JP6519382B2 - Hanging load detection device, crane and computing device - Google Patents

Hanging load detection device, crane and computing device Download PDF

Info

Publication number
JP6519382B2
JP6519382B2 JP2015148483A JP2015148483A JP6519382B2 JP 6519382 B2 JP6519382 B2 JP 6519382B2 JP 2015148483 A JP2015148483 A JP 2015148483A JP 2015148483 A JP2015148483 A JP 2015148483A JP 6519382 B2 JP6519382 B2 JP 6519382B2
Authority
JP
Japan
Prior art keywords
load
suspension
rising
boom
crane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2015148483A
Other languages
Japanese (ja)
Other versions
JP2017024900A (en
Inventor
鉄兵 前藤
鉄兵 前藤
英明 石原
英明 石原
敬博 岩澤
敬博 岩澤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kobelco Construction Machinery Co Ltd
Original Assignee
Kobelco Construction Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kobelco Construction Machinery Co Ltd filed Critical Kobelco Construction Machinery Co Ltd
Priority to JP2015148483A priority Critical patent/JP6519382B2/en
Publication of JP2017024900A publication Critical patent/JP2017024900A/en
Application granted granted Critical
Publication of JP6519382B2 publication Critical patent/JP6519382B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Jib Cranes (AREA)

Description

本発明は、吊り荷を先端部から吊り下げる吊り部材と、ロープを介して吊り部材を起伏させる起伏部材とを有するクレーンの吊荷重を求めるための技術に関する。   The present invention relates to a technique for obtaining a suspension load of a crane having a suspension member for suspending a suspension load from a tip end and a relief member for raising and lowering the suspension member via a rope.

例えば、特許文献1、2には、吊り荷を先端部から吊り下げるブーム(吊り部材)と、ロープを介してブームを起伏させるマスト(起伏部材)とを有するクレーンにおいて、吊り荷やフックの重量を含む吊荷重を算出する技術が開示されている。吊荷重はブームに作用するモーメントのつり合い式に基づいて求められるが、その際、ロープの張力によるモーメントの演算には、ブームの先端部およびマストの先端部を結ぶ直線とブームの起伏支点との間の距離(特許文献1ではf、特許文献2ではHs)が必要となる。   For example, according to Patent Documents 1 and 2, in a crane having a boom (hanging member) for suspending a suspended load from a tip end and a mast (relief member) that raises and lowers the boom through a rope, the weight of the suspended load and hooks A technique for calculating a suspended load including the The lifting load can be obtained based on the balance equation of the moment acting on the boom, but in that case, to calculate the moment by the tension of the rope, the straight line connecting the tip end of the boom and the tip end of the mast A distance between them (f in Patent Document 1, Hs in Patent Document 2) is required.

特開2000−191286号公報JP 2000-191286 A 特開2001−39670号公報JP 2001-39670 A

ここで、ブームを起伏させるロープは吊荷重に応じて伸び、このロープの伸び等によってマストの先端位置は変化する。マストの先端位置が変化すると、上記の距離fや距離Hsも変化するが、特許文献1、2ではこの距離の変化を考慮した演算は行われていない。このため、最終的に算出される吊荷重の精度が低下するという問題があった。   Here, the rope that raises and lowers the boom extends in accordance with the suspension load, and the tip position of the mast changes due to the extension of the rope and the like. When the tip end position of the mast changes, the distance f and the distance Hs also change, but in Patent Literatures 1 and 2, the calculation taking into consideration the change in the distance is not performed. For this reason, there existed a problem that the precision of the hanging load finally calculated falls.

そこで、本発明は、起伏部材の先端位置が変化する場合においても、吊荷重を精度よく算出することを目的とする。   Therefore, an object of the present invention is to accurately calculate the hanging load even when the tip end position of the up-and-down member changes.

上記目的を達成するため、本発明にかかる吊荷重検出装置は、吊り荷を先端部から吊り下げる吊り部材と、ロープを介して前記吊り部材を起伏させる起伏部材とを有するクレーンに設けられる吊荷重検出装置であって、前記ロープの張力を検出する張力検出器と、前記吊り部材の起伏角度を検出する起伏角度検出器と、前記起伏部材の起立角度を検出する起立角度検出器と、前記張力検出器、前記起伏角度検出器および前記起立角度検出器からの検出値に基づいて吊荷重を算出する演算装置と、を備えることを特徴とする。   In order to achieve the above object, a suspension load detection apparatus according to the present invention is a suspension load provided on a crane having a suspension member for suspending a suspension load from a tip end and a relief member for raising and lowering the suspension member via a rope. A detection device, comprising: a tension detector for detecting tension of the rope; an elevation angle detector for detecting an elevation angle of the suspension member; an elevation angle detector for detecting an elevation angle of the elevation member; It is characterized by including a detector, the said rise-and-fall angle detector, and the arithmetic unit which computes a suspension load based on the detected value from the said rise angle detector.

また、本発明にかかるクレーンは、吊り荷を先端部から吊り下げる吊り部材と、ロープを介して前記吊り部材を起伏させる起伏部材とを有するクレーンであって、上記吊荷重検出装置を備えることを特徴とする。   Further, a crane according to the present invention is a crane having a suspending member for suspending a suspended load from a tip end portion and a relief member for raising and lowering the lifting member via a rope, and provided with the above-mentioned suspension load detection device. It features.

また、本発明にかかる演算装置は、吊り荷を先端部から吊り下げる吊り部材と、ロープを介して前記吊り部材を起伏させる起伏部材とを有するクレーンの吊荷重を算出する演算装置であって、前記ロープの張力、前記吊り部材の起伏角度、および前記起伏部材の起立角度に基づいて吊荷重を算出することを特徴とする。   Further, the computing device according to the present invention is a computing device that calculates a suspension load of a crane having a suspension member for suspending a suspension load from a tip end portion and a relief member for raising and lowering the suspension member via a rope, A hanging load may be calculated based on the tension of the rope, the rising and lowering angle of the hanging member, and the rising angle of the rising and lowering member.

本発明によれば、ロープの伸び等によって起伏部材の先端位置が変化する場合であっても、起伏部材の起立角度の検出値に基づいて吊荷重の算出が行われるので、吊荷重を精度よく算出することができる。   According to the present invention, even when the tip position of the relief member changes due to the extension of the rope, etc., the suspension load is calculated based on the detected value of the rising angle of the relief member. It can be calculated.

本発明の実施形態にかかるクレーンの側面図である。It is a side view of a crane concerning an embodiment of the present invention. 吊荷重検出装置の構成を示すブロック図である。It is a block diagram showing composition of a suspension load detecting device. 係数δの算出過程を説明するための模式的な側面図である。It is a typical side view for explaining the calculation process of coefficient delta. その他の実施形態にかかるクレーンの側面図である。It is a side view of the crane concerning other embodiments.

以下、本実施形態にかかるクレーンについて、図面を参照しつつ説明する。図1は、本発明の実施形態にかかるクレーンの側面図である。クレーン1は、上部旋回体2が旋回ベアリング3を介してクローラ式の下部走行体4に旋回可能に搭載された構成となっている。なお、クレーン1は、クローラ以外の移動手段(例えばホイール)を用いた移動式クレーンであってもよいし、移動手段を持たない固定式クレーンであってもよい。   Hereinafter, the crane concerning this embodiment is explained, referring to drawings. FIG. 1 is a side view of a crane according to an embodiment of the present invention. The crane 1 has a configuration in which the upper swing body 2 is swingably mounted on a crawler type lower traveling body 4 via a swing bearing 3. The crane 1 may be a mobile crane using moving means (for example, a wheel) other than a crawler, or may be a fixed crane not having the moving means.

上部旋回体2は、キャブ5およびカウンタウェイト6等を有している。キャブ5は、上部旋回体2の前部に設けられた運転室である。カウンタウェイト6は、上部旋回体2の後部に配設されており、クレーン1の前方安定度を向上させるためのおもりである。上部旋回体2の前部には、ブーム7の基端部が回動可能に連結されている。ブーム7の先端部に設けられたポイントシーブ8には、巻上げロープ9が巻き掛けられており、吊り荷Wを吊るためのフック10が巻上げロープ9に吊り下げられている。巻上げロープ9を巻上げるためのウィンチ11は、上部旋回体2に設けられている。   The upper swing body 2 has a cab 5 and a counterweight 6 and the like. The cab 5 is an operator's cab provided at the front of the upper swing body 2. The counterweight 6 is disposed at the rear of the upper revolving superstructure 2 and is a weight for improving the forward stability of the crane 1. The base end of the boom 7 is pivotably connected to the front of the upper swing body 2. A hoisting rope 9 is wound around a point sheave 8 provided at the tip of the boom 7, and a hook 10 for suspending a suspended load W is suspended from the hoisting rope 9. A winch 11 for winding up the winding rope 9 is provided on the upper swing body 2.

上部旋回体2には、ブーム7を起伏させるマスト12の基端部が回動可能に連結されている。マスト12の回動支点は、ブーム7の回動支点よりも後方側に位置する。ブーム7の先端部とマスト12の先端部とは、ワイヤロープからなるガイライン13によって連結されている。マスト12の起立角度θ2を変えると、ガイライン13を介してブーム7の起伏角度θ1を変更することができる。ブーム7およびマスト12は、上部旋回体2とともに旋回中心O周りに旋回する。   The base end of a mast 12 for raising and lowering the boom 7 is rotatably connected to the upper swing body 2. The pivot point of the mast 12 is located rearward of the pivot point of the boom 7. The tip of the boom 7 and the tip of the mast 12 are connected by a guy line 13 made of a wire rope. When the elevation angle θ2 of the mast 12 is changed, the undulation angle θ1 of the boom 7 can be changed via the guy line 13. The boom 7 and the mast 12 pivot around the pivot center O together with the upper pivoting body 2.

図2は、吊荷重検出装置の構成を示すブロック図である。吊荷重検出装置20は、吊り荷Wやフック10の重量を含む吊荷重を検出するための装置である。吊荷重検出装置20は、ガイライン13の張力F(図1参照)を検出する張力検出器21、ブーム7の起伏角度θ1を検出する起伏角度検出器22、マスト12の起立角度θ2を検出する起立角度検出器23、および各検出器21〜23からの検出値に基づいて吊荷重を算出する演算装置24を有して構成される。演算装置24は、内部に記憶部25を有しており、記憶部25には吊荷重の演算に必要な各種データが格納されている。また、演算装置24は、キャブ5内に設けられている表示部15と接続されており、算出した吊荷重を表示部15に表示させる。   FIG. 2 is a block diagram showing the configuration of the suspension load detection device. The suspended load detection device 20 is a device for detecting a suspended load including the weight of the suspended load W and the hook 10. The hanging load detection device 20 includes a tension detector 21 for detecting tension F (see FIG. 1) of the guy line 13, a rise and fall angle detector 22 for detecting a rise and fall angle θ1 of the boom 7, and a stand up for detecting a rising angle θ2 of the mast 12. It comprises the angle detector 23 and the arithmetic unit 24 which calculates a suspended load based on the detected value from each detector 21-23. The arithmetic unit 24 has a storage unit 25 inside, and the storage unit 25 stores various data necessary for the calculation of the suspension load. Further, the arithmetic device 24 is connected to the display unit 15 provided in the cab 5 and causes the display unit 15 to display the calculated hanging load.

演算装置24は、基本的に特許文献1に記載されているように、次式(1)、(2)に基づいて吊荷重WAを算出する。
WA=(F−F0)/δ ・・・式(1)
δ=a/f ・・・式(2)
The arithmetic unit 24 basically calculates the suspension load WA based on the following equations (1) and (2) as described in Patent Document 1.
WA = (F−F 0 ) / δ formula (1)
δ = a / f formula (2)

ここで、Fはガイライン13の張力である。張力Fは、吊荷重WAおよびブーム7の自重成分の両方を含む総荷重により生じる張力であり、張力検出器21により検出される。一方、F0はブーム7の自重成分により生じる張力であり、ブーム7およびマスト12が張力Fの検出時と同位置にある場合に吊荷重WAが作用しない場合の張力を意味する。記憶部25には、作業半径R(図3参照、旋回中心Oとブーム7の先端部との間の水平距離)から張力F0を求めるためのテーブルが記憶されている。aはブーム7の起伏支点と吊り荷Wとの間の水平距離を、fはブーム7の先端部およびマスト12の先端部を結ぶ直線とブーム7の起伏支点との間の距離をそれぞれ示している(特許文献1の図2参照)。 Here, F is the tension of the guy line 13. The tension F is a tension generated by the total load including both the hanging load WA and the weight component of the boom 7 and is detected by the tension detector 21. On the other hand, F 0 is the tension generated by the weight component of the boom 7, refers to the tensile force when the boom 7 and the mast 12 does not act hanging load WA is when in detecting when the same position of the tension F. The storage unit 25 stores a table for obtaining the tension F 0 from the working radius R (see FIG. 3, the horizontal distance between the turning center O and the tip of the boom 7). a represents a horizontal distance between the fulcrum of the boom 7 and the load W, and f represents a distance between a straight line connecting the tip of the boom 7 and the tip of the mast 12 and the fulcrum of the boom 7 (See FIG. 2 of Patent Document 1).

なお、特許文献1の数式3では、δ=(a−t/N)/fと定義されている。tはブーム7の起伏支点と巻上げロープ9との間の距離を示しており、Nは巻上げロープ9の巻き数を示している。このように、特許文献1では、ウィンチ11による吊り荷Wの巻上げに関する項t/Nが考慮されているが、本実施形態では、係数δを上式(2)のように簡易的に定義する。ただし、係数δを特許文献1の数式3のように定義することも可能である。   In Equation 3 of Patent Document 1, it is defined as δ = (a−t / N) / f. t indicates the distance between the hoisting fulcrum of the boom 7 and the hoisting rope 9, and N indicates the number of turns of the hoisting rope 9. As described above, in the patent document 1, the term t / N related to the lifting of the suspended load W by the winch 11 is taken into consideration, but in the present embodiment, the coefficient δ is simply defined as the above equation (2). . However, it is also possible to define the coefficient δ as shown in Equation 3 of Patent Document 1.

上述のように、式(2)のfは、ブーム7の先端部およびマスト12の先端部を結ぶ直線とブーム7の起伏支点との間の距離を示しているが、ガイライン13の伸び等によってマスト12の先端位置は変化し得る。マスト12の先端位置が変化すると距離fも変化し、吊荷重WAの精度が低下してしまう。そこで、本実施形態では、起立角度検出器23で検出されたマスト12の起立角度θ2に基づいて、距離fや係数δを求める。   As described above, f in the equation (2) indicates the distance between the straight line connecting the tip of the boom 7 and the tip of the mast 12 and the fulcrum of the boom 7. The tip position of the mast 12 may change. When the tip end position of the mast 12 changes, the distance f also changes, and the accuracy of the hanging load WA decreases. Therefore, in the present embodiment, the distance f and the coefficient δ are obtained based on the rising angle θ2 of the mast 12 detected by the rising angle detector 23.

図3は、係数δの算出過程を説明するための図1の模式的な側面図である。以下に、図中の各符号が示すものを説明する。
B:ブーム7の中心軸
BP1:ブーム7の起伏支点(回動支点)
BP2:ブーム7の中心軸の先端位置
BP3:ポイントシーブ8の位置
BP4:ガイライン13のブーム7への取付位置
H1:BP1を通る水平面
M:マスト12の中心軸
MP1:マスト12の起立支点(回動支点)
MP2:ガイライン13のマスト12への取付位置
LB:ブーム7の中心軸Bの長さ
LM:マスト12の中心軸Mの長さ
H2:MP1を通る水平面
L1:BP1とBP4との間の距離
L2:BP1とMP2との間の距離
L3:BP4とMP2との間の距離
L4:BP4およびMP2を結ぶ直線とBP1との間の距離(式(2)のfと同じ)
L5:BP1とBP3との間の距離
θ1:ブーム7の水平面H1からの起伏角度(起伏角度検出器22の検出値)
θ2:マスト12の水平面H2からの起立角度(起立角度検出器23の検出値)
θ3:BP2−BP1−BP4の角度
θ4:BP1およびMP2を結ぶ直線と水平面H1とのなす角度
θ5:BP4−BP1−MP2の角度
θ6:BP1−BP4−MP2の角度
θ7:BP2−BP1−BP3の角度
BFX:旋回中心OとBP1との間の水平距離
BPX:BP1とBP3との間の水平距離(式(2)のaと同じ)
BPY:ブーム7の中心軸BとBP3との間の距離
BGX:BP4からブーム7の中心軸Bに下ろした垂線の足とBP2との距離
BGY:ブーム7の中心軸BとBP4との間の距離
MFX:旋回中心OとMP1との間の水平距離
MFY:MP1と水平面H1との間の距離
R:作業半径
FIG. 3 is a schematic side view of FIG. 1 for explaining the process of calculating the coefficient δ. Below, what each code in a figure shows is explained.
B: Central axis of boom 7 BP1: Up and down fulcrum (rotational fulcrum) of boom 7
BP2: Tip position of central axis of boom 7 BP3: Position of point sheave 8 BP4: Mounting position of guy line 13 on boom 7 H1: Horizontal plane passing through BP1 M: Central axis of mast 12 MP1: Upstanding supporting point of mast 12 (rotation Fulcrum)
MP2: mounting position of guy line 13 on mast 12 LB: length of central axis B of boom 7 LM: length of central axis M of mast 12 H2: horizontal plane passing through MP1 L1: distance between BP1 and BP4 L2 : The distance between BP1 and MP2 L3: The distance between BP4 and MP2 L4: The distance between the straight line connecting BP4 and MP2 and BP1 (same as f in equation (2))
L5: distance between BP1 and BP3 θ1: elevation angle of the boom 7 from the horizontal plane H1 (detection value of the elevation angle detector 22)
θ2: rising angle of the mast 12 from the horizontal plane H2 (detection value of the rising angle detector 23)
θ3: Angle of BP2-BP1-BP4 θ4: Angle between straight line connecting BP1 and MP2 to horizontal plane H1 θ5: Angle of BP4-BP1-MP2 θ6: Angle of BP1-BP4-MP2 θ7: BP2-BP1-BP3 Angle BFX: horizontal distance between turning center O and BP1 BPX: horizontal distance between BP1 and BP3 (same as a in equation (2))
BPY: distance between central axis B of boom 7 and BP 3 BGX: distance between perpendicular foot dropped from BP 4 to central axis B of boom 7 and BP 2 BGY: between central axis B of boom 7 and BP 4 Distance MFX: Horizontal distance between turning center O and MP1 MFY: Distance between MP1 and horizontal surface H1 R: Working radius

演算装置24は、張力検出器21で検出されたガイライン13の張力F、起伏角度検出器22で検出されたブーム7の起伏角度θ1、および起立角度検出器23で検出されたマスト12の起立角度θ2に基づいて、式(1)より吊荷重WAを算出する。まず、演算装置24は、ブーム7の起伏角度θ1に基づいて作業半径Rを計算し、記憶部25に記憶されているテーブルを参照して、作業半径Rより張力F0を求める。 The arithmetic unit 24 includes the tension F of the guy line 13 detected by the tension detector 21, the elevation angle θ 1 of the boom 7 detected by the elevation angle detector 22, and the elevation angle of the mast 12 detected by the elevation angle detector 23. The hanging load WA is calculated from the equation (1) based on θ2. First, the arithmetic unit 24 calculates the working radius R based on the elevation angle θ1 of the boom 7 and refers to the table stored in the storage unit 25 to obtain the tension F 0 from the working radius R.

また、演算装置24は、ブーム7の起伏角度θ1およびマスト12の起立角度θ2に基づいて、係数δ(=BPX/L4)を求める。係数δを求める手順を以下に示す。
[1]L1、θ3の計算
L1=[(LB−BGX)2+BGY2]1/2
θ3=arctan[BGY/(LB−BGX)]
[2]L2、θ4の計算
L2=[(BFX−MFX+LM・cosθ2)2+(MFY+LM・sinθ2)2]1/2
θ4=arctan[(MFY+LM・cosθ2)/(BFX−MFX+LM・sinθ2)]
[3]θ5の計算
θ5=180°−θ1−θ3−θ4
[4]L3の計算
L3=[L12+L22−2・L1・L2・cosθ5]1/2
[5]θ6の計算
θ6=arccos[(L32+L12−L22)/(2・L1・L3)]
[6]L4の計算
L4=L1・sinθ6
[7]L5、θ7の計算
L5=[LB2+BPY2]1/2
θ7=arctan(BPY/LB)
[8]BPXの計算
BPX=L5・cos(θ1−θ7)
[9]δの計算
δ=BPX/L4
Further, the arithmetic unit 24 obtains a coefficient δ (= BPX / L4) based on the up-and-down angle θ1 of the boom 7 and the rising angle θ2 of the mast 12. The procedure for obtaining the coefficient δ is shown below.
[1] Calculation of L1, θ3 L1 = [(LB−BGX) 2 + BGY 2 ] 1/2
θ3 = arctan [BGY / (LB−BGX)]
[2] Calculation of L2, θ4 L2 = [(BFX−MFX + LM · cos θ2) 2 + (MFY + LM · sin θ2) 2 ] 1/2
θ4 = arctan [(MFY + LM · cos θ2) / (BFX−MFX + LM · sin θ2)]
[3] Calculation of θ5 θ5 = 180 ° -θ1-θ3-θ4
[4] Calculation of L3 L3 = [L1 2 + L2 2 -2 · L1 · L2 · cosθ5] 1/2
[5] Calculation of θ 6 θ 6 = arc cos [(L 3 2 + L 1 2- L 2 2 ) / (2 · L 1 · L 3)]
[6] Calculation of L 4 L 4 = L 1 · sin θ 6
[7] Calculation of L5, θ7 L5 = [LB 2 + BPY 2 ] 1/2
θ7 = arctan (BPY / LB)
[8] Calculation of BPX BPX = L5 · cos (θ1-θ7)
[9] Calculation of δ δ = BPX / L4

このようにして求められた係数δ、テーブルから求められた張力F0、および張力検出器21で検出された張力Fから、演算装置24は、式(1)に基づいて吊荷重WAを算出する。求められた吊荷重WAはキャブ5内の表示部15に表示され、作業者が現在の吊荷重WAを知ることが可能となっている。 From the coefficient δ thus determined, the tension F 0 determined from the table, and the tension F detected by the tension detector 21, the arithmetic unit 24 calculates the suspension load WA based on the equation (1). . The obtained suspension load WA is displayed on the display unit 15 in the cab 5 so that the operator can know the current suspension load WA.

以上のように、起立角度検出器23で検出されたマスト12の起立角度θ2を用いることで、ガイライン13の伸び等によってマスト12の先端位置が変化する場合であっても、ブーム7の先端部(詳細にはガイライン13のブーム7への取付位置BP4)およびマスト12の先端部(詳細にはガイライン13のマスト12への取付位置MP2)を結ぶ直線とブーム7の起伏支点BP1との間の距離L4を精度よく算出することができる。その結果、係数δ、ひいては吊荷重WAを精度よく算出することが可能となる。   As described above, by using the erecting angle θ2 of the mast 12 detected by the erecting angle detector 23, even if the tip position of the mast 12 changes due to the extension of the guy line 13 or the like, the tip of the boom 7 (Specifically, the mounting position BP4 of the guy line 13 to the boom 7) and the tip of the mast 12 (specifically, the mounting position MP2 of the guy line 13 to the mast 12) The distance L4 can be calculated accurately. As a result, it becomes possible to calculate the coefficient δ and hence the suspension load WA with high accuracy.

(その他の実施形態)
本発明は上記実施形態に限定されるものではなく、その趣旨を逸脱しない限りにおいて上記実施形態の要素を適宜組み合わせまたは種々の変更を加えることが可能である。
(Other embodiments)
The present invention is not limited to the above embodiment, and the elements of the above embodiment can be appropriately combined or various modifications can be made without departing from the scope of the invention.

例えば、上記実施形態では、本発明の「吊り部材」としてブーム7が設けられ、本発明の「起伏部材」としてマスト12が設けられたクレーン1について説明した。しかしながら、本発明の適用対象はこのようなクレーン1に限定されない。例えば、図4に示すようなラッフィングジブクレーン100に対して本発明を適用することも可能である。   For example, in the embodiment described above, the crane 1 is described in which the boom 7 is provided as the "hanging member" of the present invention and the mast 12 is provided as the "raising and lowering member" of the present invention. However, the application object of the present invention is not limited to such a crane 1. For example, the present invention can also be applied to a luffing jib crane 100 as shown in FIG.

図4に示すように、ラッフィングジブクレーン100は、下部走行体52の上に上部旋回体51が旋回可能に配置されたクレーンであって、上部旋回体51には、ブーム53、ジブ54、前ストラット56、後ストラット57、マスト55などが取り付けられる。ブーム53の基端部は上部旋回体51に取り付けられ、ブーム53の先端部にジブ54が取り付けられる。ブーム53は上部旋回体51に対して起伏し、ジブ54はブーム53に対して起伏する。図示は省略するが、ジブ54の先端部には、ポイントシーブが設けられており、このポイントシーブから吊り下げられたフックに吊り荷が掛けられる。   As shown in FIG. 4, the luffing jib crane 100 is a crane in which the upper swing body 51 is rotatably disposed on the lower traveling body 52, and the boom 53, the jib 54, and the front struts are provided to the upper swing body 51. 56, a rear strut 57, a mast 55 and the like are attached. The proximal end of the boom 53 is attached to the upper swing body 51, and the jib 54 is attached to the distal end of the boom 53. The boom 53 is raised and lowered relative to the upper swing body 51, and the jib 54 is raised and lowered relative to the boom 53. Although not shown, a point sheave is provided at the tip of the jib 54, and a hanging load is hung on a hook suspended from the point sheave.

ジブ54の先端部と前ストラット56の先端部とは、ガイライン58(ロープ)で連結されており、前ストラット56の起立角度θ2(水平面からの傾斜角度)が変更されると、ガイライン58を介してジブ54の起伏角度θ1(水平面からの傾斜角度)が変わる。つまり、この実施形態においては、ジブ54が本発明の「吊り部材」に相当し、前ストラット56が本発明の「起伏部材」に相当する。この場合においても、上記実施形態と同様に、前ストラット56の起立角度θ2を検出し、この検出値に基づいて吊荷重を求めることによって、吊荷重の算出精度を向上させることができる。   The tip of the jib 54 and the tip of the front strut 56 are connected by a guy line 58 (rope), and the elevation angle θ2 (the angle of inclination from the horizontal surface) of the front strut 56 is changed. As a result, the undulation angle θ1 (tilt angle from the horizontal surface) of the jib 54 changes. That is, in this embodiment, the jib 54 corresponds to the "hanging member" of the present invention, and the front strut 56 corresponds to the "relief member" of the present invention. Also in this case, as in the above-described embodiment, the lifting load calculation accuracy can be improved by detecting the rising angle θ2 of the front strut 56 and determining the hanging load based on the detected value.

1:クレーン
7:ブーム(吊り部材)
12:マスト(起伏部材)
13:ガイライン(ロープ)
20:吊荷重検出装置
21:張力検出器
22:起伏角度検出器
23:起立角度検出器
24:演算装置
θ1:起伏角度
θ2:起立角度
F:張力
W:吊り荷
1: Crane 7: Boom (hanging member)
12: Mast (lifting member)
13: Guy line (rope)
20: Hanging load detection device 21: Tension detector 22: Elevation angle detector 23: Elevation angle detector 24: Arithmetic device θ1: Elevation angle θ2: Elevation angle F: Tension W: Suspension load

Claims (4)

吊り荷を先端部から吊り下げる吊り部材と、ロープを介して前記吊り部材を起伏させる起伏部材とを有するクレーンに設けられる吊荷重検出装置であって、
前記ロープの張力を検出する張力検出器と、
前記吊り部材の起伏角度を検出する起伏角度検出器と、
前記起伏部材の起立角度を検出する起立角度検出器と、
前記張力検出器、前記起伏角度検出器および前記起立角度検出器からの検出値に基づいて吊荷重を算出する演算装置と、
を備えることを特徴とする吊荷重検出装置。
A suspension load detection device provided to a crane including a suspension member for suspending a suspension load from a tip end portion and a relief member for raising and lowering the suspension member via a rope,
A tension detector for detecting the tension of the rope;
An elevation angle detector for detecting the elevation angle of the suspension member;
A rising angle detector for detecting a rising angle of the rising and lowering member;
A computing device that calculates a hanging load based on detection values from the tension detector, the rising and falling angle detector, and the rising angle detector;
A hanging load detection device comprising:
前記演算装置は、前記起立角度検出器で検出された前記起伏部材の起立角度に基づいて、前記吊り部材の先端部および前記起伏部材の先端部を結ぶ直線と前記吊り部材の起伏支点との間の距離を求め、当該距離を用いて吊荷重を算出する請求項1に記載の吊荷重検出装置。   The arithmetic device is based on a straight line connecting the tip of the suspension member and the tip of the relief member based on the elevation angle of the relief member detected by the elevation angle detector and the relief fulcrum of the suspension member. The suspended load detection device according to claim 1, wherein a suspended load is calculated using the distance. 吊り荷を先端部から吊り下げる吊り部材と、ロープを介して前記吊り部材を起伏させる起伏部材とを有するクレーンであって、請求項1または2に記載の吊荷重検出装置を備えていることを特徴とするクレーン。   It is a crane which has a suspending member which suspends a suspended load from a front-end | tip part, and an up-and-down member which raises and lowers the said suspending member via a rope, Comprising: Having the suspension load detection apparatus of Claim 1 or 2 Feature cranes. 吊り荷を先端部から吊り下げる吊り部材と、ロープを介して前記吊り部材を起伏させる起伏部材とを有するクレーンの吊荷重を算出する演算装置であって、
前記ロープの張力、前記吊り部材の起伏角度、および前記起伏部材の起立角度に基づいて吊荷重を算出することを特徴とする演算装置。
A computing device for calculating a suspension load of a crane having a suspending member for suspending a suspended load from a tip end and a relief member for raising and lowering the lifting member through a rope,
A computing device characterized by calculating a hanging load based on the tension of the rope, the rising and falling angle of the hanging member, and the rising angle of the rising and falling member.
JP2015148483A 2015-07-28 2015-07-28 Hanging load detection device, crane and computing device Active JP6519382B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2015148483A JP6519382B2 (en) 2015-07-28 2015-07-28 Hanging load detection device, crane and computing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2015148483A JP6519382B2 (en) 2015-07-28 2015-07-28 Hanging load detection device, crane and computing device

Publications (2)

Publication Number Publication Date
JP2017024900A JP2017024900A (en) 2017-02-02
JP6519382B2 true JP6519382B2 (en) 2019-05-29

Family

ID=57949447

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2015148483A Active JP6519382B2 (en) 2015-07-28 2015-07-28 Hanging load detection device, crane and computing device

Country Status (1)

Country Link
JP (1) JP6519382B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7403270B2 (en) * 2019-10-09 2023-12-22 株式会社日立産機システム Hoisting machine, hoisting machine system, suspended load mass estimation device, and suspended load mass estimation method

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3290802B2 (en) * 1994-05-17 2002-06-10 日立建機株式会社 Crane load calculation method and device
JP3256087B2 (en) * 1994-06-29 2002-02-12 日立建機株式会社 Crane load calculation device
JPH10194681A (en) * 1997-01-08 1998-07-28 Kobe Steel Ltd Boom for latticed boom crane, or jib length automatic detection method and length automatic detector thereof
JP2001039669A (en) * 1999-07-29 2001-02-13 Sumitomo Constr Mach Co Ltd Load detection device for crane

Also Published As

Publication number Publication date
JP2017024900A (en) 2017-02-02

Similar Documents

Publication Publication Date Title
US20210033482A1 (en) Load moment indicator system and method
RU2722326C2 (en) Crane, as well as a method for controlling overload protection of such a crane
CN111348562B (en) Mobile crane
JP5080051B2 (en) Roughing jib hanging load detector
JP6519382B2 (en) Hanging load detection device, crane and computing device
JP2013108245A (en) Pile driver and centroid position measuring method for pile driver
WO2017090688A1 (en) Device for verifying state of assembly of luffing jib
JP5019770B2 (en) Crane hook block deflection angle detector
JP2009137736A (en) Integrated center of gravity position display device of working vehicle
JP2019031377A (en) Overload preventing device
JP2016222392A (en) Mobile crane and boom standing method of mobile crane
JP2010228900A (en) Load calculating device for crane and crane
JP2021050083A (en) Hanging load rope oscillating angle detection device and crane equipped with the same
WO2023176675A1 (en) Hook position calculation device
JP2019123570A (en) Height adjustment auxiliary apparatus, crane therewith and height adjustment method
JP3256087B2 (en) Crane load calculation device
CA2983837C (en) Load moment indicator system and method
JP2012062176A (en) Mounting structure of cord reel
JP3281481B2 (en) Crane load calculation device
JP5822650B2 (en) Pile driver and stability measuring method of pile driver
JP7137122B2 (en) mobile crane
JP6552393B2 (en) Pile driver
JP7415762B2 (en) How to calculate the limit swing angle of a loading truck crane and boom
JP2019112169A (en) hook
JP7137121B2 (en) mobile crane

Legal Events

Date Code Title Description
A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A712

Effective date: 20180320

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20180516

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20190305

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20190326

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20190408

R150 Certificate of patent or registration of utility model

Ref document number: 6519382

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250