JP6439209B2 - Shell mounting method to pin and shell mounting device to pin - Google Patents

Shell mounting method to pin and shell mounting device to pin Download PDF

Info

Publication number
JP6439209B2
JP6439209B2 JP2014164812A JP2014164812A JP6439209B2 JP 6439209 B2 JP6439209 B2 JP 6439209B2 JP 2014164812 A JP2014164812 A JP 2014164812A JP 2014164812 A JP2014164812 A JP 2014164812A JP 6439209 B2 JP6439209 B2 JP 6439209B2
Authority
JP
Japan
Prior art keywords
pin
shell
shells
guide
pins
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2014164812A
Other languages
Japanese (ja)
Other versions
JP2016039793A (en
Inventor
杉山 弘昭
弘昭 杉山
幸克 豊沢
幸克 豊沢
Original Assignee
株式会社むつ家電特機
精研工業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社むつ家電特機, 精研工業株式会社 filed Critical 株式会社むつ家電特機
Priority to JP2014164812A priority Critical patent/JP6439209B2/en
Publication of JP2016039793A publication Critical patent/JP2016039793A/en
Application granted granted Critical
Publication of JP6439209B2 publication Critical patent/JP6439209B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A40/00Adaptation technologies in agriculture, forestry, livestock or agroalimentary production
    • Y02A40/80Adaptation technologies in agriculture, forestry, livestock or agroalimentary production in fisheries management
    • Y02A40/81Aquaculture, e.g. of fish

Description

本発明は、ホタテ貝や牡蠣などの各種貝類(以下、単に「貝」という。)を縦ロープに差し込まれている貝係止具(以下、「ピン」という)に取り付ける方法及びその装置に関する。   The present invention relates to a method and apparatus for attaching various shells such as scallops and oysters (hereinafter simply referred to as “shells”) to a shell locking tool (hereinafter referred to as “pin”) inserted into a vertical rope.

貝の養殖方法として耳吊り養殖が知られている。耳吊り養殖の一例として、ホタテ貝を養殖する場合の例を図12(a)〜(c)に示す。ホタテ貝の耳吊り養殖は図12(a)に示すように、縦ロープAに差込んで貫通させた樹脂製のピンBの両端を、ホタテ貝Cの耳にあけた穴に差込んでホタテ貝Cを縦ロープAに係止し(取付け)、この貝付きの縦ロープAを海中に吊下げて養殖する方法である。貝付きの縦ロープAは、両端にブイDが取付けられた横ロープEに多数本取付けられて海中に吊り下げられる。   Ear-hanging culture is known as a shellfish culture method. As an example of the ear-hanging culture, an example in the case of cultivating scallops is shown in FIGS. As shown in FIG. 12 (a), the scallops are scalloped by inserting both ends of the resin pin B inserted into the vertical rope A into the holes formed in the ears of the scallop C. In this method, the shell C is locked (attached) to the vertical rope A, and the vertical rope A with the shell is suspended in the sea and cultured. A large number of vertical ropes A with shells are attached to a horizontal rope E with buoys D attached to both ends and suspended in the sea.

従来、貝への穴あけ作業は、本件発明者が先に開発したモータ式の穴あけ機(特許文献1)を使用して自動的に行われ、縦ロープへのピンの貫通作業(差込み作業)は、本件発明者が先に開発したピンセッター(非特許文献1)を用いて自動的に行なわれていた。前記ピンセッターで縦ロープに貫通させたピンを貝の穴に差込む作業(貝取付け作業)は、自動機がないため、従業員が一個ずつ手作業で行っていた。また、前記穴あけ作業、貫通作業、貝取付け作業は別々に行われていた。   Conventionally, the drilling operation to the shell is automatically performed by using the motor type drilling machine (Patent Document 1) previously developed by the present inventors, and the pin penetration operation (insertion operation) to the vertical rope is performed. The inventor of the present invention has automatically performed using a pin setter (Non-Patent Document 1) previously developed. Since there is no automatic machine for inserting the pins penetrated by the vertical rope by the pin setter into the holes of the shells (shell attachment work), the employees manually performed one by one. Moreover, the said drilling operation | work, the penetration operation | work, and the shell attachment operation | work were performed separately.

特開2008−154405号公報JP 2008-154405 A

「株式会社むつ家電特機ホームページ 製品紹介『ピンセッター』(http://www.mutsukaden.com/?page_id=477)」“Mutsu Home Appliances Co., Ltd. Homepage Product Introduction“ Pinsetter ”(http://www.mutsukaden.com/?page_id=477)”

ピンを差込む貝の数は、作業者一人当たり、一日、数千個にのぼるため、この差込み作業は大変な重労働であった。   Since the number of shells into which the pins are inserted amounts to thousands per day per worker, this insertion work was very hard work.

本発明の解決課題は、従来、個別に行われていた貝への穴あけ作業、縦ロープへのピンの差込み作業、縦ロープに差し込まれたピンを貝の穴に差込む貝取付け作業を、一連に自動的に行うことができ、特に、二個の貝への同時穴あけ、二個の貝へのピンの同時差込みができるようにすることにある。   The problems to be solved by the present invention include a series of drilling operations for shells that have been conventionally performed, inserting pins into vertical ropes, and attaching shells into a shell hole by inserting pins inserted into vertical ropes. In particular, it is to enable simultaneous drilling of two shells and simultaneous insertion of pins into two shells.

[貝取付け方法]
本発明の貝取付け方法は、縦ロープに差し込まれているピンに貝を取付ける貝取付け方法において、二つの貝の耳に同時又は略同時(以下、単に「同時」という。)に穴をあける穴あけ工程と、縦ロープにピンを所定間隔で差込むピン差込み工程と、その縦ロープをピン間隔ごとに間欠送りするロープ送り工程と、送られた縦ロープのピンを保持するピン保持工程と、保持されたピンの外側に前記二つの貝を配置し、夫々の貝の外側に二本のガイドを配置して、それらピンと二つの貝の穴と二本のガイドを一直線上に並べる並べ工程と、一直線上に並べた二つの貝の夫々の穴に前記ガイドを貫通させるガイド貫通工程と、前記夫々の貝の穴を貫通して穴から突出した二本のガイドの先端部を前記ピンの先端部に一列に連結する連結工程と、前記二つの貝を夫々のガイドに沿ってピンのアゲの内側までスライドさせて、二つの貝を夫々のガイドからピンに移し替える貝移し替え工程と、二本のガイドをピンから引き抜くガイド引き抜き工程を備えた方法である。
[How to install shellfish]
The shell attachment method of the present invention is a shell attachment method in which a shell is attached to a pin inserted into a vertical rope, and a hole is formed in the ears of two shells simultaneously or substantially simultaneously (hereinafter simply referred to as “simultaneously”). A step, a pin insertion step for inserting pins into the vertical rope at predetermined intervals, a rope feeding step for intermittently feeding the vertical rope at every pin interval, a pin holding step for holding the pins of the sent vertical rope, and holding Arranging the two shells on the outside of the pin, arranging two guides on the outside of each shell, and arranging the pins, the holes of the two shells, and the two guides in a straight line; A guide penetrating step of passing the guide through the holes of two shells arranged in a straight line, and the tip portions of the two guides penetrating the holes of the shells and projecting from the holes; And connecting process to connect in a row Slide the two shells along the respective guides to the inside of the pin age, the shell transfer process to transfer the two shells from the respective guide to the pin, and the guide pulling process to pull the two guides from the pin It is a prepared method.

前記ピンへの貝取付け方法は、穴あけステーションで貝に穴をあけ、その貝を整列ステーションに移動し、縦ロープへのピンの差込みをピンセッターで行い、その縦ロープをピン間隔ごとにピン保持部に間欠送りし、その縦ロープのピンを保持し、保持されたピンの両外側に貝を配置し、それら二つの貝の外側にガイドを配置し、前記二つの貝の穴に前記ガイドを差込み、その二本のガイドと前記ピンを一列に並べ、前記二本のガイドの先端部を前記ピンの先端部に連結して二本のガイドをピンに一直線に連結し、移し替えステーションにおいて前記二つの貝を夫々のガイドに沿ってピンのアゲの内側までスライドさせて、二つの貝を夫々のガイドからピンに移し替えて当該ピンに貝を取付け、その貝の移し替え後に前記二本のガイドをピンから引き離し、その後に、前記縦ロープをピン間隔分送り出して貝取り付け済みの縦ロープを移し替えステーションから送り出すと共に当該縦ロープの次のピンをピン保持部に送り込むようにすることもできる。   The shell is attached to the pin by making a hole in the shell at the drilling station, moving the shell to the alignment station, inserting the pin into the vertical rope with a pin setter, and holding the vertical rope at every pin interval. Intermittently feed the part, hold the pin of the vertical rope, place shells on both sides of the held pin, place guides on the outside of the two shells, and place the guides in the holes of the two shells Insert the two guides and the pins in a row, connect the tip of the two guides to the tip of the pin, connect the two guides to the pin in a straight line, and at the transfer station, Slide the two shells along the respective guides to the inside of the pin age, transfer the two shells from the respective guides to the pins, attach the shells to the pins, and after transferring the shells, Pin the guide Distancing al, thereafter, it may be so fed the vertical rope in the pin holding portion for the next pin of the vertical rope with turned out pin spacing fraction feeding the shellfish already installed vertical rope from sorting station.

[貝取付け装置]
本発明の貝取付け装置は、縦ロープに差し込まれているピンに貝を取付ける装置において、二枚の貝に穴をあける穴あけ部と、縦ロープにピンを所定間隔で差込むピン差込み部と、前記縦ロープをピン間隔で間欠送りするロープ送り部と、送り出された縦ロープのピンを保持するピン保持部と、保持されピンの両外側に一列に配置された二枚の貝の穴にガイドを差込むガイド差込み部と、そのガイドの先端部を前記保持されたピンの両端に一列に連結する連結部と、連結された二本のガイドの夫々に沿って二枚の貝をピンのアゲの内側までスライドさせて、二枚の貝をピンに移し替える移し替え部を備えたものでる。
[Shell attachment device]
The shell mounting device of the present invention is a device for attaching a shell to a pin inserted in a vertical rope, a drilling portion for making a hole in two shells, a pin insertion portion for inserting a pin into the vertical rope at a predetermined interval, Guide the rope feed section that intermittently feeds the vertical rope at pin intervals, the pin holding section that holds the pin of the sent vertical rope, and the holes of the two shells that are held and arranged in a row on both outer sides of the pin A guide insertion portion for inserting a guide, a connection portion for connecting the tip end portion of the guide to the both ends of the held pin in a row, and two shells along each of the two connected guides. It is equipped with a transfer part that slides to the inside and transfers two shells to pins.

前記貝取付け装置は、貝投入ステーションと、貝整列ステーションと、穴あけステーションと、移し替えステーションを備え、それらステーションごとに間欠回転可能な回転体の回転方向数カ所に二つ一組のホルダが装備され、前記貝投入ステーションにおいて、ホルダに貝を投入することができ、前記貝整列ステーションにおいて、ホルダ内の貝の穴あけ箇所を所定位置に整列させることができ、前記穴あけステーションにおいて先に整列された貝に穴あけドリルで穴をあけることができ、前記移し替えステーションにおいて、先に縦ロープのピンの両外側に配置された二枚の貝の穴にガイドを差込んで貫通させることができ、その穴から突出したガイドの先端部を前記ピンの先端部に連結して二本のガイドとピンを一列に揃え、二枚の貝を夫々のガイドに沿ってピンのアゲの内側までスライドさせてガイドからピンに移し替えてピンに取り付けることができるものとしてもよい。   The shell mounting device includes a shell feeding station, a shell aligning station, a drilling station, and a transfer station, and two sets of holders are provided at several locations in the rotational direction of the rotating body that can rotate intermittently for each station. In the shell feeding station, the shell can be put into the holder, and in the shell aligning station, the drilling positions of the shells in the holder can be aligned at predetermined positions, and the shells previously aligned in the drilling station A hole can be drilled with a drill, and in the transfer station, a guide can be inserted into the holes of the two shells previously placed on both outer sides of the pins of the vertical rope and penetrated. The tip of the guide protruding from the pin is connected to the tip of the pin, and the two guides and the pin are aligned in a row. Along the respective guides to the inside of the Agay pins may be what can be attached to the pin transferred to the pin from the slide in the guide.

[貝移し替え方法]
本発明の貝移し替え方法は、ピンの外側に二つの貝を配置してそのピンと二つの貝の穴を一列に揃え、二つの貝の外側に二本のガイドを配置してそのガイドを貝の穴に貫通させ、その穴から突出するガイドの先端部を前記ピンの先端部に連結し、その貝を前記ガイドに沿ってピンのアゲの内側までスライドさせてガイドからピンに移し替える方法である。
[Shell transfer method]
In the shell transfer method of the present invention, two shells are arranged on the outside of the pin, the holes of the pin and the two shells are aligned in a line, two guides are arranged on the outside of the two shells, and the guide is attached to the shell. The tip of the guide protruding from the hole is connected to the tip of the pin, and the shell is slid along the guide to the inside of the pin eye and transferred from the guide to the pin. is there.

本発明には次の効果がある。
(1)一本のピンの両端に二枚の貝を同時に取り付けることができる。
(2)穴あけ作業と、縦ロープへのピンの差込み作業と、そのピンへの貝取付け作業を一連に行うことができるので、作業効率が良い。
The present invention has the following effects.
(1) Two shells can be attached to both ends of one pin at the same time.
(2) Since the drilling operation, the pin insertion operation to the vertical rope, and the shell attachment operation to the pin can be performed in series, the work efficiency is good.

本発明の貝取付け装置の一例を全体の概要側面図。The whole outline side view of an example of the shell attachment device of the present invention. (a)は本発明の貝取付け装置における回転体付近の平面図、(b)は同回転体付近の斜視図、(c)は穴あけドリルの説明図。(A) is a top view of the rotating body vicinity in the shell attachment apparatus of this invention, (b) is a perspective view of the rotating body vicinity, (c) is explanatory drawing of a drill. (a)は本発明の穴あけ部の側面図、(b)は穴あけ部の説明図。(A) is a side view of the drilling part of this invention, (b) is explanatory drawing of a drilling part. (a)は本発明におけるピンセッター部分の平面図、(b)はピンセッター部分の側面図、(c)はピン保持部の説明図。(A) is a top view of the pin setter part in this invention, (b) is a side view of a pin setter part, (c) is explanatory drawing of a pin holding | maintenance part. 本発明における貝整列部の説明図。Explanatory drawing of the shell alignment part in this invention. 本発明における貝整列部の動作説明図。Operation | movement explanatory drawing of the shell alignment part in this invention. (a)は本発明におけるロープガイド部分の概要斜視図、(b)は(a)の平面図。(A) is a general | schematic perspective view of the rope guide part in this invention, (b) is a top view of (a). 本発明におけるピン保持部の一例であって、(a)はピン保持部でピンを保持する前の側面図、(b)はピンを固定保持具に保持した状態の側面図、(c)は固定保持具と可動保持具でピンを保持した状態の側面図、(d)はピン保持後にピン保持部が前進移動した状態の側面図。It is an example of the pin holding | maintenance part in this invention, Comprising: (a) is a side view before hold | maintaining a pin with a pin holding | maintenance part, (b) is a side view of the state which hold | maintained the pin to the fixing holder, (c) is The side view of the state which hold | maintained the pin with the fixed holder and the movable holder, (d) is a side view of the state which the pin holding | maintenance part moved forward after pin holding. 本発明の貝取付け方法及び貝移し替え方法の一例を示すものであって、(a)はピンとホタテ貝とガイドを一列に配置した状態の説明図、(b)ピンとガイドを一列に連結した状態の説明図、(c)はホタテ貝をスライドさせてガイドからピンに移し替えた状態の説明図、(d)はガイドを引き戻してピンから話した状態の説明図。It shows an example of the shell attachment method and shell transfer method of the present invention, where (a) is an explanatory view showing a state where pins, scallops and guides are arranged in a row, and (b) a state where pins and guides are connected in a row. Explanatory drawing of (c), explanatory drawing of the state which scallops were slid and moved from the guide to the pin, (d) is explanatory drawing of the state which pulled back the guide and spoke from the pin. ホタテ貝をホルダで挟着、解放する場合の説明図。Explanatory drawing in the case of pinching and releasing a scallop with a holder. ホタテ貝の耳にあけた穴にガイドを貫通し、更に穴から突出したガイドの先端部をピンの先端部に被せた状態の詳細図。FIG. 3 is a detailed view of a state in which a guide is passed through a hole made in a scallop ear and a tip of a guide protruding from the hole is covered with a tip of a pin. (a)はホタテ貝の耳吊り養殖の説明図、(b)はホタテ貝の耳にあけた穴に、縦ロープに差し込まれたピンを差し込んでホタテ貝をピンに係止した状態の側面図、(c)は縦ロープに差し込まれたピンをホタテ貝の耳にあけた穴に差込む状態の従来例の説明図。(A) is an explanatory diagram of scallop ear suspension culture, (b) is a side view of a state where a pin inserted into a vertical rope is inserted into a hole drilled in the ear of a scallop and the scallop is locked to the pin (C) is explanatory drawing of the prior art example of the state which inserts the pin inserted in the vertical rope in the hole opened in the ear | edge of the scallop shell.

(実施形態)
本発明の貝取付け方法、貝取付け装置及び貝移し替え方法の一例を図面に基づいて説明する。ここでは、貝がホタテ貝3の場合を一例として説明する。
(Embodiment)
An example of the shell attachment method, the shell attachment device and the shell transfer method of the present invention will be described with reference to the drawings. Here, the case where a shellfish is the scallop 3 is demonstrated as an example.

図1に示す貝取付け装置は、二枚の貝3に同時に穴5(図1)をあけ、夫々の穴5に同時に貝係止具(ピン)2を差し込む場合である。図1の貝取付け装置は、所定間隔で間欠回転する回転体30、回転体30の回転方向数カ所に二つ一組にして取り付けられたホルダ11、ホルダ11に投入された貝3の穴あけ箇所P(図11)を所定位置に揃える貝整列部31、ホルダ11に保持された貝3の耳4(図11)に穴5をあける穴あけドリル32、貝3の穴5に差し込み可能な細長管状のガイド10(図3(a)(b))、縦ロープ1にピン2を差込むピンセッター33、縦ロープ1をピン支持箇所にピン間隔で間欠的に送り込むロープ送り機構34、送られた縦ロープ1に差込まれたピン2を支持してピン2の揺動や位置ずれを防止するピン保持部35(図4(c)、図9(a)〜(d))、支持されたピン2の外側に配置された貝3の穴5にガイド10を差込み、そのガイド10の先端部10aを前記ピン2の先端部2aに被せてガイド10とピン2を一直線に連結する差込み機構36(図3(a)(b))、前記二枚の貝3を夫々のガイド10に沿ってピン2の貝止め突起(以下「アゲ」という)7(図7(a)(b)、図9(a)〜(d))の内側までスライドさせて貝3をピン2に移し替え、移し替え後にガイド10をピン2の先端部2aから引き離す横スライダー70(図9(a)〜(d)、図10)を備えている。   The shell attachment device shown in FIG. 1 is a case where holes 5 (FIG. 1) are simultaneously drilled in two shells 3 and shell locks (pins) 2 are simultaneously inserted into the respective holes 5. 1 includes a rotating body 30 that rotates intermittently at predetermined intervals, a holder 11 that is mounted in pairs in several rotational directions of the rotating body 30, and a hole P in the shell 3 that is inserted into the holder 11. A shell aligning portion 31 for aligning (FIG. 11) in a predetermined position, a drill 32 for making a hole 5 in the ear 4 (FIG. 11) of the shell 3 held by the holder 11, and an elongated tubular shape that can be inserted into the hole 5 of the shell 3. Guide 10 (FIGS. 3A and 3B), a pin setter 33 for inserting the pin 2 into the vertical rope 1, a rope feed mechanism 34 for intermittently feeding the vertical rope 1 to the pin support portion at a pin interval, and the sent vertical A pin holding portion 35 (FIG. 4 (c), FIGS. 9 (a) to 9 (d)) that supports the pin 2 inserted into the rope 1 to prevent the pin 2 from swinging or misaligned, and the supported pin 2 and insert the guide 10 into the hole 5 of the shell 3 arranged outside the An insertion mechanism 36 (FIGS. 3A and 3B) for connecting the guide 10 and the pin 2 in a straight line by placing the tip 10a of the pin 10 on the tip 2a of the pin 2, and the two shells 3 for the respective guides. 10 is slid to the inside of the pin 2 shell stop projection (hereinafter referred to as “age”) 7 (FIGS. 7A, 7B, 9A to 9D), and the shell 3 is moved to the pin 2 A horizontal slider 70 (FIGS. 9A to 9D and FIG. 10) for pulling the guide 10 away from the tip 2a of the pin 2 after the transfer is provided.

ガイド10には金属製の細長パイプが適する。その内径はピン2の先端部2aの外周に被せることができる大きさであり、外径は貝3の穴5に差し込み可能な太さ(ピン2の外径と同じ太さ以下)である。ガイド10は硬質で一直線状であれば金属製以外のものであってもよい。   A metal elongated pipe is suitable for the guide 10. The inner diameter is a size that can be put on the outer periphery of the tip 2 a of the pin 2, and the outer diameter is a thickness that can be inserted into the hole 5 of the shell 3 (the same thickness as the outer diameter of the pin 2). The guide 10 may be other than metal as long as it is hard and straight.

前記回転体30には、その回転方向に、貝投入ステーションと、貝整列ステーションと、穴あけステーションと、移し替えステーションが設定してあり、回転体30はそれらステーションごとに間欠回転するようにしてある。この場合、前記貝投入ステーションにおいて、ホルダ11に貝3を投入することができ、前記貝整列ステーションにおいてホルダ11内の貝3の穴あけ箇所P(図11)を所定の位置に整列させることができ、前記穴あけステーションにおいて、整列された貝3に穴あけドリル32で穴5をあけることができ、前記移し替えステーションにおいて、縦ロープ1のピン2の両外側に配置された二枚の貝3の穴5にガイド10を差込んで貫通させることができ、その穴5から突出したガイド10の先端部10aを前記ピン2の先端部2aに連結して二本のガイド10とピン2を一列に並べることができ、二枚の貝3を夫々のガイド10に沿ってピン2のアゲ7の内側までスライドさせてガイド10からピン2に移し替えてピン2に貝3を取付けることができる。   In the rotating body 30, a shell feeding station, a shell aligning station, a drilling station, and a transfer station are set in the rotating direction, and the rotating body 30 rotates intermittently at each station. . In this case, the shell 3 can be loaded into the holder 11 at the shell loading station, and the hole P (FIG. 11) of the shell 3 in the holder 11 can be aligned at a predetermined position at the shell aligning station. In the drilling station, the aligned shells 3 can be drilled with the drilling drill 32, and in the transfer station, the holes of the two shells 3 arranged on both outer sides of the pins 2 of the vertical rope 1 The guide 10 can be inserted through the guide 5 and penetrated, and the tip 10a of the guide 10 protruding from the hole 5 is connected to the tip 2a of the pin 2 so that the two guides 10 and the pin 2 are aligned. The two shells 3 can be slid along the respective guides 10 to the inside of the pins 7 of the pins 2 and transferred from the guides 10 to the pins 2 to attach the shells 3 to the pins 2. Door can be.

図2(b)に示すように、前記ホルダ11は二枚の保持板11a、11bを一組としてあり、各組の保持板11a、11bは開閉可能に対向して両保持板11a、11bの間に空間(ポケット)12が形成されている。保持板11aは、開閉シリンダ69(図9(a)、図10)によって、開閉することができるようにしてある。図6に示すように、ポケット12は上面12aと両側面12bが開口し、底面が底板13で閉塞されている。ポケット12には、図1のように作業員が上面12aから貝3を投入できる。投入された貝3は底板13で支承される。この場合、ポケット12の側面12bが開口していると、投入された貝3が落下するので、側面12bを側面閉塞具20(図5)で閉塞できるようにしてある。側面閉塞具20は平面視コ字状であり、一組のホルダ11の後方に配置されており、図5の矢印A−A方向に前進後退可能であり、ポケット12の側面12bまで前進して当該側面12bを閉塞することができ、後退すると当該側面12bが開口するようにしてある。側面閉塞具20は貝3の投入時に前進して両側面12bを閉塞し、回転体30が回転してホルダ11が次の作業ステーションに送られる時にホルダ11の後方まで後退(退避)してホルダ11の回転の支障にならないようにする。   As shown in FIG. 2 (b), the holder 11 has two holding plates 11a and 11b as a set, and the holding plates 11a and 11b of each set face each other so that they can be opened and closed. A space (pocket) 12 is formed between them. The holding plate 11a can be opened and closed by an open / close cylinder 69 (FIGS. 9A and 10). As shown in FIG. 6, the pocket 12 has an upper surface 12 a and both side surfaces 12 b opened, and the bottom surface is closed by a bottom plate 13. As shown in FIG. 1, an operator can put the shell 3 into the pocket 12 from the upper surface 12a. The introduced shell 3 is supported by the bottom plate 13. In this case, when the side surface 12b of the pocket 12 is open, the thrown shell 3 falls, so that the side surface 12b can be closed with the side closing tool 20 (FIG. 5). The side obturator 20 is U-shaped in plan view, and is disposed behind the pair of holders 11, can be advanced and retracted in the direction of arrow AA in FIG. 5, and can be advanced to the side surface 12 b of the pocket 12. The side surface 12b can be closed, and the side surface 12b is opened when it is retracted. The side closing tool 20 moves forward when the shell 3 is inserted and closes both side surfaces 12b. When the rotating body 30 rotates and the holder 11 is sent to the next work station, the side closing tool 20 retracts (retracts) to the rear of the holder 11 and moves to the holder. 11 is not disturbed.

貝整列部31は前記ポケット12に投入された貝3の穴あけ箇所Pを、電動式の穴あけドリル32の軸線上に整列させるものである。ポケット12に投入された貝3の向き及び位置は不揃いであるため、そのままでは穴あけ箇所Pに正確に穴5をあけることができない。穴5は貝3の何処にあけてもいいわけではなく、決められた箇所(図2の耳4の角部の一枚殻の部分:穴あけ箇所P:図11)にあけないと貝3の成長が阻害されたり貝3が死滅したりすることがある。貝3の穴あけ箇所Pに確実に穴5をあけるためには、ポケット12内の貝3の穴あけ箇所Pを穴あけドリル32の軸線上に位置決めする必要がある。   The shell aligning part 31 aligns the hole P of the shell 3 put in the pocket 12 on the axis of the electric drill 32. Since the directions and positions of the shells 3 thrown into the pockets 12 are not uniform, the holes 5 cannot be accurately drilled at the drilling points P as they are. The hole 5 does not necessarily have to be drilled anywhere in the shell 3, but the shell 3 grows unless it is drilled at a predetermined location (a portion of the single shell at the corner of the ear 4 in FIG. 2: a punched portion P: FIG. 11). May be hindered or the shellfish 3 may be killed. In order to reliably make the hole 5 in the hole P of the shell 3, it is necessary to position the hole P of the shell 3 in the pocket 12 on the axis of the drill 32.

一例として図5及び図6に示す貝整列部31は、受け具31aと押し具31bを備えている。受け具31aと押し具31bは一対になっており、ホルダ11ごとに配置してある。受け具31aはホルダ11の貝送り方向先方に配置され、押し具31bはホルダ11の側方に配置されている。受け具31aは図5の矢印B−B方向に往復移動でき、ホルダ11の横に前進するとポケット12の側面12bの横に位置する。押し具31bは軸54の回転に伴って矢印C方向に回動して貝3の外周面3aに当たって貝3を受け具31a側に押して貝3の他方の外周面3bを受け具31aに押し付ける。このとき、貝3は湾曲している弧面31cで押されて略く字状の受け具31aで支承されるため、貝3が回動して、貝3の穴あけ箇所Pが所定位置(穴あけドリル32の軸線上)に揃えられて(位置決めされて)、二つのホルダ11に保持されている二つの貝3の穴あけ箇所Pが穴あけドリル32のドリル刃と同一線上に揃う。整列後に、ホルダ11の一対の保持板11a、11bにより貝3が挟着保持される。その後に受け具31a、押し具31bが元の位置に戻る。   As an example, the shell alignment unit 31 shown in FIGS. 5 and 6 includes a receiving tool 31a and a pressing tool 31b. The receiving tool 31 a and the pressing tool 31 b are paired and arranged for each holder 11. The receiving tool 31 a is arranged in the shell feeding direction ahead of the holder 11, and the pressing tool 31 b is arranged on the side of the holder 11. The receiving tool 31a can reciprocate in the direction of the arrow BB in FIG. 5, and is positioned beside the side surface 12b of the pocket 12 as it advances to the side of the holder 11. The pusher 31b rotates in the direction of arrow C as the shaft 54 rotates, hits the outer peripheral surface 3a of the shell 3 and pushes the shell 3 toward the receiver 31a to press the other outer peripheral surface 3b of the shell 3 against the receiver 31a. At this time, since the shell 3 is pushed by the curved arc surface 31c and is supported by the substantially letter-shaped receiving member 31a, the shell 3 is rotated and the punching position P of the shell 3 is set at a predetermined position (drilling). The holes P of the two shells 3 held by the two holders 11 are aligned with the drill blades of the drill 32. After the alignment, the shell 3 is sandwiched and held by the pair of holding plates 11a and 11b of the holder 11. Thereafter, the receiving tool 31a and the pressing tool 31b return to their original positions.

前記整列後に、回転体30が間欠回転してホルダ11で保持されている貝3を穴あけステーションに送り込む。貝3が穴あけステーションに送り込まれると、二つの穴あけドリル32(図2(a)(c))が貝3に向けて前進し、回転中のドリル刃が二つの貝3の穴あけ箇所Pに突き刺さって二つの貝3の穴あけ箇所Pに同時に穴5があけられる。穴あけ終了後、穴あけドリル32は後退して元の位置に戻る。その後、ホルダ11で保持された貝3は、回転体30の回転に伴って次の移し替えステーションに送られる。   After the alignment, the rotating body 30 rotates intermittently and the shell 3 held by the holder 11 is sent to the drilling station. When the shell 3 is fed into the drilling station, the two drilling drills 32 (FIGS. 2 (a) and 2 (c)) move forward toward the shell 3, and the rotating drill blade pierces the hole P of the two shells 3. The hole 5 is simultaneously drilled in the hole P of the two shells 3. After completion of the drilling, the drilling drill 32 moves backward and returns to the original position. Thereafter, the shell 3 held by the holder 11 is sent to the next transfer station as the rotating body 30 rotates.

縦ロープ1には、前記穴あけ作業とは別工程でピン2が差し込まれる。縦ロープ1へのピン2の差込みには、本件発明者が先に開発したピンセッター33を使用することができる。ピンセッター33は、縦ロープ1を引き込みながら、ロール状に巻かれているピン(通称:ロールピン)を引き込み、その間に縦ロープ1に案内針を差し込み、ロールピンから切り離した一本のピン2を前記案内針の中にセットし、そのピン2を押し具で押して案内針が差し込まれて縦ロープ1の穴に押し込むことにより縦ロープ1に差し込み、前記縦ロープ1及びロールピンの引き込みを行いながら、ピンを一本ずつ、一定間隔で縦ロープ1に挿し込む装置である。   A pin 2 is inserted into the vertical rope 1 in a separate process from the drilling operation. The pin setter 33 previously developed by the present inventors can be used for inserting the pin 2 into the vertical rope 1. The pin setter 33 pulls a pin (commonly called roll pin) wound in a roll while pulling the vertical rope 1, inserts a guide needle into the vertical rope 1 between them, and removes one pin 2 separated from the roll pin Set in the guide needle, push the pin 2 with a pusher and insert the guide needle into the hole of the vertical rope 1 to insert it into the vertical rope 1, while pulling in the vertical rope 1 and roll pin, Is inserted into the vertical rope 1 at regular intervals one by one.

前記のようにピン2が所定間隔で差し込まれた縦ロープ1は、ロープ送り機構34(図1)によりピン間隔で先方に送られる。送られた縦ロープ1に取り付けられたピン2は、縦ロープ1の送り込み方向先方に設けられた受け61(図4(c)、図8)で支持されて揺れが防止される。ロープ送り機構34は上下に対向配置されたロール41、42(図1)で構成され、両ロール41、42の回転により送り出される。   As described above, the vertical rope 1 in which the pins 2 are inserted at a predetermined interval is fed forward at the pin interval by the rope feeding mechanism 34 (FIG. 1). The pin 2 attached to the sent vertical rope 1 is supported by a receiver 61 (FIGS. 4C and 8) provided in the feed direction of the vertical rope 1 to prevent shaking. The rope feed mechanism 34 is composed of rolls 41 and 42 (FIG. 1) opposed to each other in the vertical direction, and is fed by the rotation of both rolls 41 and 42.

図7(a)(b)に示すように、縦ロープ1は平行に(横並びに)配置された二枚の板(ロープガイド)60(図7)の間に案内されて送り込まれ、その縦ロープ1に差し込まれたピン2が、二枚の板60の前方に突出する受け61の上に停止する。受け61の上に停止したピン2は、図4(c)に示すピン保持部35の固定保持具65と可動保持具66によって、図8(a)〜(d)に示すように挟着保持される。図8(a)(b)に示すように、固定保持具65にはピン2を位置決めできる横向きV字状の凹部67が、可動保持具66には凹部67と逆向きV字状の凹部68が設けられ、両凹部67、68間にピン2を保持できるようにしてある。可動保持具66は、例えば、エアシリンダ55(図8(a)〜(d))等の押し込みにより、図8(a)〜(c)のように回動できるようにしてある。図8(c)のようにピン2を挟着保持したしピン保持部35は、図8(d)のように前進して移し替えステーションに送られる。   As shown in FIGS. 7 (a) and 7 (b), the vertical rope 1 is guided and fed between two plates (rope guides) 60 (FIG. 7) arranged in parallel (side by side). The pin 2 inserted into the rope 1 stops on the receiver 61 protruding forward of the two plates 60. As shown in FIGS. 8A to 8D, the pin 2 stopped on the receiver 61 is clamped and held by the fixed holder 65 and the movable holder 66 of the pin holder 35 shown in FIG. 4C. Is done. As shown in FIGS. 8 (a) and 8 (b), the fixed holder 65 has a laterally V-shaped recess 67 that can position the pin 2, and the movable holder 66 has a V-shaped recess 68 that is opposite to the recess 67. Is provided so that the pin 2 can be held between the recesses 67 and 68. The movable holder 66 can be rotated as shown in FIGS. 8A to 8C, for example, by pushing the air cylinder 55 (FIGS. 8A to 8D). The pin 2 is clamped and held as shown in FIG. 8C, and the pin holding portion 35 moves forward as shown in FIG. 8D and is sent to the transfer station.

その後、移し替えステーションに送り込まれたピン2と二つの貝3を、当該ピン2と当該貝3の穴5と当該貝3の外側に位置するガイド10とが一列になるように並べ、その状態で、ガイド10をエアシリンダなどの差込み機構36で前進させて貝3の穴5に差し込んで穴5を貫通させる。穴5を貫通してその穴5から突出したガイド10の先端部10aを、ピン2の先端部2aに被せてガイド10とピン2を一直線状に連結する。次に、図9(a)及び図10に示す横スライダー70でホルダ11をガイド10に沿って横スライドさせてピン2のアゲ7の内側まで移動させて、ホルダ11に挟着保持されている貝3をピン2に移し替える。その後、図9(d)のようにガイド10を引き戻してピン2の先端部2aから引き抜く。   After that, the pin 2 and the two shells 3 sent to the transfer station are arranged so that the pin 2, the hole 5 of the shell 3 and the guide 10 located outside the shell 3 are aligned, and the state Then, the guide 10 is advanced by the insertion mechanism 36 such as an air cylinder and is inserted into the hole 5 of the shell 3 to penetrate the hole 5. The guide 10 and the pin 2 are connected in a straight line by placing the tip 10 a of the guide 10 penetrating through the hole 5 and protruding from the hole 5 on the tip 2 a of the pin 2. Next, the holder 11 is horizontally slid along the guide 10 by the horizontal slider 70 shown in FIGS. 9A and 10, and moved to the inside of the pin 7 of the pin 2, and is held by the holder 11. Transfer shell 3 to pin 2. Thereafter, the guide 10 is pulled back and pulled out from the tip 2a of the pin 2 as shown in FIG.

前記のようにガイド10を引き抜いた後は、ホルダ11による貝3の挟着保持を解除する。その後に、縦ロープ1をピン2の間隔分だけ間欠移動させて外部に送り出す。この送り出しに伴って縦ロープ1の次のピン2が、前記受け61に送られる。   After pulling out the guide 10 as described above, the holding of the shell 3 by the holder 11 is released. Thereafter, the vertical rope 1 is intermittently moved by the interval of the pins 2 and sent to the outside. With this feed, the next pin 2 of the vertical rope 1 is sent to the receiver 61.

以下、前記作業の繰り返しにより、縦ロープ1に差しまれているピン2に貝3を繰り返し取り付ける。   Hereinafter, the shell 3 is repeatedly attached to the pin 2 inserted in the vertical rope 1 by repeating the above operation.

本発明では、縦ロープ1へのピン2の差込みを別に行って、その縦ロープ1を本発明の貝取付け装置に送り込むようにしてもよい。   In the present invention, the pin 2 may be inserted into the vertical rope 1 separately, and the vertical rope 1 may be fed into the shell attachment device of the present invention.

本発明の作業手順は、前記以外の順番で行うこともできる。   The work procedure of the present invention can be performed in an order other than the above.

駆動手段にはエアリンダ以外の手段、例えば、油圧シリンダや電動駆動手段などを用いることもできる。   As the driving means, a means other than an air cylinder, for example, a hydraulic cylinder or an electric driving means can be used.

1 縦ロープ
2 貝係止具(ピン)
2a (ピンの)先端部
3 貝
3a、3b (貝の)外周面
4 耳
5 穴
7 貝止め突起(アゲ)
10 ガイド
10a (ガイドの)先端部
11 ホルダ
11a、11b 保持板
12 空間(ポケット)
12a (ポケットの)上面
12b (ポケットの)側面
13 底板
20 側面閉塞具
30 回転体
31 貝整列部
31a 受け具
31b 押し具
31c 弧面
32 穴あけドリル
33 ピンセッター
34 ロープ送り機構
35 ピン保持部
36 差込み機構
38 移し替え機構
41、42 ロール
54 軸
55 エアシリンダ
60 板(ロープガイド)
61 受け
65 固定保持具
66 可動保持具
67、68 凹部
69 開閉シリンダ
70 横スライダー
A 縦ロープ
B ピン
C ホタテ貝
D ブイ
E 横ロープ
P 穴あけ箇所
1 Vertical rope 2 Shell lock (pin)
2a (pin) tip 3 shell 3a, 3b (shell) outer peripheral surface 4 ear 5 hole 7 shell stop projection (age)
10 Guide 10a (Guide) Tip 11 Holder 11a, 11b Holding Plate 12 Space (Pocket)
12a (Pocket) upper surface 12b (Pocket) side surface 13 Bottom plate 20 Side obturator 30 Rotating body 31 Shell alignment part 31a Receiving tool 31b Pusher 31c Arc surface 32 Drill drill 33 Pin setter 34 Rope feed mechanism 35 Pin holding part 36 Insertion Mechanism 38 Transfer mechanism 41, 42 Roll 54 Shaft 55 Air cylinder 60 Plate (rope guide)
61 Receiving 65 Fixed holder 66 Movable holder 67, 68 Recess 69 Open / close cylinder 70 Horizontal slider A Vertical rope B Pin C Scallop D Buoy E Horizontal rope P

Claims (8)

縦ロープを貫通しているピンの軸方向端部に貝を取付ける貝取付け方法において、
ピンの外側に貝を配置してそのピンと貝の穴を一列に揃え、
前記貝の外側にガイドを配置してそのガイドを貝の穴に貫通させ
前記穴から突出するガイドの先端部を前記ピンの先端部に連結し、
前記貝を前記ガイドに沿ってピンのアゲの内側までスライドさせることにより、当該貝の穴にピンを通して当該貝をピンに取付け、
前記取付け後にガイドをピン端部から取外す、
ことを特徴とするピンへの貝取付け方法。
In the shell mounting method of attaching the shell to the axial end of the pin passing through the vertical rope,
Place the shells on the outside of the pins, align the pins and shell holes in a row,
A guide is placed outside the shell and the guide is passed through the shell hole ,
Connecting the tip of the guide protruding from the hole to the tip of the pin;
By sliding the shell to the inside of the pin age along the guide, the shell is attached to the pin through the pin through the hole of the shell,
Remove the guide from the end of the pin after the mounting,
A method of attaching a shell to a pin, characterized by that.
請求項1記載の貝取付け方法において、
ピンの外側に二つの貝を配置してそのピンと二つの貝の穴を一列に揃え、
前記二つの貝の外側に二本のガイドを配置してそれらガイドを二つの貝の穴に貫通させ、
前記穴から突出する二本のガイドの先端部を前記ピンの端部に連結し
前記二枚の貝を前記二本のガイドの夫々に沿ってピンのアゲの内側までスライドさせることにより、夫々の穴にピンを通して当該貝をピンに取付け、
前記取付け後にガイドをピン端部から取外す、
ことを特徴とするピンへの貝取付け方法。
In the shell attachment method of Claim 1,
Place two shells on the outside of the pin, align the pins and the holes of the two shells in a row,
Two guides are arranged outside the two shells and the guides are passed through the holes of the two shells,
Connecting the tip of two guides protruding from the hole to the end of the pin ;
Attaching the shells to the pins through the pins in the respective holes by sliding the two shells along the two guides to the inside of the pin age,
Remove the guide from the end of the pin after the mounting,
A method of attaching a shell to a pin, characterized by that.
縦ロープに差し込まれているピンに貝を取付ける貝取付け方法において、
貝の耳に穴をあける穴あけ工程と、
前記縦ロープの軸方向に所定間隔でピンを差込むピン差込み工程と、
前記縦ロープをピン差込み間隔で間欠送りするロープ送り工程と、
ピンの外側に前記貝を配置し、の外側にガイドを配置して、ピンと貝の穴とガイドを横一列に並べる並べ工程と、
前記貝の穴に前記ガイドを貫通させるガイド貫通工程と、
前記貫通により貝の穴から突出したガイドの先端部を、前記ピンの先端部に連結させる連結工程と、
前記貝をそれに差込まれているガイドに沿ってピンのアゲの内側までスライドさせることにより貝の穴にピンを通して、貝をピンの端部に取り付ける貝移し替え工程と、
前記ガイドをピンから引き抜くガイド引き抜き工程を備え
前記穴あけ工程からガイド引き抜き工程までを連続して行う、
ことを特徴とするピンへの貝取付け方法。
In the shell installation method of attaching the shell to the pin inserted in the vertical rope,
Drilling process to drill holes in shell ears ;
A pin insertion step of inserting pins at predetermined intervals in the axial direction of the vertical rope;
A rope feeding step of intermittently feeding the vertical rope at pin insertion intervals ;
Placing the shellfish on the outside of the pin, by arranging the guide on the outside of the shellfish, the process arranges arranging pins and shellfish hole and the guide in a row,
A guide penetration step of passing the guide through the hole of the shell ,
A connecting step of connecting the tip of the guide protruding from the hole of the shell by the penetration to the tip of the pin;
A shell transfer step of attaching the shell to the end of the pin by passing the pin through the hole of the shell by sliding the shell to the inside of the pin age along the guide inserted in it;
A guide drawing process of withdrawing the guide from the pin,
From the drilling process to the guide pulling process is performed continuously.
A method of attaching a shell to a pin, characterized by that.
請求項記載のピンへの貝取付け方法において、
穴あけ工程において、二つの貝の耳に同時又は略同時に穴をあけ、
並べ工程において、ピンの外側に二つの貝を配置し、夫々の貝の外側に二本のガイドを配置して、それらピンと二つの貝の穴と二本のガイドを横一列に並べ、
ガイド貫通工程において、横一列に並べた二つの貝の夫々の穴に夫々のガイドを同時又は略同時に貫通させ、
連結工程において、夫々の貝の穴を貫通して穴から突出した二本のガイドの先端部を前記ピンの先端部に同時又は略同時に連結し、
貝移し替え工程において、二つの貝を夫々のガイドに沿ってピンのアゲの内側までスライドさせることにより夫々の貝の穴に夫々のピンを通して、それら貝をピンの端部に取り付ける貝移し替え、
ガイド引き抜き工程において、前記二本のガイドをピンから同時又は略同時に引き抜く、
ことを特徴とするピンへの貝取付け方法。
In the shell attachment method to the pin according to claim 3 ,
In the drilling process, drill holes in the ears of two shells simultaneously or almost simultaneously,
In the arranging process, two shells are arranged outside the pins, two guides are arranged outside each shell, the pins, the holes of the two shells, and the two guides are arranged in a horizontal row,
In the guide penetration process, each guide is penetrated simultaneously or substantially simultaneously through the holes of the two shells arranged in a horizontal row,
In the connecting step, the tip portions of the two guides protruding from the holes through the holes of the respective shells are connected to the tip portions of the pins simultaneously or substantially simultaneously,
In the shell transfer process, slide the two shells along the respective guides to the inside of the pin age to pass the respective pins through the holes of the respective shells, and transfer the shells that attach the shells to the ends of the pins,
In the guide extracting step, the two guides are extracted from the pins simultaneously or substantially simultaneously,
A method of attaching a shell to a pin, characterized by that.
請求項1から請求項4のいずれか1項に記載のピンへの貝取付け方法において、In the shell attachment method to the pin according to any one of claims 1 to 4,
ピンをピン保持部で保持し、Hold the pin with the pin holder,
貝をホルダで保持し、保持された貝の穴に、当該孔の外側からガイドを差込んで貫通させ、Hold the shellfish with a holder, insert the guide from the outside of the hole into the hole of the held shellfish,
前記ピン保持部によるピンの保持を開放してから、貝をガイドに沿ってピンのアゲの内側までスライドさせることにより、前記待機している貝の穴にピンを通して当該貝をピンに取り付ける、After releasing the holding of the pin by the pin holding part, the shell is attached to the pin through the pin through the hole of the waiting shell by sliding the shell to the inside of the pin age along the guide,
ことを特徴とするピンへの貝取付け方法。A method of attaching a shell to a pin, characterized by that.
縦ロープに差し込まれているピンに貝を取付ける貝取付け装置において、
二枚の貝に穴をあける穴あけ部と、
前記縦ロープにピンを所定間隔で差込むピン差込み部と、
前記縦ロープをピン間隔で間欠送りするロープ送り部と、
送り出された縦ロープに差込まれているピンを保持するピン保持部と、
保持されピンの両外側に一列に配置された二枚の貝の穴にガイドを差込むガイド差込み部と、
前記ガイドの先端部を前記保持されたピンの両端に一列に連結する連結部と、
連結された二本のガイドの夫々に沿って二枚の貝をピンのアゲの内側までスライドさせて、二枚の貝をピンに移し替える移し替え部を備えた、
ことを特徴とするピンへの貝取付け装置。
In a shell mounting device that attaches a shell to a pin inserted in a vertical rope,
A drilling section for drilling holes in two shells,
A pin insertion part for inserting pins into the vertical rope at a predetermined interval;
A rope feed section that intermittently feeds the vertical rope at pin intervals;
A pin holder for holding the fed out vertical pin rope being plugged,
The difference writing guide insertion portion to guide holes of the two shells arranged in a row on both outer sides of the held pin,
A connecting portion for connecting to a line the guide tips at both ends of the retained pin,
It has a transfer section that slides two shells to the inside of the pin age along each of the two connected guides, and transfers the two shells to the pins.
A device for attaching a shell to a pin, characterized in that.
請求項記載のピンへの貝取付け装置において、
貝投入ステーションと、貝整列ステーションと、穴あけステーションと、移し替えステーションを備え、
前記ステーションごとに間欠回転可能な回転体の回転方向数カ所に二つ一組のホルダが装備され、
前記貝投入ステーションにおいて、ホルダに貝を投入することができ、
前記貝整列ステーションにおいて、ホルダ内の貝の穴あけ箇所を所定位置に整列させることができ、
前記穴あけステーションにおいて、先に整列された貝に穴あけドリルで穴をあけることができ、
前記移し替えステーションにおいて、先に縦ロープのピンの両外側に配置された二枚の貝の穴にガイドを差込んで貫通させることができ、その穴から突出したガイドの先端部を前記ピンの先端部に連結して二本のガイドとピンを一列に揃え、二枚の貝を夫々のガイドに沿ってピンのアゲの内側までスライドさせてガイドからピンに移し替えてピンに取り付けることができる、
ことを特徴とするピンへの貝取付け装置。
The apparatus for attaching a shell to a pin according to claim 6 ,
It has a shell feeding station, a shell aligning station, a drilling station, and a transfer station,
Two sets of holders are equipped in several rotational directions of the rotating body that can rotate intermittently for each station,
In the shell feeding station, shells can be put into the holder,
In the shell alignment station, it is possible to align the holes of the shell in the holder at a predetermined position,
In the drilling station, the previously aligned shells can be drilled with a drill,
In the transfer station, the guide can be inserted and penetrated into the holes of the two shells previously arranged on both outer sides of the pin of the vertical rope, and the tip of the guide protruding from the hole is inserted into the pin of the pin. Two guides and pins are aligned in a row by connecting to the tip, and the two shells can be slid along the guides to the inside of the pin age and transferred from the guides to the pins and attached to the pins ,
A device for attaching a shell to a pin, characterized in that.
請求項7記載のピンへの貝取付け装置において、
移し替えステーションにおいて、送り出された縦ロープに差込まれているピンをピン保持部により保持することができ、二枚の貝の穴から突出したガイドの先端部を前記保持されているピンの先端部に連結して二本のガイドとピンを一列に揃えることができる、
ことを特徴とするピンへの貝取付け装置
In the shell attachment apparatus to the pin of Claim 7,
In the transfer station, the pin inserted into the sent out vertical rope can be held by the pin holding part, and the tip of the guide protruding from the hole of the two shells is the tip of the held pin The two guides and pins can be aligned in a row by connecting to the part.
A device for attaching a shell to a pin, characterized in that .
JP2014164812A 2014-08-13 2014-08-13 Shell mounting method to pin and shell mounting device to pin Active JP6439209B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2014164812A JP6439209B2 (en) 2014-08-13 2014-08-13 Shell mounting method to pin and shell mounting device to pin

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2014164812A JP6439209B2 (en) 2014-08-13 2014-08-13 Shell mounting method to pin and shell mounting device to pin

Publications (2)

Publication Number Publication Date
JP2016039793A JP2016039793A (en) 2016-03-24
JP6439209B2 true JP6439209B2 (en) 2018-12-19

Family

ID=55540455

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2014164812A Active JP6439209B2 (en) 2014-08-13 2014-08-13 Shell mounting method to pin and shell mounting device to pin

Country Status (1)

Country Link
JP (1) JP6439209B2 (en)

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05211827A (en) * 1992-01-31 1993-08-24 Eagle Ind Co Ltd Lug-suspending device for culture shellfish
JPH06153737A (en) * 1992-11-17 1994-06-03 Eagle Ind Co Ltd Device for hanging shell to be cultured at ear part
JPH1118613A (en) * 1997-07-02 1999-01-26 Nippon Seimitsu Kikai Kosaku Kk Suspending device and scallop perforating, suspending machine using the same
WO2005079565A1 (en) * 2004-02-20 2005-09-01 Peter Kvietelaitis Method and apparatus for socking seed molluscs and/or for applying support devices to mollusc growing lines

Also Published As

Publication number Publication date
JP2016039793A (en) 2016-03-24

Similar Documents

Publication Publication Date Title
JP5371970B2 (en) Device and apparatus for bringing and disassembling a carcass or carcass part of a dismantled poultry into or into a product carrier
CN105476202A (en) Full-automatic spherical material perforating machine
CN109514256B (en) Automatic assembling equipment for safety needle assembly
CN109079502A (en) A kind of accurate tapping machine of motor casing
KR101717159B1 (en) Evisceration Apparatus of Fowl Having Evisceration Unit Movable Up and Down
WO2010096089A1 (en) Apparatus and system for preparing ears of corn for automated handling, positioning and orienting
JP4089285B2 (en) Binding device
JP6439209B2 (en) Shell mounting method to pin and shell mounting device to pin
JP6436418B2 (en) Shell mounting method and shell mounting apparatus
CN102742922A (en) Melon planing machine
CN103317379A (en) Material discharging device of pipe fitting machining equipment
CN109998257A (en) A kind of beam hair rubber band processes kludge automatically
CN104472408B (en) Mussel-opening pearl-taking tool
US10639690B2 (en) Preparing a tube end for rod drawing
JP3701538B2 (en) Rubber plug insertion device and rubber plug insertion method
JPH06153737A (en) Device for hanging shell to be cultured at ear part
KR900006026B1 (en) Parts applicator for slide fastener
JP2019062812A (en) Shellfish installation method to vertical rope and shellfish installation device to vertical rope
CN106312139A (en) Automatic guide and automatic tool changing device for deep hole drill
JP5547541B2 (en) Rod transport device for undersea seating type boring machine
KR102618777B1 (en) Apparatus and method for separating at least one tendon connecting the breast meat of an eviscerated poultry body or a portion thereof to the body of the poultry body or a portion thereof, and a tool unit therefor
CN209830847U (en) Automatic assembly machine for lockset
CN109788767A (en) Fish de-heading device and method for fish decaptitating
JP6232484B1 (en) Burring equipment
CN207844883U (en) A kind of tongue suspender

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20170516

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20180125

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20180130

A601 Written request for extension of time

Free format text: JAPANESE INTERMEDIATE CODE: A601

Effective date: 20180328

A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A711

Effective date: 20180525

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20180531

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20180528

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20181023

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20181102

R150 Certificate of patent or registration of utility model

Ref document number: 6439209

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250