screen
support
columns
tsunami barrier
wire rope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2015020079A
Other languages
Japanese (ja)
Other versions
JP2016142090A (en
Inventor
信秀 浅井
信秀 浅井
祐治 鎌崎
祐治 鎌崎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JFE Metal Products and Engineering Inc
Original Assignee
JFE Metal Products and Engineering Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JFE Metal Products and Engineering Inc filed Critical JFE Metal Products and Engineering Inc
Priority to JP2015020079A priority Critical patent/JP6534823B2/en
Publication of JP2016142090A publication Critical patent/JP2016142090A/en
Application granted granted Critical
Publication of JP6534823B2 publication Critical patent/JP6534823B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Cleaning Or Clearing Of The Surface Of Open Water (AREA)

Description

本発明は、津波や高潮の発生時に漂流物等を捕捉する津波バリアに関する。   The present invention relates to a tsunami barrier that captures drifting objects and the like when a tsunami or storm surge occurs.

岸壁、護岸等に設けられ、津波や高潮の発生時に押し波による船舶や漂流物の陸への流入、引き波による地上の荷物の海への流出を防止する津波バリアが知られている(例えば、特許文献1参照)。
津波バリアは、例えば、地面に立設された複数の支柱と、これらの支柱に支持される捕捉用スクリーンとを備えており、支柱及びスクリーンで漂流物等の流入、荷物の流出を阻止するとともに、衝撃を吸収することができる。
津波バリアは、陸に載置された荷物の周囲への流出を避けるため、荷物の載置スペースの周囲を囲むように設けられることが多い。
津波バリアで荷物を囲む場合、途中の中間支柱でスクリーンを架設する方向を変える必要がある。特に、載置スペースの形状に合わせて矩形状に津波バリアを設置する場合には、その角部において、スクリーンをほぼ直角に曲げる必要があるため、スクリーンが支柱に接触し、負荷が繰り返しかかることで徐々に損傷し、やがて破断してしまう。
そこで、津波バリアの角部のように、スクリーンの架設方向を大きく変える箇所がある場合には、図14、図15に示すように、角部となる位置でスクリーン101の架設を一旦終わらせ、別のスクリーン101で架設を始めるという構成をとっていた。これにより、津波バリア100に角部があっても、複数の直線状の柵を組み合わせることで、スクリーン101の破断を回避していた。
Tsunami barriers are known that are provided on quaywalls, revetments, etc. to prevent the inflow of ships and drifting objects into the land due to pushing waves when tsunamis and storm surges occur, and the outflow of luggage on the ground into the sea due to pulling waves (for example, , Patent Document 1).
The tsunami barrier includes, for example, a plurality of columns erected on the ground, and capture screens supported by the columns, and the columns and screens prevent the inflow of drifting materials and the like, and the outflow of luggage. , Can absorb shock.
A tsunami barrier is often provided so as to surround the periphery of the loading space of the load in order to avoid the outflow of the load placed on the land.
When the package is surrounded by the tsunami barrier, it is necessary to change the direction in which the screen is erected at an intermediate post on the way. In particular, in the case of installing the tsunami barrier in a rectangular shape in accordance with the shape of the mounting space, it is necessary to bend the screen almost at right angles at its corners, so that the screen contacts the support and load is repeatedly applied. It is gradually damaged and eventually breaks.
Therefore, if there is a place that greatly changes the installation direction of the screen, as in the corner of the tsunami barrier, as shown in FIG. 14 and FIG. It was configured to start construction with another screen 101. Thereby, even if the tsunami barrier 100 has corners, breaking of the screen 101 is avoided by combining a plurality of linear fences.

特開2013−119698号公報JP, 2013-19698, A

しかし、津波バリア100の角部でスクリーン101の架設を終了させると、1つの角部につき、2つの端部ができるため、スクリーン101の端部を支持する端部支柱102間に隙間ができてしまう。また、端部支柱102は、スクリーン101にかかる張力のすべてを受け止める必要があるため、構造上、他の中間部分の中間支柱103よりも強固にする必要があり、材料及び施工コストが嵩むという問題があった。したがって、津波バリア100の端部支柱101をできるだけ減らしたいという要望があった。   However, when the installation of the screen 101 is finished at the corner of the tsunami barrier 100, two ends are formed for one corner, so a gap is formed between the end support 102 supporting the end of the screen 101. I will. In addition, since the end support 102 needs to receive all the tension applied to the screen 101, the end support 102 needs to be stronger than the intermediate support 103 in the other middle part in the structure, and the material and the construction cost increase. was there. Therefore, there has been a demand to reduce the number of end struts 101 of the tsunami barrier 100 as much as possible.

そこで、本発明は、上記課題に鑑みてなされたものであり、端部支柱間のスクリーンの隙間をなくし、スクリーンを架設する方向を変える角部の数に限らず、端部支柱の数を最小限にすることができる津波バリアを提供することを目的とする。   Therefore, the present invention has been made in view of the above problems, and it is possible to eliminate the gap of the screen between the end support columns and to minimize the number of end support columns as well as the number of corner portions changing the installation direction of the screen. To provide a tsunami barrier that can be

上記課題を解決するため、本発明は、基礎に立設された複数の支柱と、前記支柱間に架け渡されるスクリーンとを備える津波バリアであって、少なくとも一部の支柱には、前記スクリーンを架け渡す方向を変えるガイド部が設けられていることを特徴とする。   In order to solve the above problems, the present invention is a tsunami barrier comprising a plurality of columns erected on a foundation and a screen bridged between the columns, wherein at least a part of the columns is the screen It is characterized in that a guide portion which changes the direction of bridging is provided.

また、前記複数の支柱は、前記スクリーンの端部を支持する少なくとも2つの端部支柱と、前記端部支柱間に配置され、前記スクリーンを支持する中間支柱と、を備え、前記ガイド部は、前記中間支柱に設けられていることが好ましい。   In addition, the plurality of columns may include at least two end columns supporting the ends of the screen, and an intermediate column disposed between the end columns and supporting the screen, wherein the guide unit includes: It is preferable to be provided in the said intermediate | middle support | pillar.

また、前記ガイド部は、前記中間支柱の側面に設けられた台座と、前記台座に設けられ、前記スクリーンを摺動可能に支持する支持部と、を備えることが好ましい。   Preferably, the guide portion includes a pedestal provided on a side surface of the intermediate support, and a support portion provided on the pedestal and slidably supporting the screen.

また、前記支持部は、前記台座に立設された軸部と、前記軸部が挿通されて前記軸部に回転自在とされ、外面に前記スクリーンを摺動可能な筒部と、を備えることが好ましい。   Further, the support portion includes: a shaft portion provided upright on the pedestal; and a cylindrical portion which has the shaft portion inserted and is rotatable on the shaft portion and whose outer surface can slide the screen. Is preferred.

また、前記支持部は、前記台座における前記スクリーンの引き込み側と引き出し側の双方に設けられていることが好ましい。   Preferably, the support portion is provided on both the lead-in side and the lead-out side of the screen in the pedestal.

また、前記支持部は、前記台座における前記スクリーンの引き込み側と引き出し側とにそれぞれ2つずつ設けられ、前記スクリーンは、各側における前記支持部の間に通されていることが好ましい。   Further, it is preferable that two supporting portions are provided on each of the lead-in side and the drawing-out side of the screen in the pedestal, and the screen is passed between the supporting portions on each side.

また、前記スクリーンは、ワイヤロープを有しており、前記支柱内を貫通するように設けられ、直線状に形成された管材を備え、前記管材に前記ワイヤロープが通されていることが好ましい。   Further, it is preferable that the screen has a wire rope, is provided so as to penetrate the inside of the column, and includes a linearly formed tube, and the wire rope is passed through the tube.

また、前記管材の両端部には、当該管材の内面側から外面側に向けて湾曲するように形成された曲面を有する受け部材が設けられている。   Moreover, the receiving member which has a curved surface formed so that it might be curved toward the outer surface side from the inner surface side of the said tube material is provided in the both ends of the said tube material.

本発明によれば、端部支柱間のスクリーンの隙間をなくすことができ、スクリーンを架設する方向を変える角部の数に限らず、端部支柱の数を最小限にすることができる。   According to the present invention, the gap of the screen between the end columns can be eliminated, and the number of the end columns can be minimized without limiting to the number of corners changing the installation direction of the screen.

荷物を囲む津波バリアが設けられた岸壁の斜視図である。It is a perspective view of a quay provided with a tsunami barrier surrounding a package. 津波バリアの平面図である。It is a top view of a tsunami barrier. 津波バリアの角部の斜視図である。It is a perspective view of the corner of a tsunami barrier. 端部支柱の一部を拡大視した斜視図である。It is the perspective view which expanded a part of end part support column. スクリーンの端部の構成を示す斜視図である。It is a perspective view which shows the structure of the edge part of a screen. ガイド部が設けられた中間支柱の正面図である。It is a front view of an intermediate support provided with a guide part. ガイド部が設けられた中間支柱の側面図である。It is a side view of an intermediate support provided with a guide part. 図6におけるA−A方向から見たガイド部の平面図である。It is a top view of the guide part seen from the AA direction in FIG. スクリーンが架設された津波バリアの角部の平面図である。It is a top view of the corner part of the tsunami barrier in which the screen was constructed. 第2の実施形態におけるガイド部が設けられた中間支柱の正面図である。It is a front view of the intermediate | middle support | pillar in which the guide part in 2nd Embodiment was provided. 第2の実施形態におけるガイド部が設けられた中間支柱の側面図である。It is a side view of the middle support pillar in which the guide part in a 2nd embodiment was provided. 図10におけるB−B方向から見たガイド部の平面図である。It is a top view of the guide part seen from the BB direction in FIG. 第2の実施形態におけるスクリーンが架設された津波バリアの角部の平面図である。It is a top view of a corner of a tsunami barrier in which the screen in a 2nd embodiment was built. 従来の津波バリアの平面図である。It is a top view of the conventional tsunami barrier. 従来の津波バリアの角部の構成を示す平面図である。It is a top view which shows the structure of the corner | angular part of the conventional tsunami barrier.

本発明の好ましい実施形態について、図面を参照しながら説明する。なお、以下に示す実施形態は一つの例示であり、本発明の範囲において、種々の実施形態をとり得る。   Preferred embodiments of the present invention will be described with reference to the drawings. In addition, embodiment shown below is one illustration and can take various embodiment in the range of the present invention.

[第1の実施形態]
<津波バリアの構成>
図1から図3は、津波バリアを説明する図であり、図4から図6は、津波バリアが備えるガイド部を説明する図である。
図1、図2に示すように、津波バリア1は、港湾の岸壁近くに設けられている。津波バリア1は、船舶に積み込む荷物C又は船舶から荷下ろしされた荷物Cを仮置きする荷置きスペースSを矩形状に囲むように設けられている。
津波バリア1は、荷置きスペースSを完全に囲むものではなく、仮置きされた荷物Cを搬出したり、荷置きスペースSに荷物を搬入するために車両が通行するゲート11が設けられている。
津波バリア1は、複数の支柱2と、スクリーン3と、ガイド部4と、管材5を備えている。
First Embodiment
<Configuration of Tsunami Barrier>
FIGS. 1 to 3 are diagrams for explaining a tsunami barrier, and FIGS. 4 to 6 are diagrams for explaining a guide portion provided in the tsunami barrier.
As shown to FIG. 1, FIG. 2, the tsunami barrier 1 is provided near the wharf of the port. The tsunami barrier 1 is provided so as to rectangularly surround a loading space S for temporarily placing a load C loaded on the ship or a load C unloaded from the ship.
The tsunami barrier 1 does not completely surround the loading space S, and there is provided a gate 11 through which the vehicle passes in order to carry out the temporarily placed load C or to load the load into the loading space S. .
The tsunami barrier 1 includes a plurality of columns 2, a screen 3, a guide 4, and a tube 5.

(支柱)
支柱2は、基礎となる地面に複数立設されている。支柱2は、直線上に並ぶように地面に立設されており、その途中で並び方向が変えられている。すなわち、並び方向が変わる箇所が津波バリア1の角部となる。津波バリア1は矩形状に形成されているため、4つの角部を有するように支柱2の並び方向が4箇所で変えられている。
これらの複数の支柱2には、スクリーン3の端部を支持する端部支柱21と、端部支柱21間に配置され、スクリーン3を支持する中間支柱22とがある。
端部支柱21は、ゲート11を構成する支柱として用いられており、これらの端部支柱21以外の支柱は全て中間支柱22であり、端部支柱21間に所定の間隔をあけて配置されている。
端部支柱21は、スクリーン3に作用する張力等に耐えられるよう、スクリーン3の途中を支持する中間支柱22よりも強固に構成されている。具体的には、端部支柱21は、中間支柱22よりも大径かつ肉厚であり、アンカー等をとって地面に深く埋設されている。
ここで、端部支柱21は、当該端部支柱21に衝突した漂流物等の衝突エネルギーを変形で吸収するように設計されている。中間支柱22は、当該中間支柱22に衝突した漂流物等の衝突エネルギーを変形で吸収するように設計されているが、スクリーン3の伸びによる衝突エネルギーの吸収によって軽減される。中間支柱22の許容変形量は、軸線の傾斜角が15°である。
(Support)
A plurality of columns 2 are erected on the ground to be a foundation. The columns 2 are erected on the ground so as to line up on a straight line, and the line direction is changed along the way. That is, the place where the alignment direction changes is the corner of the tsunami barrier 1. Since the tsunami barrier 1 is formed in a rectangular shape, the alignment direction of the columns 2 is changed at four places so as to have four corners.
The plurality of columns 2 include an end column 21 supporting the end of the screen 3 and an intermediate column 22 disposed between the end columns 21 and supporting the screen 3.
The end struts 21 are used as the struts constituting the gate 11, and all the struts other than the end struts 21 are the intermediate struts 22 and are disposed at predetermined intervals between the end struts 21. There is.
The end support 21 is configured to be stronger than the intermediate support 22 supporting the middle of the screen 3 so as to withstand tension or the like acting on the screen 3. Specifically, the end struts 21 are larger in diameter and thicker than the intermediate struts 22 and are deeply embedded in the ground with anchors and the like.
Here, the end support 21 is designed to absorb the impact energy of a drifting object or the like that has collided with the end support 21 by deformation. The intermediate column 22 is designed to absorb impact energy such as a drifting object that collides with the intermediate column 22 by deformation, but is mitigated by absorption of the collision energy by the extension of the screen 3. The allowable deformation of the intermediate column 22 is such that the inclination angle of the axis is 15 °.

(スクリーン)
スクリーン3は、津波や高潮の発生時に、海から陸に押し寄せる押し波による船舶や漂流物の陸への流入、引き波による荷置きスペースSの荷物の海への流出を防止するため、波によって流される物の捕捉体となるものである。
スクリーン3は、例えば、並べられた各支柱2に通される複数のワイヤロープ31を備えている。各ワイヤロープ31は、各支柱2の軸方向に直交する水平方向に沿うように各支柱2内に設けられた管材5に挿通されている。各ワイヤロープ31は、その延在方向が互いに平行となるように架設されており、津波バリア1の角部となる中間支柱22においてその架設方向が変えられる。図1、図2に示すように、津波バリア1が矩形状に設けられる場合には、ワイヤロープ31が角部においてほぼ90°屈曲されることになる。
図4に示すように、ワイヤロープ31の両端部は、端部支柱21に取り付けられている。図5に示すように、ワイヤロープ31の端部には、ねじ山が形成されたボルト32がワイヤロープ31と同軸上に設けられており、端部支柱21の内部を通したワイヤロープ31のボルト32をワッシャ33とナット34で締結することにより、ワイヤロープ31を端部支柱21に取り付けることができる。
ここで、スクリーン3は、支柱2間に架設された複数のワイヤロープ31によって構成することもできるが、隣接する支柱2間の距離が長い場合には、ワイヤロープ31の弛みを防止するために、ワイヤロープ31同士を所定の間隔を保ちながら連結してもよい。
(screen)
Screen 3 is used to prevent the influx of ships and drifting objects into the land due to push waves that rush from the sea to land during tsunami and storm surges, and the outflow of cargo in the loading space S due to pulling waves into the ocean. It becomes the capture body of the thing to be washed away.
The screen 3 includes, for example, a plurality of wire ropes 31 passed through the columns 2 arranged in a row. Each wire rope 31 is inserted through the pipe material 5 provided in each support 2 along the horizontal direction orthogonal to the axial direction of each support 2. The respective wire ropes 31 are constructed such that the extending directions thereof are parallel to each other, and the installation directions of the intermediate struts 22 which are the corner portions of the tsunami barrier 1 are changed. As shown in FIG. 1 and FIG. 2, when the tsunami barrier 1 is provided in a rectangular shape, the wire rope 31 is bent approximately 90 degrees at the corner.
As shown in FIG. 4, both ends of the wire rope 31 are attached to the end support 21. As shown in FIG. 5, at the end of the wire rope 31, a bolt 32 formed with a screw thread is provided coaxially with the wire rope 31, and the wire rope 31 passing through the inside of the end support 21 is The wire rope 31 can be attached to the end post 21 by fastening the bolt 32 with the washer 33 and the nut 34.
Here, the screen 3 can also be constituted by a plurality of wire ropes 31 installed between the columns 2, but in the case where the distance between the adjacent columns 2 is long, in order to prevent the slack of the wire ropes 31. The wire ropes 31 may be connected while maintaining a predetermined interval.

(ガイド部)
図3、図6から図9に示すように、ガイド部4は、津波バリア1の角部において、ワイヤロープ31が中間支柱22に接触して損傷しないようにワイヤロープ31を案内するものである。
ガイド部4は、津波バリア1の角部の中間支柱22に設けられている。ガイド部4は、各ワイヤロープ31が架設されている高さに合わせて中間支柱22に設けられている。
ガイド部4は、台座41と、支持部42とを備えている。
台座41は、角部となる中間支柱22の側面に溶接等によって固定されている。台座41は、角部となる中間支柱22におけるワイヤロープ31の引き込み側と引き出し側の双方に設けられている。言い換えると、台座41は、中間支柱22の中心に対して対向する位置に設けられている。
台座41は、中間支柱22の軸線方向に所定の間隔をあけて互いに平行に配置された2枚の板材41a,41bを有している。板材41a,41bは、例えば、鋼板から形成されている。この2枚の板材41a,41bの間に支持部42が設けられている。
支持部42は、ワイヤロープ31を摺動可能に支持してワイヤロープ31の架設方向を変えるものである。支持部42は、各台座41において、ワイヤロープ31の引き込み経路又は引き出し経路を挟み込むようにそれぞれ2つ並んで設けられている。
支持部42は、一端が台座41の一方の板材41aに固定され、他端が台座41の他方の板材41bに固定された軸部42aと、この軸部42aが挿通されて軸部42aと同軸上に配置されて軸部42aに対して回転自在とされ、その外周面にワイヤロープ31を摺動可能な筒部42bとを備えている。
軸部42aは、例えば、鋼材から形成された円柱体であり、溶接によって板材41a,41bに固定されている。
筒部42bは、例えば、樹脂等の比較的柔らかな材料から形成されおり、軸部42a回りに回転自在な円筒体であるため、ワイヤロープ31に作用する張力によって軸部42aの回りを容易に回転し、ワイヤロープ31を移動させることにより、支持部42に力が集中しないように構成されている。
(Guide section)
As shown in FIG. 3 and FIG. 6 to FIG. 9, the guide portion 4 guides the wire rope 31 so that the wire rope 31 does not contact and damage the intermediate support 22 at the corner of the tsunami barrier 1 .
The guide portion 4 is provided on an intermediate support 22 at the corner of the tsunami barrier 1. The guide part 4 is provided in the intermediate support 22 according to the height at which each wire rope 31 is installed.
The guide portion 4 includes a pedestal 41 and a support portion 42.
The pedestal 41 is fixed by welding or the like to the side surface of the intermediate support 22 which is a corner. The pedestals 41 are provided on both the lead-in side and the lead-out side of the wire rope 31 in the middle support column 22 which is a corner. In other words, the pedestal 41 is provided at a position facing the center of the intermediate support 22.
The pedestal 41 has two plate members 41 a and 41 b arranged in parallel with each other at a predetermined interval in the axial direction of the intermediate support column 22. The plate members 41a and 41b are formed of, for example, steel plates. A support portion 42 is provided between the two plate members 41a and 41b.
The support portion 42 slidably supports the wire rope 31 to change the installation direction of the wire rope 31. Two support portions 42 are provided side by side in each of the pedestals 41 so as to sandwich the lead-in path or the lead-out path of the wire rope 31.
The supporting portion 42 has a shaft portion 42 a of which one end is fixed to one plate member 41 a of the pedestal 41 and the other end is fixed to the other plate member 41 b of the pedestal 41, and the shaft portion 42 a is inserted and coaxial with the shaft portion 42 a The cylindrical portion 42b is disposed on the upper side and is rotatable with respect to the shaft portion 42a, and the outer peripheral surface thereof can slide the wire rope 31.
The shaft portion 42a is, for example, a cylindrical body formed of a steel material, and is fixed to the plate members 41a and 41b by welding.
The cylindrical portion 42b is made of, for example, a relatively soft material such as resin, and is a cylindrical body rotatable around the shaft portion 42a, so that tension around the wire rope 31 facilitates rotation of the shaft portion 42a. By rotating and moving the wire rope 31, the force is not concentrated on the support portion 42.

(管材)
図6から図9に示すように、管材5は、端部支柱21及び中間支柱22の双方に当該支柱2内を貫通するように設けられる。管材5は、その軸線が一直線に延びる円筒状に形成されている。管材5の両端部には、管材5の内面から外面に向けて湾曲するような滑らかな曲面を有する受け部材51が設けられている。受け部材51を設けるのは、挿通されるワイヤロープ31が管材5の両端部の角に接触することによる損傷を防止するためである。なお、受け部材51を管材5と一体に形成し、管材5の両端部を内面から外面に向けて曲面状に形成してもよい。
管材5を支柱2に設けた際、管材5の軸線方向に沿ってワイヤロープ31が引き込まれ、引き出されるようになっており、各台座41に設けられた2つの支持部42の間を管材5の軸線が通過するようにガイド部4及び管材5が配置されている。
(Pipe material)
As shown in FIGS. 6 to 9, the pipe member 5 is provided in both the end support 21 and the intermediate support 22 so as to penetrate the support 2. The tube member 5 is formed in a cylindrical shape in which the axis line extends in a straight line. At both ends of the tube 5, a receiving member 51 having a smooth curved surface that curves from the inner surface to the outer surface of the tube 5 is provided. The reason why the receiving member 51 is provided is to prevent damage due to the wire rope 31 to be inserted coming into contact with the corners of both ends of the pipe member 5. The receiving member 51 may be formed integrally with the tube 5, and both ends of the tube 5 may be formed in a curved shape from the inner surface to the outer surface.
When the pipe 5 is provided on the column 2, the wire rope 31 is drawn in and pulled out along the axial direction of the pipe 5, and the pipe 5 is provided between the two support portions 42 provided on each pedestal 41. The guide part 4 and the pipe material 5 are arrange | positioned so that the axis line of may pass.

<津波バリアの施工方法>
次に、津波バリア1の施工方法について説明する。
図1、図2に示すように、矩形状に仕切られた荷置きスペースSを津波バリア1で囲む際には、津波バリア1を矩形状に形成することが好ましい。
荷置きスペースSの境界に沿って支柱2を所定の間隔で設置していく。このとき、ワイヤロープ31の端部となるゲート11の支柱として端部支柱21を設置し、それ以外の支柱として中間支柱22を設置する。
端部支柱21及び中間支柱22には、管材5を挿通しておき、管材5の両端部に受け部材51を取り付けておく。また、津波バリア1の角部となる位置に配置された中間支柱22にはガイド部4を取り付けておく。
次に、ワイヤロープ31の一方の端部を一方の端部支柱21に取り付け、他方の端部を中間支柱22に順に通していく。ここで、津波バリア1の角部にワイヤロープ31を通す際には、引き込み側の2つの支持部42の間にワイヤロープ31を通した後、そのワイヤロープ31を管材5に通し、管材5から引き出したワイヤロープ31を引き出し側の2つの支持部42の間に通す。全ての中間支柱22にワイヤロープ31を通した後、ワイヤロープ31の他方の端部を他方の端部支柱21に取り付ける。
上記の作業を全てのワイヤロープ31について行うことで、漂流物や荷物を捕捉するスクリーン3が完成する。
<Construction method of tsunami barrier>
Next, the construction method of the tsunami barrier 1 will be described.
As shown in FIG. 1 and FIG. 2, when the loading space S partitioned in a rectangular shape is surrounded by the tsunami barrier 1, it is preferable to form the tsunami barrier 1 in a rectangular shape.
The columns 2 are installed at predetermined intervals along the boundary of the loading space S. At this time, the end support 21 is installed as a support of the gate 11 which is the end of the wire rope 31, and the intermediate support 22 is installed as the other support.
The pipe 5 is inserted through the end support 21 and the intermediate support 22, and the receiving members 51 are attached to both ends of the pipe 5. Further, the guide portion 4 is attached to the intermediate support 22 disposed at a position to be a corner of the tsunami barrier 1.
Next, one end of the wire rope 31 is attached to one end support 21, and the other end is sequentially passed through the intermediate support 22. Here, when the wire rope 31 is passed through the corner of the tsunami barrier 1, the wire rope 31 is passed between the two support portions 42 on the lead-in side, and then the wire rope 31 is passed through the tube 5. The wire rope 31 pulled out is passed between the two supports 42 on the withdrawal side. After passing the wire rope 31 through all the middle columns 22, the other end of the wire rope 31 is attached to the other end column 21.
By performing the above-described operation for all the wire ropes 31, the screen 3 for catching drifting objects and luggage is completed.

<作用、効果>
以上のような構成を有する津波バリア1によれば、角部となる中間支柱22にガイド部4を設けることにより、ワイヤロープ31が中間支柱22に直接接触することがなくなるため、張力が作用した際にワイヤロープ31の損傷を防止することができる。また、ガイド部4の支持部42の筒部42bが回転することで、張力が作用したときのワイヤロープ31の動きによる支持部42との摩擦を筒部42bの回転によって解消できるので、ワイヤロープ31の損傷を防止することができる。したがって、津波バリア1の角部において、ワイヤロープ31を屈曲させて支持部42に支持することができるので、従来のように、ワイヤロープ31の架設方向を変えるたびに、角部に端部支柱21を設けてワイヤロープ31を端部支柱21に固定する必要がなくなる。これにより、図2と図10の比較からも明確なように、津波バリア1の角部の支柱2の数を減らすことができるとともに、中間支柱22よりも施工の手間やコストがかかる端部支柱21の数を減らすことができるので、施工工程の短縮、コストの低減を図ることができる。また、角部における端部支柱21間において、ワイヤロープ31が架設されていない箇所をなくすことができるので、津波バリア1に対する荷物の流入、流出を防止することができる。
また、支持部42は、台座41に挟まれているので、ワイヤロープ31が支持部42から外れることもない。
また、各台座41に設けられた2つの支持部42の間を管材5の軸線が通過するようにガイド部4及び管材5が配置されているので、ワイヤロープ31を中間支柱22に直線状に挿通することができ、ワイヤロープ31の架設作業が容易となる。
また、管材5の両端部に受け部材51を設けることで、管材5とワイヤロープ31との点接触により生じる損傷を防止することができる。
<Action, effect>
According to the tsunami barrier 1 having the configuration as described above, the wire rope 31 does not directly contact the intermediate support column 22 by providing the guide section 4 on the intermediate support column 22 serving as the corner, so tension was applied. In this case, the wire rope 31 can be prevented from being damaged. In addition, rotation of the cylindrical portion 42b of the support portion 42 of the guide portion 4 can eliminate friction with the support portion 42 due to the movement of the wire rope 31 when tension is applied, by rotation of the cylindrical portion 42b. 31 damage can be prevented. Therefore, since the wire rope 31 can be bent and supported by the support portion 42 at the corner of the tsunami barrier 1, as in the prior art, each time the installation direction of the wire rope 31 is changed, the end support at the corner It is not necessary to provide 21 and secure the wire rope 31 to the end post 21. As a result, as is clear from the comparison between FIG. 2 and FIG. 10, the number of posts 2 at the corners of the tsunami barrier 1 can be reduced, and the end posts require more labor and cost than the intermediate posts 22. Since the number of 21 can be reduced, the construction process can be shortened and the cost can be reduced. Moreover, since the location in which the wire rope 31 is not constructed can be eliminated between the end support columns 21 at the corner, the inflow and outflow of the load to the tsunami barrier 1 can be prevented.
Further, since the support portion 42 is sandwiched by the pedestals 41, the wire rope 31 does not come off the support portion 42.
Further, since the guide portion 4 and the pipe member 5 are disposed such that the axis of the pipe member 5 passes between the two supporting portions 42 provided on each pedestal 41, the wire rope 31 is linearly formed on the intermediate support column 22. The wire rope 31 can be inserted and the installation work of the wire rope 31 becomes easy.
In addition, by providing the receiving members 51 at both ends of the pipe 5, damage caused by point contact between the pipe 5 and the wire rope 31 can be prevented.

[第2の実施形態]
次に、本発明の第2の実施形態について説明する。第2の実施形態が第1の実施形態と異なる点は、ガイド部の構造であるため、以下ではガイド部について説明し、第1の実施形態と同じ構成には同一符号を付して説明を省略する。
本実施形態においては、ワイヤロープ31を津波バリア1の角部に配置された中間支柱22に管材5を介して挿通するのではなく、中間支柱22の内側においてワイヤロープ31をガイド部4Aに支持させる構成を採用している。
Second Embodiment
Next, a second embodiment of the present invention will be described. The second embodiment is different from the first embodiment in the structure of the guide portion, so the guide portion will be described below, and the same components as those of the first embodiment are denoted by the same reference numerals and descriptions I omit it.
In the present embodiment, the wire rope 31 is supported by the guide portion 4A inside the intermediate column 22 instead of being inserted through the tube member 5 into the intermediate column 22 disposed at the corner of the tsunami barrier 1 Adopt a configuration.

(ガイド部)
図10から図13に示すように、ガイド部4Aは、津波バリア1の角部において、ワイヤロープ31が中間支柱22に接触して損傷しないようにワイヤロープ31を案内するものである。
ガイド部4Aは、津波バリア1の角部の中間支柱22に設けられている。ガイド部4Aは、各ワイヤロープ31が架設されている高さに合わせて中間支柱22に設けられている。
ガイド部4Aは、台座41と、支持部42とを備えている。
台座41は、角部となる中間支柱22の側面に溶接等によって固定されている。台座41は、角部となる中間支柱22から津波バリア1の内側に向けて延びるように中間支柱22に設けられている。
台座41は、中間支柱22の軸線方向に所定の間隔をあけて互いに平行に配置された2枚の板材41a,41bを有している。板材41a,41bは、例えば、鋼板から形成されている。この2枚の板材41a,41bの間に支持部42が設けられている。
支持部42は、ワイヤロープ31を摺動可能に支持してワイヤロープ31の架設方向を変えるものである。支持部42は、台座41において、ワイヤロープ31を挟み込むように2つ並んで設けられている。2つの支持部42は、それぞれの軸心が中間支柱22の軸心と一直線上に並ぶように配置されている。すなわち、2つの支持部42は、その並び方向が台座41の延在方向に沿うように配置されており、2つの支持部42の間をワイヤロープ31が通されるようになっている。
支持部42は、一端が台座41の一方の板材41aに固定され、他端が台座41の他方の板材41bに固定された軸部42aと、この軸部42aが挿通されて軸部42aと同軸上に配置されて軸部42aに対して回転自在とされ、その外周面にワイヤロープ31を摺動可能な筒部42bとを備えている。
軸部42aは、例えば、鋼材から形成された円柱体であり、溶接によって板材41a,41bに固定されている。
筒部42bは、例えば、樹脂等の比較的柔らかな材料から形成されおり、軸部42a回りに回転自在な円筒体であるため、ワイヤロープ31に作用する張力によって軸部42aの回りを容易に回転し、ワイヤロープ31を移動させることにより、支持部42に力が集中しないように構成されている。
このような構成を有するガイド部4Aにおいても、ワイヤロープ31が中間支柱22に直接接触することがなくなるため、張力が作用した際にワイヤロープ31の損傷を防止することができる。
(Guide section)
As shown in FIGS. 10 to 13, the guide portion 4 </ b> A guides the wire rope 31 so that the wire rope 31 does not contact and damage the intermediate support 22 at the corner of the tsunami barrier 1.
The guide portion 4A is provided on the middle support column 22 at the corner of the tsunami barrier 1. The guide portion 4A is provided on the intermediate support column 22 in accordance with the height at which each wire rope 31 is installed.
The guide portion 4A includes a pedestal 41 and a support portion 42.
The pedestal 41 is fixed by welding or the like to the side surface of the intermediate support 22 which is a corner. The pedestal 41 is provided on the intermediate support 22 so as to extend from the intermediate support 22 at the corner toward the inside of the tsunami barrier 1.
The pedestal 41 has two plate members 41 a and 41 b arranged in parallel with each other at a predetermined interval in the axial direction of the intermediate support column 22. The plate members 41a and 41b are formed of, for example, steel plates. A support portion 42 is provided between the two plate members 41a and 41b.
The support portion 42 slidably supports the wire rope 31 to change the installation direction of the wire rope 31. The two support portions 42 are provided side by side in the pedestal 41 so as to sandwich the wire rope 31. The two support portions 42 are arranged such that their axes are aligned with the axis of the middle support column 22. That is, the two support portions 42 are arranged such that the alignment direction is along the extending direction of the pedestals 41, and the wire rope 31 is passed between the two support portions 42.
The supporting portion 42 has a shaft portion 42 a of which one end is fixed to one plate member 41 a of the pedestal 41 and the other end is fixed to the other plate member 41 b of the pedestal 41, and the shaft portion 42 a is inserted and coaxial with the shaft portion 42 a The cylindrical portion 42b is disposed on the upper side and is rotatable with respect to the shaft portion 42a, and the outer peripheral surface thereof can slide the wire rope 31.
The shaft portion 42a is, for example, a cylindrical body formed of a steel material, and is fixed to the plate members 41a and 41b by welding.
The cylindrical portion 42b is made of, for example, a relatively soft material such as resin, and is a cylindrical body rotatable around the shaft portion 42a, so that tension around the wire rope 31 facilitates rotation of the shaft portion 42a. By rotating and moving the wire rope 31, the force is not concentrated on the support portion 42.
Also in the guide portion 4A having such a configuration, the wire rope 31 does not come into direct contact with the intermediate column 22, so that the wire rope 31 can be prevented from being damaged when tension is applied.

<その他>
なお、本発明は、上記実施形態に限られるものではなく、本発明の範囲を超えない範囲で適宜変更が可能である。例えば、スクリーン3は、複数のワイヤロープ31に限らず、網材の外縁にワイヤロープを取り付けたものであってもよい。支柱2の形状、管材5の形状も任意であって、本発明の効果を奏することができれば適宜設計変更が可能である。
<Others>
In addition, this invention is not limited to the said embodiment, It can change suitably in the range which does not exceed the scope of the present invention. For example, the screen 3 is not limited to the plurality of wire ropes 31 but may be a wire rope attached to the outer edge of the mesh material. The shape of the support 2 and the shape of the tube 5 are also arbitrary, and design changes can be made as long as the effects of the present invention can be obtained.

1 津波バリア
2 支柱
3 スクリーン
4 ガイド部
5 管材
21 端部支柱
22 中間支柱
31 ワイヤロープ
41 台座
41a 板材
41b 板材
42 支持部
42a 軸部
42b 筒部
Reference Signs List 1 tsunami barrier 2 support 3 screen 4 guide 5 tube 21 end support 22 intermediate support 31 wire rope 41 pedestal 41a plate 41b plate 42 support portion 42a shaft portion 42b tube portion

Claims (8)

基礎に立設された複数の支柱と、前記支柱間に架け渡され、波の力によって流されてきた物体を捕捉するスクリーンとを備える津波バリアであって、
少なくとも一部の支柱には、前記スクリーンを架け渡す方向を変えるガイド部が設けられており、
前記ガイド部は、
前記少なくとも一部の支柱の高さ方向に沿って延び、前記スクリーンを挟んで設けられ、前記スクリーンを摺動可能に支持する回転自在な支持部を有する
ことを特徴とする津波バリア。
A tsunami barrier comprising: a plurality of columns erected on a foundation; and a screen that is bridged between the columns and captures an object that has been swept away by the force of a wave,
At least some of the support columns are provided with a guide portion that changes the direction in which the screen is bridged ,
The guide unit is
A tsunami barrier comprising: a rotatable support portion extending along the height direction of at least a part of the columns, sandwiching the screen, and slidably supporting the screen .
前記複数の支柱は、前記スクリーンの端部を支持する少なくとも2つの端部支柱と、前記端部支柱間に配置され、前記スクリーンを支持する中間支柱と、を備え、
前記ガイド部は、前記中間支柱に設けられていることを特徴とする請求項1に記載の津波バリア。
The plurality of columns comprises at least two end columns supporting the ends of the screen, and an intermediate column disposed between the end columns and supporting the screen.
The said barrier part is provided in the said intermediate | middle support | pillar, The tsunami barrier of Claim 1 characterized by the above-mentioned.
前記ガイド部は、
前記中間支柱の側面に設けられた台座と、
前記台座に設けられ支持部と、
を備えることを特徴とする請求項2に記載の津波バリア。
The guide unit is
A pedestal provided on the side of the intermediate support;
A support provided on the pedestal;
The tsunami barrier according to claim 2, comprising:
前記支持部は、
前記台座に立設された軸部と、
前記軸部が挿通されて前記軸部に回転自在とされ、外面に前記スクリーンを摺動可能な筒部と、
を備えることを特徴とする請求項3に記載の津波バリア。
The support portion is
An axial portion erected on the pedestal;
The shaft portion is inserted and made rotatable on the shaft portion, and a cylindrical portion capable of sliding the screen on an outer surface;
The tsunami barrier according to claim 3, comprising:
前記支持部は、前記台座における前記スクリーンの引き込み側と引き出し側の双方に設けられていることを特徴とする請求項3又は4に記載の津波バリア。   The tsunami barrier according to claim 3 or 4, wherein the support portion is provided on both the lead-in side and the draw-out side of the screen in the pedestal. 前記支持部は、前記台座における前記スクリーンの引き込み側と引き出し側とにそれぞれ2つずつ設けられ、前記スクリーンは、各側における前記支持部の間に通されていることを特徴とする請求項5に記載の津波バリア。   The supporting portion is provided two each on the lead-in side and the drawing-out side of the screen in the pedestal, and the screen is passed between the supporting portions on each side. Tsunami barrier described in. 前記スクリーンは、ワイヤロープを有しており、
前記端部支柱及び前記中間支柱内を貫通するように設けられ、直線状に形成された管材を備え、前記管材に前記ワイヤロープが通されていることを特徴とする請求項から6までのいずれか一項に記載の津波バリア。
The screen comprises a wire rope,
Provided so as to penetrate the said end struts and in the intermediate pillar, the comprises a linearly formed the tube, claim 2, characterized in that the wire rope is threaded through the tube member until 6 Tsunami barrier according to any one of the preceding claims.
前記管材の両端部には、当該管材の内面側から外面側に向けて湾曲するように形成された曲面を有する受け部材が設けられていることを特徴とする請求項7に記載の津波バリア。   The tsunami barrier according to claim 7, wherein receiving members having curved surfaces formed to be curved from the inner surface side to the outer surface side of the pipe material are provided at both end portions of the pipe material.
JP2015020079A 2015-02-04 2015-02-04 Tsunami barrier Active JP6534823B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2015020079A JP6534823B2 (en) 2015-02-04 2015-02-04 Tsunami barrier

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2015020079A JP6534823B2 (en) 2015-02-04 2015-02-04 Tsunami barrier

Publications (2)

Publication Number Publication Date
JP2016142090A JP2016142090A (en) 2016-08-08
JP6534823B2 true JP6534823B2 (en) 2019-06-26

Family

ID=56568436

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2015020079A Active JP6534823B2 (en) 2015-02-04 2015-02-04 Tsunami barrier

Country Status (1)

Country Link
JP (1) JP6534823B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6739271B2 (en) * 2016-07-28 2020-08-12 Jfe建材株式会社 Tsunami barrier
JP6785093B2 (en) * 2016-08-23 2020-11-18 Jfe建材株式会社 Prop and tsunami barrier
JP7015631B2 (en) * 2016-10-05 2022-02-03 Jfe建材株式会社 Tsunami barrier

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4111399A (en) * 1977-04-13 1978-09-05 Hutchison-Western Panel fence
JPS60144408A (en) * 1983-12-29 1985-07-30 Honsyu Shikoku Renrakukiyou Kodan Buffer facility for underwater structure
JPH0728180Y2 (en) * 1991-07-18 1995-06-28 朝日スチール工業株式会社 Rockfall prevention fence
JP2527237Y2 (en) * 1992-04-15 1997-02-26 東京製綱株式会社 Corner structure of cable-type protective fence for multi-story parking lot
JP2000291736A (en) * 1999-04-09 2000-10-20 Daido Seimitsu Kogyo Kk Base isolation device
JP4835903B2 (en) * 2004-04-03 2011-12-14 有限会社フジカ Emergency protective device
JP5926046B2 (en) * 2011-12-06 2016-05-25 株式会社日本パーツセンター Breakwater fence with drifting object capture function

Also Published As

Publication number Publication date
JP2016142090A (en) 2016-08-08

Similar Documents

Publication Publication Date Title
JP6534823B2 (en) Tsunami barrier
JP2015163761A (en) Film member support method and structure for supporting film member
JP6008267B2 (en) Steel tank prefabricated concrete breakwater
JP2009249930A (en) Load-carrying material
Fanaie et al. Theoretical assessment of wire rope bracing system with soft central cylinder
JP5953281B2 (en) Protective fence
JP2007032032A (en) Guard fence and method of constructing the same
JP2011043439A (en) Construction of nuclear power plant building, and construction method thereof
JP6304809B2 (en) Truss bridge collapse prevention structure
KR101876511B1 (en) Window seismic system using Steel Frame with Slit
JP7015631B2 (en) Tsunami barrier
JP6739271B2 (en) Tsunami barrier
JP2018100484A (en) Rockfall protection fence
JP6723108B2 (en) Tsunami barrier
JP6785093B2 (en) Prop and tsunami barrier
JP6723107B2 (en) Tsunami barrier
JP5357592B2 (en) Protective fence
JP6728742B2 (en) Steel beam
JP7128675B2 (en) tsunami barrier
JP6535080B2 (en) Tsunami drifting fence
JP5923058B2 (en) Protective fence
WO2014068649A1 (en) Device for reducing tsunami wave force acting on building
JP6715452B2 (en) Ground flow countermeasure structure of pile type structure and its construction method
KR102558713B1 (en) Earthquake-proof fixing apparatus of building exterior material
JP2016125294A (en) Flying object protection facility

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20171207

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20180906

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20181009

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20181203

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20190520

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20190530

R150 Certificate of patent or registration of utility model

Ref document number: 6534823

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250