116(図6では「標準」というラベルとともに表示)と、実際の時間帯別の電気使用量、ガス使用量および給湯使用量のグラフ114(図6では「あなた」というラベルとともに表示)を、上下に並べて表示している。本実施例の給湯システム2では、ユーザ端末110は、コントローラ100から、過去の所定期間(例えば1ヶ月間)における各日の給湯履歴を取得し、それぞれの時間帯における、電気使用量、ガス使用量および給湯使用量の平均値を算出することで、実際の時間帯別の給湯パターンを記憶する。また、ユーザ端末110は、標準的な時間帯別の給湯パターンを、例えばインターネット等を介してデータベース(図示せず)からダウンロードすることで記憶する。給湯システム2のユーザは、ユーザ端末110を介して、標準的な時間帯別の給湯パターンのグラフ116と、実際の時間帯別の給湯パターンのグラフ114を見比べることによって、自身の給湯パターンの特徴を把握し、省エネルギーを図るために自身の生活様式をどのように改善すればよいかを理解することができる。なお、過去の所定期間における各日の給湯履歴から、それぞれの時間帯における、電気使用量、ガス使用量および給湯使用量の平均値を算出する処理と、実際の時間帯別の給湯パターンを記憶する処理と、標準的な時間帯別の給湯パターンを記憶する処理は、ユーザ端末110ではなく、コントローラ100で行ってもよい。
(Comparison display of actual data and standard data)
As shown in FIG. 6, in the hot water supply system 2 of the present embodiment, the user terminal 110 can display a standard hot water supply pattern for each time zone and an actual hot water supply pattern for each time zone in a comparable manner. In the example shown in FIG. 6, on the screen 112 of the user terminal 110, a graph 116 (displayed with the label “standard” in FIG. 6) of standard electricity usage, gas usage and hot water usage by time zone, A graph 114 (displayed with the label “you” in FIG. 6) of the actual electric usage, gas usage, and hot water usage for each time zone is displayed side by side. In the hot water supply system 2 of the present embodiment, the user terminal 110 acquires the hot water supply history of each day in the past predetermined period (for example, one month) from the controller 100, and uses the amount of electricity and gas used in each time zone. By calculating the average value of the amount and the amount of hot water used, the hot water supply pattern for each actual time zone is stored. In addition, the user terminal 110 stores a standard hot water supply pattern for each time zone by, for example, downloading it from a database (not shown) via the Internet or the like. The user of the hot water supply system 2 compares the standard hot water supply pattern graph 116 for each time zone with the hot water supply pattern graph 114 for each actual time zone via the user terminal 110, and thereby features of the hot water supply pattern of the user. And understand how to improve their lifestyle to save energy. In addition, from the hot water supply history of each day in the past predetermined period, a process for calculating the average value of the electric usage amount, the gas usage amount and the hot water usage amount in each time zone, and the actual hot water supply pattern for each time zone are stored. The process of storing and the process of storing a standard hot water supply pattern for each time zone may be performed by the controller 100 instead of the user terminal 110.
なお、標準的な時間帯別の給湯パターンは、複数の給湯パターンの中から、給湯システム2のユーザに適合するものを選択可能としてもよい。例えば、標準的な時間帯別の給湯パターンとして、ユーザの家庭の構成人数、居住地域、季節などに応じた給湯パターンを複数用意しておいて、ユーザがユーザ端末110において複数の給湯パターンの中から自身に適合するものを選択できるように、ユーザ端末110を構成してもよい。 Note that the standard hot water supply pattern for each time zone may be selected from a plurality of hot water supply patterns that are suitable for the user of the hot water supply system 2. For example, as a standard hot water supply pattern for each time zone, a plurality of hot water supply patterns corresponding to the number of people in the user's home, the residential area, the season, and the like are prepared, and the user can select a plurality of hot water supply patterns in the user terminal 110. The user terminal 110 may be configured so that the user can select one that suits the user.
(アドバイス表示)
図7に示すように、本実施例の給湯システム2では、ユーザ端末110において、給湯システム2のユーザに対するアドバイスを表示可能である。図7に示す例では、ユーザ端末110の画面112の上部に、標準的な給湯パターンで、ヒートポンプ50を使用することなく燃焼装置60のみを使用して給湯した場合の光熱費118(図7では「ガスのみ」というラベルとともに表示)と、標準的な給湯パターンで、ヒートポンプ50と燃焼装置60を組み合わせて使用して給湯した場合の光熱費120(図7では「標準」というラベルとともに表示)と、実際の給湯パターンでの光熱費122(図7では「あなた」というラベルとともに表示)が並べて表示されているとともに、画面112の下部に、アドバイス文124が表示されている。
(Advice display)
As shown in FIG. 7, in the hot water supply system 2 of the present embodiment, advice to the user of the hot water supply system 2 can be displayed on the user terminal 110. In the example shown in FIG. 7, the utility cost 118 (in FIG. 7) when hot water is supplied using only the combustion device 60 without using the heat pump 50 in the standard hot water supply pattern at the top of the screen 112 of the user terminal 110. (Displayed with a label of “gas only”), and a utility cost 120 (displayed with a label of “standard” in FIG. 7) when hot water is supplied using a combination of the heat pump 50 and the combustion device 60 in a standard hot water supply pattern. The utility bill 122 (displayed with the label “You” in FIG. 7) in the actual hot water supply pattern is displayed side by side, and an advice sentence 124 is displayed at the bottom of the screen 112.
図8および図9に示すように、ユーザ端末110には、複数のアドバイス文124と、そのアドバイス文124の表示条件が、関連付けて記憶されている。ユーザ端末110は、それぞれのアドバイス文124について、関連付けられた表示条件が満たされるか否かを判定し、全ての表示条件が満たされるアドバイス文124を画面112に表示する。なお、図8、図9における「標準光熱費」、「標準給湯使用量」、「標準湯はり量」、「標準給湯使用回数」は、それぞれ、標準的な給湯パターンに基づく光熱費、給湯使用量、湯はり量および給湯使用回数をいう。 As shown in FIGS. 8 and 9, the user terminal 110 stores a plurality of advice sentences 124 and display conditions for the advice sentences 124 in association with each other. The user terminal 110 determines whether or not the associated display condition is satisfied for each advice sentence 124, and displays the advice sentence 124 that satisfies all the display conditions on the screen 112. In addition, “standard utility cost”, “standard hot water use amount”, “standard hot water amount”, and “standard hot water use number” in FIGS. 8 and 9 are the utility cost and hot water use based on the standard hot water supply pattern, respectively. It refers to the volume, amount of hot water and the number of hot water usage.
図8のNo.1に示すように、本実施例の給湯システム2では、給湯設定温度が所定温度(例えば43℃)以上の場合に、ユーザ端末110は、給湯設定温度を下げることで光熱費の節約が可能である旨のアドバイス文124を表示する。 No. 8 in FIG. As shown in FIG. 1, in the hot water supply system 2 of the present embodiment, when the hot water supply set temperature is equal to or higher than a predetermined temperature (for example, 43 ° C.), the user terminal 110 can save utility costs by lowering the hot water set temperature. An advice sentence 124 to that effect is displayed.
図8のNo.2に示すように、本実施例の給湯システム2では、ふろ設定温度が所定温度(例えば43℃)以上の場合に、ユーザ端末110は、ふろ設定温度を下げることで光熱費の節約が可能である旨のアドバイス文124を表示する。 No. 8 in FIG. As shown in FIG. 2, in the hot water supply system 2 of the present embodiment, when the bath set temperature is equal to or higher than a predetermined temperature (for example, 43 ° C.), the user terminal 110 can save utility costs by lowering the bath set temperature. An advice sentence 124 to that effect is displayed.
図8のNo.3に示すように、本実施例の給湯システム2では、保温設定時間が所定時間(例えば4時間)以上の場合に、ユーザ端末110は、保温設定時間を短くすることで光熱費の節約が可能である旨のアドバイス文124を表示する。 No. 8 in FIG. As shown in FIG. 3, in the hot water supply system 2 of the present embodiment, when the heat retention set time is equal to or longer than a predetermined time (for example, 4 hours), the user terminal 110 can save utility costs by shortening the heat retention set time. Is displayed.
図8のNo.4に示すように、本実施例の給湯システム2では、以下の3つの条件が満たされた場合に、給湯開始時刻と給湯終了時刻のばらつきを減らすことで光熱費の節約が可能である旨のアドバイス文124を表示する。
(1)当月の光熱費が、標準光熱費に所定係数(例えば1.05)を乗算した値以上である。
(2)過去の所定期間(例えば7日間)の給湯開始時刻において、一番早い時刻と一番遅い時刻の時間差が所定時間差(例えば2時間)以上である。
(3)過去の所定期間(例えば7日間)の給湯終了時刻において、一番早い時刻と一番遅い時刻の時間差が所定時間差(例えば2時間)以上である。
No. 8 in FIG. As shown in FIG. 4, in the hot water supply system 2 of the present embodiment, when the following three conditions are satisfied, the utility cost can be saved by reducing the variation in the hot water start time and the hot water end time. An advice sentence 124 is displayed.
(1) The utility cost for the current month is equal to or greater than the value obtained by multiplying the standard utility cost by a predetermined coefficient (for example, 1.05).
(2) At the hot water supply start time in the past predetermined period (for example, 7 days), the time difference between the earliest time and the latest time is a predetermined time difference (for example, 2 hours) or more.
(3) The time difference between the earliest time and the latest time at the hot water supply end time in the past predetermined period (for example, 7 days) is equal to or greater than the predetermined time difference (for example, 2 hours).
図8のNo.5に示すように、本実施例の給湯システム2では、以下の3つの条件が満たされた場合に、給湯開始時刻の早い時刻へのばらつきを減らすことで光熱費の節約が可能である旨のアドバイス文124を表示する。
(1)当月の光熱費が、標準光熱費に所定係数(例えば1.05)を乗算した値以上である。
(2)過去の所定期間(例えば7日間)の給湯開始時刻において、一番早い時刻と一番遅い時刻の時間差が所定時間差(例えば2時間)以上である。
(3)過去の所定期間(例えば7日間)の給湯開始時刻において、一番早い時刻が所定時刻(例えば5:00)以前である。
No. 8 in FIG. As shown in FIG. 5, in the hot water supply system 2 of the present embodiment, when the following three conditions are satisfied, the utility cost can be saved by reducing the variation of the hot water supply start time to an earlier time. An advice sentence 124 is displayed.
(1) The utility cost for the current month is equal to or greater than the value obtained by multiplying the standard utility cost by a predetermined coefficient (for example, 1.05).
(2) At the hot water supply start time in the past predetermined period (for example, 7 days), the time difference between the earliest time and the latest time is a predetermined time difference (for example, 2 hours) or more.
(3) At the hot water supply start time in the past predetermined period (for example, 7 days), the earliest time is before the predetermined time (for example, 5:00).
図8のNo.6に示すように、本実施例の給湯システム2では、以下の3つの条件が満たされた場合に、給湯終了時刻の遅い時刻へのばらつきを減らすことで光熱費の節約が可能である旨のアドバイス文124を表示する。
(1)当月の光熱費が、標準光熱費に所定係数(例えば1.05)を乗算した値以上である。
(2)過去の所定期間(例えば7日間)の給湯終了時刻において、一番早い時刻と一番遅い時刻の時間差が所定時間差(例えば2時間)以上である。
(3)過去の所定期間(例えば7日間)の給湯終了時刻において、一番遅い時刻が所定時刻(例えば24:00)以降である。
No. 8 in FIG. As shown in FIG. 6, in the hot water supply system 2 of the present embodiment, when the following three conditions are satisfied, the utility cost can be saved by reducing the variation of the hot water supply end time to a later time. An advice sentence 124 is displayed.
(1) The utility cost for the current month is equal to or greater than the value obtained by multiplying the standard utility cost by a predetermined coefficient (for example, 1.05).
(2) At the hot water supply end time in the past predetermined period (for example, 7 days), the time difference between the earliest time and the latest time is a predetermined time difference (for example, 2 hours) or more.
(3) The latest time in the past hot water supply end time in a predetermined period (for example, 7 days) is after the predetermined time (for example, 24:00).
図8のNo.7に示すように、本実施例の給湯システム2では、以下の2つの条件が満たされた場合に、給湯開始時刻から湯はり開始時刻までの給湯使用量のばらつきを減らすことで、光熱費の節約が可能である旨のアドバイス文124を表示する。
(1)当月の光熱費が、標準光熱費に所定係数(例えば1.05)を乗算した値以上である。
(2)過去の所定期間(例えば7日間)の給湯開始時刻から湯はり開始前までの給湯使用量について、一番多い日の使用量と一番少ない日の使用量の差が所定量(例えば30L)以上である。
No. 8 in FIG. As shown in FIG. 7, in the hot water supply system 2 of the present embodiment, when the following two conditions are satisfied, the variation in hot water usage from the hot water start time to the hot water start time is reduced, thereby reducing the utility cost. An advice sentence 124 indicating that saving is possible is displayed.
(1) The utility cost for the current month is equal to or greater than the value obtained by multiplying the standard utility cost by a predetermined coefficient (for example, 1.05).
(2) Regarding the amount of hot water used from the hot water supply start time in the past predetermined period (for example, 7 days) to before the start of the hot water beam, the difference between the most used day and the least used day is the predetermined amount (for example, 30L) or more.
図8のNo.8に示すように、本実施例の給湯システム2では、以下の2つの条件が満たされた場合に、給湯開始時刻から湯はり開始時刻までの給湯量を減らすことで、光熱費の節約が可能である旨のアドバイス文124を表示する。
(1)当月の光熱費が、標準光熱費に所定係数(例えば1.05)を乗算した値以上である。
(2)過去の所定期間(例えば7日間)の給湯開始時刻から湯はり開始前までの給湯使用量が、標準給湯使用量に所定係数(例えば1.10)を乗算した値以上である。
No. 8 in FIG. As shown in FIG. 8, in the hot water supply system 2 of the present embodiment, when the following two conditions are satisfied, the amount of hot water from the hot water start time to the hot water start time can be reduced, so that the utility cost can be saved. Is displayed.
(1) The utility cost for the current month is equal to or greater than the value obtained by multiplying the standard utility cost by a predetermined coefficient (for example, 1.05).
(2) The amount of hot water supply used from the hot water supply start time in the past predetermined period (for example, 7 days) to before the start of hot water is not less than the value obtained by multiplying the standard hot water supply usage by a predetermined coefficient (for example, 1.10).
図8のNo.9に示すように、本実施例の給湯システム2では、以下の2つの条件が満たされた場合に、湯はり量を減らすことで、光熱費の節約が可能である旨のアドバイス文124を表示する。
(1)当月の光熱費が、標準光熱費に所定係数(例えば1.05)を乗算した値以上である。
(2)過去の所定期間(例えば7日間)の湯はり量が、標準湯はり量に所定係数(例えば1.10)を乗算した値以上である。
No. 8 in FIG. As shown in FIG. 9, in the hot water supply system 2 of the present embodiment, when the following two conditions are satisfied, an advice sentence 124 indicating that the utility cost can be saved by reducing the amount of hot water is displayed. To do.
(1) The utility cost for the current month is equal to or greater than the value obtained by multiplying the standard utility cost by a predetermined coefficient (for example, 1.05).
(2) The amount of hot water in the past predetermined period (for example, 7 days) is not less than the value obtained by multiplying the amount of standard hot water by a predetermined coefficient (for example, 1.10).
図8のNo.10に示すように、本実施例の給湯システム2では、以下の2つの条件が満たされた場合に、湯はり終了後から給湯終了時刻までの給湯使用量を減らすことで、光熱費の節約が可能である旨のアドバイス文124を表示する。
(1)当月の光熱費が、標準光熱費に所定係数(例えば1.05)を乗算した値以上である。
(2)過去の所定期間(例えば7日間)の湯はり終了後から給湯終了時刻までの給湯使用量が、標準給湯使用量に所定係数(例えば1.10)を乗算した値以上である。
No. 8 in FIG. As shown in FIG. 10, in the hot water supply system 2 of the present embodiment, when the following two conditions are satisfied, by reducing the amount of hot water used from the end of hot water until the end of hot water supply, the utility cost can be saved. An advice sentence 124 indicating that it is possible is displayed.
(1) The utility cost for the current month is equal to or greater than the value obtained by multiplying the standard utility cost by a predetermined coefficient (for example, 1.05).
(2) The amount of hot water used from the end of hot water feeding in the past predetermined period (for example, 7 days) to the end of hot water supply is not less than the value obtained by multiplying the standard hot water usage by a predetermined coefficient (for example, 1.10).
図9のNo.11に示すように、本実施例の給湯システム2では、過去の所定期間(例えば7日間)の湯はり開始時刻において、一番早い時刻と一番遅い時刻の時間差が所定時間差(例えば3時間)以上の場合に、入浴時間のばらつきを減らすことで、光熱費の節約が可能である旨のアドバイス文124を表示する。 No. of FIG. As shown in FIG. 11, in the hot water supply system 2 of the present embodiment, the difference between the earliest time and the latest time is a predetermined time difference (for example, 3 hours) at the hot water start time in the past predetermined period (for example, 7 days). In the above case, the advice sentence 124 indicating that the utility cost can be saved by reducing the variation in bathing time is displayed.
図9のNo.12に示すように、本実施例の給湯システム2では、以下の2つの条件が満たされた場合に、午前の給湯使用回数を減らすことで、光熱費の節約が可能である旨のアドバイス文124を表示する。
(1)当月の光熱費が、標準光熱費に所定係数(例えば1.05)を乗算した値以上である。
(2)過去の所定期間(例えば7日間)の午前の給湯使用回数が、午前の標準給湯使用回数に所定係数(例えば1.15)を乗算した値以上である。
No. of FIG. As shown in FIG. 12, in the hot water supply system 2 of the present embodiment, an advice statement 124 that the utility cost can be saved by reducing the number of times of use of the hot water supply in the morning when the following two conditions are satisfied. Is displayed.
(1) The utility cost for the current month is equal to or greater than the value obtained by multiplying the standard utility cost by a predetermined coefficient (for example, 1.05).
(2) The number of morning hot water supply usages in the past predetermined period (eg, 7 days) is equal to or greater than the value obtained by multiplying the standard number of morning hot water usages by a predetermined coefficient (eg, 1.15).
図9のNo.13に示すように、本実施例の給湯システム2では、以下の2つの条件が満たされた場合に、午後の給湯使用回数を減らすことで、光熱費の節約が可能である旨のアドバイス文124を表示する。
(1)当月の光熱費が、標準光熱費に所定係数(例えば1.05)を乗算した値以上である。
(2)過去の所定期間(例えば7日間)の午後の給湯使用回数が、午後の標準給湯使用回数に所定係数(例えば1.15)を乗算した値以上である。
No. of FIG. As shown in FIG. 13, in the hot water supply system 2 of the present embodiment, an advice statement 124 that the utility cost can be saved by reducing the number of hot water use in the afternoon when the following two conditions are satisfied. Is displayed.
(1) The utility cost for the current month is equal to or greater than the value obtained by multiplying the standard utility cost by a predetermined coefficient (for example, 1.05).
(2) The number of afternoon hot water supply usages in the past predetermined period (for example, 7 days) is equal to or greater than a value obtained by multiplying the standard number of afternoon hot water usages by a predetermined coefficient (for example, 1.15).
図9のNo.14に示すように、本実施例の給湯システム2では、当月の光熱費が、標準光熱費に所定係数(例えば1.05)を乗算した値以上である場合に、光熱費の節約を促す旨のアドバイス文124を表示する。 No. of FIG. As shown in FIG. 14, in the hot water supply system 2 of the present embodiment, when the utility cost of the month is equal to or greater than a value obtained by multiplying the standard utility cost by a predetermined coefficient (for example, 1.05), the utility cost saving is promoted. The advice sentence 124 is displayed.
図9のNo.15に示すように、本実施例の給湯システム2では、当月の光熱費が、標準光熱費に所定係数(例えば0.95)を乗算した値以下である場合に、光熱費の節約が十分に行われている旨のアドバイス文124を表示する。 No. of FIG. As shown in FIG. 15, in the hot water supply system 2 of the present embodiment, when the utility cost of the current month is equal to or less than a value obtained by multiplying the standard utility cost by a predetermined coefficient (for example, 0.95), the utility cost can be sufficiently saved. An advice sentence 124 to the effect that it is being performed is displayed.
以上のように、本実施例の給湯システム2は、水を貯えるタンク10と、自然環境から吸熱して水を加熱するヒートポンプ50と、タンク10とヒートポンプ50の間で水を循環させる循環ポンプ22(循環手段に相当する)と、コントローラ100と、コントローラ100と通信可能なユーザ端末110を備えている。コントローラ100は、循環ポンプ22によってタンク10とヒートポンプ50の間で水を循環させながら、ヒートポンプ50によって水を加熱する沸上運転を実行可能である。コントローラ100は、給湯システム2の過去の給湯の履歴を記憶可能である。ユーザ端末110は、標準的な時間帯別の給湯パターンを記憶可能である。ユーザ端末110は、給湯システム2の過去の給湯の履歴に基いて、実際の時間帯別の給湯パターンを算出可能である。時間帯別の給湯パターンは、時間帯別の電気使用量と、時間帯別の給湯使用量を含んでいる。図6に示すように、ユーザ端末110は、標準的な時間帯別の給湯パターンと、実際の時間帯別の給湯パターンを、対比可能にユーザに提示するように構成されている。 As described above, the hot water supply system 2 of this embodiment includes the tank 10 for storing water, the heat pump 50 that absorbs heat from the natural environment and heats the water, and the circulation pump 22 that circulates water between the tank 10 and the heat pump 50. (Corresponding to circulation means), a controller 100, and a user terminal 110 capable of communicating with the controller 100. The controller 100 can execute a boiling operation in which water is heated by the heat pump 50 while water is circulated between the tank 10 and the heat pump 50 by the circulation pump 22. The controller 100 can store the past hot water supply history of the hot water supply system 2. The user terminal 110 can store a standard hot water supply pattern for each time zone. The user terminal 110 can calculate a hot water supply pattern for each actual time zone based on the past hot water supply history of the hot water supply system 2. The hot water supply pattern by time zone includes the amount of electricity used by time zone and the amount of hot water usage by time zone. As shown in FIG. 6, the user terminal 110 is configured to present a standard hot water supply pattern for each time zone and an actual hot water supply pattern for each time zone to the user in a comparable manner.
本実施例の給湯システム2は、燃料ガスの燃焼によって水を加熱する燃焼装置60をさらに備えている。図6に示すように、時間帯別の給湯パターンは、時間帯別のガス使用量をさらに含んでいる。 The hot water supply system 2 of the present embodiment further includes a combustion device 60 that heats water by combustion of fuel gas. As shown in FIG. 6, the hot water supply pattern for each time zone further includes a gas usage amount for each time zone.
図8および図9に示すように、本実施例の給湯システム2において、ユーザ端末110は、過去の給湯の履歴に基いて算出される光熱費が所定値を超える場合に、ユーザにアドバイスを提示するように構成されている。 As shown in FIGS. 8 and 9, in the hot water supply system 2 of the present embodiment, the user terminal 110 presents advice to the user when the utility cost calculated based on the past hot water supply history exceeds a predetermined value. Is configured to do.
以上、本発明の実施例について詳細に説明したが、これらは例示に過ぎず、特許請求の範囲を限定するものではない。特許請求の範囲に記載の技術には、以上に例示した具体例を様々に変形、変更したものが含まれる。 As mentioned above, although the Example of this invention was described in detail, these are only illustrations and do not limit a claim. The technology described in the claims includes various modifications and changes of the specific examples illustrated above.
本明細書または図面に説明した技術要素は、単独であるいは各種の組合せによって技術的有用性を発揮するものであり、出願時の請求項に記載の組合せに限定されるものではない。また、本明細書または図面に例示した技術は複数目的を同時に達成し得るものであり、そのうちの一つの目的を達成すること自体で技術的有用性を持つものである。 The technical elements described in this specification or the drawings exhibit technical usefulness alone or in various combinations, and are not limited to the combinations described in the claims at the time of filing. In addition, the technology exemplified in this specification or the drawings can achieve a plurality of objects at the same time, and has technical usefulness by achieving one of the objects.
2 :給湯システム
10 :タンク
12 :サーミスタ
14 :サーミスタ
16 :サーミスタ
18 :サーミスタ
20 :タンク水循環路
22 :循環ポンプ
24 :サーミスタ
30 :水道水導入路
30a :第1導入路
30b :第2導入路
31 :水道水供給源
32 :サーミスタ
40 :供給路
42 :混合弁
44 :サーミスタ
46 :湯はり弁
50 :ヒートポンプ
52 :外気温センサ
60 :燃焼装置
100 :コントローラ
110 :ユーザ端末
112 :画面
114 :グラフ
116 :グラフ
118 :光熱費
120 :光熱費
122 :光熱費
124 :アドバイス文
2: Hot water supply system 10: Tank 12: Thermistor 14: Thermistor 16: Thermistor 18: Thermistor 20: Tank water circulation path 22: Circulation pump 24: Thermistor 30: Tap water introduction path 30a: First introduction path 30b: Second introduction path 31 : Tap water supply source 32: thermistor 40: supply path 42: mixing valve 44: thermistor 46: hot water valve 50: heat pump 52: outside air temperature sensor 60: combustion apparatus 100: controller 110: user terminal 112: screen 114: graph 116 : Graph 118: Utilities costs 120: Utilities costs 122: Utilities costs 124: Advice text
Claims (3)
水を貯えるタンクと、
自然環境から吸熱して水を加熱するヒートポンプと、
タンクとヒートポンプの間で水を循環させる循環手段と、
コントローラと、
コントローラと通信可能なユーザ端末を備えており、
コントローラは、循環手段によってタンクとヒートポンプの間で水を循環させながら、ヒートポンプによって水を加熱する沸上運転を実行可能であり、
コントローラは、給湯システムの過去の給湯の履歴を記憶可能であり、
ユーザ端末又はコントローラは、少なくともユーザの家庭の構成人数、居住地域、季節のうちの1つに応じて予め用意されている標準的な時間帯別の給湯パターンを記憶可能であり、
ユーザ端末又はコントローラは、給湯システムの過去の給湯の履歴に基いて、実際の時間帯別の給湯パターンを算出可能であり、
時間帯別の給湯パターンは、時間帯別のヒートポンプでの電気使用量と、時間帯別の給湯使用量を含んでおり、
ユーザ端末は、標準的な時間帯別の給湯パターンと、実際の時間帯別の給湯パターンを、対比可能にユーザに提示するように構成されている、給湯システム。 A hot water system,
A tank for storing water,
A heat pump that absorbs heat from the natural environment and heats the water,
A circulation means for circulating water between the tank and the heat pump;
A controller,
It has a user terminal that can communicate with the controller,
The controller can execute a boiling operation in which water is heated by the heat pump while circulating water between the tank and the heat pump by the circulation means.
The controller can store the history of past hot water supply of the hot water supply system,
User terminal or controller is capable storage at least the number of players of a user's home, residential areas, the standard time zone of the hot water supply patterns are prepared in advance according to one of the season,
The user terminal or the controller can calculate a hot water supply pattern for each actual time zone based on the past hot water supply history of the hot water supply system,
The hot water supply pattern by time zone includes the amount of electricity used by the heat pump by time zone and the amount of hot water usage by time zone.
The user terminal is configured to present a standard hot water supply pattern for each time zone and a hot water supply pattern for each actual time zone to the user in a comparable manner.
時間帯別の給湯パターンが、時間帯別の燃焼装置でのガス使用量をさらに含んでいる、請求項1の給湯システム。 Further comprising a combustion device for heating water by combustion of fuel gas;
The hot water supply system according to claim 1, wherein the hot water supply pattern by time zone further includes a gas usage amount in the combustion device by time zone.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2015157409A JP6594094B2 (en) | 2015-08-07 | 2015-08-07 | Hot water system |
KR1020160094958A KR102316802B1 (en) | 2015-08-07 | 2016-07-26 | Hot water supply system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2015157409A JP6594094B2 (en) | 2015-08-07 | 2015-08-07 | Hot water system |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2017036867A JP2017036867A (en) | 2017-02-16 |
JP6594094B2 true JP6594094B2 (en) | 2019-10-23 |
Family
ID=58049275
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2015157409A Active JP6594094B2 (en) | 2015-08-07 | 2015-08-07 | Hot water system |
Country Status (2)
Country | Link |
---|---|
JP (1) | JP6594094B2 (en) |
KR (1) | KR102316802B1 (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110822724B (en) * | 2019-12-03 | 2021-03-16 | 美的集团股份有限公司 | Water consumption prediction method and device for water heater, water heater and electronic equipment |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3876701B2 (en) * | 2001-12-03 | 2007-02-07 | ダイキン工業株式会社 | Heat pump type water heater |
JP3847193B2 (en) * | 2002-03-25 | 2006-11-15 | 大阪瓦斯株式会社 | Water heater, external server and communication system |
JP4962035B2 (en) | 2007-02-14 | 2012-06-27 | 株式会社デンソー | Hot water supply device and control device for hot water supply device |
JP5310576B2 (en) | 2010-01-19 | 2013-10-09 | ダイキン工業株式会社 | Hot water supply system |
JP5899037B2 (en) * | 2012-04-20 | 2016-04-06 | リンナイ株式会社 | Hot water system |
JP5569581B2 (en) * | 2012-12-12 | 2014-08-13 | 三菱電機株式会社 | Hot water storage hot water supply system |
-
2015
- 2015-08-07 JP JP2015157409A patent/JP6594094B2/en active Active
-
2016
- 2016-07-26 KR KR1020160094958A patent/KR102316802B1/en active IP Right Grant
Also Published As
Publication number | Publication date |
---|---|
KR20170017724A (en) | 2017-02-15 |
KR102316802B1 (en) | 2021-10-22 |
JP2017036867A (en) | 2017-02-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP5899037B2 (en) | Hot water system | |
JP5861568B2 (en) | Hot water system | |
JP5874502B2 (en) | Equipment control system | |
KR101621168B1 (en) | Hot water supply system | |
JP6368493B2 (en) | Hot water system | |
JP5970854B2 (en) | Hot water storage water heater | |
JP6539572B2 (en) | Hot water supply system | |
JP5310576B2 (en) | Hot water supply system | |
JP6594094B2 (en) | Hot water system | |
JP6106510B2 (en) | Hot water supply system | |
JP6594093B2 (en) | Hot water system | |
JP6712505B2 (en) | Heat medium heating device | |
JP6533717B2 (en) | Hot water supply system | |
JP7161882B2 (en) | hot water system | |
JP2015038397A (en) | Hot water supply system | |
JP7042066B2 (en) | Hot water supply system | |
JP2015230121A (en) | Thermal apparatus | |
JP7217102B2 (en) | hot water system | |
JP6986412B2 (en) | Hot water supply system | |
JP6637833B2 (en) | Thermal equipment | |
JP6751619B2 (en) | Hot water supply system | |
JP6251116B2 (en) | Thermal storage control system, control device, and control method | |
JP2019060516A (en) | Hot water system | |
JP5296007B2 (en) | Heat pump type hot water supply control system | |
JPS6030935A (en) | Control device for hot water storage type electric water heater |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20180521 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20190116 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20190212 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20190320 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20190514 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20190528 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20190910 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20190924 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 6594094 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |