hot water
water storage
power
storage tank
operation mode
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2015030015A
Other languages
Japanese (ja)
Other versions
JP2016151396A (en
Inventor
相良 峰雄
峰雄 相良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sekisui Chemical Co Ltd
Original Assignee
Sekisui Chemical Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sekisui Chemical Co Ltd filed Critical Sekisui Chemical Co Ltd
Priority to JP2015030015A priority Critical patent/JP6491494B2/en
Publication of JP2016151396A publication Critical patent/JP2016151396A/en
Application granted granted Critical
Publication of JP6491494B2 publication Critical patent/JP6491494B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Heat-Pump Type And Storage Water Heaters (AREA)

Description

本発明は、発電装置の発電電力により貯湯が可能な給湯制御装置に関する。   The present invention relates to a hot water supply control device capable of storing hot water using generated power of a power generation device.

従来、発電装置の発電電力により貯湯タンクに蓄熱可能な給湯制御装置が知られている(例えば、特許文献1参照)。
この従来技術は、太陽光発電装置から系統電力網への逆潮流時に、系統電圧が所定の閾値を超えた場合には、太陽光発電装置の出力抑制を行う前に、給湯装置の貯湯作動を実行させることで、逆潮流電力を減少させ、出力抑制の実行を制限するようにしている。
したがって、この従来技術では、通常は太陽光発電装置の余剰電力を系統電力網へ供給しつつ、系統電圧が閾値を超えた場合には、余剰電力により給湯装置を貯湯作動させ、出力抑制の実行を抑え、エネルギ効率の向上を図ることができる。
2. Description of the Related Art Conventionally, a hot water supply control device that can store heat in a hot water storage tank using power generated by a power generation device is known (see, for example, Patent Document 1).
This conventional technology performs hot water storage operation of a hot water supply device before suppressing the output of the solar power generation device when the system voltage exceeds a predetermined threshold during reverse power flow from the solar power generation device to the power grid. By doing so, the reverse flow power is reduced, and the execution of output suppression is limited.
Therefore, in this prior art, normally, surplus power of the solar power generation device is supplied to the grid power network, and when the system voltage exceeds the threshold value, the hot water storage device is operated to store hot water using the surplus power, and output suppression is executed. And energy efficiency can be improved.

特開2014−166114号公報JP 2014-166114 A

しかしながら、上述の従来技術では、余剰電力のみによる貯湯量では、使用時間帯に必要な貯湯量を得ることができない場合がある。
また、単価の安い深夜電力を用いて貯湯を行うことは一般に行われているが、この深夜電力による貯湯により貯湯タンクが一杯になっている場合には、上述の余剰電力を用いた貯湯を行うことができない。
However, in the above-described conventional technology, there may be a case where the amount of hot water required during the usage time cannot be obtained with the amount of hot water stored only by surplus power.
In addition, hot water storage using midnight power with a low unit price is generally performed, but when the hot water storage tank is full due to hot water storage using this midnight power, hot water storage using the above surplus power is performed. I can't.

本発明は、上述の問題を解決することを目的とするものであり、余剰電力の有効利用を図りつつ、貯湯タンクに必要湯量を確保可能な給湯制御装置を提供することを目的としている。   An object of the present invention is to solve the above-described problem, and an object of the present invention is to provide a hot water supply control device capable of securing a necessary amount of hot water in a hot water storage tank while effectively using surplus power.

上記目的を達成するために、
太陽光により発電する太陽光発電装置と、
前記太陽光発電装置と系統電力網と建物の電力負荷機器との間の電力供給状態を、情報受信部からの入力情報に基づいて制御する電力コントロールユニットと、
前記電力負荷機器に含まれ、電力を消費して貯湯タンクに貯湯を行うことが可能な給湯装置と、
を備え、
前記電力コントロールユニットは、
前記貯湯タンクに貯湯を行う貯湯運転モードを、前記入力情報に含まれる予め設定された切替判断情報に基づいて、
前記貯湯タンクの貯湯の使用時間帯の前の深夜電力を用いて前記貯湯タンクに予め設定された必要貯湯量を溜めるとともに、前記使用時間帯の前に余剰電力が生じた場合は、この余剰電力を用いて前記貯湯タンクに前記必要貯湯量を越えて貯湯を行う第1貯湯運転モードと、
前記入力情報に含まれる気象情報に基づいて前記使用時間帯前の前記余剰電力を予測するとともに、求めた予測余剰電力により貯湯可能な予測貯湯量をさらに求め、前記必要貯湯量に対して前記予測貯湯量では不足する湯量を、前記深夜電力を用いて前記貯湯タンクに貯湯した後、前記使用時間帯前に実際に生じた余剰電力を用いて前記給湯装置を作動させて前記必要貯湯量まで貯湯を行う第2貯湯運転モードと、
に切り替えることを特徴とする給湯制御装置とした。
To achieve the above objective,
A solar power generation device that generates power by sunlight;
A power control unit for controlling a power supply state between the photovoltaic power generation apparatus, the grid power network, and a power load device of the building based on input information from an information receiving unit;
A hot water supply device that is included in the power load device and that can store hot water in a hot water storage tank by consuming electric power;
With
The power control unit is
A hot water storage operation mode for storing hot water in the hot water storage tank is based on preset switching determination information included in the input information,
When the necessary amount of hot water stored in the hot water storage tank is stored in the hot water storage tank in advance using the midnight power before the hot water storage time of the hot water storage tank, and the surplus power is generated before the use time of the hot water storage tank, A first hot water storage operation mode in which hot water is stored in the hot water storage tank beyond the required amount of hot water using
Predicting the surplus power before the use time period based on weather information included in the input information, further obtaining a predicted hot water storage amount that can be stored by the calculated surplus power, and predicting the required hot water storage amount After the hot water amount that is insufficient in the hot water storage amount is stored in the hot water storage tank using the midnight power, the hot water supply device is operated using the surplus power actually generated before the use time period to store the hot water up to the required hot water storage amount. A second hot water storage operation mode,
It was set as the hot-water supply control apparatus characterized by switching to.

また、本発明の給湯制御装置は、
前記切替判断情報として、前記系統電力網における前記太陽光発電装置からの電力供給を制限する出力抑制の実施に関する情報を含み、
前記電力コントロールユニットは、前記出力抑制を実施するとの情報を得た場合は、前記第2貯湯運転モードを選択し、前記出力抑制を実施する情報を得ない場合は、前記第1貯湯運転モードを選択することが好ましい。
また、本発明の給湯制御装置は、
前記切替判断情報として、前記気象情報に基づいて前記電力コントロールユニットが予測した前記太陽光発電装置の出力電圧に関する情報を含み、
前記電力コントロールユニットは、前記出力電圧の予測値が予め設定された閾値を越える場合は前記第2貯湯運転モードを選択し、前記予測値が前記閾値を越えない場合は前記第1貯湯運転モードを選択することが好ましい。
また、本発明の給湯制御装置は、
前記切替判断情報として、前記太陽光発電装置と、前記入力情報を含む前記情報受信部側との少なくともいずれかの故障に関する情報を含み、
前記電力コントロールユニットは、前記故障の発生時は前記第1貯湯運転モードを選択し、前記故障の非発生時は前記第2貯湯運転モードを選択することが好ましい。
In addition, the hot water supply control device of the present invention is
As the switching determination information, including information on the implementation of output suppression to limit the power supply from the solar power generation device in the grid power network,
The power control unit selects the second hot water storage operation mode when obtaining the information that the output suppression is performed, and selects the first hot water storage operation mode when the information for performing the output suppression is not obtained. It is preferable to select.
In addition, the hot water supply control device of the present invention is
As the switching determination information, including information on the output voltage of the photovoltaic power generation device predicted by the power control unit based on the weather information,
The power control unit selects the second hot water storage operation mode when the predicted value of the output voltage exceeds a preset threshold value, and selects the first hot water storage operation mode when the predicted value does not exceed the threshold value. It is preferable to select.
In addition, the hot water supply control device of the present invention is
As the switching determination information, including information on at least one of the failure of the photovoltaic power generation apparatus and the information receiving unit side including the input information,
It is preferable that the power control unit selects the first hot water storage operation mode when the failure occurs and selects the second hot water storage operation mode when the failure does not occur.

本発明の給湯制御装置では、第1貯湯運転モードの選択時には、使用時間帯前に、深夜電力を用いて給湯装置に必要貯湯量を溜める。よって、使用時間帯には、確実に必要湯量を確保することができる。
さらに、第1貯湯運転モードにおいて、使用時間帯前に余剰電力が生じた場合、この余剰電力を用いて給湯装置に必要貯湯量を超えて貯湯を行う。よって、太陽光発電装置の出力電圧を抑制させることなく、余剰電力の有効利用が可能である。
一方、第2貯湯運転モードでは、気象情報に基づいて、余剰電力を予測し、この予測余剰電力により貯湯される余剰電力予測貯湯量を求め、必要貯湯量に対する余剰電力予測貯湯量の不足分を、深夜電力を用いて貯湯する。その後、使用時間帯前には、実際に生じた余剰電力を用いて、必要貯湯量まで貯湯を行う。
したがって、この場合も、使用時間帯には、必要貯湯量を確保することができる。また、余剰電力をより有効に利用して、貯湯を行うことができる。
以上のように、余剰電力をより有効に図ることが可能な第2貯湯運転モードと、深夜電力を利用して前もって確実に必要貯湯量を確保する第1貯湯運転モードとを、適宜切り換えることにより、余剰電力の有効利用を図りつつ、使用時間帯前には貯湯タンクに必要湯量を確保可能な給湯制御装置を提供することができる。
In the hot water supply control device of the present invention, when the first hot water storage operation mode is selected, the necessary amount of hot water storage is stored in the hot water supply device using midnight power before the use time period. Therefore, the required amount of hot water can be ensured reliably during the use time period.
Further, in the first hot water storage operation mode, when surplus power is generated before the use time period, the surplus power is used to store hot water exceeding the necessary amount of hot water storage. Therefore, it is possible to effectively use surplus power without suppressing the output voltage of the solar power generation device.
On the other hand, in the second hot water storage operation mode, surplus power is predicted based on weather information, a surplus power predicted hot water storage amount stored by this predicted surplus power is obtained, and a shortage of the surplus power predicted hot water storage amount relative to the required hot water storage amount is calculated. Store hot water using midnight power. Thereafter, hot water is stored up to the required amount of hot water using the surplus power actually generated before the use time period.
Therefore, also in this case, it is possible to secure the necessary hot water storage amount during the use time period. Moreover, hot water can be stored by using surplus power more effectively.
As described above, by appropriately switching between the second hot water storage operation mode in which surplus power can be more effectively achieved and the first hot water storage operation mode in which the necessary hot water storage amount is ensured in advance by using midnight power. Thus, it is possible to provide a hot water supply control device that can ensure the necessary amount of hot water in the hot water storage tank before the use time period while effectively utilizing surplus power.

また、系統電力網側では、電力の供給状態予測などに基づいて、太陽光発電装置などの再生エネルギ発電装置からの供給を抑制する出力抑制を行う場合がある。このように、出力抑制が実施された場合、太陽光発電装置で発電した電力を系統電力網側へ供給することができず、余剰電力が生じる。
このような出力抑制の実施に関する情報を得た場合に、第2貯湯運転モードを選択するようにすると、出力抑制により生じる余剰電力を無駄にすることなく貯湯タンクに貯湯を行うことができる。
さらに、この第2貯湯運転モードでは、使用時間帯前の深夜電力では、必要貯湯量から余剰電力予測貯湯量を差し引いた不足分しか貯湯しないため、出力抑制により余剰電力が多く発生した場合でも、余剰電力を無駄にすることなく貯湯に使用可能である。よって、余剰電力のより確実な有効利用が可能である。
In addition, on the grid power network side, output suppression that suppresses supply from a renewable energy power generation device such as a solar power generation device may be performed based on power supply state prediction or the like. Thus, when output suppression is implemented, the electric power generated with the solar power generation device cannot be supplied to the grid power network side, and surplus power is generated.
When information regarding the implementation of such output suppression is obtained, if the second hot water storage operation mode is selected, hot water can be stored in the hot water storage tank without wasting surplus power generated by the output suppression.
Further, in the second hot water storage operation mode, in the late-night power before the use time zone, only a shortage of hot water is stored by subtracting the surplus power predicted hot water amount from the required hot water amount, so even if excessive power is generated due to output suppression, It can be used for hot water storage without wasting excess power. Therefore, it is possible to use surplus power more reliably and effectively.

晴天が長時間続いた場合などには太陽光発電装置の出力電圧が上昇する。電力コントロールユニットは、系統電力網側に逆潮流を行っている際に、出力電圧が系統電力網の許容範囲を超えて上昇する場合には、出力電圧の上昇を抑制する出力電圧上昇抑制作動を実行する。
そこで、切替判断情報として気象情報に基づいて予測される太陽光発電装置の出力電圧が閾値を超える場合に、第2貯湯運転モードを選択するようにすると、出力電圧上昇抑制作動を実行する前に、余剰電力を用いて貯湯を行って必要貯湯量まで貯湯を行うことができる。また、この場合、予測貯湯量により必要貯湯量に対して不足する湯量は、深夜電力を用いて予め貯湯タンクに貯湯することにより、余剰電力を無駄にすることなく必要貯湯量を確保することができる。
When the clear sky continues for a long time, the output voltage of the photovoltaic power generator rises. The power control unit executes an output voltage increase suppression operation that suppresses an increase in the output voltage when the output voltage increases beyond the allowable range of the system power network while performing reverse power flow to the system power network side. .
Therefore, when the second hot water storage operation mode is selected when the output voltage of the photovoltaic power generation apparatus predicted based on weather information as the switching determination information exceeds the threshold, before the output voltage increase suppression operation is executed. The hot water can be stored up to the required amount of hot water by storing hot water using surplus power. Also, in this case, the amount of hot water that is insufficient relative to the required hot water storage amount due to the predicted hot water storage amount can be secured in the hot water storage tank in advance using midnight power, so that the necessary hot water storage amount can be ensured without wasting surplus power. it can.

太陽光発電装置に何らかの故障が生じた場合、余剰電力を用いて貯湯を行うことができない。また、情報受信部あるいは情報受信部に情報をもたらす手段に故障が生じた場合、電力コントロールユニットでは、正確な入力情報を得ることができず、余剰電力による貯湯量の正確な予測を行うことができない。
したがって、太陽光発電装置や情報受信部側の故障発生時に、第1貯湯運転モードを選択するようにした場合、前もって深夜電力を用いて必要貯湯量まで貯湯を行うことにより、使用時に、余剰電力が発生しなかったり、予測値と実際値とが異なったりしていても、貯湯量の不足が生じることが無い。
When any failure occurs in the solar power generation device, hot water cannot be stored using surplus power. Further, when a failure occurs in the information receiving unit or the means for providing information to the information receiving unit, the power control unit cannot obtain accurate input information, and can accurately predict the amount of hot water stored by surplus power. Can not.
Therefore, when the first hot water storage operation mode is selected when a failure occurs on the photovoltaic power generation device or the information reception unit side, surplus electric power is stored at the time of use by storing hot water up to the required amount of hot water using midnight power in advance. No shortage of hot water storage will occur even if the predicted value and the actual value differ from each other.

図1は、本発明の実施の形態1の給湯制御装置を示すブロック図である。FIG. 1 is a block diagram illustrating a hot water supply control apparatus according to Embodiment 1 of the present invention. 図2は、実施の形態1の給湯制御装置の第1貯湯運転モードによる作動例を示すタイムチャートである。FIG. 2 is a time chart showing an example of operation in the first hot water storage operation mode of the hot water supply control apparatus of the first embodiment. 図3は、実施の形態1の給湯制御装置の第2貯湯運転モードによる作動例を示すタイムチャートである。FIG. 3 is a time chart showing an example of operation in the second hot water storage operation mode of the hot water supply control apparatus of the first embodiment. 図4は、実施の形態1の給湯制御装置における運転モード切替制御の処理の流れを示すフローチャートである。FIG. 4 is a flowchart showing a process flow of operation mode switching control in the hot water supply control apparatus of the first embodiment.

以下に、本発明の実施の形態の給湯制御装置Aについて、図1〜図4に基づいて説明する。
図1に示すように、本実施形態に係る給湯制御装置Aは、戸建の住宅Hに設置されたもので、太陽光発電装置1、電力コントロールユニット2、給湯装置31を含む電力負荷機器3、蓄電装置4を備えている。
Below, the hot water supply control apparatus A of embodiment of this invention is demonstrated based on FIGS.
As shown in FIG. 1, a hot water supply control device A according to the present embodiment is installed in a detached house H, and includes an electric power load device 3 including a solar power generation device 1, a power control unit 2, and a hot water supply device 31. A power storage device 4 is provided.

太陽光発電装置1は、太陽光を受けて直流電力を発生するもので、例えば、複数の太陽電池をパネル状に並べたソーラパネルを用いることができる。   The solar power generation device 1 receives direct sunlight and generates direct-current power. For example, a solar panel in which a plurality of solar cells are arranged in a panel shape can be used.

電力コントロールユニット2は、情報受信部24から得られる種々の入力情報に基づいて、太陽光発電装置1と、系統電力網Eと、電力負荷機器3、蓄電装置4との間の電力供給状態を切り替えるもので、パワーコンディショナ21、分電装置22、制御装置23、情報受信部24を備えている。
なお、系統電力網Eは、商用電源などの系統電力の供給網である。
また、電力負荷機器3は、住宅Hに設けられた電力により作動する機器である。なお、本実施の形態1には、電力負荷機器3に空調装置34が含まれ、この空調装置34は、熱を一時的に貯めることができる蓄熱部34aを床下に備えている。
The power control unit 2 switches the power supply state among the solar power generation device 1, the grid power network E, the power load device 3, and the power storage device 4 based on various input information obtained from the information receiving unit 24. A power conditioner 21, a power distribution device 22, a control device 23, and an information receiving unit 24 are provided.
The grid power network E is a grid power supply network such as a commercial power supply.
In addition, the power load device 3 is a device that operates with electric power provided in the house H. In the first embodiment, the power load device 3 includes an air conditioner 34, and the air conditioner 34 includes a heat storage unit 34 a that can temporarily store heat under the floor.

さらに、電力コントロールユニット2について説明を加える、パワーコンディショナ21は、太陽光発電装置1が発電し出力する直流電力を交流電力に変換するPVパワーコンディショナ機能と、蓄電装置4の直流電力を交流電力に変換して出力したり交流電力を直流電力に変換して蓄電装置4に充電させたりする蓄電パワーコンディショナ機能とを有する。なお、蓄電装置4は、鉛蓄電池などの図示を省略した蓄電池を備えている。   Further, the power conditioner 21, which adds a description of the power control unit 2, converts the direct current power generated and output by the solar power generation device 1 into alternating current power and the direct current power of the power storage device 4 by alternating current. It has a power storage power conditioner function that converts power into power and outputs it, or converts AC power into DC power and charges the power storage device 4. In addition, the electrical storage apparatus 4 is provided with the storage battery which abbreviate | omitted illustration, such as a lead storage battery.

分電装置22は、上述した電力供給状態の切り替えを行う。すなわち、分電装置22は、系統電力網Eの電力を住宅Hの電力負荷機器3に供給する状態、太陽光発電装置1にて発電した電力を電力負荷機器3、蓄電装置4、系統電力網Eのいずれか1つあるいは複数に供給する状態、蓄電装置4に蓄えた電力を電力負荷機器3に供給する状態に切り替える。   The power distribution device 22 switches the power supply state described above. That is, the power distribution device 22 supplies power from the grid power network E to the power load device 3 in the house H, and the power generated by the solar power generation device 1 is supplied to the power load device 3, the power storage device 4, and the grid power network E. The state is switched to a state of supplying to any one or a plurality of states, and a state of supplying power stored in the power storage device 4 to the power load device 3.

制御装置23は、センサ群41からの入力情報およびインターネット42を介して得られるサーバ群43からの入力情報に基づいて、上記のパワーコンディショナ21の作動および分電装置22による電力供給状態の切り替えを制御する。なお、この制御装置23は、いわゆる情報処理や演算などを行うCPU(Central Processing Unit)や、プログラムや種々のデータ等を記憶するメモリなどを備えている。   Based on the input information from the sensor group 41 and the input information from the server group 43 obtained via the Internet 42, the control device 23 operates the power conditioner 21 and switches the power supply state by the power distribution device 22. To control. The control device 23 includes a CPU (Central Processing Unit) that performs so-called information processing and calculation, a memory that stores programs, various data, and the like.

センサ群41は、系統電力網Eの電圧を検出するセンサ、パワーコンディショナ21から系統電力網Eへ供給する(逆潮流)電圧を検出するセンサ、各部位の温度を検出するセンサが含まれる。   The sensor group 41 includes a sensor that detects a voltage of the grid power network E, a sensor that detects a voltage (reverse power flow) supplied from the power conditioner 21 to the grid power network E, and a sensor that detects the temperature of each part.

また、サーバ群43からインターネット42を介して得られる入力情報には、気象予報を提供するサーバからの天気、気温、日照状態を含む気象情報や、電力会社のサーバからの、電力単価、出力抑制の実施の有無などの電力関係情報などが含まれる。   The input information obtained from the server group 43 via the Internet 42 includes weather information from the server that provides the weather forecast, weather information including the weather, temperature, and sunshine status, power unit price from the power company server, and output suppression. Power-related information such as whether or not to perform the operation.

次に、給湯装置31について説明する。
給湯装置31は、熱交換部32および貯湯タンク33備える。
熱交換部32は、貯湯タンク33からの給水を加熱して貯湯タンク33に戻す。本実施の形態1では、熱交換部32として、いわゆるヒートポンプ式のものを用いており、図示は省略するが空気中の熱をヒートポンプサイクルに吸熱する熱交換器と、このヒートポンプサイクルに吸熱した熱により貯湯タンク33からの給水と熱交換する熱交換器とを備えている。なお、熱交換部32としては、単純に電力により発熱して給水と熱交換するものを用いてもよい。
また、貯湯タンク33は、上水道から給水を行う配管33aと、貯湯を住宅H内に給湯する配管33bとが接続されている。
Next, the hot water supply device 31 will be described.
The hot water supply device 31 includes a heat exchange unit 32 and a hot water storage tank 33.
The heat exchange unit 32 heats the water supplied from the hot water storage tank 33 and returns it to the hot water storage tank 33. In this Embodiment 1, what is called a heat pump type is used as the heat exchanging part 32, although illustration is omitted, the heat exchanger which absorbs heat in the air into the heat pump cycle, and the heat absorbed in the heat pump cycle Is provided with a heat exchanger for exchanging heat with water supplied from the hot water storage tank 33. In addition, as the heat exchange part 32, what generate | occur | produces simply with electric power and heat-exchanges with water supply may be used.
The hot water storage tank 33 is connected to a pipe 33a for supplying water from the water supply and a pipe 33b for supplying hot water to the house H.

次に、制御装置23による制御について説明する。
まず、制御装置23による電力供給状態の切替制御について簡単に説明する。
制御装置23は、太陽光発電装置1の発電電力と、住宅内の電力負荷機器3への通電によって消費される消費電力とを比較する。そして、この比較で太陽光発電装置1の発電電力が消費電力よりも大きい場合には、その余剰電力を商用電源である系統電力網E側に供給(逆潮流)し、電力会社にその余剰電力を売電する。さらに、制御装置23は、必要に応じて、太陽光発電装置1の発電電力に生じた余分な電力や、相対的に安価な深夜電力を用いて蓄電装置4に充電を行う。
また、制御装置23は、雨天や曇りなどで太陽光発電装置1の発電電力が消費電力よりも少ないと判断した場合、系統電力網Eあるいは蓄電装置4から、電力負荷機器3側へ不足分の電力の供給するように制御する。
Next, control by the control device 23 will be described.
First, power supply state switching control by the control device 23 will be briefly described.
The control device 23 compares the generated power of the solar power generation device 1 with the power consumption consumed by energizing the power load device 3 in the house. If the generated power of the photovoltaic power generation apparatus 1 is larger than the consumed power in this comparison, the surplus power is supplied (reverse power flow) to the grid power network E side which is a commercial power source, and the surplus power is supplied to the power company. Sell power. Furthermore, the control device 23 charges the power storage device 4 using extra power generated in the power generated by the solar power generation device 1 or relatively inexpensive midnight power as necessary.
Further, when the control device 23 determines that the generated power of the solar power generation device 1 is less than the power consumption due to rain or cloudy weather, the power shortage from the system power network E or the power storage device 4 to the power load device 3 side. Control to supply.

次に、制御装置23による貯湯制御について説明する。
制御装置23は、給湯装置31の貯湯タンク33に、貯湯の使用時間帯前に、必要貯湯量を貯湯する貯湯制御を実行する。
ここで、必要貯湯量は、予め標準的な初期値が与えられているとともに、住宅Hにおける実際の1日の使用量、ならびに使用時間帯情報を蓄積し補正することで、常に、住宅Hにとっての最適の値が保存されている。
Next, hot water storage control by the control device 23 will be described.
The control device 23 executes hot water storage control for storing the required amount of hot water in the hot water storage tank 33 of the hot water supply device 31 before the hot water usage time period.
Here, the necessary amount of stored hot water is given a standard initial value in advance, and by accumulating and correcting the actual daily usage amount and usage time zone information in the house H, it is always for the house H. The optimal value of is stored.

また、使用時間帯は、住宅Hの実際の使用状況に基づいて適宜決定するもので、本実施の形態1では、図2、図3のタイムチャートに示すように、夕方以降の夜間とする。なお、この使用時間帯は、実際の使用状態を蓄積して自動的に設定してもよいし、使用者の手動入力により設定するようにしてもよい。   Further, the usage time zone is appropriately determined based on the actual usage status of the house H, and in the first embodiment, as shown in the time charts of FIGS. Note that the usage time period may be set automatically by accumulating the actual usage state, or may be set by a user's manual input.

制御装置23は、上述の貯湯制御における運転モードとして、第1貯湯運転モードと、第2貯湯運転モードとを備えている。
第1貯湯運転モードでは、図2のタイムチャートに示すように、系統電力網Eの深夜電力時間帯に深夜電力を用いて貯湯タンク33に必要貯湯量Vnを溜める。さらに、使用時間帯の前の昼間に太陽光発電装置1に余剰電力が生じた場合は、この余剰電力を用いて給湯装置31を給湯作動させて必要貯湯量Vnを越えて貯湯を行う。
The control device 23 includes a first hot water storage operation mode and a second hot water storage operation mode as operation modes in the hot water storage control described above.
In the first hot water storage operation mode, as shown in the time chart of FIG. 2, the necessary hot water storage amount Vn is stored in the hot water storage tank 33 using midnight power in the midnight power time zone of the system power network E. Furthermore, when surplus electric power is generated in the solar power generation device 1 in the daytime before the use time zone, the hot water supply device 31 is hot-watered using this surplus power to store hot water exceeding the necessary hot water storage amount Vn.

第2貯湯運転モードでは、使用時間帯前に生じる余剰電力を予測し、そして、図3のタイムチャートに示す、この予測余剰電力による貯湯量である予測貯湯量Veを求める。そして、必要貯湯量Vnから予測貯湯量Veを差し引いた不足分の湯量である不足貯湯量Vmを、深夜電力を用いて給湯装置31を作動させて貯湯タンク33に貯湯し、その後に実際に生じた余剰電力を用いて使用時間帯前に必要貯湯量Vnまで貯湯を行う。
なお、予測余剰電力は、インターネット42を介して入力した気象情報(日照時間、気温など)に基づいて演算する。また、第2貯湯運転モードにより、余剰電力を用いて貯湯を行う際に、余剰電力が不足した場合には、系統電力網Eの電力を補充して、必要貯湯量Vnを確保する。
In the second hot water storage operation mode, surplus power generated before the use time period is predicted, and a predicted hot water storage amount Ve, which is a hot water storage amount based on the predicted surplus power, shown in the time chart of FIG. 3 is obtained. Then, the hot water storage amount Vm, which is a shortage of hot water obtained by subtracting the predicted hot water storage amount Ve from the necessary hot water storage amount Vn, is stored in the hot water storage tank 33 by operating the hot water supply device 31 using midnight power, and then actually occurs. Using the surplus power, hot water is stored up to the required hot water storage amount Vn before the use time.
The predicted surplus power is calculated based on weather information (such as sunshine time and temperature) input via the Internet 42. In addition, in the second hot water storage operation mode, when hot water is stored using surplus power, if the surplus power is insufficient, the power of the grid power network E is supplemented to ensure the necessary hot water storage amount Vn.

上述の貯湯運転モードの切り替えは、制御装置23により、予め設定された切替判断情報に基づく貯湯運転モード切替制御により行う。ここで、切替判断情報として、本実施の形態では、故障情報、出力抑制実施情報、出力電圧上昇抑制作動予測情報が含まれる。   Switching of the hot water storage operation mode described above is performed by the control device 23 by hot water storage operation mode switching control based on preset switching determination information. Here, in this embodiment, the switching determination information includes failure information, output suppression execution information, and output voltage increase suppression operation prediction information.

故障情報には、太陽光発電装置1において、正常に発電することができない故障が生じた情報が含まれる。この故障判断は、例えば、太陽光発電装置1において予め設定された自己診断プログラムにより行うことができる。   The failure information includes information on the occurrence of a failure in the solar power generation device 1 that cannot generate power normally. This failure determination can be performed, for example, by a self-diagnosis program set in advance in the solar power generation device 1.

さらに、故障情報には、情報受信部24側の故障に関する情報が含まれる。すなわち、情報受信部24側の故障とは、情報受信部24において正確な情報が得られない状態を指す。このような情報受信部24側の故障としては、情報受信部24、それ自体の故障のみならず、センサ群41に含まれるセンサの故障や、インターネット42との接続不良、あるいは、サーバ群43における所定のサーバにおいて不具合が生じている場合が含まれる。   Further, the failure information includes information regarding a failure on the information receiving unit 24 side. That is, the failure on the information receiving unit 24 side refers to a state where accurate information cannot be obtained in the information receiving unit 24. Such a failure on the side of the information receiving unit 24 includes not only the failure of the information receiving unit 24 and itself, but also the failure of the sensor included in the sensor group 41, the poor connection with the Internet 42, or the server group 43. A case where a problem occurs in a predetermined server is included.

出力抑制実施情報は、系統電力網Eに電力供給を行う電力会社が、電力の買い取りを行わない出力抑制を実施するという情報であり、この出力抑制の実施の日にちや時間は、前もって、インターネット42を介して電力会社のサーバから得られる。   The output suppression implementation information is information that an electric power company that supplies power to the grid power network E implements output suppression that does not purchase power. Through the power company server.

出力電圧上昇抑制作動予測情報は、太陽光発電装置1の出力電圧が系統電圧の許容範囲を越えて上昇した場合に、パワーコンディショナ21が太陽光発電装置1の出力を抑える出力電圧上昇抑制作動を行うことを予測する情報である。この予測は、制御装置23において、インターネット42を介して得られる気象情報から得られる日照時間や気温などの情報ならびに予め入力されている太陽光発電装置1の発電性能情報に基づいて行う。また、この気象情報は、本実施の形態1では、サーバ群43において複数の気象予報会社のサーバから得られる複数の気象情報に基づいて、確率が高いと推定する気象予報に基づいて行う。
すなわち、複数の気象予報会社から複数の気象予報情報を入力した場合に、複数の予報会社で共通する情報を用いるようにする。例えば、「晴れ」と、「晴れ時々曇り」との予報が混在する場合、多い方の予報を用いて、日照時間を予測する。
The output voltage increase suppression operation prediction information is an output voltage increase suppression operation in which the power conditioner 21 suppresses the output of the solar power generation device 1 when the output voltage of the solar power generation device 1 increases beyond the allowable range of the system voltage. It is the information which predicts performing. This prediction is performed by the control device 23 based on information such as sunshine hours and temperature obtained from weather information obtained via the Internet 42 and power generation performance information of the solar power generation device 1 input in advance. Further, in the first embodiment, this weather information is performed based on a weather forecast that is estimated to have a high probability based on a plurality of weather information obtained from servers of a plurality of weather forecast companies in the server group 43.
That is, when a plurality of weather forecast information is input from a plurality of weather forecast companies, information common to the plurality of forecast companies is used. For example, when forecasts of “sunny” and “sunny and sometimes cloudy” are mixed, the sunshine duration is predicted using the more forecast.

そして、制御装置23は、予測した日照時間などの情報に基づいて、使用時間帯前の太陽光発電装置1の出力電圧を予測し、この出力電圧が、予め設定された系統電圧の許容電圧に基づく閾値を越える場合に、出力電圧を抑える出力電圧上昇抑制作動を行うと予測する。一方、出力電圧が前記閾値を越えない場合は、出力電圧上昇抑制作動は行わないと予測する。なお、閾値は、出力電圧上昇抑制作動を実行する判断値よりも僅かに低い値に設定しておく。   And the control apparatus 23 estimates the output voltage of the solar power generation device 1 before a use time zone based on information, such as the estimated sunshine hours, and this output voltage becomes the allowable voltage of the system voltage set beforehand. When the threshold value is exceeded, it is predicted that the output voltage increase suppressing operation for suppressing the output voltage is performed. On the other hand, when the output voltage does not exceed the threshold value, it is predicted that the output voltage increase suppression operation is not performed. The threshold value is set to a value slightly lower than the determination value for executing the output voltage increase suppression operation.

次に、制御装置23による貯湯運転モードの切替処理の流れを図4のフローチャートに基づいて説明する。
なお、この貯湯運転モードの切替処理は、本実施の形態1では、対象となる使用時間帯の前の深夜電力時間帯よりも前に実行する。ここで、本実施の形態1では、深夜電力時間帯(図2のt21〜t23、図3のt31〜t34)を、23:00〜7:00であるとする。したがって、貯湯運転モードの切替処理は、23:00の直前(このタイミングを当日とする)に実行し、貯湯運転制御により翌日の使用時間帯である夕方(例えば、17:00)以前に、貯湯タンク33に、必要貯湯量Vnの貯湯を行う。
Next, the flow of the hot water storage operation mode switching process by the control device 23 will be described based on the flowchart of FIG.
In the first embodiment, the hot water storage operation mode switching process is executed before the midnight power time zone before the target usage time zone. Here, in the first embodiment, it is assumed that the midnight power time zone (t21 to t23 in FIG. 2, t31 to t34 in FIG. 3) is 23:00 to 7:00. Therefore, the hot water storage operation mode switching process is executed immediately before 23:00 (this timing is assumed to be the current day), and the hot water storage operation is performed before the evening (for example, 17:00) that is the use time zone of the next day by the hot water storage operation control. Hot water is stored in the tank 33 in the required amount of hot water Vn.

このようなタイミングで実行する貯湯運転モードの切替処理では、まず、最初のステップS101で、故障の有無を判定し、故障発生時には、ステップS104に進んで第1貯湯運転モードを選択し、非故障発生時には、ステップS102に進む。
非故障発生時に進むステップS102では、出力抑制実施情報の有無を判定し、翌日の昼前に出力抑制を実施するとの情報が無い場合には、ステップS103に進み、翌日の昼前に出力抑制を実施するとの情報が有る場合にはステップS105に進む。すなわち、前述したように、インターネット42を介して得られる電力会社のサーバからの情報に基づいて、翌日に、電力会社が再生エネルギによる電力の買い取りを停止する出力抑制が実施されるか否かを判定する。そして、この出力抑制が、翌日の太陽光発電装置1の発電時間帯に実施される場合は、ステップS105に進む。
In the hot water storage operation mode switching process executed at such timing, first, in the first step S101, it is determined whether or not there is a failure, and when a failure occurs, the process proceeds to step S104 to select the first hot water storage operation mode and non-failure When it occurs, the process proceeds to step S102.
In step S102 that proceeds when a non-failure occurs, the presence / absence of output suppression execution information is determined. If there is no information indicating that output suppression is to be performed before noon the next day, the process proceeds to step S103, where output suppression is performed before noon the next day. If there is such information, the process proceeds to step S105. That is, as described above, based on the information from the server of the electric power company obtained via the Internet 42, it is determined whether or not output suppression is performed on the next day when the electric power company stops the purchase of electric power using renewable energy. judge. And when this output suppression is implemented in the electric power generation time zone of the solar power generation device 1 of the next day, it progresses to step S105.

この出力抑制を実施するとの情報が無い場合に進むステップS103では、翌日の太陽光発電装置1の出力電圧の予測情報に基づいて、出力電圧上昇抑制作動を実行すると予測しているか否かを判定する。そして、出力電圧上昇抑制作動の実行が予測される場合には、ステップS105に進み、その実行が予測されない場合にはステップS104に進む。   In step S103, which is performed when there is no information indicating that the output suppression is to be performed, it is determined whether or not the output voltage increase suppression operation is predicted to be executed based on the prediction information of the output voltage of the photovoltaic power generation device 1 on the next day. To do. Then, when the execution of the output voltage increase suppressing operation is predicted, the process proceeds to step S105, and when the execution is not predicted, the process proceeds to step S104.

以上の貯湯モード切替処理に基づいて、太陽光発電装置1あるいは情報受信部24側に故障が発生しており、太陽光発電装置1により発電が成されないか、その正確な発電量予測に基づく給湯装置31による貯湯量の予測ができない場合には、第1貯湯運転モードを選択する。また、非故障発生時であっても、出力抑制の実施および出力電圧上昇抑制作動の実行が予測されず、太陽光発電装置1から系統電力網Eへの逆潮流(売電)が可能な場合も、第1貯湯運転モードを選択する。   Based on the hot water storage mode switching process described above, a failure has occurred on the photovoltaic power generation device 1 or the information receiving unit 24 side, so that the photovoltaic power generation device 1 does not generate power, or hot water supply based on accurate power generation amount prediction. When the hot water storage amount cannot be predicted by the device 31, the first hot water storage operation mode is selected. In addition, even when a non-failure occurs, there is a case where execution of output suppression and execution of output voltage increase suppression operation are not predicted, and reverse power flow (power sale) from the solar power generation device 1 to the grid power network E is possible. The first hot water storage operation mode is selected.

一方、故障発生が無く太陽光発電装置1により正常な発電が可能であるにもかかわらず、出力抑制の実施あるいは出力電圧上昇抑制作動の実行が予測され、余剰電力が大幅に生じる場合には、第2貯湯運転モードを選択する。   On the other hand, when there is no occurrence of failure and normal power generation is possible with the solar power generation device 1, execution of output suppression or execution of output voltage increase suppression operation is predicted, and when surplus power is significantly generated, The second hot water storage operation mode is selected.

(実施の形態1の作用)
以下に、実施の形態1の作用について説明する。
(太陽光発電装置あるいは情報受信部側の故障発生時)
太陽光発電装置1に故障が生じたり、情報受信部24それ自体あるいはその入力情報を正常に得られない故障が生じたりした場合には、制御装置23は、第1貯湯運転モードを選択する(ステップS101→S104の処理の流れに基づく)。
(Operation of Embodiment 1)
The operation of the first embodiment will be described below.
(When a failure occurs on the solar power generation device or information receiver)
When a failure occurs in the solar power generation device 1 or a failure occurs in which the information receiving unit 24 itself or its input information cannot be normally obtained, the control device 23 selects the first hot water storage operation mode ( (Based on the process flow from step S101 to S104).

この場合、図2のタイムチャートに示すように、翌日の貯湯の使用時間帯の前の深夜電力時間帯(t21の時点からt23の時点までの間)に、深夜電力を使用して必要貯湯量Vnを貯湯タンク33に貯める。
したがって、t26の時点以降の使用時間帯には、貯湯タンク33に必要貯湯量が貯湯されており、通常の使用では貯湯の不足が生じることなく、また、新たに系統電力網Eの電力を使用して沸かすことなく、貯湯を使用することができる。
In this case, as shown in the time chart of FIG. 2, the necessary hot water storage amount using midnight power during the midnight power time zone (between the time t21 and the time t23) before the hot water use time zone of the next day. Vn is stored in the hot water storage tank 33.
Therefore, the hot water storage tank 33 stores the required amount of hot water in the usage time zone after the time t26, so that there is no shortage of hot water in normal use, and new power from the grid power network E is used. Hot water can be used without boiling.

(出力抑制実施情報がなく、かつ出力電圧上昇抑制の実行が予測されない時)
次に、非故障発生時であって、電力会社から出力抑制実施との情報が入力されず、かつ、気象情報に基づく太陽光発電装置1において翌日に出力電圧上昇抑制の実行が予測されない場合、第1貯湯運転モードを選択する(ステップS101→S102→S103→S104の処理の流れに基づく)。
(When there is no output suppression execution information and execution of output voltage increase suppression is not predicted)
Next, when non-failure occurs, when the information on the execution of output suppression is not input from the power company, and in the photovoltaic power generation device 1 based on weather information, it is not predicted that the output voltage increase will be suppressed the next day, The first hot water storage operation mode is selected (based on the processing flow of steps S101 → S102 → S103 → S104).

この場合、第1貯湯運転モードに基づいて、図2のタイムチャートに示すように、深夜電力を用いて貯湯タンク33に必要貯湯量Vnを貯湯する点は、上記と同様である。
また、この場合、翌日の昼間が晴れの場合には、太陽光発電装置1により発電を行い、制御装置23の制御に基づいて、電力負荷機器3による消費を上回る余剰電力は系統電力網Eへ供給(売電)する。
さらに、この逆潮流時に、太陽光発電装置1における出力電力が閾値を越える場合、この余剰電力を用いて、給湯装置31を貯湯作動させて、貯湯タンク33に貯湯を行う(t24の時点からt25の時点)。
In this case, based on the first hot water storage operation mode, as shown in the time chart of FIG. 2, the hot water storage amount Vn is stored in the hot water storage tank 33 using the late-night power as described above.
Further, in this case, when the daytime of the next day is sunny, power is generated by the solar power generation device 1, and surplus power exceeding the consumption by the power load device 3 is supplied to the grid power network E based on the control of the control device 23. (Sell electricity).
Furthermore, when the output power in the photovoltaic power generator 1 exceeds the threshold during this reverse power flow, the hot water supply device 31 is operated to store hot water using this surplus power to store hot water in the hot water storage tank 33 (from time t24 to time t25). Of time).

ここで、貯湯タンク33には、既に、必要貯湯量Vnの貯湯は行われているが、通常、最大貯湯量Vfullには余裕を有する。よって、余剰電力を用いて、この余裕の範囲の貯湯を行う。
したがって、太陽光発電装置1は、系統電圧を許容電圧以下に抑える出力電圧上昇抑制作動を行う必要が無く、再生エネルギの有効利用を図ることができる。
Here, although the hot water storage tank 33 has already stored hot water of the required amount of hot water Vn, it usually has a margin for the maximum hot water storage amount Vful. Therefore, the surplus power is used to store hot water within this margin.
Therefore, the solar power generation device 1 does not need to perform an output voltage increase suppression operation that suppresses the system voltage below the allowable voltage, and can effectively use the regenerative energy.

すなわち、従来、太陽光発電装置1では、系統電力網Eへ供給(逆潮流)する電圧が、許容電圧を越える場合には、発電を抑制して出力電圧を低下させる出力電圧上昇抑制運転を行っており、その分、再生エネルギの有効利用が成されなくなる。   That is, conventionally, in the photovoltaic power generation apparatus 1, when the voltage supplied (reverse power flow) to the grid power network E exceeds the allowable voltage, an output voltage increase suppression operation is performed to suppress power generation and reduce the output voltage. Therefore, the effective use of the regenerative energy is not achieved.

本実施の形態1では、このような場合でも、太陽光発電装置1の出力電圧上昇抑制運転を行うことなく、余剰電力を用いて給湯装置31による貯湯を行うことで、再生エネルギを有効利用できる。
なお、余剰電力により貯湯を行って貯湯タンク33の最大貯湯量Vfullまで貯湯を行った場合には、余剰電力を蓄電装置4に充電することも可能であり、さらに、冬場であれば、空調装置34を作動させて蓄熱部34aに蓄熱することも可能である。このように制御することで、再生エネルギの、一層の有効利用が可能となる。
In the present embodiment 1, even in such a case, the regeneration energy can be effectively used by storing hot water by the hot water supply device 31 using surplus power without performing the output voltage increase suppression operation of the solar power generation device 1. .
In addition, when hot water is stored with surplus power and hot water is stored up to the maximum hot water storage amount Vfull of the hot water storage tank 33, it is also possible to charge the power storage device 4 with surplus power, and in winter, an air conditioner It is also possible to store the heat in the heat storage section 34a by operating 34. By controlling in this way, the regenerative energy can be used more effectively.

(出力抑制実施の情報があった時)
電力会社のサーバからインターネット42を介して得られた出力抑制実施情報が、翌日、出力抑制が実施されることを示す場合には、第2貯湯運転モードを選択する(ステップS101→S102→S105の処理の流れに基づく)。
(When there is information on output suppression implementation)
When the output suppression execution information obtained from the server of the electric power company via the Internet 42 indicates that output suppression will be performed the next day, the second hot water storage operation mode is selected (steps S101 → S102 → S105). Based on processing flow).

この第2貯湯運転モードでは、まず、翌日の気象情報に基づいて、翌日に生じる予測余剰電力を求める。なお、この場合、前述したように、複数の気象予測会社の情報に基づいて、複数社に共通する情報を用いることで、気象情報の予測精度を高める。
また、予測余剰電力は、過去のその季節における日照時間および気温と、実際に生じた余剰電力との情報を関連させて記憶したデータに基づいて求める。この場合、本装置が設置された地域の標準的なデータを予め入力しておき、その後、実際に得られた発電電力、電力負荷機器3による使用電力、生じた余剰電力の各データに基づいて、予測される余剰電力を補正するのが好ましい。
In the second hot water storage operation mode, first, the predicted surplus power generated on the next day is obtained based on the weather information on the next day. In this case, as described above, by using information common to a plurality of companies based on information of a plurality of weather prediction companies, the prediction accuracy of the weather information is increased.
The predicted surplus power is obtained based on data stored by associating information on the past sunshine hours and temperatures in the season and the actually generated surplus power. In this case, standard data of the area where the present apparatus is installed is input in advance, and thereafter, based on the actual generated power, the power used by the power load device 3, and the generated surplus power. It is preferable to correct the predicted surplus power.

次に、上述のようにして求めた予測余剰電力により給湯装置31を作動させて得られる貯湯量である予測貯湯量Veを求める。この予測余剰電力による予測貯湯量Veについても、過去の実際の余剰電力と実際の貯湯量との関係を示すデータに基づいて求める。   Next, a predicted hot water storage amount Ve, which is a hot water storage amount obtained by operating the hot water supply device 31 with the predicted surplus power determined as described above, is obtained. The predicted hot water storage amount Ve based on the predicted surplus power is also obtained based on data indicating the relationship between the past actual surplus power and the actual hot water storage amount.

さらに、必要貯湯量Vnに対して予測貯湯量Veでは不足する貯湯量、すなわち、必要貯湯量Vnから予測貯湯量Veを差し引いた値を不足貯湯量Vmとして求める。
そして、以上の各値を求めた後、図3のタイムチャートに示すように、まず、前日あるいは当日の深夜に深夜電力を用いて不足貯湯量Vmの貯湯を行う(t32の時点〜t33の時点)。
Further, a hot water storage amount that is insufficient with the predicted hot water storage amount Ve with respect to the required hot water storage amount Vn, that is, a value obtained by subtracting the predicted hot water storage amount Ve from the required hot water storage amount Vn is obtained as the insufficient hot water storage amount Vm.
And after calculating | requiring each above value, as shown to the time chart of FIG. 3, first, the hot water storage of the insufficient hot water storage amount Vm is performed using the late-night power at the midnight of the previous day or the same day (from time t32 to time t33) ).

次に、翌日の昼間に生じた余剰電力を用いて、給湯装置31を作動させて、必要貯湯量Vnまで貯湯を行う。すなわち、出力抑制により売電できない余剰電力を用いて貯湯を行う(t35の時点〜t36の時点)。したがって、t37の時点以降の使用時間帯には、必要貯湯量Vnの貯湯が成される。   Next, the hot water supply device 31 is operated using the surplus power generated in the daytime of the next day, and hot water is stored up to the necessary hot water storage amount Vn. That is, hot water is stored using surplus power that cannot be sold due to output suppression (from time t35 to time t36). Therefore, the hot water storage of the required hot water storage amount Vn is performed in the use time zone after the time t37.

また、このとき、実際に生じた余剰電力が予想余剰電力を上回った場合には、必要貯湯量Vnを越えて貯湯を行い、太陽光発電装置1における出力抑制作動の実行を極力抑える。
一方、実際に生じた余剰電力が、予想余剰電力を下回った場合には、不足した電力を蓄電装置4あるいは系統電力網Eから補って、必要貯湯量Vnまで貯湯を行う。
このように、出力抑制により、非出力抑制時よりも多く生じる余剰電力を無駄なく貯湯に用いることができる。
At this time, if the surplus power actually generated exceeds the expected surplus power, hot water is stored exceeding the necessary hot water storage amount Vn, and the execution of the output suppression operation in the solar power generation device 1 is suppressed as much as possible.
On the other hand, when the surplus power actually generated falls below the expected surplus power, the shortage power is supplemented from the power storage device 4 or the grid power network E, and hot water is stored up to the required hot water storage amount Vn.
As described above, by suppressing the output, surplus power generated more than when suppressing the non-output can be used for hot water storage without waste.

(出力抑制実施の情報がなく、かつ出力電圧上昇抑制作動が予測される時)
電力会社から出力抑制実施情報が、翌日、出力抑制が実施されないことを示しているが、気象情報に基づく出力電圧が、出力電圧上昇抑制作動を実行する閾値を越える場合には、上記の出力抑制実施情報入力時と同様に、(ステップS101→S102→S103→S105の処理の流れに基づく)。
(When there is no information on how to suppress output and when output voltage increase suppression operation is predicted)
Output suppression execution information from the electric power company indicates that output suppression will not be performed the next day, but if the output voltage based on weather information exceeds the threshold for executing the output voltage increase suppression operation, the above output suppression As in the case of the execution information input (based on the processing flow of steps S101 → S102 → S103 → S105).

よって、この場合も、図3のタイムチャートに示すように、まず、前日あるいは当日の深夜に深夜電力を用いて不足貯湯量Vmの貯湯を行い、翌日の昼間に生じた余剰電力を用いて、給湯装置31を作動させて、必要貯湯量Vnまで貯湯を行う。このときの余剰電力は、出力電圧上昇抑制作動により無駄になる電力に相当する。   Therefore, also in this case, as shown in the time chart of FIG. 3, first, the hot water of the insufficient hot water storage amount Vm is stored using the midnight power at midnight the previous day or the same day, and the surplus power generated in the daytime of the next day is used. The hot water supply device 31 is operated to store hot water up to the required hot water storage amount Vn. The surplus power at this time corresponds to power that is wasted due to the output voltage rise suppression operation.

(実施の形態1の効果)
以上説明したように、本実施の形態1の給湯制御装置では、以下に列挙する効果を得ることができる。
1)実施の形態1の給湯制御装置は、
太陽光により発電する太陽光発電装置1と、
前記太陽光発電装置1と系統電力網Eと建物としての住宅Hとの電力負荷機器3との間の電力供給状態を、情報受信部24からの入力情報に基づいて制御する電力コントロールユニット2と、
前記電力負荷機器3に含まれ、電力を消費して貯湯タンク33に貯湯を行うことが可能な給湯装置31と、
を備え、
前記電力コントロールユニット2は、
前記貯湯タンク33に貯湯を行う貯湯運転モードを、前記入力情報に含まれる予め設定された切替判断情報に基づいて、
前記貯湯タンク33の貯湯の使用時間帯前の深夜電力を用いて前記貯湯タンク33に必要貯湯量Vnを溜めるとともに、前記使用時間帯の前に前記太陽光発電装置1で余剰電力が生じた場合は、この余剰電力を用いて前記貯湯タンク33に前記必要貯湯量Vnを越えて貯湯を行う第1貯湯運転モードと、
前記入力情報に含まれる気象情報に基づいて前記使用時間帯前の前記余剰電力を予測するとともに、求めた予測余剰電力により貯湯可能な予測貯湯量Veをさらに求め、前記必要貯湯量Vnに対して前記予測貯湯量Veでは不足する湯量である不足貯湯量Vmを、前記深夜電力を用いて前記貯湯タンク33に貯湯した後、前記使用時間帯前に実際に生じた実余剰電力を用いて前記給湯装置31を作動させて前記必要貯湯量Vnまで貯湯を行う第2貯湯運転モードと、
に切り替えることを特徴とする。
したがって、第1貯湯運転モードの選択時には、使用時間帯前に、確実に必要貯湯量Vnを確保することができる。
加えて、第1貯湯運転モードでは、使用時間帯前に余剰電力が生じた場合、この余剰電力を用いて必要貯湯量Vnを超えて貯湯を行うため、太陽光発電装置1の出力電圧上昇抑制作動を行うことなく、余剰電力の有効利用が可能である。
一方、第2貯湯運転モードの選択時には、深夜電力により必要貯湯量Vnに対して予測貯湯量Veでは不足する湯量を貯湯し、その後、使用時間帯前に、実際に生じた余剰電力を用いて、必要貯湯量Vnまで貯湯を行う。
したがって、この場合も、使用時間帯には、必要貯湯量Vnを確保することができる。また、余剰電力をより一層有効に利用して、貯湯を行うことができる。
以上のように、本実施の形態1の給湯制御装置では、第1貯湯運転モードと第2貯湯運転モードとを、適宜切り換えることにより、余剰電力の有効利用を図りつつ、貯湯タンクに必要貯湯量Vnを確実に確保可能な給湯制御装置を提供することができる。
(Effect of Embodiment 1)
As described above, the hot water supply control apparatus according to the first embodiment can obtain the effects listed below.
1) The hot water supply control apparatus of the first embodiment is
A solar power generation device 1 that generates power by sunlight;
A power control unit 2 for controlling the power supply state among the photovoltaic power generation apparatus 1, the grid power network E, and the power load equipment 3 of the house H as a building based on input information from the information receiving unit 24;
A hot water supply device 31 included in the power load device 3 and capable of consuming electric power and storing hot water in the hot water storage tank 33;
With
The power control unit 2
A hot water storage operation mode in which hot water is stored in the hot water storage tank 33 is set based on preset switching determination information included in the input information,
When the necessary hot water storage amount Vn is stored in the hot water storage tank 33 using the late-night power before the hot water use time of the hot water storage tank 33 and surplus power is generated in the solar power generation device 1 before the use time zone Is a first hot water storage operation mode in which hot water is stored in the hot water storage tank 33 in excess of the necessary hot water storage amount Vn using the surplus power;
Predicting the surplus power before the use time zone based on weather information included in the input information, further obtaining a predicted hot water storage amount Ve that can be stored by the calculated surplus power, and for the required hot water storage amount Vn After the hot water storage amount Vm, which is the amount of hot water that is insufficient for the predicted hot water storage amount Ve, is stored in the hot water storage tank 33 using the midnight power, the hot water supply is used using the actual surplus power actually generated before the use time period. A second hot water storage operation mode in which the device 31 is operated to store hot water up to the necessary hot water storage amount Vn;
It is characterized by switching to.
Therefore, when the first hot water storage operation mode is selected, the necessary hot water storage amount Vn can be reliably ensured before the use time period.
In addition, in the first hot water storage operation mode, when surplus power is generated before the use time period, the surplus power is used to store hot water exceeding the necessary hot water storage amount Vn. It is possible to effectively use surplus power without performing the operation.
On the other hand, when the second hot water storage operation mode is selected, the amount of hot water that is insufficient in the predicted hot water storage amount Ve with respect to the required hot water storage amount Vn is stored by midnight power, and then the surplus power actually generated is used before the use time period. The hot water is stored up to the necessary hot water storage amount Vn.
Therefore, also in this case, the necessary hot water storage amount Vn can be ensured during the use time period. Moreover, hot water can be stored by using surplus power more effectively.
As described above, in the hot water supply control apparatus according to the first embodiment, the required amount of hot water stored in the hot water storage tank while effectively utilizing surplus power by appropriately switching between the first hot water storage operation mode and the second hot water storage operation mode. It is possible to provide a hot water supply control device capable of reliably securing Vn.

2)実施の形態1の給湯制御装置は、
前記切替判断情報として、前記系統電力網Eにおける前記太陽光発電装置1からの電力供給を制限する出力抑制の実施に関する情報を含み、
前記電力コントロールユニット2は、前記出力抑制を実施するとの情報を得た場合は、前記第2貯湯運転モードを選択し、前記出力抑制を実施する情報を得ない場合は、前記第1貯湯運転モードを選択することを特徴とする。
したがって、出力抑制が実施される場合には、第2貯湯運転モードを選択することで、出力抑制により生じる余剰電力を無駄にすることなく貯湯タンク33に貯湯を行うことができる。
さらに、この第2貯湯運転モードでは、使用時間帯前の深夜電力では、必要貯湯量Vnから予測貯湯量Veを差し引いた不足分しか貯湯しないため、深夜電力による貯湯が過剰になることを抑制できる。
2) The hot water supply control apparatus of the first embodiment is
As the switching determination information, including information related to implementation of output suppression for limiting power supply from the solar power generation device 1 in the grid power network E,
The power control unit 2 selects the second hot water storage operation mode when obtaining the information that the output suppression is performed, and selects the first hot water storage operation mode when the information for performing the output suppression is not obtained. It is characterized by selecting.
Therefore, when output suppression is performed, hot water can be stored in the hot water storage tank 33 without wasting surplus power generated by output suppression by selecting the second hot water storage operation mode.
Further, in the second hot water storage operation mode, the midnight power before the use time zone stores only the shortage of the required hot water storage amount Vn minus the predicted hot water storage amount Ve. .

3)実施の形態1の給湯制御装置は、
前記切替判断情報として、前記気象情報に基づいて前記電力コントロールユニット2が予測した前記太陽光発電装置1の出力電圧に関する情報を含み、
前記電力コントロールユニット2は、前記出力電圧の予測値が予め設定された閾値を越えて出力電圧上昇抑制の実行が予測される場合は前記第2貯湯運転モードを選択し、前記予測値が前記閾値を越えない場合は前記第1貯湯運転モードを選択することを特徴とする。
したがって、系統電力網E側に逆潮流を行っている場合に、系統電力網Eの許容範囲である閾値を超える電圧を出力するのを制限するために出力電圧上昇抑制作動を実行すると予測される場合には、第2貯湯運転モードを選択する。これにより、出力電圧上昇抑制作動を実行する前に、余剰電力を用いて貯湯を行って必要貯湯量Vnまで貯湯を行うことができる。よって、余剰電力の、より一層の有効活用が可能となる。
加えて、上記2)でも述べたように、第2貯湯運転モードでは、使用時間帯前の深夜電力では、必要貯湯量Vnから予測貯湯量Veを差し引いた不足分しか貯湯しないため、深夜電力による貯湯が過剰になることを抑制できる。
3) The hot water supply control apparatus of Embodiment 1
As the switching determination information, including information on the output voltage of the solar power generation device 1 predicted by the power control unit 2 based on the weather information,
The power control unit 2 selects the second hot water storage operation mode when the predicted output voltage value exceeds a preset threshold value and execution of output voltage increase suppression is predicted, and the predicted value is the threshold value. If not exceeding, the first hot water storage operation mode is selected.
Therefore, when the reverse power flow is performed on the grid power network E side, when it is predicted that the output voltage increase suppression operation is performed in order to limit the output of the voltage exceeding the threshold that is the allowable range of the grid power network E. Selects the second hot water storage operation mode. Thereby, before performing output voltage rise suppression operation | movement, hot water can be stored using surplus electric power and hot water can be stored to the required hot water storage amount Vn. Therefore, the surplus power can be used more effectively.
In addition, as described in 2) above, in the second hot water storage operation mode, in the midnight power before the usage time zone, only a shortage of hot water stored by subtracting the predicted hot water storage amount Ve from the required hot water storage amount Vn is stored. Excessive hot water storage can be suppressed.

4)実施の形態1の給湯制御装置は、
前記電力コントロールユニット2は、前記出力抑制を実施するとの情報を得た場合は、前記第2貯湯運転モードを選択し、前記出力抑制を実施するとの情報を得ない場合は、さらに、出力電圧上昇抑制の実行が予測されるか否かを判定し、出力電圧上昇抑制の実行が予測される場合は前記第2貯湯運転モードを選択し、前記予測値が前記閾値を越えない場合は前記第1貯湯運転モードを選択することを特徴とする。
したがって、上記2)のように、出力抑制が実施される場合に、余剰電力を用いて貯湯を行うことにより余剰電力を無駄なく利用して貯湯を行うことができるとともに、出力抑制が実行されない場合であっても、太陽光発電装置1の出力電圧が系統電圧の許容値を超える電圧上昇が予測される場合には、余剰電力を用いて貯湯を行うことにより、余剰電力を無駄なく利用して貯湯を行うことができる。
加えて、上記2)3)で述べたように、第2貯湯運転モードでは、使用時間帯前の深夜電力では、必要貯湯量Vnから予測貯湯量Veを差し引いた不足分しか貯湯しないため、深夜電力による貯湯が過剰になることを抑制できる。
4) The hot water supply control apparatus of Embodiment 1
The power control unit 2 selects the second hot water storage operation mode when obtaining the information that the output suppression is performed, and further increases the output voltage when the information that the output suppression is performed is not obtained. It is determined whether or not execution of suppression is predicted, and when execution of output voltage increase suppression is predicted, the second hot water storage operation mode is selected, and when the predicted value does not exceed the threshold, the first The hot water storage operation mode is selected.
Therefore, when output suppression is carried out as in 2) above, hot water can be stored without waste by storing hot water using surplus power, and output suppression is not performed. Even so, in the case where an increase in the output voltage of the photovoltaic power generation apparatus 1 exceeding the allowable value of the system voltage is predicted, hot water is stored using surplus power, so that surplus power can be used without waste. Hot water can be stored.
In addition, as described in 2) and 3) above, in the second hot water storage operation mode, the midnight power before the use time zone stores only the shortage of the required hot water volume Vn minus the predicted hot water volume Ve. It can suppress that the hot water storage by electric power becomes excessive.

5)実施の形態1の給湯制御装置は、
前記切替判断情報として、前記太陽光発電装置1と、前記入力情報を含む前記情報受信部24側との少なくともいずれかの故障に関する情報を含み、
前記電力コントロールユニット2は、前記故障の発生時は前記第1貯湯運転モードを選択し、前記故障の非発生時は前記第2貯湯運転モードを選択することを特徴とする。
太陽光発電装置1に何らかの故障が生じたり、情報受信部24に正確な情報が入力されない故障が生じたりした場合には、余剰電力による貯湯量の正確な予測を行うことができない。
したがって、このような故障発生時には、第1貯湯運転モードを選択し、前もって深夜電力を用いて必要貯湯量Vnまで貯湯を行うことにより、使用時間帯に、貯湯量の不足が生じることが無い。
5) The hot water supply control apparatus of Embodiment 1
As the switching determination information, including information related to at least one of the failure of the photovoltaic power generation device 1 and the information receiving unit 24 side including the input information,
The power control unit 2 selects the first hot water storage operation mode when the failure occurs, and selects the second hot water storage operation mode when the failure does not occur.
When some sort of failure occurs in the solar power generation device 1 or a failure occurs in which accurate information is not input to the information receiving unit 24, it is not possible to accurately predict the amount of hot water stored by surplus power.
Therefore, when such a failure occurs, the first hot water storage operation mode is selected, and hot water is stored up to the required hot water storage amount Vn using midnight power in advance, so that there is no shortage of hot water storage during the usage time.

6)実施の形態1の給湯制御装置は、
電力コントロールユニット2は、第2貯湯運転モードでは、複数(社)の気象予測情報において共通する情報に基づいて、翌日に生じる予測余剰電力を求め、この予測余剰電力により貯湯可能な余剰電力予測貯湯量を求めることを特徴とする。
したがって、1つの気象予測情報に基づいて、翌日に生じる予測余剰電力ならびに余剰電力予測貯湯量を求める場合と比較して、その予測精度を高め、無駄な電力の消費ならびに無駄な貯湯量が生じるのを抑えることができる。
6) The hot water supply control apparatus of Embodiment 1
In the second hot water storage operation mode, the power control unit 2 obtains a predicted surplus power generated on the next day based on information common to a plurality of (company) weather forecast information, and a surplus power predicted hot water that can be stored by this predicted surplus power. It is characterized by determining the quantity.
Therefore, compared with the case of obtaining the predicted surplus power and surplus power predicted hot water amount generated the next day based on one weather forecast information, the prediction accuracy is improved, and wasteful power consumption and wasteful hot water storage amount are generated. Can be suppressed.

以上、本発明の給湯制御装置を実施の形態に基づき説明してきたが、具体的な構成については、この実施の形態に限られるものではなく、特許請求の範囲の各請求項に係る発明の要旨を逸脱しない限り、設計の変更や追加等は許容される。   As mentioned above, although the hot-water supply control apparatus of this invention has been demonstrated based on embodiment, about a concrete structure, it is not restricted to this embodiment, The summary of the invention which concerns on each claim of a claim As long as they do not deviate, design changes and additions are permitted.

例えば、実施の形態では、太陽光発電装置、給湯装置、電力負荷機器を設置する建物として、一戸建の住宅を図示したが、この建物は、一戸建の住宅に限定されず、集合住宅や、公共・私用の建物など他の建物に設けてもよい。
また、実施の形態では、使用時間帯を夕方以降としたが、使用時間帯はこれに限定されるものではなく、使用者の使用形態に応じて任意に設定できる。
また、実施の形態1では、第1運転モードにおいて、余剰電力が生じた場合、まず、系統電力網へ売電を行い、さらに出力電圧が閾値を越えると、余剰電力により貯湯を行うようにした例を示したが、その順番は、これに限定されない。例えば、第1運転モードにおいて余剰電力が生じた場合、まず、余剰電力を用いて最大貯湯量まで貯湯した後、系統電力網へ売電するようにしてもよい。
For example, in the embodiment, a single-family house is illustrated as a building for installing a solar power generation device, a hot water supply device, and a power load device, but this building is not limited to a single-family house, It may be installed in other buildings such as public and private buildings.
Further, in the embodiment, the usage time zone is set to the evening or later, but the usage time zone is not limited to this, and can be arbitrarily set according to the usage mode of the user.
In the first embodiment, when surplus power is generated in the first operation mode, power is first sold to the grid power network, and when the output voltage exceeds a threshold value, hot water is stored using the surplus power. However, the order is not limited to this. For example, when surplus power is generated in the first operation mode, first, hot water may be stored up to the maximum amount of hot water using surplus power and then sold to the grid power network.

1 太陽光発電装置
2 電力コントロールユニット
3 電力負荷機器
4 蓄電装置
24 情報受信部
31 給湯装置
33 貯湯タンク
A 給湯制御装置
E 系統電力網
H 住宅
Ve 予測貯湯量
Vm 不足貯湯量
Vn 必要貯湯量
DESCRIPTION OF SYMBOLS 1 Photovoltaic power generation device 2 Electric power control unit 3 Electric power load apparatus 4 Power storage device 24 Information receiving part 31 Hot water supply device 33 Hot water storage tank A Hot water supply control device E System electric power network H Residential Ve Expected hot water storage amount Vm Insufficient hot water storage amount Vn Necessary hot water storage amount

Claims (3)

太陽光により発電する太陽光発電装置と、
前記太陽光発電装置と系統電力網と建物の電力負荷機器との間の電力供給状態を、情報受信部からの入力情報に基づいて制御する電力コントロールユニットと、
前記電力負荷機器に含まれ、電力を消費して貯湯タンクに貯湯を行うことが可能な給湯装置と、
を備え、
前記電力コントロールユニットは、
前記貯湯タンクに貯湯を行う貯湯運転モードを、前記入力情報に含まれる予め設定された切替判断情報に基づいて、
前記貯湯タンクの貯湯の使用時間帯の前の深夜電力を用いて前記貯湯タンクに予め設定された必要貯湯量を溜めるとともに、前記使用時間帯の前に余剰電力が生じた場合は、この余剰電力を用いて前記貯湯タンクに前記必要貯湯量を越えて貯湯を行う第1貯湯運転モードと、
前記入力情報に含まれる気象情報に基づいて前記使用時間帯の前の前記余剰電力を予測するとともに、求めた予測余剰電力により貯湯可能な予測貯湯量をさらに求め、前記必要貯湯量に対して前記予測貯湯量では不足する湯量を、前記深夜電力を用いて前記貯湯タンクに貯湯した後、前記使用時間帯の前に実際に生じた余剰電力を用いて前記給湯装置を作動させて前記必要貯湯量まで貯湯を行う第2貯湯運転モードと、
に切り替え、
さらに、前記切替判断情報として、前記系統電力網における前記太陽光発電装置からの電力供給を制限する出力抑制の実施に関する情報を含み、
記出力抑制を実施するとの情報を得た場合は、前記第2貯湯運転モードを選択し、前記出力抑制を実施する情報を得ない場合は、前記第1貯湯運転モードを選択することを特徴とする給湯制御装置。
A solar power generation device that generates power by sunlight;
A power control unit for controlling a power supply state between the photovoltaic power generation apparatus, the grid power network, and a power load device of the building based on input information from an information receiving unit;
A hot water supply device that is included in the power load device and that can store hot water in a hot water storage tank by consuming electric power;
With
The power control unit is
A hot water storage operation mode for storing hot water in the hot water storage tank is based on preset switching determination information included in the input information,
When the necessary amount of hot water stored in the hot water storage tank is stored in the hot water storage tank in advance using the midnight power before the hot water storage time of the hot water storage tank, and the surplus power is generated before the use time of the hot water storage tank, A first hot water storage operation mode in which hot water is stored in the hot water storage tank beyond the required amount of hot water using
Predicting the surplus power before the use time zone based on the weather information included in the input information, further obtaining a predicted hot water storage amount that can be stored by the calculated predicted surplus power, for the required hot water storage amount After storing hot water in the hot water storage tank using the late-night power, the amount of hot water that is insufficient in the predicted hot water storage amount, and operating the hot water supply device using surplus power actually generated before the use time period, the required hot water storage amount A second hot water storage operation mode for storing hot water until
Switch to
In addition, as the switching determination information, including information on the implementation of output suppression to limit the power supply from the solar power generation device in the grid power network,
If obtaining the information and carrying out the pre-SL output suppression, the second select hot water storage operation mode, if not get the information for implementing the output suppression, characterized by selecting a first hot water storage operation mode A hot water supply control device.
太陽光により発電する太陽光発電装置と、
前記太陽光発電装置と系統電力網と建物の電力負荷機器との間の電力供給状態を、情報受信部からの入力情報に基づいて制御する電力コントロールユニットと、
前記電力負荷機器に含まれ、電力を消費して貯湯タンクに貯湯を行うことが可能な給湯装置と、
を備え、
前記電力コントロールユニットは、
前記貯湯タンクに貯湯を行う貯湯運転モードを、前記入力情報に含まれる予め設定された切替判断情報に基づいて、
前記貯湯タンクの貯湯の使用時間帯の前の深夜電力を用いて前記貯湯タンクに予め設定された必要貯湯量を溜めるとともに、前記使用時間帯の前に余剰電力が生じた場合は、この余剰電力を用いて前記貯湯タンクに前記必要貯湯量を越えて貯湯を行う第1貯湯運転モードと、
前記入力情報に含まれる気象情報に基づいて前記使用時間帯の前の前記余剰電力を予測するとともに、求めた予測余剰電力により貯湯可能な予測貯湯量をさらに求め、前記必要貯湯量に対して前記予測貯湯量では不足する湯量を、前記深夜電力を用いて前記貯湯タンクに貯湯した後、前記使用時間帯の前に実際に生じた余剰電力を用いて前記給湯装置を作動させて前記必要貯湯量まで貯湯を行う第2貯湯運転モードと、
に切り替え、
さらに、前記切替判断情報として、前記気象情報に基づいて前記電力コントロールユニットが予測した前記太陽光発電装置の出力電圧に関する情報を含み、
記出力電圧の予測値が予め設定された閾値を越える場合は前記第2貯湯運転モードを選択し、前記予測値が前記閾値を越えない場合は前記第1貯湯運転モードを選択することを特徴とする給湯制御装置。
A solar power generation device that generates power by sunlight;
A power control unit for controlling a power supply state between the photovoltaic power generation apparatus, the grid power network, and a power load device of the building based on input information from an information receiving unit;
A hot water supply device that is included in the power load device and that can store hot water in a hot water storage tank by consuming electric power;
With
The power control unit is
A hot water storage operation mode for storing hot water in the hot water storage tank is based on preset switching determination information included in the input information,
When the necessary amount of hot water stored in the hot water storage tank is stored in the hot water storage tank in advance using the midnight power before the hot water storage time of the hot water storage tank, and the surplus power is generated before the use time of the hot water storage tank, A first hot water storage operation mode in which hot water is stored in the hot water storage tank beyond the required amount of hot water using
Predicting the surplus power before the use time zone based on the weather information included in the input information, further obtaining a predicted hot water storage amount that can be stored by the calculated predicted surplus power, for the required hot water storage amount After storing hot water in the hot water storage tank using the late-night power, the amount of hot water that is insufficient in the predicted hot water storage amount, and operating the hot water supply device using surplus power actually generated before the use time period, the required hot water storage amount A second hot water storage operation mode for storing hot water until
Switch to
Furthermore, as the switching determination information, including information on the output voltage of the photovoltaic power generation apparatus predicted by the power control unit based on the weather information,
If the predicted value before Symbol output voltage exceeds a preset threshold value and selecting the second hot water storage operation mode, if the predicted value does not exceed the threshold value, wherein selecting said first hot water storage operation mode A hot water supply control device.
太陽光により発電する太陽光発電装置と、
前記太陽光発電装置と系統電力網と建物の電力負荷機器との間の電力供給状態を、情報受信部からの入力情報に基づいて制御する電力コントロールユニットと、
前記電力負荷機器に含まれ、電力を消費して貯湯タンクに貯湯を行うことが可能な給湯装置と、
を備え、
前記電力コントロールユニットは、
前記貯湯タンクに貯湯を行う貯湯運転モードを、前記入力情報に含まれる予め設定された切替判断情報に基づいて、
前記貯湯タンクの貯湯の使用時間帯の前の深夜電力を用いて前記貯湯タンクに予め設定された必要貯湯量を溜めるとともに、前記使用時間帯の前に余剰電力が生じた場合は、この余剰電力を用いて前記貯湯タンクに前記必要貯湯量を越えて貯湯を行う第1貯湯運転モードと、
前記入力情報に含まれる気象情報に基づいて前記使用時間帯の前の前記余剰電力を予測するとともに、求めた予測余剰電力により貯湯可能な予測貯湯量をさらに求め、前記必要貯湯量に対して前記予測貯湯量では不足する湯量を、前記深夜電力を用いて前記貯湯タンクに貯湯した後、前記使用時間帯の前に実際に生じた余剰電力を用いて前記給湯装置を作動させて前記必要貯湯量まで貯湯を行う第2貯湯運転モードと、
に切り替え、
さらに、前記切替判断情報として、前記太陽光発電装置と、前記入力情報を含む前記情報受信部側との少なくともいずれかの故障に関する情報を含み、
記故障の発生時は前記第1貯湯運転モードを選択し、前記故障の非発生時は前記第2貯湯運転モードを選択することを特徴とする給湯制御装置。
A solar power generation device that generates power by sunlight;
A power control unit for controlling a power supply state between the photovoltaic power generation apparatus, the grid power network, and a power load device of the building based on input information from an information receiving unit;
A hot water supply device that is included in the power load device and that can store hot water in a hot water storage tank by consuming electric power;
With
The power control unit is
A hot water storage operation mode for storing hot water in the hot water storage tank is based on preset switching determination information included in the input information,
When the necessary amount of hot water stored in the hot water storage tank is stored in the hot water storage tank in advance using the midnight power before the hot water storage time of the hot water storage tank, and the surplus power is generated before the use time of the hot water storage tank, A first hot water storage operation mode in which hot water is stored in the hot water storage tank beyond the required amount of hot water using
Predicting the surplus power before the use time zone based on the weather information included in the input information, further obtaining a predicted hot water storage amount that can be stored by the calculated predicted surplus power, for the required hot water storage amount After storing hot water in the hot water storage tank using the late-night power, the amount of hot water that is insufficient in the predicted hot water storage amount, and operating the hot water supply device using surplus power actually generated before the use time period, the required hot water storage amount A second hot water storage operation mode for storing hot water until
Switch to
Furthermore, as the switching determination information, including information on at least one of the failure of the photovoltaic power generation apparatus and the information receiving unit side including the input information,
Before Symbol the event of failure to select the first hot water storage operation mode, when the non-occurrence of the failure hot water supply control apparatus characterized by selecting said second hot water storage operation mode.
JP2015030015A 2015-02-18 2015-02-18 Hot water controller Active JP6491494B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2015030015A JP6491494B2 (en) 2015-02-18 2015-02-18 Hot water controller

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2015030015A JP6491494B2 (en) 2015-02-18 2015-02-18 Hot water controller

Publications (2)

Publication Number Publication Date
JP2016151396A JP2016151396A (en) 2016-08-22
JP6491494B2 true JP6491494B2 (en) 2019-03-27

Family

ID=56696369

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2015030015A Active JP6491494B2 (en) 2015-02-18 2015-02-18 Hot water controller

Country Status (1)

Country Link
JP (1) JP6491494B2 (en)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6964732B2 (en) * 2017-03-27 2021-11-10 株式会社コロナ Photovoltaic power generation equipment cooperation hot water storage type hot water supply system and solar power generation equipment cooperation hot water storage type hot water supply equipment
JP6759138B2 (en) * 2017-03-27 2020-09-23 株式会社コロナ Photovoltaic power generation equipment cooperation hot water storage type hot water supply device and solar power generation equipment cooperation hot water storage type hot water supply system
JP6897331B2 (en) * 2017-05-31 2021-06-30 三菱電機株式会社 Hot water storage type water heater
JP7013812B2 (en) * 2017-11-20 2022-02-01 三菱電機株式会社 Hot water storage type hot water supply device
JP6963749B2 (en) * 2017-11-27 2021-11-10 株式会社ノーリツ Hot water storage system
JP6928164B2 (en) * 2018-02-26 2021-09-01 三菱電機株式会社 Hot water supply system, cloud server, boiling schedule creation method and program
JP7116907B2 (en) * 2018-03-26 2022-08-12 株式会社ノーリツ hot water storage system
JP7540879B2 (en) * 2019-04-10 2024-08-27 シャープ株式会社 Control device, control method, and power control system
CN111968010B (en) * 2020-08-15 2022-07-29 中国建筑第五工程局有限公司 Control method and system of pressurized water supply equipment and storage medium
WO2022118382A1 (en) * 2020-12-02 2022-06-09 株式会社日立製作所 Drainage treatment system and drainage treatment method

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006158027A (en) * 2004-11-26 2006-06-15 Hanshin Electric Co Ltd Domestic power system
JP2008002702A (en) * 2006-06-20 2008-01-10 Matsushita Electric Ind Co Ltd Hot water storage type water heater, hot water supply method and program
JP5681448B2 (en) * 2010-10-29 2015-03-11 株式会社東芝 Home energy management system
JP5838825B2 (en) * 2012-01-20 2016-01-06 三菱電機株式会社 Hot water storage hot water supply system
JP5891944B2 (en) * 2012-05-23 2016-03-23 三菱電機株式会社 Electric water heater

Also Published As

Publication number Publication date
JP2016151396A (en) 2016-08-22

Similar Documents

Publication Publication Date Title
JP6491494B2 (en) Hot water controller
US9002531B2 (en) System and method for predictive peak load management via integrated load management
JP5789792B2 (en) Supply and demand control device, supply and demand control method, and supply and demand control system
US9557068B2 (en) Heat pump hot-water supply system
JP6554923B2 (en) Power control method and power control system
JP5925554B2 (en) Control device, control system, and control method
JP6192531B2 (en) Power management system, power management apparatus, power management method, and program
JP2009284586A (en) Power system and its control method
JP5653487B2 (en) Energy management system and program
EP3193421A1 (en) Device operation plan creation device, device operation plan creation method, and storage medium storing device operation plan creation program
JP5709910B2 (en) Control apparatus and method, program, and natural energy power generation apparatus including the same
EP2667477B1 (en) Distributed Power Generation System and Method of Controlling Distribution Power Generation System
JP5413390B2 (en) Charge control device, charge control method, and photovoltaic power generation system
JP6232158B2 (en) Demand power prediction apparatus, power demand prediction method and program
JP2005012906A (en) Method and device for controlling output of cogeneration system
JP5853144B2 (en) Power supply control device and power supply system including the same
JP7349840B2 (en) power supply system
JP7146938B2 (en) Energy management systems, independent systems, and methods of operating independent systems
JP6280741B2 (en) Power supply system
JP2023081779A (en) Electric power management system and electric power management method
JP6105476B2 (en) Power generation system, control device, and power control method
JP2020048323A (en) system
JP2018074814A (en) Energy management device, control method therefor and thermoelectric supply system

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20171006

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20180613

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20180710

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20180829

RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20180829

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20190205

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20190301

R151 Written notification of patent or utility model registration

Ref document number: 6491494

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R151