JP6221714B2 - Power consumption management device, power consumption management method, and power consumption management program - Google Patents

Power consumption management device, power consumption management method, and power consumption management program Download PDF

Info

Publication number
JP6221714B2
JP6221714B2 JP2013256097A JP2013256097A JP6221714B2 JP 6221714 B2 JP6221714 B2 JP 6221714B2 JP 2013256097 A JP2013256097 A JP 2013256097A JP 2013256097 A JP2013256097 A JP 2013256097A JP 6221714 B2 JP6221714 B2 JP 6221714B2
Authority
JP
Japan
Prior art keywords
power
information
power consumption
instruction
demand facility
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2013256097A
Other languages
Japanese (ja)
Other versions
JP2015116038A (en
Inventor
三好 秀和
秀和 三好
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sumitomo Electric Industries Ltd
Original Assignee
Sumitomo Electric Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sumitomo Electric Industries Ltd filed Critical Sumitomo Electric Industries Ltd
Priority to JP2013256097A priority Critical patent/JP6221714B2/en
Publication of JP2015116038A publication Critical patent/JP2015116038A/en
Application granted granted Critical
Publication of JP6221714B2 publication Critical patent/JP6221714B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • Y02B70/3225Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/222Demand response systems, e.g. load shedding, peak shaving

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

本発明は、電力消費管理装置、電力消費管理方法および電力消費管理プログラムに関し、特に、複数の電力需要施設における電力消費を管理する電力消費管理装置、電力消費管理方法および電力消費管理プログラムに関する。   The present invention relates to a power consumption management device, a power consumption management method, and a power consumption management program, and more particularly to a power consumption management device, a power consumption management method, and a power consumption management program for managing power consumption in a plurality of power demand facilities.

従来、電力需給が逼迫している場合等に一般家庭およびオフィス等の電力需要施設における電力消費が抑制されるように、複数の電力需要施設における電力消費を管理するシステムが開発されている。   2. Description of the Related Art Conventionally, a system for managing power consumption in a plurality of power demand facilities has been developed so that power consumption in power demand facilities such as ordinary homes and offices is suppressed when power supply and demand is tight.

たとえば、特許文献1(特開2012−205358号公報)には、以下のような技術が開示されている。すなわち、電力管理システムは、予め登録された複数の参加者を含むコミュニティに関する参加者リストを保持する保持部と、電力削減制御の実行の要否を判定する判定部と、電力削減制御の実行が必要であると判定部が判定した場合に、参加者リストに含まれている複数の参加者の中から、電力削減制御の対象となる一以上の対象者を選定する選定部と、選定部によって選定された対象者に関して、電力削減制御を実行する制御部と、電力削減制御が実行された対象者に対して、削減電力に基づく特典を付与する付与部と、を備える。   For example, Patent Document 1 (Japanese Patent Laid-Open No. 2012-205358) discloses the following technique. That is, the power management system includes a holding unit that holds a participant list related to a community including a plurality of registered participants, a determination unit that determines whether or not to execute power reduction control, and execution of power reduction control. When the determination unit determines that it is necessary, a selection unit that selects one or more target persons to be subjected to power reduction control from a plurality of participants included in the participant list, and a selection unit With respect to the selected target person, a control unit that performs power reduction control and a grant unit that grants a privilege based on the reduced power to the target person for which power reduction control has been executed are provided.

特開2012−205358号公報JP 2012-205358 A 特開2013−161144号公報JP 2013-161144 A

また、節電を目的として、ビル等へのBEMS(Building Energy Management System)の導入が行われている。BEMSとは、ビル等で使用される電力量を監視し、ビル内の機器または設備等の運転状態を管理することによって、ビル等の電力消費量の削減を図るためのシステムである。BEMSは、BEMSアグリゲータと呼ばれる事業者等により導入される。BEMSアグリゲータは、集中管理システムを設置し、BEMSを導入したビル等に対してエネルギー管理支援サービスを行う。   For the purpose of power saving, BEMS (Building Energy Management System) has been introduced into buildings and the like. BEMS is a system for reducing the power consumption of a building or the like by monitoring the amount of power used in the building or the like and managing the operation state of equipment or facilities in the building. BEMS is introduced by an operator called a BEMS aggregator. The BEMS aggregator installs a centralized management system and provides an energy management support service for buildings and the like where BEMS is introduced.

電力会社は、多くのビル等にBEMSが導入されることにより、電力需要の調整を行わせることが容易となる。たとえば、電力会社は、電力需給の逼迫が予測される場合に、BEMSアグリゲータに対して予め節電要請を行う。そして、BEMSアグリゲータは、各ビルの需要家に対して節電要請を行うとともに、たとえば、各ビルの空調および照明等を制御して電力の消費を抑制する。   An electric power company can easily adjust power demand by introducing BEMS in many buildings. For example, an electric power company makes a power-saving request in advance to the BEMS aggregator when it is predicted that power supply and demand will be tight. Then, the BEMS aggregator makes a power saving request to the customers of each building, and controls the air conditioning and lighting of each building, for example, to suppress power consumption.

しかしながら、上記のように、電力需給の逼迫が予測される場合等に各施設の需要家に対して節電要請を予め送信した場合、当該節電要請を受信した需要家が、対象期間において当該節電要請に従った電力消費の抑制を行うことが困難な状況となることがあり、このような場合、適切な電力制御を行うことができないという問題がある。   However, as described above, when a power saving request is transmitted to a customer of each facility in advance when power supply / demand tightness is predicted, the customer who has received the power saving request receives the power saving request in the target period. In some cases, it is difficult to suppress power consumption according to the above. In such a case, there is a problem that appropriate power control cannot be performed.

この発明は、上述の課題を解決するためになされたもので、その目的は、電力需要施設における電力消費を状況に応じて適切に制御することができる電力消費管理装置、電力消費管理方法および電力消費管理プログラムを提供することである。   This invention was made in order to solve the above-mentioned subject, The objective is a power consumption management apparatus, a power consumption management method, and power which can control appropriately power consumption in a power demand facility according to a situation. It is to provide a consumption management program.

(1)上記課題を解決するために、この発明のある局面に係わる電力消費管理装置は、複数の電力需要施設における電力消費を管理する電力消費管理装置であって、1または複数の電力供給側から電力消費に関する電力管理情報を取得する管理情報取得部と、前記電力管理情報に基づいて、前記電力需要施設における電力消費に関する指示情報を前記電力需要施設に通知する指示処理を行う指示部と、前記指示情報を通知した前記電力需要施設における電力消費を監視する監視部とを備え、前記指示部は、前記電力管理情報および前記監視部の監視結果に基づいて、前記指示処理の内容を変更する。   (1) In order to solve the above-described problem, a power consumption management device according to an aspect of the present invention is a power consumption management device that manages power consumption in a plurality of power demand facilities, and includes one or more power supply sides. A management information acquisition unit that acquires power management information related to power consumption from an instruction unit that performs instruction processing for notifying the power demand facility of instruction information related to power consumption in the power demand facility based on the power management information; A monitoring unit that monitors power consumption in the power demand facility that has notified the instruction information, and the instruction unit changes contents of the instruction processing based on the power management information and a monitoring result of the monitoring unit. .

(11)上記課題を解決するために、この発明のある局面に係わる電力消費管理方法は、複数の電力需要施設における電力消費を管理する電力消費管理装置における電力消費管理方法であって、1または複数の電力供給側から電力消費に関する電力管理情報を取得するステップと、前記電力管理情報に基づいて、前記電力需要施設における電力消費に関する指示情報を前記電力需要施設に通知する指示処理を行うステップと、前記指示情報を通知した前記電力需要施設における電力消費を監視するステップと、前記電力管理情報および前記監視部の監視結果に基づいて、内容を変更した前記指示処理を行うステップとを含む。   (11) In order to solve the above-described problem, a power consumption management method according to an aspect of the present invention is a power consumption management method in a power consumption management device that manages power consumption in a plurality of power demanding facilities. Obtaining power management information related to power consumption from a plurality of power supply sides; performing instruction processing for notifying the power demand facility of instruction information related to power consumption in the power demand facility based on the power management information; , Monitoring the power consumption in the power demand facility that has notified the instruction information, and performing the instruction process with the contents changed based on the power management information and the monitoring result of the monitoring unit.

(12)上記課題を解決するために、この発明のある局面に係わる電力消費管理プログラムは、複数の電力需要施設における電力消費を管理する電力消費管理装置において用いられる電力消費管理プログラムであって、コンピュータに、1または複数の電力供給側から電力消費に関する電力管理情報を取得するステップと、前記電力管理情報に基づいて、前記電力需要施設における電力消費に関する指示情報を前記電力需要施設に通知する指示処理を行うステップと、前記指示情報を通知した前記電力需要施設における電力消費を監視するステップと、前記電力管理情報および前記監視部の監視結果に基づいて、内容を変更した前記指示処理を行うステップとを実行させるためのプログラムである。   (12) In order to solve the above problem, a power consumption management program according to an aspect of the present invention is a power consumption management program used in a power consumption management device that manages power consumption in a plurality of power demand facilities, An instruction to acquire power management information related to power consumption from one or a plurality of power supply sides to the computer and to notify the power demand facility of instruction information related to power consumption in the power demand facility based on the power management information A step of performing processing, a step of monitoring power consumption in the power demand facility that has notified the instruction information, and a step of performing the instruction processing in which the content is changed based on the power management information and a monitoring result of the monitoring unit Is a program for executing

本発明は、このような特徴的な処理部を備える電力消費管理装置の一部または全部を実現する半導体集積回路として実現することができる。   The present invention can be realized as a semiconductor integrated circuit that realizes part or all of the power consumption management apparatus including such a characteristic processing unit.

本発明によれば、電力需要施設における電力消費を状況に応じて適切に制御することができる。   ADVANTAGE OF THE INVENTION According to this invention, the power consumption in a power demand facility can be appropriately controlled according to a condition.

図1は、本発明の実施の形態に係る電力消費管理システムの構成を示す図である。FIG. 1 is a diagram showing a configuration of a power consumption management system according to an embodiment of the present invention. 図2は、本発明の実施の形態に係る電力消費管理システムの電力消費管理装置による指示処理の一例を示す図である。FIG. 2 is a diagram illustrating an example of instruction processing by the power consumption management device of the power consumption management system according to the embodiment of the present invention. 図3は、本発明の実施の形態に係る電力消費管理システムの電力消費管理装置による指示処理の一例を示す図である。FIG. 3 is a diagram showing an example of instruction processing by the power consumption management apparatus of the power consumption management system according to the embodiment of the present invention. 図4は、本発明の実施の形態に係る電力消費管理システムの電力消費管理装置の構成を示す図である。FIG. 4 is a diagram showing the configuration of the power consumption management device of the power consumption management system according to the embodiment of the present invention. 図5は、本発明の実施の形態に係る電力消費管理システムの電力消費管理装置における記憶部に記憶されている優先情報の一例を示す図である。FIG. 5 is a diagram showing an example of priority information stored in the storage unit in the power consumption management device of the power consumption management system according to the embodiment of the present invention. 図6は、本発明の実施の形態に係る機器管理システムによる電力消費管理の動作手順を示すシーケンス図である。FIG. 6 is a sequence diagram showing an operation procedure of power consumption management by the device management system according to the embodiment of the present invention. 図7は、図6に示す監視処理の詳細な動作手順を示すフローチャートである。FIG. 7 is a flowchart showing a detailed operation procedure of the monitoring process shown in FIG. 図8は、本発明の実施の形態に係る電力消費管理システムの電力会社サーバによる基準値の算出に用いられるテーブルの一例を示す図である。FIG. 8 is a diagram showing an example of a table used for calculating a reference value by the power company server of the power consumption management system according to the embodiment of the present invention. 図9は、本発明の実施の形態に係る電力消費管理システムの電力消費管理装置に記憶される、過去に指示情報を通知した需要家装置による電気機器の動作の制御内容等を含むテーブルの一例を示す図である。FIG. 9 is an example of a table that includes the control contents of the operation of the electrical device by the consumer device that has notified the instruction information in the past, stored in the power consumption management device of the power consumption management system according to the embodiment of the present invention. FIG. 図10は、本発明の実施の形態に係る電力消費管理システムの電力消費管理装置に記憶される、各電力需要施設のイベント情報を含むテーブルの一例を示す図である。FIG. 10 is a diagram illustrating an example of a table including event information of each power demand facility stored in the power consumption management apparatus of the power consumption management system according to the embodiment of the present invention.

最初に、本発明の実施形態の内容を列記して説明する。   First, the contents of the embodiment of the present invention will be listed and described.

(1)本発明の実施の形態に係る電力消費管理装置は、複数の電力需要施設における電力消費を管理する電力消費管理装置であって、1または複数の電力供給側から電力消費に関する電力管理情報を取得する管理情報取得部と、前記電力管理情報に基づいて、前記電力需要施設における電力消費に関する指示情報を前記電力需要施設に通知する指示処理を行う指示部と、前記指示情報を通知した前記電力需要施設における電力消費を監視する監視部とを備え、前記指示部は、前記電力管理情報および前記監視部の監視結果に基づいて、前記指示処理の内容を変更する。   (1) A power consumption management apparatus according to an embodiment of the present invention is a power consumption management apparatus that manages power consumption in a plurality of power demand facilities, and includes power management information related to power consumption from one or more power supply sides. A management information acquisition unit that acquires the power management information, an instruction unit that performs an instruction process for notifying the power demand facility of instruction information related to power consumption in the power demand facility, and the instruction information that has been notified A monitoring unit that monitors power consumption in the power demand facility, and the instruction unit changes the content of the instruction processing based on the power management information and a monitoring result of the monitoring unit.

このように、指示情報の通知先である電力需要施設における電力消費の制御状況をリアルタイムで監視し、監視結果および電力管理情報に基づいて指示処理の内容を変更する構成により、電力需要施設における電力消費を状況に応じて適切に制御することができる。   As described above, the power consumption control facility in the power demand facility that is the notification destination of the instruction information is monitored in real time, and the content of the instruction processing is changed based on the monitoring result and the power management information. Consumption can be appropriately controlled according to the situation.

(2)好ましくは、前記指示部は、前記指示処理の内容の変更として、1または複数の新たな前記電力需要施設に新たな前記指示情報を通知するか、または、前記指示情報を通知した前記電力需要施設に異なる内容の前記指示情報を通知する。   (2) Preferably, the said instruction | indication part notifies the said new instruction information to one or several new said power demand facilities as a change of the content of the said instruction | indication process, or the said instruction information was notified The instruction information having different contents is notified to the power demand facility.

このように、たとえば、通知された指示情報に従った電力消費制御を行うことが困難な電力需要施設が存在する場合であっても、他の電力需要施設に対する新たな指示情報の通知または同一の電力需要施設に対する異なる内容の指示情報の通知を行うことにより、電力供給側からの要請等に応じた電力消費の制御を行うことができる。   Thus, for example, even when there is a power demand facility where it is difficult to perform power consumption control according to the notified instruction information, notification of new instruction information to other power demand facilities or the same By notifying instruction information having different contents to the power demand facility, it is possible to control power consumption in response to a request from the power supply side.

(3)好ましくは、前記電力消費管理装置は、さらに、前記電力需要施設における電力消費の基準となる基準電力消費情報を取得する基準情報取得部を備え、前記指示部は、前記電力管理情報と、前記監視部の監視結果と、前記基準電力消費情報とに基づいて、前記指示処理の内容を変更する。   (3) Preferably, the power consumption management device further includes a reference information acquisition unit that acquires reference power consumption information serving as a reference of power consumption in the power demand facility, and the instruction unit includes the power management information and The content of the instruction process is changed based on the monitoring result of the monitoring unit and the reference power consumption information.

このように、電力管理情報と、監視部の監視結果とに加えて、電力需要施設における電力消費の基準を考慮して指示処理の内容を変更するか否かを判断する構成により、指示処理の内容の変更の必要性をより適切に判断することができる。   Thus, in addition to the power management information and the monitoring result of the monitoring unit, it is possible to determine whether to change the content of the instruction process in consideration of the power consumption standard in the power demand facility. The necessity of changing the contents can be judged more appropriately.

(4)好ましくは、前記電力消費管理装置は、さらに、各前記電力需要施設に付与された優先度または優先順位を示す優先情報を取得する優先情報取得部を備え、前記指示部は、前記優先情報に基づいて、前記各電力需要施設の中から新たな前記指示情報を通知すべき前記電力需要施設を選択する。   (4) Preferably, the power consumption management device further includes a priority information acquisition unit that acquires priority information indicating a priority or priority given to each power demand facility, and the instruction unit includes the priority Based on the information, the power demand facility to be notified of the new instruction information is selected from the power demand facilities.

このような構成により、新たな指示情報の通知先として優先的に選択すべき電力需要施設を容易に判断することができる。   With such a configuration, it is possible to easily determine a power demand facility to be preferentially selected as a notification destination of new instruction information.

(5)より好ましくは、前記電力消費管理装置は、さらに、前記電力需要施設に対して過去に前記指示情報を通知したタイミングを示すタイミング情報を取得するタイミング情報取得部を備え、前記指示部は、前記優先情報および前記タイミング情報の少なくともいずれか一方に基づいて、前記各電力需要施設の中から新たな前記指示情報を通知すべき前記電力需要施設を選択する。   (5) More preferably, the power consumption management device further includes a timing information acquisition unit that acquires timing information indicating a timing at which the instruction information was previously notified to the power demand facility, and the instruction unit includes: Based on at least one of the priority information and the timing information, the power demand facility to be notified of the new instruction information is selected from the power demand facilities.

このような構成により、たとえば同一の電力需要施設に対して複数回連続して指示情報を通知することを避け、複数の電力需要施設間での電力削減の偏りを防ぐことができる。   With such a configuration, for example, it is possible to avoid notifying instruction information to the same power demand facility a plurality of times in succession, and to prevent a bias in power reduction among the plurality of power demand facilities.

(6)好ましくは、前記電力消費管理装置は、さらに、前記電力需要施設の前記電力供給側から供給される電力量に関する電力量情報を取得する電力量情報取得部を備え、前記指示部は、前記優先情報および前記電力量情報の少なくともいずれか一方に基づいて、前記各電力需要施設の中から新たな前記指示情報を通知すべき前記電力需要施設を選択する。   (6) Preferably, the power consumption management device further includes a power amount information acquisition unit that acquires power amount information regarding the amount of power supplied from the power supply side of the power demand facility, and the instruction unit includes: Based on at least one of the priority information and the power amount information, the power demand facility to be notified of the new instruction information is selected from the power demand facilities.

このような構成により、電力供給側から供給される電力量が大きい電力需要施設など、比較的容易に電力消費の抑制等を行うことが可能な電力需要施設を、新たな指示情報の通知先として選択することができる。   With such a configuration, a power demand facility capable of relatively easily suppressing power consumption, such as a power demand facility with a large amount of power supplied from the power supply side, is used as a new instruction information notification destination. You can choose.

(7)好ましくは、前記電力消費管理装置は、さらに、前記電力需要施設における電力消費の基準となる基準電力消費情報を取得する基準情報取得部を備え、前記指示部は、前記基準電力消費情報と前記電力需要施設における電力消費を監視した結果との比較を、複数の前記電力需要施設の各々について行い、前記優先情報および比較結果の少なくともいずれか一方に基づいて、比較した各前記電力需要施設の中から新たな前記指示情報を通知すべき前記電力需要施設を選択する。   (7) Preferably, the power consumption management device further includes a reference information acquisition unit that acquires reference power consumption information serving as a reference for power consumption in the power demand facility, and the instruction unit includes the reference power consumption information. And the result of monitoring the power consumption in the power demand facility for each of the plurality of power demand facilities, and the power demand facilities compared based on at least one of the priority information and the comparison result The power demand facility to which the new instruction information is to be notified is selected.

このように、電力消費の基準となる情報と電力需要施設における実際の電力消費とを比較することにより、たとえば当該電力需要施設において抑制することのできる電力量を把握し、新たな指示情報の通知先として適切な電力需要施設を選択することができる。   In this way, by comparing the power consumption reference information with the actual power consumption in the power demand facility, for example, the amount of power that can be suppressed in the power demand facility is grasped, and new instruction information is notified. An appropriate power demand facility can be selected as the destination.

(8)好ましくは、前記電力消費管理装置は、さらに、前記電力需要施設における電力消費の予測値を取得する予測値取得部を備え、前記指示部は、前記予測値と前記電力需要施設における電力消費を監視した結果との比較を、複数の前記電力需要施設の各々について行い、前記優先情報および比較結果の少なくともいずれか一方に基づいて、比較した前記各電力需要施設の中から新たな前記指示情報を通知すべき前記電力需要施設を選択する。   (8) Preferably, the power consumption management device further includes a predicted value acquisition unit that acquires a predicted value of power consumption in the power demand facility, and the instruction unit includes the predicted value and power in the power demand facility. Comparison with the result of monitoring consumption is performed for each of the plurality of power demanding facilities, and based on at least one of the priority information and the comparison result, a new instruction is generated from the compared power demanding facilities. The power demand facility to be notified of is selected.

このように、電力需要施設による電力消費の予測値と当該電力需要施設における実際の電力消費とを比較することにより、たとえば当該電力需要施設において抑制することのできる電力量を把握し、新たな指示情報の通知先として適切な電力需要施設を選択することができる。   In this way, by comparing the predicted value of power consumption by the power demand facility and the actual power consumption at the power demand facility, for example, the amount of power that can be suppressed at the power demand facility is grasped, and a new instruction is obtained. An appropriate power demand facility can be selected as the information notification destination.

(9)好ましくは、前記電力消費管理装置は、さらに、前記電力需要施設における電力消費の基準となる基準電力消費情報を取得する基準情報取得部と、前記電力需要施設における電力消費の予測値を取得する予測値取得部を備え、前記指示部は、前記基準電力消費情報と前記予測値との比較を、複数の前記電力需要施設の各々について行い、前記優先情報および比較結果の少なくともいずれか一方に基づいて、比較した前記各電力需要施設の中から新たな前記指示情報を通知すべき前記電力需要施設を選択する。   (9) Preferably, the power consumption management device further includes a reference information acquisition unit that acquires reference power consumption information serving as a reference of power consumption in the power demand facility, and a predicted value of power consumption in the power demand facility. A predicted value acquisition unit to acquire, wherein the instruction unit performs comparison between the reference power consumption information and the predicted value for each of the plurality of power demand facilities, and at least one of the priority information and the comparison result The power demand facility to be notified of the new instruction information is selected from the compared power demand facilities.

このように、電力需要施設による電力消費の予測値と電力消費の基準となる情報との比較を行うことにより、当該電力需要施設における電力消費の傾向を把握することができるため、新たな指示情報の通知先として適切な電力需要施設を選択することができる。   In this way, by comparing the predicted value of power consumption by the power demand facility with the information used as the standard for power consumption, it is possible to grasp the power consumption trend in the power demand facility, so new instruction information It is possible to select an appropriate power demand facility as the notification destination.

(10)好ましくは、前記電力消費管理装置は、さらに、前記電力需要施設における電力消費の基準となる基準電力消費情報を取得する基準情報取得部を備え、前記指示部は、前記監視結果と前記基準電力消費情報との比較を、複数の前記電力需要施設の各々について行い、前記優先情報および比較結果の少なくともいずれか一方に基づいて、比較した前記各電力需要施設の中から新たな前記指示情報を通知すべき前記電力需要施設を選択する。   (10) Preferably, the power consumption management device further includes a reference information acquisition unit that acquires reference power consumption information serving as a reference of power consumption in the power demand facility, and the instruction unit includes the monitoring result and the monitoring result Comparison with reference power consumption information is performed for each of the plurality of power demanding facilities, and based on at least one of the priority information and the comparison result, the new instruction information among the compared power demanding facilities. The power demand facility to be notified of is selected.

このように、電力需要施設による現時点における電力消費の監視結果と、電力消費の基準となる情報との比較を行うことにより、現時点における電力需要施設による電力消費の傾向を把握することができるため、新たな指示情報の通知先として適切な電力需要施設を選択することができる。   In this way, by comparing the current power consumption monitoring result by the power demand facility with the information that is the standard for power consumption, it is possible to grasp the trend of power consumption by the current power demand facility. An appropriate power demand facility can be selected as a notification destination of new instruction information.

(11)本発明の実施の形態に係る電力消費管理方法は、複数の電力需要施設における電力消費を管理する電力消費管理装置における電力消費管理方法であって、1または複数の電力供給側から電力消費に関する電力管理情報を取得するステップと、前記電力管理情報に基づいて、前記電力需要施設における電力消費に関する指示情報を前記電力需要施設に通知する指示処理を行うステップと、前記指示情報を通知した前記電力需要施設における電力消費を監視するステップと、前記電力管理情報および前記監視部の監視結果に基づいて、内容を変更した前記指示処理を行うステップとを含む。   (11) A power consumption management method according to an embodiment of the present invention is a power consumption management method in a power consumption management apparatus that manages power consumption in a plurality of power demand facilities, and includes power from one or more power supply sides. Obtaining power management information relating to consumption; performing instruction processing for notifying the power demand facility of instruction information relating to power consumption in the power demand facility based on the power management information; and notifying the instruction information Monitoring the power consumption in the power demand facility, and performing the instruction process with the contents changed based on the power management information and the monitoring result of the monitoring unit.

このように、指示情報の通知先である電力需要施設における電力消費の制御状況をリアルタイムで監視し、監視結果および電力管理情報に基づいて指示処理の内容を変更することにより、電力需要施設における電力消費を状況に応じて適切に制御することができる。   In this way, by monitoring the power consumption control status in the power demand facility that is the notification destination of the instruction information in real time and changing the contents of the instruction processing based on the monitoring result and the power management information, Consumption can be appropriately controlled according to the situation.

(12)本発明の実施の形態に係る電力消費管理プログラムは、複数の電力需要施設における電力消費を管理する電力消費管理装置において用いられる電力消費管理プログラムであって、コンピュータに、1または複数の電力供給側から電力消費に関する電力管理情報を取得するステップと、前記電力管理情報に基づいて、前記電力需要施設における電力消費に関する指示情報を前記電力需要施設に通知する指示処理を行うステップと、前記指示情報を通知した前記電力需要施設における電力消費を監視するステップと、前記電力管理情報および前記監視部の監視結果に基づいて、内容を変更した前記指示処理を行うステップとを実行させるためのプログラムである。   (12) A power consumption management program according to an embodiment of the present invention is a power consumption management program used in a power consumption management apparatus that manages power consumption in a plurality of power demand facilities, and includes one or a plurality of Obtaining power management information related to power consumption from the power supply side; performing instruction processing for notifying the power demand facility of instruction information related to power consumption in the power demand facility based on the power management information; and A program for executing a step of monitoring power consumption in the power demand facility that has notified the instruction information, and a step of performing the instruction process with the contents changed based on the power management information and a monitoring result of the monitoring unit It is.

このように、指示情報の通知先である電力需要施設における電力消費の制御状況をリアルタイムで監視し、監視結果および電力管理情報に基づいて指示処理の内容を変更することにより、電力需要施設における電力消費を状況に応じて適切に制御することができる。   In this way, by monitoring the power consumption control status in the power demand facility that is the notification destination of the instruction information in real time and changing the contents of the instruction processing based on the monitoring result and the power management information, Consumption can be appropriately controlled according to the situation.

以下、本発明の実施の形態について図面を用いて説明する。なお、図中同一または相当部分には同一符号を付してその説明は繰り返さない。また、以下に記載する実施の形態の少なくとも一部を任意に組み合わせてもよい。   Hereinafter, embodiments of the present invention will be described with reference to the drawings. In the drawings, the same or corresponding parts are denoted by the same reference numerals and description thereof will not be repeated. Moreover, you may combine arbitrarily at least one part of embodiment described below.

[構成および基本動作]
(システム全体の概要)
図1は、本発明の実施の形態に係る電力消費管理システムの構成を示す図である。
[Configuration and basic operation]
(Overview of the entire system)
FIG. 1 is a diagram showing a configuration of a power consumption management system according to an embodiment of the present invention.

図1を参照して、本発明の実施の形態に係る電力消費管理システム201は、電力会社サーバ101と、電力消費管理装置102と、複数の需要家装置151とを備える。   Referring to FIG. 1, a power consumption management system 201 according to an embodiment of the present invention includes a power company server 101, a power consumption management device 102, and a plurality of customer devices 151.

電力会社サーバ101は、電力供給側である電力会社等により運用され、電力消費に関する電力管理情報を電力消費管理装置102へ送信する。この電力管理情報は、電力需給の逼迫が予想される期間を示す情報、日別もしくは時間帯別の電気料金情報、または、電力の節電要請を示す情報などである。   The power company server 101 is operated by a power company on the power supply side, and transmits power management information related to power consumption to the power consumption management apparatus 102. This power management information is information indicating a period in which a tight supply and demand of power is expected, information on electricity charges by day or time, information indicating a power saving request, and the like.

需要家装置151は、電力会社から電力の供給を受けるビル、工場または家庭などの電力需要施設に設けられている。需要家装置151は、電力需要施設における電気機器の動作を制御することによって消費電力の削減を図るためのBEMS(Building Energy Management System)またはHEMS(Home Energy Management System)等のシステムにおいて用いられる装置であり、たとえばBEMSアグリゲータと呼ばれる事業者等により導入される。   The consumer device 151 is provided in a power demand facility such as a building, factory, or home that receives power from an electric power company. The consumer device 151 is a device used in a system such as a BEMS (Building Energy Management System) or a HEMS (Home Energy Management System) for reducing power consumption by controlling the operation of electrical equipment in a power demand facility. Yes, for example, it is introduced by an operator called a BEMS aggregator.

電力消費管理装置102は、複数の需要家装置151と通信を行うことにより、複数の電力需要施設における電力消費を集中して管理する。具体的には、電力消費管理装置102は、電力会社サーバ101から電力管理情報を受信すると、受信した電力管理情報に基づいて電力消費に関する指示情報を1または複数の需要家装置151に通知する指示処理を行う。   The power consumption management device 102 centrally manages power consumption in a plurality of power demanding facilities by communicating with a plurality of customer devices 151. Specifically, when the power consumption management apparatus 102 receives the power management information from the power company server 101, the instruction to notify the one or more customer apparatuses 151 of the instruction information regarding power consumption based on the received power management information. Process.

たとえば、電力消費管理装置102は、受信した電力管理情報に基づいて、電力消費を抑制すべき節電期間、および、抑制すべき電力量を示す節電目標等を設定し、設定した節電期間および節電目標等を示す指示情報を1または複数の需要家装置151へ通知する。   For example, the power consumption management apparatus 102 sets a power saving period in which power consumption should be suppressed, a power saving target indicating the amount of power to be suppressed, and the like based on the received power management information, and the set power saving period and power saving target. Is sent to one or a plurality of customer devices 151.

また、電力消費管理装置102は、指示情報を通知した各需要家装置151における電力消費を監視し、監視結果に基づいて指示処理の内容を変更する。たとえば、電力消費管理装置102は、節電期間において各需要家装置151による電力消費を継続して監視し、節電目標が達成できない状況にあると判断した場合には、新たな指示情報を1または複数の需要家装置151へ通知する。なお、監視結果に基づいて新たに通知される指示情報を、以下「追加指示情報」と称する。   In addition, the power consumption management device 102 monitors the power consumption in each customer device 151 that has notified the instruction information, and changes the content of the instruction processing based on the monitoring result. For example, when the power consumption management apparatus 102 continuously monitors the power consumption by each customer apparatus 151 during the power saving period and determines that the power saving target cannot be achieved, one or more new instruction information is provided. To the consumer device 151. The instruction information newly notified based on the monitoring result is hereinafter referred to as “addition instruction information”.

(具体例1)
図2は、本発明の実施の形態に係る電力消費管理システムの電力消費管理装置による指示処理の一例を示す図である。
(Specific example 1)
FIG. 2 is a diagram illustrating an example of instruction processing by the power consumption management device of the power consumption management system according to the embodiment of the present invention.

図2を参照して、電力消費管理システム201には、需要家装置151A,151B,151C,151Dが含まれているとする。   Referring to FIG. 2, it is assumed that power consumption management system 201 includes customer apparatuses 151A, 151B, 151C, and 151D.

まず、電力消費管理装置102は、時刻t1から時刻t2の期間において電力需給の逼迫が予測されることを示す電力管理情報を電力会社サーバ101から受信する。   First, the power consumption management apparatus 102 receives, from the power company server 101, power management information indicating that power supply / demand tightness is predicted in a period from time t1 to time t2.

次に、電力消費管理装置102は、需要家装置151A,151B,151C,151Dの中から指示情報の通知先として1または複数の需要家装置151を選択する。ここでは、電力消費管理装置102は、需要家装置151A,151B,151Cの3つの需要家装置151を選択する。   Next, the power consumption management apparatus 102 selects one or a plurality of consumer apparatuses 151 as the notification destination of the instruction information from the consumer apparatuses 151A, 151B, 151C, and 151D. Here, the power consumption management apparatus 102 selects the three consumer apparatuses 151 of the consumer apparatuses 151A, 151B, and 151C.

また、電力消費管理装置102は、長期間に亘る電力消費の抑制による各電力需要施設の負担を軽減させるため、時刻t1から時刻t2までの期間を、たとえば、指示情報の通知先として選択した需要家装置151の数、具体的には3つのサブ節電期間に分割する。そして、電力消費管理装置102は、分割した各サブ節電期間を、指示情報の通知先として選択した各需要家装置151に割り当てる。   Moreover, the power consumption management apparatus 102 has selected the period from the time t1 to the time t2 as the notification destination of instruction information, for example, in order to reduce the burden of each power demand facility by suppression of the power consumption over a long period of time. The number of home devices 151 is divided into three sub power saving periods. Then, the power consumption management apparatus 102 assigns each divided sub power saving period to each consumer apparatus 151 selected as a notification destination of instruction information.

なお、電力消費管理装置102は、たとえば、時刻t1から時刻t2までの期間を所定時間ごとに区切られた複数のサブ節電期間に分割し、分割した各サブ節電期間を、指示情報の通知先として選択した各需要家装置151に割り当てる構成であっても良い。   For example, the power consumption management apparatus 102 divides the period from time t1 to time t2 into a plurality of sub power saving periods divided at predetermined time intervals, and uses each divided sub power saving period as a notification destination of instruction information. The structure allocated to each selected consumer apparatus 151 may be sufficient.

ここでは、電力消費管理装置102は、時刻t1から時刻t2までの期間を、期間A、期間Bおよび期間Cの3つのサブ節電期間に分割し、期間Aを需要家装置151Aに割り当て、期間Bを需要家装置151Bに割り当て、期間Cを需要家装置151Cに割り当てる。   Here, the power consumption management apparatus 102 divides the period from time t1 to time t2 into three sub power saving periods of period A, period B, and period C, assigns period A to the consumer apparatus 151A, and sets period B Is assigned to the consumer device 151B, and the period C is assigned to the consumer device 151C.

次に、電力消費管理装置102は、各サブ節電期間における節電目標Ga,Gb,Gcを設定し、期間Aおよび節電目標Gaを示す節電要請を指示情報として需要家装置151Aに通知し、期間Bおよび節電目標Gbを示す節電要請を指示情報として需要家装置151Bに通知し、期間Cおよび節電目標Gcを示す節電要請を指示情報として需要家装置151Cに通知する指示処理を行う。   Next, the power consumption management apparatus 102 sets power saving targets Ga, Gb, and Gc in each sub power saving period, notifies the power saving request indicating the period A and the power saving target Ga to the consumer apparatus 151A as instruction information, and sets the period B In addition, a power saving request indicating the power saving target Gb is notified to the consumer device 151B as instruction information, and a power saving request indicating the period C and the power saving target Gc is notified to the consumer device 151C as instruction information.

次に、需要家装置151A,151B,151Cは、時刻t1から時刻t2の期間において、電力消費管理装置102から受信した指示情報に従い、自己が設けられている電力需要施設の電気機器の動作を制御する。たとえば、需要家装置151A,151B,151Cは、空調の設定温度を上げるなどの制御を行うことにより、消費電力の削減を図る。   Next, in the period from time t1 to time t2, the consumer devices 151A, 151B, and 151C control the operation of the electrical equipment of the power demand facility in which they are provided according to the instruction information received from the power consumption management device 102. To do. For example, the consumer devices 151A, 151B, and 151C reduce power consumption by performing control such as increasing the set temperature of air conditioning.

これにより、時刻t1から時刻t2の期間において、需要家装置151A,151B,151C,151Dがそれぞれ設けられている電力需要施設における消費電力の合計(図2下の実線のグラフ)は、電力消費管理装置102による指示処理が行われなかったと仮定した場合における消費電力の合計(図2下の破線のグラフ)と比較して減少する。   Thus, during the period from time t1 to time t2, the total power consumption (solid line graph in FIG. 2) in the power demand facility provided with the customer apparatuses 151A, 151B, 151C, 151D is the power consumption management. Compared to the total power consumption (dashed line graph in FIG. 2) in the case where it is assumed that the instruction processing by the device 102 has not been performed, the power consumption decreases.

(具体例2)
図3は、本発明の実施の形態に係る電力消費管理システムの電力消費管理装置による指示処理の一例を示す図である。
(Specific example 2)
FIG. 3 is a diagram showing an example of instruction processing by the power consumption management apparatus of the power consumption management system according to the embodiment of the present invention.

図3を参照して、ここでは、図2に示す場合と同様に、電力消費管理装置102は、期間Aおよび節電目標Gaを示す節電要請を指示情報として需要家装置151Aに通知し、期間Bおよび節電目標Gbを示す節電要請を指示情報として需要家装置151Bに通知し、期間Cおよび節電目標Gcを示す節電要請を指示情報として需要家装置151Cに通知する指示処理を、時刻t1よりも前に行う。   Referring to FIG. 3, here, similarly to the case shown in FIG. 2, the power consumption management apparatus 102 notifies the customer apparatus 151 </ b> A of the power saving request indicating the period A and the power saving target Ga as instruction information, and the period B And an instruction process of notifying the consumer device 151B of the power saving request indicating the power saving target Gb as instruction information and notifying the consumer device 151C of the power saving request indicating the period C and the power saving target Gc as instruction information before the time t1. To do.

次に、需要家装置151Bが設けられている電力需要施設が、期間Bにおいて指示情報に従った電力消費の抑制を行うことが困難な状況となり、電力消費管理装置102がタイミングt3において、期間Bにおける節電目標Gbが達成できない状況にあると判断する。   Next, it becomes difficult for the power demand facility provided with the consumer apparatus 151B to suppress power consumption according to the instruction information in the period B, and the power consumption management apparatus 102 performs the period B at the timing t3. It is determined that the power saving target Gb is not achieved.

そして、電力消費管理装置102は、時刻t1よりも前に行った指示処理の内容を変更して、たとえば、タイミングt3から期間Bの終了までの期間を示す節電要請を追加指示情報として需要家装置151Dに通知する。そして、需要家装置151Dは、電力消費管理装置102から受信した指示情報に従い、自己が設けられている電力需要施設における電気機器の動作を制御する。   And the power consumption management apparatus 102 changes the content of the instruction | indication process performed before the time t1, for example, a consumer apparatus is set by using the power-saving request | requirement which shows the period from the timing t3 to the end of the period B as additional instruction information. 151D is notified. And consumer apparatus 151D controls operation | movement of the electric equipment in the electric power demand facility in which self is provided according to the instruction information received from the power consumption management apparatus 102. FIG.

これにより、期間Aにおいて需要家装置151Aにより電力消費が抑制され、期間Bにおいて需要家装置151Bおよび需要家装置151Dによる電力消費が抑制され、期間Cにおいて需要家装置151Cにより電力消費が抑制される。   Thereby, power consumption is suppressed by the consumer device 151A in the period A, power consumption by the consumer device 151B and the consumer device 151D is suppressed in the period B, and power consumption is suppressed by the consumer device 151C in the period C. .

この結果、時刻t1から時刻t2の期間において、需要家装置151A,151B,151C,151Dがそれぞれ設けられている電力需要施設における消費電力の合計(図3下の実線のグラフ)は、電力消費管理装置102による指示処理が行われなかったと仮定した場合における消費電力の合計(図3下の破線のグラフ)と比較して減少する。   As a result, during the period from time t1 to time t2, the total power consumption (solid line graph at the bottom of FIG. 3) in the power demand facilities provided with the customer apparatuses 151A, 151B, 151C, and 151D is the power consumption management. This is reduced compared to the total power consumption (dashed line graph in FIG. 3) when it is assumed that the instruction processing by the device 102 has not been performed.

なお、電力消費管理装置102は、既に指示情報を通知した需要家装置151以外の需要家装置151の中から、追加指示情報の通知先となる需要家装置151を選択しても良いし、既に指示情報を通知した需要家装置151を含む需要家装置151の中から、追加指示情報の通知先となる需要家装置151を選択しても良い。   Note that the power consumption management apparatus 102 may select the consumer apparatus 151 that is the notification destination of the additional instruction information from the consumer apparatuses 151 other than the consumer apparatus 151 that has already notified the instruction information. You may select the consumer apparatus 151 used as the notification destination of additional instruction information from the consumer apparatuses 151 containing the consumer apparatus 151 which notified instruction information.

すなわち、上述した例では、電力消費管理装置102は、追加指示情報の通知先として、既に指示情報を通知した需要家装置151A,151B,151C以外の需要家装置151Dを選択したが、追加指示情報の通知先として、需要家装置151A,151B,151Cのうちのいずれかの需要家装置151を選択しても良い。   That is, in the example described above, the power consumption management apparatus 102 has selected the consumer apparatus 151D other than the consumer apparatuses 151A, 151B, and 151C that have already notified the instruction information as the notification destination of the additional instruction information. As the notification destination, any one of the customer apparatuses 151A, 151B, 151C may be selected.

(電力消費管理装置の構成)
図4は、本発明の実施の形態に係る電力消費管理システムの電力消費管理装置の構成を示す図である。
(Configuration of power consumption management device)
FIG. 4 is a diagram showing the configuration of the power consumption management device of the power consumption management system according to the embodiment of the present invention.

図4を参照して、電力消費管理装置102は、管理情報取得部11と、指示部12と、監視部13と、基準情報取得部14と、記憶部15と、優先情報取得部16と、選択用情報取得部17とを含む。なお、記憶部15は、電力消費管理装置102の外部に設けられていても良い。   Referring to FIG. 4, the power consumption management device 102 includes a management information acquisition unit 11, an instruction unit 12, a monitoring unit 13, a reference information acquisition unit 14, a storage unit 15, a priority information acquisition unit 16, A selection information acquisition unit 17. Note that the storage unit 15 may be provided outside the power consumption management apparatus 102.

管理情報取得部11は、電力会社サーバ101から送信される電力管理情報を受信し、受信した電力管理情報を指示部12へ出力する。   The management information acquisition unit 11 receives the power management information transmitted from the power company server 101 and outputs the received power management information to the instruction unit 12.

指示部12は、管理情報取得部11から電力管理情報を受けると、記憶部15に記憶されている優先情報を優先情報取得部16経由で取得する。この優先情報は、電力消費管理システム201に含まれる複数の需要家装置151にそれぞれ付与された優先度または優先順位を示す。   Upon receiving the power management information from the management information acquisition unit 11, the instruction unit 12 acquires the priority information stored in the storage unit 15 via the priority information acquisition unit 16. This priority information indicates the priority or priority assigned to each of the plurality of consumer devices 151 included in the power consumption management system 201.

図5は、本発明の実施の形態に係る電力消費管理システムの電力消費管理装置における記憶部に記憶されている優先情報の一例を示す図である。   FIG. 5 is a diagram showing an example of priority information stored in the storage unit in the power consumption management device of the power consumption management system according to the embodiment of the present invention.

図5を参照して、優先情報は、たとえば、電力消費管理システム201に需要家装置151A,151B,151C,151D,151E,151Fが含まれていること、需要家装置151A,151B,151Cに優先度「1」が付与されていること、および、需要家装置151D,151E,151Fに優先度「2」が付与されていることを示す。なお、需要家装置151には、優先度に限らず、優先順位が付与されていても良い。   Referring to FIG. 5, the priority information includes, for example, that power consumption management system 201 includes consumer devices 151A, 151B, 151C, 151D, 151E, and 151F, and prioritizes consumer devices 151A, 151B, and 151C. The degree “1” is given, and the customer device 151D, 151E, 151F is given the priority “2”. The consumer device 151 is not limited to priority, and may be given priority.

このような優先度または優先順位は、電力需要施設ごとの契約等により各需要家装置151に付与され、指示部12による指示情報の通知先の選択において、これら優先度または優先順位が用いられる。   Such priorities or priorities are given to each consumer device 151 by a contract or the like for each power demand facility, and these priorities or priorities are used in selecting instruction information notification destinations by the instruction unit 12.

再び図4を参照して、指示部12は、優先情報を用いて、たとえば優先度「1」が付与されている需要家装置151A,151B,151Cを、指示情報の通知先として選択する。   Referring to FIG. 4 again, using the priority information, instructing unit 12 selects, for example, customer devices 151A, 151B, 151C to which priority “1” is assigned as the notification destination of the instruction information.

また、指示部12は、管理情報取得部11から受けた電力管理情報に基づいて、たとえば電力需給の逼迫が予測される期間を、30分間または1時間などの所定時間ごとに区切られた複数のサブ節電期間に分割し、分割した各サブ節電期間を、指示情報の通知先として選択した各需要家装置151に割り当てる。また、指示部12は、各サブ節電期間における節電目標を設定する。そして、指示部12は、指示情報の通知先として選択した各需要家装置151に、割り当てたサブ節電期間、および、設定した節電目標を示す指示情報を通知する。なお、指示部12は、1つの需要家装置151に複数のサブ節電期間を割り当てても良い。また、指示情報の通知先として選択された需要家装置151の中には、サブ節電期間が1つも割り当てられない需要家装置151があっても良い。   In addition, the instruction unit 12 is based on the power management information received from the management information acquisition unit 11, for example, a period in which the tightness of power supply and demand is predicted is divided into a plurality of intervals divided by predetermined time such as 30 minutes or 1 hour It divides | segments into a sub power saving period, and assigns each divided sub power saving period to each consumer apparatus 151 selected as a notification destination of instruction information. In addition, the instruction unit 12 sets a power saving target in each sub power saving period. And the instruction | indication part 12 notifies instruction | indication information which shows the allocated sub power-saving period and the set power-saving target to each consumer apparatus 151 selected as a notification destination of instruction information. Note that the instruction unit 12 may assign a plurality of sub power saving periods to one consumer device 151. Further, among the consumer devices 151 selected as the notification destination of the instruction information, there may be a consumer device 151 to which no sub power saving period is assigned.

基準情報取得部14は、各電力需要施設における電力消費の基準となる基準電力消費情報を電力会社サーバ101から受信する。この基準電力消費情報は、たとえば、電力会社サーバ101により過去のデータに基づいて算出される、電力需要施設の電力消費量の基準となるベースライン(以下、単に「基準値」と称する)を示す。そして、基準情報取得部14は、受信した基準電力消費情報を監視部13へ出力する。   The reference information acquisition unit 14 receives, from the power company server 101, reference power consumption information that is a reference for power consumption in each power demand facility. The reference power consumption information indicates, for example, a baseline (hereinafter simply referred to as “reference value”) that is calculated by the power company server 101 based on past data and serves as a reference for the power consumption of the power demand facility. . Then, the reference information acquisition unit 14 outputs the received reference power consumption information to the monitoring unit 13.

監視部13は、指示部12により1または複数の需要家装置151に割り当てられた各サブ節電期間と、各サブ節電期間における節電目標とを示す情報を指示部12から受ける。また、監視部13は、電力消費管理システム201に含まれる各需要家装置151から、対応する電力需要施設における消費電力情報をたとえば所定間隔で受信する。   The monitoring unit 13 receives, from the instruction unit 12, information indicating each sub power saving period assigned to one or a plurality of customer devices 151 by the instruction unit 12 and a power saving target in each sub power saving period. Moreover, the monitoring part 13 receives the power consumption information in a corresponding power demand facility from each consumer apparatus 151 included in the power consumption management system 201 at a predetermined interval, for example.

そして、監視部13は、各需要家装置151から受信した消費電力情報および基準情報取得部14から受けた基準電力消費情報に基づいて、各サブ節電期間における節電目標が達成できる状況にあるか否かを継続して監視する。そして、監視部13は、節電目標が達成できない状況にあると判断した場合、指示処理の内容の変更要求を指示部12へ出力する。   Then, based on the power consumption information received from each consumer device 151 and the reference power consumption information received from the reference information acquisition unit 14, the monitoring unit 13 is in a situation where the power saving target in each sub power saving period can be achieved. Continue monitoring. When the monitoring unit 13 determines that the power saving target cannot be achieved, the monitoring unit 13 outputs a request for changing the content of the instruction process to the instruction unit 12.

指示部12は、監視部13から指示処理の内容の変更要求を受けると、記憶部15に記憶されている選択用情報を選択用情報取得部17経由で取得する。この選択用情報は、追加指示情報の通知先を選択する際に用いられる情報であり、たとえば、各需要家装置151に対する過去の指示情報の通知タイミングを示すタイミング情報である。   When the instruction unit 12 receives a request for changing the content of the instruction process from the monitoring unit 13, the instruction unit 12 acquires the selection information stored in the storage unit 15 via the selection information acquisition unit 17. This selection information is information used when selecting a notification destination of additional instruction information. For example, the selection information is timing information indicating the notification timing of past instruction information to each consumer device 151.

そして、指示部12は、優先情報取得部16から受けた優先情報と、選択用情報取得部17から受けた選択用情報とを用いて、追加指示情報の通知先を選択する。たとえば、指示部12は、優先度「2」が付与されている複数の需要家装置151の中から、過去の指示情報の通知タイミングが最も古い需要家装置151を、追加指示情報の通知先として選択する。   Then, the instruction unit 12 selects a notification destination of the additional instruction information using the priority information received from the priority information acquisition unit 16 and the selection information received from the selection information acquisition unit 17. For example, the instruction unit 12 uses the customer device 151 having the oldest notification timing of the past instruction information as the notification destination of the additional instruction information from among the plurality of customer devices 151 to which the priority “2” is given. select.

そして、指示部12は、追加指示情報の通知先として選択した当該需要家装置151に要請する節電期間および節電目標を新たに設定し、設定した節電期間および節電目標を示す節電要請を、追加指示情報として当該需要家装置151に通知する。なお、追加指示情報が示す節電期間および節電目標と、既に通知された指示情報が示す節電期間および節電目標とが同じ内容であっても良い。   And the instruction | indication part 12 sets newly the power-saving period and power-saving target requested | required of the said consumer apparatus 151 selected as the notification destination of additional instruction information, and adds the power-saving request | requirement which shows the set power-saving period and power-saving target. The information is notified to the consumer device 151 as information. The power saving period and the power saving target indicated by the additional instruction information may be the same as the power saving period and the power saving target indicated by the already notified instruction information.

[動作]
次に、本発明の実施の形態に係る電力消費管理システム201の動作について説明する。
[Operation]
Next, the operation of the power consumption management system 201 according to the embodiment of the present invention will be described.

電力消費管理システム201における各装置は、コンピュータを備え、当該コンピュータにおけるCPU等の演算処理部は、以下のシーケンス図またはフローチャートの各ステップの一部または全部を含むプログラムを図示しないメモリからそれぞれ読み出して実行する。これら複数の装置のプログラムは、それぞれ、外部からインストールすることができる。これら複数の装置のプログラムは、それぞれ、記録媒体に格納された状態で流通する。   Each device in the power consumption management system 201 includes a computer, and an arithmetic processing unit such as a CPU in the computer reads a program including a part or all of each step of the following sequence diagram or flowchart from a memory (not shown). Run. Each of the programs of the plurality of apparatuses can be installed from the outside. The programs of the plurality of apparatuses are distributed while being stored in a recording medium.

(電力消費管理動作)
図6は、本発明の実施の形態に係る機器管理システムによる電力消費管理の動作手順を示すシーケンス図である。
(Power consumption management operation)
FIG. 6 is a sequence diagram showing an operation procedure of power consumption management by the device management system according to the embodiment of the present invention.

図6を参照して、まず、電力会社サーバ101は、たとえば電力需給の逼迫が予測される期間を示す電力管理情報を電力消費管理装置102へ送信する(ステップS11)。   With reference to FIG. 6, first, the power company server 101 transmits, for example, power management information indicating a period during which tightness of power supply and demand is predicted to the power consumption management device 102 (step S11).

次に、電力消費管理装置102は、電力会社サーバ101から電力管理情報を受信すると、指示情報の通知先となる需要家装置151として、たとえば需要家装置151A,151B,151Cを選択する(ステップS12)。   Next, when receiving the power management information from the power company server 101, the power consumption management device 102 selects, for example, the customer devices 151A, 151B, and 151C as the customer device 151 that is the notification destination of the instruction information (step S12). ).

次に、電力消費管理装置102は、電力需給の逼迫が予測される期間を複数のサブ節電期間に分割し、各サブ節電期間を、指示情報の通知先として選択した各需要家装置151に割り当てる。また、電力消費管理装置102は、各サブ節電期間における節電目標を設定する(ステップS13)。   Next, the power consumption management apparatus 102 divides the period during which power supply and demand is tight, into a plurality of sub power saving periods, and assigns each sub power saving period to each consumer apparatus 151 selected as the instruction information notification destination. . Moreover, the power consumption management apparatus 102 sets a power saving target in each sub power saving period (step S13).

次に、電力消費管理装置102は、指示情報の通知先として選択した各需要家装置151に、サブ節電期間および節電目標を示す節電要請を指示情報として通知する。たとえば、電力消費管理装置102は、節電期間Aおよび節電目標Gaを示す指示情報を需要家装置151Aへ通知する(ステップS14)。また、電力消費管理装置102は、節電期間Bおよび節電目標Gbを示す指示情報を需要家装置151Bへ通知する(ステップ15)。また、電力消費管理装置102は、節電期間Cおよび節電目標Gcを示す指示情報を需要家装置151Cへ通知する(ステップS16)。   Next, the power consumption management apparatus 102 notifies each customer apparatus 151 selected as the instruction information notification destination of a power saving request indicating a sub power saving period and a power saving target as instruction information. For example, the power consumption management device 102 notifies the consumer device 151A of instruction information indicating the power saving period A and the power saving target Ga (step S14). In addition, the power consumption management device 102 notifies the customer device 151B of instruction information indicating the power saving period B and the power saving target Gb (step 15). Moreover, the power consumption management apparatus 102 notifies the instruction | indication information which shows the power-saving period C and the power-saving target Gc to the consumer apparatus 151C (step S16).

次に、需要家装置151Aは、電力消費管理装置102から受信した指示情報に従い、期間Aにおいて節電目標Gaが満たされるように、自己が設けられている電力需要施設における電気機器の動作を制御する(ステップS17)。   Next, according to the instruction information received from the power consumption management device 102, the consumer device 151A controls the operation of the electrical equipment in the power demand facility in which the customer device 151A is provided so that the power saving target Ga is satisfied in the period A. (Step S17).

また、需要家装置151Bは、電力消費管理装置102から受信した指示情報に従い、期間Bにおいて節電目標Gbが満たされるように、自己が設けられている電力需要施設における電気機器の動作を制御する(ステップS18)。   Further, the consumer device 151B controls the operation of the electrical equipment in the power demand facility in which the customer device 151B is provided so that the power saving target Gb is satisfied in the period B according to the instruction information received from the power consumption management device 102 ( Step S18).

また、需要家装置151Cは、電力消費管理装置102から受信した指示情報に従い、期間Cにおいて節電目標Gbが満たされるように、自己が設けられている電力需要施設における電気機器の動作を制御する(ステップS19)。   Further, according to the instruction information received from the power consumption management device 102, the consumer device 151C controls the operation of the electrical equipment in the power demand facility in which the customer device 151C is provided so that the power saving target Gb is satisfied in the period C ( Step S19).

また、電力消費管理装置102は、期間Aから期間Cにおいて、各需要家装置151から、対応する電力需要施設における消費電力情報を繰り返し受信し、受信した消費電力情報に基づいて、各サブ節電期間における節電目標が達成できる状況にあるか否かを継続して監視する監視処理を行う。   In addition, the power consumption management apparatus 102 repeatedly receives power consumption information in the corresponding power demand facility from each consumer apparatus 151 from period A to period C, and based on the received power consumption information, each sub power saving period Monitoring processing is performed to continuously monitor whether or not the power saving target can be achieved.

たとえば、電力消費管理装置102は、各電力需要施設における電力消費の基準となる基準電力消費情報を電力会社サーバ101から受信する。そして、電力消費管理装置102は、受信した基準電力消費情報と、各需要家装置151から受信した消費電力情報とを比較することにより、各サブ節電期間における節電目標が達成できる状況にあるか否かを判断する。   For example, the power consumption management apparatus 102 receives from the power company server 101 reference power consumption information that is a reference for power consumption in each power demand facility. Then, the power consumption management device 102 compares the received reference power consumption information with the power consumption information received from each consumer device 151 to determine whether or not the power saving target can be achieved in each sub power saving period. Determine whether.

そして、電力消費管理装置102は、監視処理の結果、節電目標が達成できない状況にあると判断した場合、たとえば需要家装置151Dに追加指示情報を通知する。そして、需要家装置151Dは、電力消費管理装置102から受信した指示情報に従い、自己が設けられている電力需要施設における電気機器の動作を制御する(ステップS20)。   If the power consumption management apparatus 102 determines that the power saving target cannot be achieved as a result of the monitoring process, the power consumption management apparatus 102 notifies the customer apparatus 151D of additional instruction information, for example. And consumer apparatus 151D controls operation | movement of the electric equipment in the electric power demand facility in which it is provided according to the instruction information received from the power consumption management apparatus 102 (step S20).

(監視処理の詳細)
図7は、図6に示す監視処理の詳細な動作手順を示すフローチャートである。
(Details of monitoring processing)
FIG. 7 is a flowchart showing a detailed operation procedure of the monitoring process shown in FIG.

図7を参照して、電力消費管理装置102は、まず、電力消費管理システム201に含まれる各需要家装置151から、対応する電力需要施設における消費電力情報を、たとえば15分毎に受信する(ステップS21)。   Referring to FIG. 7, first, the power consumption management apparatus 102 receives power consumption information in a corresponding power demand facility from each customer apparatus 151 included in the power consumption management system 201, for example, every 15 minutes ( Step S21).

次に、電力消費管理装置102は、節電期間における電力需要施設の電力消費量の基準値を示す基準電力消費情報を、電力会社サーバ101から受信する(ステップS22)。   Next, the power consumption management apparatus 102 receives the reference power consumption information indicating the reference value of the power consumption of the power demand facility during the power saving period from the power company server 101 (step S22).

次に、電力消費管理装置102は、たとえば需要家装置151から消費電力情報を受信する度に、当該消費電力情報に示される消費電力と、基準値との差を算出する。そして、電力消費管理装置102は、算出した値を、当該需要家装置151が抑制することのできた電力量(以下、「抑制実績量」とも称する)として取得する(ステップS23)。   Next, for example, every time power consumption management apparatus 102 receives power consumption information from consumer apparatus 151, power consumption management apparatus 102 calculates the difference between the power consumption indicated in the power consumption information and the reference value. And the power consumption management apparatus 102 acquires the calculated value as the electric energy (henceforth "the suppression actual amount") which the said consumer apparatus 151 was able to suppress (step S23).

次に、電力消費管理装置102は、算出した抑制実績量と、節電期間における節電目標とを比較することにより、当該節電目標が達成できる状況にあるか否かを判断する。   Next, the power consumption management apparatus 102 determines whether or not the power saving target can be achieved by comparing the calculated actual amount of suppression with the power saving target in the power saving period.

たとえば、電力消費管理装置102は、節電目標が抑制すべき電力量を示している場合、抑制実績量を算出する度に、節電目標に示される抑制すべき電力量と、算出した抑制実績量との差D1(=(節電目標に示される抑制すべき電力量)−(抑制実績量))を算出する。そして、電力消費管理装置102は、算出した差D1が閾値Th以上である状態が所定時間以上継続する場合、当該節電目標が達成できない状況にあると判断する。一方、電力消費管理装置102は、算出した差D1が閾値Th以上である状態が所定時間以上継続しない場合、当該節電目標が達成できる状況にあると判断する(ステップS24)。   For example, when the power consumption management device 102 indicates the amount of power to be suppressed, the power consumption management apparatus 102 calculates the amount of power to be suppressed indicated in the power saving target and the calculated amount of suppression to be suppressed every time the amount of suppression is calculated. Difference D1 (= (amount of power to be suppressed indicated in the power saving target) − (actual suppression amount)) is calculated. Then, when the state where the calculated difference D1 is equal to or greater than the threshold Th continues for a predetermined time or longer, the power consumption management apparatus 102 determines that the power saving target cannot be achieved. On the other hand, when the state where the calculated difference D1 is equal to or greater than the threshold Th does not continue for a predetermined time or more, the power consumption management apparatus 102 determines that the power saving target can be achieved (step S24).

そして、電力消費管理装置102は、節電目標が達成できる状況にあると判断した場合(ステップS24において「Yes」)、電力消費管理システム201に含まれる各需要家装置151から送信される消費電力情報を継続して受信する(ステップS21)。   When the power consumption management device 102 determines that the power saving target can be achieved (“Yes” in step S24), the power consumption information transmitted from each consumer device 151 included in the power consumption management system 201. Is continuously received (step S21).

一方、電力消費管理装置102は、節電目標が達成できない状況にあると判断した場合(ステップS24において「No」)、指示処理の内容を変更する。   On the other hand, when it is determined that the power saving target cannot be achieved (“No” in step S24), the power consumption management apparatus 102 changes the content of the instruction process.

具体的には、電力消費管理装置102は、優先情報と選択用情報とを用いて、追加指示情報の通知先となる需要家装置151を選択する(ステップS25)。   Specifically, the power consumption management apparatus 102 uses the priority information and the selection information to select the consumer apparatus 151 that is the notification destination of the additional instruction information (Step S25).

そして、電力消費管理装置102は、たとえば、需要家装置151毎の抑制実績量の合計が節電目標を上回るように、節電期間および節電目標を新たに設定する(ステップS26)。そして、電力消費管理装置102は、新たに設定した節電期間および節電目標を示す追加指示情報を、選択した需要家装置151へ通知する(ステップS27)。   Then, for example, the power consumption management apparatus 102 newly sets a power saving period and a power saving target so that the total amount of actual records of suppression for each consumer device 151 exceeds the power saving target (step S26). Then, the power consumption management device 102 notifies the selected consumer device 151 of additional instruction information indicating the newly set power saving period and power saving target (step S27).

そして、電力消費管理装置102は、上述のような動作を、たとえば電力管理情報に示される電力需給の逼迫が予測される期間が終了するまで繰り返し行う。   Then, the power consumption management apparatus 102 repeats the above-described operation until, for example, a period during which the tightness of power supply and demand indicated in the power management information is predicted ends.

(基準値の算出処理)
図8は、本発明の実施の形態に係る電力消費管理システムの電力会社サーバによる基準値の算出に用いられるテーブルの一例を示す図である。
(Reference value calculation process)
FIG. 8 is a diagram showing an example of a table used for calculating a reference value by the power company server of the power consumption management system according to the embodiment of the present invention.

図8を参照して、電力会社サーバ101は、過去の電力需要施設の電力消費量を1時間毎に計測し、計測した値をテーブルT1に記憶する。   Referring to FIG. 8, power company server 101 measures the power consumption of past power demand facilities every hour, and stores the measured value in table T1.

たとえば、テーブルT1には、2013年の10月6日、10月7日、10月8日、10月9日、10月10日のそれぞれにおいて、13時〜14時における電力需要施設の電力消費量が、それぞれ100kWh、90kWh、95kWh、120kWh、100kWhであることが記憶されている。   For example, the table T1 includes the power consumption of the power demand facility at 13:00 to 14:00 on October 6, October 7, October 8, October 9, October 10, 2013. It is stored that the amounts are 100 kWh, 90 kWh, 95 kWh, 120 kWh, and 100 kWh, respectively.

また、テーブルT1には、2013年の10月6日、10月7日、10月8日、10月9日、10月10日のそれぞれにおいて、電力需要施設の電力消費量の1日の合計が、1200kWh、950kWh、1100kWh、1500kWh、1100kWhであることが記憶されている。   In addition, the table T1 includes the total daily power consumption of the power demand facilities in October 6, 2013, October 7, October 8, October 9, and October 10, 2013. Are 1200 kWh, 950 kWh, 1100 kWh, 1500 kWh, and 1100 kWh.

電力会社サーバ101は、たとえば、電力需給の逼迫が予測される対象日の直前5日間のデータに基づいて、当該対象日の基準値を算出する。すなわち、電力会社サーバ101は、2013年10月11日の13時〜14時に電力需給が逼迫することが予測されているとすると、2013年の10月6日から10月10日までの5日間のデータに基づいて、2013年10月11日の13時〜14時における基準値を算出する。   For example, the power company server 101 calculates a reference value for the target date based on data for five days immediately before the target date on which tightness of power supply and demand is predicted. That is, if it is predicted that the power supply and demand will be tightened from 13:00 to 14:00 on October 11, 2013, the power company server 101 has five days from October 6 to October 10, 2013. Based on this data, a reference value for 13:00 to 14:00 on October 11, 2013 is calculated.

具体的には、電力会社サーバ101は、2013年の10月6日から10月10日までのそれぞれの日について、13時〜14時における電力需要施設の電力消費量、すなわち10月6日の「100kWh」、10月7日の「90kWh」、10月8日の「95kWh」、10月9日の「120kWh」および10月10日の「100kWh」を抽出し、抽出したこれらの値の平均(=(100+90+95+120+100)/5=101kWh)を算出する。そして、電力会社サーバ101は、算出したこの値を、2013年10月11日の13時〜14時における基準値とする。   Specifically, for each day from October 6 to October 10, 2013, the power company server 101 uses the power consumption of the power demand facility from 13:00 to 14:00, that is, October 6 “100 kWh”, October 7 “90 kWh”, October 8 “95 kWh”, October 9 “120 kWh” and October 10 “100 kWh”, and the average of these extracted values (= (100 + 90 + 95 + 120 + 100) / 5 = 101 kWh) is calculated. Then, the electric power company server 101 sets the calculated value as a reference value for 13:00 to 14:00 on October 11, 2013.

このように、電力会社サーバ101は、過去のデータに基づいて、節電期間における電力消費量の基準値を算出し、算出した基準値を電力消費管理装置102へ送信する。   As described above, the power company server 101 calculates the power consumption reference value in the power saving period based on the past data, and transmits the calculated reference value to the power consumption management apparatus 102.

なお、電力会社サーバ101は、電力消費管理装置102により電力消費を管理される全ての電力需要施設による電力消費量のデータに基づいて基準値を算出しても良いし、電力消費管理装置102により電力消費を管理される電力需要施設のうちの一部の電力需要施設による電力消費量のデータに基づいて基準値を算出しても良い。   The power company server 101 may calculate the reference value based on the data of the power consumption by all the power demanding facilities whose power consumption is managed by the power consumption management apparatus 102, or the power consumption management apparatus 102 may The reference value may be calculated based on power consumption data of some of the power demanding facilities whose power consumption is managed.

また、電力会社サーバ101は、上記のような算出方法に限らず、他の算出方法を用いて基準値を算出しても良い。   In addition, the power company server 101 may calculate the reference value by using other calculation methods as well as the above calculation method.

たとえば、電力会社サーバ101は、電力需給の逼迫が予測される対象日の直前5日間のうち、1日の電力消費量の合計が最も大きい日を特定する。そして、電力需給の逼迫が予測される時間帯が13時〜14時であるとすると、電力会社サーバ101は、特定した日の13時〜14時における電力消費量を、対象日の13時〜14時における基準値とすることができる。   For example, the electric power company server 101 specifies the day with the largest total daily power consumption among the five days immediately before the target date on which the tightness of power supply and demand is predicted. Then, assuming that the time zone in which power supply and demand is tight is predicted to be from 13:00 to 14:00, the power company server 101 calculates the power consumption at 13:00 to 14:00 on the specified day from 13:00 on the target day. The reference value at 14:00 can be used.

また、他の算出方法として、たとえば、電力会社サーバ101は、電力需給の逼迫が予測される対象日の直前5日間のうち、時間毎の電力消費量の分散が最も大きい1日を除外する。そして、電力需給の逼迫が予測される時間帯が13時〜14時であるとすると、電力会社サーバ101は、残りの4日間を対象として、13時〜14時における電力需要施設の電力消費量の平均を算出する。そして、電力会社サーバ101は、算出した値を対象日の13時〜14時における基準値とすることができる。   Further, as another calculation method, for example, the power company server 101 excludes one day in which the variance of power consumption for each hour is the largest among the five days immediately before the target date on which the tightness of power supply and demand is predicted. Then, assuming that the time period in which the tightness of power supply and demand is predicted is from 13:00 to 14:00, the power company server 101 covers the remaining four days, and the power consumption of the power demand facility at 13:00 to 14:00. The average of is calculated. And the electric power company server 101 can make the calculated value the reference value in 13:00 to 14:00 on a target day.

また、電力会社サーバ101が基準値を算出する構成に限らず、たとえば電力消費管理装置102が上記のような各種算出方法を用いて基準値を算出する構成であっても良い。   The power company server 101 is not limited to the configuration in which the reference value is calculated. For example, the power consumption management apparatus 102 may be configured to calculate the reference value using the various calculation methods as described above.

(追加指示情報の通知先の選択方法)
次に、電力消費管理装置102による追加指示情報の通知先の具体的な選択方法について説明する。
(How to select the notification destination for additional instruction information)
Next, a specific method for selecting a notification destination of additional instruction information by the power consumption management apparatus 102 will be described.

(i)具体例1
電力消費管理装置102は、選択用情報として、たとえば電力消費管理システム201に含まれる一部または全部の需要家装置151に対する過去の指示情報の通知タイミングを示すタイミング情報を記憶する。この場合、電力消費管理装置102の選択用情報取得部17は、タイミング情報取得部として機能する。
(I) Specific example 1
The power consumption management apparatus 102 stores timing information indicating the notification timing of past instruction information for some or all of the consumer apparatuses 151 included in the power consumption management system 201, for example, as selection information. In this case, the selection information acquisition unit 17 of the power consumption management apparatus 102 functions as a timing information acquisition unit.

そして、電力消費管理装置102は、追加指示情報の通知先を選択する際、たとえば、優先度「2」が付与された複数の需要家装置151のうち、通知タイミングが古い需要家装置151を追加指示情報の通知先として優先的に選択する。   When the power consumption management apparatus 102 selects the notification destination of the additional instruction information, for example, among the plurality of consumer apparatuses 151 given the priority “2”, the consumer apparatus 151 with the old notification timing is added. Select preferentially as a notification destination of instruction information.

(ii)具体例2
また、電力消費管理装置102は、選択用情報として、たとえば電力消費管理システム201に含まれる一部または全部の需要家装置151について、電力会社との間で契約している契約電力量、または、各需要家装置151が電力会社から供給を受けた電力供給量を示す電力量情報を記憶する。この場合、電力消費管理装置102の選択用情報取得部17は、電力量情報取得部として機能する。
(Ii) Specific example 2
In addition, the power consumption management device 102 selects, as selection information, for example, a contract power amount contracted with an electric power company for some or all of the customer devices 151 included in the power consumption management system 201, or Each customer device 151 stores power amount information indicating the amount of power supplied from the power company. In this case, the selection information acquisition unit 17 of the power consumption management apparatus 102 functions as a power amount information acquisition unit.

そして、電力消費管理装置102は、追加指示情報の通知先を選択する際、たとえば、優先度「2」が付与された複数の需要家装置151のうち、契約電力量または供給電力量が大きい需要家装置151を追加指示情報の通知先として優先的に選択する。   When the power consumption management apparatus 102 selects the notification destination of the additional instruction information, for example, among the plurality of customer apparatuses 151 to which the priority “2” is given, the demand with the large contract power amount or the supplied power amount The home device 151 is preferentially selected as the notification destination of the additional instruction information.

(iii)具体例3
また、電力消費管理装置102は、選択用情報として、たとえば、過去に需要家装置151に指示情報を通知したときの、当該需要家装置151による電気機器の動作の制御内容、対応の電力需要施設における消費電力、気象情報およびイベント情報等を取得する。
(Iii) Specific example 3
Moreover, the power consumption management apparatus 102, for example, as the selection information, when the instruction information is notified to the consumer apparatus 151 in the past, the control content of the operation of the electrical equipment by the consumer apparatus 151, the corresponding power demand facility Power consumption, weather information, event information, etc.

図9は、本発明の実施の形態に係る電力消費管理システムの電力消費管理装置に記憶される、過去に指示情報を通知した需要家装置による電気機器の動作の制御内容等を含むテーブルの一例を示す図である。また、図10は、本発明の実施の形態に係る電力消費管理システムの電力消費管理装置に記憶される、各電力需要施設のイベント情報を含むテーブルの一例を示す図である。   FIG. 9 is an example of a table that includes the control contents of the operation of the electrical device by the consumer device that has notified the instruction information in the past, stored in the power consumption management device of the power consumption management system according to the embodiment of the present invention. FIG. Moreover, FIG. 10 is a figure which shows an example of the table containing the event information of each power demand facility memorize | stored in the power consumption management apparatus of the power consumption management system which concerns on embodiment of this invention.

図9を参照して、電力消費管理装置102は、過去に指示情報を通知した需要家装置151と、指示情報を通知した日時と、指示情報の通知を受けた需要家装置151による電気機器の制御内容と、当該制御内容が行われた際の対応の電力需要施設における消費電力と、指示情報を通知したときの気象情報およびイベント情報とを対応づけた複数のエントリを含むテーブルT2を記憶する。   Referring to FIG. 9, the power consumption management apparatus 102 includes the consumer device 151 that has notified the instruction information in the past, the date and time when the instruction information is notified, and the electrical equipment of the consumer device 151 that has received the notification of the instruction information. Stores a table T2 including a plurality of entries in which the control contents, the power consumption in the corresponding power demand facility when the control contents are performed, and the weather information and event information when the instruction information is notified are associated with each other .

また、図10を参照して、電力消費管理装置102は、各電力需要施設において行われる予定であるイベント情報を含むテーブルT3を記憶する。   Referring to FIG. 10, the power consumption management apparatus 102 stores a table T3 including event information that is scheduled to be performed at each power demand facility.

電力消費管理装置102は、テーブルT3を参照して、節電期間における各電力需要施設のイベント情報を確認する。また、電力消費管理装置102は、インターネット等を介して当該節電期間の天気予報などの気象情報を取得する。   The power consumption management apparatus 102 refers to the table T3 and confirms event information of each power demand facility during the power saving period. Further, the power consumption management apparatus 102 acquires weather information such as a weather forecast for the power saving period via the Internet or the like.

電力消費管理装置102は、たとえば2013年10月11日の13時〜14時が節電期間であるとすると、テーブルT3を参照して、2013年10月11日の13時〜14時において需要家装置151Aが設けられている電力需要施設ではイベント「無し」であり、需要家装置151Bが設けられている電力需要施設ではイベント「全体会合」が行われる予定であることを確認する。また、電力消費管理装置102は、天気予報等に基づいて、2013年10月11日の13時〜14時の気温「32℃」、湿度「80%」、天気「晴れ」を示す情報を取得する。   For example, assuming that 13:00 to 14:00 on October 11, 2013 is a power saving period, the power consumption management apparatus 102 refers to the table T3 and uses the consumer at 13:00 to 14:00 on October 11, 2013. It is confirmed that the event “none” occurs at the power demand facility where the device 151A is provided, and the event “whole meeting” is scheduled to be performed at the power demand facility where the customer device 151B is provided. In addition, the power consumption management apparatus 102 acquires information indicating the temperature “32 ° C.”, the humidity “80%”, and the weather “sunny” from 13:00 to 14:00 on October 11, 2013 based on the weather forecast and the like. To do.

また、電力消費管理装置102は、図9に示すテーブルT2を参照して、たとえば、需要家装置151A,151Bのそれぞれについて、テーブルT2に含まれる複数のエントリの中から、節電期間の気象およびイベントと同一または近似している気象およびイベントを含むエントリを1つ以上選択する。   Further, the power consumption management apparatus 102 refers to the table T2 shown in FIG. 9, for example, for each of the customer apparatuses 151A and 151B, from among a plurality of entries included in the table T2, weather and events in the power saving period Select one or more entries that contain the same or similar weather and events.

たとえば、電力消費管理装置102は、需要家装置151Aについて、テーブルT2に含まれるエントリ「A1」,「A2」,「A3」の中から、エントリ「A1」およびエントリ「A2」を選択する。また、たとえば、電力消費管理装置102は、需要家装置151Bについて、テーブルT2に含まれるエントリ「B1」,「B2」,「B3」の中から、エントリ「B1」およびエントリ「B2」を選択する。   For example, the power consumption management apparatus 102 selects the entry “A1” and the entry “A2” from the entries “A1”, “A2”, and “A3” included in the table T2 for the consumer apparatus 151A. For example, the power consumption management apparatus 102 selects the entry “B1” and the entry “B2” from the entries “B1”, “B2”, and “B3” included in the table T2 for the customer apparatus 151B. .

そして、電力消費管理装置102は、選択したエントリの中から、気象およびイベントが節電期間における気象およびイベントと最も近似している1つのエントリ(以下、「最適エントリ」と称する)を、需要家装置151ごとに選択する。   Then, the power consumption management apparatus 102 selects one entry (hereinafter referred to as “optimum entry”) in which the weather and the event are most similar to the weather and the event in the power saving period among the selected entries. Select every 151.

すなわち、電力消費管理装置102は、節電期間における気温を「Tpredict」とし、選択したエントリに含まれる気温を「Tpast」とし、節電期間における湿度を「Hpredict」とし、選択したエントリに含まれる湿度を「Hpast」とすると、以下の式における差D2が最も小さくなるエントリを最適エントリとして選択する。
D2=(Tpredict−Tpast)×W1+(Hpredict−Hpast)×W2+Event
That is, the power consumption management apparatus 102 sets the temperature during the power saving period to “Tpredict”, sets the temperature included in the selected entry to “Tpast”, sets the humidity during the power saving period as “Hpredict”, and sets the humidity included in the selected entry to Assuming that “Hpast”, the entry with the smallest difference D2 in the following expression is selected as the optimum entry.
D2 = (Tpredict−Tpast) × W1 + (Hpredict−Hpast) × W2 + Event

なお、上記の式において、「Event」は、節電期間のイベントと、選択したエントリに含まれるイベントとが一致する場合には負の値となり、節電期間のイベントと、選択したエントリに含まれるイベントとが一致しない場合には正の値となる。さらに、「W1」および「W2」は、重み付けのために用いられる定数である。   In the above formula, “Event” is a negative value when the event in the power saving period and the event included in the selected entry match, and the event in the power saving period and the event included in the selected entry. If does not match, it is a positive value. Further, “W1” and “W2” are constants used for weighting.

たとえば、電力消費管理装置102は、エントリ「A2」を最適エントリとして選択した場合、2013年10月11日の13時〜14時に需要家装置151Aが指示情報の通知を受けると、需要家装置151Aは空調の設定温度を1℃上昇させる制御を行う可能性が高いと推測することができる。そして、電力消費管理装置102は、需要家装置151Aがこのような制御を行うことにより、需要家装置151Aが設けられている電力需要施設の消費電力が「100kWh」となる可能性が高いと推測することができる。   For example, when the power consumption management apparatus 102 selects the entry “A2” as the optimum entry, when the consumer apparatus 151A receives notification of instruction information from 13:00 to 14:00 on October 11, 2013, the consumer apparatus 151A Can be presumed to be highly likely to carry out control to increase the set temperature of the air conditioning by 1 ° C. Then, the power consumption management device 102 estimates that the power consumption of the power demand facility in which the consumer device 151A is provided is likely to be “100 kWh” by the consumer device 151A performing such control. can do.

また、たとえば、電力消費管理装置102は、エントリ「B2」を最適エントリとして選択した場合、2013年10月11日の13時〜14時において需要家装置151Bが指示情報の通知を受けると、需要家装置151Bは空調の設定温度を2℃上昇させる制御を行う可能性が高いと推測することができる。そして、電力消費管理装置102は、需要家装置151Bがこのような制御を行うことにより、需要家装置151Bが設けられている電力需要施設の消費電力は「50kWh」となる可能性が高いことを推測することができる。   For example, when the power consumption management apparatus 102 selects the entry “B2” as the optimum entry, when the consumer apparatus 151B receives notification of instruction information at 13:00 to 14:00 on October 11, 2013, the demand information It can be estimated that the house device 151B is highly likely to perform control for increasing the set temperature of the air conditioning by 2 ° C. Then, the power consumption management apparatus 102 has a high possibility that the power consumption of the power demand facility in which the consumer apparatus 151B is provided will be “50 kWh” by the consumer apparatus 151B performing such control. Can be guessed.

そして、電力消費管理装置102は、基準電力消費情報を電力会社サーバ101から受信し、受信した基準電力消費情報に示される節電期間における基準値と、最適エントリに含まれる消費電力との差を、抑制することが可能であると推定される電力量(以下、「抑制可能量」と称する)として算出する。なお、電力消費管理装置102は、電力消費管理システム201に含まれる一部または全部の需要家装置151について、上記のような抑制可能量の算出を行う。   Then, the power consumption management apparatus 102 receives the reference power consumption information from the power company server 101, and calculates the difference between the reference value in the power saving period indicated in the received reference power consumption information and the power consumption included in the optimum entry. It is calculated as the amount of power estimated to be able to be suppressed (hereinafter referred to as “amount that can be suppressed”). Note that the power consumption management apparatus 102 calculates the suppression possible amount as described above for some or all of the customer apparatuses 151 included in the power consumption management system 201.

そして、電力消費管理装置102は、追加指示情報の通知先を選択する際、たとえば、優先度「2」が付与された複数の需要家装置151のうち、抑制可能量が大きい需要家装置151を追加指示情報の通知先として優先的に選択する。   When the power consumption management apparatus 102 selects the notification destination of the additional instruction information, for example, among the plurality of consumer apparatuses 151 to which the priority “2” is given, the consumer apparatus 151 having a large suppression amount is selected. Select preferentially as a notification destination of additional instruction information.

なお、電力消費管理装置102は、ニュートラルネットワークまたは自己回帰分析などの技術を用いて、各電力需要施設における節電期間の消費電力を予測する構成であっても良い。そして、この場合、電力消費管理装置102は、予測した消費電力(以下、「予測値」と称する)と、最適エントリに含まれる消費電力との差を、抑制可能量として算出することができる。   Note that the power consumption management apparatus 102 may be configured to predict power consumption during a power saving period in each power demand facility using a technique such as a neutral network or autoregressive analysis. In this case, the power consumption management apparatus 102 can calculate the difference between the predicted power consumption (hereinafter referred to as “predicted value”) and the power consumption included in the optimum entry as a controllable amount.

(iv)具体例4
また、電力消費管理装置102は、選択用情報として、たとえば電力消費管理システム201に含まれる一部または全部の需要家装置151について、節電期間における予測値を取得する。この場合、電力消費管理装置102の選択用情報取得部17は、予測値取得部として機能する。
(Iv) Specific Example 4
Moreover, the power consumption management apparatus 102 acquires the predicted value in a power-saving period about some or all the customer apparatuses 151 contained in the power consumption management system 201 as selection information, for example. In this case, the selection information acquisition unit 17 of the power consumption management apparatus 102 functions as a predicted value acquisition unit.

そして、電力消費管理装置102は、取得した予測値と、節電期間における基準値との差D3を算出し、追加指示情報の通知先を選択する際、たとえば、優先度「2」が付与された複数の需要家装置151のうち、算出した差D3が大きい需要家装置151を追加指示情報の通知先として優先的に選択する。   Then, when the power consumption management apparatus 102 calculates the difference D3 between the acquired predicted value and the reference value in the power saving period and selects the notification destination of the additional instruction information, for example, the priority “2” is given. Among the plurality of customer devices 151, the customer device 151 having a large calculated difference D3 is preferentially selected as the notification destination of the additional instruction information.

(v)具体例5
また、電力消費管理装置102は、選択用情報として、たとえば電力消費管理システム201に含まれる一部または全部の需要家装置151について、直前のN時間分の電力供給量を示す情報を取得する。そして、電力消費管理装置102は、取得した直前のN時間分の電力供給量と、直前のN時間分の基準値との差D4を算出し、追加指示情報の通知先を選択する際、たとえば、優先度「2」が付与された複数の需要家装置151のうち、算出した差D4が大きい需要家装置151を追加指示情報の通知先として優先的に選択する。
(V) Specific Example 5
Moreover, the power consumption management apparatus 102 acquires the information which shows the power supply amount for the last N hours about the one part or all the customer apparatuses 151 contained in the power consumption management system 201 as selection information, for example. When the power consumption management apparatus 102 calculates a difference D4 between the acquired power supply amount for the previous N hours and the reference value for the previous N hours, and selects a notification destination of additional instruction information, for example, Among the plurality of customer devices 151 to which the priority “2” is given, the customer device 151 having a large calculated difference D4 is preferentially selected as the notification destination of the additional instruction information.

なお、電力消費管理装置102は、上述した具体例1から具体例5までのいずれか1つの方法に限らず、たとえば、これら具体例1から具体例5までの方法のうちいずれか2つ以上の方法を組み合わせて、追加指示情報の通知先を選択しても良い。   Note that the power consumption management apparatus 102 is not limited to any one of the above-described specific examples 1 to 5, but, for example, any two or more of the methods from the specific examples 1 to 5 may be used. A notification destination of additional instruction information may be selected by combining methods.

また、上述した具体例1から具体例5までの方法では、優先度「2」が付与された需要家装置151の中から追加指示情報の通知先となる需要家装置151を選択しているが、このような構成に限定されず、たとえば優先度「1」が付与されている需要家装置151の中から追加指示情報の通知先を選択しても良い。   Further, in the above-described methods from the first specific example to the fifth specific example, the customer apparatus 151 that is the notification destination of the additional instruction information is selected from the customer apparatuses 151 given the priority “2”. For example, the notification destination of the additional instruction information may be selected from the customer apparatuses 151 to which the priority “1” is given.

また、電力消費管理装置102は、選択期間前に通知する指示情報の通知先となる需要家装置151を、上述した具体例1から具体例5までの方法を用いて選択しても良い。   In addition, the power consumption management apparatus 102 may select the consumer apparatus 151 that is the notification destination of the instruction information to be notified before the selection period, using the method from the first specific example to the fifth specific example.

(変形例)
また、電力消費管理装置102は、追加指示情報を通知する際、電気機器の制御内容を需要家装置151に対して指示する構成であっても良い。
(Modification)
Further, the power consumption management device 102 may be configured to instruct the consumer device 151 of the control content of the electric device when notifying the additional instruction information.

詳細には、電力消費管理装置102は、図9に示すテーブルT2を参照して、このテーブルT2に含まれる複数のエントリの中から、節電期間の気象およびイベントと同一または近似している気象およびイベントを含むエントリを1つ以上選択する。また、電力消費管理装置102は、ニュートラルネットワークまたは自己回帰分析などの技術を用いて、追加指示情報の通知先となる需要家装置151について、節電期間の消費電力の予測値を取得する。   Specifically, the power consumption management apparatus 102 refers to the table T2 shown in FIG. 9 and, from among a plurality of entries included in the table T2, the weather and the weather that are the same as or approximate to the weather and events in the power saving period Select one or more entries that contain events. Moreover, the power consumption management apparatus 102 acquires the predicted value of the power consumption of a power saving period about the consumer apparatus 151 which becomes a notification destination of additional instruction information using techniques, such as a neutral network or autoregressive analysis.

そして、電力消費管理装置102は、取得した予測値と、選択した各エントリに含まれる消費電力との差D5を算出する。この差D5は、各エントリに含まれる電気機器の制御内容を実行した場合に抑制することが可能であると推定される電力量に相当する。   Then, the power consumption management apparatus 102 calculates a difference D5 between the acquired predicted value and the power consumption included in each selected entry. This difference D5 corresponds to the amount of power that is estimated to be able to be suppressed when the control content of the electrical device included in each entry is executed.

また、電力消費管理装置102は、需要家装置151毎の抑制実績量の合計が節電目標を上回るように、追加指示情報の通知先に要請する節電目標を新たに設定する。   In addition, the power consumption management device 102 newly sets a power saving target to be requested to the notification destination of the additional instruction information so that the total amount of suppression results for each consumer device 151 exceeds the power saving target.

そして、電力消費管理装置102は、各エントリについて算出した差D5と、新たに設定した節電目標とに基づいて、当該節電目標を達成するために最適なエントリを選択し、選択したエントリに含まれる電気機器の制御内容、たとえば「空調の設定温度を1℃上昇させる」という電気機器の制御内容を、追加指示情報の通知先である需要家装置151に指示することができる。   Then, based on the difference D5 calculated for each entry and the newly set power saving target, the power consumption management apparatus 102 selects an optimum entry for achieving the power saving target, and is included in the selected entry. The control content of the electrical device, for example, the control content of the electrical device that “increases the set temperature of the air conditioning by 1 ° C.” can be instructed to the consumer device 151 that is the notification destination of the additional instruction information.

ところで、上述した非特許文献1に記載の機器管理システムのように複数の電力需要施設における電力消費を管理するシステムでは、電力需給の逼迫が予測される場合等に、各施設の需要家に対して節電要請を予め送信しておくことができる。   By the way, in a system that manages power consumption in a plurality of power demand facilities, such as the device management system described in Non-Patent Document 1 described above, when the demand for power supply and demand is predicted, the customer of each facility is requested. The power saving request can be transmitted in advance.

しかしながら、当該節電要請を受信した需要家が、対象期間において当該節電要請に従った電力消費の抑制を行うことが困難な状況となる場合があり、このような場合、適切な電力制御を行うことができないという問題がある。   However, it may be difficult for the customer who has received the power saving request to control power consumption according to the power saving request during the target period. In such a case, appropriate power control should be performed. There is a problem that can not be.

これに対して、本発明の実施の形態に係る電力消費管理システム201における電力消費管理装置102では、管理情報取得部11が、1または複数の電力供給側から電力消費に関する電力管理情報を取得する。また、指示部12が、電力管理情報に基づいて、電力需要施設における電力消費に関する指示情報を電力需要施設に通知する指示処理を行う。また、監視部13が、指示情報を通知した電力需要施設における電力消費を監視する。また、指示部12は、電力管理情報および監視部13の監視結果に基づいて、指示処理の内容を変更する。   On the other hand, in the power consumption management apparatus 102 in the power consumption management system 201 according to the embodiment of the present invention, the management information acquisition unit 11 acquires power management information related to power consumption from one or more power supply sides. . Moreover, the instruction | indication part 12 performs the instruction | indication process which notifies the instruction | indication information regarding the power consumption in a power demand facility to a power demand facility based on power management information. In addition, the monitoring unit 13 monitors power consumption in the power demand facility that has notified the instruction information. In addition, the instruction unit 12 changes the content of the instruction processing based on the power management information and the monitoring result of the monitoring unit 13.

このように、指示情報の通知先である電力需要施設における電力消費の制御状況をリアルタイムで監視し、監視結果および電力管理情報に基づいて指示処理の内容を変更する構成により、電力需要施設における電力消費を状況に応じて適切に制御することができる。   As described above, the power consumption control facility in the power demand facility that is the notification destination of the instruction information is monitored in real time, and the content of the instruction processing is changed based on the monitoring result and the power management information. Consumption can be appropriately controlled according to the situation.

また、本発明の実施の形態に係る電力消費管理システム201における電力消費管理装置102では、指示部12は、指示処理の内容の変更として、1または複数の新たな電力需要施設に新たな指示情報を通知するか、または、指示情報を通知した電力需要施設に異なる内容の指示情報を通知する。   Moreover, in the power consumption management apparatus 102 in the power consumption management system 201 according to the embodiment of the present invention, the instruction unit 12 adds new instruction information to one or more new power demanding facilities as a change in the contents of the instruction processing. Or the instruction information of different contents is notified to the power demand facility that has notified the instruction information.

このように、たとえば、通知された指示情報に従った電力消費制御を行うことが困難な電力需要施設が存在する場合であっても、他の電力需要施設に対する新たな指示情報の通知または同一の電力需要施設に対する異なる内容の指示情報の通知を行うことにより、電力供給側からの要請等に応じた電力消費の制御を行うことができる。   Thus, for example, even when there is a power demand facility where it is difficult to perform power consumption control according to the notified instruction information, notification of new instruction information to other power demand facilities or the same By notifying instruction information having different contents to the power demand facility, it is possible to control power consumption in response to a request from the power supply side.

また、本発明の実施の形態に係る電力消費管理システム201における電力消費管理装置102では、基準情報取得部14が、電力需要施設における電力消費の基準となる基準電力消費情報を取得する。また、指示部12が、電力管理情報と、監視部13の監視結果と、基準電力消費情報とに基づいて、指示処理の内容を変更する。   Moreover, in the power consumption management apparatus 102 in the power consumption management system 201 according to the embodiment of the present invention, the reference information acquisition unit 14 acquires reference power consumption information that is a reference for power consumption in the power demand facility. Further, the instruction unit 12 changes the content of the instruction process based on the power management information, the monitoring result of the monitoring unit 13, and the reference power consumption information.

このように、電力管理情報と、監視部の監視結果とに加えて、電力需要施設における電力消費の基準を考慮して指示処理の内容を変更するか否かを判断する構成により、指示処理の内容の変更の必要性をより適切に判断することができる。   Thus, in addition to the power management information and the monitoring result of the monitoring unit, it is possible to determine whether to change the content of the instruction process in consideration of the power consumption standard in the power demand facility. The necessity of changing the contents can be judged more appropriately.

また、本発明の実施の形態に係る電力消費管理システム201における電力消費管理装置102では、優先情報取得部16が、各電力需要施設に付与された優先度または優先順位を示す優先情報を取得する。また、指示部12が、優先情報に基づいて、各電力需要施設の中から新たな指示情報を通知すべき電力需要施設を選択する。   Moreover, in the power consumption management apparatus 102 in the power consumption management system 201 according to the embodiment of the present invention, the priority information acquisition unit 16 acquires priority information indicating the priority or priority assigned to each power demand facility. . Moreover, the instruction | indication part 12 selects the power demand facility which should notify new instruction information from each power demand facility based on priority information.

このような構成により、新たな指示情報の通知先として優先的に選択すべき電力需要施設を容易に判断することができる。   With such a configuration, it is possible to easily determine a power demand facility to be preferentially selected as a notification destination of new instruction information.

また、本発明の実施の形態に係る電力消費管理システム201における電力消費管理装置102では、タイミング情報取得部17が、電力需要施設に対して過去に指示情報を通知したタイミングを示すタイミング情報を取得する。また、指示部12は、優先情報およびタイミング情報の少なくともいずれか一方に基づいて、各電力需要施設の中から新たな指示情報を通知すべき電力需要施設を選択する。   Moreover, in the power consumption management apparatus 102 in the power consumption management system 201 according to the embodiment of the present invention, the timing information acquisition unit 17 acquires timing information indicating the timing when the instruction information has been notified to the power demand facility in the past. To do. Moreover, the instruction | indication part 12 selects the electric power demand facility which should notify new instruction information from each electric power demand facility based on at least any one of priority information and timing information.

このような構成により、たとえば同一の電力需要施設に対して複数回連続して指示情報を通知することを避け、複数の電力需要施設間での電力削減の偏りを防ぐことができる。   With such a configuration, for example, it is possible to avoid notifying instruction information to the same power demand facility a plurality of times in succession, and to prevent a bias in power reduction among the plurality of power demand facilities.

また、本発明の実施の形態に係る電力消費管理システム201における電力消費管理装置102では、電力量情報取得部17が、電力需要施設の電力供給側から供給される電力量に関する電力量情報を取得する。また、指示部12は、優先情報および電力量情報の少なくともいずれか一方に基づいて、各電力需要施設の中から新たな指示情報を通知すべき電力需要施設を選択する。   In the power consumption management apparatus 102 in the power consumption management system 201 according to the embodiment of the present invention, the power amount information acquisition unit 17 acquires power amount information related to the amount of power supplied from the power supply side of the power demand facility. To do. Moreover, the instruction | indication part 12 selects the electric power demand facility which should notify new instruction information from each electric power demand facility based on at least any one of priority information and electric energy information.

このような構成により、電力供給側から供給される電力量が大きい電力需要施設など、比較的容易に電力消費の抑制等を行うことが可能な電力需要施設を、新たな指示情報の通知先として選択することができる。   With such a configuration, a power demand facility capable of relatively easily suppressing power consumption, such as a power demand facility with a large amount of power supplied from the power supply side, is used as a new instruction information notification destination. You can choose.

また、本発明の実施の形態に係る電力消費管理システム201における電力消費管理装置102では、基準情報取得部14が、電力需要施設における電力消費の基準となる基準電力消費情報を取得する。また、指示部12が、基準電力消費情報と電力需要施設における電力消費を監視した結果との比較を、複数の電力需要施設の各々について行い、優先情報および比較結果の少なくともいずれか一方に基づいて、比較した各電力需要施設の中から新たな指示情報を通知すべき電力需要施設を選択する。   Moreover, in the power consumption management apparatus 102 in the power consumption management system 201 according to the embodiment of the present invention, the reference information acquisition unit 14 acquires reference power consumption information that is a reference for power consumption in the power demand facility. The instruction unit 12 compares the reference power consumption information with the result of monitoring the power consumption in the power demand facility for each of the plurality of power demand facilities, and based on at least one of the priority information and the comparison result. Then, a power demand facility to which new instruction information is to be notified is selected from the compared power demand facilities.

このように、電力消費の基準となる情報と電力需要施設における実際の電力消費とを比較することにより、たとえば当該電力需要施設において抑制することのできる電力量を把握し、新たな指示情報の通知先として適切な電力需要施設を選択することができる。   In this way, by comparing the power consumption reference information with the actual power consumption in the power demand facility, for example, the amount of power that can be suppressed in the power demand facility is grasped, and new instruction information is notified. An appropriate power demand facility can be selected as the destination.

また、本発明の実施の形態に係る電力消費管理システム201における電力消費管理装置102では、予測値取得部17が、電力需要施設における電力消費の予測値を取得する。また、指示部12が、予測値と電力需要施設における電力消費を監視した結果との比較を、複数の電力需要施設の各々について行い、優先情報および比較結果の少なくともいずれか一方に基づいて、比較した各電力需要施設の中から新たな指示情報を通知すべき電力需要施設を選択する。   Moreover, in the power consumption management apparatus 102 in the power consumption management system 201 according to the embodiment of the present invention, the predicted value acquisition unit 17 acquires the predicted value of power consumption in the power demand facility. Further, the instruction unit 12 compares the predicted value with the result of monitoring the power consumption in the power demand facility for each of the plurality of power demand facilities, and compares the result based on at least one of the priority information and the comparison result. The power demand facility to which new instruction information is to be notified is selected from the respective power demand facilities.

このように、電力需要施設による電力消費の予測値と当該電力需要施設における実際の電力消費とを比較することにより、たとえば当該電力需要施設において抑制することのできる電力量を把握し、新たな指示情報の通知先として適切な電力需要施設を選択することができる。   In this way, by comparing the predicted value of power consumption by the power demand facility and the actual power consumption at the power demand facility, for example, the amount of power that can be suppressed at the power demand facility is grasped, and a new instruction is obtained. An appropriate power demand facility can be selected as the information notification destination.

また、本発明の実施の形態に係る電力消費管理システム201における電力消費管理装置102では、基準情報取得部14が、電力需要施設における電力消費の基準となる基準電力消費情報を取得する。また、予測値取得部17が、電力需要施設における電力消費の予測値を取得する。また、指示部12が、基準電力消費情報と予測値との比較を、複数の電力需要施設の各々について行い、優先情報および比較結果の少なくともいずれか一方に基づいて、比較した各電力需要施設の中から新たな指示情報を通知すべき電力需要施設を選択する。   Moreover, in the power consumption management apparatus 102 in the power consumption management system 201 according to the embodiment of the present invention, the reference information acquisition unit 14 acquires reference power consumption information that is a reference for power consumption in the power demand facility. Moreover, the predicted value acquisition unit 17 acquires a predicted value of power consumption in the power demand facility. In addition, the instruction unit 12 compares the reference power consumption information with the predicted value for each of the plurality of power demand facilities, and based on at least one of the priority information and the comparison result, A power demand facility to which new instruction information should be notified is selected.

このように、電力需要施設による電力消費の予測値と電力消費の基準となる情報との比較を行うことにより、当該電力需要施設における電力消費の傾向を把握することができるため、新たな指示情報の通知先として適切な電力需要施設を選択することができる。   In this way, by comparing the predicted value of power consumption by the power demand facility with the information used as the standard for power consumption, it is possible to grasp the power consumption trend in the power demand facility, so new instruction information It is possible to select an appropriate power demand facility as the notification destination.

また、本発明の実施の形態に係る電力消費管理システム201における電力消費管理装置102では、基準情報取得部14が、電力需要施設における電力消費の基準となる基準電力消費情報を取得する。また、指示部12が、監視部13による監視結果と基準電力消費情報との比較を、複数の電力需要施設の各々について行い、優先情報および比較結果の少なくともいずれか一方に基づいて、比較した各電力需要施設の中から新たな指示情報を通知すべき電力需要施設を選択する。   Moreover, in the power consumption management apparatus 102 in the power consumption management system 201 according to the embodiment of the present invention, the reference information acquisition unit 14 acquires reference power consumption information that is a reference for power consumption in the power demand facility. Further, the instruction unit 12 compares the monitoring result by the monitoring unit 13 with the reference power consumption information for each of the plurality of power demand facilities, and compares each based on at least one of the priority information and the comparison result A power demand facility to which new instruction information should be notified is selected from the power demand facilities.

このように、電力需要施設による現時点における電力消費の監視結果と、電力消費の基準となる情報との比較を行うことにより、現時点における電力需要施設による電力消費の傾向を把握することができるため、新たな指示情報の通知先として適切な電力需要施設を選択することができる。   In this way, by comparing the current power consumption monitoring result by the power demand facility with the information that is the standard for power consumption, it is possible to grasp the trend of power consumption by the current power demand facility. An appropriate power demand facility can be selected as a notification destination of new instruction information.

上記実施の形態は、すべての点で例示であって制限的なものではないと考えられるべきである。本発明の範囲は、上記説明ではなく特許請求の範囲によって示され、特許請求の範囲と均等の意味および範囲内でのすべての変更が含まれることが意図される。   The above embodiment should be considered as illustrative in all points and not restrictive. The scope of the present invention is defined by the terms of the claims, rather than the description above, and is intended to include any modifications within the scope and meaning equivalent to the terms of the claims.

以上の説明は、以下に付記する特徴を含む。   The above description includes the following features.

[付記1]
複数の電力需要施設における電力消費を管理する電力消費管理装置であって、
1または複数の電力供給側から電力消費に関する電力管理情報を取得する管理情報取得部と、
前記電力管理情報に基づいて、前記電力需要施設における電力消費に関する指示情報を前記電力需要施設に通知する指示処理を行う指示部と、
前記指示情報を通知した前記電力需要施設における電力消費を監視する監視部とを備え、
前記指示部は、前記電力管理情報および前記監視部の監視結果に基づいて、前記指示処理の内容を変更し、
前記電力管理情報は、電力需給の逼迫が予想される期間を示す情報、日別もしくは時間帯別の電気料金情報、または、電力の節電要請を示す情報であり、
前記指示部は、前記電力需要施設に設けられたBEMS(Building Energy Management System)またはHEMS(Home Energy Management System)における需要家装置に前記指示情報を通知する、電力消費管理装置。
[Appendix 1]
A power consumption management device for managing power consumption in a plurality of power demand facilities,
A management information acquisition unit that acquires power management information related to power consumption from one or more power supply sides;
Based on the power management information, an instruction unit for performing an instruction process for notifying the power demand facility of instruction information regarding power consumption in the power demand facility;
A monitoring unit that monitors power consumption in the power demand facility that has notified the instruction information,
The instruction unit changes the content of the instruction process based on the power management information and a monitoring result of the monitoring unit,
The power management information is information indicating a period in which the tightness of power supply and demand is expected, electric charge information by day or time period, or information indicating a power saving request,
The said instruction | indication part is a power consumption management apparatus which notifies the said instruction information to the consumer apparatus in BEMS (Building Energy Management System) or HEMS (Home Energy Management System) provided in the said electric power demand facility.

11 管理情報取得部
12 指示部
13 監視部
14 基準情報取得部
15 記憶部
16 優先情報取得部
17 選択用情報取得部(タイミング情報取得部または予測値取得部)
101 電力会社サーバ
102 電力消費管理装置
151 需要家装置
201 電力消費管理システム
DESCRIPTION OF SYMBOLS 11 Management information acquisition part 12 Instruction part 13 Monitoring part 14 Reference | standard information acquisition part 15 Storage | storage part 16 Priority information acquisition part 17 Selection information acquisition part (timing information acquisition part or prediction value acquisition part)
DESCRIPTION OF SYMBOLS 101 Power company server 102 Power consumption management apparatus 151 Consumer apparatus 201 Power consumption management system

Claims (12)

複数の電力需要施設における電力消費を管理する電力消費管理装置であって、
1または複数の電力供給側から電力消費に関する電力管理情報を取得する管理情報取得部と、
前記電力管理情報に基づいて、前記電力需要施設における電力消費に関する指示情報を前記電力需要施設に通知する指示処理を行う指示部と、
前記指示情報を通知した前記電力需要施設における電力消費を監視する監視部とを備え、
前記指示部は、前記電力管理情報および前記監視部の監視結果に基づいて、前記指示処理の内容を変更し、
前記電力消費管理装置は、各前記電力需要施設に対して過去に前記指示情報を通知したときの、前記電力需要施設における消費電力と、気象情報およびイベント情報の少なくともいずれか一方とを示す第1の情報を取得し、前記電力管理情報の示す節電期間における前記各電力需要施設の気象情報およびイベント情報の少なくともいずれか一方を示す第2の情報を取得し、取得した前記第1の情報および前記第2の情報に基づいて前記各電力需要施設の消費電力を予測し、予測結果に基づいて、前記各電力需要施設の中から新たな前記指示情報を通知すべき前記電力需要施設を選択する、電力消費管理装置。
A power consumption management device for managing power consumption in a plurality of power demand facilities,
A management information acquisition unit that acquires power management information related to power consumption from one or more power supply sides;
Based on the power management information, an instruction unit for performing an instruction process for notifying the power demand facility of instruction information regarding power consumption in the power demand facility;
A monitoring unit that monitors power consumption in the power demand facility that has notified the instruction information,
The instruction unit changes the content of the instruction process based on the power management information and a monitoring result of the monitoring unit ,
The power consumption management device is a first unit that indicates power consumption in the power demand facility and at least one of weather information and event information when the instruction information is notified to each power demand facility in the past. The second information indicating at least one of weather information and event information of each power demand facility in the power saving period indicated by the power management information, and acquiring the first information and the acquired information Predicting the power consumption of each power demand facility based on second information, and selecting the power demand facility to be notified of the new instruction information from the power demand facilities based on the prediction result; Power consumption management device.
前記指示部は、前記指示処理の内容の変更として、1または複数の新たな前記電力需要施設に新たな前記指示情報を通知するか、または、前記指示情報を通知した前記電力需要施設に異なる内容の前記指示情報を通知する、請求項1に記載の電力消費管理装置。   The instruction unit, as a change in the contents of the instruction processing, notifies the new instruction information to one or more new power demand facilities, or different contents to the power demand facility that has notified the instruction information The power consumption management apparatus according to claim 1, wherein the instruction information is notified. 前記電力消費管理装置は、さらに、
前記電力需要施設における電力消費の基準となる基準電力消費情報を取得する基準情報取得部を備え、
前記指示部は、前記電力管理情報と、前記監視部の監視結果と、前記基準電力消費情報とに基づいて、前記指示処理の内容を変更する、請求項1または請求項2に記載の電力消費管理装置。
The power consumption management device further includes:
A reference information acquisition unit that acquires reference power consumption information that is a reference for power consumption in the power demand facility,
The power consumption according to claim 1 or 2, wherein the instruction unit changes contents of the instruction process based on the power management information, a monitoring result of the monitoring unit, and the reference power consumption information. Management device.
前記電力消費管理装置は、さらに、
各前記電力需要施設に付与された優先度または優先順位を示す優先情報を取得する優先情報取得部を備え、
前記指示部は、前記優先情報に基づいて、前記各電力需要施設の中から新たな前記指示情報を通知すべき前記電力需要施設を選択する、請求項1から請求項3のいずれか1項に記載の電力消費管理装置。
The power consumption management device further includes:
A priority information acquisition unit that acquires priority information indicating the priority or priority given to each of the power demand facilities,
The said instruction | indication part selects the said electric power demand facility which should notify the said said new instruction information from each said electric power demand facility based on the said priority information, In any one of Claims 1-3. The power consumption management device described.
前記電力消費管理装置は、さらに、
前記電力需要施設に対して過去に前記指示情報を通知したタイミングを示すタイミング情報を取得するタイミング情報取得部を備え、
前記指示部は、前記優先情報および前記タイミング情報の少なくともいずれか一方に基づいて、前記各電力需要施設の中から新たな前記指示情報を通知すべき前記電力需要施設を選択する、請求項4に記載の電力消費管理装置。
The power consumption management device further includes:
A timing information acquisition unit that acquires timing information indicating a timing at which the instruction information was previously notified to the power demand facility;
The said instruction | indication part selects the said electric power demand facility which should notify the said said new instruction information from each said electric power demand facility based on at least any one of the said priority information and the said timing information. The power consumption management device described.
前記電力消費管理装置は、さらに、
前記電力需要施設の前記電力供給側から供給される電力量に関する電力量情報を取得する電力量情報取得部を備え、
前記指示部は、前記優先情報および前記電力量情報の少なくともいずれか一方に基づいて、前記各電力需要施設の中から新たな前記指示情報を通知すべき前記電力需要施設を選択する、請求項4または請求項5に記載の電力消費管理装置。
The power consumption management device further includes:
A power amount information acquisition unit that acquires power amount information related to the amount of power supplied from the power supply side of the power demand facility,
The said instruction | indication part selects the said electric power demand facility which should notify the said said new instruction information from each said electric power demand facility based on at least any one of the said priority information and the said electric energy information. Or the power consumption management apparatus of Claim 5.
前記電力消費管理装置は、さらに、
前記電力需要施設における電力消費の基準となる基準電力消費情報を取得する基準情報取得部を備え、
前記指示部は、前記基準電力消費情報と前記電力需要施設における電力消費を監視した結果との比較を、複数の前記電力需要施設の各々について行い、前記優先情報および比較結果の少なくともいずれか一方に基づいて、比較した各前記電力需要施設の中から新たな前記指示情報を通知すべき前記電力需要施設を選択する、請求項4から請求項6のいずれか1項に記載の電力消費管理装置。
The power consumption management device further includes:
A reference information acquisition unit that acquires reference power consumption information that is a reference for power consumption in the power demand facility,
The instructing unit compares the reference power consumption information with the result of monitoring the power consumption in the power demand facility for each of the plurality of power demand facilities, and at least one of the priority information and the comparison result. The power consumption management device according to any one of claims 4 to 6, wherein the power demand facility to be notified of the new instruction information is selected from the compared power demand facilities.
前記電力消費管理装置は、さらに、
前記電力需要施設における電力消費の予測値を取得する予測値取得部を備え、
前記指示部は、前記予測値と前記電力需要施設における電力消費を監視した結果との比較を、複数の前記電力需要施設の各々について行い、前記優先情報および比較結果の少なくともいずれか一方に基づいて、比較した前記各電力需要施設の中から新たな前記指示情報を通知すべき前記電力需要施設を選択する、請求項4から請求項7のいずれか1項に記載の電力消費管理装置。
The power consumption management device further includes:
A predicted value acquisition unit for acquiring a predicted value of power consumption in the power demand facility;
The instruction unit performs a comparison between the predicted value and a result of monitoring power consumption in the power demand facility for each of the plurality of power demand facilities, and based on at least one of the priority information and the comparison result The power consumption management apparatus according to any one of claims 4 to 7, wherein the power demand facility to be notified of the new instruction information is selected from the compared power demand facilities.
前記電力消費管理装置は、さらに、
前記電力需要施設における電力消費の基準となる基準電力消費情報を取得する基準情報取得部と、
前記電力需要施設における電力消費の予測値を取得する予測値取得部を備え、
前記指示部は、前記基準電力消費情報と前記予測値との比較を、複数の前記電力需要施設の各々について行い、前記優先情報および比較結果の少なくともいずれか一方に基づいて、比較した前記各電力需要施設の中から新たな前記指示情報を通知すべき前記電力需要施設を選択する、請求項4から請求項8のいずれか1項に記載の電力消費管理装置。
The power consumption management device further includes:
A reference information acquisition unit for acquiring reference power consumption information to be a reference of power consumption in the power demand facility;
A predicted value acquisition unit for acquiring a predicted value of power consumption in the power demand facility;
The instruction unit compares the reference power consumption information with the predicted value for each of the plurality of power demand facilities, and compares the powers based on at least one of the priority information and the comparison result. The power consumption management apparatus according to any one of claims 4 to 8, wherein the power demand facility to be notified of the new instruction information is selected from the demand facilities.
前記電力消費管理装置は、さらに、
前記電力需要施設における電力消費の基準となる基準電力消費情報を取得する基準情報取得部を備え、
前記指示部は、前記監視結果と前記基準電力消費情報との比較を、複数の前記電力需要施設の各々について行い、前記優先情報および比較結果の少なくともいずれか一方に基づいて、比較した前記各電力需要施設の中から新たな前記指示情報を通知すべき前記電力需要施設を選択する、請求項4から請求項9のいずれか1項に記載の電力消費管理装置。
The power consumption management device further includes:
A reference information acquisition unit that acquires reference power consumption information that is a reference for power consumption in the power demand facility,
The instructing unit compares the monitoring result with the reference power consumption information for each of the plurality of power demand facilities, and compares the powers based on at least one of the priority information and the comparison result. The power consumption management apparatus according to any one of claims 4 to 9, wherein the power demand facility to be notified of the new instruction information is selected from the demand facilities.
複数の電力需要施設における電力消費を管理する電力消費管理装置における電力消費管理方法であって、
1または複数の電力供給側から電力消費に関する電力管理情報を取得するステップと、
前記電力管理情報に基づいて、前記電力需要施設における電力消費に関する指示情報を前記電力需要施設に通知する指示処理を行うステップと、
前記指示情報を通知した前記電力需要施設における電力消費を監視するステップと、
前記電力管理情報および監視結果に基づいて、内容を変更した前記指示処理を行うステップとを含み、
内容を変更した前記指示処理を行うステップにおいては、各前記電力需要施設に対して過去に前記指示情報を通知したときの、前記電力需要施設における消費電力と、気象情報およびイベント情報の少なくともいずれか一方とを示す第1の情報を取得し、前記電力管理情報の示す節電期間における前記各電力需要施設の気象情報およびイベント情報の少なくともいずれか一方を示す第2の情報を取得し、取得した前記第1の情報および前記第2の情報に基づいて前記各電力需要施設の消費電力を予測し、予測結果に基づいて、前記各電力需要施設の中から新たな前記指示情報を通知すべき前記電力需要施設を選択する、電力消費管理方法。
A power consumption management method in a power consumption management device for managing power consumption in a plurality of power demand facilities,
Obtaining power management information relating to power consumption from one or more power suppliers;
Performing an instruction process of notifying the power demand facility of instruction information regarding power consumption in the power demand facility based on the power management information;
Monitoring power consumption in the power demand facility that has notified the instruction information;
Based on said power management information and monitoring results, viewed including the step of performing the instruction processing for changing the content,
In the step of performing the instruction process with the content changed, at least one of power consumption in the power demand facility, weather information, and event information when the instruction information is notified to each power demand facility in the past 1st information which shows one side is acquired, 2nd information which shows at least any one of the weather information and event information of each said electricity demand facility in the power-saving period which the said power management information shows is acquired, and the acquired The power to be used for predicting the power consumption of each power demand facility based on the first information and the second information, and notifying the new instruction information from the power demand facilities based on the prediction result A power consumption management method that selects a demand facility .
複数の電力需要施設における電力消費を管理する電力消費管理装置において用いられる電力消費管理プログラムであって、
コンピュータに、
1または複数の電力供給側から電力消費に関する電力管理情報を取得するステップと、
前記電力管理情報に基づいて、前記電力需要施設における電力消費に関する指示情報を前記電力需要施設に通知する指示処理を行うステップと、
前記指示情報を通知した前記電力需要施設における電力消費を監視するステップと、
前記電力管理情報および監視結果に基づいて、内容を変更した前記指示処理を行うステップとを実行させるためのプログラムであり、
内容を変更した前記指示処理を行うステップにおいては、各前記電力需要施設に対して過去に前記指示情報を通知したときの、前記電力需要施設における消費電力と、気象情報およびイベント情報の少なくともいずれか一方とを示す第1の情報を取得し、前記電力管理情報の示す節電期間における前記各電力需要施設の気象情報およびイベント情報の少なくともいずれか一方を示す第2の情報を取得し、取得した前記第1の情報および前記第2の情報に基づいて前記各電力需要施設の消費電力を予測し、予測結果に基づいて、前記各電力需要施設の中から新たな前記指示情報を通知すべき前記電力需要施設を選択する、電力消費管理プログラム。
A power consumption management program used in a power consumption management device that manages power consumption in a plurality of power demand facilities,
On the computer,
Obtaining power management information relating to power consumption from one or more power suppliers;
Performing an instruction process of notifying the power demand facility of instruction information regarding power consumption in the power demand facility based on the power management information;
Monitoring power consumption in the power demand facility that has notified the instruction information;
Based on said power management information and monitoring results, a program for executing and performing the instruction processing for changing the content,
In the step of performing the instruction process with the content changed, at least one of power consumption in the power demand facility, weather information, and event information when the instruction information is notified to each power demand facility in the past 1st information which shows one side is acquired, 2nd information which shows at least any one of the weather information and event information of each said electricity demand facility in the power-saving period which the said power management information shows is acquired, and the acquired The power to be used for predicting the power consumption of each power demand facility based on the first information and the second information, and notifying the new instruction information from the power demand facilities based on the prediction result A power consumption management program that selects demand facilities .
JP2013256097A 2013-12-11 2013-12-11 Power consumption management device, power consumption management method, and power consumption management program Active JP6221714B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2013256097A JP6221714B2 (en) 2013-12-11 2013-12-11 Power consumption management device, power consumption management method, and power consumption management program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2013256097A JP6221714B2 (en) 2013-12-11 2013-12-11 Power consumption management device, power consumption management method, and power consumption management program

Publications (2)

Publication Number Publication Date
JP2015116038A JP2015116038A (en) 2015-06-22
JP6221714B2 true JP6221714B2 (en) 2017-11-01

Family

ID=53529380

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2013256097A Active JP6221714B2 (en) 2013-12-11 2013-12-11 Power consumption management device, power consumption management method, and power consumption management program

Country Status (1)

Country Link
JP (1) JP6221714B2 (en)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6575804B2 (en) * 2015-07-16 2019-09-18 パナソニックIpマネジメント株式会社 Power saving target determination device, power saving target determination method, and control program
JP6610059B2 (en) * 2015-07-29 2019-11-27 富士電機株式会社 Electric power demand induction device
CN105303462A (en) * 2015-11-03 2016-02-03 国家电网公司 EMD distance based coal consumption comparative analysis method for coal-fired power generation unit groups
JP6722481B2 (en) * 2016-03-18 2020-07-15 株式会社エヌ・ティ・ティ・データ Energy demand control device, energy demand control method, energy demand control system, and program
JP6261708B1 (en) * 2016-11-28 2018-01-17 三菱電機株式会社 Power saving request device and power saving request program
KR102089772B1 (en) * 2017-12-18 2020-03-17 두산중공업 주식회사 System and method for predicting power usage
JP7084231B2 (en) * 2018-06-29 2022-06-14 アズビル株式会社 Goal achievement judgment method, consumer selection method and equipment
JP7084235B2 (en) * 2018-07-06 2022-06-14 アズビル株式会社 Customer selection method and equipment
JP7279435B2 (en) * 2019-03-18 2023-05-23 住友電気工業株式会社 Power management system, management device, management method and computer program
JP6976385B1 (en) * 2020-06-23 2021-12-08 三菱電機株式会社 Control device, control method and control program

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005033952A (en) * 2003-07-09 2005-02-03 Nec Corp System, method and program for power supply-demand management
WO2010042200A1 (en) * 2008-10-08 2010-04-15 Rey Montalvo Method and system for fully automated energy curtailment
JP5487125B2 (en) * 2011-01-11 2014-05-07 株式会社東芝 Power supply / demand adjustment reserve capacity trading system and power supply / demand adjustment reserve capacity transaction method
WO2012120623A1 (en) * 2011-03-07 2012-09-13 株式会社日立製作所 System, method, and computer program for energy consumption management
JP2013230051A (en) * 2012-04-26 2013-11-07 Ntt Facilities Inc Power saving support processing system, power saving support processing device, power management terminal, power management server, power saving support method, and program

Also Published As

Publication number Publication date
JP2015116038A (en) 2015-06-22

Similar Documents

Publication Publication Date Title
JP6221714B2 (en) Power consumption management device, power consumption management method, and power consumption management program
JP5906534B2 (en) Demand response method and demand response control device
JP5671285B2 (en) Method and system for demand response in a distribution network
JP5643791B2 (en) Electric power supply and demand control device and electric power supply and demand control method
WO2013039336A1 (en) Apparatus and method for executing energy demand response process in an electrical power network
WO2015122074A1 (en) Demand control device and program
US20140316599A1 (en) Consumer energy management system and consumer energy management method
US9766679B2 (en) Power monitoring device and power monitoring system
WO2014097646A1 (en) Energy management device and energy management system
JP2011134325A (en) Method and system for demand response management in network
JP5768097B2 (en) Information processing apparatus and service providing method
JPWO2016017426A1 (en) Control device, device control device, control method, notification receiving method, notification method, and recording medium
US20150340900A1 (en) Electric power control method and electric power control device
JP2020054214A (en) Storage battery management device and storage battery management method
JP5794531B2 (en) Power navigation device
JP5826714B2 (en) Power control system and power monitoring device
JP6173382B2 (en) Control device, energy management system, control method and program
JP6221715B2 (en) Upper management apparatus, lower management apparatus, power consumption management system, power consumption management method, and power consumption management program
JP6701761B2 (en) Power consumption management device, power consumption management system, and power consumption management program
JP2016046934A (en) Energy management system, community energy management system, and user energy management system
US20130173067A1 (en) Smoothing device, smoothing system, and computer program product
JP2017169292A (en) Controller, control method, and program
Umer et al. Priority based power sharing scheme for power consumption control in smart homes
JP6753593B2 (en) Energy management system, guide server and energy management method
JP2016161251A (en) Peak power development prediction device and prediction method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20160629

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20170309

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20170321

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20170509

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20170905

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20170918

R150 Certificate of patent or registration of utility model

Ref document number: 6221714

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250