JP5983548B2 JP2013140882A JP2013140882A JP5983548B2 JP 5983548 B2 JP5983548 B2 JP 5983548B2 JP 2013140882 A JP2013140882 A JP 2013140882A JP 2013140882 A JP2013140882 A JP 2013140882A JP 5983548 B2 JP5983548 B2 JP 5983548B2
Authority
JP
Japan
Prior art keywords
wall
coke oven
coke
machine
pair
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2013140882A
Other languages
Japanese (ja)
Other versions
JP2015013937A (en
Inventor
横塚 智人
智人 横塚
勝 長谷川
勝 長谷川
光彦 永原
光彦 永原
保章 小柳
保章 小柳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JFE Steel Corp
Original Assignee
JFE Steel Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JFE Steel Corp filed Critical JFE Steel Corp
Priority to JP2013140882A priority Critical patent/JP5983548B2/en
Publication of JP2015013937A publication Critical patent/JP2015013937A/en
Application granted granted Critical
Publication of JP5983548B2 publication Critical patent/JP5983548B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Description

本発明は、炉団方向に炭化室と燃焼室とが交互に配置されたコークス炉を更新する方法に関する。   The present invention relates to a method for renewing a coke oven in which carbonization chambers and combustion chambers are alternately arranged in the direction of the furnace group.

図11は、コークス炉の概略構成を示すものである(例えば、特許文献1)。この図11のコークス炉は、蓄熱室1の上部に、炭化室2と燃焼室3とが炉団方向に横長となるように交互に配置されている。炭化室2には、炭槽4に貯蔵された石炭がコークス炉の炉頂部上に配設された軌道5上を走行する装炭車6から装入されるようになっている。そして、装炭車6から炭化室2に装入された石炭は、燃焼室3で発生した熱により乾留されてコークス化する。炭化室2でコークスが生成されると、押出し機7により、炭化室2の炉長方向の両側の窯口に設置した炉蓋を開放し、押出し機7が、炭化室2のコークスをマシンサイドMSの窯口からコークスサイドCSの窯口まで押し出して排出する。   FIG. 11 shows a schematic configuration of a coke oven (for example, Patent Document 1). The coke oven shown in FIG. 11 is alternately arranged in the upper part of the heat storage chamber 1 so that the carbonization chamber 2 and the combustion chamber 3 are horizontally long in the direction of the furnace group. The coal stored in the charcoal tank 4 is charged into the carbonization chamber 2 from a charcoal vehicle 6 running on a track 5 disposed on the top of the coke oven. Then, the coal charged into the carbonization chamber 2 from the coal-coating vehicle 6 is dry-distilled by the heat generated in the combustion chamber 3 to be coke. When coke is generated in the carbonization chamber 2, the extruder 7 opens the furnace lids installed at the kilns on both sides in the furnace length direction of the carbonization chamber 2, and the extruder 7 removes the coke from the carbonization chamber 2 on the machine side. Push out from the MS kiln to the coke side CS kiln and discharge.

炭化室2のコークスサイドCSの窯口まで押し出されたコークスは、ガイド車8を介してコークス受け台車9の受容容器9aに払い出されるようになっており、受容容器9aに払い出されたコークス(赤熱コークス)は、冷却設備、例えばCDQ11(コークス乾式消火設備)まで搬送される。なお、ガイド車8は、プラットフォーム10上に配設された軌道(不図示)上を走行し、コークスの押し出しが行われる所定の炭化室2の窯口まで移動する。   The coke pushed to the coke side CS kiln of the carbonization chamber 2 is discharged to the receiving container 9a of the coke receiving carriage 9 via the guide wheel 8, and the coke discharged to the receiving container 9a ( The red hot coke) is conveyed to a cooling facility, for example, CDQ11 (coke dry fire extinguishing facility). The guide wheel 8 travels on a track (not shown) disposed on the platform 10 and moves to a kiln opening of a predetermined carbonization chamber 2 where coke is pushed out.

図12は、炉団方向に交互に配置された炭化室2及び燃焼室3の一部を平面視で示すものであり、各燃焼室3を形成しているレンガ壁12が、MSで立設している2本のMSバックステー14a,14bと、コークスサイドCSで立設している2本のCSバックステー15a,15bとに、炉体金物13を介して支持されている。
炉体金物13は、炭化室2の窯口(マシンサイドMSの窯口、コークスサイドCSの窯口)2aを形成するドアフレーム13a、レンガ壁12を押さえるプロテンションレッジ13b、フラッシュプレート13c、ヘッドプレート13dなどで構成されている。
FIG. 12 shows a part of the carbonization chambers 2 and the combustion chambers 3 arranged alternately in the furnace group direction in a plan view, and the brick walls 12 forming the combustion chambers 3 are erected by MS. The two MS back stays 14a and 14b and the two CS back stays 15a and 15b provided upright at the coke side CS are supported by the furnace body 13.
The furnace body hardware 13 includes a door frame 13a that forms a furnace opening (a furnace opening of the machine side MS, a furnace opening of the coke side CS) 2a of the carbonization chamber 2, a tension ledge 13b that holds down the brick wall 12, a flash plate 13c, a head It consists of a plate 13d and the like.

ところで、コークス炉を20年〜30年を越える期間で稼働して乾留、排出を繰り返すと、燃焼室3を形成しているレンガ壁12が損耗する。このため、損耗したレンガ壁12、バックステー14a,14b,15a,15bを撤去し、新たなレンガ壁12を形成し、新たなバックステーを立設する更新工事が行われる。   By the way, if the coke oven is operated for a period exceeding 20 to 30 years and repeatedly subjected to dry distillation and discharge, the brick wall 12 forming the combustion chamber 3 is worn out. For this reason, the renewal work which removes the worn brick wall 12 and the back stays 14a, 14b, 15a and 15b, forms a new brick wall 12, and stands a new back stay is performed.

損耗したレンガ壁12の解体工事、及びバックステー15a,15bの撤去工事は、以下のように行われていた。先ず、例えばMSの作業ヤードに解体用建機を設置し、この解体用建機によりマシンサイドMSのMSバックステー14a,14b及び炉体金物13を解体する。次いで、損耗したレンガ壁12を、解体用建機でMSからCSに向けて解体していく。解体されたレンガ壁12はマシンサイドMSの作業ヤードで待機している搬出手段に移送され、搬出手段により他の場所に搬出される。そして、レンガ壁12の解体・搬出が完了した後、コークスサイドCSのバックステー15a,15bを1本ずつ撤去していく。   The demolition work of the worn brick wall 12 and the removal work of the backstays 15a and 15b were performed as follows. First, for example, a dismantling construction machine is installed in an MS work yard, and the MS backstays 14a and 14b and the furnace body 13 of the machine side MS are dismantled by the dismantling construction machine. Next, the worn brick wall 12 is demolished from the MS toward the CS with a dismantling construction machine. The demolished brick wall 12 is transferred to the unloading means waiting in the work yard of the machine side MS, and is unloaded to another place by the unloading means. Then, after the dismantling / unloading of the brick wall 12 is completed, the back stays 15a, 15b of the coke side CS are removed one by one.

特開2012−140569号JP 2012-140569 A

ところで、コークスサイドCSのレンガ壁12は、CSバックステー15a,15b及び炉体金物13で支持されているが、炉体金物13のドアフレーム13aによりコークスサイドCSの窯口2aが開口しているので、解体用建機で解体したレンガ壁12のレンガ屑がコークスサイドCSの窯口2aからプラットフォーム10側に落下するおそれがある。
このため、レンガ壁12の解体作業を行っているときには、コークスサイドCSの窯口2a近くで作業する作業員の安全性の面で問題がある。
また、レンガ壁12を解体した後に、プラットフォーム10上の軌道に堆積してしまったレンガ屑を除去する作業が必要となる。
By the way, although the brick wall 12 of the coke side CS is supported by the CS back stays 15a and 15b and the furnace body 13, the kiln port 2a of the coke side CS is opened by the door frame 13a of the furnace body 13. Therefore, there is a possibility that brick scraps of the brick wall 12 disassembled by the dismantling construction machine may fall from the coke side CS kiln 2a to the platform 10 side.
For this reason, when the brick wall 12 is being dismantled, there is a problem in terms of safety of workers working near the kiln 2a of the coke side CS.
Further, after the brick wall 12 is dismantled, it is necessary to remove the brick waste that has accumulated on the track on the platform 10.

さらに、レンガ壁12の解体を解体した後、コークスサイドCSのバックステー15a,15bを1本ずつ撤去しなければならず、バックステーの撤去作業の能率の面で問題があった。
そこで、本発明は、上記従来例の未解決の課題に着目してなされたものであり、コークス炉の周囲で作業を行っている作業員の安全性を高めながらレンガ壁を解体することができ、レンガ壁の解体作業及びバックステーの撤去作業を効率良く行うことができるコークス炉の更新方法を提供することを目的としている。
Further, after dismantling the brick wall 12, the back stays 15a and 15b of the coke side CS have to be removed one by one, which has a problem in terms of efficiency of the back stay removal work.
Therefore, the present invention has been made paying attention to the unsolved problems of the above-described conventional example, and it is possible to dismantle the brick wall while improving the safety of workers working around the coke oven. An object of the present invention is to provide a method for renewing a coke oven that can efficiently perform a brick wall dismantling operation and a backstay removal operation.

上記目的を達成するために、本発明の一態様に係るコークス炉の更新方法は、炉団方向に炭化室と燃焼室とが交互に配置されたコークス炉の更新すべき燃焼室のレンガ壁を解体するに際し、前記コークス炉のマシンサイド及びコークスサイドの一方のサイドに解体機械を配置し、前記更新すべき燃焼室の近傍の前記マシンサイド及び前記コークスサイドの他方のサイドで開口している前記炭化室の窯口などの開口部位を防護壁で閉塞した後、前記解体機械により、前記更新すべき燃焼室の前記レンガ壁を前記一方のサイドから前記他方のサイドに向かって解体していくとともに、前記他方のサイドの側壁に、前記炉団方向に互いに離間して立設し、炉体金物を介して前記レンガ壁を支持する一対のバックステーが配置されており、これら一対のバックステーに前記防護壁を固定することで前記開口部位を閉塞することを特徴とするコークス炉の更新方法である。 In order to achieve the above object, a method for renewing a coke oven according to one aspect of the present invention is to provide a brick wall of a combustion chamber to be renewed in a coke oven in which carbonization chambers and combustion chambers are alternately arranged in the furnace group direction. When disassembling, disassembling machine is disposed on one side of the coke oven machine side and coke side, and the machine side near the combustion chamber to be updated and the other side of the coke side are opened. after closing the opening portion, such as kiln inlet of the coking chamber at the protective wall, by the demolition machine, together with the brick wall of the combustion chamber to be the update will be dismantled toward the other side from the one side A pair of back stays are provided on the side wall of the other side so as to be spaced apart from each other in the direction of the furnace group, and support the brick wall via a furnace body hardware. An update process of the coke oven, characterized by closing the opening portion by fixing the protective barrier backstay.

また、本発明の一態様に係るコークス炉の更新方法は、前記一対のバックステーは、前記側壁から外方に延在するウェブと、このウェブの外方端部に直交して延在するフランンジを有する鋼材であり、前記防護壁は、複数の分割された壁ユニットで構成されており、各壁ユニットを、吊り手段で吊り下げて前記一対のバックステーの前記フランジ及び前記ウェブで囲まれた空間に挿入し、所定の高さ位置まで昇降移動した後、前記フランジに固定することが好ましい。 The coke oven renewal method according to one aspect of the present invention includes a pair of back stays, a web extending outward from the side wall, and a flange that extends perpendicularly to an outer end of the web. The protective wall is composed of a plurality of divided wall units, and each wall unit is suspended by a suspending means and surrounded by the flange and the web of the pair of backstays. It is preferable to insert it into the space and move it up and down to a predetermined height, and then fix it to the flange.

また、本発明の一態様に係るコークス炉の更新方法は、仮固定手段により前記一対のバックステーの前記フランジの内側に当接するように前記壁ユニットを仮固定した後、溶接により前記壁ユニットを前記一対のバックステーに固定することが好ましい。
さらに、本発明の一態様に係るコークス炉の更新方法は、前記防護壁を固定している全ての前記バックステーの下部に切れ目を入れ、この切れ目に沿って特定のバックステーに対して倒れる方向に外力を加えることが好ましい。
Further, in the coke oven renewal method according to one aspect of the present invention, the wall unit is temporarily fixed by temporary fixing means so as to contact the inside of the flanges of the pair of backstays, and then the wall unit is welded. It is preferable to fix to the pair of backstays.
Furthermore, in the method for renewing a coke oven according to one aspect of the present invention, a cut is made in the lower part of all the backstays fixing the protective wall, and the direction of falling with respect to a specific backstay along the cuts It is preferable to apply an external force to.

本発明に係るコークス炉の解体方法によると、更新すべき燃焼室のレンガ壁を解体する際には、開口部が存在していた他方のサイドが防護壁により閉塞されるので、コークス炉の周囲で作業を行っている作業員の安全性を高めながら更新すべき燃焼室のレンガ壁を解体することができるとともに、レンガ壁の解体作業を効率良く行うことができる。   According to the method for disassembling a coke oven according to the present invention, when the brick wall of the combustion chamber to be renewed is dismantled, the other side where the opening was present is blocked by the protective wall. The brick wall of the combustion chamber to be renewed can be dismantled while improving the safety of the worker who is performing the work, and the brick wall dismantling work can be efficiently performed.

本発明に係るコークス炉の更新方法において一方のサイドのバックステーを解体している状態を示す図である。It is a figure which shows the state which has disassembled the backstay of one side in the update method of the coke oven which concerns on this invention. コークス炉の他方のサイドの開口部を示す図である。It is a figure which shows the opening part of the other side of a coke oven. 本発明に係るコークス炉の更新方法を他方のサイドから示した図である。It is the figure which showed the update method of the coke oven which concerns on this invention from the other side. 本発明に係る壁ユニットが上下に移動する状態を示す図である。It is a figure which shows the state which the wall unit which concerns on this invention moves up and down. 本発明に係る壁ユニットがバックステーのフランジに当接している状態を示す図である。It is a figure which shows the state which the wall unit which concerns on this invention is contact | abutting to the flange of a backstay. 本発明に係る壁ユニットがバックステーのフランジに仮固定される直前の状態を示す図である。It is a figure which shows the state just before the wall unit which concerns on this invention is temporarily fixed to the flange of a backstay. 本発明に係る壁ユニットがバックステーのフランジに仮固定される状態を示す図である。It is a figure which shows the state by which the wall unit which concerns on this invention is temporarily fixed to the flange of a backstay. コークス炉の他方のサイドの開口部が防護壁で閉塞された状態を示す図である。It is a figure which shows the state by which the opening part of the other side of the coke oven was obstruct | occluded with the protective wall. 更新すべき燃焼室のレンガ壁が解体されている状態を示す図である。It is a figure which shows the state by which the brick wall of the combustion chamber which should be updated is demolished. 燃焼室のレンガ壁が解体された後に他方のサイドのバックステーが一度に倒されていく状態を示す図である。It is a figure which shows the state in which the backstay of the other side is fallen at once after the brick wall of a combustion chamber is demolished. コークス炉の外観を示す図である。It is a figure which shows the external appearance of a coke oven. 炉団方向に交互に配置された炭化室及び燃焼室を示す断面図である。It is sectional drawing which shows the carbonization chamber and combustion chamber which are alternately arrange | positioned in the furnace group direction.

以下、本発明を実施するための形態(以下、実施形態という。)を、図面を参照しながら詳細に説明する。なお、図11及び図12で示した構成と同一構成部分には同一符号を付して説明を省略する。
本発明に係るコークス炉の更新方法の1実施形態について説明する。
本実施形態のコークス炉の更新方法では、先ず、図1に示すように、コークス炉のマシンサイドMSに解体機械20を設置する。次いで、解体機械20を使用し、更新すべき燃焼室3のレンガ壁12を支持しているMSバックステー14a,14b及び炉体金物13(不図示)を解体する。
DESCRIPTION OF EMBODIMENTS Hereinafter, modes for carrying out the present invention (hereinafter referred to as embodiments) will be described in detail with reference to the drawings. In addition, the same code | symbol is attached | subjected to the same component as the structure shown in FIG.11 and FIG.12, and description is abbreviate | omitted.
An embodiment of a coke oven renewal method according to the present invention will be described.
In the coke oven renewal method of the present embodiment, first, as shown in FIG. 1, a demolition machine 20 is installed on the machine side MS of the coke oven. Next, the MS backstays 14a and 14b and the furnace body hardware 13 (not shown) supporting the brick wall 12 of the combustion chamber 3 to be updated are disassembled using the dismantling machine 20.

図2は、更新すべき燃焼室3及び炭化室2をコークスサイドCSから示した図であり、炉蓋(不図示)を取り外した炭化室2には窯口2aが設けられている。
本実施形態は、図1のようにMSバックステー14a,14bなどを解体した後、図2に示すように、解体機械20で吊下げ保持した壁ユニット21を所定位置まで昇降移動し、炉団方向に互いに離間して立設している2本のCSバックステー15a,15bに固定していき、複数の壁ユニット21を上下に列状に配置することで、窯口2aを閉塞する防護壁(図8の符号PW)を形成する。
FIG. 2 is a view showing the combustion chamber 3 and the carbonization chamber 2 to be renewed from the coke side CS, and the carbonization chamber 2 from which a furnace lid (not shown) is removed is provided with a kiln opening 2a.
In this embodiment, after disassembling the MS backstays 14a and 14b as shown in FIG. 1, the wall unit 21 suspended and held by the dismantling machine 20 is moved up and down to a predetermined position as shown in FIG. A protective wall that closes the kiln port 2a by fixing it to two CS backstays 15a and 15b that are erected apart from each other in the direction, and arranging a plurality of wall units 21 in a vertical line. (PW in FIG. 8) is formed.

CSバックステー15aは、図4に示すように、一対のフランジf1,f2と、これらの間にウェブwを備えたH形鋼であり、CSバックステー15bも同様の構造のH形鋼である。
壁ユニット21は、図2に示すように正面視が長方形状のユニット体であり、この壁ユニット21の短尺方向の寸法が、2本のCSバックステー15a,15bのウェブwの間の距離より僅かに小さな長さに設定されている。
As shown in FIG. 4, the CS back stay 15a is a H-shaped steel having a pair of flanges f1 and f2 and a web w between them, and the CS back stay 15b is also an H-shaped steel having the same structure. .
As shown in FIG. 2, the wall unit 21 is a unit body having a rectangular shape when viewed from the front. The dimension of the wall unit 21 in the short direction is based on the distance between the webs w of the two CS backstays 15a and 15b. It is set to a slightly smaller length.

また、壁ユニット21は、図2及び図3に示すように、長方形状のユニット体であり、上端面に吊りフック部22が形成され、この吊りフック部22に解体機械20から垂下したワイヤ23が係合することで吊下げ保持される。そして、壁ユニット21の大面積の一側面に、複数のコッター係合部材24が突出して設けられている。
コッター係合部材24は、図3に示すように、板状部材の先端側に、引きワイヤ25を係止するワイヤ係止穴26が形成されているとともに、板状部材の基端側に、先端に向かって長軸が延在するコッター用スリット27が形成されている。
2 and 3, the wall unit 21 is a rectangular unit body. A suspension hook portion 22 is formed on the upper end surface of the wall unit 21, and a wire 23 suspended from the demolition machine 20 on the suspension hook portion 22. Is suspended and held. A plurality of cotter engagement members 24 project from one side surface of the large area of the wall unit 21.
As shown in FIG. 3, the cotter engagement member 24 has a wire locking hole 26 for locking the pulling wire 25 formed on the distal end side of the plate-like member, and on the proximal end side of the plate-like member. A cotter slit 27 having a long axis extending toward the tip is formed.

ここで、壁ユニット21をCSバックステー15a,15bに固定する具体的な手順について、図3から図8を参照して説明する。
先ず、図3に示すように、更新すべき燃焼室3の近傍のプラットフォーム10上に足場28を架設する。
次いで、解体機械20にワイヤ23を介して吊下げ保持された壁ユニット21を、2本のCSバックステー15a,15bの間に挿入する。そして、図3及び図4に示すように、壁ユニット21を、2本のCSバックステー15a,15bのウェブwでガイドしながら下降させていく。
Here, a specific procedure for fixing the wall unit 21 to the CS backstays 15a and 15b will be described with reference to FIGS.
First, as shown in FIG. 3, a scaffold 28 is constructed on the platform 10 in the vicinity of the combustion chamber 3 to be updated.
Next, the wall unit 21 suspended from the dismantling machine 20 via the wire 23 is inserted between the two CS backstays 15a and 15b. Then, as shown in FIGS. 3 and 4, the wall unit 21 is lowered while being guided by the webs w of the two CS backstays 15a and 15b.

次いで、図3及び図5に示すように、足場28で待機している作業員が、下降させた壁ユニット21のコッター係合部材24に連結している引きワイヤ25を引く。引きワイヤ25で引かれた壁ユニット21は、2本のCSバックステー15a,15bの外側に位置するフランジf2の内側に当接する。
次いで、図6(a)に示すように、CSバックステー15a,15bのフランジf2の外側に、壁ユニット21のコッター係合部材24に係合する固定用プレート29を装着する。この固定用プレート29は、図6(b)に示すように、スリット29aを形成した板材であり、2本のCSバックステー15a,15bのフランジf2に当接した壁ユニット21のコッター係合部材24にスリット29aが嵌まり込むように、固定用プレート29を下方から装着する。
Next, as shown in FIGS. 3 and 5, the worker waiting on the scaffold 28 pulls the pulling wire 25 connected to the cotter engaging member 24 of the lowered wall unit 21. The wall unit 21 pulled by the pulling wire 25 comes into contact with the inside of the flange f2 located outside the two CS backstays 15a and 15b.
Next, as shown in FIG. 6A, a fixing plate 29 that engages with the cotter engagement member 24 of the wall unit 21 is attached to the outside of the flange f2 of the CS backstays 15a and 15b. As shown in FIG. 6B, the fixing plate 29 is a plate material in which slits 29a are formed, and the cotter engaging member of the wall unit 21 in contact with the flanges f2 of the two CS backstays 15a and 15b. The fixing plate 29 is mounted from below so that the slits 29a are fitted in 24.

次いで、図7に示すように、コッター係合部材24に形成されているコッター用スリット27(図3参照)に、楔形状のコッター30を挿入する。これにより、壁ユニット21は、2本のCSバックステー15a,15bのフランジf2に当接した状態で仮固定される。
次いで、コッター係合部材24及びコッター30、及び固定用プレート29及びCSバックステー15a,15bのフランジf2を溶接することで、壁ユニット21を2本のCSバックステー15a,15bに固定する。
Next, as shown in FIG. 7, a wedge-shaped cotter 30 is inserted into a cotter slit 27 (see FIG. 3) formed in the cotter engagement member 24. Thereby, the wall unit 21 is temporarily fixed in the state contact | abutted to the flange f2 of the two CS backstays 15a and 15b.
Next, the wall unit 21 is fixed to the two CS back stays 15a and 15b by welding the cotter engaging member 24 and the cotter 30, and the fixing plate 29 and the flange f2 of the CS back stays 15a and 15b.

このような図3から図7で示したCSバックステー15a,15bに対する壁ユニット21の固定を、他の複数の壁ユニット21に対して炉高方向に列状に行うことで、図8に示すように、窯口2aを閉塞する防護壁PWを形成する。
次いで、本実施形態は、図9に示すように、解体機械20を使用し、マシンサイドMS側からレンガ壁12を解体していく。レンガ壁12の解体作業において、燃焼室3から搬出したレンガ屑は、マシンサイドMSの作業ヤードで待機しているトラックTRに移送されて他の場所に搬出される。
Such fixing of the wall unit 21 to the CS backstays 15a and 15b shown in FIGS. 3 to 7 in a row in the furnace height direction with respect to the other wall units 21 is shown in FIG. Thus, the protective wall PW which closes the kiln 2a is formed.
Next, as shown in FIG. 9, the present embodiment uses the dismantling machine 20 to dismantle the brick wall 12 from the machine side MS side. In the dismantling work of the brick wall 12, the brick waste carried out from the combustion chamber 3 is transferred to the truck TR waiting in the work yard of the machine side MS and carried out to another place.

そして、更新すべき燃焼室3のレンガ壁12の解体作業が完了した後、図10に示すように、CSバックステー15a,15bの撤去作業を行う。
このCSバックステー15a,15bの撤去作業では、先ず、全てのCSバックステー15a,15bの下部に切れ目(不図示)を入れる。また、特定のCSバックステー15a,15bの上部にワイヤ31を掛け、このワイヤ31をマシンサイドMSに延在させて重機32で引く。そして、解体機械20のアームによりCSバックステー15a,15bに対してマシンサイドMSに向く方向に外力加える。
Then, after the disassembly work of the brick wall 12 of the combustion chamber 3 to be updated is completed, the CS backstays 15a and 15b are removed as shown in FIG.
In the removal work of the CS back stays 15a and 15b, first, a cut (not shown) is made in the lower part of all the CS back stays 15a and 15b. Further, a wire 31 is hung on the upper part of the specific CS backstays 15a, 15b, and this wire 31 is extended to the machine side MS and pulled by the heavy machine 32. Then, an external force is applied to the CS back stays 15a and 15b by the arm of the dismantling machine 20 in a direction toward the machine side MS.

全てのCSバックステー15a,15bは、防護壁PW(複数の壁ユニット21)を介して一体化されている。
そして、解体機械20にマシンサイドMSに向く方向の外力が加えられ、重機32にワイヤ31を介して引かれていると、一体化された全てのCSバックステー15a,15bは、切れ目を境に同時に倒れていく。
All the CS backstays 15a and 15b are integrated through a protective wall PW (a plurality of wall units 21).
When an external force in the direction toward the machine side MS is applied to the dismantling machine 20 and pulled by the heavy machine 32 via the wire 31, all the integrated CS backstays 15a and 15b It falls down at the same time.

ここで、本発明に係る一方のサイドがマシンサイドMSに対応し、本発明に係る他方のサイドがコークスサイドCSに対応し、本発明の鋼材はH形鋼に対応している。また、本発明の仮固定手段が、壁ユニット21のコッター係合部材24、コッター係合部材24に形成されているコッター用スリット27、固定用プレート29及びコッター30に対応している。   Here, one side according to the present invention corresponds to the machine side MS, the other side according to the present invention corresponds to the coke side CS, and the steel material of the present invention corresponds to H-section steel. The temporary fixing means of the present invention corresponds to the cotter engaging member 24 of the wall unit 21, the cotter slit 27, the fixing plate 29 and the cotter 30 formed in the cotter engaging member 24.

したがって、本実施形態のコークス炉の更新方法では、更新すべき燃焼室3のレンガ壁12を解体する際には、開口部(窯口2a)が存在していたコークスサイドCSが防護壁PWにより閉塞されるので、レンガ壁12の解体時に発生するれんが屑がコークスサイドCSに落下せず、コークスサイドCSのプラットフォーム近くで作業する作業員の安全性を確保することができる。また、レンガ壁12の解体後には、プラットフォーム10上の軌道にレンガ屑が堆積せず、レンガ屑の除去作業が不要となる。   Therefore, in the coke oven renewal method of the present embodiment, when the brick wall 12 of the combustion chamber 3 to be renewed is dismantled, the coke side CS where the opening (the kiln 2a) was present is removed by the protective wall PW. Since it is blocked, the brick waste generated when the brick wall 12 is dismantled does not fall into the coke side CS, and the safety of workers working near the platform of the coke side CS can be ensured. In addition, after the brick wall 12 is dismantled, brick waste does not accumulate on the track on the platform 10, and the brick waste removal work becomes unnecessary.

また、防護壁PWは複数の壁ユニット21で構成されており、これら壁ユニット21を、2本のCSバックステー15a,15bのウェブwでガイドしながら下降させていくことで壁ユニット21の移動を容易に行うことができるので、防護壁PWを効率良く形成することができる
また、壁ユニット21に設けたコッター係合部材24のコッター用スリット27に、楔形状のコッター30を挿入することにより、壁ユニット21は、2本のCSバックステー15a,15bのフランジf2に当接した状態で仮固定されるので、CSバックステー15a,15bに対する壁ユニット21の溶接による固定を容易に行うことができる。
Further, the protective wall PW is composed of a plurality of wall units 21, and the wall units 21 are moved by being lowered while being guided by the webs w of the two CS backstays 15a and 15b. Since the protective wall PW can be formed efficiently, the wedge-shaped cotter 30 is inserted into the cotter slit 27 of the cotter engagement member 24 provided in the wall unit 21. Since the wall unit 21 is temporarily fixed in contact with the flanges f2 of the two CS back stays 15a and 15b, the wall unit 21 can be easily fixed to the CS back stays 15a and 15b by welding. it can.

さらに、更新すべき燃焼室3のレンガ壁12の解体作業が完了した後、全てのCSバックステー15a,15bの下部に切れ目入れ、特定のCSバックステー15a,15bに対して倒れる方向に外力を加えると、防護壁PW(複数の壁ユニット21)を介して全てのCSバックステー15a,15bは一体化されているので、切れ目を境に同時に倒れていき、バックステー15a,15bを効率よく撤去することができる。   Furthermore, after the dismantling work of the brick wall 12 of the combustion chamber 3 to be updated is completed, a cut is made in the lower part of all the CS back stays 15a and 15b, and an external force is applied in the direction of falling with respect to the specific CS back stays 15a and 15b. In addition, since all CS backstays 15a and 15b are integrated via the protective wall PW (multiple wall units 21), they fall down at the same time, and the backstays 15a and 15b are efficiently removed. can do.

1…蓄熱室、2…炭化室、2a…窯口、3…燃焼室、10…プラットフォーム、12… レンガ壁、13…炉体金物、14a,14b,15a,15b…バックステー、20…解体機械、21…壁ユニット、24…コッター係合部材、27…コッター用スリット、28…足場、30…コッター、32…重機、f1,f2…フランジ、w…ウェブ、CS…コークスサイド、MS…マシンサイド、PW…防護壁   DESCRIPTION OF SYMBOLS 1 ... Thermal storage chamber, 2 ... Carbonization chamber, 2a ... Kiln opening, 3 ... Combustion chamber, 10 ... Platform, 12 ... Brick wall, 13 ... Furnace body hardware, 14a, 14b, 15a, 15b ... Backstay, 20 ... Demolition machine , 21 ... wall unit, 24 ... cotter engagement member, 27 ... cotter slit, 28 ... scaffold, 30 ... cotter, 32 ... heavy machinery, f1, f2 ... flange, w ... web, CS ... coke side, MS ... machine side , PW ... Protective wall

Claims (4)

炉団方向に炭化室と燃焼室とが交互に配置されたコークス炉の更新すべき燃焼室のレンガ壁を解体するに際し、
前記コークス炉のマシンサイド及びコークスサイドの一方のサイドに解体機械を配置し、
前記更新すべき燃焼室の近傍の前記マシンサイド及び前記コークスサイドの他方のサイドで開口している前記炭化室の窯口などの開口部位を防護壁で閉塞した後、
前記解体機械により、前記更新すべき燃焼室の前記レンガ壁を前記一方のサイドから前記他方のサイドに向かって解体していくとともに、
前記他方のサイドの側壁に、前記炉団方向に互いに離間して立設し、炉体金物を介して前記レンガ壁を支持する一対のバックステーが配置されており、これら一対のバックステーに前記防護壁を固定することで前記開口部位を閉塞することを特徴とするコークス炉の更新方法。
When dismantling the brick wall of the combustion chamber to be renewed in a coke oven in which carbonization chambers and combustion chambers are alternately arranged in the furnace group direction,
Disposing a dismantling machine on one side of the coke oven machine side and coke side;
After closing an opening portion such as a kiln opening of the carbonization chamber opened on the other side of the machine side and the coke side in the vicinity of the combustion chamber to be updated with a protective wall,
While dismantling the brick wall of the combustion chamber to be updated from the one side toward the other side by the demolition machine ,
On the other side wall, a pair of back stays are arranged to be spaced apart from each other in the furnace group direction and support the brick wall via a furnace body hardware. A method for renewing a coke oven , wherein the opening is closed by fixing a protective wall .
前記一対のバックステーは、前記側壁から外方に延在するウェブと、このウェブの外方端部に直交して延在するフランジを有する鋼材であり、
前記防護壁は、複数の分割された壁ユニットで構成されており、
各壁ユニットを、吊り手段で吊り下げて前記一対のバックステーの前記フランジ及び前記ウェブで囲まれた空間に挿入し、所定の高さ位置まで昇降移動した後、前記フランジに固定することを特徴とする請求項1記載のコークス炉の更新方法。
The pair of backstays is a steel material having a web extending outward from the side wall and a flange extending perpendicular to the outer end of the web,
The protective wall is composed of a plurality of divided wall units,
Each wall unit is suspended by a suspension means, inserted into the space surrounded by the flange and the web of the pair of backstays, moved up and down to a predetermined height position, and then fixed to the flange. The coke oven renewal method according to claim 1.
仮固定手段により前記一対のバックステーの前記フランジの内側に当接するように前記壁ユニットを仮固定した後、溶接により前記壁ユニットを前記一対のバックステーに固定することを特徴とする請求項2記載のコークス炉の更新方法。 3. The wall unit is fixed to the pair of back stays by welding after temporarily fixing the wall unit so as to contact the inside of the flange of the pair of back stays by temporary fixing means. How to update the described coke oven. 前記防護壁を固定している全ての前記バックステーの下部に切れ目を入れ、この切れ目に沿って特定のバックステーに対して倒れる方向に外力を加えることを特徴とする請求項1乃至の何れか1項に記載のコークス炉の更新方法。 Scored at the bottom of all of said backstay securing the protective wall, one of claims 1 to 3, characterized in that an external force is applied in a tilting direction with respect to a particular backstay along the cut updating method coke oven according to any one of claims.
JP2013140882A 2013-07-04 2013-07-04 How to update the coke oven Active JP5983548B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2013140882A JP5983548B2 (en) 2013-07-04 2013-07-04 How to update the coke oven

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2013140882A JP5983548B2 (en) 2013-07-04 2013-07-04 How to update the coke oven

Publications (2)

Publication Number Publication Date
JP2015013937A JP2015013937A (en) 2015-01-22
JP5983548B2 true JP5983548B2 (en) 2016-08-31

Family

ID=52435911

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2013140882A Active JP5983548B2 (en) 2013-07-04 2013-07-04 How to update the coke oven

Country Status (1)

Country Link
JP (1) JP5983548B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6680275B2 (en) * 2017-07-12 2020-04-15 Jfeスチール株式会社 Foreign matter removal method
JP7135359B2 (en) * 2018-03-22 2022-09-13 日本製鉄株式会社 How to dismantle a coke oven
US20220121113A1 (en) 2019-01-23 2022-04-21 Basf Se Oxime ester photoinitiators having a special aroyl chromophore
CN115210219A (en) 2020-03-04 2022-10-18 巴斯夫欧洲公司 Oxime ester photoinitiators

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0820778A (en) * 1994-07-06 1996-01-23 Kawasaki Steel Corp Temporary cover for repairing coke oven wall
JP3574408B2 (en) * 2001-01-24 2004-10-06 シンコー株式会社 Composition method of curing wall for demolition work and movable curing wall
JP2006152136A (en) * 2004-11-30 2006-06-15 Jfe Steel Kk Method for re-erecting brick wall in combustion chamber of coke oven
US20080209849A1 (en) * 2007-03-02 2008-09-04 Saturn Machine & Welding Co., Inc. Method and Apparatus for Replacing Coke Oven Wall
JP4784898B2 (en) * 2008-11-04 2011-10-05 株式会社ナベカヰ Boiler facility demolition method
US9470006B2 (en) * 2011-10-20 2016-10-18 DESPE S.p.A. Equipment and method for demolishing a building

Also Published As

Publication number Publication date
JP2015013937A (en) 2015-01-22

Similar Documents

Publication Publication Date Title
JP5983548B2 (en) How to update the coke oven
KR100541024B1 (en) Method of repairing a coke oven buckstay and a moving device for use in such method
JP5050694B2 (en) Heat insulation box for repairing coke oven carbonization chamber and method for repairing coke oven
JP6720005B2 (en) Coke oven dismantling method
JP6482484B2 (en) Furnace trolley carrying module blocks for coke oven repair
CN106996698B (en) A kind of dismounting and discharge method of coke dry quenching furnace inner lining refractory
JP2017137446A (en) In-pile import method of module block
JP6720004B2 (en) Coke oven dismantling method
CN103759538B (en) Heating furnace burner block replacing method capable of reserving furnace top
JP6496701B2 (en) Furnace trolley carrying module blocks for coke oven repair
JP6702026B2 (en) Coke oven brick dismantling method
JP6587951B2 (en) Heavy machinery cart that transports heavy machinery for dismantling the coke oven combustion chamber
JP5169034B2 (en) Coke dry fire extinguishing equipment construction and repair method
JP2008075295A (en) Chimney dismantling method
JP6678481B2 (en) Equipment for replacing and repairing long parts of coke ovens
JP4049310B2 (en) Hot repair method for coke oven carbonization chamber wall
JP2006036934A (en) Method for construction of temporary shed for coke oven and coke oven
JP2011132559A (en) Truck-type heating furnace
CN211821692U (en) Open-type hot metal bottle is with tearing open jar safety protection dolly
JP6375686B2 (en) Coke oven temporary roof and coke oven construction method
JP6224463B2 (en) Dismantling method of fireproof coating layer inside chimney
JP2016500632A (en) Method for cleaning tank melting furnace for making glassware
CN102199678B (en) Method for quickly dismantling steel bricks of furnace throat of blast furnace
CN103575110B (en) A kind of heating furnace furnace roof hanging beam constructing structure
CN218192526U (en) Ladle unpacking station

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20150223

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20151124

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20160120

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20160705

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20160718

R150 Certificate of patent or registration of utility model

Ref document number: 5983548

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250