JP6263688B2 - How to prevent fall of tree work - Google Patents

How to prevent fall of tree work Download PDF

Info

Publication number
JP6263688B2
JP6263688B2 JP2013188644A JP2013188644A JP6263688B2 JP 6263688 B2 JP6263688 B2 JP 6263688B2 JP 2013188644 A JP2013188644 A JP 2013188644A JP 2013188644 A JP2013188644 A JP 2013188644A JP 6263688 B2 JP6263688 B2 JP 6263688B2
Authority
JP
Japan
Prior art keywords
rope
tree
anchor
annular
winding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2013188644A
Other languages
Japanese (ja)
Other versions
JP2015053890A (en
Inventor
邦男 安田
邦男 安田
元樹 信原
元樹 信原
Original Assignee
株式会社グリーンメンテナンス
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社グリーンメンテナンス filed Critical 株式会社グリーンメンテナンス
Priority to JP2013188644A priority Critical patent/JP6263688B2/en
Publication of JP2015053890A publication Critical patent/JP2015053890A/en
Application granted granted Critical
Publication of JP6263688B2 publication Critical patent/JP6263688B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Emergency Lowering Means (AREA)

Description

本発明は、作業者が樹木に登って樹木の剪定や枝打ち等の樹上作業を行なう際の墜落を防止する樹上作業の墜落防止方法に関する。   The present invention relates to a fall prevention method for tree work that prevents a fall when a worker climbs a tree and performs tree work such as pruning or pruning the tree.

樹上作業においては、従来より、ダブルロープテクニック(世界では「DRT」と簡略化して呼称されている)が使われている。このダブルロープテクニックは、世界の各地で使われている木登り時のロープワークであり、その一例について説明すれば、1本の長尺ロープを樹木の高位置にある木股に掛けて折り返すことで2重ロープ状態とし、その枝から延びた2重ロープの一方のロープ部の端部に例えば二重8の字状結び部を形成し、その輪っか部をカラビナ(第1連結器)を介して作業者の安全帯につないで、その二重8の字状結び部分から延びた長尺ロープ部分に、一端部に輪っか部を設けた短尺ロープ材の他端部を巻き付けてブレイクスヒッチ(伸縮調整具)を形成し、その短尺ロープ材の一端部の輪っか部にカラビナ(第2連結器)を付けて、このカラビナを作業者の安全帯に取り付けるようにしたもので、ブレイクスヒッチより下方の長尺ロープを引き、その後ブレイクスヒッチを押し上げ、これを繰り返すことによって安全を確保しながら登っていくことができる。   In tree work, a double rope technique (referred to simply as “DRT” in the world) has been conventionally used. This double rope technique is a rope work used when climbing trees in various parts of the world. An example of this is to fold one long rope around a tree crotch at a high position in the tree and fold it back. In the double rope state, for example, a double 8-shaped knot is formed at the end of one of the double ropes extending from the branch, and the looped part is connected via a carabiner (first coupler). The other end of a short rope member with a looped portion at one end is wrapped around the long rope portion extending from the double 8-shaped knot portion by connecting to the worker's safety belt. From the breaks hitch, a carabiner (second coupler) is attached to the loop part of one end of the short rope material and this carabiner is attached to the operator's safety belt. Pull the lower long rope, Push up the breaks hitch after, it is possible to go up while ensuring safety by repeating this.

ところが、このダブルロープテクニックは、樹木の高い位置にある木股をトップアンカーとして、これに、ダブルロープテクニックにおけるカラビナ(第1連結器)とブレイクスヒッチ(伸縮調整具)とカラビナ(第2連結器)とで形成される環状ロープ部を引っ掛けて、このトップアンカーの1点で支持させるようにしているため、2点以上のアンカーによるバックアップが必要であることを義務づけている日本の労働基準監督署の指導に適っていない。   However, this double rope technique uses the crotch in the high position of the tree as the top anchor, and the carabiner (first coupler), breaks hitch (extension adjustment tool) and carabiner (second joint) in the double rope technique. Japan Labor Standards Supervision, which requires that a backup with two or more anchors is required because the ring rope part formed by It is not suitable for the guidance of the station.

尚、上述したダブルロープテクニックの環状ロープ部は、基本的な一例を説明したもので、近年では簡略化した種々の環状ロープ部が採用されている。即ち、上記の説明では、長尺ロープの一端部に第1連結器を設け、この第1連結器から所要長さ離れたロープ上に伸縮調整具を設け、この伸縮調整具に第2連結器を設けて、第1連結器と伸縮調整具と第2連結環とで形成されるロープ部を環状ロープ部として、この環状ロープ部の第1連結器と第2連結器を作業者の安全帯に固定するようにしているが、例えば、第1連結器と第2連結器とを1つの共通連結器として、この共通連結器に長尺ロープの一端部と伸縮調整具とをつないで、この共通連結器を作業者の安全帯に固定するようにしたものでもよい。その他種々の簡略化された環状ロープ部が長尺ロープの一部に形成されるが、ダブルロープテクニックにおける環状ロープ部としては、長尺ロープの一部に伸縮調整具を介して伸縮調整可能な環状ロープ部を形成するものであれば、どのような構成の環状ロープ部でもよいものとされる。   In addition, the annular rope part of the double rope technique mentioned above demonstrated the basic example, and various simplified annular rope parts are employ | adopted in recent years. In other words, in the above description, the first coupler is provided at one end of the long rope, and the expansion / contraction adjustment tool is provided on the rope that is separated from the first connection by a required length. The rope portion formed by the first coupler, the expansion / contraction adjustment tool, and the second coupling ring is used as an annular rope portion, and the first coupler and the second coupler of the annular rope portion are used as an operator safety belt. For example, the first connector and the second connector are used as one common connector, and one end of the long rope and the expansion / contraction adjustment tool are connected to the common connector. The common coupler may be fixed to the worker's safety belt. Various other simplified circular ropes are formed on a part of the long rope, but as an annular rope part in the double rope technique, it is possible to adjust the expansion / contraction to a part of the long rope via a telescopic adjustment tool. As long as the annular rope portion is formed, any configuration of the annular rope portion may be used.

また従来より、ダブルロープテクニックでは、樹木の高い位置にある木股をトップアンカーとして、これを最初に設置するのに、先端にパウチ(袋状の錘)を付けたスローライン(細い紐)を、地上から樹木の高位置にある木股に投げて通した後、そのスローラインに長尺ロープの始端部につないで、スローラインを引っ張ることにより、長尺ロープを引き上げて木股に掛け渡すようにするため、市街地でのパウチの投げ上げ及び落下には、樹木の下を通る人や車両等に危害を加える危険性があり、また樹木の枝振りや樹形等によっては木股への掛け渡しができない場合がある。また、このように地上からパウチを投げ上げて、樹木の高位置にある木股であるトップアンカーを設置するから、その木股の強度を目視によって確認することができない、つまりその木股の安全性を確認することができない。   Traditionally, with the double rope technique, the crotch in the high position of the tree is used as the top anchor, and this is the first to be installed. A slow line (thin string) with a pouch (bag-like weight) is attached to the tip. After throwing it from the ground to the tree crotch at a high position of the tree, connect it to the start line of the long rope to the throw line, pull the slow line, pull the long rope and pass it over the tree crotch Therefore, throwing and dropping pouches in urban areas may cause danger to people and vehicles passing under the trees, and depending on the tree branches and tree shape, it may be hung on the crotch. You may not be able to pass. In addition, since the pouch is thrown up from the ground in this way and the top anchor that is the tree crotch at the high position of the tree is installed, the strength of the tree crotch cannot be visually confirmed, that is, the safety of the tree crotch The sex cannot be confirmed.

上記のような問題点を解決できるものとして、本出願人によって提供された下記特許文献1に記載された樹上作業の墜落防止方法がある。これは、作業者が樹上作業を行なうにあたり、地上側でストックした長尺ロープの始端側を作業対象樹木の根元付近に固定し、作業者は、通したロープへの重量負荷によって作動する摺動ストッパー(伸縮調整具)を身に付け、樹木の所要位置に巻留用索体を巻き留めて第1支持点(アンカー)とし、この第1支持点の巻留用索体に保持させた例えばカラビナに、長尺ロープの始端部側を通し、このロープを更に摺動ストッパーに通した上で地上へ垂らし、順次同様にして巻留用索体による第2支持点以降の支持点を設けると共に、これら支持点において、巻留用索体に保持させたカラビナに、前記摺動ストッパーと下位の支持点との間に保留させたロープの余剰部を通すようにする方法である。   As a method for solving the above-described problems, there is a tree fall prevention method described in Patent Document 1 provided by the present applicant. This is because when a worker performs a tree work, the starting end of the long rope stocked on the ground side is fixed near the root of the tree to be worked, and the worker is operated by a weight load on the passed rope. For example, a carabiner, which is equipped with a dynamic stopper (extension adjustment tool), winds the winding cord at the required position of the tree to serve as the first support point (anchor), and is held by the winding cord at the first support point In addition, through the start end side of the long rope, pass this rope further through the sliding stopper and hang it on the ground, and in the same way, provide support points after the second support point by the winding cord, In the supporting point, the excess portion of the rope held between the sliding stopper and the lower supporting point is passed through the carabiner held by the winding cord.

この特許文献1の方法は、樹木の下方より上方へとアンカーを順次小刻みに、第1支持点、第2支持点、第3支持点・・・として形成して、樹木の根元側に固定した始端側からのロープを各アンカーに通していくから、上部側アンカーが破断しても、下部アンカーによりバックアップできて、地上への墜落を防止することができ、前述した日本の労働基準監督署の指導に適う。また、この方法では、地上から樹木伝いに登って、小刻みにアンカーを形成していくので、市街地のように樹木の下を通る人や車両等に危害を加える危険性がなく、樹木の枝振りや樹形等に左右されることなくアンカーを設置できる上に、アンカーの設置部を作業者が間近で目視により確認できるため、アンカー設置部の安全性を確認できる。従って、この特許文献1の方法によれば、前述した従来のダブルロープテクニックにおける問題点を解決することができる。   In the method of Patent Document 1, the anchors are formed in small increments from the bottom to the top of the tree in order as a first support point, a second support point, a third support point, etc., and fixed to the root side of the tree. Since the rope from the start side is passed through each anchor, even if the upper side anchor breaks, it can be backed up by the lower side anchor to prevent the fall to the ground. Suitable for instruction. Also, with this method, climbing along the trees from the ground and forming anchors in small increments, there is no risk of harming people and vehicles etc. passing under the trees as in urban areas, The anchor can be installed without being influenced by the tree shape and the operator can confirm the anchor installation part by visual observation, so the safety of the anchor installation part can be confirmed. Therefore, according to the method of Patent Document 1, the problems in the conventional double rope technique described above can be solved.

特開2006−158229号公報JP 2006-158229 A

しかしながら、上記特許文献1の方法では、ロープの始端側を樹木の根元付近に固定した長尺ロープを樹木の最下部のアンカーに支持させるから、トップアンカーにかかる荷重が作業者の体重の2倍になり、ダブルロープテクニックで設置するアンカーより太径の幹にしかアンカーを設置できず、またアンカーを形成するための開閉式連結器付き巻留用索体(スリングベルト)の数が多くなり、樹上作業に手間取ると共に、その重量的負担が大きいという問題があった。   However, in the method of the above-mentioned Patent Document 1, since the long rope with the start end side of the rope fixed near the tree root is supported by the anchor at the bottom of the tree, the load applied to the top anchor is twice the weight of the operator. Therefore, anchors can only be installed on trunks with a larger diameter than anchors installed using the double rope technique, and the number of winding cords (sling belts) with open / close couplings to form anchors has increased. There is a problem that it takes time for the above work and the weight burden is large.

本発明は、上記のような特許文献1の方法における問題点を解消することができる樹上作業の墜落防止方法を提供することを目的とする。   An object of this invention is to provide the fall prevention method of tree work which can eliminate the trouble in the method of the above patent documents 1.

上記課題を解決するための手段を、後述する実施形態の参照符号を付して説明すると、請求項1に係る発明の樹上作業の墜落防止方法は、その長尺ロープ2の一部に伸縮調整具6を介して伸縮調整可能な環状ロープ部Roを形成する、ダブルロープテクニックに使用する長尺ロープ2と、
樹木Tの幹Ta又は太枝の所要部に巻き留めて夫々ダブルロープテクニックのアンカーを形成する少なくとも2つの開閉式連結器8付き巻留用索体3,4と、を用いる樹上作業の墜落防止方法であって、
前記環状ロープ部Roの所要箇所を作業者Mの安全帯10に固定した状態で、この環状ロープ部Roを、樹木Tの幹Ta又は太枝に形成した少なくとも2つのアンカーKである巻留用索体3,4の開閉式連結器8,8に通して少なくとも2点支持することにより、作業者Mの墜落を防止するようにしたことを特徴とする。
Means for solving the above problems will be described with reference numerals in the embodiments described later. The fall prevention method for tree work according to the first aspect of the present invention can be expanded and contracted on a part of the long rope 2. A long rope 2 used for the double rope technique that forms an annular rope portion Ro that can be expanded and contracted via an adjusting tool 6;
Prevention of fall of tree work using at least two anchoring ropes 3 and 4 with an open / close coupler 8 which are wound around a necessary part of a trunk Ta or a large branch of a tree T to form an anchor of a double rope technique, respectively. A method,
In the state where the required portion of the annular rope portion Ro is fixed to the safety band 10 of the worker M, the annular rope portion Ro is at least two anchors K formed on the trunk Ta or the large branch of the tree T. The fall of the operator M is prevented by supporting at least two points through the open / close couplers 8 and 8 of the bodies 3 and 4.

上記解決手段による発明の効果を、後述する実施形態の参照符号を付して説明すると、請求項1に係る発明の墜落防止方法は、環状ロープ部Roの所要箇所を作業者Mの安全帯10に固定した状態で、この環状ロープ部Roを、樹木Tの幹Ta又は太枝に形成した少なくとも2つのアンカーKである巻留用索体3,4の開閉式連結器8,8に通して少なくとも2点支持するようにしたから、前記特許文献1の方法と同様に下部アンカーによりバックアップが出来て、地上への墜落を防止でき、日本の労働基準監督署の指導にも適う一方、アンカーにかかる荷重が作業者の体重と同じ荷重となるから、樹木Tの比較的細い幹でもアンカーKが設置可能となり、また作業者は、樹木に登る際には巻留用索体を少なくとも2つ持って登ればよいから、樹上作業に手間がかからず、作業者の重量的負担を軽減することができる。   The effects of the invention by the above-described solution means will be described with reference numerals in the embodiments described later. In the fall prevention method according to the first aspect of the present invention, the required position of the annular rope portion Ro is set at the safety band 10 of the worker M. In this state, the annular rope portion Ro is passed through the open / close couplers 8 and 8 of the winding cords 3 and 4 which are at least two anchors K formed on the trunk Ta or the large branch of the tree T. Since two points are supported, it can be backed up by the lower anchor in the same manner as in the method of Patent Document 1 above, and can be prevented from falling to the ground. Since the load is the same as the weight of the operator, the anchor K can be installed even on a relatively thin trunk of the tree T, and the operator can climb with at least two winding cords when climbing the tree. Because Takes the hassle in the tree on the work, it is possible to reduce the weight burden on the operator.

本発明に係る墜落防止方法の実施形態を示すもので、その方法の最初の段階を示す説明図である。An embodiment of the fall prevention method concerning the present invention is shown, and is an explanatory view showing the first step of the method. 同方法の次の段階を示す説明図である。It is explanatory drawing which shows the next step of the method. 同方法の更に次の段階を示す説明図である。It is explanatory drawing which shows the further next step of the same method. 同方法の更に次の段階を示す説明図である。It is explanatory drawing which shows the further next step of the same method. 同方法の更に次の段階を示す説明図である。It is explanatory drawing which shows the further next step of the same method. 同方法に用いるロープ装置及び巻留用索体を示す斜視図で、環状ロープ部の一例を示している。It is a perspective view which shows the rope apparatus and winding cord used for the method, and has shown an example of the annular rope part. 図6と同様な斜視図で、環状ロープ部の他の例を示している。It is the same perspective view as FIG. 6, and has shown the other example of the annular rope part. 図6と同様な斜視図で、環状ロープ部の更に他の例を示している。It is the same perspective view as FIG. 6, and has shown the further another example of the annular rope part.

以下に本発明の好適な一実施形態を図面を参照して具体的に説明すると、図1〜図5は本発明に係る樹上作業の墜落防止方法を実施している状態を示し、図6はこの方法に使用するロープ装置及び巻留用索体を示す。これらの図において、Mは作業者、Tは樹木、2はダブルロープテクニックに使用する長尺ロープで、一端部側にダブルロープテクニックの環状ロープ部Roを形成し、他端部側を樹木T近傍の地上にストックする。3及び4はダブルロープテクニックのアンカーを形成する第1巻留用索体及び第2巻留用索体であり、10は作業者Mが装着した安全帯である。   Hereinafter, a preferred embodiment of the present invention will be described in detail with reference to the drawings. FIGS. 1 to 5 show a state in which the tree work fall prevention method according to the present invention is implemented, and FIG. Shows a rope device and a winding cord used in this method. In these drawings, M is an operator, T is a tree, 2 is a long rope used for the double rope technique, an annular rope portion Ro of the double rope technique is formed on one end side, and the tree T is placed on the other end side. Stock on nearby ground. Reference numerals 3 and 4 are a first winding cable body and a second winding cable body that form anchors of a double rope technique, and 10 is a safety belt worn by the worker M.

図6から分かるように、長尺ロープ2の一端部に、開閉式の第1連結器5(例えばカラビナ15)を取り付け、この第1連結器5から所要長さ離れた長尺ロープ2上に伸縮調整具6(例えばブレイクスヒッチ13)を設け、この伸縮調整具6に開閉式の第2連結器7(例えばカラビナ15)を取り付けることによって、この長尺ロープ2の一端部側に、第1連結器5と伸縮調整具6と第2連結器7とによってダブルロープテクニックの環状ロープ部Roを形成する。尚、第1連結器5としてのカラビナ15は、長尺ロープ2の一端部に設けた輪っか部2oに通し入れる。   As can be seen from FIG. 6, an openable first coupler 5 (for example, a carabiner 15) is attached to one end of the long rope 2, and the long rope 2 is separated from the first coupler 5 by a required length. By providing an expansion / contraction adjustment tool 6 (for example, breaks hitch 13) and attaching an open / close-type second coupler 7 (for example, a carabiner 15) to the expansion / contraction adjustment tool 6, a first end portion of the long rope 2 is An annular rope portion Ro of the double rope technique is formed by the first connector 5, the expansion / contraction adjustment tool 6 and the second connector 7. In addition, the carabiner 15 as the first coupler 5 is inserted into a ring portion 2o provided at one end of the long rope 2.

本発明の墜落防止方法について、図1〜図6を参照しながら説明すると、作業者Mは、先ず、前記のように第1連結器5と伸縮調整具6と第2連結器7とで形成されるダブルロープテクニックにおける環状ロープ部Roの第1連結器5(カラビナ15)と、伸縮調整具6に取り付けてある第2連結器7(カラビナ15)とを作業者Mの安全帯10に連結した状態とし、この状態で、作業者Mは、図1に示すように、樹木Tの幹Taの地上から所要高さの位置に第1巻留用索体3を巻き留めて下段側アンカーKを形成し、この下段側アンカーKの第1巻留用索体3の開閉式連結器8(開閉式フック16)にダブルロープテクニック(DRT)の環状ロープ部Roを通し入れる。   The crash prevention method of the present invention will be described with reference to FIGS. 1 to 6. First, the worker M is formed by the first coupler 5, the expansion / contraction adjustment tool 6, and the second coupler 7 as described above. The first coupler 5 (carabiner 15) of the annular rope portion Ro and the second coupler 7 (carabiner 15) attached to the expansion / contraction adjustment tool 6 are coupled to the safety belt 10 of the worker M. In this state, as shown in FIG. 1, the worker M winds the first anchoring rope 3 around the trunk Ta of the tree T at the required height and holds the lower anchor K. Then, the annular rope portion Ro of the double rope technique (DRT) is inserted into the open / close coupler 8 (open / close hook 16) of the first winding cord 3 of the lower anchor K.

尚、第1巻留用索体3又は第2巻留用索体4を樹木Tの幹Taに巻き留めする箇所は、幹Taから枝Tbへの枝分かれ部分To(図1〜図5参照)の上側位置が最も好ましいが、一番最初に第1巻留用索体3を幹Taに巻き留める際、即ち最初のアンカーKを形成する時に、例えば図1に示すように、地上から作業者Mの手が届く位置に適当な枝分かれ部分Toなどが無く、その位置より高い位置に好ましい巻留箇所が存在する場合には、脚立や梯子(図示省略)を使用し、第1巻留用索体3を幹Taに巻き留めてアンカーKを形成すればよい。尚、第1,第2巻留用索体3,4の巻き留め箇所は、樹木Tの幹Taだけでなく、枝Tbと変わらないほど太い場合にはその太枝(図示せず)でもよい。   The location where the first winding cable body 3 or the second winding cable body 4 is wound around the trunk Ta of the tree T is above the branching portion To (see FIGS. 1 to 5) from the trunk Ta to the branch Tb. Although the position is most preferable, when the first winding cable body 3 is wound around the trunk Ta first, that is, when the first anchor K is formed, as shown in FIG. If there is no suitable branching portion To at a position where the sag reaches, and there is a preferred winding location at a position higher than that location, a stepladder or ladder (not shown) is used, and the first winding cord 3 is trunked. What is necessary is just to wind around Ta and to form the anchor K. It should be noted that the winding place of the first and second winding cords 3 and 4 is not limited to the trunk Ta of the tree T, but may be a thick branch (not shown) if it is thick enough to be the same as the branch Tb.

図1に示すように最初の下段側アンカーKを形成し、その第1巻留用索体3の開閉式連結器8(開閉式フック16)にダブルロープテクニックにおける環状ロープ部Roを通し入れたならば、作業者Mは、図2に示すように、最初の下段側アンカーKに近い位置にある枝Tbのところまで、脚立や梯子を使用し、又はダブルロープテクニックを使用して登って、その登った位置で、下段側アンカーKである第1巻留用索体3の巻留位置より高い位置に第2巻留用索体4を巻き留めて上段側アンカーKを形成し、そしてこの上段側アンカーKである第2巻留用索体4の開閉式連結器8に、環状ロープ部Roを通し入れて、図2に示すような状態とする。   If the first lower anchor K is formed as shown in FIG. 1, and the annular rope portion Ro in the double rope technique is inserted into the open / close coupler 8 (open / close hook 16) of the first winding rope 3 For example, as shown in FIG. 2, the worker M uses a stepladder or a ladder, or climbs up to the branch Tb located near the first lower anchor K using the double rope technique, In the climbed position, the second anchoring cord 4 is fastened to a position higher than the winding position of the first anchoring cord 3 which is the lower anchor K, and the upper anchor K is formed, and this upper anchor An annular rope portion Ro is inserted into the open / close coupler 8 of the second winding cable 4 that is K, and the state shown in FIG. 2 is obtained.

この時、ダブルロープテクニックの環状ロープ部Roは、図2に示すように、上段側アンカーKである第2巻留用索体4の開閉式連結器8と、下段側アンカーKである第1巻留用索体3の開閉式連結器8とを通っていて、上段側アンカーKによる支持と下段側アンカーKによる支持との2点支持状態となっている。このように、環状ロープ部Roが、上段側アンカーKと下段側アンカーKとの2点で支持されているから、作業者Mは、そのような状態で樹木Tの剪定作業や枝打ち作業を行う際に、仮に、図2に示す上段側アンカーKの下側にある枝Tbが折れて、第2巻留用索体4が滑り落ちる状態となっても、環状ロープ部Roが下段側アンカーKである第1巻留用索体3で支持されてバックアップされ、しかして伸縮調整具6には作業者Mの体重による引張荷重が作用して長尺ロープ2での移動を阻止されるため、作業者Mは、宙吊り状態となって、地上への墜落を防止される。   At this time, as shown in FIG. 2, the circular rope portion Ro of the double rope technique includes an open / close coupler 8 of the second winding anchor 4 that is the upper anchor K and a first winding that is the lower anchor K. It passes through the open / close coupler 8 of the anchoring cable 3 and is in a two-point support state of support by the upper anchor K and support by the lower anchor K. Thus, since the annular rope portion Ro is supported at two points of the upper stage side anchor K and the lower stage side anchor K, the worker M performs the pruning work and the pruning work of the tree T in such a state. At this time, even if the branch Tb on the lower side of the upper anchor K shown in FIG. 2 is broken and the second winding cable 4 is slid down, the annular rope portion Ro is the lower anchor K. Since it is supported and backed up by the first winding cord 3, and the extension adjustment tool 6 is subjected to a tensile load due to the weight of the worker M and is prevented from moving on the long rope 2, the worker M Will be suspended in the air and prevented from falling to the ground.

そして、作業者Mは、図2で示すような位置での剪定や枝打ちなどの必要な樹上作業を終えた後、更に高い位置での樹上作業に移る時に、下段側アンカーKである第1巻留用索体3を樹木Tの幹Taから取り外し、この取り外した第1巻留用索体3を、図3に示すように作業者Mが安全帯10に取り付けて保持した状態で、伸縮調整具6によって環状ロープ部Roの長さを調整しながら所要高さまで登る。即ち、作業者Mは、図3に示すように、伸縮調整具6より下方の長尺ロープ2部分を引っ張る動作と、その後の伸縮調整具6を押し上げる動作とを繰り返しながら所要高さまで登っていく。この登り時は、ダブルロープテクニックの環状ロープ部Roは、図3に示すように、第2巻留用索体4である上段側アンカーKによる1点で支持されている。   Then, after the worker M completes the necessary tree work such as pruning and pruning at the position shown in FIG. 2, and moves to the tree work at a higher position, the worker M is the lower anchor K. The first winding cable 3 is removed from the trunk Ta of the tree T, and the removed first winding cable 3 is attached to the safety belt 10 and held by the worker M as shown in FIG. The tool 6 is climbed to the required height while adjusting the length of the annular rope portion Ro. That is, as shown in FIG. 3, the worker M climbs to the required height while repeating the operation of pulling the long rope 2 portion below the expansion / contraction adjustment tool 6 and the subsequent operation of pushing up the expansion / contraction adjustment tool 6. . At the time of this climbing, the annular rope portion Ro of the double rope technique is supported at one point by the upper anchor K which is the second winding rope 4 as shown in FIG.

上記のようにして作業者Mが樹木Tを図3に示す低位置から図4に示す位置まで登って適当な樹木Tの枝Tbに乗った状態で、作業者Mは、下段側アンカーKの第2巻留用索体4よりも高い位置に第1巻留用索体3を巻き留めることによって上段側アンカーKを形成した後、ダブルロープテクニックの環状ロープ部Roを上段側アンカーKの第1巻留用索体3の開閉式連結器8に通し入れ、図4に示すような状態とする。   With the worker M climbing the tree T from the low position shown in FIG. 3 to the position shown in FIG. 4 and riding on the branch Tb of the appropriate tree T as described above, the worker M After forming the upper anchor K by winding the first anchoring cable 3 at a position higher than the second anchoring cable 4, the first rope of the upper anchor K is connected to the annular rope portion Ro of the double rope technique. It is inserted into the open / close coupler 8 of the anchoring cable 3 and brought into a state as shown in FIG.

図4に示す状態において、ダブルロープテクニックの環状ロープ部Roは、図2に示す状態と同様に、上段側アンカーKによる支持と下段側アンカーKによる支持の2点支持状態にあるから、作業者Mは、図4に示す状態から、仮に、上段側アンカーKの下側にある枝Tbが折れて、第1巻留用索体3が滑り落ちる状態となっても、環状ロープ部Roは、下段側アンカーKである第1巻留用索体3によって支持されてバックアップされるため、作業者Mの墜落を防止することができる。図5は、樹木T上の更に高い位置でダブルロープテクニックの環状ロープ部Roが、第1巻留用索体3である上段側アンカーKによる支持と、第2巻留用索体4である下段側アンカーKによる支持との2点支持状態を示す。   In the state shown in FIG. 4, the annular rope portion Ro of the double rope technique is in a two-point support state of support by the upper anchor K and support by the lower anchor K, as in the state shown in FIG. 2. In the state where M is the state shown in FIG. 4, even if the branch Tb on the lower side of the upper anchor K is folded and the first winding cable body 3 is slid down, the annular rope portion Ro Since it is supported and backed up by the first winding cord 3 which is the anchor K, the worker M can be prevented from falling. FIG. 5 shows that the annular rope portion Ro of the double rope technique is supported at a higher position on the tree T by the upper anchor K that is the first winding rope 3 and the lower rope that is the second winding rope 4. A two-point support state with support by the anchor K is shown.

以降同様にして、作業者Mは、ダブルロープテクニックにおける環状ロープ部Roと、第1及び第2の2つの巻留用索体3,4を使用して、樹木Tの幹Taに下段側アンカーKと上段側アンカーKとを交互に形成しながら、環状ロープ部Roを、下段側アンカーKから、順次高くなっていく上段側アンカーKに付け替えていくことにより、樹木Tの低位置から高い位置に至る各所での剪定作業や枝打ち等の樹上作業時は、環状ロープ部Roを、上段側アンカーKによる支持と下段側アンカーKによる支持との2点支持状態とすることによって、作業者の墜落を確実に防止することができる。   Thereafter, in the same manner, the worker M uses the annular rope portion Ro in the double rope technique and the first and second winding cords 3 and 4 to the trunk Ta of the tree T to the lower anchor K. By alternately changing the annular rope portion Ro from the lower anchor K to the upper anchor K that gradually increases, the tree T is moved from a lower position to a higher position. When pruning work or pruning work everywhere, the annular rope portion Ro is supported at two points, the support by the upper anchor K and the support by the lower anchor K. Can be reliably prevented.

一方、樹上作業を終えて樹木Tから下りる際は、ダブルロープテクニックの上段側アンカーKを形成している巻留用索体3又は4の開閉式連結器8から環状ロープ部Roを抜き、その巻留用索体3又は4を樹木Tから取り外して作業者Mの身に付けた後、下段側アンカーKとして残っている巻留用索体3又は4の開閉式連結器8に通されて1点支持されている環状ロープ部Roを使って下方の枝Tbに下り、その枝Tbに乗った状態で、作業者Mの身に付けている巻留用索体3又は4を、上記巻留用索体3又は4の下方で樹木T又は太枝に巻き掛けて新たな下段側アンカーKを形成し、この新たな下段側アンカーKである巻留用索体3又は4の開閉式連結器8に環状ロープ部Roを通し、しかして環状ロープ部Roは、この新たな下段側アンカーKの開閉式連結器8と、下段側アンカーKとして残っていたものが新たな上段側となったアンカーKの開閉式連結器8とに通されることにより2点支持状態となる。   On the other hand, when descending from the tree T after finishing the tree work, the annular rope portion Ro is removed from the open / close coupler 8 of the winding rope 3 or 4 forming the upper anchor K of the double rope technique, After the winding cord 3 or 4 is removed from the tree T and worn by the worker M, it is passed through the open / close coupler 8 of the winding cord 3 or 4 remaining as the lower anchor K. The winding rope 3 or 4 attached to the worker M in the state of descending to the lower branch Tb using the supported annular rope portion Ro and riding on the branch Tb is used as the winding rope. A new lower anchor K is formed by wrapping the tree T or a large branch below 3 or 4, and an annular rope is connected to the open / close coupler 8 of the winding cord 3 or 4 which is the new lower anchor K. Through the section Ro, the annular rope section Ro A retractable coupling 8 over K, a two-point support state by what was left as the lower side anchor K is passed through the closure coupler 8 anchors K became a new upper stage.

こうして作業者Mは、環状ロープ部Roを2点支持した状態で、上記枝Tbに乗ったまま、上段側アンカーKを形成している巻留用索体3又は4の開閉式連結器8から環状ロープ部Roを抜き、その巻留用索体3又は4を樹木Tから取り外して作業者Mの身に付けた後、下段側アンカーKである巻留用索体3又は4の開閉式連結器8に通されている環状ロープ部Roを使って下方の枝Tbに下りる。以降、上述した動作を繰り返すことにより、地上へ安全に下りることができる。   In this way, the worker M is annularly connected from the open / close coupler 8 of the winding cord 3 or 4 that forms the upper anchor K while riding on the branch Tb while supporting the annular rope portion Ro at two points. After pulling out the rope portion Ro, removing the winding cord 3 or 4 from the tree T and attaching it to the worker M, it is connected to the open / close coupler 8 of the winding cord 3 or 4 which is the lower anchor K. It goes down to the lower branch Tb using the annular rope portion Ro that is passed through. Thereafter, it is possible to safely go down to the ground by repeating the above-described operation.

前記第1及び第2巻留用索体3,4は、例えば輪状になったスリングベルト(ソウンスリングとも称される)からなるもので、使用にあたっては、図6に示すように、輪状になったものを伸ばして二重直線状とし、この二重直線状としたものを樹木Tの幹Taに巻き掛けて、図示のように互いに会合した一端部3a,4aを他端部3b,4bの輪に通し、下方へ引っ張って引き締めることにより、幹Taに巻き留め固定してアンカーKを形成することができる。各巻留用索体3,4には一端部3a,4aに、図示のように開閉式連結器8が取り付けられる。このスリングベルトは使用の一例であって、第1及び第2巻留用索体3,4としては、スリングベルト以外に適当なものを使用することができる。   The first and second winding cords 3 and 4 are formed of, for example, a ring-shaped sling belt (also referred to as a sounsling), and in use, as shown in FIG. An object is stretched to form a double straight line, and the double straight line is wound around the trunk Ta of the tree T, and one end portions 3a and 4a that are associated with each other as shown in the figure are connected to the other end portions 3b and 4b. The anchor K can be formed by being wound around and fixed to the trunk Ta by pulling downward and tightening. As shown in the figure, an open / close coupler 8 is attached to each of the winding cords 3 and 4 at one end 3a and 4a. This sling belt is an example of use, and as the first and second winding cords 3 and 4, a suitable one other than the sling belt can be used.

尚、巻留用索体3,4としてのスリングベルトは、植林の枝打ち作業などの高所作業において身体をつなぎ留めるのに使用される高強度で非常に摩擦性の高い布材からなるもので、図6に示すように樹木Tの幹Taに巻き留めた状態で安定状態に支持され、しかも開閉式連結器8に急激な大荷重がかかっても全くずれ落ちしないから、作業者Mが落下した際の衝撃と荷重に耐えるアンカーKとして確実に機能することができる。   In addition, the sling belt as the winding cords 3 and 4 is made of a cloth material having high strength and extremely high friction used to hold the body in high place work such as tree planting pruning work, As shown in FIG. 6, the worker M falls because it is supported in a stable state while being wound around the trunk Ta of the tree T, and does not fall off at all even if a sudden heavy load is applied to the open / close coupler 8. It can function reliably as an anchor K that can withstand impact and load.

第1巻留用索体3及び第2巻留用索体4に取り付ける開閉式連結器8としては、頻繁に開閉操作を行うため、図6に示すような周知の開閉式フック16あるいはカラビナを使用する。   As the open / close coupler 8 attached to the first winding cable body 3 and the second winding cable body 4, a known open / close hook 16 or a carabiner as shown in FIG. 6 is used for frequent opening / closing operations. .

長尺ロープ2の一端部に取り付けた第1連結器5から所要長さ離れた長尺ロープ2上に設けられる伸縮調整具6は、図6に示すように、短尺ロープ材12の一端部側を長尺ロープ2に巻き付けて結び目、例えばブレイクスヒッチ13を形成したものからなるもので、このブレイクスヒッチ13を掴んで長尺ロープ2上を移動させることにより、ダブルロープテクニックの環状ロープ部Roを伸縮でき、短尺ロープ材12を所定方向に引っ張ることによって長尺ロープ2上での移動を阻止できる。尚、短尺ロープ材12の他端部には輪っか部12oを設け、これに第1連結器7としてのカラビナ15を通し入れる。そして、伸縮調整具6としては、このような結び目の他に、所定の操作をすることで長尺ロープ2上を移動し、所定方向の荷重がかかることで長尺ロープ2上での移動を阻止するロック金具18(図8参照)を使用することができる。   The expansion / contraction adjustment tool 6 provided on the long rope 2 separated from the first connector 5 attached to one end of the long rope 2 by the required length is one end side of the short rope member 12 as shown in FIG. Is formed by tying the rope 2 around the long rope 2 and forming a knot, for example, a breaks hitch 13. By gripping the break hitch 13 and moving it on the long rope 2, the circular rope part of the double rope technique Ro can be expanded and contracted, and movement on the long rope 2 can be prevented by pulling the short rope material 12 in a predetermined direction. In addition, the other end part of the short rope material 12 is provided with a ring-shaped part 12o, and a carabiner 15 as the first coupler 7 is inserted into this. In addition to the knot, the expansion / contraction adjustment tool 6 moves on the long rope 2 by performing a predetermined operation, and moves on the long rope 2 by applying a load in a predetermined direction. A blocking metal fitting 18 (see FIG. 8) can be used.

作業者Sが装着する安全帯10としては、フルハーネス型安全帯、シットハーネス型安全帯等を使用する。図6に示す安全帯10は、胴ベルト10aと肩ベルト10bと腿ベルト10cとからなるフルハーネス型安全帯であり、胴ベルト10aには前部側中央に輪っか状の被連結部17が設けてあって、この被連結部17に第1連結器5及び第2連結器7がつながれるようになっている。   As the safety belt 10 worn by the worker S, a full harness safety belt, a sit harness safety belt, or the like is used. The safety belt 10 shown in FIG. 6 is a full harness type safety belt composed of a waist belt 10a, a shoulder belt 10b, and a thigh belt 10c. The waist belt 10a is provided with a ring-shaped connected portion 17 at the front center. Accordingly, the first connector 5 and the second connector 7 are connected to the connected portion 17.

以上、図1〜図6によって説明した実施形態では、長尺ロープ2の一端部に第1連結器5を設け、この第1連結器5から所要長さ離れたロープ2上に伸縮調整具6を設け、この伸縮調整具6に第2連結器7を設けて、これらの第1連結器5と伸縮調整具6と第2連結環7とでダブルロープテクニックの環状ロープ部Roを形成しているが、この環状ロープ部Roは基本的な一例であって、これ以外に、簡略化した種々の環状ロープ部Roが採用されている。その簡略化した環状ロープ部Roの一部の例を図7及び図8に示す。   As described above, in the embodiment described with reference to FIGS. 1 to 6, the first coupler 5 is provided at one end of the long rope 2, and the expansion / contraction adjustment tool 6 is provided on the rope 2 that is separated from the first coupler 5 by a required length. A second connector 7 is provided on the expansion / contraction adjustment tool 6, and an annular rope portion Ro of the double rope technique is formed by the first connection device 5, the expansion / contraction adjustment tool 6 and the second connection ring 7. However, this annular rope portion Ro is a basic example, and various other simplified annular rope portions Ro are employed. An example of a part of the simplified annular rope portion Ro is shown in FIGS.

図7に例示した環状ロープ部Roでは、長尺ロープ2の所要部を折り返して、その折り返し部に二重8の字状結び19を形成し、この二重8の字状結び19から延出したロープ部2aの先端部側を長尺ロープ2の本体側に巻き付けて、例えばブレイクスヒッチ13を形成することにより伸縮調整具6を形成し、前記二重8の字状結び19の輪っか部19oにカラビナからなる連結器20を取り付けることにより、長尺ロープ2の一端部と伸縮調整具6とを連結器20でつなぐようにしたもので、この連結器20と伸縮調整具6とによってダブルロープテクニックの環状ロープ部Roを形成し、この環状ロープ部Roの連結器20を、作業者Mの安全帯10の被連結部17に連結するようにしている。   In the annular rope portion Ro illustrated in FIG. 7, a required portion of the long rope 2 is folded, and a double 8-shaped knot 19 is formed at the folded portion, and the double 8-shaped knot 19 extends. The distal end side of the rope portion 2a is wound around the main body side of the long rope 2, and the expansion / contraction adjustment tool 6 is formed, for example, by forming the breaks hitch 13, and the loop portion of the double 8-shaped knot 19 A connector 20 made of a carabiner is attached to 19o so that one end of the long rope 2 and the expansion / contraction adjustment tool 6 are connected by the connection device 20. An annular rope portion Ro of the rope technique is formed, and the coupler 20 of the annular rope portion Ro is connected to the connected portion 17 of the safety belt 10 of the worker M.

図8に例示した環状ロープ部Roにおいては、長尺ロープ2の一端部に設けた輪っか部2oにカラビナからなる連結器21を挿し込んで取り付け、この連結器21から所要長さ離れた長尺ロープ2上には、所定の操作をすることで長尺ロープ2上を移動し、所定方向の荷重がかかることで長尺ロープ2上での移動を阻止する、伸縮調整具6としてのロック金具18を取り付けると共に、このロック金具18を前記連結器21に取り付けることにより、長尺ロープ2の一端部と伸縮調整具6とを連結器21でつなぐようにしたもので、連結器21と伸縮調整具6とによりダブルロープテクニックの環状ロープ部Roを形成し、この環状ロープ部Roの連結器21を安全帯10の被連結部17に連結するようにしている。   In the annular rope portion Ro illustrated in FIG. 8, a coupler 21 made of a carabiner is inserted into and attached to a ring portion 2 o provided at one end of the long rope 2, and a long length separated from the coupler 21 by a required length. On the rope 2, a lock fitting as the expansion / contraction adjustment tool 6 that moves on the long rope 2 by performing a predetermined operation and prevents movement on the long rope 2 by applying a load in a predetermined direction. 18, and the lock fitting 18 is attached to the coupler 21 so that one end of the long rope 2 and the expansion / contraction adjustment tool 6 are connected by the coupler 21. An annular rope portion Ro of the double rope technique is formed by the tool 6, and the coupler 21 of the annular rope portion Ro is connected to the connected portion 17 of the safety belt 10.

上記ロック金具18は、周知のもので、図8の一部拡大図2ら分かるように、所定方向に荷重をかけることで作動するロック部材22のロック作用により長尺ロープ2上での移動が阻止され、荷重を解放することでロック部材22によるロックが解除され、そのロック解除状態で金具本体23を押し引き操作することによって長尺ロープ2上で移動可能となるように構成されている。ロック部材22は、長尺ロープ2を保持する金具本体23に枢軸24で枢着されていて、一端側には長尺ロープ2に対し接離可能な偏心カム部25を有し、他端部には連結器21としてのカラビナを取り付ける取付孔26を有し、常時はバネによって、ロック部材22を、その偏心カム部25が長尺ロープ2から離間して金具本体23を長尺ロープ2に沿ってスライド可能なロック解除位置に付勢し、そして連結器21であるカラビナを前記バネに抗して所定方向に引っ張ることにより、ロック部材22が枢軸24を中心に回動して偏心カム部25が長尺ロープ2に圧接し、その圧接摩擦力で金具本体23を長尺ロープ2上にロックするようになっている。   The lock fitting 18 is a well-known one, and as can be seen from the partially enlarged view 2 of FIG. 8, the lock member 22 that operates by applying a load in a predetermined direction can be moved on the long rope 2. It is blocked, and the lock by the lock member 22 is released by releasing the load, and it can be moved on the long rope 2 by pushing and pulling the metal fitting body 23 in the unlocked state. The lock member 22 is pivotally attached to a metal fitting body 23 that holds the long rope 2 by a pivot 24, and has an eccentric cam portion 25 that can contact and separate from the long rope 2 on one end side, and the other end portion. Has a mounting hole 26 for attaching a carabiner as the coupler 21, and the lock member 22 is always separated by a spring, the eccentric cam portion 25 thereof is separated from the long rope 2, and the metal fitting body 23 is attached to the long rope 2. The lock member 22 is rotated about the pivot shaft 24 by urging to the unlocking position slidable along and pulling the carabiner as the connector 21 against the spring in a predetermined direction. 25 is press-contacted to the long rope 2, and the metal fitting body 23 is locked onto the long rope 2 by the press-contact friction force.

上述した図7及び図8に示される環状ロープ部Roは、一部の例であり、これ以外にも種々の形態のものがある。従って、ダブルロープテクニックにおける環状ロープ部Roとしては、長尺ロープ2の一部に伸縮調整具6を介して伸縮調整可能な環状ロープ部Roを形成するものであれば、如何なる構成でもよい。しかして、そのような環状ロープ部Roの所要箇所を作業者Mの安全帯10に固定した状態で、この環状ロープ部Roを樹木Tの幹Ta又は太枝に形成した少なくとも2つのアンカーKである巻留用索体3,4の開閉式連結器8,8に通して少なくとも2点支持することにより、上部アンカーKの設けてある樹木Tの幹Taが折れたとしても、下部アンカーKでバックアップでき、地上への墜落を防止でき、日本の労働基準監督署の指導にも適うことになる。また、アンカーKにかかる荷重が作業者の体重と同じ荷重となるから、樹木Tの比較的細い幹でもアンカーKを設置可能となり、そしてまた作業者は、樹木に登る際には巻留用索体3,4を少なくとも2つ持って登ればよいから、作業者の重量的負担を軽減できる。   The annular rope portion Ro shown in FIG. 7 and FIG. 8 described above is a part of the example, and there are various forms other than this. Accordingly, the annular rope portion Ro in the double rope technique may have any configuration as long as the annular rope portion Ro that can be adjusted to be expanded and contracted via the expansion and contraction adjusting tool 6 is formed on a part of the long rope 2. Thus, in a state where the required portion of the annular rope portion Ro is fixed to the safety belt 10 of the worker M, the annular rope portion Ro is formed by at least two anchors K formed on the trunk Ta or the large branch of the tree T. Even if the trunk Ta of the tree T provided with the upper anchor K breaks by supporting at least two points through the open / close couplers 8 and 8 of the winding cords 3 and 4, the lower anchor K backs up. It is possible to prevent the fall to the ground, and it is also suitable for the guidance of the Japan Labor Standards Inspection Office. In addition, since the load applied to the anchor K is the same as the weight of the operator, the anchor K can be installed even on a relatively thin trunk of the tree T, and the operator can use the anchoring rope when climbing the tree. Since it is sufficient to climb with at least two of 3 and 4, the weight burden on the operator can be reduced.

M 作業者
T 樹木
Ta 樹木の幹
Tb 樹木の枝
To 樹木の枝分かれ部分
DRT ダブルロープテクニック
2 長尺ロープ
3 第1巻留用索体
4 第2巻留用索体
K アンカー
5 第1連結器
6 伸縮調整具
7 第2連結器
8 連結器
10 安全帯
13 伸縮調整具としてのブレイクスヒッチ
15 連結器としてのカラビナ
16 開閉式連結器としての開閉式フック
18 伸縮調整具としてのロック金具
20 連結器
21 連結器
M worker T tree Ta tree trunk Tb tree branch To tree branch part DRT double rope technique 2 long rope 3 first winding cable 4 second winding cable K anchor 5 first coupler 6 expansion and contraction adjustment Tool 7 Second connector 8 Connector 10 Safety belt 13 Breaks hitch 15 as expansion / contraction adjustment device Carabiner 16 as connection device Opening / closing hook 18 as an open / close connection device Lock fitting 20 as an expansion / contraction adjustment device Connector 21 Connection vessel

Claims (1)

その長尺ロープの一部に伸縮調整具を介して伸縮調整可能な環状ロープ部を形成する、ダブルロープテクニックに使用する長尺ロープと、
樹木の幹又は太枝の所要部に巻き留めて夫々ダブルロープテクニックのアンカーを形成する少なくとも2つの開閉式連結器付き巻留用索体と、を用いる樹上作業の墜落防止方法であって、
前記環状ロープ部の所要箇所を作業者の安全帯に固定した状態で、この環状ロープ部を、樹木の幹又は太枝に形成した少なくとも2つのアンカーである巻留用索体の開閉式連結器に通して少なくとも2点支持することにより、作業者の墜落を防止するようにした樹上作業の墜落防止方法。
A long rope used for the double rope technique that forms an annular rope part that can be expanded and contracted via an expansion adjustment tool on a part of the long rope,
A method for preventing fall of tree work using at least two anchoring ropes with an open-close coupling, each of which is wound around a required part of a tree trunk or a large branch to form an anchor of a double rope technique,
In a state in which the required portion of the annular rope portion is fixed to the operator's safety belt, the annular rope portion is connected to an open / close coupler of a winding rope that is at least two anchors formed on a tree trunk or a large branch. A fall prevention method for tree work that prevents the fall of the worker by supporting at least two points through.
JP2013188644A 2013-09-11 2013-09-11 How to prevent fall of tree work Active JP6263688B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2013188644A JP6263688B2 (en) 2013-09-11 2013-09-11 How to prevent fall of tree work

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2013188644A JP6263688B2 (en) 2013-09-11 2013-09-11 How to prevent fall of tree work

Publications (2)

Publication Number Publication Date
JP2015053890A JP2015053890A (en) 2015-03-23
JP6263688B2 true JP6263688B2 (en) 2018-01-24

Family

ID=52818741

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2013188644A Active JP6263688B2 (en) 2013-09-11 2013-09-11 How to prevent fall of tree work

Country Status (1)

Country Link
JP (1) JP6263688B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102148450B1 (en) * 2017-10-30 2020-08-27 삼성엔지니어링 주식회사 Personal anchorage connector and method of preventing worker from dropping by using the same

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020117353A1 (en) * 2000-09-14 2002-08-29 Jones D. Keith Adjustable safety line
JP4420802B2 (en) * 2004-12-03 2010-02-24 株式会社グリーンメンテナンス How to prevent fall of tree work
JP4808680B2 (en) * 2007-07-09 2011-11-02 株式会社グリーンメンテナンス Training device for cutting work at tree heights
JP5748529B2 (en) * 2011-01-07 2015-07-15 株式会社グリーンメンテナンス Torso for work safety belts on trees
JP5651514B2 (en) * 2011-03-25 2015-01-14 藤井電工株式会社 Tree lift assisting tool equipped with a two-point locking fall prevention rope and a belt with a choke stand, and a tree lifting method using the same

Also Published As

Publication number Publication date
JP2015053890A (en) 2015-03-23

Similar Documents

Publication Publication Date Title
US8235173B2 (en) Single waistband belt system convertible between a sit harness and quick release utility belt
US20080156583A1 (en) Safety harness and method
US9332748B2 (en) Aerial safety system
JP6533641B2 (en) Fall prevention method using wind-up fall prevention device and harness type safety belt used therefor
US20090236176A1 (en) Integrated harness boiler suit
EP0511319A1 (en) Fall prevention and lowering system, methods of use and body engagement means utilizable therewith
US20110101061A1 (en) Belt and Harness Assembly
US5341896A (en) Safety harness for tree climbers
US20070114095A1 (en) Positioning and safety lanyard device and associated method of use
US20110067953A1 (en) Extraction Device
US20110309617A1 (en) Apparatus, system, and method for facilitating tying a friction hitch knot in a chord
JP5651514B2 (en) Tree lift assisting tool equipped with a two-point locking fall prevention rope and a belt with a choke stand, and a tree lifting method using the same
JP6263688B2 (en) How to prevent fall of tree work
EP3831450A1 (en) Remote clipping device
CN202179825U (en) Climbing rope and climbing device
JPH09510368A (en) Personal safety equipment
JP6733884B2 (en) Harness type safety belt
JP6063699B2 (en) Securing tree work posture stability
US20130240293A1 (en) Fire escape emergency descent system (eds)
JP2016093486A (en) Grip of lanyard for slope and safety measure device as well as double safety measure method in slope work
US20050092545A1 (en) Adjustable safety line
JP4420802B2 (en) How to prevent fall of tree work
JP2002152933A (en) Method of engineering work using scaffolding net
JP2015228950A (en) High place work safety belt
US9677333B1 (en) Unfurlable rescue ladder

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20160901

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20170526

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20170630

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20170712

R150 Certificate of patent or registration of utility model

Ref document number: 6263688

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250