- Publication number
- JP6166512B2 JP6166512B2 JP2012108022A JP2012108022A JP6166512B2 JP 6166512 B2 JP6166512 B2 JP 6166512B2 JP 2012108022 A JP2012108022 A JP 2012108022A JP 2012108022 A JP2012108022 A JP 2012108022A JP 6166512 B2 JP6166512 B2 JP 6166512B2
- Authority
- JP
- Japan
- Prior art keywords
- power
- storage battery
- battery device
- load
- output
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E70/00—Other energy conversion or management systems reducing GHG emissions
- Y02E70/30—Systems combining energy storage with energy generation of non-fossil origin
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
Description
本発明は、電力の需要家等に適用される制御装置、電力システム、及び制御方法に関する。 The present invention relates to a control device, a power system, and a control method that are applied to a power consumer or the like.
近年、電力の需要家において、分散電源、特に、太陽光発電装置及び燃料電池発電装置の普及が進んでいる。 In recent years, the spread of distributed power sources, particularly solar power generation devices and fuel cell power generation devices, has been increasing among power consumers.
燃料電池発電装置は、定格出力電力までの範囲内で出力電力が可変であり、負荷の消費電力の増減に合わせて発電量を増減する「負荷追従運転」が適用されることが一般的である。 The fuel cell power generator generally has a variable output power within the range up to the rated output power, and “load following operation” is generally applied in which the power generation amount is increased or decreased in accordance with the increase or decrease in load power consumption. .
燃料電池発電装置は、その発電原理に起因して、発電量を急激に変更できない。よって、負荷追従運転を燃料電池発電装置に適用しても、負荷の消費電力が急増すると、負荷の消費電力に対して燃料電池発電装置からの出力電力に不足(以下、「負荷追従運転で不足する電力」という)が生じる。 The fuel cell power generation device cannot change the power generation amount rapidly due to the power generation principle. Therefore, even if the load following operation is applied to the fuel cell power generation device, if the power consumption of the load increases rapidly, the output power from the fuel cell power generation device is insufficient for the power consumption of the load (hereinafter referred to as “insufficient in load following operation”). Power ”).
このような状況に鑑みて、燃料電池発電装置を小容量の蓄電池を用いた蓄電池装置と併用し、負荷追従運転で不足する電力を蓄電池装置から負荷に出力する電力システムが提案されている(特許文献1参照)。 In view of such a situation, a power system has been proposed in which a fuel cell power generator is used in combination with a storage battery device using a small-capacity storage battery, and power shortage in load following operation is output from the storage battery device to a load (patent) Reference 1).
現状、太陽光発電装置からの電力(余剰電力)は系統への売電の対象になる。よって、蓄電池装置を、太陽光発電装置から系統への売電量を増やすために利用することが考えられる。 At present, the power (surplus power) from the photovoltaic power generation device is a target for selling power to the grid. Therefore, it is conceivable to use the storage battery device in order to increase the amount of power sold from the solar power generation device to the system.
しかしながら、負荷追従運転で不足する電力を常に小容量の蓄電池から出力してしまうと、太陽光発電装置からの電力を系統へ売電可能な時点において蓄電残量が尽きていることがある。したがって、小容量の蓄電池を利用して売電量を増やすことが難しいという問題がある。 However, if the power shortage in the load following operation is always output from the small-capacity storage battery, the remaining amount of power storage may be exhausted when the power from the photovoltaic power generator can be sold to the system. Therefore, there is a problem that it is difficult to increase the amount of power sold using a small-capacity storage battery.
そこで、本発明は、蓄電池装置を利用して売電量を増やすことができる制御装置、電力システム、及び制御方法を提供することを目的とする。 Then, an object of this invention is to provide the control apparatus, electric power system, and control method which can increase the amount of electric power sales using a storage battery apparatus.
上述した課題を解決するために、本発明は以下のような特徴を有している。 In order to solve the above-described problems, the present invention has the following features.
本発明の制御装置は、負荷に電力を出力でき、かつ、余剰電力が系統に売電可能である第1の発電装置と、負荷追従運転により前記負荷に電力を出力する第2の発電装置と、前記負荷追従運転で不足する電力を前記負荷に出力するための蓄電池装置と、を有する電力システムに適用される制御装置であって、前記第1の発電装置が出力する電力に応じた値が閾値以上であるとき、前記蓄電池装置から電力を出力するよう制御する制御部を有することを特徴とする。 The control device of the present invention includes a first power generation device that can output power to a load and surplus power can be sold to the system, and a second power generation device that outputs power to the load by load following operation. A storage battery device for outputting to the load the power shortage in the load following operation, a control device applied to the power system, the value according to the power output from the first power generator It has a control part which controls to output electric power from the storage battery device when it is more than a threshold.
前記制御部は、前記第1の発電装置が出力する電力に応じた値が前記閾値未満であるとき、前記蓄電池装置から電力を出力することを抑止するよう制御してもよい。 The control unit may perform control so as to suppress output of power from the storage battery device when a value corresponding to power output from the first power generation device is less than the threshold value.
前記制御部は、前記蓄電池装置での充電を開始できる充電開始時点と、現時点から前記充電開始時点までの前記負荷の消費電力と、を予測し、前記制御部は、前記蓄電池装置における蓄電残量と、前記予測の結果と、に応じて、前記蓄電池装置における蓄電残量が前記充電開始時点までに尽きると判断した場合において、前記第1の発電装置が出力する電力に応じた値が前記閾値以上であるとき、前記蓄電池装置から電力を出力するよう制御してもよい。 The control unit predicts a charging start time point at which charging in the storage battery device can be started and power consumption of the load from the current time point to the charging start time point, and the control unit stores a remaining power storage amount in the storage battery device. And depending on the result of the prediction, the value corresponding to the power output by the first power generation device is the threshold value when it is determined that the remaining amount of power storage in the storage battery device is exhausted until the charging start time. When it is above, you may control to output electric power from the said storage battery apparatus.
前記制御部は、前記蓄電池装置における蓄電残量と、前記予測の結果と、に応じて、前記蓄電池装置における蓄電残量が前記充電開始時点までに尽きないと判断した場合には、前記第1の発電装置が出力する電力に応じた値に拘わらず、前記蓄電池装置から電力を出力するよう制御してもよい。 When the control unit determines that the remaining amount of electricity stored in the storage battery device does not run out before the start of charging according to the remaining amount of storage in the storage battery device and the result of the prediction, Regardless of the value corresponding to the power output by the power generation device, control may be performed so that power is output from the storage battery device.
前記充電開始時点は、前記負荷の消費電力が前記第2の発電装置の定格出力電力を下回る時点、又は、前記系統からの買電単価が所定価格を下回る時点であってもよい。 The charging start time may be a time when the power consumption of the load is lower than a rated output power of the second power generation device, or a time when a power purchase unit price from the system is lower than a predetermined price.
前記制御部は、前記蓄電池装置から電力を出力することで前記余剰電力が増加する度合いを示す値を、前記第1の発電装置が出力する電力に応じた値として算出してもよい。 The control unit may calculate a value indicating a degree of increase in the surplus power by outputting power from the storage battery device as a value according to the power output from the first power generation device.
前記制御部は、前記負荷が消費する電力のうち前記第2の発電装置の定格出力電力を超える電力と、前記蓄電池装置から出力できる電力と、の差に応じて、前記閾値を設定してもよい。 The control unit may set the threshold according to a difference between power consumed by the load that exceeds the rated output power of the second power generation device and power that can be output from the storage battery device. Good.
前記制御部は、前記蓄電池装置から出力できる電力が、前記負荷が消費する電力のうち前記第2の発電装置の定格出力電力を超える電力未満である場合には、前記第1の発電装置が出力する電力に応じた値が前記閾値以上であっても、前記蓄電池装置から電力を出力することを抑止するよう制御してもよい。 When the power that can be output from the storage battery device is less than the power that exceeds the rated output power of the second power generator among the power consumed by the load, the controller generates an output from the first power generator. Even if the value corresponding to the power to be output is equal to or greater than the threshold value, the output from the storage battery device may be controlled to be suppressed.
前記制御部は、前記余剰電力の買取単価が、前記蓄電池装置が蓄えている電力の単価未満である場合には、前記第1の発電装置が出力する電力に応じた値が前記閾値以上であっても、前記蓄電池装置から電力を出力することを抑止するよう制御してもよい。 When the unit price for purchasing the surplus power is less than the unit price of power stored in the storage battery device, the control unit has a value corresponding to the power output from the first power generation device equal to or greater than the threshold value. However, it may be controlled so as to suppress the output of electric power from the storage battery device.
本発明の電力システムは、負荷に出力でき、かつ、余剰電力が系統に売電可能である第1の発電装置と、負荷追従運転により前記負荷に電力を出力する第2の発電装置と、前記負荷追従運転で不足する電力を前記負荷に出力するための蓄電池装置と、前記第1の発電装置が出力する電力に応じた値が閾値以上であるとき、前記蓄電池装置から電力を出力するよう制御する制御装置と、を有することを特徴とする。 The power system of the present invention includes a first power generator that can output to a load and surplus power can be sold to the system, a second power generator that outputs power to the load by load following operation, A control to output power from the storage battery device when a value corresponding to the power output from the storage battery device for outputting the power shortage in load following operation to the load and the first power generation device is equal to or greater than a threshold value And a control device.
本発明の制御方法は、負荷に電力を出力でき、かつ、余剰電力が系統に売電可能である第1の発電装置と、負荷追従運転により前記負荷に電力を出力する第2の発電装置と、前記負荷追従運転で不足する電力を前記負荷に出力するための蓄電池装置と、を有する電力システムに適用される制御方法であって、前記第1の発電装置が出力する電力に応じた値が閾値以上であるとき、前記蓄電池装置から電力を出力するよう制御するステップを有することを特徴とする。 The control method of the present invention includes a first power generator that can output power to a load and surplus power can be sold to the system, and a second power generator that outputs power to the load by load following operation. And a storage battery device for outputting power that is insufficient in the load following operation to the load, and a value corresponding to the power output by the first power generator. It has the step which controls to output electric power from the said storage battery device, when it is more than a threshold.
本発明によれば、蓄電池装置を利用して売電量を増やすことができる制御装置、電力システム、及び制御方法を提供できる。 ADVANTAGE OF THE INVENTION According to this invention, the control apparatus, electric power system, and control method which can increase electric power sales amount using a storage battery apparatus can be provided.
図面を参照して、本発明の実施形態を説明する。以下の実施形態に係る図面において、同一又は類似の部分には同一又は類似の符号を付す。 Embodiments of the present invention will be described with reference to the drawings. In the drawings according to the following embodiments, the same or similar parts are denoted by the same or similar reference numerals.
[実施形態]
図1は、本実施形態に係る電力システムのブロック図である。
[Embodiment]
FIG. 1 is a block diagram of a power system according to the present embodiment.
図1に示すように、本実施形態に係る電力システムは、系統1と、系統1からの電力供給を受ける需要家としての住宅Hと、を有する。系統1は、電力会社によって管理されており、交流電力を住宅Hに供給する。 As shown in FIG. 1, the power system according to the present embodiment includes a grid 1 and a house H as a consumer who receives power supply from the grid 1. System 1 is managed by an electric power company and supplies AC power to house H.
住宅Hは、系統1との間で電力を伝送する系統電源ラインL1と、系統電源ラインL1上に設けられるスマートメータ2及び分電盤3と、を有する。 The house H includes a system power supply line L1 for transmitting power to and from the system 1, and a smart meter 2 and a distribution board 3 provided on the system power supply line L1.
スマートメータ2は、外部ネットワークNW2に接続される。スマートメータ2は、住宅Hの消費電力(買電電力)及び逆潮流電力(売電電力)を測定し、宅内ネットワークNW1及び外部ネットワークNW2を介して測定情報を送信したり、外部ネットワークNW2を介して電力制御情報を受信したりする。 The smart meter 2 is connected to the external network NW2. The smart meter 2 measures power consumption (purchased power) and reverse power flow (power sold power) of the house H, and transmits measurement information via the home network NW1 and the external network NW2, or via the external network NW2. To receive power control information.
分電盤3は、系統電源ラインL1を介して入力される電力を複数の負荷40に分配する。ただし、負荷40は複数の場合に限らず、1つであってもよい。
The distribution board 3 distributes the electric power input via the system power supply line L1 to the plurality of
負荷40は、系統電源ラインL1を介して入力される電力を消費して動作する。負荷40は、住宅Hに設けられる家電機器(例えば、冷蔵庫、エアコン、照明など)などである。負荷40は、自身の消費電力の測定情報を、宅内ネットワークNW1を介して宅内エネルギー管理システム(HEMS)50に送信できる。
The
住宅Hは、複数の分散電源(太陽光発電装置10、燃料電池発電装置20、及び蓄電池装置30)を有する。太陽光発電装置(第1の発電装置)10、燃料電池発電装置(第2の発電装置)20、及び蓄電池装置30のそれぞれは、系統電源ラインL1に接続される。
House H has a plurality of distributed power sources (solar
太陽光発電装置10は、太陽電池パネル11が、再生可能エネルギーである太陽光を受けて発電を行うことで、系統電源ラインL1を介して負荷40に電力を出力する。
The solar
太陽光発電装置10から出力された電力は売電(すなわち、電力会社による買取)の対象になる。よって、太陽光発電装置10は、系統電源ラインL1を介して余剰電力を系統1に逆潮流(売電)できる。
The electric power output from the solar
本実施形態では、系統電源ラインL1において、太陽光発電装置10の接続位置は、燃料電池発電装置20及び蓄電池装置30の接続位置よりも系統1側である。
In the present embodiment, in the system power supply line L1, the connection position of the solar
燃料電池発電装置20は、ガスを用いて発電を行うことで、系統電源ラインL1を介して負荷40に電力を出力する。
The fuel cell
燃料電池発電装置20の出力電力は売電の対象ではない。また、燃料電池発電装置20は、定格出力電力までの範囲内で出力電力が可変である。よって、燃料電池発電装置20は、負荷40の消費電力の増減に合わせて発電量を増減する「負荷追従運転」が適用される。
The output power of the fuel
本実施形態では、系統電源ラインL1において、燃料電池発電装置20の接続位置は、太陽光発電装置10の接続位置よりも負荷40側である。
In the present embodiment, the connection position of the fuel cell
蓄電池装置30は、系統電源ラインL1を介して燃料電池発電装置20から供給される電力により充電される。蓄電池装置30は、系統電源ラインL1を介して系統1から供給される電力(特に、安価な深夜電力)により充電されてもよい。
The
燃料電池発電装置20の出力電力は売電の対象にならない。また、燃料電池発電装置20は、負荷追従運転を適用しても、負荷40の消費電力が急増すると、負荷40の消費電力に対して燃料電池発電装置20の出力電力に不足が生じる。このような負荷追従運転で不足する電力を太陽光発電装置10の出力電力で賄うと、系統1への売電量が減ってしまう。よって、蓄電池装置30は、放電を行うことで、負荷追従運転で不足する電力を、系統電源ラインL1を介して負荷40に出力する。このような用途であるので、蓄電池装置30は、小容量のタイプであってもよい。
The output power of the fuel
本実施形態では、系統電源ラインL1において、蓄電池装置30の接続位置は、太陽光発電装置10及び燃料電池発電装置20の接続位置よりも負荷40側である。
In the present embodiment, in the system power supply line L1, the connection position of the
スマートメータ2、太陽光発電装置10、燃料電池発電装置20、蓄電池装置30、及び負荷40のそれぞれは、宅内ネットワークNW1に接続される。宅内ネットワークNW1は、Zigbee(登録商標)などによる無線ネットワークであってもよく、イーサネット(登録商標)などによる有線ネットワークであってもよい。或いは、宅内ネットワークNW1の少なくとも一部は、電力線通信(PLC)により系統電源ラインL1と共用化されていてもよい。
Each of smart meter 2, solar
宅内ネットワークNW1には、HEMS50が接続される。HEMS50は、住宅Hにおける消費電力を管理すると共に、宅内ネットワークNW1に接続された機器(太陽光発電装置10、燃料電池発電装置20、蓄電池装置30、及び負荷40)との通信を行って当該機器を制御する。本実施形態においてHEMS50は、制御装置に相当する。
A
HEMS50は、外部ネットワークNW2に接続され、外部ネットワークNW2との通信を行ってもよい。或いは、HEMS50は、スマートメータ2経由で外部ネットワークNW2との通信を行ってもよい。
The
次に、太陽光発電装置10、燃料電池発電装置20、蓄電池装置30、及びHEMS50の構成を説明する。図2は、太陽光発電装置10、燃料電池発電装置20、蓄電池装置30、及びHEMS50のブロック図である。
Next, the structure of the solar
図2に示すように、太陽光発電装置10は、太陽電池パネル11、太陽電池パワーコンディショナ(太陽電池PCS)12、及び制御部13を含む。
As shown in FIG. 2, the solar
太陽電池パネル11は、太陽光を受けて発電を行い、直流電力を出力する。太陽電池パネル11が出力する電力は、太陽電池パネル11に照射される日射量に応じて変化する。
The
太陽電池PCS12は、太陽電池パネル11からの直流電力を交流に変換し、系統電源ラインL1を介して交流電力を出力する。
Solar cell PCS12 converts DC power from
制御部13は、HEMS50の制御下で、太陽光発電装置10の各種の機能を制御する。制御部13は、宅内ネットワークNW1を介してHEMS50との通信を行うことができる。制御部13は、太陽電池PCS12が出力する電力などを測定し、測定情報をHEMS50に送信する。
The
燃料電池発電装置20は、発電部21、燃料電池パワーコンディショナ(燃料電池PCS)22、及び制御部23を含む。また、燃料電池発電装置20は、発電部21における発電時の排熱を利用して得られた湯を貯えるための貯湯ユニットを含んでもよい。
The fuel cell
発電部21は、供給されるガスから取り出した水素と空気中の酸素との電気化学反応により発電を行い、直流電力を燃料電池PCS22に出力する。発電部21における発電量は、発電部21で消費されるガス及び空気の量に応じて変化する。また、ガス及び空気の量は、制御部23によって制御される。
The
燃料電池PCS22は、発電部21からの直流電力を交流に変換し、系統電源ラインL1を介して交流電力を出力する。
The fuel cell PCS22 converts the DC power from the
制御部23は、HEMS50の制御下で、燃料電池発電装置20の各種の機能を制御する。制御部23は、負荷追従運転を行うための測定及び制御を行う。また、制御部23は、宅内ネットワークNW1を介してHEMS50との通信を行うことができる。制御部23は、燃料電池PCS22が出力する電力などを測定し、測定情報をHEMS50に送信する。
The
蓄電池装置30は、蓄電池31、蓄電池パワーコンディショナ(蓄電池PCS)32、及び制御部33を含む。
The
蓄電池31は、蓄電池PCS32から出力される直流電力を充電する。また、蓄電池31は、放電により、直流電力を蓄電池PCS32に出力する。
The
蓄電池PCS32は、蓄電池31の充電時において、系統電源ラインL1を介して供給される交流電力を直流に変換し、直流電力を蓄電池31に出力する。また、蓄電池PCS32は、蓄電池31の放電時において、蓄電池31からの直流電力を交流に変換し、系統電源ラインL1を介して交流電力を出力する。
The
制御部33は、HEMS50の制御下で、蓄電池装置30の各種の機能を制御する。制御部33は、蓄電池31の充放電を制御する。また、制御部33は、宅内ネットワークNW1を介してHEMS50との通信を行うことができる。制御部33は、蓄電池31の蓄電残量及び蓄電池PCS32が出力する電力などを測定し、測定情報をHEMS50に送信する。
The
HEMS50は、記憶部51、及び制御部52を含む。
The
記憶部51は、メモリなどにより構成されており、制御部52における制御に使用される各種情報を記憶する。記憶部51は、負荷40の消費電力遷移パターンと、燃料電池発電装置20の定格出力電力と、閾値と、を記憶する。
The
ここで、消費電力遷移パターンは、例えば1日以上の学習に基づいて制御部52によって作成される。或いは、直近の消費電力の変動傾向に基づいて消費電力遷移パターンを作成してもよい。
Here, the power consumption transition pattern is created by the
燃料電池発電装置20の定格出力電力は、燃料電池発電装置20の性能に応じて予め定められている。或いは、燃料電池発電装置20の定格出力電力の情報は、燃料電池発電装置20から取得してもよい。
The rated output power of the fuel
閾値は、蓄電池装置30の放電制御に使用される。本実施形態では、ゼロよりも大きい値が閾値として予め設定されている。
The threshold value is used for discharge control of the
制御部52は、プロセッサなどにより構成されており、HEMS50の各種の機能を制御する。制御部52は、スマートメータ2、太陽光発電装置10、燃料電池発電装置20、及び蓄電池装置30のそれぞれから得られた測定情報に基づいて、太陽光発電装置10、燃料電池発電装置20、及び蓄電池装置30のそれぞれを制御する。
The
図3は、住宅Hにおける1日の各電力の遷移状況の一例を示すグラフである。 FIG. 3 is a graph showing an example of a transition state of each power in the house H in one day.
図3に示すように、深夜から早朝(0時から6時)の時間帯は、負荷40の消費電力(電力負荷)が低い。太陽光発電装置10の出力電力はゼロであり、売電量もゼロである。また、負荷40の消費電力が燃料電池発電装置20の定格出力電力よりも低いため、燃料電池発電装置20の出力電力により蓄電上限量(或いは目標蓄電量)まで蓄電池装置30が充電される。
As shown in FIG. 3, the power consumption (electric power load) of the
6時から10時までの時間帯において、負荷40の消費電力が上昇し、燃料電池発電装置20の定格出力電力を超えている。蓄電池装置30は、燃料電池発電装置20の負荷追従運転で不足する電力を出力する。その結果、蓄電池装置30の蓄電残量が減少し、ゼロになる。
In the time zone from 6:00 to 10:00, the power consumption of the
10時から12時までの時間帯において、負荷40の消費電力が低下し、燃料電池発電装置20の定格出力電力を下回る。よって、燃料電池発電装置20の出力電力により蓄電池装置30が充電される。
In the time zone from 10:00 to 12:00, the power consumption of the
12時から14時までの時間帯において、負荷40の消費電力が上昇し、燃料電池発電装置20の定格出力電力を超える。よって、蓄電池装置30は、燃料電池発電装置20の負荷追従運転で不足する電力を出力する。その結果、蓄電池装置30の蓄電残量が減少し、ゼロになる。
In the time zone from 12:00 to 14:00, the power consumption of the
14時から18時までの時間帯において、負荷40の消費電力が低下し、燃料電池発電装置20の定格出力電力を下回る。よって、燃料電池発電装置20の出力電力により蓄電池装置30が充電される。
In the time zone from 14:00 to 18:00, the power consumption of the
18時から22時までの時間帯において、負荷40の消費電力が上昇し、燃料電池発電装置20の定格出力電力を超える。よって、蓄電池装置30は、燃料電池発電装置20の負荷追従運転で不足する電力を出力する。その結果、蓄電池装置30の蓄電残量が減少し、ゼロになる。蓄電池装置30で賄えない負荷40の消費電力は、系統1からの買電で賄われる。
In the time zone from 18:00 to 22:00, the power consumption of the
次に、HEMS50の動作を説明する。図4は、HEMS50の動作フロー図である。
Next, the operation of the
図4に示すように、ステップS1において、制御部52は、負荷40の消費電力パターンに基づいて、蓄電池装置30の充電を開始できる充電開始時点と、現時点から充電開始時点までの負荷40の消費電力と、を予測する。本実施形態では、充電開始時点とは、負荷40の消費電力が燃料電池発電装置20の定格出力電力を下回る時点であるが、系統1からの買電単価が所定価格を下回る時点を充電開始時点としてもよい。なお、このような予測は、定期的に行われる。
As shown in FIG. 4, in step S <b> 1, based on the power consumption pattern of the
ステップS2において、制御部52は、蓄電池装置30の蓄電残量と、ステップS1での予測の結果と、に応じて、蓄電池装置30の蓄電残量が充電開始時点までに尽きるか否かを判断する。詳細には、負荷追従運転で不足する電力を常に蓄電池装置30から出力すると仮定した場合に、蓄電池装置30の蓄電残量が充電開始時点までに尽きるか否かを判断する。
In step S <b> 2, the
蓄電池装置30の蓄電残量が充電開始時点までに尽きると判断した場合(ステップS2;YES)、ステップS3において、制御部52は、太陽光発電装置10が出力する電力が閾値以上であるときにのみ、負荷追従運転で不足する電力を蓄電池装置30から出力するよう制御する。言い換えると、制御部52は、蓄電池装置30の蓄電残量が充電開始時点までに尽きると判断した場合には、太陽光発電装置10が出力する電力が閾値未満であるときは、負荷追従運転で不足する電力を蓄電池装置30から出力しないよう、つまり、蓄電池装置30から電力を出力することを抑止するよう制御する。
When it is determined that the remaining amount of electricity stored in the
一方、蓄電池装置30の蓄電残量が充電開始時点までに尽きないと判断した場合(ステップS2;NO)、ステップS4において、制御部52は、太陽光発電装置10が出力する電力に拘わらず、負荷追従運転で不足する電力を常に蓄電池装置30から出力するよう制御する。
On the other hand, when it is determined that the remaining amount of power stored in the
なお、制御を簡略化するために、ステップS1及びステップS2を省略し、ステップS3を実行してもよい。この場合、制御部52は、太陽光発電装置10が出力する電力が閾値以上であるときにのみ、負荷追従運転で不足する電力を蓄電池装置30から出力するよう制御する。すなわち、制御部52は、太陽光発電装置10が出力する電力が閾値未満であるとき、負荷追従運転で不足する電力を蓄電池装置30から出力しないよう、つまり、蓄電池装置30から電力を出力することを抑止するよう制御する。
In order to simplify the control, step S1 and step S2 may be omitted and step S3 may be executed. In this case, the
このように、本実施形態に係るHEMS50は、太陽光発電装置10が出力する電力が閾値以上であるときにのみ、負荷追従運転で不足する電力を蓄電池装置30から出力するよう制御する。これにより、小容量の蓄電池装置30であっても、より確実に、売電量を増やす効果(押し上げ効果)を得ることができる。
As described above, the
[第1変更例]
上述した実施形態では、制御部52は、太陽光発電装置10が出力する電力と閾値との比較により、蓄電池装置30から電力を出力するか否かを制御していた。これに対し、本変更例では、制御部52は、より確実に押し上げ効果を得るために、以下の処理を行う。
[First modification]
In the embodiment described above, the
制御部52は、太陽光発電装置10が出力する電力に基づいて、蓄電池装置30が負荷40に電力を出力することで余剰電力が増加する度合いを示す値(以下、「押し上げ効率」という)を算出する。そして、制御部52は、算出した押し上げ効率を閾値と比較する。
Based on the power output from the solar
ここで、太陽光発電装置10が出力する電力を「A」、蓄電池装置30が出力できる電力(単位時間当たりの放電量)を「B」、負荷40が消費する電力のうち燃料電池発電装置20の定格出力電力を超える電力を「C」とし、B>Cとすると、押し上げ効率は、例えば、A>Cの場合は「C/C=1」、A≦Cの場合は「A/C」の計算式により算出できる。
Here, the power output from the solar
そして、制御部52は、押し上げ効率が閾値以上であるときにのみ、負荷追従運転で不足する電力を蓄電池装置30から出力するよう制御する。すなわち、制御部52は、押し上げ効率が閾値未満であるとき、負荷追従運転で不足する電力を蓄電池装置30から出力しないよう、つまり、蓄電池装置30から電力を出力することを抑止するよう制御する。
And the
[第2変更例]
上述した実施形態では、制御部52は、太陽光発電装置10が出力する電力を固定の閾値と比較していた。また、上述した第1変形例では、制御部52は、算出した押し上げ効率を固定の閾値と比較していた。
[Second modification]
In embodiment mentioned above, the
本変更例では、制御部52は、負荷40が消費する電力のうち燃料電池発電装置20の定格出力電力を超える電力と、蓄電池装置30から出力できる電力(単位時間当たりの放電量)と、の差に応じて、閾値を設定する。
In the present modification example, the
負荷40が消費する電力のうち燃料電池発電装置20の定格出力電力を超える電力が、蓄電池装置30から出力できる電力よりも大きければ、蓄電池装置30から電力を出力しても、大きな押し上げ効果を得ることができない。よって、負荷40が消費する電力のうち燃料電池発電装置20の定格出力電力を超える電力が、蓄電池装置30から出力できる電力よりも大きければ、閾値を通常よりも高く設定する。
If the power consumed by the
或いは、制御部52は、蓄電池装置30から出力できる電力が、負荷40が消費する電力のうち燃料電池発電装置20の定格出力電力を超える電力未満である場合には、太陽光発電装置10が出力する電力に応じた値(太陽光発電装置10が出力する電力、又は押し上げ効率)が閾値以上であっても、蓄電池装置30から電力を出力しないよう、つまり、蓄電池装置30から電力を出力することを抑止するよう制御してもよい。
Alternatively, when the power that can be output from the
[第3変更例]
上述した実施形態では、余剰電力の買取単価が、蓄電池装置30が蓄えている電力の単価(燃料電池発電装置20の発電単価、又は買電単価)よりも高いことを前提としていた。
[Third Modification]
In the embodiment described above, it is assumed that the unit price of surplus power purchase is higher than the unit price of power stored in the storage battery device 30 (the unit price of power generation of the fuel cell
しかしながら、余剰電力の買取単価が、蓄電池装置30が蓄えている電力の単価(燃料電池発電装置20の発電単価、又は買電単価)よりも安い場合には、売電量を増やすための制御は行わなくてもよい。
However, when the purchase price of surplus power is lower than the unit price of power stored in the storage battery device 30 (the power generation unit price of the fuel cell
よって、制御部52は、余剰電力の買取単価が、蓄電池装置30が蓄えている電力の単価未満である場合には、太陽光発電装置10が出力する電力に応じた値が閾値以上であっても、蓄電池装置30から電力を出力しないよう、つまり、蓄電池装置30から電力を出力することを抑止するよう制御してもよい。
Therefore, when the unit price for purchasing surplus power is less than the unit price of power stored in the
[その他の実施形態]
この開示の一部をなす記述及び図面はこの発明を限定するものであると理解すべきではない。この開示から当業者には様々な代替実施形態、実施例及び運用技術が明らかとなる。
[Other Embodiments]
The descriptions and drawings forming part of this disclosure should not be construed as limiting the invention. From this disclosure, various alternative embodiments, examples and operational techniques will be apparent to those skilled in the art.
例えば、上述した実施形態において、HEMS50(制御部52)が実施していた制御の少なくとも一部を、蓄電池装置30の制御部33が実施する構成としてもよい。この場合、制御部33は各種の情報を宅内ネットワークNW1経由で収集し、収集した情報に基づいて、上述した各種の制御を行う。
For example, in the above-described embodiment, the
また、上述した実施形態では、需要家としての住宅Hを例示し、住宅H単位で電力管理を行う制御装置であるHEMS50に関して説明した。しかしながら、HEMS50に限らず、需要家としてのビルを対象としたBEMS、需要家としての工場を対象としたFEMS、又は需要家としての店舗を対象としたSEMSなどであってもよい。
Moreover, in embodiment mentioned above, the house H as a consumer was illustrated and HEMS50 which is a control apparatus which performs electric power management per house H was demonstrated. However, the present invention is not limited to the
また、上述した実施形態では、第1の発電装置として太陽光発電装置を例示したが、太陽光発電装置に限らず、太陽光以外の再生可能エネルギーである風力、水力、又はバイオマス等により発電する発電装置などであってもよい。また、第2の発電装置として燃料電池発電装置を例示したが、燃料電池発電装置に限らず、ガスエンジンを適用した発電装置などであってもよい。 Moreover, in embodiment mentioned above, although the solar power generation device was illustrated as a 1st power generation device, it generate | occur | produces not only with a solar power generation device but with the wind, hydraulic power, biomass, etc. which are renewable energy other than sunlight. It may be a power generation device or the like. Moreover, although the fuel cell power generation device is illustrated as the second power generation device, the power generation device is not limited to the fuel cell power generation device, and may be a power generation device to which a gas engine is applied.
1…系統、2…スマートメータ、3…分電盤、10…太陽光発電装置、11…太陽電池パネル、12…太陽電池PCS、13…制御部、20…燃料電池発電装置、21…発電部、22…燃料電池PCS、23…制御部、30…蓄電池装置、31…蓄電池、32…蓄電池PCS、33…制御部、40…負荷、50…HEMS、51…記憶部、52…制御部 DESCRIPTION OF SYMBOLS 1 ... System | strain, 2 ... Smart meter, 3 ... Distribution board, 10 ... Solar power generation device, 11 ... Solar cell panel, 12 ... Solar cell PCS, 13 ... Control part, 20 ... Fuel cell power generation device, 21 ... Power generation part , 22 ... Fuel cell PCS, 23 ... Control unit, 30 ... Storage battery device, 31 ... Storage battery, 32 ... Storage battery PCS, 33 ... Control unit, 40 ... Load, 50 ... HEMS, 51 ... Storage unit, 52 ... Control unit
Claims (14)
前記蓄電池装置を制御する制御部を備え、
前記第2の発電装置は、負荷の消費電力に追従するように電力を出力する負荷追従運転を行うとともに、前記蓄電池装置に充電電力を供給し得るように構成されており、
前記蓄電池装置は、前記負荷追従運転で不足する電力を出力する放電動作を行うように構成されており、
前記蓄電池装置は、さらに、前記第2発電装置の定格電力よりも前記負荷の消費電力が少ないときの前記第2発電装置の出力電力、又は系統から供給される電力を充電するように構成されており、
前記第1の発電装置は、前記第1の発電装置から前記負荷に出力される電力を前記第1の発電装置の発電電力から除いた余剰電力を前記系統に出力するように構成されており、
前記制御部は、
前記第1の発電装置の発電電力に応じた所定値が閾値以上であるとき、前記負荷追従運転で不足する電力を補うために前記放電動作を行うように前記蓄電池装置を制御し、
前記所定値が前記閾値未満であるとき、前記放電動作を行わないように前記蓄電池装置を制御し、
前記所定値は、前記第1の発電装置の発電電力を示す値又は前記放電動作によって前記余剰電力が増加する度合いを示す値であることを特徴とする制御装置。 A control device applied to an electric power system having a first power generation device, a second power generation device, and a storage battery device,
A control unit for controlling the storage battery device;
The second power generation device is configured to perform a load following operation for outputting power so as to follow the power consumption of the load, and to supply charging power to the storage battery device ,
The storage battery device is configured to perform a discharging operation that outputs insufficient power in the load following operation,
The storage battery device is further configured to charge the output power of the second power generator when the power consumption of the load is less than the rated power of the second power generator, or the power supplied from the grid. And
Wherein the first power generator is constructed surplus power other than the power generation power of the first said electrical power output to the load from the power generating apparatus of the first power generation unit to output to the system,
The controller is
When the predetermined value according to the generated power of the first power generation device is equal to or greater than a threshold value, the storage battery device is controlled to perform the discharging operation in order to compensate for the power shortage in the load following operation,
When the predetermined value is less than the threshold value, the storage battery device is controlled not to perform the discharging operation ,
The predetermined value, the first power generation control device according to claim value der Rukoto indicating the degree to which the surplus electric power is increased by the value or the discharge operation is shown a generated power of the device.
前記蓄電池装置を制御する制御部を備え、
前記第2の発電装置は、負荷の消費電力に追従するように電力を出力する負荷追従運転を行うとともに、前記蓄電池装置に充電電力を供給し得るように構成されており、
前記蓄電池装置は、前記負荷追従運転で不足する電力を出力する放電動作を行うように構成されており、
前記蓄電池装置は、さらに、前記第2発電装置の定格電力よりも前記負荷の消費電力が少ないときの前記第2発電装置の出力電力、又は系統から供給される電力を充電するように構成されており、
前記第1の発電装置は、前記第1の発電装置から前記負荷に出力される電力を前記第1の発電装置の発電電力から除いた余剰電力を前記系統に出力するように構成されており、
前記制御部は、前記蓄電池装置の充電を開始する充電開始時点までに前記蓄電池装置の蓄電残量が尽きると判断した場合において、
前記第1の発電装置の発電電力に応じた所定値が閾値以上であるとき、前記負荷追従運転で不足する電力を補うために前記放電動作を行うように前記蓄電池装置を制御し、
前記所定値が前記閾値未満であるとき、前記放電動作を行わないように前記蓄電池装置を制御し、
前記所定値は、前記第1の発電装置の発電電力を示す値又は前記放電動作によって前記余剰電力が増加する度合いを示す値であることを特徴とする制御装置。 A control device applied to an electric power system having a first power generation device, a second power generation device, and a storage battery device,
A control unit for controlling the storage battery device;
The second power generation device is configured to perform a load following operation for outputting power so as to follow the power consumption of the load, and to supply charging power to the storage battery device,
The storage battery device is configured to perform a discharging operation that outputs insufficient power in the load following operation,
The storage battery device is further configured to charge the output power of the second power generator when the power consumption of the load is less than the rated power of the second power generator, or the power supplied from the grid. And
The first power generator is configured to output surplus power obtained by removing the power output from the first power generator to the load from the generated power of the first power generator, to the system.
In the case where the control unit determines that the remaining amount of electricity stored in the storage battery device is exhausted by the start of charging to start charging the storage battery device ,
When the predetermined value according to the generated power of the first power generation device is equal to or greater than a threshold value, the storage battery device is controlled to perform the discharging operation in order to compensate for the power shortage in the load following operation,
When the predetermined value is less than the threshold value, the storage battery device is controlled not to perform the discharging operation ,
The predetermined value, the first power generation control device according to claim value der Rukoto indicating the degree to which the surplus electric power is increased by the value or the discharge operation is shown a generated power of the device.
前記制御部は、前記負荷追従運転で不足する電力が前記蓄電池装置から出力できる電力よりも大きい場合に、前記閾値として前記第2の閾値を設定することを特徴とする請求項1に記載の制御装置。 The control unit sets a first threshold value or a second threshold value larger than the first threshold value as the threshold value ,
2. The control according to claim 1, wherein the control unit sets the second threshold value as the threshold value when power that is insufficient in the load following operation is larger than power that can be output from the storage battery device. apparatus.
前記第2の発電装置は、負荷の消費電力に追従するように電力を出力する負荷追従運転を行うとともに、前記蓄電池装置に充電電力を供給し得るように構成されており、
前記蓄電池装置は、前記負荷追従運転で不足する電力を出力する放電動作を行うように構成されており、
前記蓄電池装置は、さらに、前記第2発電装置の定格電力よりも前記負荷の消費電力が少ないときの前記第2発電装置の出力電力、又は系統から供給される電力を充電するように構成されており、
前記第1の発電装置は、前記第1の発電装置から前記負荷に出力される電力を前記第1の発電装置の発電電力から除いた余剰電力を前記系統に出力するように構成されており、
前記制御装置は、
前記第1の発電装置の発電電力に応じた所定値が閾値以上であるとき、前記負荷追従運転で不足する電力を補うために前記放電動作を行うように前記蓄電池装置を制御し、
前記所定値が前記閾値未満であるとき、前記放電動作を行わないように前記蓄電池装置を制御し、
前記所定値は、前記第1の発電装置の発電電力を示す値又は前記放電動作によって前記余剰電力が増加する度合いを示す値であることを特徴とする電力システム。 An electric power system having a first power generation device, a second power generation device, a storage battery device, and a control device,
The second power generation device is configured to perform a load following operation for outputting power so as to follow the power consumption of the load, and to supply charging power to the storage battery device ,
The storage battery device is configured to perform a discharging operation that outputs insufficient power in the load following operation,
The storage battery device is further configured to charge the output power of the second power generator when the power consumption of the load is less than the rated power of the second power generator, or the power supplied from the grid. And
Wherein the first power generator is constructed surplus power other than the power generation power of the first said electrical power output to the load from the power generating apparatus of the first power generation unit to output to the system,
The controller is
When the predetermined value according to the generated power of the first power generation device is equal to or greater than a threshold value, the storage battery device is controlled to perform the discharging operation in order to compensate for the power shortage in the load following operation,
When the predetermined value is less than the threshold value, the storage battery device is controlled not to perform the discharging operation ,
The predetermined value, the first power system, wherein the value der Rukoto indicating the degree to which the surplus electric power is increased by the value or the discharge operation is shown the power generated by the power generator.
前記第2の発電装置は、負荷の消費電力に追従するように電力を出力する負荷追従運転を行うとともに、前記蓄電池装置に充電電力を供給し得るように構成されており、
前記蓄電池装置は、前記負荷追従運転で不足する電力を出力する放電動作を行うように構成されており、
前記蓄電池装置は、さらに、前記第2発電装置の定格電力よりも前記負荷の消費電力が少ないときの前記第2発電装置の出力電力、又は系統から供給される電力を充電するように構成されており、
前記第1の発電装置は、前記第1の発電装置から前記負荷に出力される電力を前記第1の発電装置の発電電力から除いた余剰電力を前記系統に出力するように構成されており、
前記制御装置は、前記蓄電池装置の充電を開始する充電開始時点までに前記蓄電池装置の蓄電残量が尽きると判断した場合において、
前記第1の発電装置の発電電力に応じた所定値が閾値以上であるとき、前記負荷追従運転で不足する電力を補うために前記放電動作を行うように前記蓄電池装置を制御し、
前記所定値が前記閾値未満であるとき、前記放電動作を行わないように前記蓄電池装置を制御し、
前記所定値は、前記第1の発電装置の発電電力を示す値又は前記放電動作によって前記余剰電力が増加する度合いを示す値であることを特徴とする電力システム。 An electric power system having a first power generation device, a second power generation device, a storage battery device, and a control device,
The second power generation device is configured to perform a load following operation for outputting power so as to follow the power consumption of the load, and to supply charging power to the storage battery device,
The storage battery device is configured to perform a discharging operation that outputs insufficient power in the load following operation,
The storage battery device is further configured to charge the output power of the second power generator when the power consumption of the load is less than the rated power of the second power generator, or the power supplied from the grid. And
The first power generator is configured to output surplus power obtained by removing the power output from the first power generator to the load from the generated power of the first power generator, to the system.
In the case where the control device determines that the remaining storage amount of the storage battery device is exhausted by the start of charging to start charging the storage battery device,
When the predetermined value according to the generated power of the first power generation device is equal to or greater than a threshold value, the storage battery device is controlled to perform the discharging operation in order to compensate for the power shortage in the load following operation,
When the predetermined value is less than the threshold value, the storage battery device is controlled not to perform the discharging operation ,
The predetermined value, the first power system, wherein the value der Rukoto indicating the degree to which the surplus electric power is increased by the value or the discharge operation is shown the power generated by the power generator.
前記第2の発電装置は、負荷の消費電力に追従するように電力を出力する負荷追従運転を行うとともに、前記蓄電池装置に充電電力を供給し得るように構成されており、
前記蓄電池装置は、前記負荷追従運転で不足する電力を出力する放電動作を行うように構成されており、
前記蓄電池装置は、さらに、前記第2発電装置の定格電力よりも前記負荷の消費電力が少ないときの前記第2発電装置の出力電力、又は系統から供給される電力を充電するように構成されており、
前記第1の発電装置は、前記第1の発電装置から前記負荷に出力される電力を前記第1の発電装置の発電電力から除いた余剰電力を前記系統に出力するように構成されており、
前記第1の発電装置の発電電力に応じた所定値が閾値以上であるとき、前記負荷追従運転で不足する電力を補うために前記放電動作を行うように前記蓄電池装置を制御するステップAと、
前記所定値が前記閾値未満であるとき、前記放電動作を行わないように前記蓄電池装置を制御するステップBとを有し、
前記所定値は、前記第1の発電装置の発電電力を示す値又は前記放電動作によって前記余剰電力が増加する度合いを示す値であることを特徴とする制御方法。 A control method applied to a power system having a first power generation device, a second power generation device, and a storage battery device,
The second power generation device is configured to perform a load following operation for outputting power so as to follow the power consumption of the load, and to supply charging power to the storage battery device ,
The storage battery device is configured to perform a discharging operation that outputs insufficient power in the load following operation,
The storage battery device is further configured to charge the output power of the second power generator when the power consumption of the load is less than the rated power of the second power generator, or the power supplied from the grid. And
Wherein the first power generator is constructed surplus power other than the power generation power of the first said electrical power output to the load from the power generating apparatus of the first power generation unit to output to the system,
When the predetermined value corresponding to the generated power of the first power generation device is equal to or greater than a threshold value, the step A for controlling the storage battery device to perform the discharging operation to compensate for the power shortage in the load following operation;
When said predetermined value is less than the threshold value, possess a step B for controlling the storage battery device so as not to perform the discharge operation,
Wherein the predetermined value, the control method characterized by values der Rukoto indicating the degree to which the surplus electric power is increased by the value or the discharge operation is shown a generated power of said first power generation unit.
前記第2の発電装置は、負荷の消費電力に追従するように電力を出力する負荷追従運転を行うとともに、前記蓄電池装置に充電電力を供給し得るように構成されており、
前記蓄電池装置は、前記負荷追従運転で不足する電力を出力する放電動作を行うように構成されており、
前記蓄電池装置は、さらに、前記第2発電装置の定格電力よりも前記負荷の消費電力が少ないときの前記第2発電装置の出力電力、又は系統から供給される電力を充電するように構成されており、
前記第1の発電装置は、前記第1の発電装置から前記負荷に出力される電力を前記第1の発電装置の発電電力から除いた余剰電力を前記系統に出力するように構成されており、
制御装置が、前記蓄電池装置の充電を開始する充電開始時点までに前記蓄電池装置の蓄電残量が尽きると判断した場合において、
前記第1の発電装置の発電電力に応じた所定値が閾値以上であるとき、前記負荷追従運転で不足する電力を補うために前記放電動作を行うように前記蓄電池装置を制御するステップAと、
前記所定値が前記閾値未満であるとき、前記放電動作を行わないように前記蓄電池装置を制御するステップBとを含み、
前記所定値は、前記第1の発電装置の発電電力を示す値又は前記放電動作によって前記余剰電力が増加する度合いを示す値であることを特徴とする制御方法。 A control method applied to a power system having a first power generation device, a second power generation device, and a storage battery device,
The second power generation device is configured to perform a load following operation for outputting power so as to follow the power consumption of the load, and to supply charging power to the storage battery device,
The storage battery device is configured to perform a discharging operation that outputs insufficient power in the load following operation,
The storage battery device is further configured to charge the output power of the second power generator when the power consumption of the load is less than the rated power of the second power generator, or the power supplied from the grid. And
The first power generator is configured to output surplus power obtained by removing the power output from the first power generator to the load from the generated power of the first power generator, to the system.
In a case where the control device determines that the remaining amount of electricity stored in the storage battery device is exhausted by the start of charging to start charging the storage battery device,
When the predetermined value corresponding to the generated power of the first power generation device is equal to or greater than a threshold value, the step A for controlling the storage battery device to perform the discharging operation to compensate for the power shortage in the load following operation;
When the predetermined value is less than the threshold, it looks including a step B for controlling the storage battery device so as not to perform the discharge operation,
The control method according to claim 1, wherein the predetermined value is a value indicating the generated power of the first power generator or a value indicating a degree of the surplus power increasing due to the discharging operation .
前記閾値を設定するステップは、前記負荷追従運転で不足する電力が前記蓄電池装置から出力できる電力よりも大きい場合に、前記閾値として前記第2の閾値を設定するステップを含むことを特徴とする請求項10に記載の制御方法。 Have a step of setting a second threshold value larger than the first threshold value or the first threshold value as the threshold value,
The step of setting the threshold value includes the step of setting the second threshold value as the threshold value when the electric power deficient in the load following operation is larger than the electric power that can be output from the storage battery device. Item 11. The control method according to Item 10 .
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2012108022A JP6166512B2 (en) | 2012-05-09 | 2012-05-09 | Control device, power system, and control method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2012108022A JP6166512B2 (en) | 2012-05-09 | 2012-05-09 | Control device, power system, and control method |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2013236495A JP2013236495A (en) | 2013-11-21 |
JP6166512B2 true JP6166512B2 (en) | 2017-07-19 |
Family
ID=49762162
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2012108022A Active JP6166512B2 (en) | 2012-05-09 | 2012-05-09 | Control device, power system, and control method |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP6166512B2 (en) |
Families Citing this family (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2015106962A (en) * | 2013-11-29 | 2015-06-08 | 株式会社デンソー | Charge discharge controller and charge discharge system |
US10270256B2 (en) | 2013-12-16 | 2019-04-23 | Kyocera Corporation | Power control apparatus, equipment control apparatus, and method |
JP6280741B2 (en) * | 2013-12-27 | 2018-02-14 | 大和ハウス工業株式会社 | Power supply system |
JP6184888B2 (en) * | 2014-02-27 | 2017-08-23 | 東芝燃料電池システム株式会社 | Cogeneration system with cogeneration unit |
JP6378955B2 (en) * | 2014-07-10 | 2018-08-22 | 大和ハウス工業株式会社 | Power supply system |
JP2016067125A (en) * | 2014-09-25 | 2016-04-28 | 株式会社日立製作所 | Energy equipment operation controller and energy equipment operation control method |
WO2022038778A1 (en) * | 2020-08-21 | 2022-02-24 | 三菱電機株式会社 | Fuel cell system and method for controlling fuel cell system |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH08186931A (en) * | 1994-12-31 | 1996-07-16 | Tokyo Gas Co Ltd | Co-generation system |
JP5799254B2 (en) * | 2009-11-16 | 2015-10-21 | パナソニックIpマネジメント株式会社 | Power distribution system |
JP2011181377A (en) * | 2010-03-02 | 2011-09-15 | Toshiba Fuel Cell Power Systems Corp | Fuel cell system |
JP5782233B2 (en) * | 2010-06-14 | 2015-09-24 | 大和ハウス工業株式会社 | Energy management system and energy management method |
-
2012
- 2012-05-09 JP JP2012108022A patent/JP6166512B2/en active Active
Also Published As
Publication number | Publication date |
---|---|
JP2013236495A (en) | 2013-11-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP6166512B2 (en) | Control device, power system, and control method | |
CN108370162B (en) | Method and apparatus for generator in microgrid with hysteretic coordinated droop control | |
US11223202B2 (en) | Energy management method for an energy system and energy system | |
JP5925554B2 (en) | Control device, control system, and control method | |
JP5655167B2 (en) | Power management apparatus and program | |
JP5891386B2 (en) | Power control apparatus and power supply system using the same | |
JP5592772B2 (en) | Power supply control device and power supply system using the same | |
JP5729764B2 (en) | Apartment house power system and control device | |
JP5897899B2 (en) | Power control system, control device, and power control method | |
JP2011250673A (en) | Energy controller and control method | |
WO2014167928A1 (en) | Storage battery charge/discharge control device and storage battery charge/discharge control method | |
JP5877747B2 (en) | Control device, power supply system, and control method | |
KR20180070077A (en) | Multi-sensor based MTTP interworking control system for solar charge controller of energy storage system | |
JP5373528B2 (en) | Power distribution equipment | |
JP5980575B2 (en) | Power system, control device, and control method | |
AU2017364286B2 (en) | Electric radiator type heating apparatus including a voltage converter | |
JP5940263B2 (en) | Power control apparatus and power control method | |
JP7386028B2 (en) | power supply system | |
CN117096936A (en) | Control method of power supply circuit, power supply equipment and energy storage equipment | |
JP5893319B2 (en) | Power management system and power management apparatus | |
EP2882021B1 (en) | Control device, fuel cell system, and control method | |
JP6183758B2 (en) | Power control apparatus, power supply system using the same, and power control method | |
JP7386029B2 (en) | power supply system | |
US20180233910A1 (en) | Energy management device, energy management method, and energy management program | |
JP5745986B2 (en) | Power supply system, control device, and discharge control method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20141117 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20150728 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20150729 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20150928 |
|
A02 | Decision of refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A02 Effective date: 20151104 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20160204 |
|
A911 | Transfer of reconsideration by examiner before appeal (zenchi) |
Free format text: JAPANESE INTERMEDIATE CODE: A911 Effective date: 20160216 |
|
A912 | Removal of reconsideration by examiner before appeal (zenchi) |
Free format text: JAPANESE INTERMEDIATE CODE: A912 Effective date: 20160311 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20170227 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20170518 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20170623 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 6166512 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |