JP6071961B2 - Bind mounting / detaching device with sheath winding - Google Patents

Bind mounting / detaching device with sheath winding Download PDF

Info

Publication number
JP6071961B2
JP6071961B2 JP2014171645A JP2014171645A JP6071961B2 JP 6071961 B2 JP6071961 B2 JP 6071961B2 JP 2014171645 A JP2014171645 A JP 2014171645A JP 2014171645 A JP2014171645 A JP 2014171645A JP 6071961 B2 JP6071961 B2 JP 6071961B2
Authority
JP
Japan
Prior art keywords
bind
wire
line
horizontal portion
attachment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2014171645A
Other languages
Japanese (ja)
Other versions
JP2016046984A (en
Inventor
尚 宮古
尚 宮古
健一 小竹
健一 小竹
孝幸 永木
孝幸 永木
木村 慎吾
慎吾 木村
田中 順二
順二 田中
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tohoku Electric Power Co Inc
Nagaki Seiki Co Ltd
Original Assignee
Tohoku Electric Power Co Inc
Nagaki Seiki Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tohoku Electric Power Co Inc, Nagaki Seiki Co Ltd filed Critical Tohoku Electric Power Co Inc
Priority to JP2014171645A priority Critical patent/JP6071961B2/en
Publication of JP2016046984A publication Critical patent/JP2016046984A/en
Application granted granted Critical
Publication of JP6071961B2 publication Critical patent/JP6071961B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Electric Cable Installation (AREA)

Description

本発明は、被覆巻付バインド取付・取外器に関し、特に、例えば、高圧線に巻き付けた状態でその高圧線を高圧ピン碍子に固定するためのバインド線の高圧線に対する取り付けまたは取り外しの用途に用いる、被覆巻付バインド取付・取外器に関するものである。   TECHNICAL FIELD The present invention relates to a sheath winding binding attachment / detacher, and in particular, for use in attaching or removing a binding wire to or from a high voltage wire to fix the high voltage wire to a high voltage pin insulator while being wound around the high voltage wire. The present invention relates to a bind winding attachment / removal device with a sheath winding.

一般に、高圧線をバインド線によって高圧ピン碍子に固定する工事または劣化したバインド線を新たなものに取り替える工事を行うに際しては、既設架線である高圧線に電源を供給した活線状態で行われている。なぜならば、高圧線を高圧ピン碍子に固定する箇所の電源供給側回路を遮断した状態で工事を行うと、その工事中に広範囲の電力需要者に停電の影響が及ぶからである。従来は、上述の工事に際し高圧ゴム手袋や絶縁用上衣などの絶縁用保護具を着用して、活線状態の高圧充電部に直接触れて作業を行う直接活線作業を行っていたが、この直接活線作業は、停電状態としての作業に比べて若干の危険を伴うことや、天候に左右され易い。   In general, when the work to fix the high-voltage line to the high-voltage pin insulator by the bind line or the work to replace the deteriorated bind line with a new one, it is performed in a live line state where power is supplied to the existing high-voltage line. Yes. This is because if construction is performed with the power supply side circuit at the location where the high-voltage line is fixed to the high-voltage pin insulator shut off, a wide range of power consumers will be affected during the construction. Conventionally, in the above-mentioned construction, wearing a protective device for insulation such as a high-pressure rubber glove or an insulation garment, and performing a direct live-line work in which the work is performed by directly touching a high-voltage live part in a live line state, Direct hot-line work involves some dangers compared to work in a power failure state, and is easily affected by the weather.

そこで、近年では、活線状態の高圧線に対して絶縁操作工具を用いた遠隔操作による間接作業でバインド線を巻き付け
または取り外す、いわゆる「ホットスティック工法」が採用されている。この「ホットスティック工法」によるバインド線の着脱工事に際しては、例えば、特許文献1に記載のバインド線着脱用工具が採用されている。特許文献1に記載のバインド線着脱用工具は、絶縁操作棒1と、この絶縁操作棒1の先端部に固着された着脱操作部材2とを備える。着脱操作部材2は、絶縁操作棒1に固着された基部3と、絶縁操作棒1に対し直交する軸心回りに回動自在に基部3に設けられて、バインド線13が巻き付けられる高圧線12に掛け止めされる支持フック部9と、支持フック部9から突設されて、支持フック部9の高圧線12回りの回動時にバインド線13に対し高圧線12への巻き付け方向または該巻き付け方向とは逆方向に強制的にねじ向けるよう作用する梃子軸体部10とを備えている。
Therefore, in recent years, a so-called “hot stick method” is employed in which a bind wire is wound or removed by remote operation using an insulating operation tool on a high-voltage wire in a live state. For example, a binding wire attaching / detaching tool described in Patent Document 1 is employed for attaching / detaching a bind wire by the “hot stick method”. The binding wire attaching / detaching tool described in Patent Document 1 includes an insulating operation rod 1 and an attaching / detaching operation member 2 fixed to the tip of the insulating operation rod 1. The detachable operation member 2 includes a base portion 3 fixed to the insulating operation rod 1 and a high-voltage wire 12 provided on the base portion 3 so as to be rotatable about an axis perpendicular to the insulation operation rod 1 and around which a bind wire 13 is wound. A hook portion 9 that is hooked on the support hook portion 9, and a direction in which the bind hook 13 is wound around the high-voltage line 12 when the support hook portion 9 rotates around the high-voltage line 12 or the winding direction. Is provided with an insulator shaft body portion 10 which acts to force the screw in the opposite direction.

また、特許文献2に記載の巻付バインド着脱工具は、一端が操作棒の先端に着脱自在に連結され、他端に前記操作棒の軸線に直交する第1の回転軸を備えた基部と、当該第1の回転軸によって前記操作棒の軸延長線を含む仮想平面上または当該仮想平面に略平行に近接する仮想平面上を回動可能とされるとともに、前記電線の周面に当接され、当該当接点を支点として前記巻付バインドに対し前記電線の円周方向の作用力を及ぼすように構成された梃子体部とからなる。特許文献2に記載の図13図示バインド打器45は、円形断面の鉄棒48の一端が基部46にその軸線に固定され、他端側が略C型状に折り曲げられ、さらに基部46寄りに鉄棒48に垂直に突出片47が設けられた構造を有している。   In addition, the wound binding attachment / detachment tool described in Patent Literature 2 has one end detachably coupled to the tip of the operation rod, and a base having a first rotation axis orthogonal to the axis of the operation rod at the other end, The first rotating shaft can be rotated on a virtual plane including an axis extension line of the operation rod or on a virtual plane close to the virtual plane in parallel, and is brought into contact with the peripheral surface of the electric wire. And an insulator body portion configured to exert an acting force in the circumferential direction of the wire on the winding binding with the contact point as a fulcrum. The bind hitter 45 shown in FIG. 13 described in Patent Document 2 has one end of a steel rod 48 having a circular cross section fixed to the axis of the base 46, the other end is bent into a substantially C shape, and the iron bar 48 is further closer to the base 46. It has the structure where the protrusion piece 47 was provided perpendicularly | vertically.

特開2004―153900号公報JP 2004-153900 A 特開2008―42990号公報JP 2008-42990 A

特許文献1のバインド線着脱用工具は、高圧線とそれに巻き付けられたバインド線との間に差し込まれる支持フック部9及び梃子軸体部10が、絶縁操作棒1の軸心から外れた位置に形成されているので、支持フック部9及び梃子軸体部10を高圧線とバインド線との間に差し込むときにモーメントがかかり、使い勝手が余り良いとはいえない。
特許文献2に関連する発明は、比較的軽量であるが、第1の回転軸15から突き出た梃子体部20が、バインド線に作用する湾曲部221までの距離が長く、操作するときの可動域が大きすぎるために、バインド線の端部を、架線に密着させて固定することに困難を伴う。
特許文献2の図13図示バインド打器45は、高圧線に巻き付けられたバインド線の端部を高圧線から外した後に、バインド線を回しながら外すことができるが、高圧線に巻き付けられたバインド線の端部を高圧線から外し緩めることに困難を伴う。
本発明は、前記事情を勘案し、操作棒の先端に装着することにより、大きな操作力を必要としないで巻付バインド線の電線等への巻き付け作業および電線等からの取り外し作業を容易に行うことができ、作業効率の向上が図れる小型で構造が簡単な、被覆巻付バインド取付・取外器を提供することを目的とする。
In the binding wire attaching / detaching tool of Patent Document 1, the support hook portion 9 and the insulator shaft body portion 10 inserted between the high-voltage wire and the binding wire wound around the high-pressure wire are located at a position away from the axis of the insulating operation rod 1. Since it is formed, a moment is applied when the support hook portion 9 and the insulator shaft body portion 10 are inserted between the high-voltage line and the bind line, and it cannot be said that the usability is very good.
The invention related to Patent Document 2 is relatively lightweight, but the insulator body portion 20 protruding from the first rotating shaft 15 has a long distance to the curved portion 221 that acts on the binding line, and is movable when operated. Since the area is too large, it is difficult to fix the end of the bind wire in close contact with the overhead wire.
The bind hitter 45 shown in FIG. 13 of Patent Document 2 can be removed while turning the bind wire after the end of the bind wire wound around the high voltage wire is removed from the high voltage wire. It is difficult to loosen the end of the wire from the high voltage wire.
In consideration of the above circumstances, the present invention can be easily attached to a wire or the like from a wire or the like and attached to the tip of an operation rod without requiring a large operating force. An object of the present invention is to provide a cover-wrapping bind attachment / detacher that is small and has a simple structure that can improve work efficiency.

本発明にかかる被覆巻付バインド取付・取外器は、
操作棒の先端に配設される被覆巻付バインド取付・取外器であって、
前記操作棒の側において、操作棒の軸線に直交ないしは交差する方向にのびる第1横設部と、
該第1横設部の一部に接続され、前記操作棒の軸線に沿う方向にのびる縦設部と、
該縦設部の第1横設部が接続された側とは反対側の先端に接続され、操作棒の軸線に直交ないしは交差する方向にのびる第2横設部とを有し、
前記第1横設部と第2横設部と縦設部とが、略U字型に一体に形成され、
前記第1横設部の先端の近傍で第2横設部と向き合う側に、バインド線を引っ掛けるための引っ掛け凹部が形成され、及び/又は、前記第2横設部の先端の近傍で第1横設部と向き合う側にバインド線を引っ掛けるための引っ掛け凹部が形成されたことを特徴とする。
請求項2にかかる被覆巻付バインド取付・取外器は、
前記第1横設部の引っ掛け凹部は、バインド線を押す方向に向けて開口し、バインド線を押す方向と交差する方向に形成され、前記第2横設部の引っ掛け凹部は、バインド線を引く方向に向けて開口し、バインド線を引く方向と交差する方向に形成される。
請求項3にかかる被覆巻付バインド取付・取外器は、
前記縦設部は、棒状であって、架線の周面に当接され、該当接点を支点として、前記第1横設部及び第2横設部を回動できるように構成され、
前記第1横設部及び第2横設部は、前記当接点を支点として、バインド線の端部を架線の上方又は下方に移動させる作用を及ぼすように構成されたことを特徴とする。
Coated winding binding attachment / detacher according to the present invention is:
Cover binding binding attachment / detacher disposed at the tip of the operation rod,
A first horizontal portion extending in a direction perpendicular to or intersecting with the axis of the operation rod on the operation rod side;
A vertical portion connected to a part of the first horizontal portion and extending in a direction along the axis of the operation rod;
A second horizontal portion connected to the tip of the vertical portion opposite to the side to which the first horizontal portion is connected, and extending in a direction perpendicular to or intersecting the axis of the operating rod;
The first horizontal portion, the second horizontal portion, and the vertical portion are integrally formed in a substantially U shape,
A hook recess for hooking a binding wire is formed on the side facing the second lateral portion in the vicinity of the distal end of the first lateral portion, and / or the first in the vicinity of the distal end of the second lateral portion. A hook recess for hooking the bind line is formed on the side facing the horizontal portion.
The bound winding attachment / detacher according to claim 2 is:
The hook recess of the first horizontal portion opens in a direction pushing the bind line and is formed in a direction crossing the direction of pushing the bind line, and the hook recess of the second horizontal portion pulls the bind line. It is opened in the direction and formed in a direction intersecting with the direction of drawing the binding line.
The bound winding binding attachment / detacher according to claim 3 is:
The vertical portion is rod-shaped and is configured to be in contact with the peripheral surface of the overhead wire so that the first horizontal portion and the second horizontal portion can be rotated with the corresponding contact as a fulcrum.
The first horizontal portion and the second horizontal portion are configured to act to move the end portion of the bind line upward or downward with respect to the contact point as a fulcrum.

本発明にかかる被覆巻付バインド取付・取外器によれば、操作棒の先端に装着して用いることができ、また小型でかつ簡単な構造で大きな操作力を必要としないで巻付バインド線の電線等への巻き付け作業および電線等からの取り外し作業を容易に行うことができ、その結果作業効率の向上が図れる。   According to the coated winding binding attachment / detacher according to the present invention, the winding binding wire can be used by being attached to the tip of the operation rod, and is small and has a simple structure without requiring a large operating force. The wire can be easily wound around the wire and removed from the wire, and as a result, the work efficiency can be improved.

本発明の上述の目的、その他の目的、特徴および利点は、図面を参照して行う以下の発明を実施するための形態の説明から一層明らかとなろう。   The above-described object, other objects, features, and advantages of the present invention will become more apparent from the following description of embodiments for carrying out the invention with reference to the drawings.

本発明の被覆巻付バインド取付・取外器の実施形態の一例を示す図である。It is a figure which shows an example of embodiment of the bind attachment attachment / detacher with a covering winding of this invention. 図1に示す実施形態を斜視図解図であり、(A)は正面図解図であり、(B)は側面図である。It is a perspective view solution figure of embodiment shown in FIG. 1, (A) is a front view solution figure, (B) is a side view. 図1に示す巻付バインド線の電線及び碍子への巻き付け方法の概略を示す斜視図である。It is a perspective view which shows the outline of the winding method to the electric wire and insulator of the winding binding wire shown in FIG. プレフォーム巻付バインド線の形状を示した正面図である。It is the front view which showed the shape of the preform winding bind wire. 図1に示す被覆巻付バインド取付・取外器を用いたバインド線の一方側の巻き付け方法の概略を示す斜視図である。It is a perspective view which shows the outline of the winding method of one side of the bind wire | line using the covering winding binding attachment and removal device shown in FIG. 図1に示す被覆巻付バインド取付・取外器を用いたバインド線の一方側の巻き付け方法の概略を示す斜視図である。It is a perspective view which shows the outline of the winding method of one side of the bind wire | line using the covering winding binding attachment and removal device shown in FIG. 図1に示す被覆巻付バインド取付・取外器を用いたバインド線の一方側の巻き付け方法の概略を示す斜視図である。It is a perspective view which shows the outline of the winding method of one side of the bind wire | line using the covering winding binding attachment and removal device shown in FIG. 図1に示す被覆巻付バインド取付・取外器を用いたバインド線の一方側の巻き付け方法の概略を示す斜視図である。It is a perspective view which shows the outline of the winding method of one side of the bind wire | line using the covering winding binding attachment and removal device shown in FIG. 図1に示す被覆巻付バインド取付・取外器を用いたバインド線の一方側の巻き付け方法の概略を示す斜視図である。It is a perspective view which shows the outline of the winding method of one side of the bind wire | line using the covering winding binding attachment and removal device shown in FIG. 図1に示す被覆巻付バインド取付・取外器を用いたバインド線の他方側の巻き付け方法の概略を示す斜視図である。It is a perspective view which shows the outline of the winding method of the other side of the bind wire using the covering winding binding attachment and removal device shown in FIG. 図1に示す被覆巻付バインド取付・取外器を用いたバインド線の他方側の巻き付け方法の概略を示す斜視図である。It is a perspective view which shows the outline of the winding method of the other side of the bind wire using the covering winding binding attachment and removal device shown in FIG. 図1に示す被覆巻付バインド取付・取外器を用いたバインド線の他方側の巻き付け方法の概略を示す斜視図である。It is a perspective view which shows the outline of the winding method of the other side of the bind wire using the covering winding binding attachment and removal device shown in FIG. 図1に示す被覆巻付バインド取付・取外器を用いたバインド線の他方側の巻き付け方法の概略を示す斜視図である。It is a perspective view which shows the outline of the winding method of the other side of the bind wire using the covering winding binding attachment and removal device shown in FIG. 図1に示す被覆巻付バインド取付・取外器を用いたバインド線の他方側の巻き付け方法の概略を示す斜視図である。It is a perspective view which shows the outline of the winding method of the other side of the bind wire using the covering winding binding attachment and removal device shown in FIG. 図1に示す被覆巻付バインド取付・取外器を用いたバインド線の一方側の取り外し方法の概略を示す斜視図である。It is a perspective view which shows the outline of the removal method of one side of the bind wire | line using the covering winding bind attachment and removal device shown in FIG. 図1に示す被覆巻付バインド取付・取外器を用いたバインド線の一方側の取り外し方法の概略を示す斜視図である。It is a perspective view which shows the outline of the removal method of one side of the bind wire | line using the covering winding bind attachment and removal device shown in FIG. 図1に示す被覆巻付バインド取付・取外器を用いたバインド線の一方側の取り外し方法の概略を示す斜視図である。It is a perspective view which shows the outline of the removal method of one side of the bind wire | line using the covering winding bind attachment and removal device shown in FIG. 図1に示す被覆巻付バインド取付・取外器を用いたバインド線の一方側の取り外し方法の概略を示す斜視図である。It is a perspective view which shows the outline of the removal method of one side of the bind wire | line using the covering winding bind attachment and removal device shown in FIG. 図1に示す被覆巻付バインド取付・取外器を用いたバインド線の一方側の取り外し方法の概略を示す斜視図である。It is a perspective view which shows the outline of the removal method of one side of the bind wire | line using the covering winding bind attachment and removal device shown in FIG. 図1に示す被覆巻付バインド取付・取外器を用いたバインド線の一方側の取り外し方法の概略を示す斜視図である。It is a perspective view which shows the outline of the removal method of one side of the bind wire | line using the covering winding bind attachment and removal device shown in FIG. 図1に示す被覆巻付バインド取付・取外器を用いたバインド線の他方側の取り外し方法の概略を示す斜視図である。It is a perspective view which shows the outline of the removal method of the other side of the bind wire | line using the covering winding binding attachment and removal device shown in FIG. 図1に示す被覆巻付バインド取付・取外器を用いたバインド線の他方側の取り外し方法の概略を示す斜視図である。It is a perspective view which shows the outline of the removal method of the other side of the bind wire | line using the covering winding binding attachment and removal device shown in FIG. 本発明の被覆巻付バインド取付・取外器の説明図である。It is explanatory drawing of the binding attachment attachment / detacher with a covering winding of this invention.

以下、本発明にかかる被覆巻付バインド取付・取外器の実施の形態を、主として、図1及び2に基づいて、詳細に説明する。
なお、以下では、被覆巻付バインド取付・取外器10において、操作部の操作棒に装着される側を「操作棒側」と呼び、操作棒側の軸線方向の操作部とは反対側を「先端側」と呼ぶこととする。
DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, an embodiment of a cover winding bind attachment / detacher according to the present invention will be described in detail mainly based on FIGS.
In the following description, the side of the operating part that is attached to the operating rod in the sheathed binding attachment / detacher 10 will be referred to as the “operating bar side”, and the side opposite to the operating part in the axial direction on the operating bar side. It will be called “front end side”.

被覆巻付バインド取付・取外器10は、操作棒50の先端に配設されている。
被覆巻付バインド取付・取外器10は、前記操作棒50の側において、操作棒50の軸線に直交ないしは交差する方向にのびる第1横設部12と、該第1横設部12の一部に接続され、前記操作棒50の軸線に沿う方向にのびる縦設部14と、該縦設部14の第1横設部12を接続された側とは反対側の先端に接続され、操作棒50の軸線に直交ないしは交差する方向にのびる第2横設部16とを有している。
The cover winding bind attachment / detacher 10 is disposed at the tip of the operation rod 50.
The cover winding bind attachment / detacher 10 includes, on the operation rod 50 side, a first horizontal portion 12 extending in a direction perpendicular to or intersecting with the axis of the operation rod 50, and one of the first horizontal portions 12. Connected to the vertical portion 14 extending in the direction along the axis of the operation bar 50 and connected to the tip of the vertical portion 14 opposite to the side where the first horizontal portion 12 is connected. And a second horizontal portion 16 extending in a direction perpendicular to or intersecting with the axis of the rod 50.

第1横設部12、縦設部14及び第2横設部16は、断面方形の直線棒状であって、正面視略U字型に連結されて、操作部18を形成している。
前記第1横設部12と第2横設部16と縦設部14とは、スチール、ステンレスなどにより、略U字型に金属で一体に形成されている。
The first horizontal portion 12, the vertical portion 14, and the second horizontal portion 16 have a straight bar shape with a square cross section, and are connected in a substantially U shape when viewed from the front to form an operation portion 18.
The first horizontal portion 12, the second horizontal portion 16, and the vertical portion 14 are integrally formed of a metal in a substantially U shape with steel, stainless steel, or the like.

第1横設部12と第2横設部16とは、平行にのびる、略々同じ長さを有する棒状体である。
被覆巻付バインド取付・取外器10の第1横設部12、縦設部14及び第2横設部16は、操作棒50の長手方向の軸線Xと、該軸線Xに直交する第1横設部12の軸線Y(第2横設部16の線も含む)とを含む平面Pxyに沿ってのびる長手方向を有する棒状体である(図23参照)。
第1横設部12と第2横設部16とは、少なくともバインド線100及び架線160の上から下に亘る長さを備えている。
縦設部14は、架線160の直径より長い長さを備えている。
The first horizontal portion 12 and the second horizontal portion 16 are rod-shaped bodies extending in parallel and having substantially the same length.
The first horizontal portion 12, the vertical portion 14, and the second horizontal portion 16 of the cover winding binding attachment / detacher 10 are provided with a longitudinal axis X of the operating rod 50 and a first axis orthogonal to the axial line X. This is a rod-like body having a longitudinal direction extending along a plane Pxy including the axis Y of the horizontal portion 12 (including the line of the second horizontal portion 16) (see FIG. 23).
The first horizontal portion 12 and the second horizontal portion 16 have at least a length extending from the top to the bottom of the bind line 100 and the overhead line 160.
The vertical portion 14 has a length longer than the diameter of the overhead wire 160.

第1横設部12は、縦設部14における操作棒50に近い側に形成され、第2横設部16は、縦設部14における操作棒50に遠い側に形成されている。
第1横設部12は、前記中間部分において、連結部30により、操作棒50の先端を固定されている。
すなわち、縦設部14と連結部30との間の長さL1より、連結部30と第1横設部12の先端との間の長さL2の方が長く、該長さL2は、該長さL1の1.7倍程度である(図23参照)。
連結部30は、第1横設部12の長手方向における中央より縦設部14に近い側において、第1横設部12の下部に突設されている。
The first horizontal portion 12 is formed on the side close to the operation rod 50 in the vertical portion 14, and the second horizontal portion 16 is formed on the side far from the operation rod 50 in the vertical portion 14.
In the first horizontal portion 12, the distal end of the operation rod 50 is fixed by the connecting portion 30 in the intermediate portion.
That is, the length L2 between the connecting portion 30 and the tip of the first horizontal portion 12 is longer than the length L1 between the vertical portion 14 and the connecting portion 30, and the length L2 is It is about 1.7 times the length L1 (see FIG. 23).
The connecting portion 30 protrudes from the center of the first horizontal portion 12 in the longitudinal direction on the lower side of the first horizontal portion 12 on the side closer to the vertical portion 14.

前記第1横設部12の先端の近傍で第2横設部16と向き合う側に、バインド線100を引っ掛けるための第1引っ掛け凹部20を形成され、及び/又は、前記第2横設部16の先端の近傍で第1横設部12と向き合う側にバインド線100を引っ掛けるための第2引っ掛け凹部22を形成されている。
第1引っ掛け凹部20と第2引っ掛け凹部22とは、いずれもバインド線100の外形に近似した形状であって、対向しており、対称形である。
A first hook recess 20 for hooking the binding wire 100 is formed on the side facing the second horizontal portion 16 near the tip of the first horizontal portion 12 and / or the second horizontal portion 16. A second hooking recess 22 for hooking the bind wire 100 is formed on the side facing the first lateral portion 12 in the vicinity of the tip of the second hooking portion.
Each of the first hook recess 20 and the second hook recess 22 has a shape that approximates the outer shape of the bind line 100, faces each other, and is symmetrical.

第1横設部12は、縦設部14における操作棒50に近い側に形成されている。
前記第1横設部12の第1引っ掛け凹部20は、バインド線100の外周面の形状に対応した、断面半円弧状であって、架線160の手前にあるバインド線100に引っ掛けられて、例えば、バインド線100を架線160の向こうに移動させるように形成されている。第1引っ掛け凹部20は、バインド線100を押す方向に向けて開口している。第1引っ掛け凹部20は、バインド線100を押す方向と交差ないしは直交する方向において一方端から他方端に亘って形成されており、バインド線100の軸心方向に形成されている。
第1引っ掛け凹部20は、平面PXY(操作棒50の長手方向の軸線Xと、該軸線Xに直交する第1横設部12の軸線Y(第2横設部16の線も含む)とを含む平面)より手前側である、第1横設部12の手前側の表面の上端から、平面PXYより向こう側である、第1横設部12の向こう側の表面の上端に亘って、連続して形成されている。
第1引っ掛け凹部20は、平面PXY(操作棒50の長手方向の軸線Xと、該軸線Xに直交する第1横設部12の軸線Y(第2横設部16の線も含む)とを含む平面)と直交ないしは交差するとともに、第1横設部12の手前側の表面と直交ないしは交差し、且つ第1横設部12の向こう側の表面と直交ないしは交差している。
The first horizontal portion 12 is formed on the side close to the operation rod 50 in the vertical portion 14.
The first hook recess 20 of the first lateral portion 12 has a semicircular cross section corresponding to the shape of the outer peripheral surface of the bind wire 100 and is hooked on the bind wire 100 in front of the overhead wire 160, for example, The binding line 100 is formed to move beyond the overhead line 160. The first hook recess 20 is open toward the direction in which the bind line 100 is pushed. The first hook recess 20 is formed from one end to the other end in a direction intersecting or orthogonal to the direction in which the bind line 100 is pushed, and is formed in the axial direction of the bind line 100.
The first hook recess 20 has a plane PXY (the longitudinal axis X of the operation rod 50 and the axis Y of the first lateral portion 12 (including the line of the second lateral portion 16) perpendicular to the axial line X). From the upper end of the surface on the near side of the first lateral portion 12 that is on the near side to the upper side of the first lateral portion 12 that is on the far side from the plane PXY. Is formed.
The first hook recess 20 has a plane PXY (the longitudinal axis X of the operation rod 50 and the axis Y of the first lateral portion 12 (including the line of the second lateral portion 16) perpendicular to the axial line X). And a plane perpendicular to or intersecting with the surface on the near side of the first lateral portion 12 and perpendicular to or intersecting with the surface on the other side of the first lateral portion 12.

第2横設部16は、縦設部14における操作棒50に遠い側に形成されている。
前記第2横設部16の第2引っ掛け凹部22は、バインド線100の外周面の形状に対応した、断面半円弧状であって、架線160の向こう側にあるバインド線100に引っ掛けられて、例えば、バインド線100を架線160の下方の手前側に移動させるように形成されている。
第2引っ掛け凹部22は、バインド線100を引く方向に向けて開口している。第2引っ掛け凹部22は、バインド線100を引く方向と交差ないしは直交する方向において一方端から他方端に亘って形成されており、バインド線100の軸心方向に形成されている。
第2引っ掛け凹部22は、平面PXY(操作棒50の長手方向の軸線Xと、該軸線Xに直交する第1横設部12の軸線Y(第2横設部16の線も含む)とを含む平面)より手前側である、第2横設部16の手前側の表面の下端から、平面PXYより向こう側である、第2横設部16の向こう側の表面の下端に亘って、連続して形成されている。
第2引っ掛け凹部22は、平面PXY(操作棒50の長手方向の軸線Xと、該軸線Xに直交する第1横設部12の軸線Y(第2横設部16の線も含む)とを含む平面)と直交ないしは交差するとともに、第2横設部16の手前側の表面と直交ないしは交差し、且つ第2横設部16の向こう側の表面と直交ないしは交差している
The second horizontal portion 16 is formed on the side far from the operation rod 50 in the vertical portion 14.
The second hook recess 22 of the second lateral portion 16 has a semicircular cross section corresponding to the shape of the outer peripheral surface of the bind wire 100 and is hooked by the bind wire 100 on the other side of the overhead wire 160, For example, the binding line 100 is formed to move to the near side below the overhead line 160.
The second hook recess 22 opens toward the direction in which the bind line 100 is pulled. The second hook recess 22 is formed from one end to the other end in a direction crossing or orthogonal to the direction in which the bind line 100 is pulled, and is formed in the axial direction of the bind line 100.
The second hook recess 22 includes a plane PXY (the longitudinal axis X of the operation rod 50 and the axis Y of the first lateral portion 12 (including the line of the second lateral portion 16) orthogonal to the axial line X). From the lower end of the surface on the near side of the second lateral portion 16, which is on the near side to the plane including), continuously from the lower end of the surface on the far side of the second lateral portion 16, which is on the far side from the plane PXY. Is formed.
The second hook recess 22 includes a plane PXY (the longitudinal axis X of the operation rod 50 and the axis Y of the first lateral portion 12 (including the line of the second lateral portion 16) orthogonal to the axial line X). Perpendicular to or intersect with the plane on the front side of the second lateral portion 16 and perpendicular to or intersect with the surface on the other side of the second lateral portion 16.

前記実施の形態の第1横設部12、縦設部14及び第2横設部16は、角柱状の金属棒を正面視略U字型に成形されているが、例えば、円柱状の金属棒を正面視略U字型に成形されているものでもよい。
又、前記実施の形態の第1横設部12、縦設部14及び第2横設部16は、合成樹脂製の角柱状体又は円柱状体で形成されてもよい。
In the first horizontal portion 12, the vertical portion 14, and the second horizontal portion 16 of the above embodiment, a prismatic metal rod is formed in a substantially U shape when viewed from the front. The rod may be formed in a substantially U shape when viewed from the front.
Moreover, the 1st horizontal part 12, the vertical part 14, and the 2nd horizontal part 16 of the said embodiment may be formed with the prismatic body or cylindrical body made from a synthetic resin.

図1に示す実施形態の被覆巻付バインド取付・取外器10について、主として図3ないし22に基づいて、その使用方法を説明する。   A method of using the bound winding attachment / detacher 10 of the embodiment shown in FIG. 1 will be described mainly based on FIGS.

高圧線等の架線160は、図3に示すように、自体にバインド線100が巻き付けられるとともに、そのバインド線100の中央部に形成された掛止用湾曲部106を碍子150に掛け止めすることにより、碍子150に固定される。
前記バインド線100は、硬質金属線を例えばゴム製の絶縁部材で被覆したものであり、両端部が第1端末キャップ102及び第2端末キャップ104を取り付けて保護されている。このバインド線100は、碍子交換等の工事のときに、取付け、取外す必要がある。
電柱の腕木(または腕金)170に取り付けられた碍子150にバインド線100を用いて固定する前に、碍子150上部の外周に設けられた電線吊架溝152にバインド線100の掛止用湾曲部106を嵌め込む。(図3参照)
次に、架線160をピン150の電線吊架溝152に当接すると、バインド線100の一方の第1螺旋部108は、架線160の下側から、また他方の第2螺旋部110は、架線160の上側から巻き付け可能な状態となる。(図4参照)
As shown in FIG. 3, the overhead wire 160 such as a high-voltage wire has the binding wire 100 wound around itself, and the latching curved portion 106 formed at the center of the binding wire 100 is latched to the insulator 150. Thus, the insulator 150 is fixed.
The bind wire 100 is a hard metal wire covered with an insulating member made of rubber, for example, and both ends are protected by attaching a first terminal cap 102 and a second terminal cap 104. The bind line 100 needs to be attached and removed during construction such as insulator replacement.
Before the wire 150 is fixed to the insulator 150 attached to the arm (170) of the utility pole using the bind wire 100, the wire suspension groove 152 provided on the outer periphery of the insulator 150 is bent in the wire suspension groove 152. The part 106 is fitted. (See Figure 3)
Next, when the overhead wire 160 is brought into contact with the wire suspension groove 152 of the pin 150, one of the first spiral portions 108 of the bind wire 100 is from the lower side of the overhead wire 160 and the other second spiral portion 110 is It will be in the state which can be wound from the upper side of 160. FIG. (See Figure 4)

バインド線100の第1螺旋部108側を巻き付ける場合は、反対側の巻付バインド線100の第2螺旋部110と架線160とを把持工具(図示せず)を用いて把持し、両者を仮固定する。   When winding the first spiral portion 108 side of the bind wire 100, the second spiral portion 110 and the overhead wire 160 of the opposite winding bind wire 100 are gripped using a gripping tool (not shown), and both are temporarily mounted. Fix it.

バインド線100の一方側(操作者から視て右側)の第1螺旋部108を碍子150及び架線160への巻き付け方法について、主として、図5ないしは図9に基づいて説明する。
まず、バインド線100は、架線160の下側から巻き付け可能な第1螺旋部108を最初に架線160に巻き付けられる。
そのとき、図1に示す被覆巻付バインド取付・取外器10を用いて架線160に、バインド線100の第1螺旋部108を巻き付けていく。第1螺旋部108は、操作者が手前から見て、碍子150の右側に位置する。
A method of winding the first spiral portion 108 on one side (right side as viewed from the operator) of the bind wire 100 around the lever 150 and the overhead wire 160 will be mainly described with reference to FIGS.
First, the bind wire 100 is wound around the overhead wire 160 first with the first spiral portion 108 that can be wound from the lower side of the overhead wire 160.
At that time, the first spiral portion 108 of the bind wire 100 is wound around the overhead wire 160 by using the covered winding bind attachment / detacher 10 shown in FIG. The first spiral portion 108 is located on the right side of the lever 150 as viewed from the front of the operator.

まず、被覆巻付バインド取付・取外器10及び操作棒50の操作者は、架線160の向こう側(操作者からみて裏側)にバインド線100があるとき、バインド線100を架線160側の下側から、被覆巻付バインド取付・取外器10の操作部18を架線160の向こう側に差し出し、被覆巻付バインド取付・取外器10の第2横設部16及び縦設部14の開口部28側の面に引っ掛け、下側を通過させて架線160の手前側(操作者からみて表側)に引き出す(巻き付けの第1ステップ:向こう側から手前側へ移動)。   First, when the operator of the bound winding binding attachment / detacher 10 and the operating rod 50 has the binding wire 100 on the other side of the overhead wire 160 (the back side as viewed from the operator), the binding wire 100 is moved below the overhead wire 160 side. From the side, the operating portion 18 of the bound winding binding attachment / detacher 10 is inserted beyond the overhead wire 160, and the openings of the second horizontal portion 16 and the vertical portion 14 of the covering winding bind attachment / detacher 10 are opened. Hook on the surface on the part 28 side, pass the lower side, and pull it out to the near side (front side as viewed from the operator) of the overhead wire 160 (first step of winding: moving from the far side to the near side).

次に、被覆巻付バインド取付・取外器10の操作者は、操作部18の縦設部14を操作者からみて右側(碍子150とは反対側)にし、操作部18の第1横設部12を操作者からみて左側(碍子150側)にし、開口部28を碍子150に向けて、縦設部14を架線160の上側に位置させ且つ第2横設部16を架線160の上に位置させて、操作部18の第1横設部12をバインド線100の下側に位置させる。
次に、被覆巻付バインド取付・取外器10の操作者は、図5において示すように、第1横設部12の第2横設部16との対向面及び縦設部14の開口部28側の面にバインド線100を位置させて、バインド線100を架線160の上面に巻き付ける(巻き付けの第2ステップ:持ち上げて向こう側へ移動)。
被覆巻付バインド取付・取外器10の操作者は、架線160を中心に碍子150側からみて反時計回りに半円を描くように、操作棒50により操作して、バインド線100を架線160の上面に巻き付ける。
Next, the operator of the cover winding binding attachment / detacher 10 places the vertical portion 14 of the operation portion 18 on the right side (opposite side of the lever 150) as viewed from the operator, and the first horizontal installation of the operation portion 18 is performed. The portion 12 is on the left side (the lever 150 side) when viewed from the operator, the opening 28 is directed toward the lever 150, the vertical portion 14 is positioned above the overhead line 160, and the second lateral portion 16 is above the overhead line 160. The first horizontal portion 12 of the operation portion 18 is positioned below the bind line 100.
Next, as shown in FIG. 5, the operator of the cover winding bind attachment / detacher 10 faces the second horizontal portion 16 of the first horizontal portion 12 and the opening of the vertical portion 14. The bind line 100 is positioned on the 28 side surface, and the bind line 100 is wound around the upper surface of the overhead line 160 (second step of winding: lifting and moving to the other side).
The operator of the bound winding binding attachment / detacher 10 operates the operating rod 50 so as to draw a semicircle counterclockwise as viewed from the lever 150 side with the overhead wire 160 as the center. Wrap around the top surface of.

次に、被覆巻付バインド取付・取外器10の操作者は、図6に示すように、操作棒50の操作者による操作により、操作部18を架線160の向こう側に差し出し、操作部18の第2横設部16及び縦設部14の開口部28側の面にバインド線100の向こう側(操作者からみて裏側)及び上側を引っ掛けて、バインド線100の下側を通過させて、バインド線100を架線160の向こう側から架線160の手前側(操作者からにて表側)に捻回させる(巻き付けの第3ステップ:向こう側から手前側に下げる移動)。
被覆巻付バインド取付・取外器10の操作者は、架線160を中心に碍子150側からみて反時計回りに半円を描くように、操作棒50を操作して、バインド線100を架線160の下面に巻き付ける。
Next, as shown in FIG. 6, the operator of the cover winding bind attachment / detacher 10 pushes the operation unit 18 beyond the overhead wire 160 by the operation of the operation bar 50, and the operation unit 18. Hang the other side of the binding line 100 (the back side as viewed from the operator) and the upper side of the surface of the second lateral part 16 and the vertical part 14 on the side of the opening 28, and pass the lower side of the binding line 100, The bind wire 100 is twisted from the other side of the overhead wire 160 to the front side of the overhead wire 160 (front side from the operator) (third step of winding: movement to lower from the other side to the near side).
The operator of the bound winding binding attachment / detacher 10 operates the operating rod 50 so as to draw a semicircle counterclockwise as viewed from the lever 150 side with the overhead wire 160 as the center, and the binding wire 100 is moved to the overhead wire 160. Wrap around the bottom of the.

次に、被覆巻付バインド取付・取外器10の操作者は、図7に示すように、操作棒50の操作により、操作部18の第1横設部12の向こう側にバインド線100の手前側を及び縦設部14の開口部28側にバインド線100の下側を引っ掛けて、架線160の手前側(操作者からみて表側)から向こう側(操作者から見て裏側)に向けて、架線160の上側にバインド線100を稔回させる(巻き付け第4ステップ:手前側から向こう側に持ち上げる移動)。
被覆巻付バインド取付・取外器10の操作者は、架線160を中心に碍子150側からみて反時計回りに半円を描くように、操作棒50の操作によって、バインド線100を架線160の上面に巻き付ける。
Next, as shown in FIG. 7, the operator of the cover winding bind attachment / detacher 10 operates the operation rod 50 to move the bind wire 100 to the other side of the first lateral portion 12 of the operation portion 18. Hang the lower side of the binding line 100 on the front side and the opening 28 side of the vertical portion 14, from the front side (front side as viewed from the operator) to the far side (back side as viewed from the operator) of the overhead wire 160. Then, the bind wire 100 is wound on the upper side of the overhead wire 160 (winding fourth step: a movement of lifting from the near side to the far side).
The operator of the bound winding binding attachment / detacher 10 moves the bind wire 100 to the overhead wire 160 by operating the operating rod 50 so as to draw a semicircle counterclockwise as viewed from the lever 150 side around the overhead wire 160. Wrap around the top surface.

被覆巻付バインド取付・取外器10の操作者は、前記操作(巻き付け第2ステップ、第3ステップ及び第4ステップ)を繰り返して、バインド線100を架線160の周面に、円筒らせん状(つるまき線状)に巻き付ける。   The operator of the cover winding bind attachment / detacher 10 repeats the above-described operation (the second winding step, the third step, and the fourth step), so that the bind wire 100 is formed in a cylindrical spiral shape on the peripheral surface of the overhead wire 160 ( Wrap around a spiral line.

次に、被覆巻付バインド取付・取外器10の操作者は、図8に示すように、架線160の向こう側(操作者からみて裏側)にあるバインド線100の向こう側(操作者からみて裏側)において、第2横設部16の第2引っ掛け凹部22を、バインド線100の第1端末キャップ102の近傍の末端に引っ掛ける。
そして、図8に示すように、バインド線100の第1端末キャップ102の近傍に第1横設部16の第2引っ掛け凹部22を引っ掛けた状態にて、操作部18を架線160の下方から架線160の手前側(操作者からみて表側)に位置させ、図9に示すように、第1横設部12の先端により、架線160の手前側面に密着させる(巻き付けの第5ステップ:端末の固定)。
そのために、被覆巻付バインド取付・取外器10の操作者は、縦設部14を架線160の上面に当接させ、当接点f1を支点として第1横設部12の先端をバインド線100の第1端末キャップ102に作用させて、第1端末キャップ102を架線160の手前側の面に沿って上昇させて、架線160の手前側面に、バインド線100の第1端末キャップ102を密着させる。
被覆巻付バインド取付・取外器10は、てこ(梃子)の要領で回転させて、第1端末キャップ102を架線160に嵌めることをできる。
以上のように、操作者は、操作棒50及び被覆巻付バインド取付・取外器10を操作して、バインド線100を架線160に円筒らせん状(つるまき線状)に巻き付けることができる。
Next, as shown in FIG. 8, the operator of the cover winding bind attachment / detacher 10, as shown in FIG. 8, is the other side of the binding wire 100 (the rear side as viewed from the operator) and the other side (as viewed from the operator). On the back side, the second hooking recess 22 of the second lateral portion 16 is hooked to the end of the binding wire 100 near the first terminal cap 102.
Then, as shown in FIG. 8, the operation unit 18 is suspended from the lower side of the overhead line 160 in a state where the second hooking recess 22 of the first lateral portion 16 is hooked in the vicinity of the first terminal cap 102 of the binding line 100. Positioned on the front side of 160 (front side as viewed from the operator), as shown in FIG. 9, the front end of the first lateral portion 12 is brought into close contact with the front side surface of the overhead wire 160 (fifth step of winding: fixing the terminal) ).
For this purpose, the operator of the cover-wound bind attachment / detacher 10 brings the vertical portion 14 into contact with the upper surface of the overhead wire 160, and the tip of the first horizontal portion 12 is bound to the bind line 100 with the contact point f1 as a fulcrum. The first terminal cap 102 is caused to act on the front side of the overhead wire 160 so that the first terminal cap 102 of the binding wire 160 is brought into close contact with the front side surface of the overhead wire 160. .
The cover winding bind attachment / detacher 10 can be rotated in the manner of a lever to fit the first terminal cap 102 to the overhead wire 160.
As described above, the operator can wind the bind wire 100 around the overhead wire 160 in a cylindrical spiral shape (helical wire shape) by operating the operation rod 50 and the cover winding bind attachment / detacher 10.

このように、一方の側の第1螺旋部108の巻き付き作業が終了したところで、他方の側の第2螺旋部110の巻き付き作業に取り掛かる。第2螺旋部110は、操作者が手前側から見て、碍子150の左側に位置する。
まず、それまでバインド線100の第2螺旋部110と架線160を仮固定していた把持具(図示せず)を取り外す。
Thus, when the winding operation of the first spiral portion 108 on one side is completed, the winding operation of the second spiral portion 110 on the other side is started. The second spiral portion 110 is located on the left side of the lever 150 as viewed from the front side by the operator.
First, the gripping tool (not shown) that has temporarily fixed the second spiral portion 110 and the overhead wire 160 of the bind wire 100 is removed.

次に、バインド線100他方の側(操作者から視て左側)の第2螺旋部110を碍子150及び架線160への巻き付け方法について、主として、図10ないしは図14に基づいて説明する。
まず、被覆巻付バインド取付・取外器10及び操作棒50の操作者は、図10に示すように、架線160の手前側(操作者から見て表側)にバインド線100があるとき、被覆巻付バインド取付・取外器10の操作部18の第1横設部12の上に及び縦設部14の開口部28側の面の上にバインド線100(第2螺旋部110)を引っ掛け、バインド線100(第2螺旋部110)を、架線160側の下側から架線160の向こう側(操作者から見て裏側)に移動させ、操作部18を持ち上げる(巻き付けの第6ステップ:手前側から向こう側へ移動)。
Next, a method of winding the second spiral portion 110 on the other side (left side as viewed from the operator) of the bind wire 100 around the lever 150 and the overhead wire 160 will be mainly described with reference to FIGS.
First, as shown in FIG. 10, the operator of the cover winding bind attachment / detacher 10 and the operating rod 50 is covered when the bind wire 100 is on the front side of the overhead wire 160 (front side as viewed from the operator). The bind wire 100 (second spiral portion 110) is hooked on the first horizontal portion 12 of the operation portion 18 of the winding binding attachment / detacher 10 and on the surface of the vertical portion 14 on the opening 28 side. The binding wire 100 (second spiral portion 110) is moved from the lower side of the overhead wire 160 to the other side of the overhead wire 160 (the back side when viewed from the operator), and the operation portion 18 is lifted (sixth step of winding: front side) Move from side to side).

次に、被覆巻付バインド取付・取外器10の操作者は、図11に示すように、操作部18を架線160の向こう側に差し出し、操作部18の縦設部14を操作者からみて左側(碍子150とは反対側)にし、操作部18の第1横設部12を操作者からみて右側(碍子150側)にし、開口部28を碍子150に向けて、縦設部14をバインド線100の上側に位置させ且つ第2横設部16をバインド線100の下側に位置させて、操作部18の第1横設部12をバインド線100の下側に位置させる。   Next, as shown in FIG. 11, the operator of the cover winding bind attachment / detacher 10 inserts the operation unit 18 beyond the overhead line 160, and sees the vertical unit 14 of the operation unit 18 from the operator. Left side (opposite side of the lever 150), the first horizontal portion 12 of the operation unit 18 is on the right side (the lever 150 side) when viewed from the operator, and the vertical portion 14 is bound with the opening 28 facing the lever 150 The first horizontal portion 12 of the operation unit 18 is positioned below the bind line 100 while the second horizontal portion 16 is positioned below the bind line 100 and the second horizontal portion 16 is positioned below the bind line 100.

次に、被覆巻付バインド取付・取外器10の操作者は、図11に示すように、操作棒50の操作により、操作部18の第2横設部16及び縦設部14の開口部28側の面にバインド線100の向こう側(操作者からみて裏側)及び上側を引っ掛けて、架線160の上側を通過させて、バインド線100を架線160の向こう側からバインド線100を架線160の手前側(操作者からにて表側)に捻回させる(巻き付けの第7ステップ:向こう側から手前側に移動)。
被覆巻付バインド取付・取外器10の操作者は、架線160を中心に碍子150側からみて反時計回りに半円を描くように、操作棒50の操作によって、バインド線100を架線160の上面に巻き付ける。
Next, as shown in FIG. 11, the operator of the cover winding bind attachment / detacher 10 operates the operation rod 50 to open the second horizontal portion 16 of the operation portion 18 and the opening portions of the vertical portion 14. The other side of the bind line 100 (the back side as viewed from the operator) and the upper side are hooked on the 28-side surface, and the upper side of the overhead line 160 is passed through. Twist to the near side (front side from the operator) (seventh step of winding: move from the far side to the near side).
The operator of the bound winding binding attachment / detacher 10 moves the bind wire 100 to the overhead wire 160 by operating the operating rod 50 so as to draw a semicircle counterclockwise as viewed from the lever 150 side around the overhead wire 160. Wrap around the top surface.

次に、被覆巻付バインド取付・取外器10の操作者は、図12に示すように、操作棒50の操作により、操作部18の第1横設部12の向こう側にバインド線100の手前側を及び縦設部14の開口部28側にバインド線100の下側を引っ掛けて、架線160の手前側(操作者から視て表側)から向こう側(操作者から視て裏側)に向けて、架線160の下側にバインド線100を稔回させる(巻き付け第9ステップ:手前側から向こう側に持ち上げる移動)。
被覆巻付バインド取付・取外器10の操作者は、架線160を中心に碍子150側からみて反時計回りに半円を描くように、操作棒50の操作によって、バインド線100を架線160の上面に巻き付ける。
Next, as shown in FIG. 12, the operator of the cover winding bind attachment / detacher 10 operates the operation rod 50 to move the bind wire 100 beyond the first horizontal portion 12 of the operation portion 18. Hang the lower side of the binding line 100 on the front side and the opening 28 side of the vertical portion 14, and from the front side (front side as viewed from the operator) to the far side (back side as viewed from the operator) of the overhead line 160 Then, the bind wire 100 is wound below the overhead wire 160 (9th winding step: movement to lift from the near side to the far side).
The operator of the bound winding binding attachment / detacher 10 moves the bind wire 100 to the overhead wire 160 by operating the operating rod 50 so as to draw a semicircle counterclockwise as viewed from the lever 150 side around the overhead wire 160. Wrap around the top surface.

被覆巻付バインド取付・取外器10の操作者は、前記操作(巻き付け第7ステップ、第8ステップ及び第9ステップ)を繰り返して、バインド線100を架線160の周面に、円筒らせん状(つるまき線状)に巻き付ける。   The operator of the cover winding bind attachment / detacher 10 repeats the above-described operation (the seventh winding step, the eighth step, and the ninth step) so that the bind wire 100 is formed in a cylindrical spiral shape on the peripheral surface of the overhead wire 160 ( Wrap around a spiral line.

次に、被覆巻付バインド取付・取外器10の操作者は、図13に示すように、架線160の向こう側(操作者からみて裏側)にあるバインド線100の向こう側(操作者からみて裏側)において、第1横設部12の第1引っ掛け凹部20を、バインド線100の第2端末キャップ104の近傍の末端に引っ掛ける。
そして、バインド線100の第1端末キャップ104の近傍に第1横設部12の第1引っ掛け凹部20を引っ掛けた状態にて、操作部18を架線160の上方から架線160の手前側(操作者からみて表側)に位置させ、第2横設部16の先端により、架線160の手前側面に密着させる(巻き付けの第10ステップ:端末の固定)。
そのために、被覆巻付バインド取付・取外器10の操作者は、図14に示すように、縦設部14を架線160の上面に当接させ、当接点f2を支点として第2横設部16の先端をバインド線100の第2端末キャップ104に作用させて、第2端末キャップ104を架線160の向こう側の面に沿って上昇させて、架線160の手前側面に、バインド線100の第2端末キャップ104を密着させる。
被覆巻付バインド取付・取外器10は、てこ(梃子)の要領で回転させて、第1端末キャップ102を架線160に嵌めることができる。
以上のように、操作者は、操作棒50及び被覆巻付バインド取付・取外器10を操作して、バインド線100を架線160に円筒らせん状(つるまき線状)に巻き付けることをできる。
この操作(巻き付けの第7ステップ,第8ステップ及び第9ステップ)を数回繰り返し、バインド線100の第2端末キャップ104の近傍に前記末端処理を施すことで、バインド線100の末端まで架線160にバインド線100を巻き付けることができる。
Next, as shown in FIG. 13, the operator of the cover-wound bind attachment / detacher 10, as shown in FIG. 13, is the other side of the binding wire 100 (the rear side as viewed from the operator) and the other side (as viewed from the operator). On the back side, the first hook recess 20 of the first lateral portion 12 is hooked to the end of the bind wire 100 near the second terminal cap 104.
Then, in a state where the first hook recess 20 of the first lateral portion 12 is hooked in the vicinity of the first terminal cap 104 of the bind line 100, the operation unit 18 is moved from above the overhead line 160 to the near side of the overhead line 160 (operator It is positioned on the front side as viewed from the side, and is brought into close contact with the front side surface of the overhead wire 160 by the tip of the second lateral portion 16 (10th step of winding: fixing of the terminal).
For this purpose, as shown in FIG. 14, the operator of the bound winding binding attachment / detacher 10 causes the vertical portion 14 to abut on the upper surface of the overhead wire 160, and uses the abutment point f <b> 2 as a fulcrum. The tip of 16 is made to act on the second end cap 104 of the bind line 100, and the second end cap 104 is raised along the surface on the other side of the overhead line 160, so that the first end of the bind line 100 is The two terminal cap 104 is brought into close contact.
The bound winding binding attachment / detacher 10 can be rotated in the manner of a lever (the lever) so that the first terminal cap 102 can be fitted to the overhead wire 160.
As described above, the operator can wind the bind wire 100 around the overhead wire 160 in a cylindrical spiral shape (helical wire shape) by operating the operating rod 50 and the cover winding bind attachment / detacher 10.
This operation (the seventh step, the eighth step and the ninth step) is repeated several times, and the end treatment is performed in the vicinity of the second terminal cap 104 of the bind line 100, so that the overhead line 160 reaches the end of the bind line 100. The bind wire 100 can be wound around.

次に、架線160に巻き付けられたバインド線100の架線160からの取り外し作業について、主として、図15ないし図22に基づいて、説明する。   Next, an operation for removing the bind line 100 wound around the overhead line 160 from the overhead line 160 will be described mainly with reference to FIGS.

最初に、操作者が手前側から視て碍子150の右側に位置する、バインド線100(第1螺旋部108)の取り外しを説明する。
まず、被覆巻付バインド取付・取外器10の操作者は、架線160に巻き付けられたバインド線100の第1端末キャップ102の近傍において、図15において示すように、操作部18の縦設部14を架線160の下方に位置させ、第1横設部12を架線160の手前側(操作者からみて表側)に位置させ、第2横設部16を架線160の向こう側(操作者からみて裏側)に位置させる。
そして、被覆巻付バインド取付・取外器10の操作者は、操作部18の縦設部14の上面を架線160の下面に当接させ、第1横設部12の下面をバインド線100の第1端末キャップ102の上面に当接させる。
次に、被覆巻付バインド取付・取外器10の操作者は、図15に示すように、その縦設部14の上面と架線160の下面との当接点f3を支点として第1横設部12の先端をバインド線100の第1端末キャップ102に作用させて、第1端末キャップ102を架線160の手前側の下方に向けて下降させ、架線160から離問させる(取り外し第1ステップ:端末の取り外し)。
被覆巻付バインド取付・取外器10の操作部18は、てこ(梃子)の要領で回転され、バインド線100の第1端末キャップ102の近傍の末端を架線160から外すことをできる。
First, the removal of the binding line 100 (first spiral portion 108) that is positioned on the right side of the lever 150 as viewed from the front side by the operator will be described.
First, as shown in FIG. 15, the operator of the cover-wound bind attachment / detacher 10 near the first terminal cap 102 of the bind wire 100 wound around the overhead wire 160 has a vertically installed portion. 14 is positioned below the overhead line 160, the first horizontal portion 12 is positioned on the near side of the overhead line 160 (front side as viewed from the operator), and the second lateral portion 16 is located on the other side of the overhead line 160 (as viewed from the operator). Position it on the back side.
Then, the operator of the bound winding binding attachment / detacher 10 brings the upper surface of the vertical portion 14 of the operation portion 18 into contact with the lower surface of the overhead wire 160, and the lower surface of the first horizontal portion 12 is connected to the binding wire 100. It abuts on the upper surface of the first terminal cap 102.
Next, as shown in FIG. 15, the operator of the cover winding bind attachment / detacher 10 uses the first horizontal portion as a fulcrum at the contact point f 3 between the upper surface of the vertical portion 14 and the lower surface of the overhead wire 160. The tip of 12 is made to act on the first terminal cap 102 of the bind wire 100, and the first terminal cap 102 is lowered toward the lower side on the near side of the overhead wire 160 and separated from the overhead wire 160 (first step of removal: terminal) Removal).
The operation unit 18 of the cover-wound bind attachment / detacher 10 is rotated in the manner of a lever, and the end of the bind wire 100 in the vicinity of the first terminal cap 102 can be detached from the overhead wire 160.

被覆巻付バインド取付・取外器10の操作者は、操作棒50の操作により、その手前側からバインド線100及び架線160に向けて、操作部18の第1横設部12と第2横設部16との間にバインド線100を入れて、第1横設部12を第1端末キャップ102の近傍に位置させる。
そして、被覆巻付バインド取付・取外器10の操作者は、図16において示すように、バインド線100の第1端末キャップ102の近傍に第1横設部12の第1引っ掛け凹部20を係合させ、架線160の下方において架線160の手前側から、向こう側に移動させ、架線160の向こう側において、バインド線100の端末を上方に持ち上げる(取り外し第2ステップ:端末の手前から向こう側への移動)。
By operating the operating rod 50, the operator of the bound winding binding attachment / detacher 10 moves the first horizontal portion 12 and the second horizontal portion of the operating portion 18 from the near side toward the binding wire 100 and the overhead wire 160. The bind line 100 is inserted between the mounting portion 16 and the first horizontal portion 12 is positioned in the vicinity of the first terminal cap 102.
Then, as shown in FIG. 16, the operator of the cover winding bind attachment / detacher 10 engages the first hook recess 20 of the first lateral portion 12 in the vicinity of the first terminal cap 102 of the bind wire 100. And move the terminal of the bind line 100 from the near side of the overhead line 160 to the far side below the overhead line 160 and lift the terminal of the bind line 100 upward (the second step of removal: from the front side of the terminal to the far side) Move).

次に、被覆巻付バインド取付・取外器10の操作者は、操作棒50の操作により、図17において示すように、操作部18を架線160の上方に位置させ、操作部18の第2横設部16にバインド線100の第1端末キャップ102の近傍を当接させる。そして、図18及び19において示すように、操作部18の第2横設部16及び縦設部14の開口部28側の面にバインド線100の向こう側を位置させ、バインド線100を操作部18に引っ掛けた状態にて、架線160の上方から、バインド線100の第1端末キャップ102の近傍の末端を手前側の下方に移動させる(取り外し第3ステップ:向こう側から手前側への移動)。   Next, as shown in FIG. 17, the operator of the cover winding bind attachment / detacher 10 operates the operation rod 50 to position the operation unit 18 above the overhead line 160, so that the second of the operation unit 18 is operated. The vicinity of the first terminal cap 102 of the bind wire 100 is brought into contact with the horizontal portion 16. Then, as shown in FIGS. 18 and 19, the other side of the bind line 100 is positioned on the surface of the second lateral portion 16 of the operation portion 18 and the opening portion 28 side of the vertical portion 14, and the bind line 100 is moved to the operation portion. 18, the end of the bind wire 100 in the vicinity of the first terminal cap 102 is moved downward on the near side from above the overhead line 160 (removal third step: movement from the far side to the near side). .

次に、被覆巻付バインド取付・取外器10の操作者は、操作棒50の操作により、図20において示すように、操作部18を架線160の下方に位置させ、操作部18の第1横設部12の第2横設部16との対向面にバインド線100を位置させ、操作部18の第1横設部12と縦設部14の内面にバインド線100を当接させる。
そして、図20において示すように、操作部18をバインド線100に引っ掛けた状態にて、バインド線100を架線160の手前側から向こう側に移動させる(取り外し第4ステップ:手前側から向こう側への移動)
Next, as shown in FIG. 20, the operator of the cover winding bind attachment / detacher 10 operates the operation rod 50 to position the operation unit 18 below the overhead line 160, so that the first of the operation unit 18 is operated. The bind line 100 is positioned on the surface of the horizontal portion 12 facing the second horizontal portion 16, and the bind line 100 is brought into contact with the inner surfaces of the first horizontal portion 12 and the vertical portion 14 of the operation unit 18.
Then, as shown in FIG. 20, in a state where the operation unit 18 is hooked on the bind line 100, the bind line 100 is moved from the near side of the overhead line 160 to the far side (removal fourth step: from the near side to the far side). Move)

引き続き、操作者は、前記操作(取り外し第3ステップ及び第14ステップ)を繰り返して、バインド線100を架線160の周囲から取り外す。   Subsequently, the operator repeats the above operation (the third removal step and the fourteenth step) to remove the bind line 100 from the periphery of the overhead line 160.

次に、操作者が手前側から視て碍子150の左側に位置する、バインド線100(第2螺旋部110)の取り外しを説明する。
まず、被覆巻付バインド取付・取外器10の操作者は、架線160に巻き付けられたバインド線100の第2端末キャップ104の近傍において、図21において示すように、操作部18の縦設部14を架線160の上方に位置させ、第1横設部12を架線160の手前側(操作者からみて表側)に位置させ、第2横設部16を架線160の向こう側(操作者からみて裏側)に位置させる。
Next, removal of the binding wire 100 (second spiral portion 110) that is positioned on the left side of the lever 150 as viewed from the front side by the operator will be described.
First, as shown in FIG. 21, the operator of the cover-wound bind attachment / detacher 10 near the second terminal cap 104 of the bind wire 100 wound around the overhead wire 160 has a vertically installed portion. 14 is positioned above the overhead line 160, the first horizontal portion 12 is positioned on the near side of the overhead line 160 (front side as viewed from the operator), and the second lateral portion 16 is located on the other side of the overhead line 160 (as viewed from the operator). Position it on the back side.

そして、被覆巻付バインド取付・取外器10の操作者は、図21において示すように、バインド線100の第2端末キャップ104の近傍に第1横設部12の第1引っ掛け凹部20を係合させ、架線160の手前側において、バインド線100の端末を上方に持ち上げる(取り外し第5ステップ:端末の移動)。   Then, as shown in FIG. 21, the operator of the cover winding bind attachment / detacher 10 engages the first hook recess 20 of the first lateral portion 12 in the vicinity of the second terminal cap 104 of the bind wire 100. Then, on the front side of the overhead line 160, the terminal of the bind line 100 is lifted upward (removal fifth step: movement of the terminal).

そして、被覆巻付バインド取付・取外器10の操作者は、操作部18の縦設部14の上面を架線160の下面に当接させ、第2横設部16の下面をバインド線100の第2端末キャップ104の上面に当接させる。
次に、被覆巻付バインド取付・取外器10の操作者は、図22に示すように、その縦設部14の上面と架線160の下面との当接点f4を支点として第2横設部16の先端をバインド線100の第2端末キャップ104に作用させて、第2端末キャップ104を架線160の向こう側の下方に向けて下降させ、架線160から離問させる(取り外し第6ステップ:端末の取り外し)。
被覆巻付バインド取付・取外器10の操作部18は、てこ(梃子)の要領で回転され、バインド線100の第2端末キャップ104の近傍の末端を架線160から外すことをできる。
Then, the operator of the bind-wrap binding attachment / detacher 10 with the sheath winds the upper surface of the vertical portion 14 of the operation portion 18 in contact with the lower surface of the overhead wire 160, and the lower surface of the second lateral portion 16 is connected to the bind wire 100. It abuts on the upper surface of the second terminal cap 104.
Next, as shown in FIG. 22, the operator of the bound winding attachment / detacher 10 takes the second laterally installed portion with the contact point f4 between the upper surface of the vertically installed portion 14 and the lower surface of the overhead wire 160 as a fulcrum. The tip of 16 is made to act on the 2nd terminal cap 104 of the bind line 100, the 2nd terminal cap 104 is lowered toward the lower part of the other side of the overhead line 160, and it is made to question from the overhead line 160 (detachment 6th step: terminal) Removal).
The operation unit 18 of the cover-wound bind attachment / detacher 10 is rotated in the manner of a lever, and the end of the bind wire 100 near the second terminal cap 104 can be detached from the overhead wire 160.

次に、被覆巻付バインド取付・取外器10の操作者は、操作棒50の操作により、操作部18を架線160の向こうに位置させ、操作部18の第2横設部16にバインド線100の第2端末キャップ104の近傍を当接させる。そして、操作部18の第2横設部16及び開口部28側の面にバインド線100の向こう側を位置させ、バインド線100を操作部18に引っ掛けた状態にて、架線160の上方から、バインド線100の第2端末キャップ104の近傍の末端を架線160の手前側の下方に移動させる(取り外し第7ステップ:向こう側から手前側への移動)。   Next, the operator of the bind / attachment device 10 with the wound winding positions the operation unit 18 beyond the overhead wire 160 by operating the operation rod 50, and binds the binding line to the second horizontal portion 16 of the operation unit 18. The vicinity of the 100 second terminal cap 104 is brought into contact. Then, the other side of the bind line 100 is positioned on the surface of the operation unit 18 on the second lateral portion 16 and the opening 28 side, and the bind line 100 is hooked on the operation unit 18 from above the overhead line 160. The end of the bind line 100 in the vicinity of the second terminal cap 104 is moved downward to the near side of the overhead line 160 (seventh removal step: movement from the far side to the near side).

次に、被覆巻付バインド取付・取外器10の操作者は、操作棒50の操作により、操作部18を架線160の下方に位置させ、操作部18の第1横設部12の第2横設部16との対向面にバインド線100を位置させ、操作部18の第1横設部12と縦設部14の内面にバインド線100を当接させる。
そして、操作部18をバインド線100に引っ掛けた状態にて、バインド線100を架線160の手前側から向こう側に移動させる(取り外し第8ステップ:手前側から向こう側への移動)
Next, the operator of the cover winding bind attachment / detacher 10 operates the operation rod 50 to position the operation unit 18 below the overhead wire 160, so that the second of the first lateral portion 12 of the operation unit 18 is set. The bind line 100 is positioned on the surface facing the horizontal portion 16, and the bind line 100 is brought into contact with the inner surfaces of the first horizontal portion 12 and the vertical portion 14 of the operation portion 18.
Then, in a state where the operation unit 18 is hooked on the bind line 100, the bind line 100 is moved from the near side of the overhead line 160 to the far side (removal eighth step: movement from the near side to the far side).

引き続き、操作者は、前記操作(取り外し第7ステップ及び第8ステップ)を繰り返して、バインド線100を架線160の周囲から取り外す。
以上のように、操作者は、操作棒50及び被覆巻付バインド取付・取外器10を操作して、巻き付ける方法とは逆方向に強制的にねじ向けて、バインド線100を架線160から取り外すことをできる。
Subsequently, the operator repeats the above-described operation (removal seventh step and eighth step) to remove the bind wire 100 from the periphery of the overhead wire 160.
As described above, the operator operates the operating rod 50 and the cover winding bind attachment / detacher 10 to forcibly turn the screw in the direction opposite to the winding method and remove the bind wire 100 from the overhead wire 160. I can do it.

本発明の被覆巻付バインド取付・取外器は、間接活線作業においてピン碍子に電線(配電線)を固定するに際して、プレフォーム巻き付きバインドを用いて前記電線をピン碍子に固定し、またはピン碍子から取り外すのに有効に使用できる。   In the case of fixing the electric wire (distribution line) to the pin insulator in the indirect hot wire operation, the coated winding bind attachment / detacher of the present invention uses the preform winding bind to fix the electric wire to the pin insulator, or the pin Can be used effectively to remove from the insulator.

10 被覆巻付バインド取付・取外器
12 第1横設部
14 縦設部
16 第2横設部
18 操作部
20 第1引っ掛け凹部
22 第2引っ掛け凹部
28 開口部
30 連結部
50 操作棒

100 バインド線
102 第1端末キャップ
104 第2端末キャップ
106 掛止用湾曲部
108 第1螺旋部
110 第2螺旋部
150 碍子
152 電線吊架溝
160 架線
170 腕金
DESCRIPTION OF SYMBOLS 10 Cover winding bind attachment / removal device 12 1st horizontal part 14 Vertical part 16 2nd horizontal part 18 Operation part 20 1st hook recessed part 22 2nd hook recessed part 28 Opening part 30 Connection part 50 Operation rod

DESCRIPTION OF SYMBOLS 100 Binding wire 102 1st terminal cap 104 2nd terminal cap 106 Curved part for latching 108 1st spiral part 110 2nd spiral part 150 Insulator 152 Electric wire suspension groove 160 Overhead wire 170 Arm

Claims (3)

操作棒の先端に配設される被覆巻付バインド取付・取外器であって、
前記操作棒の側において、操作棒の軸線に直交ないしは交差する方向にのびる第1横設部と、
該第1横設部の一部に接続され、前記操作棒の軸線に沿う方向にのびる縦設部と、
該縦設部の第1横設部が接続された側とは反対側の先端に接続され、操作棒の軸線に直交ないしは交差する方向にのびる第2横設部とを有し、
前記第1横設部と第2横設部と縦設部とが、略U字型に一体に形成され、
前記第1横設部の先端の近傍で第2横設部と向き合う側に、バインド線を引っ掛けるための引っ掛け凹部が形成され、及び/又は、前記第2横設部の先端の近傍で第1横設部と向き合う側にバインド線を引っ掛けるための引っ掛け凹部が形成されたことを特徴とする、被覆巻付バインド取付・取外器。
Cover binding binding attachment / detacher disposed at the tip of the operation rod,
A first horizontal portion extending in a direction perpendicular to or intersecting with the axis of the operation rod on the operation rod side;
A vertical portion connected to a part of the first horizontal portion and extending in a direction along the axis of the operation rod;
A second horizontal portion connected to the tip of the vertical portion opposite to the side to which the first horizontal portion is connected, and extending in a direction perpendicular to or intersecting the axis of the operating rod;
The first horizontal portion, the second horizontal portion, and the vertical portion are integrally formed in a substantially U shape,
A hook recess for hooking a binding wire is formed on the side facing the second lateral portion in the vicinity of the distal end of the first lateral portion, and / or the first in the vicinity of the distal end of the second lateral portion. A covering winding binding attachment / detacher characterized in that a hooking recess for hooking a binding wire is formed on the side facing the horizontal portion.
前記第1横設部の引っ掛け凹部は、バインド線を押す方向に向けて開口し、バインド線を押す方向と交差する方向に形成され、前記第2横設部の引っ掛け凹部は、バインド線を引く方向に向けて開口し、バインド線を引く方向と交差する方向に形成される、請求項1に記載の被覆巻付バインド取付・取外器。   The hook recess of the first horizontal portion opens in a direction pushing the bind line and is formed in a direction crossing the direction of pushing the bind line, and the hook recess of the second horizontal portion pulls the bind line. The binding attachment / detacher for covering winding according to claim 1, wherein the binding attachment / detacher is wound in a direction and intersects with a direction in which a binding line is drawn. 前記縦設部は、棒状であって、架線の周面に当接され、該当接点を支点として、前記第1横設部及び第2横設部を回動できるように構成され、
前記第1横設部及び第2横設部は、前記当接点を支点として、バインド線の端部を架線の上方又は下方に移動させる作用を及ぼすように構成されたことを特徴とする、請求項1又は請求項2に記載の被覆巻付バインド取付・取外器。
The vertical portion is rod-shaped and is configured to be in contact with the peripheral surface of the overhead wire so that the first horizontal portion and the second horizontal portion can be rotated with the corresponding contact as a fulcrum.
The first horizontal portion and the second horizontal portion are configured so as to act to move an end portion of the binding line above or below the overhead line with the contact point as a fulcrum. Claim | item 1 or Claim 2 bind attachment attachment and removal device with a winding.
JP2014171645A 2014-08-26 2014-08-26 Bind mounting / detaching device with sheath winding Active JP6071961B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2014171645A JP6071961B2 (en) 2014-08-26 2014-08-26 Bind mounting / detaching device with sheath winding

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2014171645A JP6071961B2 (en) 2014-08-26 2014-08-26 Bind mounting / detaching device with sheath winding

Publications (2)

Publication Number Publication Date
JP2016046984A JP2016046984A (en) 2016-04-04
JP6071961B2 true JP6071961B2 (en) 2017-02-01

Family

ID=55637054

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2014171645A Active JP6071961B2 (en) 2014-08-26 2014-08-26 Bind mounting / detaching device with sheath winding

Country Status (1)

Country Link
JP (1) JP6071961B2 (en)

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4884242B2 (en) * 2007-01-24 2012-02-29 中国電力株式会社 Indirect tool
JP5094569B2 (en) * 2008-06-05 2012-12-12 中国電力株式会社 Tip tool for insulation operation bar and branch wire winding method
JP5479785B2 (en) * 2009-06-15 2014-04-23 中国電力株式会社 Binding wire attaching / detaching tool
JP5465794B1 (en) * 2013-01-10 2014-04-09 中国電力株式会社 Tip tool for indirect hot wire work

Also Published As

Publication number Publication date
JP2016046984A (en) 2016-04-04

Similar Documents

Publication Publication Date Title
JP5358488B2 (en) Attaching jigs for bird harm prevention tools, mounting methods for bird harm prevention tools
JP2009118561A (en) Insulator bind
JP5595817B2 (en) Wire winding binding and binding method
JP5848410B1 (en) Indirect hot wire tip tool for cotter pin
JP5797592B2 (en) Tip tool for indirect hot wire
JP6071961B2 (en) Bind mounting / detaching device with sheath winding
JP5946876B2 (en) Winding binding for cable and binding method
JP6325301B2 (en) Indirect hot-line construction clip and work method using the clip
JP5420739B1 (en) Tape winding tip tool
JP6000903B2 (en) Indirect hot wire tip tool compatible nut
JP5519032B1 (en) Electric wire binder
JP2014007902A (en) High voltage drop wire edge line support
JP5465767B1 (en) Removal tool for cotter pin split pins
JP2016171725A (en) Tip tool for indirect hot-line
JP2017098075A (en) Winding bind
CN203707673U (en) Pre-twisted suspension wire clamp construction tool
CN102176602B (en) Special tool for assembling and disassembling horizontal bus ground wires
JP5654076B2 (en) Retaining grip and its mounting method
JP6488779B2 (en) Underline terminal cap
JP2004153900A (en) Tool for attaching/detaching binding wire, and method using the tool
CN103346459B (en) A kind of enamelled wire coating removal film device
JP5886244B2 (en) High tension tensile insulator
JP5908525B2 (en) Tip tool for indirect hot wire
JP2015176809A (en) Coil bind
JP5524375B1 (en) Winding binding

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20160318

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20161207

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20161213

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20161227

R150 Certificate of patent or registration of utility model

Ref document number: 6071961

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250